  1. Southern Company - Kemper County, Mississippi | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Southern Company - Kemper County, Mississippi Southern Company - Kemper County, Mississippi Southern Company - Kemper County, Mississippi KEMPER COUNTY ENERGY FACILITY In February 2006, the U.S. Department of Energy awarded a Cooperative Agreement to Southern Company Services under the Clean Coal Power Initiative (CCPI) Round 2 Program to provide financial support for the development and deployment of the Transport Integrated Gasification (TRIGTM) technology that is being utilized by the

  2. Secretary Moniz Tours Kemper Carbon Capture and Storage Facility

    Energy.gov [DOE]

    On Friday, Nov. 8, 2013, Secretary Moniz and international energy officials toured Kemper, the nation's largest carbon capture and storage facility, in Liberty, Mississippi.

  3. EIS-0409: Kemper County Integrated Gasification Combined Cycle Project, Mississippi

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EIS analyzes DOE's decision to provide funding for the Kemper County Integrated Gasification Combined Cycle Project in Kemper County, Mississippi to assess the potential environmental impacts associated with the construction and operation of a project proposed by Southern Power Company, through its affiliate Mississippi Power Company, which has been selected by DOE for consideration under the Clean Coal Power Initiative (CCPI) program.

  4. eis kemper | netl.doe.gov

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Final Environmental Impact Statement for Kemper County IGCC VOLUME 1 Cover Sheet [PDF-1,168 KB] Table of Contents [PDF-65 KB] List of Acronyms and Abbreviations [PDF-31 KB] Glossary [PDF-471 KB] Summary [PDF-688 KB] Chapter 1: Purpose and Need for Agency Action [PDF-98 KB] Chapter 2: The Proposed Action and Alternatives [PDF-10,306 KB] Chapter 3: Affected Environment [PDF-15,817 KB] Chapter 4: Environmental Consequences [PDF-4,101 KB] Chapter 5: Pollution Prevention and Mitigation Measures

  5. Kemper County IGCC (tm) Project Preliminary Public Design Report

    SciTech Connect

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  6. USACE | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    USACE Design-Build Contract Awarded for Electrical Substation at Los Alamos National Laboratory LOS ALAMOS, NM - Under an interagency agreement with the Department of Energy's National Nuclear Security Administration (DOE/NNSA), the U.S. Army Corps of Engineers (USACE) has awarded a design-build contract at Los Alamos National Laboratory (LANL) to Gardner Zemke Mechanical

  7. USACE 2012 Nationwide Permits | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: USACE 2012 Nationwide PermitsPermittingRegulatory GuidanceSupplemental Material...

  8. TITLE

    Office of Legacy Management (LM)

    WE/OR/20722-275 102-HSP-01 Rev. 1 HEALTH AND SAFETY PLAN FOR THE ALBANY RESEARCH CENTER SITE SEFTEMBER 1990 Prepared for United S t a t e s Department of Energy Oak Ridge Operations Office Under Contract N o . DE-AC05-810R20722 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job N o . 14501 TITLE : HEALTH AND SAFETY PLAN FOR THE U Y RESEARCH CENTER SITE DDCUMENT NUMBER: 102-HSP-01 REVISION NUMBER: 1 PROJECT: PUSPAP JOB NO. : 1 4 5 0 1 REVIEW: ~a fetf Services REVIEWED: REVIEWED : APPROVED:

  9. Title

    Gasoline and Diesel Fuel Update

    Name Title Date Cap and Trade: the Lieberman-Warner Climate Security Act of 2007 John Steelman April 2011 The Future of Onshore Oil & Gas Production 1 Largest New Source: Existing Oil Fields 2 How we produce oil matters NETL 2008 3 How we produce oil matters NETL 2008 CO 2 -EOR in Permian Basin w/ natural CO 2 NETL 2010 71 4 How we produce oil matters NETL 2008 CO 2 -EOR in Permian Basin w/ natural CO 2 NETL 2010 -157 CO 2 -EOR in Permian Basin w/ CCS 71 5 Where we produce gas matters 6

  10. USACE Engineer Regulation 1110-2-1454 Corps Responsibilities...

    OpenEI (Open Energy Information) [EERE & EIA]

    USACE Engineer Regulation 1110-2-1454 Corps Responsibilities for Non-Federal Hydroelectric Power Development under the Federal Power Act Jump to: navigation, search OpenEI...

  11. USACE EC 1165-2-216 Policy and Procedural Guidance for Processing...

    OpenEI (Open Energy Information) [EERE & EIA]

    USACE EC 1165-2-216 Policy and Procedural Guidance for Processing Requests to Alter USACE Civil Works Projects Pursuant to 33 USC 408 Jump to: navigation, search OpenEI Reference...

  12. USACE ER 200-2-2 Procedures for Implementing NEPA | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    ER 200-2-2 Procedures for Implementing NEPA Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: USACE ER 200-2-2...

  13. EIS-0526: USACE and BOR Notice of Availability of the Draft Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy 6: USACE and BOR Notice of Availability of the Draft Environmental Impact Statement EIS-0526: USACE and BOR Notice of Availability of the Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana The U.S. Army Corps of Engineers and the Bureau of Reclamation jointly issued a notice of availability for a Draft EIS for the Lower Yellowstone Intake Diversion Dam Fish Passage Project. DOE's

  14. EIS-0526: USACE and BOR Notice of Availability of the Final Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy 526: USACE and BOR Notice of Availability of the Final Environmental Impact Statement EIS-0526: USACE and BOR Notice of Availability of the Final Environmental Impact Statement EIS-0526: Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana The U.S. Army Corps of Engineers and the Bureau of Reclamation jointly announced the availability of a Final EIS for the Lower Yellowstone Intake Diversion Dam Fish Passage Project, a

  15. 1,"John Day","Hydroelectric","USACE Northwestern Division",2160

    Energy Information Administration (EIA) (indexed site)

    Oregon" ,"Plant","Primary energy source","Operating company","Net summer capacity (MW)" 1,"John Day","Hydroelectric","USACE Northwestern Division",2160 2,"The Dalles","Hydroelectric","USACE Northwestern Division",1822.7 3,"Bonneville","Hydroelectric","USACE Northwestern Division",1153.9 4,"McNary","Hydroelectric","USACE Northwestern

  16. Title XVII

    Energy.gov [DOE]

    Title XVII of EPAct05 provides the basis of the Energy Department’s program. This title provides broad authority for the Department to guarantee loans that support early commercial use of advanced...

  17. Title | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    40.3 KB) More Documents & Publications Title Title Title

  18. --No Title--

    Energy.gov [DOE] (indexed site)

    Guard Corps, as contained in Titles II and III of the Iran Threat Reduction and Syria Human Rights Act of 2012. The effective date was December 10, 2012. This Flash will be...

  19. --No Title--

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    reciprocity of tax-exempt status to other states. The only provision which will establish tax-exempt status under California ruling is that title of property purchased for use in...

  20. --No Title--

    Energy Information Administration (EIA) (indexed site)

    FILE TITLE: SEQUENTIAL MASTER FILE DATA SET NAME: CN6944.PRJ.F759.MASTERYY ... Census Region Code 1 2 2 N See below for values FIPS State Code 3 4 2 N Ownership Code 5 5 ...

  1. TITLE SLIDE OPTION 1 PRESENTATION TITLE HERE KEEP LEFT JUSTIFIED

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hendrix, USACE Dan Patla, USACE OLD HICKORY HYDROPOWER REHABILITATION ANALYSIS REPORT TEAM CUMBERLAND 1 File Name OBJECTIVES * Determine the benefits of turbine-generator unit replacement * Optimize the design of the replacement units 2 CONSTRAINTS * Inter-blade/Inter-channel vortices * Pressure pulsations * Outflow cavitation * Equipment Limitations * Pool Elevations * Minimum Tailwater * Time of No Generation * Power Production Ramp Rates * Spill Ramp Rates * Minimum Flow * Dissolved Oxygen 3

  2. TITLE XVII APPLICATION PORTAL

    Energy.gov [DOE]

    The Title XVII online application portal guides users through the Title XVII loan guarantee application process.

