Document Details


Title:
DOE/ORO Labor Standards Committee Case Report
Author(s):
Respess, A [comp.; Energy Systems Coordinator]; Warren, S L [auth.; Medical Advisor]
Addressee:
Nichols, K.D. (Colonel; U.S Atomic Energy Comission)
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General; Science and Technology\Biology and Medicine
Document Type:
MISCELLANEOUS
Publication Date:
1995 Aug 14
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF01058
Document Number(s):
95-0599; K-1073; K1073; ORO-355; ORO355
Originating Research Org.:
Lockheed Martin Energy Systems, Inc.
OpenNet Entry Date:
1996 May 21
Description/Abstract:
This project entails the asphalt paving of general non-specific areas at the K-25 site to support general operation of the K-25 Plant Operations. These areas are located throughout the plant, approximately 30,000 square yards.


<< Return to Search Results