Title:
HORIZONTAL ROD CALIBRATIONS, KW PILE PRELIMINARY REPORT -- PRODUCTION TEST IP-76-C
Subject Terms:
CONTROL ROD CALIBRATIONFUEL FABRICATIONFUELS AND MATERIALS ENGINEERINGHANFORD PRODUCTION REACTORSKW REACTORPT-IP-76-C
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1957 Jun 12
Declassification Date:
1992 Nov 10
Declassification Status:
Declassified
Accession Number:
RL-1-365785
Document Number(s):
HW-50714
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jun 12
Description/Abstract:
PRESENTS PRELIMINARY RESULTS OF PARTIAL CALIBRATION OF THE 2-ROD HCR SYSTEM AT KW PILE. FIVE GRAPHS ARE INCLUDED.