Document Details


Title:
WEEKLY PROGRESS REPORT - TECHNICAL DIVISION FOR PERIOD ENDING DECEMBER 25, 1943
Author(s):
Subject Terms:
FUEL FABRICATIONNEUTRON FLUX MEASUREMENTSREACTOR TECHNOLOGYSEPARATION PROCESSES AND PROCEDURESSHIELDINGSLUG HANDLING - STORAGETEMPERATUREUNLOADING
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1943 Dec 30
Declassification Date:
1994 Jun 29
Declassification Status:
Declassified
Document Pages:
4
Accession Number:
RL-1-340936
Document Number(s):
GEH-20319
Originating Research Org.:
DUPONT
OpenNet Entry Date:
2004 Jan 06
OpenNet Modified Date:
2016 Jul 07
Description/Abstract:
PREDICTED HEAT LOAD IN THE SHIELDS AT THE ENDS OF THE PILE; DECAY PERIODS NECESSARY FOR GIVEN TIMES OF PILE OPERATION; MEASURING NEUTRON DENSITY BY MEANS OF A "NEUTRON THERMOMETER" ; WAITING PERIODS AFTER PUSHING A BATCH OF METAL FROM THE PILE SO THAT THE RADIATION AT VARIOUS STAGES OF THE PROCESS WILL BE TOLERABLE; STACKING OF GRAPHITE TO IMPROVE K.


<< Return to Search Results