Document Details


Title:
ENRICHED URANIUM TESTING PROGRAM
Author(s):
Subject Terms:
FUEL FABRICATIONFUELS AND MATERIALS ENGINEERINGHANFORD PRODUCTION REACTORSPRODUCTIONREACTOR LOADINGTRITIUMTRITIUM PRODUCTION
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1956 Jan 11
Declassification Date:
1992 Sep 22
Declassification Status:
Declassified
Document Pages:
8
Accession Number:
RL-1-363058
Document Number(s):
HW-40555
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2016 Jul 07
Description/Abstract:
OUTLINES BASIC AND JUSTIFICATION OF A PRELIMINARY TEST AND FOUR BASIC TESTS TO DEMONSTRATE THE PRACTICALITY OF (1) PRODUCING TRITIUM FROM AN ENRICHED U LOADING USING METAL OF 0.94% U-235 ISOTOPE LEVEL (2) REPLACING U-235 ALLOY SLUGS WITH ENRICHED U SLUGS FOR SPIKE ENRICHMENT.


<< Return to Search Results