Document Details


Title:
Seismic Upgrade at the Water Treatment Water Intake Bldg.
Author(s):
McMillan, K E [Martin Marietta Energy Systems, Inc.]
Subject Terms:
Construction; Earthquake; Masonry Building
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General
Document Type:
LEGAL DOCUMENT
Publication Date:
1995 Apr 06
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF03456
Document Number(s):
95-0339
Originating Research Org.:
Department of Energy-Oak Ridge Operations Office
OpenNet Entry Date:
1995 Jul 31
Description/Abstract:
Labor Standards Committee Case Report. Work consists of furnishing labor, materials, tools, equipment and services (except that specified to be furnished or performed by others) to construct upgrades to the existing unreinforced masonry building, including additional steel reinforcing, grout, and anchor bolts. Work shall be completed in accordance with the contract documents. The installation includes additional steel reinforcing, grout, and anchor bolts, all of which is construction in nature. Davis Bacon wage rates should apply. MK Ferguson will competitvely bid a fixed price subcontract for design, procurement and installation. $168,000.


<< Return to Search Results