National Library of Energy BETA

Sample records for white oak creek

  1. The development of an aquatic spill model for the White Oak Creek watershed, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Johnson, R.O.

    1996-05-01

    This study develops an aquatic spill model applicable to the White Oak Creek watershed draining the Oak Ridge National Laboratory. Hazardous, toxic, and radioactive chemicals are handled and stored on the laboratory reservation. An accidental spill into the White Oak Creek watershed could contaminate downstream water supplies if insufficient dilution did not occur. White Oak Creek empties into the Clinch River, which flows into the Tennessee River. Both rivers serve as municipal water supplies. The aquatic spill model provides estimates of the dilution at sequential downstream locations along White Oak creek and the Clinch River after an accidental spill of a liquid containing a radioactively decaying constituent. The location of the spill on the laboratory is arbitrary, while hydrologic conditions range from drought to extreme flood are simulated. The aquatic spill model provides quantitative estimates with which to assess water quality downstream from the site of the accidental spill, allowing an informed decision to be made whether to perform mitigating measures so that the integrity of affected water supplies is not jeopardized.

  2. White Oak Creek Watershed topographic map and related materials

    SciTech Connect

    Farrow, N.D.

    1981-04-01

    On March 22, 1978 a contract was let to Accu-Air Surveys, Inc., of Seymour, Indiana, to produce a topographic map of the White Oak Creek Watershed. Working from photography and ground control surveys, Accu-Air produced a map to ORNL's specifications. The map is in four sections (N.W., N.E., S.W., S.E.) at a scale of 1:2400. Contour intervals are 5 ft (1.5 m) with accented delineations every 25 ft (7.6 m). The scribe method was used for the finished map. Planimetric features, roads, major fence lines, drainage features, and tree lines are included. The ORNL grid is the primary coordinate system which is superimposed on the state plain coordinates.

  3. White Oak Creek Embayment site characterization and contaminant screening analysis

    SciTech Connect

    Blaylock, B.G.; Ford, C.J.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.

    1993-01-01

    Analyses of sediment samples collected near the mouth of White Oak Creek during the summer of 1990 revealed [sup 137]Cs concentrations [> 10[sup 6] Bq/kg dry wt (> 10[sup 4] pCi/g dry wt)] near the sediment surface. Available evidence indicates that these relatively high concentrations of [sup 137]Cs now at the sediment surface were released from White Oak Dam in the mid-1950s and had accumulated at depositionalsites in the embayment. These accumulated sediments are being eroded and transported downstream primarily during winter low-water levels by flood events and by a combination of normal downstream flow and the water turbulence created by the release of water from Melton Hill Dam during hydropower generation cycles. This report provides a more thorough characterization of the extent of contamination in WOCE than was previously available. Environmental samples collected from WOCE were analyzed for organic, inorganic, and radiological contaminants in fish, water, and sediment. These results were used to conduct a human health effects screening analysis. Walkover radiation surveys conducted inside the fenced area surrounding the WOCE at summer-pool (741 ft MSL) and at winter-pool (733 ft MSL) level, indicated a maximum exposure rate of 3 mR h[sup 1] 1 m above the soil surface.

  4. Simulation of contaminated sediment transport in White Oak Creek basin

    SciTech Connect

    Bao, Y.; Clapp, R.B.; Brenkert, A.L.; Moore, T.D.; Fontaine, T.A.

    1995-12-31

    This paper presents a systematic approach to management of the contaminated sediments in the White Oak Creek watershed at Oak Ridge National Laboratory near Oak Ridge, Tennessee. The primary contaminant of concern is radioactive cesium-137 ({sup 137}Cs), which binds to soil and sediment particles. The key components in the approach include an intensive sampling and monitoring system for flood events; modeling of hydrological processes, sediment transport, and contaminant flux movement; and a decision framework with a detailed human health risk analysis. Emphasis is placed on modeling of watershed rainfall-runoff and contaminated sediment transport during flooding periods using the Hydrologic Simulation Program- Fortran (HSPF) model. Because a large number of parameters are required in HSPF modeling, the major effort in the modeling process is the calibration of model parameters to make simulation results and measured values agree as closely as possible. An optimization model incorporating the concepts of an expert system was developed to improve calibration results and efficiency. Over a five-year simulation period, the simulated flows match the observed values well. Simulated total amount of sediment loads at various locations during storms match with the observed values within a factor of 1.5. Simulated annual releases of {sup 137}Cs off-site locations match the data within a factor of 2 for the five-year period. The comprehensive modeling approach can provide a valuable tool for decision makers to quantitatively analyze sediment erosion, deposition, and transport; exposure risk related to radionuclides in contaminated sediment; and various management strategies.

  5. White Oak Creek watershed: Melton Valley area Remedial Investigation report, at the Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 2, Appendixes A and B

    SciTech Connect

    1996-11-01

    This document contains Appendixes A ``Source Inventory Information for the Subbasins Evaluated for the White Oak Creek Watershed`` and B ``Human Health Risk Assessment for White Oak Creek / Melton Valley Area`` for the remedial investigation report for the White Oak Creek Watershed and Melton Valley Area. Appendix A identifies the waste types and contaminants for each subbasin in addition to the disposal methods. Appendix B identifies potential human health risks and hazards that may result from contaminants present in the different media within Oak Ridge National Laboratory sites.

  6. Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Blaylock, B.G.; Boston, H.L.; Huston, M.A.; Kimmel, B.L.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Kitchings, J.T.; Olsen, C.R.

    1991-09-01

    On April 1, 1986, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge National Laboratory (ORNL) (EPA 1986). As specified in Part 3: Special Conditions (Item H) of the permit, a plan for biological monitoring of the Clinch River, White Oak Creek (WOC), Northwest Tributary (NWT) of WOC, Melton Branch (MB), Fifth Creek, and First Creek shall be submitted for approval to the US Environmental Protection Agency (EPA) and the Tennessee Department of Health and Environment (TDHE) within 90 days of the effective date of the permit. The plan, which is referred to in Part 3 (H) of the permit as the Biological Monitoring Plan and Abatement Program (BMPAP), describes characterization monitoring studies to be conducted for the duration of the permit (5 years). In order to be consistent with the terminology used for the Biological Monitoring and Abatement Programs for the Oak Ridge Y-12 Plan and the Oak Ridge K-25 Plant, BMPAP will subsequently be referred to as the Biological Monitoring and Abatement Program (BMAP). The proposed BMAP outlined in this document is based on preliminary discussions held on December 9, 1985, between staff of Martin Marietta Energy Systems, Inc. (ORNL and Central Management), the US Department of Energy (DOE), EPA, and TDHE. 232 refs., 11 figs., 7 tabs.

  7. White Oak Creek Watershed: Melton Valley Area Remedial Investigation Report, Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 3 Appendix C

    SciTech Connect

    1996-11-01

    This report provides details on the baseline ecological risk assessment conducted in support of the Remedial Investigation (RI) Report for the Melton Valley areas of the White Oak Creek watershed (WOCW). The RI presents an analysis meant to enable the US Department of Energy (DOE) to pursue a series of remedial actions resulting in site cleanup and stabilization. The ecological risk assessment builds off of the WOCW screening ecological risk assessment. All information available for contaminated sites under the jurisdiction of the US Department of Energy`s Comprehensive Environmental Response, Compensation, and Liability Act Federal Facilities Agreement within the White Oak Creek (WOC) RI area has been used to identify areas of potential concern with respect to the presence of contamination posing a potential risk to ecological receptors within the Melton Valley area of the White Oak Creek watershed. The risk assessment report evaluates the potential risks to receptors within each subbasin of the watershed as well as at a watershed-wide scale. The WOC system has been exposed to contaminant releases from Oak Ridge National Laboratory and associated operations since 1943 and continues to receive contaminants from adjacent waste area groupings.

  8. Human health risk assessment and remediation activities at White Oak Creek Embayment at Oak Ridge National Laboratory

    SciTech Connect

    Blaylock, B.G.

    1994-12-31

    Cesium-137 concentrations of >10{sup 6} Bq/kg dry wt (10{sup 4} pCi/g dry wt) were found in the surface sediments of White Oak Creek Embayment (WOCE) during 1990. A review of past data indicated Cesium-137, among other contaminants, was released from White Oak dam in the mid 1950s and had accumulated in the sediment of WOCE. The sediments from WOCE were being eroded and transported downstream primarily during winter low-water levels by flood events and by a combination of normal downstream flow and water turbulence. Sampling was conducted to determine the extent of radiological and nonradiological contamination. A contaminant screening analysis was conducted to determine which contaminants pose a problem from a human health standpoint. All noncarcinogens had screening indices of <1.0, indicating that concentrations of noncarcinogens were below the levels of concern for a realistic maximum exposure situation. An illegal intruder or an individual using the embayment for fishing purposes could be exposed to >10{sup 4} risk of excess lifetime cancer incidence from external exposure to Cesium-137 in sediment and from ingestion of polychlorinated biphenyls in fish. As a result of these analyses and the fact that >10{sup 6} Bq/kg dry wt (10{sup 4} pCi/g dry wt) of Cesium-137 could be transported from the Oak Ridge Reservation, a coffer-cell dam was constructed at the mouth of White Oak Creek in 1992 to: (1) reduce sediment erosion and the transport of radioactive sediments from the WOCE into the Clinch River, (2) maintain year-round inundation of the embayment sediments to reduce external radiation exposure, and (3) impede the movement of fish into and out of the embayment. The effectiveness of this remediation is being evaluated.

  9. Second report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Bailey, R.D.; Blaylock, B.G.; Boston, H.L.; Cox, D.K.; Huston, M.A.; Kimmel, B.L.; Loar, J.M.; Olsen, C.R.; Ryon, M.G.; Shugart, L.R.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Talmage, S.S.; Murphy, J.B.; Valentine, C.K.; Appellanis, S.M.; Jimenez, B.D.; Huq, M.V.; Meyers-Schone, L.J.; Mohrbacher, D.A.; Olsen, C.R.; Stout, J.G.

    1992-12-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. BMAP consists of seven major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring; (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota; (3) biological indicator studies; (4) instream ecological monitoring; (5) assessment of contaminants in the terrestrial environment; (6) radioecology of WOC and White Oak Lake (WOL); and (7) contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system. This document, the second of a series of annual reports, described the results of BMAP studies conducted in 1987.

  10. White Oak Creek Embayment site characterization and contaminant screening analysis. Environmental Restoration Program

    SciTech Connect

    Blaylock, B.G.; Ford, C.J.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.

    1993-01-01

    Analyses of sediment samples collected near the mouth of White Oak Creek during the summer of 1990 revealed {sup 137}Cs concentrations [> 10{sup 6} Bq/kg dry wt (> 10{sup 4} pCi/g dry wt)] near the sediment surface. Available evidence indicates that these relatively high concentrations of {sup 137}Cs now at the sediment surface were released from White Oak Dam in the mid-1950s and had accumulated at depositionalsites in the embayment. These accumulated sediments are being eroded and transported downstream primarily during winter low-water levels by flood events and by a combination of normal downstream flow and the water turbulence created by the release of water from Melton Hill Dam during hydropower generation cycles. This report provides a more thorough characterization of the extent of contamination in WOCE than was previously available. Environmental samples collected from WOCE were analyzed for organic, inorganic, and radiological contaminants in fish, water, and sediment. These results were used to conduct a human health effects screening analysis. Walkover radiation surveys conducted inside the fenced area surrounding the WOCE at summer-pool (741 ft MSL) and at winter-pool (733 ft MSL) level, indicated a maximum exposure rate of 3 mR h{sup 1} 1 m above the soil surface.

  11. Hydrologic data summary for the White Oak Creek watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, January--December 1994

    SciTech Connect

    Borders, D.M.; Ziegler, K.S.; Reece, D.K.; Watts, J.A.; Frederick, B.J.; McCalla, W.L.; Pridmore, D.J.

    1995-08-01

    This report summarizes, for the 12-month period January through December 1994, the available dynamic hydrologic data collected on the White Oak Creek (WOC) watershed as well as information collected on surface flow systems in the surrounding vicinity that may affect the quality or quantity of surface water in the watershed. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to characterize the quantity and quality of water in the surface flow system, assist with the planning and assessment of remedial action activities, provide long-term availability of data and quality assurance of these data, and support long-term measures of contaminant fluxes at a spatial scale to provide a comprehensive picture of watershed performance that is commensurate with future remedial actions.

  12. Third report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Bailey, R.D.

    1994-03-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. The BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs at ORNL. These are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring, (5) assessment of contaminants in the terrestrial environment, and (6) radioecology of WOC and White Oak Lake (WOL). The investigation of contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system was originally a task of the BMAP but, in 1988, was incorporated into the Resource Conservation and Recovery Act Facility Investigation for the Clinch River, a separate study to assess offsite contamination from all three Department of Energy facilities in Oak Ridge.

  13. Fourth report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect

    Loar, J.M.

    1994-04-01

    In response to a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC) and selected tributaries. BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring, (5) assessment of contaminants in the terrestrial environment, and (6) radioecology of WOC and White Oak Lake. The ecological characterization of the WOC watershed will provide baseline data that can be used to document the ecological effects of the water pollution control program and the remedial action program. The long-term nature of BMAP ensures that the effectiveness of remedial measures will be properly evaluated.

  14. White Oak Creek Watershed: Melton Valley Area Remedial Investigation Report, Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 1 Main Text

    SciTech Connect

    1996-11-01

    The purpose of this Remedial Investigation (RI) report is to present an analysis of the Melton Valley portion of the White Oak Creek (WOC) watershed, which will enable the US Department of Energy (DOE) to pursue a series of cost-effective remedial actions resulting in site cleanup and stabilization. In this RI existing levels of contamination and radiological exposure are compared to levels acceptable for future industrial and potential recreational use levels at the site. This comparison provides a perspective for the magnitude of remedial actions required to achieve a site condition compatible with relaxed access restrictions over existing conditions. Ecological risk will be assessed to evaluate measures required for ecological receptor protection. For each subbasin, this report will provide site-specific analyses of the physical setting including identification of contaminant source areas, description of contaminant transport pathways, identification of release mechanisms, analysis of contaminant source interactions with groundwater, identification of secondary contaminated media associated with the source and seepage pathways, assessment of potential human health and ecological risks from exposure to contaminants, ranking of each source area within the subwatershed, and outline the conditions that remedial technologies must address to stop present and future contaminant releases, prevent the spread of contamination and achieve the goal of limiting environmental contamination to be consistent with a potential recreational use of the site.

  15. Hydrologic data summary for the White Oak Creek watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee (January--December 1993)

    SciTech Connect

    Borders, D.M.; Frederick, B.J.; Reece, D.K.; McCalla, W.L.; Watts, J.A.; Ziegler, K.S.

    1994-10-01

    This report summarizes, for the 12-month period (January through December 1993), the available dynamic hydrologic data collected, primarily, on the White Oak Creek (WOC) watershed along with information collected on the surface flow systems which affect the quality or quantity of surface water. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data, an activity that contributes to the Site Investigations (SI) component of the ERP. This report provides and describes sources of hydrologic data for Environmental Restoration activities that use monitoring data to quantify and assess the impact from releases of contaminants from ORNL WAGs.

  16. Oak Creek Energy Systems Wind Farm II | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    II Jump to: navigation, search Name Oak Creek Energy Systems Wind Farm II Facility Oak Creek Energy Systems Sector Wind energy Facility Type Commercial Scale Wind Facility Status...

  17. Annual hydrologic data summary for the White Oak Creek Watershed: Water Year 1990 (October 1989--September 1990)

    SciTech Connect

    Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Moore, G.K.; Watts, J.A.; Broders, C.C.; Bednarek, A.T.

    1991-09-01

    This report summarizes, for the Water Year 1990 (October 1989-- September 1990), the dynamic hydrologic data collected on the Whiteoak Creek (WOC) Watershed's surface and subsurface flow systems. These systems affect the quality or quantity of surface water and groundwater. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to 1. characterize the quantity and quality of water in the flow system, 2. plan and assess remedial action activities, and 3. provide long-term availability of data and assure quality. Characterizing the hydrology of the WOC watershed provides a better understanding of the processes which drive contaminant transport in the watershed. Identifying of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. Hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping boundaries and ultimately to the off-site environment. The majority of the data summarized in this report are available from the Remedial Action Programs Data and Information Management System data base. Surface water data available within the WOC flow system include discharge and runoff, surface water quality, radiological and chemical contamination of sediments, and descriptions of the outfalls to the WOC flow system. Climatological data available for the Oak Ridge area include precipitation, temperature, humidity, wind speed, and wind direction. Information on groundwater levels, aquifer characteristics, and groundwater quality are presented. Anomalies in the data and problems with monitoring and accuracy are discussed. 58 refs., 54 figs., 15 tabs.

  18. Technical background information for the environmental and safety report, Volume 4: White Oak Lake and Dam

    SciTech Connect

    Oakes, T.W.; Kelly, B.A.; Ohnesorge, W.F.; Eldridge, J.S.; Bird, J.C.; Shank, K.E.; Tsakeres, F.S.

    1982-03-01

    This report has been prepared to provide background information on White Oak Lake for the Oak Ridge National Laboratory Environmental and Safety Report. The paper presents the history of White Oak Dam and Lake and describes the hydrological conditions of the White Oak Creek watershed. Past and present sediment and water data are included; pathway analyses are described in detail.

  19. Oak Creek Energy Systems Inc | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Creek Energy Systems Inc Place: California Sector: Wind energy Product: Californian wind project developer and asset manager. References: Oak Creek Energy Systems Inc1 This...

  20. White Creek Wind Power Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Creek Wind Power Project Jump to: navigation, search Name White Creek Wind Power Project Facility White Creek Wind Power Project Sector Wind energy Facility Type Commercial Scale...

  1. Recommendation 208 : Use White Paper on Oak Ridge Reservation...

    Office of Environmental Management (EM)

    8 : Use White Paper on Oak Ridge Reservation Recommendation 208 : Use White Paper on Oak Ridge Reservation The ORSSAB approved the enclosed recommendation suggesting DOE Oak Ridge...

  2. White Oak Wind Energy Center | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Wind Energy Center Jump to: navigation, search Name White Oak Wind Energy Center Facility White Oak Wind Energy Center Sector Wind energy Facility Type Commercial Scale Wind...

  3. Hydrologic data summary for the White Oak Watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, October 1990--December 1991

    SciTech Connect

    Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Watts, J.A.

    1992-06-01

    This report summarizes for the 15-month period of October 1990-- December 1991 the available dynamic hydrologic data collected, primarily on the White Oak Creek (WOC) watershed, along with information collected on the surface flow systems that affect the quality or quantity of surface water. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to: (1) characterize the quantity and quality of water in the flow systems; (2) assist with the planning and assessment of remedial action activities; and, (3) provide long-term availability of data and quality assurance. Characterization of the hydrology of the WOC watershed is critical for understanding the processes that drive contaminant transport in the watershed. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data activities that contribute to the Site Investigations component of the ERP. (White Oak Creek is also referred to as ``Whiteoak`` Creek).

  4. Hydrologic data summary for the White Oak Watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, October 1990--December 1991

    SciTech Connect

    Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Watts, J.A.

    1992-06-01

    This report summarizes for the 15-month period of October 1990-- December 1991 the available dynamic hydrologic data collected, primarily on the White Oak Creek (WOC) watershed, along with information collected on the surface flow systems that affect the quality or quantity of surface water. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to: (1) characterize the quantity and quality of water in the flow systems; (2) assist with the planning and assessment of remedial action activities; and, (3) provide long-term availability of data and quality assurance. Characterization of the hydrology of the WOC watershed is critical for understanding the processes that drive contaminant transport in the watershed. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data activities that contribute to the Site Investigations component of the ERP. (White Oak Creek is also referred to as Whiteoak'' Creek).

  5. Oak Creek Wind Power Phase 2 Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Wind Power Phase 2 Wind Farm Jump to: navigation, search Name Oak Creek Wind Power Phase 2 Wind Farm Facility Oak Creek Wind Power Phase 2 Sector Wind energy Facility Type...

  6. Food and Drug Administration White Oak Campus Environmental Stewardshi...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Campus Environmental Stewardship and Cost Savings FEMP ESPC Success Story on water conservation and green energy at the Food and Drug Administration (FDA) White Oak Campus....

  7. Food and Drug Administration White Oak Campus Environmental Stewardship and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cost Savings | Department of Energy Food and Drug Administration White Oak Campus Environmental Stewardship and Cost Savings Food and Drug Administration White Oak Campus Environmental Stewardship and Cost Savings FEMP ESPC Success Story on water conservation and green energy at the Food and Drug Administration (FDA) White Oak Campus. Download the success story. (1.81 MB) More Documents & Publications Energy Savings Performance Contract Success Stories Harold Washington Social Security

  8. Food and Drug Administration White Oak Campus Environmental Stewardshi...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Food and Drug Administration White Oak Campus Environmental Stewardship and Cost Savings FEMP ESPC Success Story on water conservation and green energy at the Food and Drug ...

  9. White Oak Dam stability analysis. Volume I

    SciTech Connect

    Ahmed, S.B.

    1994-01-01

    A parametric study was conducted to evaluate the stability of the White Oak Dam (WOD) embankment and foundation. Slope stability analyses were performed for the upper and lower bound soil properties at three sections of the dam using the PCSTABL4 computer program. Minimum safety factors were calculated for the applicable seismic and static loading conditions. Liquefaction potential of the dam embankment and foundation solid during the seismic event was assessed by using simplified procedures. The WOD is classified as a low hazard facility and the Evaluation Basis Earthquake (EBE) is defined as an earthquake with a magnitude of m{sub b} = 5.6 and a Peak Ground Accelerator (PGA) of 0.13 g. This event is approximately equivalent to a Modified Mercalli Intensity of VI-VIII. The EBE is used to perform the seismic evaluation for slope stability and liquefaction potential. Results of the stability analyses and the liquefaction assessment lead to the conclusion that the White Oak Dam is safe and stable for the static and the seismic events defined in this study. Ogden Environmental, at the request of MMES, has checked and verified the calculations for the critical loading conditions and performed a peer review of this report. Ogden has determined that the WOD is stable under the defined static and seismic loading conditions and the embankment materials are in general not susceptible to liquefaction.

  10. Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    NONE

    1998-01-01

    The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08.

  11. White Oak, Maryland: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    stub. You can help OpenEI by expanding it. White Oak is a census-designated place in Montgomery County, Maryland.1 References US Census Bureau 2005 Place to 2006 CBSA...

  12. White Oak, Ohio: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. White Oak is a census-designated place in Hamilton County, Ohio.1 References US Census...

  13. White Oak West, Ohio: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. White Oak West is a census-designated place in Hamilton County, Ohio.1 References US...

  14. White Oak, Pennsylvania: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. White Oak is a borough in Allegheny County, Pennsylvania. It falls under Pennsylvania's 14th...

  15. White Oak East, Ohio: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. White Oak East is a census-designated place in Hamilton County, Ohio.1 References US...

  16. Phase 2 confirmatory sampling data report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-01-01

    A Remedial Investigation of East Fork Poplar Creek (EFPC) concluded that mercury is the principal contaminant of concern in the EFPC floodplain. The highest concentrations of mercury were found to be in a visually distinct black layer of soil that typically lies 15 to 30 cm (6 to 12 in.) below the surface. Mercury contamination was found to be situated in distinct areas along the floodplain, and generally at depths > 20 cm (8 in.) below the surface. In accordance with Comprehensive, Environmental Response, Compensation, and Liability Act (CERCLA), a feasibility study was prepared to assess alternatives for remediation, and a proposed plan was issued to the public in which a preferred alternative was identified. In response to public input, the plan was modified and US Department of Energy (DOE) issued a Record of Decision in 1995 committing to excavating all soil in the EFPC floodplain exceeding a concentration of 400 parts per million (ppm) of mercury. The Lower East Fork Poplar Creek (LEFPC) remedial action (RA) focuses on the stretch of EFPC flowing from Lake Reality at the Y-12 Plant, through the city of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation (ORR) and its associated floodplain. Specific areas were identified that required remediation at the National Oceanographic and Atmospheric Administration (NOAA) Site along Illinois Avenue and at the Bruner Site along the Oak Ridge Turnpike. The RA was conducted in two separate phases. Phase 2, conducted from February to October 1997, completed the remediation efforts at the NOAA facility and fully remediated the Bruner Site. During both phases, data were collected to show that the remedial efforts performed at the NOAA and Bruner sites were successful in implementing the Record of Decision and had no adverse impact on the creek water quality or the city of Oak Ridge publicly owned treatment works.

  17. Report on the biological monitoring program for Bear Creek at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, 1989-1994

    SciTech Connect

    Hinzman, R.L.; Beauchamp, J.J.; Cada, G.F.; Peterson, M.J.

    1996-04-01

    The Bear Creek Valley watershed drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in the Bear Creek Valley resulted in the contamination of Bear Creek and consequent ecological damage. Ecological monitoring by the Biological Monitoring and Abatement Program (BMAP) was initiated in the Bear Creek watershed in May 1984 and continues at present. Studies conducted during the first year provided a detailed characterization of the benthic invertebrate and fish communities in Bear Creek. The initial characterization was followed by a biological monitoring phase in which studies were conducted at reduced intensities.

  18. Phase 1 report on the Bear Creek Valley treatability study, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1997-04-01

    Bear Creek Valley (BCV) is located within the US Department of Energy (DOE) Oak Ridge Reservation and encompasses multiple waste units containing hazardous and radioactive wastes associated with past operations at the adjacent Oak Ridge Y-12 Plant. The BCV Remedial Investigation determined that disposal of wastes at the S-3 Site, Boneyard/Burnyard (BYBY), and Bear Creek Burial Grounds (BCBG) has caused contamination of both deep and shallow groundwater. The primary contaminants include uranium, nitrate, and VOCs, although other metals such as aluminum, magnesium, and cadmium persist. The BCV feasibility study will describe several remedial options for this area, including both in situ and ex situ treatment of groundwater. This Treatability Study Phase 1 Report describes the results of preliminary screening of treatment technologies that may be applied within BCV. Four activities were undertaken in Phase 1: field characterization, laboratory screening of potential sorbents, laboratory testing of zero valent iron products, and field screening of three biological treatment systems. Each of these activities is described fully in technical memos attached in Appendices A through G.

  19. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect

    1996-12-01

    This document describes the organization, strategy, and procedures to be used to confirm that mercury concentrations in soils in the remediated areas are statistically less than, or equal to, the cleanup standard of 400 ppm. It focuses on confirming the cleanup of the stretch of the Lower East Fork Popular Creed flowing from Lake Reality at the Y-12 Plant, through the City of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation and its associated flood plain.

