Document Details


PURL
Title:
INTERIM REPORT NO. 5, PRODUCTION TEST NO. 105-506-E -- RECIRCULATION OF PILE COOLING WATER
Author(s):
Subject Terms:
ALUMINUMCOOLANT PROCESSINGCOOLANT RADIOACTIVITYCOOLANT RICIRCULATIONCOOLANT TEMPERATURECOOLING SYSTEMEXPERIMENTAL FACILITIESFUELS AND MATERIALS ENGINEERINGH REACTORHIGH TEMPERATURE CORROSIONMETALLURGYREACTOR TECHNOLOGYSLUG ELEMENTS CORROSIONZIRCONIUM
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1955 Nov 15
Declassification Date:
1992 Sep 09
Declassification Status:
Declassified
Document Pages:
58
Accession Number:
RL-1-362536
Document Number(s):
HW-38766
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Aug 26
Description/Abstract:
RESULTS FROM 5 RUNS IN THE H-PILE HIGH TEMPERATURE RECIRCULATION LOOP ARE REPORTED. THE RUNS WERE MADE USING A ZR PROCESS TUBE, WITH OUTLET TEMPERATURES UP TO 200 C, DURING THE PERIOD FROM OCTOBER 1954 TO AUGUST 1955. SLUG CORROSION, ACTIVIATITY PROBLEMS AND WATER QUALITY ARE DISCUSSED. AN IN-PILE BOILING EXPERIMENT IS ALSO DESCRIBED.


<< Return to Search Results