Document Details


PURL
Title:
METAL PREPARATION SECTION EQUIPMENT CAPACITY REQUIREMENTS FOR I amp;E LEAD DIP PRODUCTION
Subject Terms:
300 AreaCastingFuel FabricationFuels and Materials EngineeringLEAD-DIPPROCESS EFFICIENCYSLUG CANNING (HOLLOW)
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1956 Feb 02
Declassification Date:
1981 Jul 10
Declassification Status:
Declassified
Document Pages:
7
Accession Number:
RL-1-363204
Document Number(s):
HW-41101
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 24
Description/Abstract:
AN OUTLINE OF REQUIREMENTS FOR PRODUCTION OF I & E SLUG ELEMENTS AT PRESENT PRODUCTION RATES.


<< Return to Search Results