Title:
REACTOR BUILDING DOSE RATES ASSOCIATED WITH BALL VALVE OPERATION
Subject Terms:
100 AreasC ReactorENVIRONS MONITORINGHANFORD PRODUCTION REACTORSRadiation and Radiation ProtectionRADIATION FROMSHIELDING
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1956 Jun 19
Declassification Status:
Declassified
Accession Number:
RL-1-364024
Document Number(s):
HW-43814
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 02
Description/Abstract:
THE DOSE RATES ARE TABULATED. THE HIGH DOSE RATES INDICATE THE NEED FOR ADDITIONAL REAR FACE SHIELDING OR AN EVACUATION OF ALL AFFECTED AREAS PRIOR TO EXTENSIVE USE OF THIS DISCHARGE METHOD. THE INSTALLATION OF THE REQUIRED ADDITIONAL SHIELDING IS RECOMMENDED CONCURRENTLY WITH THE MODIFICATION OF ADDITIONAL PROCESS TUBES.