  3. Title Standards 2001

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Title Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of

  4. Guide Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE G XXX.X-X xx-xx-20XX Guide Title [This Guide describes acceptable, but not mandatory means for complying with requirements. Guides are not requirements documents and are not to be construed as requirements in any audit or appraisal for compliance with associated rule or directives.] U.S. Department of Energy Office of Primary Interest FOREWORD (optional) THE FOREWORD SHOULD DESCRIBE THE DOE REQUIREMENTS, DIRECTIVES, OR RULES THAT MAY BE SATISFIED BY IMPLEMENTING THIS GUIDE. CONTENTS

  5. my title

    Office of Scientific and Technical Information (OSTI)

    Negative to positive magnetoresistance and magnetocaloric effect in Pr0.6Er0.4Al2 Arjun K. Pathak, 1, [1] K. A. Gschneidner, Jr., 1, 2 and V. K. Pecharsky1, 2 1The Ames Laboratory, U.S. Department of Energy, Iowa State University, Ames, Iowa 50011-3020, USA 2Department of Materials Science and Engineering, Iowa State University, Ames, Iowa 50011-2300, USA ABSTRACT We report on the magnetic, magnetocaloric and magnetotransport properties of Pr0.6Er0.4Al2. The title compound exhibits a large

  6. Title | Department of Energy

    Energy.gov [DOE] (indexed site)

    154.24 KB) More Documents & Publications Title Slide 1 Instructions for Grant and Loan Recipients

  7. TITLE SLIDE OPTION 1 PRESENTATION TITLE HERE KEEP LEFT JUSTIFIED

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bishop, USACE Kathleen King, MWH October 12, 2016 WOLF CREEK HYDROPOWER REHABILITATION ANALYSIS REPORT 1 File Name WOLF CREEK POWER PLANT Location: Russell County, KY River Mile 460.9 Generation: 6 Units @ 51.8 MW 310.5 MW WOL/P HRAR 2 CONSTRAINTS  SEPA MOU  Minimum Flow  Dissolved Oxygen  Drawdown Limits  Downstream Release  Temperature  Water Control Manual  Refill Restrictions 3 WOL/P HRAR ANALYSIS  Opinion of Probable Construction Cost  Opinion of Schedule 

  8. Southern Company - Kemper County | Department of Energy

    Energy.gov [DOE] (indexed site)

    GAS ACHIEVED The combined cycle unit was placed into commercial service on natural gas on August 9, 2014. GROUNDBREAKING CEREMONY A groundbreaking ceremony was held on...

  9. eis kemper draft | netl.doe.gov

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    PDF-265KB Chapter 6: Cumulative Effects PDF-860KB Chapter 7: Permitting and Licensing Requirements PDF-290KB Chapter 8: Irreversible or Irretrievable Commitments of ...

  10. Widget:SetTitle | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Parameters include: title - title text to display Usage: Widget:SetTitle |titleHello World Retrieved from "http:en.openei.orgwindex.php?titleWidget:SetTitle&oldid...

  11. TITLE XVII | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Title XVII innovative clean energy projects loan program (Title XVII) provides loan guarantees to accelerate the deployment of innovative clean energy technology. The U.S. ...

  12. Title | Department of Energy

    Energy.gov [DOE] (indexed site)

    248.05 KB) More Documents & Publications Title Microsoft PowerPoint - FederalReporting Grants Apr 2010 [Compatibility Mode] Recovery Act Recipient Reporting on FederalReporting.gov

  13. Implementation of Division F, Title I, Title II, and Title III...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 Implementation of Division F, Title I, Title II, and Title III and Division G, ...

  14. Title | Department of Energy

    Energy.gov [DOE] (indexed site)

    Matthew Seaford presentation on Title III of the Defense Production Act at the Industry Roundtable. 2_seaford_roundtable.pdf (1.21 MB) More Documents & Publications A National Strategic Plan For Advanced Manufacturing Market Drivers for Biofuels Networking and Information Technology Research and Development Supplement to the President's Budget (February 2010)

    Announcement from the Loan Program Office Title XVII Incentives for Innovative Technologies (50.02 KB) More Documents &

  15. Major Design Changes Late in Title II or early in Title III Can...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Design Changes Late in Title II or early in Title III Can Be Costly PMLL Identifier: ... design changes occur late in Title II or early in Title III Discussion: Numerous ...

  16. TITLE XVII GOVERNING DOCUMENTS | Department of Energy

    Energy.gov [DOE] (indexed site)

    GOVERNING DOCUMENTS The following lists documents that provide the statutory and legislative framework for the Title XVII loan guarantee program. TITLE XVII GOVERNING DOCUMENTS: * ...

  17. TITLE XVII ENVIRONMENTAL COMPLIANCE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ENVIRONMENTAL COMPLIANCE TITLE XVII ENVIRONMENTAL COMPLIANCE TITLE XVII ENVIRONMENTAL COMPLIANCE Various federal environmental laws apply to DOE loans and loan guarantees, ...

  18. TITLE XVII OPEN SOLICITATIONS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Prospective applicants may use the Title XVII online application portal to apply, or continue on to learn more about the Title XVII application process. Distributed Energy Projects ...

  19. NIF Title III engineering plan

    SciTech Connect

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  20. Title IX | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to

  1. Title VI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    VI Title VI Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, and national origin in programs and activities that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. The Office of

  2. National Ignition Facility Title II Design Plan

    SciTech Connect

    Kumpan, S

    1997-03-01

    This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

  3. Implementation of Title V in California

    SciTech Connect

    Werner, B.; Cook, B.

    1996-12-31

    This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

  4. Title XVII-Innovative Technology Loan Guarantee Program under ARRA |

    Energy Saver

    Title Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of

  5. Louisiana Title V General Permits

    SciTech Connect

    Boyer, B.E.; Neal, T.L.

    1995-12-31

    Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

  6. Title III hazardous air pollutants

    SciTech Connect

    Todd, R.

    1995-12-31

    The author presents an overview of the key provisions of Title III of the Clean Air Act Amendments of 1990. The key provisions include the following: 112(b) -- 189 Hazardous Air Pollutants (HAP); 112(a) -- Major Source: 10 TPY/25 TPY; 112(d) -- Application of MACT; 112(g) -- Modifications; 112(I) -- State Program; 112(j) -- The Hammer; and 112(r) -- Accidental Release Provisions.

  7. Negotiating Title V and non-Title V permits

    SciTech Connect

    Erbes, R.E.; MacDougall, C.R.

    1998-12-31

    The Title V Operating Permits program has been extended over many more years than originally anticipated when the 1990 Clean Air Act Amendments were first legislated. In fact, the regulatory program is still being refined even as facilities complete and submit their Title V permit applications. Likewise, it is clear that the agency review of the Title V permit applications will probably take considerably longer than originally anticipated. Finally, when the agency does complete the review, it is equally clear that there will need to be a significant amount of negotiating on the part of the facility to arrive at a simplified permit that is operationally feasible. This paper presents a number of suggestions for what the facility should be doing between the time the permit application is first submitted and the agency responds with a draft permit. The suggestions are designed to help simplify the permit and enhance flexibility. In addition, the paper presents permit negotiating techniques and points out the pitfalls that will be encountered if the facility does not take action prior to receiving the draft Title V permit. This paper suggests that the facility should internally evaluate how the permit application impacts facility operations prior to the agency doing so. It also suggests that the facility should contact the agency early and amend the permit application to take advantage of increasing regulatory flexibility. By taking these steps, and properly negotiating the permit terms and conditions; the facility will achieve a much better permit, and will hopefully be able to avoid the regulatory burdens and delays associated with re-opening the permit during the next 5 to 8 years (from the time of permit application submittal).

  8. Title 23 CCR Waters | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 23 CCR WatersLegal Abstract California Code of Regulations, Title 23 Waters, sections...

  9. Title XVII Final Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Final Rule Title XVII Final Rule Title XVII Final Rule (107.56 KB) More Documents & Publications Final Rule (December 4, 2009) Notice of Proposed Rulemaking (August 6, 2009) Final Rule (October 23, 2007)

  10. Title: Collaborative Industry - Academic Synchrophasor Engineering...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Title: Collaborative Industry - Academic Synchrophasor Engineering Program Principal ... course in the Electrical and Computer Engineering (ECE) department where students will ...