  20. Closure certification report for the Bear Creek burial grounds B area and walk-in pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1994-06-01

    On July 5, 1993, the revised RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, DOE/OR/01-1100&D3 and Y/ER-53&D3, was approved by the Tennessee Department of Environment and Conservation (TDEC). The closure activities described in that closure plan have been performed. The purpose of this document is to summarize the closure activities for B Area and Walk-In Pits (WIPs), including placement of the Kerr Hollow Quarry debris at the WIPs.

  1. Site characterization summary report for dry weather surface water sampling upper East Fork Poplar Creek characterization area Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    This report describes activities associated with conducting dry weather surface water sampling of Upper East Fork Poplar Creek (UEFPC) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This activity is a portion of the work to be performed at UEFPC Operable Unit (OU) 1 [now known as the UEFPC Characterization Area (CA)], as described in the RCRA Facility Investigation Plan for Group 4 at the Oak- Ridge Y-12 Plant, Oak Ridge, Tennessee and in the Response to Comments and Recommendations on RCRA Facility Investigation Plan for Group 4 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Volume 1, Operable Unit 1. Because these documents contained sensitive information, they were labeled as unclassified controlled nuclear information and as such are not readily available for public review. To address this issue the U.S. Department of Energy (DOE) published an unclassified, nonsensitive version of the initial plan, text and appendixes, of this Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Plan in early 1994. These documents describe a program for collecting four rounds of wet weather and dry weather surface water samples and one round of sediment samples from UEFPC. They provide the strategy for the overall sample collection program including dry weather sampling, wet weather sampling, and sediment sampling. Figure 1.1 is a schematic flowchart of the overall sampling strategy and other associated activities. A Quality Assurance Project Plan (QAPJP) was prepared to specifically address four rounds of dry weather surface water sampling and one round of sediment sampling. For a variety of reasons, sediment sampling has not been conducted and has been deferred to the UEFPC CA Remedial Investigation (RI), as has wet weather sampling.

  2. OAK GROVE C OAL D EGAS CEDAR COVE COAL D EGAS BLU E CREEK COAL...

    Energy Information Administration (EIA) (indexed site)

    ... MILITARY GROVE HAMILTONMSD BIG CR EEKALD TAYLOR CREEK COAL D EGAS MAT UBBY CREEK ... Authors: Sam Limerick (1), Lucy Luo (1), Gary Long (2), David Morehouse (2), Jack Perrin ...

  3. Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 6: Appendix G -- Baseline ecological risk assessment report

    SciTech Connect

    1996-09-01

    This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix G contains ecological risks for fish, benthic invertebrates, soil invertebrates, plants, small mammals, deer, and predator/scavengers (hawks and fox). This risk assessment identified significant ecological risks from chemicals in water, sediment, soil, and shallow ground water. Metals and PCBs are the primary contaminants of concern.

  4. Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1

    SciTech Connect

    1996-09-01

    This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV.

  5. Sampling and analysis plan for Phase II of the Bear Creek Valley Treatability Study, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    NONE

    1997-09-01

    The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining potential treatment technologies applicable to contaminated groundwater and surface water. This project directly supports Alternative 5 of the base action in the BCV Feasibility Study and indirectly supports other alternatives through proof of concept. In that role, the ultimate goal is to install a treatment system that will remove uranium and nitrate from groundwater before it reaches Bear Creek. A secondary goal is the concurrent removal of technetium and several metals that affect ecological risk. This project is intended to produce hydraulic and treatment performance data required to design the treatment system to reach those goals. This project will also generate information that can be applied at other facilities within the Oak Ridge Reservation. This report is the sampling and analysis plan (SAP) for the field work component of Phase II of the BCV Treatability Study. Field work for this phase of the BCV Treatability Study consists of environmental and media testing. The SAP addresses environmental sampling at the S-3 Site at the Oak Ridge Y-12 Plant. Samples will be taken from groundwater, surface water, seeps, effluent from test columns, effluent from an algal mat reactor, and effluent from a pilot-scale wetland. Groundwater, surface water, and seeps will be monitored continuously for field parameters and sampled for analytical parameters during pump tests conducted periodically during the investigation. In-field continuous flow tests will be conducted over an extended time period (5 weeks) to generate data on long-term treatment effects on potential treatment effects on potential treatment media including sorbents and zero valent iron, over 28 weeks for constructed wetlands treatment, and over 24 weeks for algal mats treatment.

  6. Sampling and analysis plan for phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    NONE

    1997-05-01

    The Bear Creek Valley (BCV) Treatability Study is intended to provide site-specific data defining potential treatment technologies applicable to contaminated groundwater and surface water. This project directly supports Alternative 5 of the base action in the BCV Feasibility Study, and indirectly supports other alternatives through proof of concept. In that role, the ultimate goal is to install a treatment system that will remove uranium and nitrate from groundwater before it reaches Bear Creek. A secondary goal is the concurrent removal of technetium and several metals that impact ecological risk. This project is intended to produce hydraulic and treatment performance data required to design the treatment system to reach those goals. This project will also generate information that can be applied at other facilities within the Oak Ridge Reservation. This report is the sampling and analysis plan (SAP) for the field work component of Phase II of the BCV Treatability Study. Field work for this phase of the BCV Treatability Study consists of media testing. In-field continuous flow tests will be conducted over an extended time period (5 weeks) to generate data on long-term treatment effects on potential treatment media including sorbents and zero valent iron, over 28 weeks for constructed wetlands treatment, and over 24 weeks for algal mats treatment. The SAP addresses environmental sampling at the S-3 Site at the Oak Ridge Y-12 Plant. Samples will be taken from groundwater, effluent from test columns, effluent from an algal mat reactor, and effluent from a pilot-scale wetlands. This plan will be implemented as part of the BCV Phase II Treatability Study Best Management Practices Plan and in conjunction with the BCV Phase II Treatability Study Health and Safety Plan and the BCV Phase II Treatability Study Waste Management Plan.

  7. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    SciTech Connect

    1996-04-01

    On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on the National Priorities List (NPL). On January 1, 1992, a Federal Facilities Agreement (FFA) between the DOE Field Office in Oak Ridge (DOE-OR), EPA Region IV, and the Tennessee Department of Environment and Conservation (TDEC) went into effect. This FFA establishes the procedural framework and schedule by which DOE-OR will develop, coordinate, implement and monitor environmental restoration activities on the ORR in accordance with applicable federal and state environmental regulations. The DOE-OR Environmental Restoration Program for the ORR addresses the remediation of areas both within and outside the ORR boundaries. This sampling and analysis plan focuses on confirming the cleanup of the stretch of EFPC flowing from Lake Reality at the Y-12 Plant through the City of Oak Ridge, to Poplar Creek on the ORR and its associated floodplain. Both EFPC and its floodplain have been contaminated by releases from the Y-12 Plant since the mid-1950s. Because the EFPC site-designated as an ORR operable unit (OU) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is included on the NPL, its remediation must follow the specific procedures mandated by CERCLA, as amended by the Superfund Amendments and Reauthorization Act in 1986.

  8. OAK GROVE C OAL D EGAS CEDAR COVE COAL D EGAS BLU E CREEK COAL...

    Gasoline and Diesel Fuel Update

    LITT LE SAND Y CREEK COAL D EGAS FAYETTE SW FAYETTE N WAT TS CR EEKALD YELLOW CR EEKALD RPDOKTIBBEHACNT Y-1 BALLS BRAN CH BU TT AH ATCH IE RIVER NETT LET ON ABERD EEN E ...

  9. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

  10. First report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Boston, H.L.; Huston, M.A.; McCarthy, J.F.; Smith, J.G.; Southworth, G.R.; Stewart, A.J. ); Black, M.C. ); Gatz, A.J. Jr. ); Hinzman, R.L. ); Jimenez, B.D. (Puerto Rico Univ.,

    1992-07-01

    As stipulated in the National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of the BMAP are (1) to demonstrate that the current effluent limitations established for the Oak Ridge Y-12 Plant protect the uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) [formerly the Tennessee Department of Health and Environment (TDHE)], and (2) to document the ecological effects resulting from implementation of a water pollution control program that includes construction of several large wastewater treatment facilities. The BMAP consists of four major tasks: (1) ambient toxicity testing, (2) bioaccumulation studies, (3) biological indicator studies, and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic macroinvertebrates, and fish. This document, the first in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted from May 1985 through September 1986.

  11. Second report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    SciTech Connect

    Hinzman, R.L.; Adams, S.M.; Black, M.C.

    1993-06-01

    As stipulated in the National Pollutant Discharge Elimination System (NDPES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of BMAP are (1) to demonstrate that the current effluent limitations established for the Y-12 Plant protect the classified uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) and (2) to document the ecological effects resulting from implementation of a Water Pollution Control Program that includes construction of several large wastewater treatment facilities. BMAP consists of four major tasks: (1) ambient toxicity testing; (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic (bottom-dwelling) macroinvertebrates, and fish. This document, the second in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted between July 1986 and July 1988, although additional data collected outside this time period are included, as appropriate.

  12. Post construction report for Lower East Fork Poplar Creek Project, Phase 1, Oak Ridge, Tennessee

    SciTech Connect

    1996-11-01

    This Phase 1 Remedial Action (RA) effort was conducted in accordance with the Record of Decision (ROD) for Lower East Fork Poplar Creek (LEFPC) as a Comprehensive Environmental Response, Compensation, and Liability Act action. The LEFPC, Phase 1 RA removed approximately 5,560 yd{sup 3} of mercury-contaminated soils, {ge} 400 ppm, from selected portions of the National Oceanographic and Atmospheric Administration (NOAA) site LEFPC floodplain from July 8, 1996--September 14, 1996. During excavation activities, pockets of elevated radiologically contaminated soils (greater than 35 pCi/g) were located by the continuous monitoring of the excavation areas and contaminated soils with radiological monitoring instruments. Through characterization sampling it has been determined that {approximately} 90 yd{sup 3} are less than 35 pCi/g uranium contaminated and will be transported to the Y-12 Landfill V for disposal and the remaining {approximately}40 yd{sup 3} do not meet the WAC for radiological constituents included in the Special Waste Permit for Landfill V. The radiologically contaminated soil will be placed in 21st Century containers for storage at the K-25 site.

  13. FY94 site characterization and multilevel well installation at a west Bear Creek Valley research site on the Oak Ridge Reservation

    SciTech Connect

    Moline, G.R.; Schreiber, M.E.

    1996-03-01

    The goals of this project are to collect data that will assist in determining what constitutes a representative groundwater sample in fractured shale typical of much of the geology underlying the ORR waste disposal sites, and to determine how monitoring-well construction and sampling methods impact the representativeness of the sample. This report details the FY94 field activities at a research site in west Bear Creek Valley on the Oak Ridge Reservation (ORR). These activities funded by the Energy Systems Groundwater Program Office through the Oak Ridge Reservation Hydrologic and Geologic Studies (ORRHAGS) task, focus on developing appropriate sampling protocols for the type of fractured media that underlies many of the ORR waste disposal sites. Currently accepted protocols were developed for porous media and are likely to result in nonrepresentative samples in fractured systems.

  14. The transport of contaminants during storms in the White Oak Creek and Melton Branch Watersheds

    SciTech Connect

    Solomon, D.K.; Marsh, J.D.; Wickliff, D.S.; Larsen, I.L.; Clapp, R.B.

    1989-03-01

    This report documents are transport of contaminants from SWSA 5 along two principle pathways: the saturated groundwater system and the intermittently saturated stormflow system. The results of a baseflow sampling effort and a dye tracer study, indicated that much of the transport through the saturated groundwater system occurs along discrete geologic features. These features appear to be related to the contact between the Maryville and Nolichucky members of the Conasauga shale. Three discrete sources of tritium to Melton Branch Stream (MBS) were identified and traced to SWSA 5 by measuring soil moisture and evapotranspiration along transects between MBS and SWSA 5.

  15. Geophysical survey work plan for White Wing Scrap Yard (Waste Area Grouping 11) at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1994-02-01

    The White Wing Scrap Yard, located on the U.S. Department of Energy`s Oak Ridge Reservation, served as an aboveground storage and disposal area for contaminated debris and scrap from the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, and the Oak Ridge National laboratory. The site is believed to have been active from the early 1950s until the mid-1960s. A variety of materials were disposed of at the site, including contaminated steel tanks and vehicles. As an interim corrective action, a surface debris removal effort was initiated in November 1993 to reduce the potential threat to human health and the environment from the radionuclide-contaminated debris. Following this removal effort, a geophysical survey will be conducted across the site to locate and determine the lateral extent of buried nonindigenous materials. This survey will provide the data necessary to prepare a map showing areas of conductivity and magnetic intensity that vary from measured background values. These anomalies represent potential buried materials and therefore can be targeted for further evaluation. This work plan outlines the activities necessary to conduct the geophysical survey.

  16. Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 5: Appendix F -- Baseline human health risk assessment report

    SciTech Connect

    1996-09-01

    This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix F documents potential risks and provides information necessary for making remediation decisions. A quantitative analysis of the inorganic, organic, and radiological site-related contaminants found in various media is used to characterize the potential risks to human health associated with exposure to these contaminants.

  17. Sampling and analysis plan for treatment water and creek water for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect

    1996-04-01

    This document provides the Environmental Restoration Program with information about the methodology, organizational structure, quality assurance and health and safety practices to be employed during the water sampling and analysis activities associated with the remediation of the Lower East Fork Poplar Creek Operable Unit during remediation of the National Oceanic and Atmospheric Administration and Bruner sites.

  18. Addendum to the remedial investigation report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant Oak Ridge, Tennessee. Volume 1: Main text

    SciTech Connect

    1995-04-01

    This addendum to the Remedial Investigation (RI) Report on Bear Creek Valley Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant was prepared in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for reporting the results of a site characterization for public review. This addendum is a supplement to a document that was previously issued in January 1995 and that provided the Environmental Restoration Program with information about the results of the 1993 investigation performed at OU 2. The January 1995 D2 version of the RI Report on Bear Creek Valley OU 2 included information on risk assessments that have evaluated impacts to human health and the environment. Information provided in the document formed the basis for the development of the Feasibility Study Report. This addendum includes revisions to four chapters of information that were a part of the document issued in January 1995. Specifically, it includes revisions to Chaps. 2, 3, 4, and 9. Volume 1 of this document is not being reissued in its entirety as a D3 version because only the four chapters just mentioned have been affected by requested changes. Note also that Volume 2 of this RI Report on Bear Creek Valley OU 2 is not being reissued in conjunction with Volume 1 of this document because there have been no changes requested or made to the previously issued version of Volume 2 of this document.

  19. Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    NONE

    1998-03-01

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

  20. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

  1. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk- In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1993-01-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Subsequently, this plan was modified again and approved as Y/TS-395, Revised RCRA Closure Plan for the Bear Creek Burial Grounds (February 29, 1988). Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. The plan was presented to the state of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. This amended closure plan goes further to include inspection and maintenance criteria along with other details.

  2. Work plan for support to Upper East Fork Poplar Creek east end VOC plumes well installation project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    Under the Resource Conservation and Recovery Act of 1976 guidelines and requirements from the Tennessee Department of Environment and Conservation (TDEC), the Y-12 Plant initiated investigation and monitoring of various sites within its boundaries in the mid-1980s. The entire Oak Ridge Reservation (ORR) was placed on the National Priorities List of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) sites in November 1989. Following CERCLA guidelines, sites within the ORR require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) or an engineering evaluation/cost analysis (EE/CA) of potential remedial actions. Data from monitoring wells at the east end of the Y-12 Plant have identified an area of groundwater contamination dominated by the volatile organic compound (VOC) carbon tetrachloride; other VOCs include chloroform, tetrachloroethene, and trichloroethene.

  3. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  4. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    SciTech Connect

    1996-04-01

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment.

  5. Second report on the Oak Ridge Y-12 Plant fish kill for Upper East Fork Poplar Creek

    SciTech Connect

    Etnier, E.L.; Opresko, D.M.; Talmage, S.S.

    1994-08-01

    This report summarizes the monitoring of fish kills in upper East Fork Poplar Creek (EFPC) from July 1990 to June 1993. Since the opening of Lake Reality (LR) in 1988, total numbers of fish inhabiting upper EFPC have increased. However, species diversity has remained poor. Water quality data have been collected in upper EFPC during the time period covered in this report. Total residual chlorine (TRC) levels have exceeded federal and state water quality criteria over the years. However, with the installation of two dechlorination systems in late 1992, TRC levels have been substantially lowered in most portions of upper EFPC. By June 1993, concentrations of TRC were 0.04 to 0.06 mg/L at the north-south pipes (NSP) and below detection limits at sampling station AS-8 and were 0 to 0.01 mg/L at the inlet and outlet of LR. The daily chronic fish mortality in upper EFPC has been attributed to background stress resulting from the continuous discharge of chlorine into upper EFPC. Mean daily mortality rates for 22 acute fish kills were three fold or more above background and usually exceeded ten fish per day. Total number of dead fish collected per acute kill event ranged from 30 to over 1,000 fish; predominant species killed were central stonerollers (Campostoma anomalum) and striped shiners (Luxilus chrysocephalus). Spills or elevated releases of toxic chemicals, such as acids, organophosphates, aluminum nitrate, ammonia, or chlorine, were identified as possible causative agents; however, a definitive cause-effect relationship was rarely established for any acute kills. Ambient toxicity testing, in situ chemical monitoring, and streamside experiments were used to examine TRC dynamics and ambient toxicity in EFPC.

  6. Y-12 Groundwater Protection Program Calendar Year 2000 Groundwater Monitoring Data Evaluation Report for the Bear Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    2001-09-01

    This report presents an evaluation of the groundwater and surface water monitoring data obtained during calendar year (CY) 2000 in the Bear Creek Hydrogeologic Regime (Bear Creek Regime). The Bear Creek Regime encompasses many confirmed and potential sources of groundwater and surface water contamination associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee (Figure A.1). Prepared by the Y-12 Groundwater Protection Program (GWPP), this report addresses applicable provisions of DOE Order 5400.1 (General Environmental Protection Program) that require: (1) an evaluation of the quantity and quality of groundwater and surface water in areas that are, or could be, affected by Y-12 operations, (2) an evaluation of groundwater and surface water quality in areas where contaminants from Y-12 operations are most likely to migrate beyond the DOE Oak Ridge Reservation (ORR) property line, and (3) an evaluation of long-term trends in groundwater quality at Y-12. The following sections of this report contain relevant background information (Section 2.0); describe the results of the respective data evaluations required under DOE Order 5400.1 (Section 3.0); summarize significant findings of each evaluation (Section 4.0); and list the technical reports and regulatory documents cited for more detailed information (Section 5.0). Illustrations (maps and trend graphs) are presented in Appendix A. Brief data summary tables referenced in each section are contained within the sections. Supplemental information and extensive data tables are provided in Appendix B.

  7. Report on the remedial investigation of Bear Creek Valley at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2: Appendix A -- Waste sites, source terms, and waste inventory report; Appendix B -- Description of the field activities and report database; Appendix C -- Characterization of hydrogeologic setting report

    SciTech Connect

    1996-09-01

    This Remedial Investigation (RI) Report characterizes the nature and extent of contamination, evaluates the fate and transport of contaminants, and assesses risk to human health and the environment resulting from waste disposal and other US Department of Energy (DOE) operations in Bear Creek Valley (BCV). BCV, which is located within the DOE Oak Ridge Reservation (ORR) encompasses multiple waste units containing hazardous and radioactive wastes arising from operations at the adjacent Oak Ridge Y-12 Plant. The primary waste units discussed in this RI Report are the S-3 Site, Oil Landfarm (OLF), Boneyard/Burnyard (BYBY), Sanitary Landfill 1 (SL 1), and Bear Creek Burial Grounds (BCBG). These waste units, plus the contaminated media resulting from environmental transport of the wastes from these units, are the subject of this RI. This BCV RI Report represents the first major step in the decision-making process for the BCV watershed. The RI results, in concert with the follow-on FS will form the basis for the Proposed Plan and Record of Decision for all BCV sites. This comprehensive decision document process will meet the objectives of the watershed approach for BCV. Appendix A includes descriptions of waste areas and estimates of the current compositions of the wastes. Appendix B contains an extensive database of environmental data for the Bear Creek Valley Characterization Area. Information is also presented about the number and location of samples collected, the analytes examined, and the extent of data validation. Appendix C describes the hydrogeologic conceptual model for Bear Creek Valley. This model is one of the principal components of the conceptual site models for contaminant transport in BCV.

  8. Oak Ridge Dose Reconstruction annual report for calendar year 1997

    SciTech Connect

    1998-09-01

    Calendar year 1997 was the third full year of work on the Oak Ridge Dose Reconstruction. Activities are summarized on the following individual project tasks: Task 1 -- Investigation of radioiodine releases from X-10 radioactive lanthanum processing; Task 2 -- Investigation of mercury releases from Y-12 lithium enrichment; Task 3 -- Investigation of PCBs in the environment near Oak Ridge; Task 4 -- Investigation of radionuclides released from White Oak Creek to the Clinch River; Task 5 -- Systematic searching of records repositories; Task 6 -- Evaluation of the quality of uranium monitoring data and a screening evaluation of potential off-site health risks; and Task 7 -- Performance of screening for additional materials not evaluated in the feasibility study.

  9. Calendar year 1993 groundwater quality report for the Upper East Fork Poplar Creek Hydrogeologic Regime, Y-12 Plant, Oak Ridge, Tennessee. 1993 groundwater quality data and calculated rate of contaminant migration, Part 1

    SciTech Connect

    Not Available

    1994-02-01

    This report contains groundwater quality data obtained during the 1993 calendar year (CY) at several waste management facilities and petroleum fuel underground storage tank (UST) sites associated with the US Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. These sites are within the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), which is one of three regimes defined for the purposes of groundwater and surface-water quality monitoring at the Y-12 Plant. The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability Organization manages the groundwater monitoring activities in each regime as part of the Y-12 Plant Groundwater Protection Program (GWPP). The annual groundwater report for the East Fork Regime is completed in two-parts; Part 1 (this report) containing the groundwater quality data and Part 2 containing a detailed evaluation of the data. The primary purpose of this report is to serve as a reference for the groundwater data obtained each year under the lead of the Y-12 Plant GWPP. However, because it contains information needed to comply with the Resource Conservation and Recovery Act (RCRA) interim status assessment monitoring reporting requirements, this report is submitted to the Tennessee Department of Health and Environment (TDEC) by the RCRA reporting deadline.

  10. An Assessment of health risk associated with mercury in soil and sediment from East Fork Poplar Creek, Oak Ridge, Tennessee. Final report

    SciTech Connect

    Revis, N.; Holdsworth, G.; Bingham, G.; King, A.; Elmore, J.

    1989-04-01

    This report presents results from a study conducted to determine the toxicity of Mercury in soils sediments samples. Mice were fed via diet, soils and sediment, from various locations along the East Fork Poplar creek. Tissue distribution of pollutants was determined at various intervals. The tissue level relative to toxicity was used to determine the effect of a complex matrix on the gastrointestinal absorption and tissue distribution of the pollutants (other pollutants included cadmium and selenium).

  11. First annual report on the Biological Monitoring and Abatement Program at Oak Ridge National Laboratory

    SciTech Connect

    Loar, J.M.; Adams, S.M.; Blaylock, B.G.; Boston, H.L.; Frank, M.L.; Garten, C.T.; Houston, M.A.; Kimmel, B.L.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Berry, J.B.; Talmage, S.S. ); Amano, H. ); Jimenez, B.D. ); Kitchings, J.T.

    1992-08-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. BMAP consists of seven major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring; (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota; (3) biological indicator studies; (4) instream ecological monitoring; (5) assessment of contaminants in the terrestrial environment; (6) radioecology of WOC and White Oak Lake (WOL); and (7) contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system. This document, the first of a series of annual reports presenting the results of BMAP, describes studies that were conducted from March through December 1986.

  12. Big Bayou Creek and Little Bayou Creek Watershed Monitoring Program

    SciTech Connect

    Kszos, L.A.; Peterson, M.J.; Ryon; Smith, J.G.

    1999-03-01

    Biological monitoring of Little Bayou and Big Bayou creeks, which border the Paducah Site, has been conducted since 1987. Biological monitoring was conducted by University of Kentucky from 1987 to 1991 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 through March 1999. In March 1998, renewed Kentucky Pollutant Discharge Elimination System (KPDES) permits were issued to the US Department of Energy (DOE) and US Enrichment Corporation. The renewed DOE permit requires that a watershed monitoring program be developed for the Paducah Site within 90 days of the effective date of the renewed permit. This plan outlines the sampling and analysis that will be conducted for the watershed monitoring program. The objectives of the watershed monitoring are to (1) determine whether discharges from the Paducah Site and the Solid Waste Management Units (SWMUs) associated with the Paducah Site are adversely affecting instream fauna, (2) assess the ecological health of Little Bayou and Big Bayou creeks, (3) assess the degree to which abatement actions ecologically benefit Big Bayou Creek and Little Bayou Creek, (4) provide guidance for remediation, (5) provide an evaluation of changes in potential human health concerns, and (6) provide data which could be used to assess the impact of inadvertent spills or fish kill. According to the cleanup will result in these watersheds [Big Bayou and Little Bayou creeks] achieving compliance with the applicable water quality criteria.

  13. Environmental Survey Report for ORNL: Small Mammal Abundance and Distribution Survey Oak Ridge National Environmental Research Park 2009 - 2010

    SciTech Connect

    Giffen, Neil R; Reasor, R. Scott; Campbell, Claire L.

    2009-12-01

    This report summarizes a 1-year small mammal biodiversity survey conducted on the Oak Ridge National Environmental Research Park (OR Research Park). The task was implemented through the Oak Ridge National Laboratory (ORNL) Natural Resources Management Program and included researchers from the ORNL Environmental Sciences Division, interns in the Oak Ridge Institute for Science and Education Higher Education Research Experiences Program, and ORNL Environmental Protection Services staff. Eight sites were surveyed reservation wide. The survey was conducted in an effort to determine species abundance and diversity of small mammal populations throughout the reservation and to continue the historical inventory of small mammal presence for biodiversity records. This data collection effort was in support of the approved Wildlife Management Plan for the Oak Ridge Reservation, a major goal of which is to maintain and enhance wildlife biodiversity on the Reservation. Three of the sites (Poplar Creek, McNew Hollow, and Deer Check Station Field) were previously surveyed during a major natural resources inventory conducted in 1996. Five new sites were included in this study: Bearden Creek, Rainy Knob (Natural Area 21), Gum Hollow, White Oak Creek and Melton Branch. The 2009-2010 small mammal surveys were conducted from June 2009 to July 2010 on the Oak Ridge National Environmental Research Park (OR Research Park). The survey had two main goals: (1) to determine species abundance and diversity and (2) to update historical records on the OR Research Park. The park is located on the Department of Energy-owned Oak Ridge Reservation, which encompasses 13,580 ha. The primary focus of the study was riparian zones. In addition to small mammal sampling, vegetation and coarse woody debris samples were taken at certain sites to determine any correlations between habitat and species presence. During the survey all specimens were captured and released using live trapping techniques including

  14. Third annual environmental restoration monitoring and assessment report for FY 1994 of the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Clapp, R.B.; Watts, J.A.; Guth, M.A.S.

