Title:
Thermal Desorption Pilot Demonstration Facility
Author(s):
Robertson, S K [comp.; Lockheed Martin Energy Systems, Inc.]
Subject Terms:
Building 9212; Construction; Facility Maintenance; Facility Repair; Labor
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General
Document Type:
LEGAL DOCUMENT
Publication Date:
1995 Jun 15
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF04380
Document Number(s):
95-0493; Work Order MB7423(M); WorkOrderMB7423M
Originating Research Org.:
Department of Energy-Oak Ridge Operations Office
OpenNet Entry Date:
1995 Jul 31
Description/Abstract:
Labor Standards Committee Case Report. Install test equipment and make the building modifications to the electrical distribution ventilation system as required to support the Thermal Desorption Project. Install the Kiln Boiler and Reheater. Transport the Kiln from the 2nd floor of 9212 to the site of the Thermal Desorption project. Install the Water Chiller for the Jet Condenser Unit. Install the Venturi Jet Condenser Unit in Building 9731. Equipment has been procured and is available for installation. 1.B. - Operational and maintenance activities in support of the construction contractor. 4.A. - Installation and transportation of equipment related to construction project. LMES Engineering will provide Title II and III design work as well as construction management services and final tie-ins. Special equipment procurement is by LMES. MK-Ferguson is proposed to install the equipment and supply construction management services. Work will be accomplished by MK-Ferguson direct hire. Note: This is a consolidation of 5 previous cases. $463,150