Document Details


PURL
Title:
FEASIBILITY REPORT -- INSTALLATION OF THE 231 BUILDING ISOLATION PROCESS IN 224-T.
Author(s):
Subject Terms:
231-ZBISMUTH PHOSPHATE PROCESSISOLATIONPROCESS PLANTST PLANT
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1955 Nov 14
Declassification Date:
1992 Sep 11
Declassification Status:
Declassified
Document Pages:
22
Accession Number:
RL-1-362856
Document Number(s):
HW-39871-RD
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jun 11
Description/Abstract:
THE 224-T ISOLATION PROCESS WILL PERFORM THE PURIFICATION AND CONCENTRATION OF THE T PLANT PRODUCT STREAM AS IS PRESENTLY DONE IN THE 231 BUILDING. THREE ALTERNATE METHODS WERE STUDIED.


<< Return to Search Results