  11. Title III of the Defense Production Act

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Title III Title III of the D f P d ti A t Defense Production Act Matthew Seaford Matthew Seaford (703) 415-7107 DPA Background * The Defense Production Act (DPA) is the President's primary authority to ensure the timely availability of private sector resources for national defense. Title III of the DPA provides unique economic authorities to mitigate industrial Title III of the DPA provides unique economic authorities to mitigate industrial base shortfalls/risks and expand U.S. production

  12. The United States Code - Printing, Title 44 Excerpts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The United States Code - Printing, Title 44 Excerpts The United States Code - Printing, Title 44 Excerpts The United States Code - Printing, Title 44 Excerpts PDF icon The United ...

  13. No Slide Title | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    No Slide Title No Slide Title No Slide Title (688.67 KB) More Documents & Publications Slide 1 EVMS and Project Analysis Standard Operating Procedure (EPASOP) Hanford ETR - Tank Waste Treatment and Immobilization Plant - Hanford Tank Waste Treatment and Immobilization Plant Technical Review - Estimate at Completion (Cost) Report

  14. Practical experience with Title V

    SciTech Connect

    Hoffnagle, G.F.

    1996-12-31

    Having prepared numerous Title V permit applications and applications for synthetic minor status, the do`s and don`ts of this experience are evaluated. The philosophy for what goes into the application is reviewed, with special regard to the EPA {open_quotes}White Paper{close_quotes} on streamlining the process. The pros and cons of accepting and applying for synthetic minor status are evaluated.

  15. Title

    Office of Environmental Management (EM)

    ... explore in emerging and or frontier basins, with emphasis on characterization of shale gas reservoir systems (Included in 2007 Solicitation) - Focus on improving the strategic ...

  16. Title:

    Office of Scientific and Technical Information (OSTI)

    ... Phys Med Biol 1984; 29: 1537-1554. 8 . ' 21. Mijnheer BJ, Wootton P, Williams JR, Eenma J, Pamell, CJ. Uniformity in dosimetry protocols for therapeutic applications of fast ...

  17. TITLE

    Office of Legacy Management (LM)

    ... and Floodwuy Map, City of Albany, Oregon, Ltnn and Benton Counties, Community Panel Nos. ... of radionuclides in soil,* ( 2 ) concentration8 of airborne *A remote SFHP mite is ...

  18. TITLE

    Office of Legacy Management (LM)

    at existing appropriately licensed disposal facilities; and disposal of wastedebris below DOE contaminationradiological release guidelines in a commercial disposal facility. ...

  19. Title

    Energy.gov [DOE] (indexed site)

    Two-page tip sheets give engineers and equipment operators advice to quickly make improvements. Learn how to determine air-fuel ratios for burners, evaluate adjustable speed drive efficiency, inspect and repair steam traps, benchmark fuel costs, and handle other system efficiency issues. Available for: pump, steam, motor, compressed air, process heating, and plant wide systems. Pumps Tip Sheets Adjustable Speed Pumping Applications Conduct an In-Plant Pumping System Survey Control Strategies for

  20. Title

    Energy.gov [DOE] (indexed site)

    Grant and Loan Recipients 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board Main Purpose: Stimulate the economy; create & retain jobs!

  1. TITLE

    Office of Legacy Management (LM)

  2. TITLE

    Office of Legacy Management (LM)

  3. TITLE

    Office of Legacy Management (LM)

  4. TITLE

    Office of Legacy Management (LM)

    Plates are not available in electronic format. Please e-mail lm.records@lm.doe.gov to request the appendix.

  5. TITLE

    Office of Legacy Management (LM)

    Plates are not available in electronic format. Please e-mail lm.records@lm.doe.gov to request the appendix

  6. TITLE

    Office of Legacy Management (LM)

    , , - :. , L L b ' pi1 2 25. STATE OF MISSISSIPPI a . a . , i l l ; .. - . a ,-. , I , SALMON SITE , , , . . . C I A . - - 1 COUNTY OF LAMAR - T - TRACT NO. 101-E KNOW ALL MEN BY THESE PRESENTS, that, we, MARTHA T. BRIDGES alkla MARTHA TATUM BRIDGES LOPEZ, ROBERT TODD BRIDGES, MARTHA TATUM BRIDGES LOPEZ as Guardian of Nlchoias Carl Bridges, a minor, DIANA W. TATUM, NANCY 0. TATUM, and ADDISON T. TATUM, JR., alkla A. T. Tatum, Jr., whose addreas I s clo Mr. John Burnam, Post Office Box 1828,

  7. TITLE

    Office of Legacy Management (LM)

    ... of 1978, Public Law No. 95-341, Washington. DC. Archaeological and Historic Preservation Act of 1974, Public Law No. 93-291; 88 Stat. 174; 16 U.S.C. 469, Washington, DC. Brooks, L.R.. ...

  8. TITLE

    Office of Legacy Management (LM)

    ... pecmisaible under federal law without the u s e of a 3 respirator (0.015 gm ) . ... without a respirator under existing Federal law. Mass Loading Factor 0.015 gm3 (Ref. ...

  9. TITLE

    Office of Legacy Management (LM)

    These state requirements may be more stringent than those found in the federal hazardous waste regulations. However, Federal law is still controlling in situations where issues are ...

  10. TITLE

    Office of Legacy Management (LM)

    ... t o the extent required by federal law and applicable W E orders, regulations, ... provisions of the National Environmental Policy Act (NEPA) that are mandatory under law. ...

  11. Title

    National Nuclear Security Administration (NNSA)

    ... persons with extreme positions that have an emotional or economic rather than an ecological base. * Work performed under the auspices of the United States Atomic Energy Commission. ...

  12. Title

    National Nuclear Security Administration (NNSA)

    ... MAP 12 CONTAMINATED AREAS REPORT DATED 10-10-92 PAGE 13 of 22 GRAVEL GERTIE U.S. ATOMIC ENERGY COMMISSION NEVADA TEST SITE WITH REFERENCE STAKES REYNOLDS ELECT. AND ENGR. CO., INC. ...

  13. TITLE

    Office of Legacy Management (LM)

    ... Sampling Locations FIGURE 42: Building 28, Bosement, Indicating Reference Grid 51 REMEDIATED AREA MEASUREMENT FOET LOCATIONS UElERS 1 SINGLE-PO1NT FOR SCALE AND PARTS FIGURE 43: ...

  14. TITLE

    Office of Legacy Management (LM)

    Volume Projections 3.0 Work Plan 3.1 Design Engineering 3.2 Access Agreements 3.3 ... by the end of the calendar year. 3.1 DESIGN ENGINEERING From February to May 1987, ...

  15. TITLE

    Office of Legacy Management (LM)

    and Deconlssioning (D&D) Program w i t h i n t h e U.S. department o f Energy ... t e o r f a c j l t t y are f n compliance w i t h established c r i t e r i a , ...

  16. TITLE

    Office of Legacy Management (LM)

    respectively) and om analysls o f s o i l samples, dust sllples, m d scraplwgs from the f l o o r seams reported i n Tables 3, 4, and 5, on pages 27, 28, and 29, respectively). ...

  17. TITLE

    Office of Legacy Management (LM)

    6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak...

  18. Title

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oil & Natural Gas R&D National Energy Technology Laboratory Office of Fossil Energy 2008 Annual Plan (Draft) EPACT 2005, Subtitle J, Section999 John R. Duda, Deputy Director ...

  19. Title

    Office of Environmental Management (EM)

    Brad Tomer Director, Strategic Center for Natural Gas & Oil EPACT Section 999 Federal Advisory Committee Meetings January 28-29, 2008 Strategic Center for Natural Gas and Oil ...

  20. TITLE

    Office of Legacy Management (LM)

    ... materialb In mutamhated r m e soilb Emanating power ot &-22zb Radon vertical dimension oh rnhim Average annual wind speedb Average building air e d m q e rateb Height of ...

