Document Details


PURL
Title:
INTERIM REPORT, PRODUCTION TEST 105-542-E -- REDUCTION OF THE AMOUNT OF DICHROMATE ADDED TO PILE COOLING WATER
Author(s):
Subject Terms:
100 AreasColumbia RiverCOOLANT LEAKAGECOOLANT PROCESSINGCORROSIOND ReactorMetallurgyPT-105-542-EReactor TechnologySLUG ELEMENTS FAILURE IN REACTORSTUBE CORROSION
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1955 Sep 09
Declassification Date:
1981 Jul 07
Declassification Status:
Declassified
Document Pages:
13
Accession Number:
RL-1-362597
Document Number(s):
HW-38919
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 13
Description/Abstract:
THE FAR SIDE OF D PILE OPERATED FOR OVER A YEAR WITH 0.5 PPM NA2CR207 ON THE PROCESS H20. SLUG FAILURES AND THE TUBE LEAKS WERE EXCESSIVE IN THIS ZONE BUT CAN BE ATTRIBUTED TO OPERATIONAL DIFFICULTIES. RECOMMENDS THAT THIS TEST BE CONTINUED UNTIL CONCLUSIVE RESULTS CAN BE OBTAINED.


<< Return to Search Results