Document Details


PURL
Title:
PROBOLOGING PROCESS TUBES PRIOR TO REPLACEMENT
Author(s):
Subject Terms:
100 AreasB ReactorD ReactorF ReactorH ReactorHANFORD PRODUCTION REACTORSMetallurgyReactor TechnologyTUBE CORROSIONTUBE REPLACEMENT
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1957 Jan 28
Declassification Date:
1981 Jul 24
Declassification Status:
Declassified
Document Pages:
6
Accession Number:
RL-1-365045
Document Number(s):
HW-48025
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 24
Description/Abstract:
SUGGESTS THAT MIN WALL THICKNESS OF ALL PROCESS TUBES BE DETD BY USE OF PROBOLOG BEFORE REPLACEMENT OF THE TUBES, THAT THE MIN WALL THICKNESS BE CHANGED FROM 25 TO 28 MILS, THAT THE RESULTS OF PROBOLOG MEASUREMENTS BE USED TO DEVELOP MORE ACCURATE FORMULAS FOR TUBE CORROSION CALCULATIONS. GIVES REASONS FOR THESE SUGGESTIONS.


<< Return to Search Results