Document Details


PURL
Title:
25-3 POWER REACTOR PRELIMINARY REVIEW OF ELECTRIC GENERATING FACILITIES
Author(s):
Subject Terms:
Electric Generating FacilitiesHANFORD DUAL PURPOSE REACTORPOWER RECOVERY
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1957 Sep 26
Declassification Date:
1981 Aug 03
Declassification Status:
Declassified
Document Pages:
18
Accession Number:
RL-1-366415
Document Number(s):
HW-53393
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Aug 24
Description/Abstract:
PRELIMINARY INFORMATION ON (1) APPROXIMATE SIZE OF MAJOR EQUIPMENT REQUIRED FOR A FACILITY TO GENERATE 300 MW OF ELECTRIC POWER (2) QUANTITY AND QUALITY OF STEAM THAT MAY BE GENERATED AND METHODS OF DIPOSING OF EXCESS HEAT (3) QUANTITY OF COOLING WATER REQUIRED (4) COMPARISON OF ELECTRIC GENERATING FACILITY BASED ON DUAL PURPOSE REACTORS OPERATING WITH BULK OUTLET TEMPERATURES OF 580 AND 475F.


<< Return to Search Results