    1994-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring, field investigations, and assessments conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, providing an ORNL site-wide perspective on types, distribution, and transport of contamination. The results presented are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) Project. WAG 2 is the lower portion of the White Oak Creek system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The Remedial Investigation Plan (DOE 1992) for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and the major conduit of contaminants from the ORNL site. During FY 1992, the remedial investigation activities were integrated with a series of environmental monitoring and SI activities at ORNL that address pathways and processes important for contaminant movement to gain a more integrated perspective of contamination movement at the watershed scale.

  15. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.

  16. OAK RIDGE

    Office of Legacy Management (LM)

    or _^ *ORNL/RASA-89/1 I : OAK RIDGE _NATIONAL LABORATORY |*H~~~~~ -~~Results of the I'I-------_____ ~ Preliminary Radiological * "~ i, .irri uSurvey at B&T Metals, _" 425 West Town Street, i * !' V Columbus, Ohio (C0001) I i. U Wo. 0aa-. r m ~~~~~~~~~ if? _ ~ W. D. Cottrell J. L Quillen J. W. Crutcher , I OPERATED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOR THE UNITED STATES DEPARTMENT OF ENERGY ORNL/RASA-89/1 3*1~~ ~HEALTH AND SAFETY RESEARCH DIVISION Waste Management Research

  17. Oak Ridge Office

    Office of Environmental Management (EM)

    PO. Box 2001 Oak Ridge, Tennessee 37831 July 21, 2010 Mr. Ron Murphree, Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 1 Oak Ridge, Tennessee 3783 1 Dear Mr....

  18. Oak Ridge Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    October 1, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO....

  19. Oak Ridge Office

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Ms. ... ON FISCAL YEAR 2014 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  20. Declared Wolf Creek

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    20-Dec 27-Dec 115% Nameplate Declared Wolf Creek UNIT 1 (MW) 52 45 52 52 52 52 52 52 ... -250 -238 -238 -238 -28 -28 -28 -28 -28 Wolf Creek generation limitations 0600-1200 ...

  1. OAK FMSXSE

    Office of Legacy Management (LM)

    d x-' . J ' T* ,I, fJ&w h5z8 - ornl r* OAK FMSXSE ~A~,O~A~ L tABORblTORY r c LI I C L * I _ CII II c I -hw LV tlilAm@ ENEROY 8YwEMs, lr4c. ~T~~~~~T~~$ W EkUD%GY I uauws79~fm ORNL/RASA-95115 Results of the Independent Radiological Verification Survey at the Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio (FOHOOl) D. E. Rice M. E. Murray K. S. Brown Thii report has been reproduced directly from the best avaitable ccpy. Available to DOE and DOE contractors from

  2. History of disposal of radioactive wastes into the ground at Oak Ridge National Laboratory

    SciTech Connect

    Coobs, J.H.; Gissel, J.R.

    1986-10-01

    Since the beginning of operations at the Oak Ridge National Laboratory (ORNL) in 1943, shallow land burial has been used for the disposal of solid low-level radioactive waste. These wastes have originated from nearly every operating facility, and from 1955 to 1963, ORNL's solid waste storage areas were designated by the Atomic Energy Commission (AEC) as the Southern Regional Burial Ground. During this period, about one million cubic feet of solid waste from various off-site installations were buried in solid waste storage areas (SWSAs) 4 and 5. Six SWSAs have been used since land burial operations began at ORNL in early 1944. ORNL has generated liquid radioactive waste since the separation of plutonium began in 1944. The majority of these wastes are classified as process (low-level) waste and are derived from evaporator condensate and cooling water from process vessels, and from building drains and surface drainage from contaminated areas. Process wastes are monitored at sampling stations located strategicially throughout the plant, and for nearly 15 years (1944 to 1957) they were discharged directly into White Oak Creek without being treated chemically to remove radionuclides. A smaller quantity of intermediate-level wastes (ILW) originate from the radiochemical separation process and from test reactors. The collection, treatment, and methods of disposal of ILW from the years 1943 to 1981 are described. Over this period of time there was a great deal of variation in the amounts and types of radioactive liquid wastes generated.

  3. Fermilab | Tritium at Fermilab | Ferry Creek Aerial View

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Ferry Creek Aerial View Ferry Creek Aerial View

  4. Fermilab | Tritium at Fermilab | Kress Creek Aerial View

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Kress Creek Aerial View Kress Creek Aerial View

  5. Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    SciTech Connect

    Not Available

    1993-09-01

    The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

  6. Oak Ridge Office

    Office of Environmental Management (EM)

    Martin , Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 I Oak Ridge, Tennessee 37831 Dear Mr. Martin : May 22, 2013 RESPONSE TO YOUR LETTER DATED MAY 9, 2013, RECOMMENDATION 216: RECOMMENDATIONS ON FISCAL YEAR 2015 DOE OAK RIDGE ENVIRONMENT AL MANAGEMENT BUDGET REQUEST Reference: Letter from David Martin to Mark Whitney, Recommendation 216: Recommendation on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request, dated May 9, 2013. I would like to express my

  7. Oak Ridge Office

    Office of Environmental Management (EM)

    I Oak Ridge, Tennessee 37831 Dear Mr. Martin : September 12, 2013 ru:SPONSE TO YOUR LETTER DATED .JUNE 13, 2013, RECOMMENDATION 217: RECOMMENDATION ON STEWARDSHIP POINT OF CONT ACT FOR THE OAK RIDGE RESERVATION Reference: June 13 , 2013, Letter from David Martin to Susan Cange, Recommendation 217: Recommendation on Stewardship Point of Contact for the Oak Ridge Reservation. We appreciate the recommendation provided by the Oak Ridge Site Specific Advisory Board regard in g having a dedicated

  8. White Oak Builders | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    TX Information About Partnership with NREL Partnership with NREL Yes Partnership Type Test & Evaluation Partner Partnering Center within NREL Electricity Resources & Building...

  9. AmeriFlux US-Oho Oak Openings

    SciTech Connect

    Chen, Jiquan

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-Oho Oak Openings. Site Description - The Ohio Oak Openings site is located within the Oak Openings Preserve Metropark of northwest Ohio, one of the few remaining oak woodlands/savanna/prairie complexes in the Midwest. Declared one of the "One of America's Last Great Places" by the Nature Conservancy the area consists of four main vegetation types: Oak Woodlands, Oak Savanna, Floodplain Forests and Wet Prairies. The stand surrounding the tower is mainly Oak Woodlands dominated by red, white and black oaks with a relatively abundant population of red maples indicating high soil moisture retention and a history of limited fire disturbances. Most of the area was cleared for agriculture at the time of Euro-American settlements in the mid to late-19th century. A large fraction of the cleared land was later abandoned due to the poor sandy soils. These areas reverted to Oak Savannas and in cases where fire was limited progressively made the transition to Oak Woodlands. Today patches of the forest are burned every few years as part of prescribed burning cycle to control stand density.

  10. Papalote Creek II | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Papalote Creek II Jump to: navigation, search Name Papalote Creek II Facility Papalote Creek II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service...

  11. Blue Creek Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Creek Wind Farm Jump to: navigation, search Name Blue Creek Wind Farm Facility Blue Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  12. Results of the radiological survey at Two Mile Creek, Tonawanda, New York (TNY002)

    SciTech Connect

    Murray, M.E.; Rodriguez, R.E.; Uziel, M.S.

    1997-08-01

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at Two Mile Creek, Tonawanda, New York. The survey was performed in November 1991 and May 1996. The purpose of the survey was to determine if radioactive materials from work performed under government contract at the Linde Air Products Division of Union Carbide Corporation, Tonawanda, New York, had been transported into the creek. The survey included a surface gamma scan in accessible areas near the creek and the collection of soil, sediment, and core samples for radionuclide analyses. Survey results indicate that no significant material originating at the Linde plant is presently in the creek. Three of the 1991 soil sample locations on the creek bank and one near the lake contained slightly elevated concentrations of {sup 238}U with radionuclide distributions similar to that found in materials resulting from former processing activities at the Linde site.

  13. Manager, Oak Ridge Office

    Energy.gov [DOE]

    A successful candidate in this position will provide overall executive leadership to and integration of the Oak Ridge Integrated Support Center, which houses mission critical activities and support...

  14. Oak Ridge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge Oak Ridge Oak Ridge's compliance agreements - which help support the development of effective compliance approaches and strategies - are listed below. Summaries of the agreements also are included. Oak Ridge Reservation Compliance Order, September 26, 1995 (164.23 KB) Oak Ridge Reservation Compliance Order, September 26, 1995 Summary (40.23 KB) Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992 (1.92 MB) Federal Facility Agreement for the Oak Ridge Reservation,

  15. An Oak Ridge baseball team | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    An Oak Ridge baseball team An Oak Ridge baseball team An Oak Ridge baseball team

  16. Women @ Energy: Karen White | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Karen White Women @ Energy: Karen White August 28, 2015 - 10:51am Addthis Karen S. White is controls group leader and data operations manager at the Spallation Neutron Source at Oak Ridge National Laboratory. She attended Old Dominion University, where she earned a bachelor's degree in computer engineering and master's degree in computer science, and George Washington University, where she earned an M.E. in engineering management. Karen S. White is controls group leader and data operations

  17. Oak Ridge Reservation Needs Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security Complex production workers.

  18. Oak Ridge Associated Universities Procurement Questionnaire Application

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    System Supplier Profile PIA, Oak ridge Operations Office | Department of Energy Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities

  19. Geology of the lower Yellow Creek Area, Northwestern Colorado

    SciTech Connect

    Hail, W.J.

    1990-01-01

    The lower Yellow Creek area is located in Rio Blanco and Moffat Counties of northwestern Colorado, about midway between the towns of Rangely and Meeker. The study area is in the northwestern part of the Piceance Creek basin, a very deep structural and sedimentary basin that formed during the Laramide orogeny. Potentially important resources in the area are oil shale and related minerals, oil and gas, coal, and uranium. Topics discussed in the report include: Stratigraphy (Subsurface rocks, Cretaceous rocks, Tertiary rocks, and Quaternary deposits); Structure (Midland anticline, graben at Pinyon Ridge, and Crooked Wash syncline, Folds and faults in the vicinity of the White River, Red Wash syncline and central graben zone, Yellow Creek anticlinal nose); Economic geology (Oil shale and associated minerals, Coal, Oil and gas, Uranium, Gravel).

  20. Meadow Creek | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Meadow Creek Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Ridgeline Energy Developer Ridgeline Energy Energy Purchaser PacifiCorp...

  1. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  2. The Oak Ridge Reservation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Reservation 41,1EsEiiS WORKING GROUP July, 1998 This report was written and edited by members of the Stewardship Committee with the assistance of Phoenix Environmental Corporation of Alexandria, Virginia. Additional copies and information can be found on the DOE Oak Ridge Operations site on the world wide web: ornl.gov/doe~oro/em/emhome.html or by calling the Information Resource Center at 423-241-4582 Stakeholder R e ~ o r t on stewards hi^ TABLE OF CONTENTS 1 . 0 INTRODUCTION

  3. Oak Ridge Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    July 30, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R231 00, MODIFICATION A049 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $14,265 ,839.77, resulting in total obligations to this contract of $515,743,782 .56 . If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at

  4. Hills Creek Powerhouse Turbine and Unit Rehabilitation

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hills Creek Powerhouse Turbine and Unit Rehabilitation This project will replace the runners and windings for the two 17.5 MW units at the Hills Creek powerhouse. Hills Creek is a...

  5. Lost Creek Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Lost Creek Wind Farm Jump to: navigation, search Name Lost Creek Wind Farm Facility Lost Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  6. cityOakRidgeWeb

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Center Children 's Museum OFFICE OF SCIENTIFIC & TECHNICAL INFORMATION Oak Ridge Marina Centennial Golf Course Oak Ridge Memorial Park Swimming Pool 11 10 9 9 8 6 7 5 4 3 2 1...

  7. Fermilab | Tritium at Fermilab | Kress Creek Results

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Kress Creek Results chart This chart (click chart for larger version) shows the levels of tritium in Kress Creek since January 2006. To date, Fermilab has not detected tritium in Kress Creek. The detection limit is one picocurie per milliliter (see footnote). Increased monitoring began on Kress Creek following detection of low levels of tritium in Indian Creek in November 2005. The levels of tritium measured in the Fermilab cooling ponds and in Indian Creek are well below federal water standards

  8. Wolverine Creek Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search Name Wolverine Creek Wind Farm Facility Wolverine Creek Wind Energy Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  9. Fermilab | Tritium at Fermilab | Indian Creek Results

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    larger version) shows the levels of tritium in Indian Creek since November 2005, when our environmental monitoring program detected low levels of tritium in Indian Creek for the...

  10. Kiowa Creek Switching Station

    SciTech Connect

    Not Available

    1990-03-01

    The Western Area Power Administration (Western) proposes to construct, operate, and maintain a new Kiowa Creek Switching Station near Orchard in Morgan County, Colorado. Kiowa Creek Switching Station would consist of a fenced area of approximately 300 by 300 feet and contain various electrical equipment typical for a switching station. As part of this new construction, approximately one mile of an existing 115-kilovolt (kV) transmission line will be removed and replaced with a double circuit overhead line. The project will also include a short (one-third mile) realignment of an existing line to permit connection with the new switching station. In accordance with the Council on Environmental Quality (CEQ) regulations for implementing the procedural provisions of the National Environmental Policy Act of 1969 (NEPA), 40 CFR Parts 1500--1508, the Department of Energy (DOE) has determined that an environmental impact statement (EIS) is not required for the proposed project. This determination is based on the information contained in this environmental assessment (EA) prepared by Western. The EA identifies and evaluates the environmental and socioeconomic effects of the proposed action, and concludes that the advance impacts on the human environment resulting from the proposed project would not be significant. 8 refs., 3 figs., 1 tab.

  11. Oak Ridge Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Site Oak Ridge Site Demolition progress at Oak Ridge Demolition progress at Oak Ridge Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Demolition progress at Oak Ridge

  12. Summary - Mitigation and Remediation of Mercury Contamination at the Y-12 Plant, Oak Ridge, TN

    Office of Environmental Management (EM)

    Oak Ridge, TN EM Project: Mitigation/Remediation of Hg ETR Report Date: April 2008 ETR-13 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Mitigation and Remediation of Mercury Contamination at the Y-12 Plant, Oak Ridge, TN Why DOE-EM Did This Review From 1953 to 1983, ~240,000 pounds of mercury (Hg) were released to the East Fork Popular Creek during the operation of the Y-12 Plant. In 1963, direct systematic releases of mercury

  13. Bear Creek Valley Watershed | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bear Creek Valley Watershed Bear Creek Valley Watershed This document discusses the Bear Creek Valley Watershed. Topics include: * The area's safety * Any use limitations for the area * History and cleanup background for this area * How DOE's cleanup program addressed the problem Bear Creek Valley Watershed fact sheet (814.29 KB) More Documents & Publications Melton Valley Watershed Upper East Fork Poplar Creek Cleanup Progress Report - 2010

  14. History of mercury use and environmental contamination at the Oak Ridge Y-12 Plant

    SciTech Connect

    Brooks, Scott C; Southworth, George R

    2010-01-01

    Between 1950 and 1963 approximately 11 million kilograms of mercury (Hg) were used at the Oak Ridge Y-12 National Security Complex (Y-12 NSC) for lithium isotope separation processes. About 3% of the Hg was lost to the air, soil and rock under facilities, and East Fork Poplar Creek (EFPC) which originates in the plant site. Smaller amounts of Hg were used at other Oak Ridge facilities with similar results. Although the primary Hg discharges from Y-12 NSC stopped in 1963, small amounts of Hg continue to be released into the creek from point sources and diffuse contaminated soil and groundwater sources within Y-12 NSC. Mercury concentration in EFPC has decreased 85% from 2000 ng/L in the 1980s. In general, methylmercury concentrations in water and in fish have not declined in response to improvements in water quality and exhibit trends of increasing concentration in some cases.

  15. Oak Ridge ARI Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge ARI Overview Oak Ridge ARI Overview This fact sheet covers the asset revitalization initiative in Oak Ridge, TN. Oakridge_Fact_Sheet.pdf (382.48 KB) More Documents & Publications ARI Quarterly Newsletter Oak Ridge ARI Overview ARI: Creating a 2020 DOE Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets

  16. Lower East Fork Poplar Creek

    Office of Environmental Management (EM)

    is safe for limited water-contact recreational uses, such as wading in footwear. Eating fish from the creek is not recommended based upon the level of mercury in the fish. Are...

  17. Ophir Creek Space Heating Low Temperature Geothermal Facility...

    OpenEI (Open Energy Information) [EERE & EIA]

    Ophir Creek Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Ophir Creek Space Heating Low Temperature Geothermal Facility Facility Ophir Creek...

  18. Wolf Creek Nuclear Operating Corporation | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Wolf Creek Nuclear Operating Corporation Jump to: navigation, search Name: Wolf Creek Nuclear Operating Corporation Place: Burlington, Kansas Zip: 66839-0411 Product: Wolf Creek...

  19. Fourche Creek Wastewater Biomass Facility | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Fourche Creek Wastewater Biomass Facility Jump to: navigation, search Name Fourche Creek Wastewater Biomass Facility Facility Fourche Creek Wastewater Sector Biomass Facility Type...

  20. DOE Oak Ridge Operations managers

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    weapons production, and basic scientific research. Additional responsibilities have been placed on the federal offices in Oak Ridge during the years. It can be said, if the...

  1. OAK RIDGE NATIONAL LABORATORY

    Office of Legacy Management (LM)

    POST OFFICE 80X 2008 OAK RIDGE, TENNESSEE 37831 MANAGED BY MARTIN MARlElTA ENERGY SYSTEMS. INC. FOR THE U.S. DEPARTMENT OF ENERGY July 15, 1992 Dr. W. A Williams Department of Energy Trevion II Building EM-421 Washington, D. C. 20585 Dear Dr. Williams: Trip Report of ORNL Health Physics Support at the Uniroyal Chemical Company Painesvik, Ohio, on June 25,1992 As per agreement between DOE-HQ and Uniroyal of Painesville, on June 25, 1992, a member, the undersigned, from the Health and Safety

  2. Oak Ridge Site Specific

    Office of Environmental Management (EM)

    Site Specific adviSORy BOaRd fy 2014 annual RepORt OctOBeR 2013 - SeptemBeR 2014 ORSSAB FY 2014 ANNUAL REPORT FY 2014 was my first term as chair of the Oak Ridge Site Specific Advisory Board. I thank the members of the board for putting their confidence in me for the year and again for FY 2015. It is an honor and a privilege to represent this important organization. The board's primary mission is to provide independent advice and recommendations to the Department of Energy on its environmental

  3. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ... * Internet: www.oakridge.doe.govemssab Oak Ridge Site ... and maintenance budget, funding, and personnel ...

  4. Oak Ridge Office of Environmental Management

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... ON FISCAL YEAR 2016 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  5. Blue Oak Energy Inc | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Blue Oak Energy Inc Jump to: navigation, search Name: Blue Oak Energy Inc Place: Davis,, California Zip: 95618 Sector: Services Product: Focused on PV system design, planning,...

  6. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Saver

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  7. Oak Ridge shoppers | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    shoppers Oak Ridge shoppers Oak Ridge shoppers in a crowded grocery store

  8. Environmental Monitoring Report - United States Department of Energy, Oak Ridge Facilities, Calendar Year 1984

    SciTech Connect

    Jordan, R.G.

    1999-01-01

    Each year since 1972, a report has been prepared on the environmental monitoring activities for the DOE facilities in oak Ridge, Tennessee, for the previous calendar year. previously, the individual facilities published quarterly and annual progress reports that contained some environmental monitoring data. The environmental monitoring program for 1984 includes sampling and analysis of air, water from surface streams, groundwater, creek sediment, biota, and soil for both radioactive and nonradioactive (including hazardous) materials. Special environmental studies that have been conducted in the Oak Ridge area are included in this report, primarily as abstracts or brief summaries. The annual report for 1984 on environmental monitoring and surveillance of the Oak Ridge community by Oak Ridge Associated Universities (ORAU) is included as an appendix. A brief description of the topography and climate of the Oak Ridge area and a short description of the three DOE facilities are provided below to enhance the reader's understanding of the direction and contents of the environmental monitoring program for Oak Ridge.

  9. White Roofs

    ScienceCinema

    Chu, Steven

    2013-05-29

    Secretary Steven Chu discusses the benefits of switching to white roofs and light colored pavements.

  10. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Office | Department of Energy Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office (78.91 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA,

  11. Prairie Creek Ethanol LLC | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Ethanol LLC Jump to: navigation, search Name: Prairie Creek Ethanol LLC Place: Goldfield, Iowa Zip: 50542 Product: Prairie Creek Ethanol, LLC had planned to build a 55m gallon...

  12. Asotin Creek Model Watershed Plan

    SciTech Connect

    Browne, D.; Holzmiller, J.; Koch, F.; Polumsky, S.; Schlee, D.; Thiessen, G.; Johnson, C.

    1995-04-01

    The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon``. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity. The watershed coordinator for the Asotin County Conservation District led a locally based process that combined local concerns and knowledge with technology from several agencies to produce the Asotin Creek Model Watershed Plan.

  13. Smith Creek Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Smith Creek Geothermal Project Project Location Information Coordinates 39.311388888889,...

  14. Edwards Creek Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Edwards Creek Geothermal Project Project Location Information Coordinates 39.617222222222,...

  15. Oak Ridge EM Program DOE Oak Ridge Environmental Management Program

    Office of Environmental Management (EM)

    ... Offce of Environmental Management. Expansion of EMWMF (Cells ... Alpha 4 building at Y-12. History of the Oak Ridge EM Program (continued) New 1 megawatt solar array opens at ETTP under a ...

  16. Oak Ridge Opw~tlon~

    Office of Legacy Management (LM)

    634 eo.7to Department of Energy Oak Ridge Opwtlon P.O. Box ... (MED) for short-term storage of approximately 219,000 ... in the near future in areas found to be contaminated. ...

  17. Deputy Secretary visits Oak Ridge

    Energy.gov [DOE]

    As Deputy Secretary Sherwood-Randall traveled across the Oak Ridge Reservation, she stopped at the East Tennessee Technology Park for a first-hand perspective of the environmental cleanup happening there.

  18. AEC and Oak Ridge Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    to residents in 1953 - opening the way for extensive construction 3. In 1956 the first property was sold to private owners 4. In 1959 Oak Ridger's voted to incorporate and...

  19. Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge National Laboratory Oak Ridge National Laboratory An aerial view of the Oak Ridge National Laboratory campus. An aerial view of the Oak Ridge National Laboratory campus. The U.S. Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) is the nation's largest multi-program science and technology laboratory. ORNL's mission is to deliver scientific discoveries and technical breakthroughs that will accelerate the development and deployment of solutions in clean energy and global

  20. Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge National Laboratory Oak Ridge National Laboratory Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory (ORNL) conducts research and development to create scientific knowledge and solutions that strengthen the nation's leadership in key areas of science; increase the availability of clean, abundant energy; restore and protect the environment; and contribute to national security. ORNL also performs

  1. Franny White

    Energy.gov [DOE]

    Franny White is a News & Media Relations Specialist at the Energy Department’s Pacific Northwest National Laboratory.

  2. Oak Ridge Construction | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    System Supplier Profile PIA, Oak ridge Operations Office | Department of Energy Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities

  3. Recommendation 217: Stewardship Point of Contact for the Oak...

    Office of Environmental Management (EM)

    7: Stewardship Point of Contact for the Oak Ridge Reservation Recommendation 217: Stewardship Point of Contact for the Oak Ridge Reservation The Oak Ridge Site Specific Advisory...

  4. Oak Ridge Operations Office of Environmental Management Overview...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview PDF icon Oak Ridge Operations Office of...

  5. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    SciTech Connect

    Kszos, L.A.; Adams, S.M.; Ashwood, T.L.; Blaylock, B.G.; Greeley, M.S.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Hinzman, R.L.; Shoemaker, B.A.

    1993-04-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP is based on results of biological monitoring conducted from 1986 to 1992 and discussions held on November 12, 1992, between staff of Martin Marietta Energy Systems, Inc. (Oak Ridge National Laboratory and the K-25 Site), and the Tennessee Department of Environment and Conservation, Department of Energy Oversight Division. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions.

  6. Thayer Creek Hydroelectric Update - 2015

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Thayer Creek Hydroelectric Update - 2015 2015 Program Review Meeting DOE Tribal Energy Program Denver, Colorado May 5, 2015 Sharon Love General Manger/President Kootznoowoo, Inc. Harold Frank, Jr., M.S. Land and Environmental Planner Kootznoowoo, Inc. Angoon, Alaska Vicinity Map Angoon, Alaska * City of Angoon - 457 people (2013) * Angoon Community Association (IRA tribe) * Kootznoowoo, Inc. - 1,000(+) shareholders (629 original) - ANCSA village corporation * Angoon area inhabited at least

  7. White Papers

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Viz Collab IS&T Projects NSEC » Information Science and Technology Institute (ISTI) » White Papers White Papers This page contains a collection of white papers on IS&T topics and presentations about ISTI. Contact Institute Director Stephan Eidenbenz (505) 667-3742 Email Professional Staff Assistant Nickole Aguilar Garcia (505) 665-3048 Email What is ISTI? Slide deck, Author: S. Eidenbenz, November 2015

  8. Early Oak Ridge Trailer Home | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Home Early Oak Ridge Trailer Home A typical trailer home

  9. Jonathan White

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Jonathan White leads the Wind Plant Optimization Team that seeks to improve wind plant underperformance, study turbine-turbine interaction and develop new measurement technologies ...

  10. New Jersey Nuclear Profile - Oyster Creek

    Energy Information Administration (EIA) (indexed site)

    Oyster Creek" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" ...

