Document Details


Title:
Seismic Upgrade at Water Treatment Plant
Author(s):
McMillan, K E [Martin Marietta Energy Systems, Inc.]
Subject Terms:
Clay Tile; Construction; Earthquake
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General
Document Type:
LEGAL DOCUMENT
Publication Date:
1995 Apr 06
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF03457
Document Number(s):
95-0340
Originating Research Org.:
Department of Energy-Oak Ridge Operations Office
OpenNet Entry Date:
1995 Jul 31
Description/Abstract:
Labor Standards Committee Case Report. Work consists of furnishing labor, materials, tools, equipment, and services (except that specified to be furnished or performed by others) to construct reinforced shotcrete (spray applied concrete) shear walls in the filter gallery structure; clay tile wall bracing and modifications in the headhouse structure; steel bracing of concrete masonry walls around offices in the filter gallery structure; and structural safety fencing to prevent unreinforced masonry from falling from the filter building clerestory structure. Work shall be completed in strict accordance with the contract documents. The installation includes concrete application and steel bracing installation and installation of safety fencing and clay tiling, all of which is construction in nature. Davis Bacon rates should apply.. MK Ferguson will competitively bid fixed price subcontract for design, procurement and installation. $299,000.