  1. TITLE

    Office of Legacy Management (LM)

    ... specific energies for the atons of different elements and having high penetrating power. ... Based on 100-year recurtence interval, the design wind velocity shall be *..* mph at *..* ...

  2. Title

    National Nuclear Security Administration (NNSA)

    These regions included the ground zeros of above-ground nuclear tests, underground tests that vented, and some safety ... including an amplifier and power supply, a pulse-height ...

  3. TITLE

    Office of Legacy Management (LM)

    ... i m i locations where contprmnatlon . . war Sound were the restroom asmiatad witb the garage, and the a r a under the stairway Leading born the garage t o t k uptairs bedroom. ...

  4. Title

    National Nuclear Security Administration (NNSA)

    ... Extract- .f?" 6 Strontium 90 Alpha , ,,. (Net) (PC1 > 1 0 i | j"l O ' * Oil * i * ... indicate that the discharge varies widely and is greatest shortly after heavy rains. ...

  5. TITLE

    Office of Legacy Management (LM)

    ... by visual assessment with special attention addressed to the data point areas. ... This area also doubles as pasture for cattle. Big sagebmsh forms dense thickets with ...

  6. TITLE

    Office of Legacy Management (LM)

    ... 2 Light Bank vest of Truss 3 6 0 4 0 CW Big Conduit Yest o f Truss 3 55 130 cSO TABLE ... A l l beta+arna data were evaluated using specific iristrunent response factors and the ...

  7. TITLE

    Office of Legacy Management (LM)

    ... Data for the period beginning ending. Average wind speed Prevaililig wind direction - - - - - Average temperatu.re.---'---- High Temperature ...

  8. TITLE

    Office of Legacy Management (LM)

    ... t h e Grantee s h a l l i n i t i a t e a c t i o n t o p t h e sum o f S as f u l l and complete payment f o r t h e r i g h t s granted w i t h i n t h i s l i c e n s e . 4 . ...

  9. Title:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    about 2 centimeters of water in the bottom of the jar. Hold the black paper upright or prop it up against some books behind the jar. 3. Turn the lid of the jar upside down and...

  10. TITLE

    Office of Legacy Management (LM)

    ... Hardy, T. 1979. The inter-basin area report. Report ot U. S. Pish and Wildlife Service. Dept. of Biology, Univ, of Nevada, Las Vegas. Hubbs, C. 1932. Studies of the fishes of the ...

  11. Title

    National Nuclear Security Administration (NNSA)

    ... MAXHID cm 10514 6911 525 25 20 5827 7721 21 71 9i2 16fi 271 262 PERU ID ... PERU ID cm 1 63 61 6026 3917 40 51 2113 196 41 20 61 51 40 30 ...

  12. TITLE

    Office of Legacy Management (LM)

    Site, Fairf ield, Ohio copies to T. E. Morris G. R. Gale W & J. S. Allison File No. 7440124 ... however, neither OSHA nor DOT regulations are within the scope of this review. ...

  13. Title

    Energy.gov [DOE] (indexed site)

    environmental impacts - Enhanced and Unconventional Oil Recovery (EUOR) - develop ... Enhanced and Unconventional Oil Recovery * New EOR Technologies - Improve accuracy and ...

  14. TITLE

    Office of Legacy Management (LM)

    ... No. S0038700 Page 3-14 U.S. Department of Energy Rev.O Rt>v n* M

  15. TITLE

    Office of Legacy Management (LM)

    r i f you need additional information, please c a l l me a t (615) 576-0273. Sincerely, car; S. Hartman, Environmental S c i e n t i s t Former Sites Restoration D i v i s i o n ...

  16. Title:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Key Points to Understand Human activities, such as driving a car, using a hot tub, or ... would need to plant to absorb the carbon dioxide (CO 2 ) from a single car over a year. ...

  17. Title

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Brief Description of SURF Deep (>8000 ft) gold mine operated for over 100 years Extensive ... in the old Homestake Gold mine in Lead, SD. SURF was founded in 2009 with NSF funding. ...

  18. Title:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... In a monsoon convection cell there is constant wind flowing from the ocean to land, driven by solar heating. Suggested Follow-Up Activities * Collect current newspaper articles ...

  19. TITLE

    Office of Legacy Management (LM)

    TO: The F i l e The attached review documents the basis f o r determining whether DOE ... through f are h i s t o r i c a l documents i n support o f the foregoing d i scuss i on. ...

  20. TITLE

    Office of Legacy Management (LM)

    Weldon Spring V l c l n t t y Properties - U.S. A m y Reserve Property ," January 1986. O f f i c e o f Nuclear Energy Attachment cc: V. Voigt, NE-20 J. Baublttz. HE-20 W. Hurphie. ...

  1. TITLE

    Office of Legacy Management (LM)

    Lm S C I W C l 3 DIVISION Envimnmenlal Restoration a n d Was& Management Non-Defense ... he developmen1 of nuclear energy for defense-related projects for the Manhattan ...

  2. Title

    National Nuclear Security Administration (NNSA)

    ... measurements are lacking, the general climatic data and obser- vations on the climate and botany of NTS indicate that evapotranspiration equals or exceeds annual ...

  3. TITLE

    Office of Legacy Management (LM)

    i n support o f theARC cleanup e f f o r t include: pub1 i c meetings on the nature o f cleanup measures, waste. management, and waste transportation routes, i n t e r v...

  4. TITLE

    Office of Legacy Management (LM)

    ... from an American Petroleum Institute API) Oil Separator revealed the presence of a ... with a realtor and land appraiser and actual sale prices for land adjoining the site. ...

  5. TITLE

    Office of Legacy Management (LM)

    ... mountain lakes to livestock watering tanks that are heavily disturbed by cattle ... mountain lakes to livestock watering tanks that are heavily disturbed by cattle ...

  6. Title:

    National Nuclear Security Administration (NNSA)

    ... To meet this goal, LANL is currently eliminating non-essential outfalls, consolidating essential outfalls, employing evaporation tanks, and pursuing reuse strategies. Page 13 The ...

  7. TITLE

    Office of Legacy Management (LM)

    ... plumbing used for the tracer tests can be seen in Figure 6. Two sets of tanks were used. ... The following protocol was followed to perform the pre-tracer test: 1. All tanks were ...

  8. TITLE

    Office of Legacy Management (LM)

    ... Sediment samples from suspect severe, septic tanks, and drain lines were also analyzed. All soil, water, and sediment samples were analyzed for uranium-238, radium-226, and ...

  9. TITLE

    Office of Legacy Management (LM)

    ... Three cattle watering tanks have been created on the Gasbuggy Site by the construction of earth berms across drainage ways. All three of these tanks are heavily impacted by cattle, ...

  10. TITLE

    Office of Legacy Management (LM)

    ... Potential locations of two underground storage tanks have been identified. One is located ... was installed prior to MEDlAEC activities in the area where the anodizing tanks are now. ...

  11. TITLE

    Office of Legacy Management (LM)

    ... cattle tanks, and one is the result of water ponding at the upstream end of a culvert under the main access road (Forest Road 357). Two of the cattle tanks are at the sitc ...

  12. TITLE

    Office of Legacy Management (LM)

    ... Contaminants range from solvents and heavy metals to radionuclides, and they come fiom a wide variety of sources ranging from leaking tanks to underground nuclear tests. All of ...

  13. TITLE

    Office of Legacy Management (LM)

    ... three 2 10-barrel liquid (water) holding tanks three-phase separator connected to the ... reportedly at the site consist of: septic tanks that were installed for the GASBUGCY ...

