Title:
WELDING BOOTH VENTILATION 313 BUILDING
Subject Terms:
FUELS AND MATERIALS ENGINEERINGSAFETYSLUG CANNINGVENTILATIONWELDING
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1955 Aug 01
Declassification Date:
2000 Jun 26
Declassification Status:
Declassified
Accession Number:
RL-1-362385
Document Number(s):
HW-38276
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 02
Description/Abstract:
THIS REPORT PRESENTS RESULTS OF AIR FLOW SMOKE TESTS CONDUCTED IN THE 313 BUILDING WELDING BOOTHS AND DESIGN ENGINEERING'S RECOMMENDATIONS FOR VENTILATION MODIFICATION. THE TESTS WERE PERFORMED TO ESTABLISH A COMPATIBLE BALANCE BETWEEN VENTILATION REQUIREMENTS OF PERSONNEL AND THE QUANTITY OF VENTILATION PERMITTED BY THE WELDING PROCESS WITHOUT DELETERIOUS EFFECTS.