  11. Kansas Nuclear Profile - Wolf Creek Generating Station

    Energy Information Administration (EIA) (indexed site)

    April 2012" "Next Release Date: February 2013" "Wolf Creek Generating Station" ...0","9,556",94.0,"PWR","applicationvnd.ms-excel","applicationvnd.ms-excel" ...

  12. Bull Creek Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Wind Farm Facility Bull Creek Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Eurus Developer Eurus Energy Purchaser Market...

  13. Twin Creeks Technologies | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Technologies Jump to: navigation, search Name: Twin Creeks Technologies Place: San Jose, California Zip: 95134 Product: California-based silicon-based thin-film PV startup in...

  14. Calendar Year 2002 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    2003-03-31

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2002 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2002 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The sections of this report provide details regarding the CY 2002 groundwater and surface water monitoring activities in the Bear Creek, East Fork, and Chestnut Ridge Regimes. Section 2 describes the monitoring programs implemented by the Y-12 GWPP and BJC during CY 2002. Section 3 identifies the sampling locations in each hydrogeologic regime and the corresponding sampling frequency during CY 2002, along with the associated quality assurance/quality control (QA/QC) sampling. Section 4 describes groundwater and surface water sample collection and Section 5 identifies the field measurements and laboratory analytes for each sampling location. Section 6 outlines the data management protocols and data quality objectives (DQOs). Section 7 describes the groundwater elevation monitoring in each regime during CY 2002 and Section 8 lists the documents cited for more detailed operational, regulatory, and technical information.

  15. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    May 9, 2013 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 215:...

  16. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 228: Recommendation on Fiscal Year 2017 DOE Oak Ridge Environmental Management Budget Request At our June 10, ...

  17. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    on Fiscal Year 2016 DOE Oak Ridge Environmental Management Budget Request At our May 14, 2014, ... Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ...

  18. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Whitney: Recommendation 216: Recommendations on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request At our May 8, ...

  19. Small Business Administration Honors Oak Ridge Subcontractor

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – The U.S. Small Business Administration (SBA) recently honored an environmental cleanup company that supports Oak Ridge’s EM program as its Subcontractor of the Year in an eight-state region.

  20. Independent Oversight Review, Oak Ridge Office- August 2011

    Energy.gov [DOE]

    Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation

  1. Oak Ridge Environmental Management: 30 years in 30 minutes |...

    Office of Environmental Management (EM)

    Oak Ridge Environmental Management: 30 years in 30 minutes Oak Ridge Environmental Management: 30 years in 30 minutes Addthis

  2. Oak Ridge Facilities Construction | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Facilities ... Oak Ridge Facilities Construction Work in wet and mud was common during the construction of Oak Ridge facilities

  3. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    March 14, 2008 Mr. Steve McCracken Assistant Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. McCracken: Recommendation 165: Recommendation on Conducting Future Verifications of Cleanup At our March 12 meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation. The successes of independent verification of cleanup on the Oak Ridge Reservation, the David Witherspoon Site in Knoxville, and at many other sites

  4. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    3: Recommendations on Additional Waste Disposal Capacity on the Oak Ridge Reservation At our May 14, 2014, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations on additional waste disposal capacity on the Oak Ridge Reservation. These recommendations are based on the Remedial Investigation/Feasibility Study for CERCLA Oak Ridge Reservation Waste Disposal (DOE/OR/01-2535&D2). The recommendations encourage DOE to continue planning for an additional on-site

  5. Oak Ridge Site Specific Advisory Board Meetings

    Energy.gov [DOE]

    Lists links to the Oak Ridge Site Specific Advisory Board Meetings. The links provide meeting documents available for download.

  6. Secretary Moniz Visits Oak Ridge National Laboratory

    Energy.gov [DOE]

    Check out highlights from Secretary Moniz's visit to Oak National Laboratory, where he talked about science, innovation and national security.

  7. Third report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect

    Hinzman, R.L.; Adams, S.M.; Ashwood, T.L.

    1995-08-01

    As a condition of the modified National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site) on September 11, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream (Mitchell Branch or K-1700 stream). On October 1, 1992, a renewed NPDES permit was issued for the K-25 Site. A biological monitoring plan was submitted for Mitchell Branch, Poplar Creek, Poplar Creek Embayment of the Clinch River and any unnamed tributaries of these streams. The objectives of BMAP are to (1) demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life and (2) document the effects on stream biota resulting from operation of major new pollution abatement facilities, including the Central Neutralization Facility (CNF) and the Toxic Substances Control Act (TSCA) incinerator. The BMAP consists of four tasks: (1) toxicity monitoring; (2) bioaccumulation monitoring; (3) assessment of fish health; and (4) instream monitoring of biological communities, including benthic macroinvertebrates and fish. This document, the third in a series, reports on the results of the Oak Ridge K-25 Site BMAP; it describes studies that were conducted over various periods of time between June 1990 and December 1993, although monitoring conducted outside this time period is included, as appropriate.

  8. DOE Names Oak Ridge Cleanup Manager

    Energy.gov [DOE]

    Oak Ridge, Tenn. – The U.S. Department of Energy (DOE) announced today the selection of Sue Cange as the manager of the Oak Ridge Office of Environmental Management (EM). Previously, Cange served as the acting manager of EM’s Oak Ridge Office since May 2014, and she has served as the deputy manager since March 2011.

  9. Lower East Fork Poplar Creek | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    East Fork Poplar Creek Lower East Fork Poplar Creek This document discusses the Lower East Fork Poplar Creek. Topics include: * The area's safety * Any use limitations for the area * History and cleanup background for this area * How DOE's cleanup program addressed the problem Lower East Fork Poplar Creek fact sheet (837.15 KB) More Documents & Publications Upper East Fork Poplar Creek Lower Watts Bar Reservoir Clinch River/Poplar Creek Mercury Treatment Facility overview

  10. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary Bonneville ...

  11. Big Creek Hot Springs Geothermal Area | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Big Creek Hot Springs Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Big Creek Hot Springs Geothermal Area Contents 1 Area Overview 2 History and...

  12. Cedar Creek Wind Farm II (Nordex) | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Nordex) Jump to: navigation, search Name Cedar Creek Wind Farm II (Nordex) Facility Cedar Creek II (Nordex) Sector Wind energy Facility Type Commercial Scale Wind Facility Status...

  13. DOE - Office of Legacy Management -- Hoe Creek Underground Coal...

    Office of Legacy Management (LM)

    Hoe Creek Underground Coal Gasification Site - 045 FUSRAP Considered Sites Site: Hoe Creek Underground Coal Gasification Site (045) Designated Name: Alternate Name: Location: ...

  14. Kingston Creek Hydro Project Powers 100 Households | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Kingston Creek Hydro Project Powers 100 Households Kingston Creek Hydro Project Powers 100 Households August 21, 2013 - 12:00am Addthis Nevada-based contracting firm Nevada ...

  15. Horse Creek Hot Spring Pool & Spa Low Temperature Geothermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Horse Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility...

  16. Granite Creek Hot Spring Pool & Spa Low Temperature Geothermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Granite Creek Hot Spring Pool & Spa Low Temperature Geothermal Facility Facility...

  17. Smith Creek Valley Geothermal Area | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Smith Creek Valley Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Smith Creek Valley Geothermal Area Contents 1 Area Overview 2 History and...

  18. Furnace Creek Ranch Pool & Spa Low Temperature Geothermal Facility...

    OpenEI (Open Energy Information) [EERE & EIA]

    Ranch Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Furnace Creek Ranch Pool & Spa Low Temperature Geothermal Facility Facility Furnace Creek...

  19. Cement Creek Ranch Pool & Spa Low Temperature Geothermal Facility...

    OpenEI (Open Energy Information) [EERE & EIA]

    Cement Creek Ranch Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Cement Creek Ranch Pool & Spa Low Temperature Geothermal Facility Facility Cement...

  20. Hot Creek Pool & Spa Low Temperature Geothermal Facility | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Hot Creek Pool & Spa Low Temperature Geothermal Facility Facility Hot Creek Sector Geothermal energy...

  1. Silver Creek Farms Aquaculture Low Temperature Geothermal Facility...

    OpenEI (Open Energy Information) [EERE & EIA]

    Creek Farms Aquaculture Low Temperature Geothermal Facility Jump to: navigation, search Name Silver Creek Farms Aquaculture Low Temperature Geothermal Facility Facility Silver...

  2. Oak Ridge, Tennessee, Warehouses Site Fact Sheet

    Office of Legacy Management (LM)

    Oak Ridge, Tennessee, Warehouses Site. This site is managed by the U.S. Department of Energy Office of Legacy Management under the Formerly Utilized Sites Remedial Action Program. Oak Ridge, Tennessee, Warehouses Site Oak Ridge Warehouses Site Knoxville Oak Ridge 40 75 640 140 75 321 411 70 441 11 129 27 25W M:\LTS\111\0001\10\S03066\S0306600.mxd smithw 09/13/2011 2:35:09 PM 0 10 20 Miles Nashville TENNESSEE Location of the Oak Ridge, Tennessee, Warehouses Site Site Description and History The

  3. Bechtel Jacobs Company LLC Sampling and Analysis Plan for the Water Resources Restoration Program for Fiscal Year 2009, Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect

    Ketelle R.H.

    2008-09-25

    The Oak Ridge Reservation (ORR) Water Resources Restoration Program (WRRP) was established by the U. S. Department of Energy (DOE) in 1996 to implement a consistent approach to long-term environmental monitoring across the ORR. The WRRP has four principal objectives: (1) to provide the data and technical analysis necessary to assess the performance of completed Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) actions on the ORR; (2) to perform monitoring to establish a baseline against which the performance of future actions will be gauged and to support watershed management decisions; (3) to perform interim-status and post-closure permit monitoring and reporting to comply with Resource Conservation and Recovery Act of 1976 (RCRA) requirements; and (4) to support ongoing waste management activities associated with WRRP activities. Water quality projects were established for each of the major facilities on the ORR: East Tennessee Technology Park (ETTP); Oak Ridge National Laboratory (ORNL), including Bethel Valley and Melton Valley; and the Y-12 National Security Complex (Y-12 Complex or Y-12), including Bear Creek Valley (BCV), Upper East Fork Poplar Creek (UEFPC), and Chestnut Ridge. Off-site (i.e., located beyond the ORR boundary) sampling requirements are also managed as part of the Y-12 Water Quality Project (YWQP). Offsite locations include those at Lower East Fork Poplar Creek (LEFPC), the Clinch River/Poplar Creek (CR/PC), and Lower Watts Bar Reservoir (LWBR). The Oak Ridge Associated Universities (ORAU) South Campus Facility (SCF) is also included as an 'off-site' location, although it is actually situated on property owned by DOE. The administrative watersheds are shown in Fig. A.l (Appendix A). The WRRP provides a central administrative and reporting function that integrates and coordinates the activities of the water quality projects, including preparation and administration of the WRRP Sampling and Analysis Plan

  4. Field sampling and analysis plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-03-01

    The former YS-860 Firing Ranges are located at the eastern end of the Oak Ridge Y-12 Plant outside the primary facility fence line and west of Scarboro Road within the Upper East Fork Poplar Creek watershed in Oak Ridge, Tennessee. A decision has been made by the US Department of Energy to conduct a removal action of lead-contaminated soils at this site as part of early source actions within the Upper East Fork Poplar Creek watershed. This non-time critical removal action of bullets and lead-contaminated soil from the YS-860 Firing Ranges is being conducted as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 action. These actions are consistent with the Oak Ridge Reservation Environmental Restoration Program. The removal action will focus on the excavation of bullets and lead-contaminated soil from the shooting range berms, transportation of the material to a permitted treatment facility for disposal, demolition and land filling of a concrete trench and asphalt pathways at the site, and grading and revegetating of the entire site. This report is the field sampling and analysis plan for the removal action at the former YS-860 Firing Ranges. The field sampling and analysis plan addresses environmental sampling for lead after the removal of lead-contaminated soil from the target berm area. The objective of this sampling plan is to obtain sufficient analytical data to confirm that the removal action excavation has successfully reduced lead levels in soil to below the action level of 1,400 micrograms/g.

  5. Oak Ridge Associated Universities II

    Office of Legacy Management (LM)

    Prepared by Oak Ridge Associated Universities II Prepared for Division of Fuel - Cycle and Material Safety II U.S. Nuclear Regulatory Commission L RADIOLOGICAL SURVEY OF THE W. R. GRACE PROPERTY WAYNE, NEW JERSEY P. W. FRAME Radiological Site Assessment Program Manpower Education, Research, and Training Division FINAL REPORT January 1983 RADIOLOGICAL SURVEY OF THE W.R. GRACE PROPERTY WAYNE, NEW JERSEY Prepared for Division of Fuel Cycle and Material Safety U.S. Nuclear Regulatory Commission P.

  6. Oak Ridge National Laboratory Review

    SciTech Connect

    Krause, C.; Pearce, J.; Zucker, A.

    1992-01-01

    This report presents brief descriptions of the following programs at Oak Ridge National Laboratory: The effects of pollution and climate change on forests; automation to improve the safety and efficiency of rearming battle tanks; new technologies for DNA sequencing; ORNL probes the human genome; ORNL as a supercomputer research center; paving the way to superconcrete made with polystyrene; a new look at supercritical water used in waste treatment; and small mammals as environmental monitors.

  7. Oak Ridge Presentation - VOLTTRON 2016

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ORNL is managed by UT-Battelle for the US Department of Energy Utilizing VOLTTRON(tm) Platform for Enabling Energy Efficiency and Grid-Responsiveness of Building Loads Teja Kuruganti, David Fugate, James Nutaro, Jibonananda Sanyal, Brian Fricke Oak Ridge National Laboratory John Wallace Emerson Climate Technologies Presented at: Technical Meeting on Software Framework for Transactive Energy: VOLTTRON 4 th - 5 th August, 2016 Goals - The Transactive Letter * From the Grid Perspective - Increase

  8. Oak%20Ridge.jpg | OSTI, US Dept of Energy Office of Scientific and

    Office of Scientific and Technical Information (OSTI)

    Technical Information Oak%20Ridge

  9. Campbell Creek Research Homes FY 2012 Annual Performance Report

    SciTech Connect

    Gehl, Anthony C; Munk, Jeffrey D; Jackson, Roderick K; Boudreaux, Philip R; Khowailed, Gannate A

    2013-01-01

    The Campbell Creek project is funded and managed by the Tennessee Valley Authority (TVA) Technology Innovation, Energy Efficiency, Power Delivery & and Utilization Office. Technical support is provided under contract by the Oak Ridge National Laboratory (ORNL) and the Electric Power Research Institute.The project was designed to determine the relative energy efficiency of typical new home construction, energy efficiency retrofitting of existing homes, and high -performance new homes built from the ground up for energy efficiency. This project will compare three houses that represented the current construction practice as a base case (Builder House CC1); a modified house that could represent a major energy- efficient retrofit (Retrofit House CC2); and a house constructed from the ground up to be a high- performance home (High Performance House CC3). In order tTo enablehave a valid comparison, it was necessary to simulate occupancy in all three houses and heavily monitor the structural components and the energy usage by component. All three houses are two story, slab on grade, framed construction. CC1 and CC2 are approximately 2,400 square feet2. CC3 has a pantry option, that is primarily used as a mechanical equipment room, that adds approximately 100 square feet2. All three houses are all-electric (with the exception of a gas log fireplace that is not used during the testing), and use air-source heat pumps for heating and cooling. The three homes are located in Knoxville in the Campbell Creek Subdivision. CC1 and CC2 are next door to each other and CC3 is across the street and a couple of houses down. The energy data collected will be used to determine the benefits of retrofit packages and high -performance new home packages. There are over 300 channels of continuous energy performance and thermal comfort data collection in the houses (100 for each house). The data will also be used to evaluate the impact of energy -efficient upgrades ton the envelope, mechanical

  10. When did movement begin on the Furnace Creek fault zone

    SciTech Connect

    Reheis, M. )

    1993-04-01

    About 50 km of post-Jurassic right-lateral slip has occurred on the northern part of the Furnace Creek fault zone (FCFZ). The sedimentology, stratigraphy, and structure of Tertiary rocks suggest that movement on the fault began no earlier than 12--8 Ma and possibly as late as 5--4 Ma. Large remnants of erosion surfaces occur on both sides of the FCFZ in the southern White Mountains and Fish Lake Valley and are buried by rhyolite and basalt, mostly 12--10 Ma; the ash flows and welded tuffs were likely erupted from sources at least 40 km to the east. Thus, the area probably had gentle topography, suggesting a lengthy period of pre-late Miocene tectonic stability. On the west side of the FCFZ, Cambrian sedimentary rocks are buried by a fanglomerate with an [sup [minus

  11. EA-1044: Melton Valley Storage Tanks Capacity Increase Project- Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to construct and maintain additional storage capacity at the U.S. Department of Energy's Oak Ridge National Laboratory, Oak Ridge,...

  12. Upper East Fork Poplar Creek | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Upper East Fork Poplar Creek Upper East Fork Poplar Creek This document discusses the Upper East Fork Poplar Creek. Topics include: * The area's safety * Any use limitations for the area * History and cleanup background for this area * How DOE's cleanup program addressed the problem Upper East Fork Poplar Creek Watershed fact sheet (823.74 KB) More Documents & Publications Lower East Fork Poplar Creek Mercury Treatment Facility overview Recommendation 229: Recommendation on the Preferred

  13. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Oak Ridge Site Specific Advisory Board Recommendation 233: Recommendations on the Proposed Environmental Management Disposal Facility at the U.S. DOE Oak Ridge Reservation Background Much of the Manhattan Project legacy waste for which the Department of Energy (DOE) Oak Ridge Environmental Management (OREM) program is responsible falls under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 (also known as the Superfund Act), which is a federal law

  14. Oak Ridge Cleanup Areas | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Management » Environmental Stewardship » Oak Ridge Cleanup Areas Oak Ridge Cleanup Areas Employees conduct soil and water samples to determine which areas require cleanup. Employees conduct soil and water samples to determine which areas require cleanup. On November 21, 1989, the Environmental Protection Agency placed the Department of Energy's Oak Ridge site on its National Prioritization List (NPL). The list names national priorities where there are known or threatened releases of

  15. OakRidge-cert-OPEIU 1981.pdf

    Energy Saver

    September 2013 ORSSAB Meeting - September 2013 Oak Ridge Site Specific Advisory Board meeting minutes and materials. A Review of Long-term Stewardship for the Contaminated Areas on the Oak Ridge Reservation, Lorene Sigal Meeting Minutes - Sept. 2013 (64.85 KB) A Review of Long-term Stewardship for the Contaminated Areas on the Oak Ridge Reservation, Lorene Sigal (780.35 KB) Meeting Materials - Sept. 2013 (319.63 KB) More Documents & Publications ORSSAB Meeting - November 2013 ORSSAB Meeting

  16. Steel Creek fish, L-Lake/Steel Creek Biological Monitoring Program, January 1986--December 1991

    SciTech Connect

    Sayers, R.E. Jr.; Mealing, H.G. III

    1992-04-01

    The Savannah River Site (SRS) encompasses 300 sq mi of the Atlantic Coastal plain in west-central South Carolina. The Savannah River forms the western boundary of the site. Five major tributaries of the Savannah River -- Upper Three Runs Creek, Four Mile Creek, Pen Branch, Steel Creek, and Lower Three Runs Creek -- drain the site. All but Upper Three Runs Creek receive, or in the past received, thermal effluents from nuclear production reactors. In 1985, L Lake, a 400-hectare cooling reservoir, was built on the upper reaches of Steel Creek to receive effluent from the restart of L-Reactor, and protect the lower reaches from thermal impacts. The lake has an average width of approximately 600 m and extends along the Steel Creek valley approximately 7000 m from the dam to the headwaters. Water level is maintained at a normal pool elevation of 58 m above mean sea level by overflow into a vertical intake tower that has multilevel discharge gates. The intake tower is connected to a horizontal conduit that passes through the dam and releases water into Steel Creek. The Steel Creek Biological Monitoring Program was designed to meet environmental regulatory requirements associated with the restart of L-Reactor and complements the Biological Monitoring Program for L Lake. This extensive program was implemented to address portions of Section 316(a) of the Clean Water Act. The Department of Energy (DOE) must demonstrate that the operation of L-Reactor will not significantly alter the established aquatic ecosystems.

  17. Oak Rigde Associated Universities (ORAU) Radiation Emergency...

    Energy.gov [DOE] (indexed site)

    Rigde Associated Universities (ORAU) Radiation Emergency Assistance CenterTraining Site (REACTS), ORAU Director Oak Rigde Associated Universities (ORAU) Radiation Emergency ...

  18. Oak Ridge National Laboratory | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Tool 4 References 4.1 References Overview "Oak Ridge National Laboratory (ORNL) is a science and technology laboratory managed for the United States Department of Energy by...

  19. Independent Oversight Inspection, Oak Ridge National Laboratory...

    Energy.gov [DOE] (indexed site)

    8 Inspection of Nuclear Safety at the Oak Ridge National Laboratory Radiochemical Engineering Development Center, Building 7920 This report provides the results of an inspection of...

  20. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    4 Annual Meeting Oak Ridge Site Specific Advisory Board Saturday, August 16, 2014, 8 a.m. to noon DOE Information Center, 1 Science.gov Way Oak Ridge, Tenn. The Oak Ridge Site Specific Advisory Board (ORSSAB) met for its annual planning meeting beginning at 8 a.m., on Saturday, August 16, 2014, at the Department of Energy (DOE) Information Center, 1 Science.gov Way, Oak Ridge, Tenn. The objectives of the meeting were to: * Develop an increased understanding of and commitment to the goals of the

  1. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    February 12, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright) ......

  2. Oak Ridge OPEIU 2001 | Department of Energy

    Office of Environmental Management (EM)

    Oak Ridge National Laboratory (ORNL), Y-12 National Security Complex (Y-12), and East Tennessee Technology Park (ETTP) evolved and conducted different missions for the Department. ...

  3. Oak Ridge National Laboratory Technology Marketing Summaries...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... and Minerals Extraction Researchers at ORNL are ... brackish water into fresh water.... read more Oak Ridge ... wave of detection devices based on ion mobility ...

  4. Oak Ridge Site Specific Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Expedite Milestones C. Recommendation on DOE Oak Ridge GIS Fact Sheets (C. Staley) D. Election of FY 2015 Board Officers (B. Price) VII. Responses to Recommendations & Comments (D. ...

  5. Oak Ridge Centers for Manufacturing Technology - Partnership...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Impact on the Semiconductor Industry, part 2 The Oak Ridge Centers for Manufacturing Technology in partnership with SEMATECH (Semiconductor Manufacturing TECHnology) had...

  6. Oak Ridge Centers for Manufacturing Technology - Partnership...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    with some of the people who experienced the Oak Ridge Centers for Manufacturing Technology firsthand. Here is his introduction followed by the first of three letters...

  7. Oak Ridge Centers for Manufacturing Technology ? testimonials

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    testimonials The first testimonial for the successful Oak Ridge Centers for Manufacturing Technology came from Mitchell Burnett. Mitch was among the first hourly paid employees, an...

  8. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    January 13, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price) ......

  9. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    January 14, 2015, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright) ......

  10. Oak Ridge - A Center of Innovation & Technology

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    of Energy property at the East Tennessee Technology Park (ETTP) and the Oak Ridge Science & Technology Park. CROET's award-winning program to revitalize former DOE...

  11. Oak Ridge Site Specific Advisory Board Committees

    Energy.gov [DOE]

    Oak Ridge’s Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its tasks.

  12. EIS-0346: Salmon Creek Project, WA

    Energy.gov [DOE]

    This EIS analyzes BPA's proposal to fund activities that would restore sufficient water flows to Salmon Creek and rehabilitate its streambed as necessary to provide adequate passage for summer steelhead (Oncorhynchus mykiss) and possibly spring chinook (O. tshawytscha).

  13. Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request ...

    Office of Environmental Management (EM)

    6: FY 2015 DOE Oak Ridge EM Budget Request Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request At the May 8, 2013, meeting, the Oak Ridge Site Specific Advisory Board ...

  14. Oak Ridge EM Program Collaborates with Regulators on Groundwater Strategy

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – The Oak Ridge EM program has joined state and federal regulators in a series of workshops to address contaminated groundwater on the Oak Ridge Reservation.

  15. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent from buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.

  16. Hoe Creek groundwater restoration, 1989

    SciTech Connect

    Renk, R.R.; Crader, S.E.; Lindblom, S.R.; Covell, J.R.

    1990-01-01

    During the summer of 1989, approximately 6.5 million gallons of contaminated groundwater were pumped from 23 wells at the Hoe Creek underground coal gasification site, near Gillette, Wyoming. The organic contaminants were removed using activated carbon before the water was sprayed on 15.4 acres at the sites. Approximately 2647 g (5.8 lb) of phenols and 10,714 g (23.6 lb) of benzene were removed from the site aquifers. Phenols, benzene, toluene, ethylbenzene, and naphthalene concentrations were measured in 43 wells. Benzene is the only contaminant at the site exceeds the federal standard for drinking water (5 {mu}g/L). Benzene leaches into the groundwater and is slow to biologically degrade; therefore, the benzene concentration has remained high in the groundwater at the site. The pumping operation affected groundwater elevations across the entire 80-acre site. The water levels rebounded quickly when the pumping operation was stopped on October 1, 1989. Removing contaminated groundwater by pumping is not an effective way to clean up the site because the continuous release of benzene from coal tars is slow. Benzene will continue to leach of the tars for a long time unless its source is removed or the leaching rate retarded through mitigation techniques. The application of the treated groundwater to the surface stimulated plant growth. No adverse effects were noted or recorded from some 60 soil samples taken from twenty locations in the spray field area. 20 refs., 52 figs., 8 tabs.

  17. Oak Ridge recognized for bird protection practices

    Office of Energy Efficiency and Renewable Energy (EERE)

    Oak Ridge’s efforts to protect migratory birds recently garnered honorable mention for the 2013 Presidential Migratory Bird Federal Stewardship Award. The Energy Department championed the effort through partnerships with the Tennessee Wildlife Resources Agency, UT-Battelle, and URS | CH2M Oak Ridge.

  18. Oak Ridge Office of Environmental Management

    Energy.gov [DOE]

    This website highlights activities that support the mission of the Oak Ridge Office of Environmental Management (Oak Ridge Office of EM), which is to remove environmental legacies resulting from more than 60 years of nuclear weapons development and government-sponsored nuclear energy and scientific research.

