Document Details


PURL
Title:
INTERIM REPORT ON PRODUCTION TEST 105-522-E -- EXAMINATION OF PILE PROCESS TUBES REMOVED FROM 100-DR AND 100-B PILES
Author(s):
Subject Terms:
100 AreasALUMINUMB ReactorDR ReactorFuels and Materials EngineeringMetallurgyReactor TechnologyREACTOR TUBES
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1954 Dec 23
Declassification Date:
1992 Aug 11
Declassification Status:
Declassified
Document Pages:
21
Accession Number:
RL-1-361177
Document Number(s):
HW-33971
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Jan 09
OpenNet Modified Date:
2015 Aug 28
Description/Abstract:
EXAMNS WERE CONDUCTED ON 5 TUBES FROM DR AND 3 TUBES FROM B. WALL THICKNESS, PIT DEPTH, AND CLADDING THICKNESS MEASUREMENTS WERE MADE ON SEVERLY DAMAGED PARTS OF THE TUVES. TESTS WERE MADE TO DETERMINE BURSTING PRESSURE OF THE TUBING