Document Details


PURL
Title:
SUPPLEMENT A, PRODUCTION TEST 105-550-E -- OPERATION OF THE IN-PILE FACILITIES OF THE 1706-KE SEMI-WORKS
Author(s):
Subject Terms:
100 AreasALUMINUMCORROSIONEXPERIMENTAL FACILITIESFuels and Materials EngineeringHANFORD PRODUCTION REACTORSKE REACTORMELTINGMetallurgyPT-105-550-E, SUPPL ARADIATION EFFECTSReactor Technology
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1956 Feb 24
Declassification Date:
1992 Sep 25
Declassification Status:
Declassified
Document Pages:
7
Accession Number:
RL-1-363337
Document Number(s):
HW-41636
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 30
Description/Abstract:
OBJECTIVE: TO EVALUATE THE EFFECTS OF PILE RADIATION ON AL CORROSION. INCLUDES "TIME REQUIRED TO MELT ALUMINUM IN TUBE 2943-KE AFTER COMPLETE LOSS OF WATER".


<< Return to Search Results