Document Details


Title:
West Hood Replacement, Chip Burner
Author(s):
Power, W H [comp.; Martin Marietta Energy Systems, Incorporated]
Subject Terms:
Construction; Hoods
Document Location:
DOE INFORMATION CENTER 1 Science.gov Way, Oak Ridge, TN 37831; Eva Butler; Phone: 865-241-4780; Toll-Free: 800-382-6938, Option 6; FAX: 865-574-3521; Email: doeic@oro.doe.gov
Document Categories:
General, Miscellaneous, Administrative and Historical\General
Document Type:
LEGAL DOCUMENT
Publication Date:
1995 Feb 16
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
ORF00668
Document Number(s):
95-0228; Work Order S-2762; WorkOrderS2762
Originating Research Org.:
Department of Energy-Oak Ridge Operations Office
OpenNet Entry Date:
1995 Feb 28
Description/Abstract:
Labor Standards Committee Case Report: Provide engineering, procurement and construction to install a glovebox arrangement to house two existing chip burners in Room 1010 of Building 9212. Room 1010 is located in a Materials Access Area (MAA). Installation involving substantial construction of a new glovebox arrangement. Rev. 1: Changed the participant involvement from the -41 (Maintenance) to -61 (added) to reflect construction by the on-site contractor direct hire forces. This change is made possible by the recent scheduling of downtime of all operations in Room 1010. As a result of the operation schedules, the construction site can safely be isolated from process activities. The project cost estimates were revised to show actual design costs, reduced procurement estimates reflecting recent vendor quotations, and to show the costs estimated for the construction manager direct hire forces activities. Ref. Case No. 90-1039. $666,000.


<< Return to Search Results