Title:
INSTALLATION OF AUXILIARY DISSOLVER OFF-GAS HEATERS AT PUREX
Subject Terms:
EQUIPMENTPLANTSPUREXPUREX PROCESS - IODINE REMOVAL
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1956 May 14
Declassification Date:
1981 Jul 16
Declassification Status:
Declassified
Accession Number:
RL-1-363785
Document Number(s):
HW-43035
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 27
Description/Abstract:
SUMMARIZES THE ENG STUDY COVERING THE FEASIBILITY OF INCREASING THE OPERATING TEMPERATURES OF THE PUREX DISSOLVER OFF-GAS AG REACTORS FOR IMPROVED I2 EMISSION CONTROL. THE INSTALLATION OF AUXILIARY HEATING FACILITIES SHOULD INCREASE THE LIMITED PLANT FLEXIBILITY DURING THE INTERIM BEFORE PROJECT CG-647 IS COMPLETED. DESIGN MODIFICATIONS, COSTS, ALTERNATE DESIGNS CONSIDERED.