  19. OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE

    Energy.gov [DOE]

    Oak Ridge, TN - The Environmental Management Waste Management Facility (EMWMF) provides the onsite disposal capability for the majority of cleanup-generated wastes on the Oak Ridge Reservation....

  20. Letter: Congratulating Oak Ridge SSAB and its Stewardship Committee...

    Office of Environmental Management (EM)

    Congratulating Oak Ridge SSAB and its Stewardship Committee for Receiving the EPA's 2006 Citizen's Excellence in Community Involvement Award Letter: Congratulating Oak Ridge SSAB ...

  1. Other: Advancing Materials Science using Neutrons at Oak Ridge National

    Office of Scientific and Technical Information (OSTI)

    Laboratory | ScienceCinema Advancing Materials Science using Neutrons at Oak Ridge National Laboratory Citation Details Title: Advancing Materials Science using Neutrons at Oak Ridge National Laboratory

  2. DOE - Office of Legacy Management -- Oak Ridge Gaseous Diffusion...

    Office of Legacy Management (LM)

    Oak Ridge Gaseous Diffusion Plant - TN 02 FUSRAP Considered Sites Site: Oak Ridge Gaseous Diffusion Plant (TN.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site ...

  3. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Institute for Science and Education - January 2015 January 2015 ... of Oak Ridge Institute for Science and Education (ORISE) during the period of January ...

  4. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Science and Education - October 2011 October 2011 Evaluation to determine whether Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education is continuing ...

  5. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Science and Education - April 2008 Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities Oak Ridge Institute for Science and Education - April 2008 ...

  6. Former Oak Ridge Bechtel Jacobs Employee Charged with Violating...

    Office of Environmental Management (EM)

    Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Department of ...

  7. Energy Department, Oak Ridge National Lab Officials to Celebrate...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge National Laboratory Director Thom Mason, Governor Bill Haslam and ... Dr. Thom Mason, Oak Ridge National Laboratory Director Industry representatives, including ...

  8. PIA - Oak Ridge Institute for Science and Education Program Applicant...

    Energy Saver

    Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and ...

  9. Oak Ridge Site Specific Advisory Board Committees | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Committees Oak Ridge Site Specific Advisory Board Committees Oak Ridge's Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its...

  10. Oak Ridge’s K-27 Building Set for Demolition

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – The EM program in Oak Ridge is more than 96 percent complete with pre-demolition activities at the K-27 Building.

  11. John Hsu, Oak Ridge National Laboratory, Flux Coupling Machines...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    John Hsu, Oak Ridge National Laboratory, Flux Coupling Machines and Switched Reluctance Motors to Replace Permanent Magnets in Electric Vehicles John Hsu, Oak Ridge National...

  12. Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Transportation Technology Program Annual Report Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology Program Annual Report ornlttpreportfy08.pdf (4.58 ...

  13. ITER movie created by Oak Ridge National Laboratory, National...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ITER movie created by Oak Ridge National Laboratory, National Center for Computational Sciences American Fusion News Category: U.S. ITER Link: ITER movie created by Oak Ridge ...

  14. Evaluation of Side Stream Filtration Technology at Oak Ridge...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Document provides ...

  15. Transuranic Waste Processing Center Oak Ridge Site Specific...

    Office of Environmental Management (EM)

    Transuranic Waste Processing Update Oak Ridge Site Specific Advisory Board May 14, 2014 ...EM 3 Oak Ridge Transuranic (TRU) Waste Inventory * TRU waste is waste ...

  16. 2012 Annual Workforce Analysis and Staffing Plan Report - Oak...

    Energy Saver

    2 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management 2012 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of...

  17. Human Resources at Oak Ridge National Laboratory | Critical Materials...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Oak Ridge National Laboratory Contact Information The main contact for human resources for CMI at Oak Ridge National Laboratory: David Lett Phone: 865-576-5675 Email: ...

  18. Daniel White

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Daniel White About ESnet Our Mission The Network ESnet History Governance & Policies Career Opportunities ESnet Staff & Org Chart ESnet Leadership Administration Advanced Network Technologies Cybersecurity Infrastructure, Identity & Collaboration Network Engineering Network Planning Operational Enhancements Office of the CTO Science Engagement Tools Team Contact Us Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1

  19. Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education- October 2011

    Energy.gov [DOE]

    Evaluation to determine whether Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education is continuing to perform at a level deserving DOE-VPP Star recognition.

  20. Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities Oak Ridge Institute for Science and Education- April 2008

    Office of Energy Efficiency and Renewable Energy (EERE)

    Evaluation to determine whether Oak Ridge Associated Universities Oak Ridge Institute for Science and Education is continuing to perform at a level deserving DOE-VPP Star recognition.

  1. FIDDLER CREEK POLYMER AUGMENTATION PROJECT

    SciTech Connect

    Lyle A. Johnson, Jr.

    2001-10-31

    The Fiddler Creek field is in Weston County, Wyoming, and was discovered in 1948. Secondary waterflooding recovery was started in 1955 and terminated in the mid-1980s with a fieldwide recovery of approximately 40%. The West Fiddler Creek Unit, the focus of this project, had a lower recovery and therefore has the most remaining oil. Before the project this unit was producing approximately 85 bbl of oil per day from 20 pumping wells and 17 swab wells. The recovery process planned for this project involved adapting two independent processes, the injection of polymer as a channel blocker or as a deep-penetrating permeability modifier, and the stabilization of clays and reduction of the residual oil saturation in the near-wellbore area around the injection wells. Clay stabilization was not conducted because long-term fresh water injection had not severely reduced the injectivity. It was determined that future polymer injection would not be affected by the clay. For the project, two adjoining project patterns were selected on the basis of prior reservoir studies and current well availability and production. The primary injection well of Pattern 1 was treated with a small batch of MARCIT gel to create channel blocking. The long-term test was designed for three phases: (1) 77 days of injection of a 300-mg/l cationic polyacrylamide, (2) 15 days of injection of a 300-mg/l anionic polymer to ensure injectivity of the polymer, and (3) 369 days of injection of the 300-mg/l anionic polymer and a 30:1 mix of the crosslinker. Phases 1 and 2 were conducted as planned. Phase 3 was started in late March 1999 and terminated in May 2001. In this phase, a crosslinker was added with the anionic polymer. Total injection for Phase 3 was 709,064 bbl. To maintain the desired injection rate, the injection pressure was slowly increased from 1,400 psig to 2,100 psig. Early in the application of the polymer, it appeared that the sweep improvement program was having a positive effect on Pattern 1

  2. Dow Chemical Company-Oyster Creek VIII | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Dow Chemical Company-Oyster Creek VIII Jump to: navigation, search Name: Dow Chemical Company-Oyster Creek VIII Place: Texas Phone Number: 1 989-636-1000; 1 800-331-6451 Website:...

  3. Panther Creek II Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    II Wind Farm Jump to: navigation, search Name Panther Creek II Wind Farm Facility Panther Creek II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service...

  4. Cedar Creek Wind Farm II (GE) | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    GE) Jump to: navigation, search Name Cedar Creek Wind Farm II (GE) Facility Cedar Creek II (GE) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service...

  5. Foote Creek Rim II Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    II Wind Farm Jump to: navigation, search Name Foote Creek Rim II Wind Farm Facility Foote Creek Rim II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  6. Foote Creek Rim Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Edit History Foote Creek Rim Wind Farm Jump to: navigation, search The Foote Creek Rim Wind Farm is in Carbon County, Wyoming. It consists of 133 turbines and has a total...

  7. Fermilab | Tritium at Fermilab | Indian Creek Aerial View

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    lab at its southwest corner. The flow of water in the creek varies with the amount of rain that falls during the year. At present, Indian Creek has very low levels of water. Even...

  8. Recommendation 195: Mitigation of Contamination in Bear Creek Burial Grounds

    Energy.gov [DOE]

    The ORSSAB requests DOE provide possible remedial actions to mitigate releases of contamination from Bear Creek Burial Grounds.

  9. Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.gov/EM 2 EM Program Overview ETTP ORNL Y-12 City of Oak Ridge * Work is organized by Cleanup Por7olios * ETTP * Y-12 * ORNL www.energy.gov/EM 3 -3- * Approximately 10-Year Scope of Work * Regulatory Agreements * Partners and Stakeholders U-233 DisposiKon Project ETTP Cleanup and S&M TRU Waste Processing Center * Diverse, complex projects * Ongoing DOE

  10. Michelle Buchanan > Oak Ridge National Laboratory > Scientific Advisory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Board > The Energy Materials Center at Cornell Michelle Buchanan Oak Ridge National Laboratory

  11. Independent Oversight Inspection, Oak Ridge National Laboratory- October 2008

    Energy.gov [DOE]

    Inspection of Nuclear Safety at the Oak Ridge National Laboratory Radiochemical Engineering Development Center, Building 7920

  12. Early Oak Ridge Home | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Home Early Oak Ridge Home A typical dwelling predating the Manhattan Project homes

  13. Early Oak Ridge Trailer Homes | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Early Oak Ridge Trailer Homes A row of trailer homes used

  14. Enforcement Letter, Oak Ridge National Laboratory- May 31, 2002

    Office of Energy Efficiency and Renewable Energy (EERE)

    Issued to UT-Battelle, LLC related to Unplanned Radiation Exposures at Oak Ridge National Laboratory

  15. Independent Oversight Review, Oak Ridge National Laboratory- January 2013

    Energy.gov [DOE]

    Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes

  16. Energy Secretary Steven Chu Visits Oak Ridge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Visits Oak Ridge Energy Secretary Steven Chu Visits Oak Ridge March 23, 2010 - 12:00am Addthis OAK RIDGE, TN - At an event earlier this afternoon at Oak Ridge National Laboratory, U.S. Energy Secretary Steven Chu announced that DOE has issued a five-year extension to its current management and operating contractor, UT-Battelle, LLC, for the continued operation of the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. While at Oak Ridge, Secretary Chu also met with staff from the

  17. Alexander Melin Oak Ridge National Laboratory Roger Kisner Oak Ridge National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alexander Melin Oak Ridge National Laboratory Roger Kisner Oak Ridge National Laboratory Ricardo Vidrio Oak Ridge National Laboratory Modern nuclear reactor designs are creating new challenges in component design, operation, and maintenance. Many advanced reactor types, such as fluoride salt reactors, increase intrinsic safety margins and efficiency but require new components that can operate reliably in extreme environments. These extreme environments can include high temperatures and corrosive

  18. Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-12-01

    This report summarizes the well installation, plugging and abandonment, and redevelopment activities conducted during the federal fiscal year (FY) 1998 at the Y-12 Plant, Oak Ridge, Tennessee. Five new groundwater monitoring wells were installed at the Y-12 Plant under the FY 1998 drilling program. Two of the wells are located in west Bear Creek Valley, one is in the eastern Y-12 Plant area near Lake Reality, and two are located near the Oil Landfarm Waste Management Area, which were installed by Bechtel Jacobs Company LLC (Bechtel Jacobs) as part of a site characterization activity for the Oak Ridge Reservation (ORR) Disposal Cell. Also, two existing wells were upgraded and nine temporary piezometers were installed to characterize hydrogeologic conditions at the Disposal Cell site. In addition, 40 temporary piezometers were installed in the Boneyard/Bumyard area of Bear Creek Valley by Bechtel Jacobs as part of the accelerated remedial actions conducted by the Environmental Restoration Program. Ten monitoring wells at the Y-12 Plant were decommissioned in FY 1998. Two existing monitoring wells were redeveloped during FY 1998 (of these, GW-732 was redeveloped tsvice). All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures from the Environmental Surveillance Procedures Quality Control Program (Energy Systems 1988); the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1992); and the Monitoring Well Installation Plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee (Energy Systems 1997a). Well installation and development of the non-Y-12 Plant GWPP oversight installation projects were conducted using procedures/guidance defined in the following documents: Work Plan for Support to Upper East Fork Poplar Creek East End Volatile Organic Compound Plumes Well Installation Project, Oak Ridge Y-12 Plant, Oak Ridge

  19. August 1, 2005: Bodman visits Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE)

    August 1, 2005 Secretary Bodman visits (pdf) DOE's Oak Ridge National Laboratory to tour the facility and host an all-hands meeting with lab employees. The Secretary tells the employees that he is...

  20. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    migration studies. These recommendations were the result of the Groundwater Strategy Document for the Oak Ridge Reservation (DOEOR01-2628V1&V2D1) that was developed...

  1. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Specific Advisory Board Wednesday, March 12, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright)...

  2. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    A. EMStewardship (B. Hatcher, C. Staley) B. Executive (D. Hemelright) 1. Public Outreach-Earth Day Festival (M. Smalling) 2. Center for Oak Ridge Oral History (C. Staley) IX....

  3. AEC and Oak Ridge High School

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    what happened. The Atomic Energy Commission spent 3,000,000 to build a new state- of-the-art high school in Oak Ridge in a very central and special location. This was done at a...

  4. Oak Ridge Visitors Center Solar Array

    Energy.gov [DOE]

    This photograph features a 5-kilowatt photovoltaic (PV) system in front of the Oak Ridge National Laboratory Visitors Center that was dedicated in 2007 to kick off the first Southeast Solar Summit....

  5. Bear Creek Valley characterization area mixed wastes passive in situ treatment technology demonstration project - status report

    SciTech Connect

    Watson, D.; Leavitt, M.; Moss, D.

    1997-03-01

    Historical waste disposal activities within the Bear Creek Valley (BCV) Characterization Area (CA), at the U.S. Department of Energy (DOE) Oak Ridge Y-12 plant, have contaminated groundwater and surface water above human health risk levels and impacted the ecology of Bear Creek. Contaminates include nitrate, radioisotopes, metals, volatile organic chemicals (VOCS), and common ions. This paper provides a status report on a technology demonstration project that is investigating the feasibility of using passive in situ treatment systems to remove these contaminants. Although this technology may be applicable to many locations at the Oak Ridge Y-12 Plant, the project focuses on collecting the information needed to take CERCLA removal actions in 1998 at the S-3 Disposal Ponds site. Phase 1 has been completed and included site characterization, laboratory screening of treatment media (sorbents; and iron), and limited field testing of biological treatment systems. Batch tests using different Y-12 Plant waters were conducted to evaluate the removal efficiencies of most of the media. Phase 1 results suggest that the most promising treatment media are Dowex 21 k resin, peat moss, zero-valent iron, and iron oxides. Phase 2 will include in-field column testing of these media to assess loading rates, and concerns with clogging, by-products, and long-term treatment efficiency and media stability. Continued testing of wetlands and algal mats (MATs) will be conducted to determine if they can be used for in-stream polishing of surface water. Hydraulic testing of a shallow trench and horizontal well will also be completed during Phase 2. 4 refs., 3 tabs.

  6. EM Update Highlights Oak Ridge Cleanup Milestone | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Update Highlights Oak Ridge Cleanup Milestone EM Update Highlights Oak Ridge Cleanup Milestone September 13, 2016 - 12:35pm Addthis OAK RIDGE, Tenn. - In this issue of EM Update, we mark the Oak Ridge EM program's world-first accomplishment: completion of decontamination, decommissioning and demolition of its uranium gaseous diffusion enrichment process buildings. On Aug. 30, Oak Ridge achieved its ambitious Vision 2016 when workers demolished the final portion of Building K-27. This in-depth

  7. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    30: Final Proposed Plan for Soils in Zone 1 at East Tennessee Technology Park, Oak Ridge, Tennessee Background The East Tennessee Technology Park (ETTP) - formerly known as the Oak Ridge Gaseous Diffusion Plant - was built in the 1940s as part of the Manhattan Project to enrich uranium for use in nuclear weapons. Over time, the mission of the facility changed to that of producing low enriched uranium to fuel commercial and research nuclear reactors and researching new technologies for uranium

  8. Michael Starke, Oak Ridge National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Starke, Oak Ridge National Laboratory starkemr@ornl.gov Team: Sachin Nimbalkar, Brandon Johnson Oak Ridge National Laboratory Prashant More, Carlos Silva ENBALA Power Networks Anna Shipley SRA September 17, 2014 Berkeley, CA DOE/OE Transmission Reliability R&D Load as a Resource (LaaR) Objectives * ORNL is examining potential for manufacturing processes to provide regulation service. This includes: ▪ Conducting modeling analysis (more detailed understanding on impact of industrial

  9. Oak Ridge Reservation environmental report for 1989

    SciTech Connect

    Jacobs, V.A.; Wilson, A.R.

    1990-10-01

    This two-volume report, the Oak Ridge Reservation Environmental Report for 1989, is the nineteenth in an annual series that began in 1971. It reports the results of a comprehensive, year-round program to monitor the impact of operations at the three major US Department of Energy (DOE) production and research installations in Oak Ridge on the immediate areas' and surrounding region's groundwater and surface waters, soil, air quality, vegetation and wildlife, and through these multiple and varied pathways, the resident human population. Information is presented for the environmental monitoring Quality Assurance (QA) Program, audits and reviews, waste management activities, land special environmental studies. Data are included for the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory (ORNL), and Oak Ridge Gaseous Diffusion Plant (ORGDP). Volume 1 presents narratives, summaries, and conclusions based on environmental monitoring at the three DOE installations and in the surrounding environs during calendar year (CY) 1989. Volume 1 is intended to be a stand-alone'' report about the Oak Ridge Reservation (ORR) for the reader who does not want an in-depth review of 1989 data. Volume 2 presents the detailed data from which these conclusions have been drawn and should be used in conjunction with Volume 1.

  10. Pine Creek Ranch, FY 2001 Annual Report.

    SciTech Connect

    Berry, Mark E.

    2001-11-01

    Pine Creek Ranch was purchased in 1999 by the Confederated Tribes of Warm Springs using Bonneville Power Administration Fish and Wildlife Habitat Mitigation funds. The 25,000 acre property will be managed in perpetuity for the benefit of fish and wildlife habitat. Major issues include: (1) Restoring quality spawning and rearing habitat for stealhead. Streams are incised and fish passage barriers exist from culverts and possibly beaver dams. In addition to stealhead habitat, the Tribes are interested in overall riparian recovery in the John Day River system for wildlife habitat, watershed values and other values such as recreation. (2) Future grazing for specific management purposes. Past grazing practices undoubtedly contributed to current unacceptable conditions. The main stem of Pine Creek has already been enrolled in the CREP program administered by the USDA, Natural Resource Conservation Service in part because of the cost-share for vegetation restoration in a buffer portion of old fields and in part because of rental fees that will help the Tribes to pay the property taxes. Grazing is not allowed in the riparian buffer for the term of the contract. (3) Noxious weeds are a major concern. (4) Encroachment by western juniper throughout the watershed is a potential concern for the hydrology of the creek. Mark Berry, Habitat Manager, for the Pine Creek Ranch requested the Team to address the following objectives: (1) Introduce some of the field staff and others to Proper Functioning Condition (PFC) assessments and concepts. (2) Do a PFC assessment on approximately 10 miles of Pine Creek. (3) Offer management recommendations. (4) Provide guidelines for monitoring.

  11. Final review of the Campbell Creek demonstrations showcased by Tennessee Valley Authority

    SciTech Connect

    Gehl, Anthony C.; Munk, Jeffrey D.; Jackson, Roderick K.; Boudreaux, Philip R.; Miller, William A.; New, Joshua Ryan; Khowailed, Giannate

    2015-06-01

    The Tennessee Valley Authority (TVA) Technology Innovation, Energy Efficiency, Power Delivery and Utilization Office funded and managed a showcase demonstration located in the suburbs of west Knox county, Tennessee. Work started March 2008 with the goal of documenting best practices for retrofitting existing homes and for building new high-efficiency homes. The Oak Ridge National Laboratory and the Electric Power Research Institute (EPRI) provided technical support. An analytical base was developed for helping homeowners, homebuyers, builders, practitioners and the TVA make informed economic decisions for the materials and incentives necessary to build a new high-efficiency home or retrofit an existing home. New approaches to more efficiently control active energy subsystems and information for selecting or upgrading to Energy Star appliances, changing all lights to 100% CFL s and upgrading windows to low-E gas filled glazing yields a 40% energy savings with neutral cash flow for the homeowner. Passive designs were reviewed and recommendations made for envelope construction that is durable and energy efficient. The Campbell Creek project complements the DOE Building Technologies Program strategic goal. Results of the project created technologies and design approaches that will yield affordable energy efficient homes. The 2010 DOE retrofit goals are to find retrofit packages that attain 30% whole house energy savings as documented by pre and post Home Energy rating scores (HERS). Campbell Creek met these goals.

  12. Typical Oak Ridge cemesto houses and city bus | Y-12 National Security

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Complex Typical Oak Ridge cemesto ... Typical Oak Ridge cemesto houses and city bus Typical Oak Ridge cemesto houses and city bus

  13. Neutron Instruments Added at Oak Ridge (Journal Article) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Neutron Instruments Added at Oak Ridge Citation Details In-Document Search Title: Neutron Instruments Added at Oak Ridge The neutron scattering facilities at Oak Ridge National ...

  14. Sue Cange Provides Insight on Oak Ridge’s Cleanup Progress, Partnerships

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Sue Cange, manager for the Oak Ridge Office of Environmental Management, is responsible for safely executing the environmental cleanup of the Oak Ridge Reservation.

  15. ORISE: Publications - Fact Sheets, Reports, White Papers, Bibliographies

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Publications ORISE Fact Sheets, Reports, White Papers, Bibliographies For a look at the publications, reports, toolkits, programmatic fact sheets and other manuals published by the Oak Ridge Institute for Science and Education (ORISE), view the list below. Some of these publications are available in PDF format. To view these files, you must have the Adobe Reader, which is available free on the Adobe Web site. Fact Sheets ORISE Fact Sheet (PDF, 430 KB) Environmental Assessments and Health Physics

  16. Bechtel National, Inc. Engineers Constructors Oak Ridge Office

    Office of Legacy Management (LM)

    389 Bechtel National, Inc. Engineers - Constructors Oak Ridge Office Jackson Plaza Tower 800 Oak Ridge Turnpike Oak Ridge, Tennessee Mail Address: P. O. Box 350, Oak Ridge. TN 37830 u.s. Department of Energy Oak Ridge Operations Post Office Box E Oak Ridge, TN 37830 ATTN: E. L. Keller, Director Technical Services Division SUBJECT: Bechtel Job No. 14501, FUSRAP Project DOE Contract No. DE-AC05-8l0R20722 Bayo Canyon Restrictive Covenants WBS No. 04D Dear Mr. Keller: Attached are the restrictive

  17. Calendar Year 2008 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    Elvado Environmental LLC

    2009-12-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2008 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2008 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2008 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2008 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the

  18. Distribution of anthropogenic fill material within the Y-12 plant area, Oak Ridge, Tennessee

    SciTech Connect

    Sutton, G.E. Jr. |; Field, S.M.

    1995-10-01

    Widespread groundwater contamination in the vicinity of the Oak Ridge Y-12 Plant has been documented through a variety of monitoring efforts since the late 1970s. Various contaminants, most notably volatile organic compounds (VOCs), have migrated through the subsurface and formed extensive contaminant plumes within the Knox Aquifer/Maynardville Limestone, the primary exit pathway for groundwater transport within the Bear Creek Valley. In 1991, an integrated, comprehensive effort (Upper East Fork Poplar Creek [UEFPC] Phase I monitoring network) was initiated in order to (1) identify contaminant source areas within the industrialized portions of the plant and (2) define contamination migration pathways existing between the source areas and the Knox Aquifer/Maynardville Limestone. Data obtained during previous studies have indicated that extensive zones of fill and buried utility trenches may serve as preferred migration pathways. In addition, portions of UEFPC were rerouted, with several of its tributaries being filled during the initial construction of the plant. These filled surface drainage features are also believed to serve as preferred migration pathways. The identification of preferred contaminant migration pathways within the Y-12 Plant area is essential and required to refine the current Bear Creek Valley groundwater conceptual model and to assist in the selection of technically feasible and cost effective remedial strategies. This report presents the results of an initial investigation of the occurrence of manmade (anthropogenic) fill and its effect upon groundwater movement within the plant area. These interpretations are subject to revision and improvement as further investigation of the effects of the fill upon contaminant migration progresses.

  19. Field Of?b, Oak Rldge

    Office of Legacy Management (LM)

    Field Of?b, Oak Rldge P.O. Box 2001 Oak Ridge, Tennes~e 37831- 8723 April 20, 1993 Dr. Paul Merges Chief, Bureau of Radiation New York State Department of Environmental Conservation 50 Yolf Road Room 506 Albany, New York 12233-7255 Dear Dr. Merges: BAKER AND NILLIANS WRMOUSES SITE - CORPLETION OF CLEANUP ACTI(rIT1ES The purpose of this notice is to inform you about further scheduled cleanup activities to be conducted by the Department of Energy (DDE) at 513-519 West 20th Street In New York, New

  20. Oak Ridge: Approaching 4 Million Safe Work Hours

    Energy.gov [DOE]

    Workers at URS | CH2M Oak Ridge (UCOR), the prime contractor for EM’s Oak Ridge cleanup, are approaching a milestone of 4 million safe work hours without a lost time away incident.

  1. P.O. Box 117, Oak Ridge, TN 37831

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Box 117, Oak Ridge, TN 37831 g (865) 241-8893 g IVsurveys@orau.org On the Web: www.orau.orgenvironmental-assessments-health-physics Oak Ridge Associated Universities (ORAU) is a...

  2. Oak Ridge Project Opens Possibilities for Future Mission Work, Development

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM is refining the picture of uncontaminated areas within the 33,500-acre Oak Ridge Reservation through a review of historic documents and extensive sampling, analysis and characterization.

  3. Alternative Fuels Data Center: Fair Oaks Farm Harnesses the Power...

    Alternative Fuels and Advanced Vehicles Data Center

    Fair Oaks Farm Harnesses the Power of Natural Gas from Cow Manure to someone by E-mail Share Alternative Fuels Data Center: Fair Oaks Farm Harnesses the Power of Natural Gas from ...

  4. Oak Ridge Site Specific Advisory Board Meetings | Department...

    Energy.gov [DOE] (indexed site)

    Meeting with Oak Ridge City Manager about the city's perspective on DOE EM work on the Oak Ridge Reservation. March 6, 2015 ORSSAB Meeting - March 2015 Discussion about the FY 2017 ...

  5. Oak Ridge Lays Out Big Plans for 2012

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Last year, Oak Ridge’s Environmental Management (EM) program logged one of its most successful years due to sound project management and achievements in American Recovery and Reinvestment Act work.

