Document Details


Title:
Repainting of Laboratory C-147-Bldg 4500S
Author(s):
Nook, J C [comp.; Martin Marietta Energy Systems, Incorporated]
Subject Terms:
Construction
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General
Document Type:
LEGAL DOCUMENT
Publication Date:
1995 Feb 16
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF00675
Document Number(s):
95-0219; Work Order 021452; WorkOrder021452
Originating Research Org.:
Department of Energy-Oak Ridge Operations Office
OpenNet Entry Date:
1995 Feb 28
Description/Abstract:
Labor Standards Committee Case Report: Patch miscellaneous holes and chips in the plaster in preparation for painting. Paint Lab walls as required to prepare Lab for new laser research effort. This painting is to reduce dust in the Lab to minimize dust which would degrade the laser optics performance. Experience with past MMES craft work and material costs from existing AVID contractor were used to estimate the costs of this job. It is propossed that P&E crafts be permitted to perform this work. The work is to be performed in a working Lab and the use of MMES crafts will minimize interruption of the existing research. $4,500.


<< Return to Search Results