Document Details
Title:
1706-KER DUMP VALVE OPERATION AT PILE SCRAM PLUS ONE MINUTE
Author(s):
Subject Terms:
100 AreasEXPERIMENTAL FACILITIESHANFORD PRODUCTION REACTORS (KE)KE ReactorReactor TechnologySHUTDOWNSLUG ELEMENTS - TEMPERATURES
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1956 Sep 07
Declassification Date:
1992 Oct 22
Document Pages:
6
Accession Number:
RL-1-364426
Document Number(s):
HW-45479-RD
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Aug 24
Description/Abstract:
CONCLUDES THAT SHOULD A SWITCH OVER TO PROCESS WATER (IN A KER TUBE) TAKE PLACE ONE MINUTE AFTER SCRAM, THE SLUGS IN THE KER TUBE WOULD NOT EXCEED A SURFACE TEMPERATURE OF 450C.