  14. TITLE

    Office of Legacy Management (LM)

  15. TITLE

    Office of Legacy Management (LM)

    . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National

  16. TITLE

    Office of Legacy Management (LM)

    AMCHITKA BIOLOGICAL IWODlATION S J M U I i Y Prspard for tho U. S. Atoric En~rny C d a a i o n undmr Contract No. A T (26-11-171 MTTkUE Colrubua LaboratoriRa 505 Kirq A V ~ R Collubua. Ohio 43201 Printed i n t h e U n i t d S t a t ~ of A l r r i w . A v a i h b l e f t o l - Nrtio-1 Technical I n f o r m t i o n Servic* U. S. D e p a r t u n t o f C o W t E P Sprinlf i a l d , v i + # i n b 22151 Thim r e p o r t naa p r e m r d a m an account of w x k mpon~ored by t h e United S t r t a a

  17. TITLE

    Office of Legacy Management (LM)

    . . , . . - . . t e d Copj UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Faderal Center, Llcewood, Colorado 80225 BATHYMETRY OF CANNIKIN LAKE, AnCRITU ISLAND. ALASKA, WITH AN EVALUATION OF COMPUTER MAPPING TECHNIQUES Don Digeo GonerLee, Leonard E. Wollltz, and G. E . Brerhauer CONTENTS Page A b s t r a c t . . . . . . . . . . . . . . . . . .. . . . . . . , . . . . . 1 I n t r o d u c t i o n . . . . . . . . . . . . . , . . . . . . . . . . . . . . 1 Acknowl.edgments . . . . . . . . .

  18. TITLE

    Office of Legacy Management (LM)

    OFF C . 1 Ili II11IlIIllllllllllllllI1111I~I B M - 171- 147 ~ ~ ~ 0 3 3 1 0 8 Biology and M e d i c i n e AMCHITKA BIOENVIRONMENTAL PROGRAM BIOENVIRONMENTAL S A F E T Y STUDIES, AMC HITKA ISLAND, ALASKA CANNIKIN D t 2 MONTHS REPORT Compiled by James B . K i r k w o o d and R. G l e n Fuller J u n e , 1972 P r e p a r e d for the U . S. A t o m i c E n e r g y C o m m i s s i o n under C o n t r a c t N o . AT(2b- 1 ) - 17 1 - - BATTELLE Columbus Labor a t o r ies 5 05 King Avenue C o l u m b u s

  19. TITLE

    Office of Legacy Management (LM)

    Watec Resources Canter 1 I EVALUATION OF GROUNDWATER FLOW AND TRANSPORT AT THE FAULTLESS UNDERGROUND NUCLEAR TEST, CENTRAL NEVADA TEST AREA I prepared by I Karl P o h l m a ~ , Jenny Chapman, Ahmed Hassan, and Charalambos Papelis ! submitted to Nevada Operations M c e U.S. Department of Energy SEPTEMBER 1999 Publication No. 45165 @ C F J C This report uas prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of

  20. TITLE

    Office of Legacy Management (LM)

  1. TITLE

    Office of Legacy Management (LM)

  2. TITLE

    Office of Legacy Management (LM)

  3. TITLE

    Office of Legacy Management (LM)

  4. TITLE

    Office of Legacy Management (LM)

    Ill lllIlllllllllllllllllllllllIII1 SHL 000035 Letter Report Contaminant Boundary at the Shoal Underground Nuclear Test prepared by Greg Pohll and Karl Pohlmann Division of Hydrologic Sciences Desert Research Institute University and Community College System of Nevada submitted to Nevada Sitc O f i c e National Nuclear Security Administration U.S. Deparuncnt of Enagy Las Vegas, Nevada August 6,2004 The work upon which this report is based was suppomd by the U.S. Department of Energy under

  5. TITLE

    Office of Legacy Management (LM)

    CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada

  6. TITLE

    Office of Legacy Management (LM)

    Post-Remedial Action Report for the Alba Craft Site and Vicinity Properties Oxford , Ohio August 1995 POST-REMEDIAL ACTION REPORT FOR THE A D A CRAFT SITE AND VICINITY PROPERTIES OXFORD, OHIO AUGUST 1995 Prepared f o ~ United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACO5-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  7. TITLE

    Office of Legacy Management (LM)

    Distribution Category: Remedial Action nnd Ikco~issioning Progrnm (UC- 70A) A R - HhTIOaAL lABORlrTORY 9700 South Cnss Avenue Arsoune, Illinois 60439 Prepared bp R. A. Uynveen Associate Division Director, OHS W. H. Smith Senior Health Physicist C. . Sholeen Health Physicist A. L. Just- liealth Physicist K. F. Flynn Eealth Phymicist hdiologicnl Sumey Group Health Physics Section O c c u p n t i o ~ l Bealth and Safety Division June 1983 Work Performed under Budget Activity WE m-03-60-40 and AUL

  8. TITLE

    Office of Legacy Management (LM)

    7 9 3 2 0 ?. . .. ~ - 1 -<. $ 2 . DOVOW21 949-279 ~ : & . ' r; . ( i i . :.a . - l i Formerly Utilized Sites Remedial Action Program (FUSRAP) : ! Contract No. DE-AC05-91 OR21 949 $ * i -> Community Relations Plan . .!. I - for a Removal Action , - 1 . i at the Albany Research Center Site . 1 - July 1991 U.S. Department of Energy DOE Field Office, Oak Ridge Formerly Utilized Sites Remedial Action Program COMMUNITY RELATIONS PLAN FOR THE ALBANY RESEARCH CENTER SITE ALBANY, OREGON JULY 1

  9. TITLE

    Office of Legacy Management (LM)

    ADDENDUM TO THE HAZARD ASSESSMEHT FOR RADIOACTIVE CONTAnINATION IN AND BENHATB CERTAIN BUILDINGS AT TBE ALBANY RESBARCH CKNTER ALBANY, OREGON MARCH 1992 Prepared for United States Department of Energy Oak Ridge Field Office Under Contract No. DE-AC05-910R2 19 49 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 Page F i g u r e s . . . . . . . . . . . . . . . . . . . . . . . . . . i v T a b l e s . . . . . . . . . . . . . . . . . . . . . . . . . . i v Acronyms . . . . . . . . . .

  10. TITLE

    Office of Legacy Management (LM)

    Departmentaof ~ n e r ~ ~ Washington, DC 20585 IdkY O 3 1993 Mr. James Besl President Force Control Industries 3660 D i x i e Hrghway F a i r f i e l d , Ohio 45014 Dear M r . Besl : This i s t o n o t i f y you t h a t the U.S. Oepartlaent o f Energy (WE) has designated the former Associate A i r c r a f t Tool and Manufacturing Company s i t e i n F a i r f i e l d , Ohio, f o r remedial a c t i o n as a p a r t o f the Formerly U t i l i z e d Sttes Remedial Action Program. Remedial a c t i v

  11. TITLE

    Office of Legacy Management (LM)

    ~overnment Department of Energy Oak Ridge Operations Office memorandum DATE: January 19. 1995 SUBIECT: USE OF EXEHPTIOW FROW DEPhRTnEKl OF ENERGY ORDER 5820.2A F O R RADIOhCTIVE WASTE FROn FUSlUl To: James A. Turi , Director, O f f i c e o f Program Support, O f f i c e o f the Deputy Assistant Secretary Waste Clanagelent, M-33, TREY I I This m r a n d u n serves t o n o t i f y 01-33 o f the F o m r l y U t i l i z e d Sites Remedial Action Program's (FUSRAP] i n t e n t t s dispose o f

  12. TITLE

    Office of Legacy Management (LM)

    FORCE CONTROL INDUSTRIES,'INC. 1 2 3 0 7 2 CONTROL %60 Dixie Hwy.. Zip 45014 P.O. Box l a . Z p 45018 11W b l e . Sule F Failfield. Ohio T w M i g a n a8083 Phone: (513) 868-0900 Phone: !B10) 52441= FAX. (513) 868-2105 F . U i81C.l 52d-1208 C,ir Shear Clutch & Brake Systems November 10.1994 U. S. Deparbnent of Energy Oak Ridge Operations office Ann: AD-424, Katy Kates P.O. Box 2001 Oak Ridge, TN 37831 Dear Ms. Kates, In furtherance of the August 24,1994 letter from Doug Shook, his subsequent

  13. TITLE

    Office of Legacy Management (LM)

    POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAJT SITE Fairfield, Ohio Bechtel National, Inc. POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAFT SITE FAIRFIELD. OHIO JULY 1996 Prepared for United States Depariment o f Energy Oak Ridge Operations Off= Under Contract No. DE-AC05-910R2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . .

