Title:
PROTOTYPE OPERATIONAL CHARGE-DISCHARGE SYSTEM CRITERIA
Subject Terms:
100 AreasFuel HandlingHANFORD PRODUCTION REACTORSLOADING-UNLOADING MECHANISMSReactor Technology
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1956 Nov 30
Declassification Date:
1981 Apr 06
Declassification Status:
Declassified
Accession Number:
RL-1-364787
Document Number(s):
HW-47016
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Aug 28
Description/Abstract:
GENERAL REQUIREMENTS & REQUIREMENTS FOR EACH FACILITY - FRONT NOZZLE EQUIPMENT, REAR NOZZLE EQUIPMENT, AUXILIARY WATER EQUIPMENT, TRAJECTORY CONTROL, RUPTURE MONITORING SYSTEM, CHARGING MACHINE, CONTROL AND INSTRUMENTATION SYSTEM - FOR THE CHARGE-DISCHARGE PROGRAM WHICH WILL RESULT IN 112 TUBES BEING EQUIPPED AT 105-C REACTOR.