  6. DOE's Oak Ridge Office and UCOR Sign Partnering Agreement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (DOE) Oak Ridge Office and URS | CH2M Oak Ridge, LLC (UCOR) met to sign a partnering agreement that defines the working arrangement and expectations between the two entities. ...

  7. Oak Ridge Operations Office of Environmental Management Overview

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge Reservation * High levels of rainfall coupled with shallow groundwater carry contaminants to local waterways Oak Ridge is not an isolated or arid site Oak Ridge has a Unique...

  8. FTCP Site Specific Information - Nuclear Energy Oak Ridge Site Office |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Nuclear Energy Oak Ridge Site Office FTCP Site Specific Information - Nuclear Energy Oak Ridge Site Office Annual Workforce Analysis and Staffing Plan Report Calendar Year 2013 Calendar Year 2012

  9. EM's Oak Ridge Office Contractor Scores High in Latest Award...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 27, 2016 - 12:50pm Addthis OAK RIDGE, Tenn. - EM gave URS | CH2M Oak Ridge LLC ... Each year, EM releases information relating to contractor fee payments - earned by ...

  10. Oak Ridge: Approaching 4 Million Safe Work Hours | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge: Approaching 4 Million Safe Work Hours Oak Ridge: Approaching 4 Million Safe Work Hours February 27, 2013 - 12:00pm Addthis Mike Tidwell performs a leak check and ...

  11. Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility...

    Office of Environmental Management (EM)

    Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 The ...

  12. Oak Ridge Centers for Manufacturing Technology ? Insights from...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    with Dave Beck from Y-12, as well as Co-Director of the Oak Ridge Centers for Manufacturing Technology (ORMCT), was Jack Cook of Oak Ridge National Laboratory"s (ORNL"s)...

  13. Oak Ridge Focuses on Old and New in 2013

    Energy.gov [DOE]

    OAK RIDGE, Tenn. - In 2013, the Oak Ridge Office of Environmental Management completed numerous projects. Some of the major accomplishments involved reaching two long-standing goals and progressing on the design of a new construction project.

  14. Oak Ridge Site Specific Advisory Board Contacts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-942 Oak Ridge, TN ... Melyssa Noe, Alternate Deputy Designated Federal Officer U.S. DOE-OREM, P.O. Box 2001, ...

  15. EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract July 12, 2012 - 12:00pm Addthis DOE and UCOR employees held an event ...

  16. Oak Ridge Reflects on 30 Years of Cleanup

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge’s EM program hosted an event this month that documented the site’s environmental cleanup efforts since 1983, six years before the official founding of the Department’s EM.

  17. New EM Facility Treats Groundwater at Oak Ridge

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge’s EM program is operating a new facility that reduces the amount of contaminants entering Mitchell Branch, a stream at DOE’s East Tennessee Technology Park.

  18. Oak Ridge Reservation Compliance Order, September 26, 1995

    Office of Environmental Management (EM)

    Box 2001, Oak Ridge, TN 37831. Go to Table of Contents http:www.em.doe.govffaaorrffca.html 4252001 Oak Ridge Reservation Compliance Order, September 26, 1995 Page 2 of 5...

  19. FTCP Site Specific Information - Oak Ridge Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FTCP Site Specific Information - Oak Ridge Office FTCP Agent Organization Name Phone E-Mail Oak Ridge Patrick Smith 865574-0960 smithpn@oro.doe.gov Annual Workforce Analysis and ...

  20. Addendum to the post-closure permit application for the Bear Creek hydrogeologic regime at the Y-12 plant: Walk-in pits

    SciTech Connect

    1995-04-01

    In June 1987, the Resource Conservation and Recovery Act (RCRA) Closure/Post-Closure Plan for the Bear Creek Burial Grounds (BCBG) located at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval.The Closure Plan has been modified and revised several times. This document is an addendum to the Post-Closure Permit Application submitted to TDEC in June, 1994. This addendum contains information on the Walk-In Pits of the BCBG which is meant to supplement the information provided in the Post-Closure Permit Application submitted for the BCBG. This document is not intended to be a stand-alone document.

  1. Recommendation 215: Recommendation on Remaining Legacy Materials on the Oak Ridge Reservation

    Energy.gov [DOE]

    The Oak Ridge Site Specific Advisory Board approved the enclosed recommendation on remaining legacy materials on the Oak Ridge Reservation.

  2. Microsoft Word - Willow Creek EA - 7-6-2016.docx

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Willow Creek Wind Energy Facility Draft Environmental Assessment U.S. Department of Energy Western Area Power Administration DOE/EA-2016 July 2016 Willow Creek Wind Energy Facility Draft Environmental Assessment Butte County, South Dakota U.S. Department of Energy Western Area Power Administration DOE/EA-2016 July 2016 Willow Creek Wind Energy Facility Draft EA Table of Contents Western Area Power Administration TOC-1 TABLE OF CONTENTS Page No. 1.0 INTRODUCTION

  3. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1993-12-01

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.

  4. 2012 Annual Planning Summary for Oak Ridge Office

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Oak Ridge Office.

  5. Oak Ridge Metrology Center | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Technical Services Oak Ridge Metrology Center Capabilities Disciplines Contacts Secure Manufacturing Technical Services Ultrasonic cleaner cuts costs, enhances safety Nuclear...

  6. Follow-up Review, Oak Ridge National Laboratory - December 2001 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Follow-up Review, Oak Ridge National Laboratory - December 2001 Follow-up Review, Oak Ridge National Laboratory - December 2001 December 2001 Follow-up Review of the Oak Ridge National Laboratory Health Services Division This report summarizes the results of a follow-up evaluation to an occupational medicine program review that was performed at the Department of Energy's (DOE) Oak Ridge National Laboratory Health Services Division in September 1998. The follow-up review

  7. Oak Ridge National Laboratory - Computing and Computational Sciences

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Directorate Oak Ridge to acquire next generation supercomputer Oak Ridge to acquire next generation supercomputer The U.S. Department of Energy's (DOE) Oak Ridge Leadership Computing Facility (OLCF) has signed a contract with IBM to bring a next-generation supercomputer to Oak Ridge National Laboratory (ORNL). The OLCF's new hybrid CPU/GPU computing system, Summit, will be delivered in 2017. (more) Links Department of Energy Consortium for Advanced Simulation of Light Water Reactors Extreme

  8. Major Risk Factors Integrated Facility Disposition Project - Oak Ridge |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Integrated Facility Disposition Project - Oak Ridge Major Risk Factors Integrated Facility Disposition Project - Oak Ridge Full Document and Summary Versions are available for download Major Risk Factors Integrated Facility Disposition Project - Oak Ridge (3.57 MB) Summary - Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN (65.13 KB) More Documents & Publications Major Risk Factors to the Integrated Facility Disposition Project

  9. Independent Oversight Environment, Oak Ridge National Laboratory - June

    Office of Environmental Management (EM)

    2006 | Department of Energy Environment, Oak Ridge National Laboratory - June 2006 Independent Oversight Environment, Oak Ridge National Laboratory - June 2006 June 2006 Inspection of the Environmental Management Program at the Oak Ridge National Laboratory This report documents the results of an inspection of the environment, safety, and health programs for the environmental management program activities at the Department of Energy's (DOE) Oak Ridge National Laboratory. The inspection was

  10. 2013 Annual Planning Summary for the Oak Ridge Office

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Oak Ridge Office.

  11. Oak Ridge Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Site Cleanup By the Numbers Oak Ridge Site Cleanup By the Numbers Oak Ridge Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download Oak Ridge Site Cleanup By

  12. Oak Ridge Site Specific Advisory Board | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Site Specific Advisory Board Oak Ridge Site Specific Advisory Board 2016 ORSSAB members are pictured with representatives from DOE, EPA, and TDEC. 2016 ORSSAB members are pictured with representatives from DOE, EPA, and TDEC. The Oak Ridge Site Specific Advisory Board (ORSSAB) is a federally appointed citizens' panel that provides independent advice and recommendations to the U.S. Department of Energy (DOE)'s Oak Ridge Office of Environmental Management. History The board, formed in

  13. Oak Ridge Reservation annual site environmental report summary 1998

    SciTech Connect

    Hamilton, L.V.

    1999-12-01

    This report summarizes the information found in the Oak Ridge Reservation Annual Site Environmental for 1998 (DOE/ORO/2091).

  14. 2013 Annual Planning Summary for the Oak Ridge National Laboratory

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Oak Ridge National Laboratory.

  15. Oak Ridge's EM Program Realizes Successful 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge's EM Program Realizes Successful 2010 Oak Ridge's EM Program Realizes Successful 2010 February 7, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Cleanup at the Oak Ridge Reservation took a major leap forward in 2010, as the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) completed numerous projects that reduced risks, decreased the site's footprint, and paved the way for new development for DOE missions. Major accomplishments were completed across the Oak Ridge

  16. Oak Ridge Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Office of Environmental Management Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition After a decade of demolition, Oak Ridge became the world's first to remove all of its uranium enrichment processing buildings. Despite this monumental achievement, the celebration lasted only moments before workers started taking down another structure to bring them closer to the next big goal... Read more Federal Ingenuity Gives

  17. Independent Activity Report, Oak Ridge Office- June 2011

    Energy.gov [DOE]

    Review of the Oak Ridge Office FY 2012 Draft Schedules for Oversight Activities [HIAR-ORO-2011-06-21

  18. Mantle Helium And Carbon Isotopes In Separation Creek Geothermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    cold springs in the Separation Creek area near South Sister volcano carry a strong mantle signal, indicating the presence of fresh basaltic magma in the volcanic plumbing system....

  19. New Jersey Nuclear Profile - PSEG Hope Creek Generating Station

    Energy Information Administration (EIA) (indexed site)

    PSEG Hope Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License ...

  20. Geothermometry At Upper Hot Creek Ranch Area (Benoit & Blackwell...

    OpenEI (Open Energy Information) [EERE & EIA]

    Activity Details Location Upper Hot Creek Ranch Area Exploration Technique Geothermometry Activity Date Usefulness useful DOE-funding Unknown Notes Ten water samples were collected...

  1. DOE - Office of Legacy Management -- Hoe Creek Underground Coal...

    Office of Legacy Management (LM)

    Designated Name: Not Designated under FUSRAP Alternate Name: None Location: Campbell ... The Hoe Creek Underground Gasification site occupies 80 acres of land located in Campbell ...

  2. RFC Sand Creek Development LLC | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Colorado Zip: 80014 Product: Subsidiary of Republic Financial Corporation set up to invest in Sand Creek Energy LLC, a planned gas to liquid facility. Coordinates: 39.325162,...

  3. City of Battle Creek, Nebraska (Utility Company) | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Nebraska (Utility Company) Jump to: navigation, search Name: Battle Creek Municipal Light & Power Place: Nebraska Phone Number: 402.675.2165 Website: battlecreekne.com...

  4. Workplace Charging Challenge Partner: ClipperCreek, Inc. | Department...

    Office of Environmental Management (EM)

    Joined the Challenge: April 2014 Headquarters: Auburn, CA Charging Location: Auburn, CA Domestic Employees: 35 ClipperCreek is a leading manufacturer of Electric Vehicle Supply ...

  5. Indian Creek, Florida: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    it. Indian Creek is a village in Miami-Dade County, Florida. It falls under Florida's 20th congressional district.12 References US Census Bureau Incorporated place and...

  6. Queen Creek, Arizona: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Creek, Arizona: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 33.2486638, -111.6342993 Show Map Loading map... "minzoom":false,"mappingservic...

  7. Exploration Of The Upper Hot Creek Ranch Geothermal Resource...

    OpenEI (Open Energy Information) [EERE & EIA]

    of Hot Creek Canyon where challenges such as topography, a wilderness study area, and wetlands issues will make further exploration time consuming and costly. Ten water samples...

  8. Thermal Gradient Holes At Upper Hot Creek Ranch Area (Benoit...

    OpenEI (Open Energy Information) [EERE & EIA]

    of Hot Creek Canyon where challenges such as topography, a wilderness study area, and wetlands issues will make further exploration time consuming and costly. References Dick...

  9. Microsoft PowerPoint - Highlights of the Industry Working Group_Jessica White-Horton

    National Nuclear Security Administration (NNSA)

    Highlights of the Industry Working Group on the Global Cylinder Identification and Monitoring System (GCIMS) Jessica White-Horton Oak Ridge National Laboratory GCIMS Overview  Nonproliferation Objectives - Enhance the IAEA's capability to detect: * Diversion of declared cylinders * Misuse of declared cylinders and * Undeclared production scenarios involving undeclared cylinders - Significantly shorten the time to reconcile shipments between countries - Provide a capability to shorten

  10. DOE Tour of Zero Floorplans: Pebble Creek by DP Construction | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Pebble Creek by DP Construction DOE Tour of Zero Floorplans: Pebble Creek by DP Construction DOE Tour of Zero Floorplans: Pebble Creek by DP Construction

  11. EA-1117: Management of Spent Nuclear Fuel on the Oak Ridge Reservation, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal for the management of spent nuclear fuel on the U.S. Department of Energy's Oak Ridge Reservation to implement the preferred alternative...

  12. Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education- January 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Recertification of ORISE/ORAU at Oak Ridge as a Star Participant in the Department of Energy Voluntary Protection Program.

  13. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    14, 2016, 6:00 p.m. Olive Garden Restaurant 7206 Kingston Pike, Knoxville, Tenn. AGENDA I. Welcome and Announcements (E. Trujillo) ........................................................................ 6:00-6:05 A. Next Meeting: Wednesday, October 12 Presentation Topic: State of the Oak Ridge Environmental Management Program II. Comments from the EPA and TDEC Liaisons (C. Jones, K. Czartoryski)

  14. Oak Ridge Manufacturing Demonstration Facility (MDF)

    Energy.gov [DOE]

    The Manufacturing Demonstration Facility (MDF) is a collaborative manufacturing community that shares a common RD&D infrastructure. This shared infrastructure provides affordable access to advanced physical and virtual tools for rapidly demonstrating new manufacturing technologies and optimizing critical processes. Oak Ridge National Laboratory is home to AMO's MDF focused on Additive Manufacturing and Low-cost Carbon Fiber.

  15. Oak Ridge Manufacturing Demonstration Facility (MDF)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Manufacturing Demonstration Facility (MDF) is a collabora­tive manufacturing community that shares a common RD&D infrastructure. This shared infrastructure provides affordable access to advanced physical and virtual tools for rapidly demonstrating new manufacturing technologies and optimizing critical processes. Oak Ridge National Laboratory is home to AMO's MDF focused on Additive Manufacturing and Low-cost Carbon Fiber.

  16. Oak Ridge Reservation Waste Management Plan

    SciTech Connect

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  17. Oak Ridge reservation land-use plan

    SciTech Connect

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  18. Big Canyon Creek Ecological Restoration Strategy.

    SciTech Connect

    Rasmussen, Lynn; Richardson, Shannon

    2007-10-01

    He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe

  19. Microsoft PowerPoint - Wolf Creek Brief SWPA 6-10-08_File#1 Slides...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Of Engineers Of Engineers Nashville District Nashville District Wolf Wolf Creek Creek Dam Dam Saftey Saftey US Army Corps US Army Corps Of Engineers Of Engineers ...

  20. Existing systems review of treatment media for the Bear Creek Valley treatability study, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1998-01-01

    In situ treatment has been proposed as a remediation alternative for surface water and groundwater contaminated with uranium and nitrate as a result of former waste disposal practices in the S-3 Ponds. Interceptor trenches containing reactive media have been proposed to treat groundwater, and constructed wetlands and/or algal mats are potential alternatives for treating surface water. This report presents the results from testing of ten different reactive media, and combinations of media, that are candidates for use in the proposed interceptor trenches to remove uranium and nitrate from groundwater. It also presents the results of testing and evaluation of algal mats and wetlands for removing uranium and nitrate from surface water.

  1. Kansas Nuclear Profile - Wolf Creek Generating Station

    Energy Information Administration (EIA) (indexed site)

    April 2012" "Next Release Date: February 2013" "Wolf Creek Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,"1,160","9,556",94.0,"PWR","application/vnd.ms-excel","application/vnd.ms-excel"

  2. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    29: Recommendation on the Preferred Alternative for the Proposed Plan for Water Treatment at Outfall 200 at Y-12 National Security Complex Background Mercury contamination at the Y-12 National Security Complex (Y-12) is widespread and has been identified in soil, sediment, surface water, groundwater, in and underneath buildings, drains, and sumps. Mercury continues to be released into Upper East Fork Poplar Creek (UEFPC) from several sources. Mercury contamination at Y-12 is the result of

  3. Calendar Year 2004 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    N /A

    2005-09-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2004 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2004 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2004 monitoring data is deferred to the Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium (BWXT 2005). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including sampling methods and

  4. Calendar Year 2005 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    2006-09-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2005 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2005 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2005 monitoring data is deferred to the ''Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium'' (BWXT 2006). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including sampling methods and

  5. -p Oak Ricf~e Assokiatbd Unwersltles

    Office of Legacy Management (LM)

    p Oak Ricf~e Assokiatbd Unwersltles : ,k.*,., ;"~, :,: .; ,,: ;;:::A ~, ' ,, : : ~' ,Pie&red foitlie RADI' OLOGICAL SURVEY' ~ OF THE' BAKER AND WILLIAMS WAREHO,US' ES NEW YORK, KNEW YORK' ~ ,, .,,~ P. R. COlTEN, Environmental Survey and Site Assessment Program Energy/Environment Systems Division FINAL REPORT JUNE1990 ?- i i t * " i i, , F < I, ,., F 8 .& r . F, ; RADIOLOGICAL SURVEY OF THE BAKER AND WILLIAMS WAREHOUSES NEW YORK, NEW YORK Prepared by P. R. Cotten

  6. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    February 10, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price) ............................................................................ 6:006:05 A. March 9 Presentation Topic: FY 2018 Budget Formulation and Prioritization of Projects B. Introduction of New Members (S. Cange) II. Comments from the Deputy Designated Federal Officer, and EPA and TDEC Liaisons (S. Cange, C. Jones, K. Czartoryski)

  7. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    9, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (A. Cook) ......................................................................... 6:00-6:05 A. April - No Meeting in Lieu of Spring Chairs Meeting B. Presentation of Service Award (M. Noe) II. Comments from the Alternate Deputy Designated Federal Officer, and EPA and TDEC Liaisons (M. Noe, C. Jones, K. Czartoryski) .................................................... 6:05-6:15 III.

  8. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request Background Each year the U.S. Department of Energy (DOE) Environmental Management (EM) Program develops its budget request for the fiscal year two years beyond the current fiscal year, incorporating budget requests from DOE field offices to develop the EM Program budget request to the president. DOE EM Headquarters typically issues guidelines to the field offices advising them how much

  9. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    May 11, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price) ............................................................................ 6:00-6:05 A. June Presentation Topic: Technology Development to Support the DOE Mercury Cleanup Strategy (Issue Group Members: Price, Trujillo, Wilson) B. Presentation of Service Awards to Student Representatives (S. Cange) C. Introduction of New Student Representative (S. Cange) II. Comments

  10. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    October 12, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price) ......................................................................... 6:00-6:05 A. Next Meeting: Wednesday, November 9 Presentation Topic: Excess Contaminated Facilities B. Introduction of New Members & Student Representative (J. Mullis) II. Comments from the Deputy Designated Federal Officer, and EPA and TDEC Liaisons (J. Mullis, C. Jones, K. Czartoryski)

  11. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    November 9, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. 37831 AGENDA I. Welcome and Announcements (B. Price) ............................................................................ 6:006:05 A. Next Meeting: Wed., Jan. 11, 2017 Presentation Topic: Ongoing Groundwater Efforts II. Comments from the Deputy Designated Federal Officer, and EPA and TDEC Liaisons (J. Mullis, C. Jones, K. Czartoryski)

  12. ORNL (Oak Ridge National Laboratory) 89

    SciTech Connect

    Anderson, T.D.; Appleton, B.R.; Jefferson, J.W.; Merriman, J.R.; Mynatt, F.R.; Richmond, C.R.; Rosenthal, M.W.

    1989-01-01

    This is the inaugural issues of an annual publication about the Oak Ridge National Laboratory. Here you will find a brief overview of ORNL, a sampling of our recent research achievements, and a glimpse of the directions we want to take over the next 15 years. A major purpose of ornl 89 is to provide the staff with a sketch of the character and dynamics of the Laboratory.

  13. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  14. Processing of Oak Ridge Mixed Waste Labpacks

    SciTech Connect

    Estes, C. H.; Franco, P.; Bisaria, A.

    2002-02-26

    The Oak Ridge Site Treatment Plan (STP) issued under a Tennessee Commissioner's Order includes a compliance milestone related to treatment of mixed waste labpacks on the Oak Ridge sites. The treatment plan was written and approved in Fiscal Year 1997. The plan involved approximately 1,100 labpacks and 7,400 on-the-shelf labpackable items stored at three Department of Energy (DOE) sites on the Oak Ridge Reservation (ORR). The labpacks and labpack items consist of liquids and solids with various chemical constituents and radiological concerns. The waste must be processed for shipment to a commercial hazardous waste treatment facility or treatment utilizing a Broad Spectrum mixed waste treatment contract. This paper will describe the labpack treatment plan that was developed as required by the Site Treatment Plan and the operations implemented to process the labpack waste. The paper will discuss the labpack inventory in the treatment plan, treatment and disposal options, processing strategies, project risk assessment, and current project status.

  15. Pontotoc Co. Greene Co. Hale Co. OAK GROVE C OAL D EGAS CEDAR...

    Energy Information Administration (EIA) (indexed site)

    ... MILITARY GROVE HAMILTONMSD BIG CR EEKALD TAYLOR CREEK COAL DEGAS MAT UBBY CREEK ... Authors: Sam Limerick (1), Lucy Luo (1), Gary Long (2), David Morehouse (2), Jack Perrin ...

  16. Aquatic Natural Areas Analysis and Evaluation: Oak Ridge Reservation

    SciTech Connect

    Baranski, Dr. Michael J.

    2011-04-01

    This report presents an assessment of the natural area value of eight Aquatic Natural Areas (ANAs) and seven Aquatic Reference Areas (ARAs) on the Oak Ridge Reservation (ORR) in Anderson and Roane Counties in east Tennessee. It follows a previous study in 2009 that analyzed and evaluated terrestrial natural areas on the Reservation. The purpose of both studies was to evaluate and rank those specially designated areas on the Reservation that contain sensitive species, special habitats, and natural area value. Natural areas receive special protections through established statutes, regulations, and policies. The ORR contains 33,542 acres (13,574 ha) administered by the Department of Energy. The surface waters of the Reservation range from 1st-order to 5th-order streams, but the majority of the streams recognized as ANAs and ARAs are 1st- and 2nd-order streams. East Fork Poplar Creek is a 4th-order stream and the largest watershed that drains Reservation lands. All the waters of the Reservation eventually reach the Clinch River on the southern and western boundaries of the ORR. All available information was collected, synthesized, and evaluated. Field observations were made to support and supplement the available information. Geographic information system mapping techniques were used to develop several quantitative attributes about the study areas. Narrative descriptions of each ANA and ARA and tables of numerical data were prepared. Criteria for assessment and evaluation were developed, and eight categories of factors were devised to produce a ranking system. The evaluation factors used in the ranking system were: (A) size of area, (B) percentage of watershed protected, (C) taxa present with protected status, (D) overall biotic diversity, (E) stream features, (F) water quality and use support ratings, (G) disturbance regime, and (H) other factors. Each factor was evaluated on a 5-point ranking scale (0-4), and each area received a composite score, where 32 was the

  17. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1: Main text

    SciTech Connect

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  18. Hills Creek-Lookout Point Transmission Line Rebuild Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    In c o o per a t io n wi t h t h e U. S . F or es t Ser v ic e Hills Creek-Lookout Point Transmission Line Rebuild Project Draft Environmental Assessment August 2016 DOE/EA-1967 Hills Creek-Lookout Point Transmission Line Rebuild Project Draft Environmental Assessment Bonneville Power Administration In c o o per a t io n wi t h t h e U. S . F or es t Ser v ic e August 2016 Table of Contents Hills Creek-Lookout Point Transmission Line Rebuild Project Draft Environmental Assessment i Table of

  19. Calendar Year 2011 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    Elvado Environmental LLC,

    2012-12-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2011 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. This report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and known extent of groundwater contamination. The CY 2011 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by the DOE Environmental Management (EM) contractor responsible for environmental cleanup on the ORR. In August 2011, URS | CH2M Oak Ridge LLC (UCOR) replaced Bechtel Jacobs Company LLC (BJC) as the DOE EM contractor. For this report, BJC/UCOR will be referenced as the managing contractor for CY 2011. Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC/UCOR (i.e., coordinating sample collection and sharing data) ensures

  20. Oak Ridge Site Specific Advisory Board Monthly Meeting Olive Garden

    Office of Environmental Management (EM)

    Olive Garden 7206 Kingston Pike Knoxville, Tennessee 37919 The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks opportunities for input through collaborative

  1. Evaluation of Side Stream Filtration Technology at Oak Ridge National

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Laboratory | Department of Energy Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Document provides an in-depth look at side stream filtration at Oak Ridge National Laboratory. Download the Side Stream Filtration evaluation document. (1.48 MB) More Documents & Publications Side Stream Filtration for Cooling Towers Technical Evaluation of Side Stream Filtration for Cooling

  2. Fact Sheet: Collaboration of Oak Ridge, Argonne, and Livermore (CORAL) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Fact Sheet: Collaboration of Oak Ridge, Argonne, and Livermore (CORAL) Fact Sheet: Collaboration of Oak Ridge, Argonne, and Livermore (CORAL) The Collaboration of Oak Ridge, Argonne, and Livermore (CORAL) is a joint procurement activity among three of the Department of Energy's National Laboratories launched in 2014 to build state-of-the-art high-performance computing technologies that are essential for supporting U.S. national nuclear security and are key tools used for

  3. DOE's Oak Ridge Supercomputer Now World's Fastest for Open Science |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Supercomputer Now World's Fastest for Open Science DOE's Oak Ridge Supercomputer Now World's Fastest for Open Science November 10, 2008 - 4:47pm Addthis OAK RIDGE, Tenn. -- The latest upgrade to the Cray XT Jaguar supercomputer at the Department of Energy's (DOE's) Oak Ridge National Laboratory (ORNL) has increased the system's computing power to a peak 1.64 "petaflops," or quadrillion mathematical calculations per second, making Jaguar the world's first