  14. TITLE

    Office of Legacy Management (LM)

    M A U h G E D 0 1 M M l N Y A R I E I ENERGY SYSTEMS. IYC. FOR THE U.S. O E P A R I M E I I T OF ENEnOY June 14, 1994 POST OFFICE BOX 2006 OAK RIDGE. TENNESSEE 37831 Dr. W. A. Williams EM-421 Trevion II Building Department of Energy Washington, D. C. 20585 Dear Dr. Williams: T r i p Report: Radiological Survey of Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio (FOHOOl), M a y 31 and June 1,1994 On May 31 and June I, a radiological survey was conducted in the area

  15. TITLE

    Office of Legacy Management (LM)

    R i i e . Tennessee 37831 -8723 J u l y 18, 1995 Mr. Graham H i t c h e l l , Environmental Manager Ohio Envi r o n e n t a l Protection llgency Southwest O I s t r i c t O f f l c e 40 South H r i n Street Dayton, Ohio 45402 Dear Hr. M i t c h e l l : MUMD hSSESSHEKT FOR RESIDUAL COHTMINATION AT THE FORMER CISSOClATE AIRCRAFT SITE ( M S ) Enclosed i s a copy of the Hazard Assessment t h a t was performed f o r the Former Associate A i r c r a f t S i t e (MS) fn F a i r f i e l d , Ohio. In

  16. TITLE

    Office of Legacy Management (LM)

    State of ohlo Env~ronmental Protectton Agency PROVISIONAL ID NUMBER O H P

  17. TITLE

    Office of Legacy Management (LM)

    O Distribution pile 10. 7 4 4 0 / 1 2 4 , 135 s & ; ~ t EIN: Ohio ~azardous D ~ I C February 6 . 1995 Waste Regulat ions; Empty Container Rule ~ r - D . D. Sexton C-ics lo T. E. Morris& G. R. Galen G . L. Palau This Environmental Informat ion Notice ( E I N ) provides regulatory guidance concerning compliance with the Ohio Hazardous Waste regulations for residues of hazardous waste in empty containers or inner liners Ie.g.. the Empty Container Rule). This EIN is based on research and

  18. TITLE

    Office of Legacy Management (LM)

    -. i . , . United States Government L-u+-tw / S / V ~ f Department of nersy memorandum D i T E June 0 5 , 1995 FEP-Y ATTK OF: EM-421 (U. A. Williams, 301-903-8149) SUGJECT Hazard Assessmnt f o r Radioactive Contamination a t the Associate. A i r c r a f t Site, F a i r f i e l d , Ohio To L. Price, OR This memorandum i s t o ' provide comments and approval o f the Associate i r ft i t n f o r e n ' i A r c a S eHazardAssessmet I d t i f e d S o i l C ~ m i n a t i o n . The hazard assessment was

  19. TITLE

    Office of Legacy Management (LM)

    Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler:

  20. TITLE

    Office of Legacy Management (LM)

    ... April 4, 1968 (UCRL) (specific.- tions). MSA-23-2184 Well Temt Data, Volune 111, 1968, 1969 (EP1IG) (Specifications). USA-Not Cited Inventory of Wcllr and Springs Witbin a 10-Mile ...

  1. Title

    National Nuclear Security Administration (NNSA)

    ... The mobile system is mounted in a small van with a portable power supply and transported ... Vegetation appeared to be the most important influence fn decreasing wind-borne ...

  2. Title:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    with which a very hot, practically ...education.arm.gov Thermal Expansion of Water: Grades 9-12 2 * ... appropriate to balance the incident solar radiation. ...

  3. TITLE

    Office of Legacy Management (LM)

    actions and those taken before remedial action) and removal-type actions similar in scope under RCRA and other authorities (induding those taken as partiat closure actions and ...

  4. TITLE

    Office of Legacy Management (LM)

    U.S. Department of Transportation (DOT) regulations are within the scope of this review. ... action) and Removal-Type Actions Similar in Scope Under RCRA and Other Authorities." ...

  5. TITLE

    Office of Legacy Management (LM)

    readings, and were not in the original scope of work are shown in Figure 3. To ... were obtained during execution of the scope of work governed by this WI and during ...

  6. Title:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Objective The student will investigate the effect of melting ice on sea level due to global warming as evidenced by analyzing the data from the class experiment. Key Points to ...

  7. TITLE

    Office of Legacy Management (LM)

    erivation of uidelines for Uranium Residual Radioactive Material in soil at the B&T ... of Energy Derivation of Guidelines for Uranium Residual Radioactive Material in Soil at ...

  8. Title

    National Nuclear Security Administration (NNSA)

    20km i i i i t Fig. 14, Approximate location of boundary between Ash Meadows ground-water basin and Pahute Mesa ground.-water system, Nevada Test Site. -46- point out, however,...

  9. Title

    Office of Environmental Management (EM)

    including efficiency, demand response, CHP, and DG. 4 Transmission Rationale 2: ... supported by the Governor's PV and CHP goals, and by several procurement programs ...

  10. TITLE

    Office of Legacy Management (LM)

    ... Box 2501.301 L b o n t a y R o d , O d ; R I 3 7 8 3 1 35. L. K Ria, Fcrma Sks Ra' " Wi&m, Oak Ridge Fmld U . S . -of Emgy, P . O . Bolt 2001, Ollr Ridge. TN 37831-8723 3 6 . ...

  11. TITLE

    Office of Legacy Management (LM)

    ... Surface water is the most likely migration ... Section 6.1.1, is based on a 20-fold dilution used in the TCLP extraction procedure and ... Extent of contamination, confirmation of hot ...

  12. TITLE

    Office of Legacy Management (LM)

    ... Oil Company, Tonawanda, New York Bayo Canyon Area, 10s Alamos, New Mexico Chupadera Mesa Area, White Sands ... acid, (2) solvent extraction of uranium, ( 3 ) ...

  13. TITLE

    Office of Legacy Management (LM)

    ... As in previous years, the highest tritium value recorded for any sample, 4.85 x 107pCiL, was from one of these wells, Well DD-1 (Project Gnome). iii This page left blank ...

  14. TITLE

    Office of Legacy Management (LM)

    ... As in previous years, the highest tritium value recorded for any sample, 3.95 x TO7 p C a , was fiom, Well DD-1 (Project Gnome). This page left blank intentionally. CONTENTS Page . ...

  15. TITLE

    Office of Legacy Management (LM)

    ... As in previous years, the highest tritium value recorded for any sample, 3.79 x lo7 pCiL, was from one of these wells, Well DD-1 (Project Gnome). This page left blank ...

  16. TITLE

    Office of Legacy Management (LM)

    ... As in previous years, the highest tritium value recorded for any sample, 4.2 x lo7 pCiL, was from one of these wells, Well DD-1 (Project Gnome). CONTENTS Page Notice . . . . . . . ...

  17. TITLE

    Office of Legacy Management (LM)

    ... was not located within the project area and will have no bearing on the proposed project. ... Test Site 5GF1656 in Colorado and Gnome-Coach Test Site LA 432813 in New Mexico) ...

  18. TITLE

    Office of Legacy Management (LM)

    ... As in previous years, the highest tritium value recorded for any sample, 4.5 x lo7 pCiL, was from one of these wells, Well DD-1 (Project Gnome). This page left blank intentionally ...

  19. Title

    National Nuclear Security Administration (NNSA)

    EASTERN PART OF JACKASS FLATS, NEVADA TEST SITE, SOUTHERN NEVADA By Rulon C. Christensen ... eastern Jackass Flats, Nevada Test Site, southern Nevada -:--* * In pocket Figure 1.'.' ...

  20. Title

    National Nuclear Security Administration (NNSA)

    Baseline vegetation contamination at safety test sites on the NTS and Tonopah Test Range. Describes concentrations of transuranics onin native vegetation sampled on NTS and TTR in ...

