Document Details


PURL
Title:
REDUCTIONS IN THE MANUFACTURING CYCLE FOR THE FLUORINATION PROCESS OF THE 234-5 BUILDING.
Author(s):
Subject Terms:
FLUORINATIONOPERATING CONTROLPLUTONIUM FINISHING PLANTPPF PROCESS - OXIDATIONSEPARATION PROCESSES AND PROCEDURES
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1954 Oct 11
Declassification Date:
1992 Jul 31
Declassification Status:
Declassified
Document Pages:
19
Accession Number:
RL-1-360937
Document Number(s):
HW-33399
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Jan 09
OpenNet Modified Date:
2015 Aug 28
Description/Abstract:
THE TIME TO EFFECT THE OXALATE-FLUORIDE CONVERSION IN TASK II HAS BEEN REDUCED FROM 8.25 TO 4.33 HOURS BY TEMPERATURE CONTROL. THIS HAS RESULTED IN A TWOFOLD INCREASE IN PRODUCTION. DISCUSSES CHEMISTRY OF PROCESS, EQUIPMENT; ORIGINAL CYCLE, INITIAL REDUCTIONS, CAKE TEMPERATURE STUDY, FAST DRYING AND OXIDATION CYCLE, PREHEATED PROCESS GASES, INITIAL FLUORINATION TEMPERATURE REDUCTION, EFFECT OF PREHEATERS AND FURTHER REDUCTION OF FLUORINATION TEMPERATURE.


<< Return to Search Results