  4. Oak Rigde Associated Universities (ORAU) Radiation Emergency Assistance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Center/Training Site (REAC/TS), ORAU Director | Department of Energy Rigde Associated Universities (ORAU) Radiation Emergency Assistance Center/Training Site (REAC/TS), ORAU Director Oak Rigde Associated Universities (ORAU) Radiation Emergency Assistance Center/Training Site (REAC/TS), ORAU Director Oak Rigde Associated Universities (ORAU) Radiation Emergency Assistance Center/Training Site (REAC/TS), ORAU Director Oak Rigde Associated Universities (ORAU) Radiation Emergency Assistance

  5. ORISE: Recruiting students and faculty to Oak Ridge National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ORNL Recruitment ORISE helps bring the next generation of student and faculty researchers to Oak Ridge National Laboratory Research laboratory at ORNL Since 1992 when it was established as an official U.S. Department of Energy (DOE) institute, the Oak Ridge Institute for Science and Education (ORISE) has operated research participation and science education activities for Oak Ridge National Laboratory (ORNL). How ORISE is Making a Difference ORNL, which is recognized as DOE's largest science and

  6. ORISE: Supporting ARRA funded cleanup activities in Oak Ridge, Tenn.

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ORISE supporting Oak Ridge reservation cleanup activities through recovery funding ORISE technician performs an environmental scan Disposing of old and contaminated buildings, and remediating soil and groundwater across the Oak Ridge Reservation has long been a priority for the U.S. Department of Energy (DOE)-Oak Ridge Office (ORO). Though much of the work wasn't expected to begin for another three to four years, the acquisition of $755 million in American Recovery and Reinvestment Act (ARRA)

  7. Nuclear Energy Advisory Committee Facility Subcommittee visit to Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    National Laboratory | Department of Energy Committee Facility Subcommittee visit to Oak Ridge National Laboratory Nuclear Energy Advisory Committee Facility Subcommittee visit to Oak Ridge National Laboratory The NEAC Facilities Subcommittee made a site visit to Oak Ridge National Laboratory (ORNL) on August 26, 2010. Subcommittee members included John Ahearne (Vice Chairman of NEAC and Facilities Subcommittee Chairman), Dana Christensen (ORNL), Thomas B. Cochran (Natural Resources Defense

  8. Oak Ridge City Center Technology Demonstration Project | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Oak Ridge City Center Technology Demonstration Project Oak Ridge City Center Technology Demonstration Project Project objectives: To broaden market understanding of large-scale GSHP technology, and the design considerations that will impact front-end costs, ongoing maintenance costs, future energy savings, and system breakeven/lifecycle cost. gshp_thrash_oak_ridge_city_center.pdf (463.1 KB) More Documents & Publications Ground Source Heat Pump System Data Analysis Analysis of

  9. Oak Ridge National Laboratory Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge National Laboratory Cleanup Oak Ridge National Laboratory Cleanup This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the Oak Ridge National Laboratory. This document dicusses the following projects: Tank W-1A Removal Action Project Building 3026 Hot Cells Facility Non-Reactor Facilities Removal Action 2000 Complex D&D Project Bethel Valley Burial Grounds Project U-233 Material

  10. Oak Ridge Operations Office of Environmental Management Overview |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview (2 MB) More Documents & Publications OREM Hosts Community Workshop ORSSAB Meeting - August 2013 Above on the left is K-25, at Oak Ridge before and after the 844,000 sq-ft demolition. In addition, on the right: K Cooling Tower at Savannah River Site demolition. Deactivation &

  11. Contractor Fee Payments - Oak Ridge Operations | Department of Energy

    Office of Environmental Management (EM)

    Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts. Transuranic Waste Processing - North Wind (33.63 KB) Transuranic Waste Processing - Wastren (36.67 KB) East Tennessee Technology Park (35.79 KB) More Documents & Publications Major Contracts Summary Contractor Fee Payments - Idaho Operations Office Contractor Fee

  12. SLIDESHOW: Secretary Moniz Visits Oak Ridge National Laboratory |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Secretary Moniz Visits Oak Ridge National Laboratory SLIDESHOW: Secretary Moniz Visits Oak Ridge National Laboratory Addthis Energy Secretary Moniz at CASL 1 of 25 Energy Secretary Moniz at CASL Secretary Moniz tours the Consortium for Advanced Simulation of Light Water Reactors (CASL) facility at Oak Ridge National Laboratory (ORNL). CASL is one of the Energy Department's Energy Innovation Hubs. Date taken: 2013-06-03 12:04 Energy Secretary Moniz at CASL 2 of 25 Energy

  13. Oak Ridge National Laboratory Evaluation for Drum Characterization...

    Office of Environmental Management (EM)

    This document corresponds to Appendix E: Drum Characterization Integrated Summary Report of the Technical Assessment Team Report. Oak Ridge National Laboratory Evaluation for Drum ...

  14. 2015 Annual Workforce Analysis and Staffing Plan Report - Oak...

    Energy Saver

    Plan Report - Oak Ridge Office of Environmental Management Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical ...

  15. Oak Ridge National Laboratory Analysis of Waste Isolation Pilot...

    Office of Environmental Management (EM)

    This document corresponds to Appendix C: Analysis Integrated Summary Report of the Technical Assessment Team Report. Oak Ridge National Laboratory Analysis of Waste Isolation Pilot ...

  16. NREL: MIDC/Oak Ridge National Laboratory Rotating Shadowband Radiometer

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    (35.93 N, 84.31 W, 245 m, GMT-5) Oak Ridge National Laboratory Irradiance Inc. Rotating Shadowband

  17. Recommendation 169: Establishment of an Oak Ridge Oral History Program

    Energy.gov [DOE]

    The ORSSAB recommends DOE-ORO fully endorse the establishment of an Oak Ridge Oral History Program and provide necessary assistance.

  18. Health Education Specialist/Project Manager Oak Ridge Institute...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    to addressing minority health disparities in your community, please contact: rose marie Womble, mSSW Health Education SpecialistProject Manager Oak Ridge Institute for...

  19. City of Oak Ridge, Tennessee (Utility Company) | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Tennessee (Utility Company) Jump to: navigation, search Name: City of Oak Ridge Place: Tennessee Phone Number: (865) 425-1803 Website: www.oakridgetn.govdepartment Twitter:...

  20. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE TENNESSEE THE...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    MDDC 869 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE TENNESSEE THE DIFFRACTION OF NEUTRONS BY CRYSTALLINE POWDERS by E. 0. Wollan C. G. Shull Clinton Laboratories Published ...

  1. DOE Issues Final Request for Proposal for Oak Ridge Transuranic...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (NAICS) Code 562211, Hazardous Waste Treatment and Disposal. ... and disposition of TRU soil and debris waste; ... the Oak Ridge National Laboratory; and processing Nuclear ...

  2. 2011 Annual Planning Summary for Oak Ridge Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Oak Ridge Operations Office (OR) (See Environmental Management ...

  3. Thorium Fuel Cycle Pilot Experiences at Oak Ridge National Laboratory...

    Office of Scientific and Technical Information (OSTI)

    Resource Type: Conference Resource Relation: Conference: 2014 ANS Winter Meeting and Nuclear Technology Expo, Anaheim, CA, USA, 20141109, 20141113 Research Org: Oak Ridge National ...

  4. ORIS: the Oak Ridge Imaging System program listings. [Nuclear...

    Office of Scientific and Technical Information (OSTI)

    program listings. Nuclear medicine imaging with rectilinear scanner and gamma camera Citation Details In-Document Search Title: ORIS: the Oak Ridge Imaging System program...

  5. ORO Verification of Employment Tracking System(VETS) PIA, Oak...

    Energy Saver

    System and Visitor Control System PIA, Oak Ridge Operations Office Occupational Medicine - Assistant PIA, Idaho National Laboratory Freedom of Information and Privacy Act...

  6. Oak Forest, Illinois: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Oak Forest, Illinois: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.6028116, -87.7439384 Show Map Loading map... "minzoom":false,"mappings...

  7. CHP Research and Development - Presentation by Oak Ridge National...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CHP Research and Development - Presentation by Oak Ridge National Laboratory, June 2011 Presentation on Combined Heat and Power (CHP) Research and Development, given by K. Dean ...

  8. Waste Management Conference Highlights Oak Ridge's Progress and...

    Office of Environmental Management (EM)

    Management Conference Highlights Oak Ridge's Progress and Partnerships Waste Management ... Council President Mike Thompson Mike Thompson speak at the Waste Management Conference. ...

  9. Addressing Challenging Materials at Oak Ridge National Laboratory...

    Office of Scientific and Technical Information (OSTI)

    Title: Addressing Challenging Materials at Oak Ridge National Laboratory No abstract prepared. Authors: Jubin, Robert Thomas 1 ; Patton, Bradley D 1 ; Robinson, Sharon M 1 ; ...

  10. Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009

    Energy.gov [DOE]

    Issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory

  11. EM's Oak Ridge Office Launches New Website | Department of Energy

    Energy.gov [DOE] (indexed site)

    Conference Highlights Oak Ridge's Progress and Partnerships CRESO Director John Byrd provides direction to students gathering data for their research on the region's box turtle. ...

  12. Independent Oversight Targeted Review, Oak Ridge National Laboratory- April 2014

    Energy.gov [DOE]

    Targeted Review of Radiological Controls Activity-Level Implementation at the Oak Ridge National Laboratory Radiochemical Engineering Development Center and High Flux Isotope Reactor Facilities

  13. ORO Verification of Employment Tracking System(VETS) PIA, Oak...

    Energy.gov [DOE] (indexed site)

    ORO Office Safeguards and Security Clearance Tracking System and Visitor Control System PIA, Oak Ridge Operations Office Occupational Medicine - Assistant PIA, Idaho National ...

  14. Inspection, Oak Ridge National Laboratory - July 2004 | Department...

    Energy.gov [DOE] (indexed site)

    4 Inspection of Environment, Safety, and Health Management at the Oak Ridge National Laboratory This report provides the results of an inspection of environment, safety, and health...

  15. Oak Ridge Site Specific Advisory Board Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contacts Oak Ridge Site Specific Advisory Board Contacts Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-942 Oak Ridge, TN 37831 Phone Numbers (865) 241-4583, (865) 241-4584 (800) 382-6938, option 4 DOE Liaisons Jay Mullis, Deputy Designated Federal Officer U.S. DOE-OREM, P.O Box 2001, EM-90, Oak Ridge, TN 37831 Phone: (865) 241-3706 Fax: (865) 241-6932 Email: Jay.Mullis@orem.doe.gov Dave Adler, Alternate Deputy Designated Federal Officer U.S. DOE-OREM, P.O. Box 2001,

  16. Independent Oversight Targeted Review, Oak Ridge National Laboratory...

    Energy.gov [DOE] (indexed site)

    Controls Activity-Level Implementation at the Oak Ridge National Laboratory Radiochemical Engineering Development Center and High Flux Isotope Reactor Facilities The U.S....

  17. Workplace Charging Challenge Partner: Oak Ridge National Laboratory...

    Energy.gov [DOE] (indexed site)

    Oak Ridge National Laboratory's (ORNL's) Sustainable Campus Initiative contains a roadmap for development of electric vehicle charging stations, indicating that plug-in electric ...

  18. Leadership Oak Ridge visits Y-12 | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    | (NNSA) Leadership Oak Ridge visits Y-12 Friday, October 30, 2015 - 5:06pm NNSA Blog The 2015 Leadership Oak Ridge class recently visited the Y-12 National Security Complex. Members had the opportunity to go on tour and get a glimpse of what employees do at Y-12. The 2015 Leadership Oak Ridge class recently visited the Y-12 National Security Complex. Members toured and saw a glimpse of what employees do at Y-12. "The majority of Leadership Oak Ridge participants have never been inside

  19. The Oak Ridge Institute for Science and Education Human Subjects...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Human Subjects Research Program PrivacySecurity Statement Contact | Forms PurposeMission ... The Oak Ridge Institute for Science and Education (ORISE) Human Subjects Research Program ...

  20. Reliability of Oak Ridge Facilities Grows (Journal Article) ...

    Office of Scientific and Technical Information (OSTI)

    Resource Relation: Journal Name: Neutron News; Journal Volume: 22; Journal Issue: 2 Research Org: ... Subject: 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; RELIABILITY; OAK RIDGE; ...

  1. Groundwater level monitoring sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1994-04-01

    This Sampling and Analysis Plan addresses groundwater level monitoring activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Groundwater level monitoring will be conducted at 129 sites within the WAG. All of the sites will be manually monitored on a semiannual basis. Forty-five of the 128 wells, plus one site in White Oak Lake, will also be equipped with automatic water level monitoring equipment. The 46 sites are divided into three groups. One group will be equipped for continuous monitoring of water level, conductivity, and temperature. The other two groups will be equipped for continuous monitoring of water level only. The equipment will be rotated between the two groups. The data collected from the water level monitoring will be used to support determination of the contaminant flux at WAG 6.

  2. Federal Facility Agreement Annual Progress Report for Fiscal Year 1999 Oak Ridge, Tennessee

    SciTech Connect

    Bechtel Jacobs Company LLC

    2000-01-01

    Environmental Response, Compensation, and Liability Act and/or the Resource Conservation and Recovery Act. This plan will be implemented by means of a Memorandum of Understanding (MOU) incorporating its terms with the United States EPA and TDEC. The majority of projects described in this report are grouped into five watersheds. They are the East Tennessee Technical Park (ETTP) Watershed (formerly the K-25 Site), the Melton Valley (MV) and Bethel Valley (BV) Watersheds at the Oak Ridge National Laboratory (ORNL), and the Bear Creek Valley (BCV) and Upper East Fork Poplar Creek (UEFPC) Watersheds at the Y-12 Plant.

  3. Oak Ridge Site Specific Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831

    Office of Environmental Management (EM)

    October 16, 2012 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 211 : Recommendation on Availability of DOE Environmental Management Documents At our October 10, 2012, meeting the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation regarding the availability and finding of documents online through the DOE Information Center. The board recommends that steps be taken to

  4. White Light Creation Architectures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management ... White Light Creation Architectures Overview Brief History of ...

  5. Williams Creek, Indiana: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. Williams Creek is a town in Marion County, Indiana. It falls under Indiana's 5th congressional...

  6. Hunters Creek Village, Texas: Energy Resources | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    is a stub. You can help OpenEI by expanding it. Hunters Creek Village is a city in Harris County, Texas. It falls under Texas's 7th congressional district.12 References ...

  7. Coal Creek, Colorado: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. Coal Creek is a town in Fremont County, Colorado. It falls under Colorado's 5th...

  8. Pike Creek, Delaware: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. Pike Creek is a census-designated place in New Castle County, Delaware. It falls under...

  9. Isotopic Analysis At Separation Creek Area (Van Soest, Et Al...

    OpenEI (Open Energy Information) [EERE & EIA]

    Usefulness useful DOE-funding Unknown References M. C. van Soest, B. M. Kennedy, W. C. Evans, R. H. Mariner (2002) Mantle Helium And Carbon Isotopes In Separation Creek...

  10. Field Use of NMIS at Oak Ridge

    SciTech Connect

    Chiang, L.G.; Conger, M.; Hughes, S.S.; Mattingly, J.K.; McEvers, J.A.; Mihalczo, J.T.; Mullens, J.A.; Perez, R.B.; Turner, C.R.; Uckan, T.; Valentine, T.E.

    1999-08-26

    The Nuclear Materials Identification System (NMIS), developed by the Oak Ridge National Laboratory and Oak Ridge Y-12 Plant (Y-12), has been successfully used at Y-12 for nuclear material control and accountability (NMC&A). It is particularly useful in the high gamma-ray background of storage arrays and for shielded HEU. With three systems in use at Y-12, NMIS has enhanced the NMC&A capability for verification and for confirmation of materials in storage and for HEU receipts by providing capability not available or practical by other NDA methods for safeguards. It has recently cost-effectively quantified the HEU mass and enrichment of hundreds of HEU metal items to within a total spread of {+-} 5% (3 sigma) with and mean deviations for all HEU verified of + 0.2% for mass and {minus}0.2% for enrichment. Three cart portable systems are easily moved around with minimal impact on facility operations since no permanent dedicated floor space is required. The positive impact of NMIS at the Oak Ridge Y-12 Plant is improved and more cost effective NMC&A as well as the resolution of NMC&A findings. Its operation at the Y-12 Plant is essential for compliance with the NMC&A requirements of the US Department of Energy. NMIS portability has allowed one system to be moved temporarily to the former K-25 Gaseous Diffusion Plant for characterization of a large deposit of hydrated uranyl fluoride. The impact of this NMIS application was enhanced and verified nuclear criticality safety that led to the safe removal of a large deposit originally estimated by gamma-ray spectrometry and neutron counting to contain 1300 kg of 3.3 wt% {sup 235}U material. NMIS has also been operational at Los Alamos National Laboratory and Pantex.

  11. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.

  12. Oak Ridge Field O%ce

    Office of Legacy Management (LM)

    DOC F ' ;fz; , NiJlo-2- - ' U ' ted St tes Go e e t kh&~~durn Der>artment of Energy rm jl# Oak Ridge Field O%ce DATE: June 21, 1993 REPLY TO ATTW Of: EW-93:Hartman SUBJECT: WAYNE INTERIM STORAGE SITE - TERMINATION OF SITE ENVIRONMENTAL REPORT TO: Peter 3. Gross, Director, Environmental Protection Division, SE-31 The Wayne Interim Storage Site (WISS) is part of the Formerly Utilized Sites Remedial Action Program. Based upon our surveillance efforts at WISS since 1984, the data for all

  13. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    June 8, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (A. Cook) ........................................................................... 6:00-6:05 A. July 13-New Member Training Meeting B. August 6-Annual Planning Meeting, 8:00 a.m.-2:00 p.m., Tremont Lodge, Townsend, TN C. Presentation of Service Awards to Outgoing Members (S. Cange) II. Comments from the Deputy Designated Federal Officer, and EPA and TDEC Liaisons (S. Cange,

  14. Oak Ridge Mobile Agent Community (ORMAC)

    Energy Science and Technology Software Center

    2003-06-30

    The Oak Ridge Mobile Agent Community (ORMAC) framework software facilitates the execution of a collection of mobile software agents across a heterogeneous collection of computer systems. ORMAC provides the software agents with the ability to communicate with each other in a synchronous and asynchronous manner. Also, ORMAC allows the software agents to move to any computer system in the community and continue execution there. ORMAC is intended to aid programmers in solving a very generalmore » set of distributed software problems.« less

  15. EIS-0305: Treating Transuranic (TRU)/Alpha Low-Level at the Oak...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transuranic (TRU)Alpha Low-Level at the Oak Ridge National Laboratory, Oak Ridge, Tennessee EIS-0305: Treating Transuranic (TRU)Alpha Low-Level at the Oak Ridge National ...

  16. Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    Elvado Environmental LLC

    2009-12-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure A.1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted 'active' status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling (Section 3.0), whereas wells granted 'inactive' status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 3.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 4.0). This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes (Figure A.1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge directly south of Y-12 that is bound on

  17. Assess Current and Potential Salmonid Production in Rattlesnake Creek Associated with Restoration Efforts; US Geological Survey Reports, 2002-2003 Annual Report.

    SciTech Connect

    Connolly, Patrick J.

    2003-12-01

    This project was designed to document existing habitat conditions and fish populations within the Rattlesnake Creek watershed (White Salmon River subbasin, Washington) before major habitat restoration activities are implemented and prior to the reintroduction of salmon and steelhead above Condit Dam. Returning adult salmon Oncorhynchus spp. and steelhead O. mykiss have not had access to Rattlesnake Creek since 1913. An assessment of resident trout populations should serve as a good surrogate for evaluation of factors that would limit salmon and steelhead production in the watershed. Personnel from United States Geological Survey's Columbia River Research Laboratory (USGS-CRRL) attend to three main objectives of the Rattlesnake Creek project. The first is to characterize stream and riparian habitat conditions. This effort includes measures of water quality, water quantity, stream habitat, and riparian conditions. The second objective is to determine the status of fish populations in the Rattlesnake Creek drainage. To accomplish this, we derived estimates of salmonid population abundance, determined fish species composition, assessed distribution and life history attributes, obtained tissue samples for genetic analysis, and assessed fish diseases in the watershed. The third objective is to use the collected habitat and fisheries information to help identify and prioritize areas in need of restoration. As this report covers the second year of at least a three-year study, it is largely restricted to describing our efforts and findings for the first two objectives.

  18. Assess Current and Potential Salmonid Production in Rattlesnake Creek Associated with Restoration Efforts; US Geological Survey Reports, 2001-2002 Annual Report.

    SciTech Connect

    Connolly, Patrick J.

    2003-01-01

    This project was designed to document existing habitat conditions and fish populations within the Rattlesnake Creek watershed (White Salmon River subbasin, Washington) before major habitat restoration activities are implemented and prior to the reintroduction of salmon and steelhead above Condit Dam. Returning adult salmon Oncorhynchus spp. and steelhead O. mykiss have not had access to Rattlesnake Creek since 1914. An assessment of resident trout populations should serve as a good surrogate for evaluation of factors that would limit salmon and steelhead production in the watershed. Personnel from United States Geological Survey's Columbia River Research Laboratory (USGS-CRRL) attend to three main objectives of the Rattlesnake Creek project. The first is to characterize stream and riparian habitat conditions. This effort includes measures of water quality, water quantity, stream habitat, and riparian conditions. The second objective is to determine the status of fish populations in the Rattlesnake Creek drainage. To accomplish this, we derived estimates of salmonid population abundance, determined fish species composition, assessed distribution and life history attributes, obtained tissue samples for future genetic analysis, and assessed fish diseases in the watershed. The third objective is to use the collected habitat and fisheries information to help identify and prioritize areas in need of restoration. As this report covers the first year of a three-year study, this report is restricted to describing our work on the first two objectives only.

  19. BPA White Book (generation/planning)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    White Book 2011 White Book 2010 White Book 2009 White Book 2008 White Book The 2008 White Book was not formally published due to work load constraints associated with completion of...

  20. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect

    Not Available

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  1. Oak Ridge EM Program Increases Focus on Mercury Cleanup

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM Senior Advisor Dave Huizenga recently joined local lawmakers and state and federal officials to announce their partnership to increase focus on cleanup of mercury — one of Oak Ridge’s greatest environmental threats — at the Y-12 National Security Complex.

  2. Federal Facility Agreement (FFA) Signed at Oak Ridge

    Energy.gov [DOE]

    The Oak Ridge Reservation FFA was implemented on January 1, 1992. It is a CERCLA-required agreement among DOE, the United States Environmental Protection Agency, and the Tennessee Department of Environment and Conservation to promote cooperation and participation to clean and remediate the Oak Ridge Reservation.

  3. Oak Ridge Moves Closer to Reaching Vision 2016

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – About 70 employees, community leaders, and local officials recently gathered to witness the completion of K-31 Building’s demolition at Oak Ridge’s East Tennessee Technology Park (ETTP), marking the removal of the fourth of five gaseous diffusion buildings at the former uranium enrichment site.

  4. Ambitious Vision Drives Oak Ridge’s Progress

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Cleanup and transfer of the East Tennessee Technology Park (ETTP) remains one of the Oak Ridge EM office’s highest priorities. This task paves the way for a cleaner environment and enables economic reuse at the site that will benefit the entire region.

  5. 60 Years of Great Science (Oak Ridge National Laboratory)

    DOE R&D Accomplishments

    2003-01-01

    This issue of Oak Ridge National Laboratory Review (vol. 36, issue 1) highlights Oak Ridge National Laboratory's contributions in more than 30 areas of research and related activities during the past 60 years and provides glimpses of current activities that are carrying on this heritage.

  6. Preliminary Notice of Violation, MK-Ferguson of Oak Ridge Company- EA-98-08

    Office of Energy Efficiency and Renewable Energy (EERE)

    Issued to MK-Ferguson of Oak Ridge Company, related to Bioassay Program Deficiencies at DOE's Oak Ridge Facilities, (EA-98-08)

  7. Oak Ridge Removes Laboratory’s Greatest Source of Groundwater Contamination

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – This month, Oak Ridge’s EM program bid farewell to the last shipment of waste from the Tank W-1A project.

  8. DOE Issues Sources Sought/Request for Information for Oak Ridge...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sources SoughtRequest for Information for Oak Ridge Office of Environmental Management Technical Support Services DOE Issues Sources SoughtRequest for Information for Oak Ridge ...

  9. Oak Ridge National Laboratory Wins DOE Mentor of the Year Award at Small Business Forum & Expo

    Energy.gov [DOE]

    Oak Ridge National Laboratory of Oak Ridge, TN, won the DOE Mentor Award at the Small Business Forum & Expo in Tampa, FL, on July 12, 2014

  10. Oak Ridge’s EM Program Seeks Public Input on Cleanup

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge's EM office held a public meeting this week to discuss the program’s upcoming budget and cleanup priorities.

  11. EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee.

  12. Source document for waste area groupings at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Osborne, P.L.; Kuhaida, A.J., Jr.

    1996-09-01

    This document serves as a source document for Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and other types of documents developed for and pertaining to Environmental Restoration (ER) Program activities at Oak Ridge National Laboratory (ORNL). It contains descriptions of the (1) regulatory requirements for the ORR ER Program, (2) Oak Ridge Reservation (ORR) ER Program, (3) ORNL site history and characterization, and (4) history and characterization of Waste Area Groupings (WAGS) 1-20. This document was created to save time, effort, and money for persons and organizations drafting documents for the ER Program and to improve consistency in the documents prepared for the program. By eliminating the repetitious use of selected information about the program, this document will help reduce the time and costs associated with producing program documents. By serving as a benchmark for selected information about the ER Program, this reference will help ensure that information presented in future documents is accurate and complete.

  13. White Tail | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Tail Jump to: navigation, search Name White Tail Facility White Tail Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exelon Wind Developer...

  14. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  15. Tiger team assessment of the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    none,

    1990-02-01

    This document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Y-12 Plant in Oak Ridge, Tennessee. The Y-12 Plant Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environmental, Safety, and Health (including Occupational Safety and Health Administration (OSHA) compliance), and Management areas and determines the plant's compliance with applicable federal (including DOE), state, and local regulations and requirements. 4 figs., 12 tabs.

  16. Oak Ridge Reservation Environmental report for 1990

    SciTech Connect

    Wilson, A.R.

    1991-09-01

    The first two volumes of this report are devoted to a presentation of environmental data and supporting narratives for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and surrounding environs during 1990. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the ORR for the reader who does not want to review in detail all of the 1990 data. Volume 2 includes the detailed data summarized in a format to ensure that all environmental data are represented in the tables. Narratives are not included in Vol. 2. The tables in Vol. 2 are addressed in Vol. 1. For this reason, Vol. 2 cannot be considered a stand-alone report but is intended to be used in conjunction with Vol. 1.

