Document Details


Title:
DOE/ORO Labor Standards
Author(s):
Nook, J C [Energy Systems Coordinator]
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General
Document Type:
MISCELLANEOUS
Publication Date:
1995 Jul 18
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF00959
Document Number(s):
95-0566; 071252
Originating Research Org.:
Lockheed Martin Energy Systems, Inc.
OpenNet Entry Date:
1995 Aug 18
Description/Abstract:
This job will involve the disconnecting and removal of an existing traffic control panel cabinet and related signal control wiring and installing a new solid-state unit control unit and new control wires in their place. The removal process willl involve shutting off and removing the power supply wires, disconnecting the signal wires from the three signals at the intersection, removing wire back to the controller, disconnecting the traffic loop wires from the control panel and the unbolting and removing the control panel from the support pole. Installation of the replacement unit will require hanging the control cabinet, reconnecting the existing wiring and programming the controller and timer.


<< Return to Search Results