  1. Title

    National Nuclear Security Administration (NNSA)

    Noteworthy Mammal Distribution Records for the Nevada Test Site (RE: "Great Basin ... NOTEWORTHY M A M M A L DISTRIBUTION RECORDS FOR THE NEVADA TEST SITE Philip A. M.'clic-u' ...

  2. Title

    National Nuclear Security Administration (NNSA)

    Ecological studies of vertebrates in plutonium-contaminated areas of the Nevada Test Site ... of four Nevada Applied Ecology Group (NAEG) study areas of the Tonopah Test Range (TTR). ...

  3. Title

    National Nuclear Security Administration (NNSA)

    Geologic map of the Nevada Test Site, Southern Nevada. Geographic Features of NTS and upland Areas. Author Frizzell, Jr. V.A. and J. Shulters 101056 Document Date 1190 Document ...

  4. Title

    National Nuclear Security Administration (NNSA)

    Averages (1981-1967), October 56 I i i i i i i 12 15 18 21 24 Hour of Day MST Graph HI-24. Daily March of Wind Speed, 7-Year Averages (1961-1967), November 57 w -*-> o Ti O "S...

  5. Title

    National Nuclear Security Administration (NNSA)

    D bo a 10 12 15 18 21 24 Hour of Day MST Graph HI-20. Daily March of Wind Speed, 7-Year Averages (1 961-1967), July 53 Hour of Day MST. Graph ni-21. Daily March of Wind Speed,...

  6. Title

    National Nuclear Security Administration (NNSA)

    ... caldera complex are intercalated with the major ash flow sheet, from the complex, and analyses of the lavas fit well on compositional trends determined by the ash flow sheets. ...

  7. Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    External Developments Division Do financial investors destabilize oil prices? The opinions ... Motivation * Oil price surged with increasing momentum between 2003-2008 before falling in ...

  8. TITLE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... m - * Azospira, Desulfotomaculum, Achromobacter: increase with depth * Many organisms (esp. sulfur-cycling bacteria) show a similar trend in relative abundance as TDS, SO 4 , and ...

  9. TITLE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Approval Prior DOE written approval is required for the following actions: 1. Contractor award of any subcontract having a value of 500,000.00 or greater, or any subcontract...

  10. Title

    National Nuclear Security Administration (NNSA)

    of the water resources of the State and represents the water supply presently available to Nevada. Respectfully Poland D. Westergard State Engineer WATER FOR NEVADA yield. ...

  11. TITLE

    Office of Legacy Management (LM)

    and Chimney Produced by the Cannikin Nuclear Explosion I Amchitka Island, Alaska By ... in- U p n underground detonation of a nuclear device designed for containment. the rock ...

  12. Title

    National Nuclear Security Administration (NNSA)

    dating, and nomenclature of Mississippian rocks along these transects of the outer carbon- ate platform and Antler foreland basin are shown in five time-rock correlation charts...

  13. Title

    Gasoline and Diesel Fuel Update

    External Developments Division Do financial investors destabilize oil prices? The opinions expressed here are personal and not necessarily shared by the ECB or the Eurosystem Energy Information Administration 24 August 2011 by Marco J. Lombardi and Ine van Robays European Central Bank and Ghent Univeristy 2 Motivation * Oil price surged with increasing momentum between 2003-2008 before falling in the wake of the financial crisis and the subsequent economic downturn. After that, prices recovered

  14. TITLE

    Office of Scientific and Technical Information (OSTI)

    The test bed is a Intel Xeon cluster equipped with NVIDIA Tesla GPUs. Index ... The latency-throughput test is based on the Network Protocol Independent Performance ...

  15. Title

    National Nuclear Security Administration (NNSA)

    ... A blank was processed in a similar manner and proved to be quite clean. The TEM samples ... substrate during .two long, unplanned storage periods at NTS. It was not possible to 1 ...

  16. Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Disclaimer: "This report was prepared by Savannah River Nuclear Solutions, LLC (SRNS) for the United States Department of Energy under Contract No. DE-AC09-08SR22470 and is an account of work performed under that contract. Neither the Unites States Government nor any agency thereof, nor any of their employees, not any of their contractors, subcontractors or their employees assume any legal liability or responsibility for any third party's use of the results of such use of any information,

  17. Title:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3-5 Rainfall and the Water Table: The Salinity of Soil http://education.arm.gov Rainfall and the Water Table: The Salinity of Soil: Grades 3-5 1 Rainfall and the Water Table: The Salinity of Soil Approximate Time Setup and initial experiment: 45 minutes, followed by several short time segments to observe, record, and add water to soil. Objective The student will be able to explain how an increase of rainfall influenced by climate change can affect the water table and soil salinity underground as

  18. Title

    National Nuclear Security Administration (NNSA)

    ... three new programs. Section 3.1.4 provides further details on these new programs. * Green Energy Futures Park * Kistler Launch Facility (KLF) Work-for-others programs NNSANV ...

  19. Title

    National Nuclear Security Administration (NNSA)

    During tlic course of ecological studies con- ducted tit the Atomic Energy Commission test ... The Sal-'.- Thrasher (Orcoacuptea montannx). Green- tailed Towhce (Chlonirti chloruru), ...

  20. Title

    National Nuclear Security Administration (NNSA)

    This work was performed by EG&GEM for the United States Departments of Energy under ... individuals: David C. Anderson, Ron A. Green, Danny L. Rakestraw, and Cathy A. Wills. ...

  1. Title

    National Nuclear Security Administration (NNSA)

    ... PHOTOGRAPHS TAKEN AUGUST, 1991 BY E G 8 G ENERGY MEASUREMENTS, INC. TION ALLUVIAL FAN ... AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION KINEMATIC WAVE: NEW ...

  2. Title

    National Nuclear Security Administration (NNSA)

    ... These include such species as: Mallard, Pintail, Green-winged Teal, Bufflehead, Ruddy ... RESUME The U. S. Energy Research and Development Administration's Nevada Test Site (NTS) ...

  3. Title

    National Nuclear Security Administration (NNSA)

    ... L , : L - C ' , . ; k ' v k Giles to the public (Smith, et al., 1980). The ... The Georgia Veterinarian, Vol. 24, No. 3. Smith, D. D., K. R. Giles and D. E. Bernhardt. ...

  4. Title

    National Nuclear Security Administration (NNSA)

    ... ZONE VALLEY, REESE RIVEB, AND SMITH: CREEK VALLET lone and Reese River Valleys were more ... The Paradise Range which bounds lone Valley and the Desatoya Mountains which bound Smith ...

  5. Title

    National Nuclear Security Administration (NNSA)

    ... Photo 28 (Photo YM-196) Etfie Smith (Las Vegas Indian Center) at Stte 15 . 89 Photo 29 ... .91 Photo 33 (Photo YM-8) Edward THo" Smith (Chemehuevi) Holds Examples of the Lrthic ...

  6. Title

    National Nuclear Security Administration (NNSA)

    ... Observations of regional strain variations (Smith and Kind, 1972) from strain meters in ... The apparent lack of correlation of stress relaxation with seismic activity led Smith and ...

  7. Title

    National Nuclear Security Administration (NNSA)

    ... The population of Lathrop Wells in 1984 was reported as 45 (Smith and Coogan, 1984), ... Series Report 54, 25p. Smith, D.D. and J.S. Coogan, 1984. Population ...

  8. Title

    National Nuclear Security Administration (NNSA)

    ... SYSTEM (17) 106 Antelope Valley 107 Smith Valley 108 Mason Valley 109 East Walker ... Valley 133 EDWARDS CREEK VALLEY (19) 134 SMITH CREEK VALLEY (20) 123 RAWHIDE FLATS (21) ...

  9. Title

    National Nuclear Security Administration (NNSA)

    ... Cattle As discussed by Gilbert et al. (1988) and in greater detail by Smith (1979), a ... These data are given by Smith (1979) and were used by Gilbert et al. (1988) to estimate ...

  10. Title

    National Nuclear Security Administration (NNSA)

    ... Especially does it reflect the efforts of James L. Reveal, University of Maryland and the Smith- sonian Institution, whose contributions began with the first intensive plant ...