  17. Pulsed reactor experiments at Oak Ridge

    SciTech Connect

    Mihalczo, J.T.

    1994-12-31

    This paper describes dynamic experiments for 3 pulsed reactors. 1st reactor was pulsed from some average power by rotating a partial Be reflector past an unreflected core face; the other 2 reactors were pulsed by rapid insertion of a fuel rod into the unmoderated and unreflected reactor at essentially zero neutron level with no significant neutron source present. The first reactor was a mockup of an EURATOM design (never constructed) of the proposed SORA Reactor, and the other two were the Health Physics Research Reactor and the Army Pulse Radiation Facility Reactor (APRFR). This paper describes the experiments performed in initial testing of these systems, including destructive tests of APRFR, to set operating limits for this type of reactor in pulsed operation. All the experiments described were performed at the Oak Ridge Critical Experiments Facility.

  18. Oak Ridge Reservation environmental report for 1989

    SciTech Connect

    Jacobs, V.A.; Wilson, A.R.

    1990-10-01

    The first two volumes of this report are devoted to a presentation of environmental data and supporting narratives for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and surrounding environs during 1989. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the ORR for the reader who does not want to review in detail all of the 1989 data. Volume 2 includes the detailed data summarized in a format to ensure that all environmental data are represented in the tables. Narratives are not included in Vol. 2. The tables in Vol. 2 are addressed in Vol. 1. For this reason, Vol. 2 cannot be considered a stand-alone report but is intended to be used in conjunction with Vol. 1. 16 figs., 194 tabs.

  19. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    SciTech Connect

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

  20. Scotch Creek Wildlife Area 2007-2008 Annual Report.

    SciTech Connect

    Olson, Jim

    2008-11-03

    The Scotch Creek Wildlife Area is a complex of 6 separate management units located in Okanogan County in North-central Washington State. The project is located within the Columbia Cascade Province (Okanogan sub-basin) and partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams. With the acquisition of the Eder unit in 2007, the total size of the wildlife area is now 19,860 acres. The Scotch Creek Wildlife Area was approved as a wildlife mitigation project in 1996 and habitat enhancement efforts to meet mitigation objectives have been underway since the spring of 1997 on Scotch Creek. Continuing efforts to monitor the threatened Sharp-tailed grouse population on the Scotch Creek unit are encouraging. The past two spring seasons were unseasonably cold and wet, a dangerous time for the young of the year. This past spring, Scotch Creek had a cold snap with snow on June 10th, a critical period for young chicks just hatched. Still, adult numbers on the leks have remained stable the past two years. Maintenance of BPA funded enhancements is necessary to protect and enhance shrub-steppe and to recover and sustain populations of Sharp-tailed grouse and other obligate species.

  1. Coherent Scattering Investigations at the Spallation Neutron Source: a Snowmass White Paper

    SciTech Connect

    Akimov, D. Moscow Engineering Physics Institute , Russia; Bernstein, A. Lawrence Livermore National Laboratory; BarbeauP.,; Barton, P. J. Lawrence Berkeley National Laboratory; Bolozdynya, A. Moscow Engineering Physics Institute , Russia; Cabrera-Palmer, B. Sandia National Laboratories; Cavanna, F. Yale University; Cianciolo, Vince ORNL; Collar, J. University of Chicago, Enrico Fermi Institute; Cooper, R. J. Indiana University; Dean, D. J. Oak Ridge National Laboratory; Efremenko, Yuri University of Tennessee and Oak Ridge National Laboratory; Etenko, A. Moscow Engineering Physics Institute , Russia; Fields, N. University of Chicago, Enrico Fermi Institute; Foxe, M. Pennsylvania State University, University Park, PA; Figueroa-Feliciano, E. Massachusetts Institute of Technology; Fomin, N. University of Tennessee, Knoxville; Gallmeier, F. Oak Ridge National Laboratory; Garishvili, I. University of Tennessee, Knoxville; Gerling, M. Sandia National Laboratories; Green, M. University of North Carolina, Chapel Hill; Greene, Geoffrey University of Tennessee, Knoxville; Hatzikoutelis, A. University of Tennessee, Knoxville; Henning, Reyco University of North Carolina, Chapel Hill; Hix, R. University of Tennessee and Oak Ridge National Laboratory; Hogan, D. University of California-Berkeley; Hornback, D. University of Tennessee and Oak Ridge National Laboratory; Jovanovic, I. Pennsylvania State University, University Park, PA; Hossbach, T. Pacific Northwest National Laboratory; Iverson, Erik B ORNL; Klein, S. R. Lawrence Berkeley National Laboratory; Khromov, A. Moscow Engineering Physics Institute , Russia; Link, J. Virginia Polytechnic Institute and State University; Louis, W. Los Alamos National Laboratory; Lu, W. Oak Ridge National Laboratory; Mauger, C. Los Alamos National Laboratory; Marleau, P. Sandia National Laboratories; Markoff, D. North Carolina Central University, Durham; Martin, R. D. University of South Dakota; Mueller, Paul Edward ORNL; Newby, J. Oak Ridge National Laboratory; Orrell, John L. Pacific Northwest National Laboratory; O'Shaughnessy, C. University of North Carolina, Chapel Hill; Penttila, Seppo Oak Ridge National Laboratory; Patton, K. North Carolina State University, Raleigh; Poon, A. W. Lawrence Berkeley National Laboratory; Radford, David C ORNL; Reyna, D. Sandia National Laboratories; Ray, H. University of Florida, Gainesville; Scholberg, K. Duke University, North Carolina; Sosnovtsev, V. Moscow Engineering Physics Institute , Russia; Tayloe, R. Indiana University; Vetter, K. Lawrence Berkeley National Laboratory; Virtue, C. Laurentian University, Canada; Wilkerson, J. University of North Carolina, Chapel Hill; Yoo, J. Fermi National Accelerator Laboratory; Yu, Chang-Hong ORNL

    2013-01-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory, Tennessee, provides an intense flux of neutrinos in the few tens-of-MeV range, with a sharply-pulsed timing structure that is beneficial for background rejection. In this white paper, we describe how the SNS source can be used for a measurement of coherent elastic neutrino-nucleus scattering (CENNS), and the physics reach of different phases of such an experimental program (CSI: Coherent Scattering Investigations at the SNS).

  2. Microsoft PowerPoint - 9_Jessica White-Horton_NMMSS_2013.ppt [Compatibility Mode]

    National Nuclear Security Administration (NNSA)

    Global Monitoring of Uranium Hexafluoride Cylinders Jessica White-Horton, Oak Ridge National Laboratory NMMSS Users Annual Training Meeting, May 21, 2013 Outline 2  Project Context & Current Challenges  NNSA 5-year Program Plan  Concept of Operations  Stakeholder Views * Conclusions and Next Steps Model 30B cylinder for low- enriched uranium (LEU) Model 48Y cylinder for natural uranium Context for NNSA UF 6 Project 3 * Approximately 20,000 cylinders are in active circulation at

  3. Calendar Year 2010 Groundwater Monitoring Report, U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    Elvado Environmental LLC

    2011-12-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2010 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2010 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2010 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the

  4. Calendar Year 2007 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect

    Elvado Environmental LLC

    2008-12-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2007 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2007 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2007 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT), and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). In December 2007, the BWXT corporate name was changed to Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12), which is applied to personnel and organizations throughout CY 2007 for this report. Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2007 monitoring results fulfill requirements of

  5. CHP Research and Development - Presentation by Oak Ridge National

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Laboratory, June 2011 | Department of Energy Research and Development - Presentation by Oak Ridge National Laboratory, June 2011 CHP Research and Development - Presentation by Oak Ridge National Laboratory, June 2011 Presentation on Combined Heat and Power (CHP) Research and Development, given by K. Dean Edwards of Oak Ridge National Lab, at the U.S. DOE Industrial Distributed Energy Portfolio Review Meeting in Washington, D.C. on June 1-2, 2011. chp_rd_edwards.pdf (927.22 KB) More Documents

  6. Oak Ridge's Building K-27 Disappearing Quickly | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Building K-27 Disappearing Quickly Oak Ridge's Building K-27 Disappearing Quickly May 31, 2016 - 1:00pm Addthis Crews are moving at an impressive pace on Building K-27, completing more than 65 percent of the demolition since February. Crews are moving at an impressive pace on Building K-27, completing more than 65 percent of the demolition since February. Oak Ridge is moving quickly toward fulfilling its Vision 2016 by the year's end. Oak Ridge is moving quickly toward fulfilling its Vision 2016

  7. EA-1219: Hoe Creek Underground Coal Gasification Test Site Remediation, Campbell County, Wyoming

    Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming.

  8. Fast-growing willow shrub named `Fish Creek`

    DOEpatents

    Abrahamson, Lawrence P.; Kopp, Richard F.; Smart, Lawrence B.; Volk, Timothy A.

    2007-05-08

    A distinct male cultivar of Salix purpurea named `Fish Creek`, characterized by rapid stem growth producing greater than 30% more woody biomass than either of its parents (`94001` and `94006`) and 20% more biomass than a current production cultivar (`SV1`). `Fish Creek` can be planted from dormant stem cuttings, produces multiple stems after coppice, and the stem biomass can be harvested when the plant is dormant. In the spring following harvest, the plant will re-sprout very vigorously, producing new stems that can be harvested after two to four years of growth. This harvest cycle can be repeated several times. The stem biomass can be chipped and burned as a source of renewable energy, generating heat and/or electricity. `Fish Creek` displays a low incidence of rust disease or damage by beetles or sawflies.

  9. Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request

    Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2016.

  10. Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request

    Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2018.

  11. Lower Watts Bar Reservoir Clinch River/Poplar Creek | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Watts Bar Reservoir Clinch River/Poplar Creek Lower Watts Bar Reservoir Clinch River/Poplar Creek This document discusses the Lower Watts Bar Reservoir Clinch River/Poplar Creek. Topics include: * The area's safety * Any use limitations for the area * History and cleanup background for this area * How DOE's cleanup program addressed the problem Lower Watts Bar Reservoir Clinch River/Poplar Creek (982.57 KB) More Documents & Publications EA-1175: Final Environmental Assessment OREM

  12. Honey Creek Middle School Wins U.S. Department of Energy National Science

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Competition - News Releases | NREL Honey Creek Middle School Wins U.S. Department of Energy National Science Competition June 24, 2006 Photo of students from Honey Creek Middle School standing with their trophy from the National Middle School Science Bowl. Students from Honey Creek Middle School traveled from Terre Haute, Ind., to take first place at the National Middle School Science Bowl in Denver, Colo. Five middle school students from Honey Creek Middle School in Terre Haute, Ind.,

  13. Construction Support for New Slab Creek Power House Project | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Construction Support for New Slab Creek Power House Project Construction Support for New Slab Creek Power House Project Construction Support for New Slab Creek Power House Project 69c_pop-poe_percheron_power_spray.ppt (1.1 MB) More Documents & Publications CX-100081: Categorical Exclusion Determination CX-008235: Categorical Exclusion Determination CX-100448 Categorical Exclusion Determination

  14. Bill Wilcox ? The transformation and second birth of Oak Ridge...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    more in his honor somewhere in town, fittingly in our Municipal Building; so much of the shape of the Oak Ridge of today was created under his direction." Bill then brings to...

  15. Post Oak Bend City, Texas: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    is a stub. You can help OpenEI by expanding it. Post Oak Bend City is a town in Kaufman County, Texas. It falls under Texas's 5th congressional district.12 References...

  16. Oak Grove, Texas: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    This article is a stub. You can help OpenEI by expanding it. Oak Grove is a town in Kaufman County, Texas. It falls under Texas's 5th congressional district.12 References...

  17. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS

    Office of Legacy Management (LM)

    AL, 3 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS CINCINNATI AREA P. 0. BOX 39198, CINCINNATI 39, OHIO IN REPLY REFER TO: 0:OJT --r.LAal Cl E:c Mr. J. H. Noyes, ...

  18. Recent Demolition Makes Oak Ridge National Laboratory Cleaner...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ben Williams , (865) 576-0885, http:www.oakridge.doe.gov OAK RIDGE, Tenn. - U.S. Department of Energy (DOE) cleanup contractor Safety and Ecology Corporation recently removed ...

  19. B & W Y-12 and 14 Years in Oak Ridge

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Y-12 and 14 Years in Oak Ridge I well recall the transition that began in November, 2000, when BWXT Y-12 (now B&W Y-12) took over the management and operating contract for what...

  20. FTCP Site Specific Information - Oak Ridge Office of Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management | Department of Energy Office of Environmental Management FTCP Site Specific Information - Oak Ridge Office of Environmental Management Annual Workforce Analysis and Staffing Plan Report Calendar Year 2015 Calendar Year 2013 Calendar Year 2012

  1. EERE Success Story-Tennessee: Oak Ridge National Laboratory Optimizes...

    Energy.gov [DOE] (indexed site)

    light-weight, high-pressure hydrogen and natural gas storage tanks. To combat the high costs of hydrogen storage tanks, the U.S. Department of Energy's Oak Ridge National ...

  2. Science and Technology at Oak Ridge National Laboratory

    ScienceCinema

    Mason, Thomas

    2016-07-12

    ORNL Director Thom Mason explains the groundbreaking work in neutron sciences, supercomputing, clean energy, advanced materials, nuclear research, and global security taking place at the Department of Energy's Office of Science laboratory in Oak Ridge, Tenn.

  3. Colonel Bruce P. Crandall, Medal of Honor recipient visits Oak...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Ridge's three government sites and a driving tour of the city of Oak Ridge. This is the man who, on November 14, 1965, commanded a flight of 16 helicopters lifting troops into the...

  4. Oak Ridge Micro Energy Inc | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Ridge, Tennessee Zip: 37830 Product: Developer and producer of thin film rechargeable lithium and lithium-ion batteries. References: Oak Ridge Micro-Energy Inc1 This article is...

  5. Mr. David Hernelright Chair, Oak Ridge Site Specific Advisory...

    Office of Environmental Management (EM)

    Board P.O. Box 2001 Oak Ridge, Tennessee 3 7831 Dear Mr. ... at DOE EM continues to be aware of the implications of funding constraints stemming from across the board budget ...

  6. Oak Ridge Office of Environmental Management P.O

    Office of Environmental Management (EM)

    Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... The Department of Energy (DOE) has proceeded with the ... The funding is included in DOE's annual budget request, and ...

  7. ‘Project Wipeout’ Helps Clean Up Oak Ridge

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – A term like “Project Wipeout,” may conjure images of military operations, extreme sporting events or a comical competition show on television.

  8. Oak Ridge, Tennessee: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    This article is a stub. You can help OpenEI by expanding it. Oak Ridge is a city in Anderson County and Roane County, Tennessee. It falls under Tennessee's 3rd congressional...

  9. Science and Technology at Oak Ridge National Laboratory

    SciTech Connect

    Mason, Thomas

    2012-11-01

    ORNL Director Thom Mason explains the groundbreaking work in neutron sciences, supercomputing, clean energy, advanced materials, nuclear research, and global security taking place at the Department of Energy's Office of Science laboratory in Oak Ridge, Tenn.

  10. Oak Ridge Community Meeting Focused on Enabling Future Missions...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge Community Meeting Focused on Enabling Future Missions Oak Ridge Community Meeting Focused on Enabling Future Missions June 15, 2016 - 12:35pm Addthis OREM Manager Sue Cange ...

  11. Department of energy oak riDge office

    Energy.gov [DOE] (indexed site)

    present risk and hinder the Department's missions. 2 DEpaRTMEnT Of EnERgy Oak RiDgE ... Technology Park (ETTP)-evolved and conducted different missions for the Department. ...

  12. North Oaks, Minnesota: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    This article is a stub. You can help OpenEI by expanding it. North Oaks is a city in Ramsey County, Minnesota. It falls under Minnesota's 4th congressional district.12...

  13. 60 years of great science [Oak Ridge National Laboratory

    SciTech Connect

    2003-01-01

    This issue highlights Oak Ridge National Laboratory's contributions in more than 30 areas of research and related activities during the past 60 years and provides glimpses of current activities that are carrying on this heritage.

  14. Oak Ridge Centers for Manufacturing Technology, part 1

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    program of the 1960's through the early 1980's, the Oak Ridge Centers for Manufacturing Technology (ORMCT) in the 1990's was also a most unique and unusual effort. It was...

  15. Oak Ridge Centers for Manufacturing Technology, part 2

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    the ORNL Review, Vol. 28, No. 1, featured an article titled, "Oak Ridge Solution to Manufacturing Problems," written by Bill Wilburn. Bill"s introductory caption to his lead...

  16. World War II role of Oak Ridge National

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    War II role of Oak Ridge National Lab featured in second 70th anniversary lecture February ... about that laboratory's role during World War II and the shared national security mission ...

  17. Oak Park, Michigan: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. Oak Park is a city in Oakland County, Michigan. It falls under Michigan's 12th congressional...

  18. Oak Ridge North, Texas: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    article is a stub. You can help OpenEI by expanding it. Oak Ridge North is a city in Montgomery County, Texas. It falls under Texas's 8th congressional district.12 References...

  19. DOE - Office of Legacy Management -- Oak Ridge TN Warehouse Site...

    Office of Legacy Management (LM)

    FACT SHEET This fact sheet provides information about the Oak Ridge, Tennessee, Warehouses Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. ...

  20. Questions remain on funding for cleanup of Oak Ridge Reservation

    Energy.gov [DOE]

    There is great uncertainty on what the looming federal budget cuts will be and what effect they will have on funding for the Department of Energy’s (DOE) Environmental Management (EM) program at the Oak Ridge Reservation (ORR).

  1. Oak Ridge's Reindustrialization Program Named Finalist for National...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reindustrialization Program at the U.S. Department of Energy's (DOE) Oak Ridge Office (ORO) was recently named a finalist in the U.S. General Services Administration's (GSA) 14th...

  2. Oak Ridge Site Specific Advisory Board * P.O...

    Office of Environmental Management (EM)

    TN 37831 Phone: 865-241-4583, 865-241-4584, 1-800-382-6938 * Fax: 865-574-3521 * Internet: www.oakridge.doe.govemssab Many Voices Working for the Community Oak Ridge Site...

  3. Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request | Department

    Office of Environmental Management (EM)

    of Energy 9 : FY 2014 DOE Oak Ridge EM Budget Request Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request At the April 11, 2012, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations regarding the FY 2014 DOE Oak Ridge Environmental Management Program budget request. Recommendation 209 (91.1 KB) DOE response to recommendation 209 (81.13 KB) More Documents & Publications Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request Recommendation

  4. Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request | Department of

    Office of Environmental Management (EM)

    Energy 197: FY 2013 DOE Oak Ridge EM Budget Request Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request At the May 26, 2011, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations regarding the FY 2013 DOE Oak Ridge Environmental Management Program budget request. Recommendation 197 (181.59 KB) DOE response to recommendation 197 (18.48 KB) More Documents & Publications Recommendation 189: FY 2012 DOE Oak Ridge EM Budget Request Recommendation

  5. CNS Joins Oak Ridge Chamber in Nashville | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Joins Oak Ridge Chamber ... CNS Joins Oak Ridge Chamber in Nashville Posted: April 13, 2016 - 12:25pm Tennessee Governor Bill Haslam (front row center) greets Oak Ridge business leaders during Oak Ridge Chamber of Commerce's Day on the Hill. Also pictured: (back row) Kelly Callison, Gene Patterson, Rick Chinn, Ben Andrews, (front row) Stacy Myers, Parker Hardy, Patricia Myers and Lisa Copeland. Consolidated Nuclear Security and other area businesses recently joined the Oak Ridge Chamber of

  6. Recommendation 228: Recommendations on the FY 2017 DOE Oak Ridge

    Office of Environmental Management (EM)

    Department of Energy 5: Recommendation on DOE Oak Ridge GIS Fact Sheets Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Not all fact sheets that can be accessed on the DOE GIS include descriptions of future decisions or actions on cleanup areas. ORSSAB recommends that all fact sheets identify future actions expected or planned. Recommendation225.pdf (148.18 KB) Responseto225.pdf (238.07 KB) More Documents & Publications Recommendation 224: Recommendations on the FY

  7. The Oak Ridge Reservation Annual Site Environmental Report Summary, 2007

    SciTech Connect

    None, None

    2009-02-28

    The Oak Ridge Reservation Annual Site Environmental Report is prepared and published each year to inform the public of the environmental activities that take place on the reservation and in the surrounding areas. It is written to comply with DOE Order 231.1A, Environment, Safety, and Health Reporting. This document has been prepared to present the highlights of the Oak Ridge Reservation Annual Site Environmental Report 2007 in an easy-to-read, summary format.

  8. Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Act | Department of Energy Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Department of Justice press release announcing that a federal grand jury in the Eastern District of Tennessee has charged a former contract worker, Roy Lynn Oakley, at East Tennessee Technology Park with converting to his own use restricted government materials utilized for uranium enrichment and

  9. EERE Success Story-Tennessee: Oak Ridge National Laboratory Optimizes

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Carbon Fiber Production, Reduces Carbon Fiber Costs by 30% | Department of Energy Oak Ridge National Laboratory Optimizes Carbon Fiber Production, Reduces Carbon Fiber Costs by 30% EERE Success Story-Tennessee: Oak Ridge National Laboratory Optimizes Carbon Fiber Production, Reduces Carbon Fiber Costs by 30% January 24, 2014 - 12:00am Addthis The high cost of aerospace-grade carbon fiber (CF) is currently a barrier to widespread commercialization of light-weight, high-pressure hydrogen and

  10. Analysis Activities at Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge National Laboratory Analysis Activities at Oak Ridge National Laboratory Presentation on ORNL's analysis activities to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004. 15_ornl_greene_ferrada.pdf (4.45 MB) More Documents & Publications Integrated Market Modeling of Hydrogen Transition Scenarios with HyTrans DOE Hydrogen Transition Analysis Workshop DOE Analysis Related to H2USA

  11. Oak Ridge Reservation Compliance Order, September 26, 1995 Summary

    Office of Environmental Management (EM)

    Oak Ridge Reservation Compliance Order, September 26, 1995 State Tennessee Agreement Type Compliance Order Legal Driver(s) FFCAct Scope Summary Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan Parties DOE; Tennessee Department of Environment and Conservation Date 9/26/1995 SCOPE * Approve, with modifications made by TDEC, the "Proposed Site Treatment Plan for the Oak Ridge

  12. Oak Ridge Makes Safety a Community Affair | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Makes Safety a Community Affair Oak Ridge Makes Safety a Community Affair February 1, 2012 - 12:00pm Addthis Employees receive training to remove Tank W-1A. From 1951 until 1986, the tank collected and stored liquid waste from radiochemical separations and high-radiation facilities at Oak Ridge National Laboratory, until significant levels of soil and groundwater contamination were traced to the vessel. Employees receive training to remove Tank W-1A. From 1951 until 1986, the tank collected and

  13. Council Honors Oak Ridge's EM Program with Prestigious Historic

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Preservation Award | Department of Energy Council Honors Oak Ridge's EM Program with Prestigious Historic Preservation Award Council Honors Oak Ridge's EM Program with Prestigious Historic Preservation Award August 15, 2016 - 12:35pm Addthis Left to right, ACHP Chairman Milford Wayne Donaldson; Knox Heritage Executive Director Kim Trent; OREM Manager Sue Cange; and ACHP Expert Member Robert Stanton with the Chairman’s Award for Achievement in Historic Preservation. Left to right, ACHP

  14. Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Annual Report | Department of Energy Oak Ridge Transportation Technology Program Annual Report Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology Program Annual Report ornl_ttp_report_fy08.pdf (4.58 MB) More Documents & Publications FY 2008 Progress Report for Lightweighting Materials - 1. Introduction 2011 Annual Progress Report for Lightweighting Materials FY 2009 Progress Report for Lightweighting Materials - 7. Low-Cost Carbon Fiber

  15. Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 5: Recommendation on DOE Oak Ridge GIS Fact Sheets Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Not all fact sheets that can be accessed on the DOE GIS include descriptions of future decisions or actions on cleanup areas. ORSSAB recommends that all fact sheets identify future actions expected or planned. Recommendation225.pdf (148.18 KB) Responseto225.pdf (238.07 KB) More Documents & Publications Recommendation 224: Recommendations on the FY

  16. Assessment of the Integrated Facility Disposition Project at Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    National Laboratory & Y-12 for Transfer of Facilities & Materials to EM | Department of Energy the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program

  17. ISC-Oak Ridge Office Environmental Assessments (EA) / Environmental Impact

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  18. Oak Ridge National Laboratory | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Oak Ridge National Laboratory A snapshot of NNSA's counterterrorism mission NNSA's mission of counterterrorism and counterproliferation is supported through innovative science and technology. Recently, Associate Administrator and Deputy Undersecretary for Counterterrorism and Counterproliferation Jay Tilden visited Oak Ridge National Laboratory (ORNL) and met with... Sandia's ice sheet modeling of Greenland, Antarctica helps predict sea-level rise The Greenland and Antarctic ice sheets will make

  19. Experimental bypass of Lake Reality, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect

    1997-10-01

    Studies conducted by the Y-12 Reduction of Mercury in Plant Effluent (RMPE) Program and Y-12 Biological Monitoring and Abatement Program (BMAP) in 1995 and 1996 (Y/ER-251, Y/ER-277) identified concerns regarding Lake Reality`s effect on the transport and transformation of mercury in East Fork Poplar Creek (EFPC). The pond appeared to have two potentially adverse effects on mercury transport. First, it acted as a biochemical reactor, converting inorganic mercury in inflowing water to methylmercury, a more toxic substance with extremely high bioaccumulation potential in aquatic environments. Second, the pond appeared to trap mercury associated with suspended particulates during periods of stormflow, and slowly released that mercury via the export of resuspended particles during periods of baseflow. The net effect was to raise the day-to-day exposure of aquatic life to mercury in the stream downstream from the pond, and add to the calculated mercury loading of the stream under baseflow conditions. Scientific investigations thus indicated that diversion of the flow of EFPC around Lake Reality had the potential to reduce time-averaged concentrations of methylmercury and total mercury in the creek below its discharge, but that such diversion might also interfere with possible beneficial effects of the retention pond. Therefore, an experimental bypass of the pond was undertaken in late 1996 to evaluate the consequences of such an action before embarking on a more permanent change.

  20. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 4. Appendix F

    SciTech Connect

    1995-09-01

    This section contains ecotoxicological profiles for the COPECs for the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The ecotoxicological information is presented for only those endpoints for which the chemicals are COPECs. The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.