Title:
FINAL REPORT ON PRODUCTION TEST 105-514-A -- INSTALLATION OF THERMOCOUPLES IN PROCESS CHANNELS
Subject Terms:
D ReactorINSTRUMENTATIONMODERATOR TEMPERATURESReactor TechnologyTHERMOCOUPLES PERFORMANCE
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1955 Aug 08
Declassification Date:
1992 Sep 09
Declassification Status:
Declassified
Accession Number:
RL-1-362469
Document Number(s):
HW-38541
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Aug 19
Description/Abstract:
TWO CHANNEL THERMOCOUPLE ASSEMBLIES WERE INSTALLED IN TUBE CHANNEL 2166 AND 2182-D ALONG WITH A NEW C HOLE THERMOCOUPLE STRINGER. THE RELATIONSHIPS BETWEEN THE THERMOCOUPLES OF DIFFERENT WIRE COMPOSITION DURING EQUILBRIUM, SHUTDOWN AND STARTUP OPERATION.