Title:
IN-REACTOR MONITORING OF ZIRCALOY-2 PRTR PRESSURE TUBES
Subject Terms:
FUELS AND MATERIALS ENGINEERINGMETALLURGYPLUTONIUM RECYCLE TEST REACTORREACTOR TECHNOLOGYTUBE CORROSIONTUBES
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1965 Jan 27
Declassification Status:
Declassified
Accession Number:
RL-1-325751
Document Number(s):
BNWC-14
Originating Research Org.:
PNL: Pacific Northwest Laboratories
OpenNet Entry Date:
2003 Dec 22
OpenNet Modified Date:
2015 Aug 26
Description/Abstract:
96 INSPECTIONS WERE MADE DURING THE REPORTING PERIOD. GAS GAP AND ID MEASUREMENTS WERE OBTAINED FROM 16 PROCESS CHANNELS. VISUAL INSPECTIONS SHOWED THAT BOTH THE INCIDENCE AND SEVERITY OF FRETTING IS EQUAL TO OR LESS THAN THAT EXPERIENCED IN PREVIOUS REPORTING PERIOD.