Document Details


PURL
Title:
DOSIMETRY OF PLUTONIUM FABRICATION - INTERIM REPORT
Author(s):
Subject Terms:
200 West AreaDOSAGE DETERMINATIONSPlutonium Finishing PlantPLUTONUM - PERMISSIBLE LIMITSPPF PROCESS - RADIOLOGICAL MONITORINGRadiation and Radiation ProtectionSeparation Processes and Procedures
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1956 Oct 02
Declassification Date:
1973 Mar 27
Declassification Status:
Declassified
Document Pages:
12
Accession Number:
RL-1-364464
Document Number(s):
HW-45600
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jun 26
Description/Abstract:
BRIEF SUMMARY OF RADN EXPOSURE CURRENTLY AUTHORIZED FOR ROUTINE EXPOSURE ACCOUNTABILITY ON PORTIONS OF THE RMA LINE, 234-5 BUILDING. EXPOSURES HAVE BEEN CHANGED TO BE CONSISTENT WITH THE STATISTICAL THEORY OF "LOG NORMAL" DISTRIBUTIONS. EXPOSURES FOR ROUTINE CALCULATIONS COVER MODELS 200, 250, 110 AND 130.


<< Return to Search Results