Document Details


Title:
Response to HRB-21 Technical Assessment Recommendations and Irradiation status.
Author(s):
Kania, M J [auth.; Task Manager Fuel Materials Development]
Subject Terms:
Beryllium; HRB-21; Irradiation; Technical Assessment
Addressee:
Mills, R.R. (Plant Control Design Office)
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
Specific Material\General
Document Type:
CORRESPONDENCE, LETTERS, MEMOS
Publication Date:
1991 Jun 06
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF01198
Document Number(s):
ORO-495
Originating Research Org.:
Oak Ridge National Laboratory
OpenNet Entry Date:
1996 May 21
Description/Abstract:
Irradiation Caspsule HRB-21 is tentatively scheduled to be installed in its removable Beryllium Irradiation Facility during the next reactor shut-down June 17-21, 1991. Irradiation will began upon start-up HFIR cycle #299E continue to #304 for a total of approximately 132 full power days.