Document Details


Title:
DOE-ORO Labor Standards Committee Reports
Author(s):
Pickel, C G [Energy Systems Coordinator]
Subject Terms:
assembly; installation; maintenance; procurement; replacement
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General
Document Type:
MISCELLANEOUS
Publication Date:
1995 Jul 11
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF01027
Document Number(s):
95-0579
Originating Research Org.:
Lockheed Martin Energy Systems, Inc.
OpenNet Entry Date:
1995 Nov 02
Description/Abstract:
Plating 9205-Remove partition approximately 20 ft. long with 2 each 3 ft. doors and glass panels, prepare for disposal. Relocate California hood with electrical control cabinet to storage area in same room, no reconnection. Relocate existing plating tanks, 9 each, to area under the monorail. Extend existing demineralized water supply and 120 volt power to plating tanks. Extend existing 220 volt power to 3 each heaters. Run 8" flex. ducts from 5 each tanks to existing flanged exhaust header. Secure existing grit blaster to the floor, and extend existing 120 volt power and plant air to grit buster.


<< Return to Search Results