Document Details
Title:
Pressurized Water Reactor, Shippingport, PA.
Subject Terms:
AEC Division of Construction
Document Location:
Office of Management, Office of History and Heritage Resources, 1000 Independence Avenue, SW, Washington, DC 20585
Document Categories:
General, Miscellaneous, Administrative, Historical, and Multi-Disciplined Progress Reports\General
Document Type:
PHOTO
Publication Date:
1955 Aug 22
Declassification Status:
Never classified
Document Pages:
2
Accession Number:
AECDC-B05F49P054
Originating Research Org.:
Westinghouse Electric Corp. Atomic Power Div., Pittsburgh
OpenNet Entry Date:
2019 May 29
OpenNet Modified Date:
2019 May 29
Description/Abstract:
Pressurized Water Reactor (PWR) Project; View of main excavation looking Northeast. In left background is B & R crane placing steel pile for screen and pump house. Left center is shovel excavating unsuitable foundation material under structures to be erected north of the Turbine Room. Right center is Navarro crane setting reinforced steel in Pours 2A and 2B.
