Document Details


PURL
Title:
105-KE POWER LEVELS AND FLOW REQUIREMENT FORECAST
Author(s):
Subject Terms:
100 AreasCOOLANT SUPPLIESHANFORD PRODUCTION REACTORS (KE)KE ReactorPOWER LEVELReactor Technology
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1956 May 02
Declassification Date:
1992 Oct 13
Declassification Status:
Declassified
Document Pages:
8
Accession Number:
RL-1-363755
Document Number(s):
HW-42986
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Aug 24
Description/Abstract:
ATTEMPTS TO CLARIFY THE SITUATION AND PROVIDE A BASIS FOR FUTURE PLANNING. PRESENTS KE OPERATIONS SCHEDULE FOR POWER LEVELS. DISCUSSES (1) FACTORS LIMITING POWER LEVEL (2) MAGNITUDE OF STEPWISE INCREASES (3) DETERMINATION OF FLOW REQUIREMENTS AND LIMINTING CONDITIONS AT EACH LEVEL.


<< Return to Search Results