Document Details


Title:
Direct Replacement of HVAC Equipment
Author(s):
Benson, R D [Martin Marietta Energy Systems, Incorporated]
Subject Terms:
2000 Area; Construction; Cooling; HVAC; Heating
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General
Document Type:
LEGAL DOCUMENT
Publication Date:
1995 May 04
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF06045
Document Number(s):
Work Order 042453; 95-0396; 950396
Originating Research Org.:
Department of Energy-Oak Ridge Operations Office
OpenNet Entry Date:
1995 Jul 31
Description/Abstract:
Labor Standards Committee Case Report. Building 9201-2 is the ORNL Fusion Energy Division located at Plant Y-12. On the second floor in the southwest quadrant is the area identified as the "2000 Area". This area consists of 22 offices and 2 laboratories. The heating/cooling for this area is provided by four (4) 10-ton air handling units, which are structurally supported from the main ceiling of the building and, above an existing drop ceiling of the offices. The heating/cooling units are outdated, noisy, inefficient and are extremely costly to operate. We proposed to disconnect the existing water lines, electrical and vents from the existing units and abandon all 4 units in place. We will then install direct replacement, floor mounted heating/cooling units, tyiing into existing water lines, electrical and vent systems. There will be no demolition of the facilities associated with this work. I.(D). Assembly, modification, installation, replacement, rearrangement, connection, etc. of machinery and equipment. This work is a direct replacement of existing in place equipment. It is proposed the MMES forces perform this activity. This work is similar in nature to d/b 93-0276 and 91-0323. $67,400.


<< Return to Search Results