Title:
ASSEMBLY OF BIOLOGICAL SHIELD BLOCKS ON B, D, F, DR, H AND C REACTORS
Subject Terms:
100 AREA ALL REACTORS
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1955 Jan 07
Declassification Date:
1956 Jun 04
Declassification Status:
Declassified
Accession Number:
RL-1-361266
Document Number(s):
HW-34156
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Jan 09
OpenNet Modified Date:
2015 Aug 28
Description/Abstract:
ANY LOAD PLACED ON THE OUT TIE STRAPS ON THE FRONT FACE WOULD BE TRASMITTED THROUGH THE PLUG WELDS AND STUDS TO THE OUTER STEEL LAMINATION OF THE B-BLOCK, THEN THROUGH THE STEEL TUBES TO THE INNER STEEL LAMINATION OF THE B-BLOCK. THE LOAD WOULD THEN BE TRANSMITTED TO THE INNER TIE PLATES OF THE FRONT B-SHIELD. REAR B-BLOCKS HAVE ALSO BEEN STUDIES. DETAILS OF THE FINDINGS ARE GIVEN