Document Details


Title:
Review of G.S.P. Plant Progress
Author(s):
Kuhl, P E [Esso Laboratories]
Document Location:
LBNL Archives and Records Office, 1 Cyclotron Road, Mailstop 69-104, Berkeley, CA, 94720, (510)486-5525, (510)486-7200, jwstoner@llbl.gov
Document Categories:
Isotope Separation\Gas Centrifuge
Document Type:
REPORT
Publication Date:
1943 Dec 02
Declassification Status:
Sanitized
Document Pages:
12
Accession Number:
OOB020954
Document Number(s):
1-8-1
Originating Research Org.:
Esso Laboratories; Standard Oil Development Company
OpenNet Entry Date:
2002 May 31
OpenNet Modified Date:
2003 Sep 18
Description/Abstract:
Construction was undertaken in the summer of 1942 of a pilot centrifuge plant for separation of process gas. The original plan called for the installation of 24 machines which would be operated approximately as a section of a large plant cascade, the primary purpose being to work out the process control problems arising from multimachine operation.


<< Return to Search Results