Document Details


PURL
Title:
SUBSTITUTE POISON FOR THE VERTICAL SAFETY SYSTEMS
Author(s):
Subject Terms:
100 AreasB ReactorC ReactorD ReactorDR ReactorF ReactorH ReactorHANFORD PRODUCTION REACTORSKE ReactorKW ReactorN ReactorPOISON PROCEDURESREACTOR CONTROLReactor TechnologyVERTICAL SAFETY SYSTEM
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1957 Nov 26
Declassification Date:
1992 Dec 01
Declassification Status:
Declassified
Document Pages:
5
Accession Number:
RL-1-366523
Document Number(s):
HW-53689
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Aug 24
Description/Abstract:
DISCUSSES (1) REMOVAL FROM SERVICE OF MORE VSR'S THAN PERMITTED BY PROCESS STANDARDS AND (2) REMOVAL FROM SERVICE OF ALL VSR'S. CALCULATES THE AMOUNT OF POISION REQUIRED TO DUPLICATE THE EFFECT OF THE VSR'S FOR THE FIRST CASE AND THE TOTAL CONTROL REQUIREMENT FOR AN OPTIMUM POISON LOADING IN THE SECOND CASE. THESE RESULTS PROVIDE A BASIS FOR DETEMINING ALTERNATE POISON LOADINGS EQUIVALENT TO THE VSR SYSTEMS.


<< Return to Search Results