Document Details


PURL
Title:
DEEPWELL TURBINE PUMP LIQUID THROTTLE BUSHING LEAKAGE
Author(s):
Subject Terms:
B PLANT/WESFEQUIPMENTFUELS AND MATERIALS ENGINEERINGLEAKSPLUTONIUM FINISHING PLANTPUMP PERFORMANCEPUMPSREDOXSEPARATION PROCESSEST PLANT
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1957 Dec 09
Declassification Date:
1960 May 13
Declassification Status:
Declassified
Document Pages:
14
Accession Number:
RL-1-366468
Document Number(s):
HW-53530
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Aug 28
Description/Abstract:
A STUDY HAD BEEN MADE TO DETERMINE THE CAUSE AND REMEDY FOR EXCESSIVE LEAKAGE AND PREMATURE FAILURE OF HAPO SEPARATIONS PLANT DEEPWELL TURBINE PUMPS. THIS REPORT PRESENTS THE PROBABLE CAUSES OF LEAKAGE AND A METHOD FOR REDUCING IT TO MORE TOLERABLE QUANTITIES.


<< Return to Search Results