  11. Title

    National Nuclear Security Administration (NNSA)

    ... Hamilton, R. M., B. E. Smith, F. G. Fischer, and P. J. Papanek, 1971. Seismicity of the ... Hamilton, R. M., B. E. Smith, J. C. H a l l , and J. H. HeaIy, 1969. Summary of Seismic ...

  12. Title

    National Nuclear Security Administration (NNSA)

    ... Additional evaluations include Bradshaw and Smith (1994), Connor and Hill (1994), Ho et al (1991), Smith et al (1990 and 1991), and Wells et al (1990). For facilities with siting ...

  13. Title

    National Nuclear Security Administration (NNSA)

    ... C. Eadie. 1976. "Parameters for Estimating the Uptake of Transuranic Elements. by Terrestrial Plants." USEPA Technical Note. ORPI.V 76-2. Brctthaucr, E. W. , P. B. Smith, A. .). ...

  14. Title

    National Nuclear Security Administration (NNSA)

    ... culminated in the environmental assessment studies recommending three candidate sites for further consideration: Hanford, Washington; Deaf Smith, Texas; and Yucca Mountain, Nevada. ...

  15. Title

    National Nuclear Security Administration (NNSA)

    ... The terminology for the pyroclastic rocks described in this report is that of Ross and Smith (1961) and Poole, Elston, and Carr (1965). I Several general characteristics of the ...

  16. Title

    National Nuclear Security Administration (NNSA)

    ... from the soil and not through a food-web intermediary. 404 TRANSURANIC, ELEMENTS IN ... plutonium directly from the soil and to a lesser extent through a food-web intermediary. ...

  17. Title

    National Nuclear Security Administration (NNSA)

    (USGS Open file Report 92-xxxx) Author Laczniak, R. J., Cole, J. C, Sawyer D.A. and Trudeau, D. A. Document Date 5792 Document Type Report Recipients DOENV 100960 ...

  18. Title:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Grades 6-8 3 experimentactivity, but the need for students to learn to use laboratory equipment should be considered. Use alcohol-filled thermometers for this activity. Urge ...

  19. TITLE

    Office of Legacy Management (LM)

    under date of kcember 7 , 1966, an oil and gas l e a s e was entered i n t o ... R ? S 6f the working, royalty, ar ather oil snd gas interests I n the U n i t Area. ...

  20. Title

    National Nuclear Security Administration (NNSA)

    Anita G. Harris Branch of Paleontology and Stratigraphy U. S. Geological Survey National ... km of Yucca Mountain in 1991. Cqnodont samples from two of these hew wells and 190 ...

  1. Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6-000 Virtual Environment for Reactor Applications (VERA) Workshop Session 1: Physics and Methods Rose Montgomery The Tennessee Valley Authority April 1, 2015 CASL-U-2015-0066-000 1 The Virtual Environment for Reactor Applications (VERA) Session 1: Physics and Methods Paul Turinsky, Scott Palmtag, Bob Salko, Brenden Mervin April 1, 2015 Hilton Head, SC CASL-U-2015-0066-000 2 2 CASL-U-2015-0066-000 2 CASL-U-2015-0066-000 2 Overview of CASL CASL Mission: provide leading-edge M&S capabilities

  2. Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Study of Scintillation, Fluorescence and Scattering in Mineral Oil for the MiniBooNE Neutrino Detector Bruce C. Brown, Senior-Member, IEEE,Stephen Brice, Eric Hawker, Shannon Maza, Hans-Otto Meyer, Anna Pla-Dalmau, Rex Tayloe, Hirohisa A. Tanaka and Dmitri Toptygin Abstract- The MiniBooNE neutrino detector at Fermilab (FNAL) is filled with 250,000 gallons of pure mineral oil. The principal signal for MiniBooNE is light observed in a prompt Cherenkov cone. Scattering and fluorescence modify our

  3. Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Utah, Nevada, and California BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several other...

  4. Title

    Energy.gov [DOE] (indexed site)

    ... that should be linked. * In the search results, click on the previous ... box will be blank. * Check the "Terms and Conditions" box and enter your FRPIN. * Click "Update Link." ...

  5. Title

    Gasoline and Diesel Fuel Update

    Unlocking Energy Efficiency in the U.S. Economy 2010 Energy Conference EIA, SAIS April 7, 2010 McKinsey & Company | 1 Carbon emissions Gigatons CO 2 e * End-use consumption Quadrillion BTUs * Includes carbon emission abatement potential from CHP Source: EIA AEO 2008, McKinsey analysis Significant energy efficiency potential exists in the U.S. economy Industrial Residential Commercial -9.1 Baseline 2020 Baseline case, 2008 30.8 36.9 39.9 NPV- positive case, 2020 3.2 NPV- positive case, 2020

  6. TITLE

    Office of Legacy Management (LM)

    ... required by Headquarters for the justification as specifled in this paragraph and in ... as set forth in paragraph IV.6. c. justification for Suolemental Limits and Exceptions. ...

  7. TITLE

    Office of Legacy Management (LM)

    Site Oxford, Ohio U.S. Department of Energy Formerly Utilized Sites Remedial Action ... High School m p t s (018) Hr. J e f f Schroer Department of Energy Washmgton, DC 20585 S t ...

  8. TITLE

    Office of Legacy Management (LM)

    ... Wire brushing grinding Using needle gun Scabbl ing Small areas or equipment that ... The needle gun is a hand-held device with abrasive needles that abrade a surface; it is ...

  9. TITLE

    Office of Legacy Management (LM)

    ... - z - Walls were decontaminated using a wire brush or needle gun where necessary. ... were remediated by vacuuming, scraping with hand tools, and by using a needle gun. ...

  10. G Subject: Implementation of Division D, Title III and Title V, and Division E, Title

    Energy Saver

    of Energy Funding Opportunity Announcement for Water Power Manufacturing Funding Opportunity Announcement for Water Power Manufacturing April 11, 2014 - 11:23am Addthis On April 11, 2014, the funding opportunity titled "Water Power Manufacturing" was released by the Water Power Program to support the application of advanced materials and manufacturing techniques to the development of new hydropower technologies. There is a significant opportunity across the country to increase the

  11. Implementation of Division D, Titles III and V, and Division...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and guidance for Division D, Titles III and V, and Division E, Title VII of the ... Implementation of Division D, Titles III and V, and Division E, Title VII of the ...

  12. Research Highlights Sorted by Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Title "Invisible" Giants in the Sky ARM ASR Kassianov, E. "Radiance Assimilation" Correction Method Improves Water Vapor Radiosonde Observations in the Upper Troposphere ARM Soden, B. J. "Roobik" Is Part of the Answer, Not a Puzzle ARM Turner, D. D. 4D (Space-time) Ice Cloud Microphysical Properties of DCSs Retrieved from NEXRAD ARM ASR Dong, X. 2007 Floods Not a Complete Washout in U.S. Great Plains ARM ASR Bhattacharya, A. A "Little" Respect: Droplet

  13. Flyer, Title VI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Flyer, Title VI Flyer, Title VI Titles VI and IX of the Civil Rights Act of 1964, as amended prohibit discrimination in programs and activities receiving Federal financial assistance. This flyer explains this probition, and can be downloaded and displayed at your place of work. discrimination flyer July 2011.pdf (259.37 KB) More Documents & Publications NO FEAR Act Notice DOE F 1600.5 DOE F 1600.1

  14. Categorical Exclusion Determination Form Proposed Action Title...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects ...

  15. Title IX: More than Just Sports

    Energy.gov [DOE]

    Title IX isn't just about sports or the law. It's about securing a clean energy future by closing the gender gap in math and science.

  16. TITLE XVII FAQS | Department of Energy

    Office of Environmental Management (EM)

    ... The emission limitation requirements in Section 1703(d) of Title XVII apply only to gasification projects involving coal, biomass, or petroleum coke, or any combination of coal, ...

  17. No Slide Title | Department of Energy

    Energy.gov [DOE] (indexed site)

    Title More Documents & Publications Policy Flash 2014-01 Acquisition Guide 15.4-3 Negotiation Documentation: Pre-negotiation Plan & the Price Negotiation Memorandum Chapter 71 -...

  18. DOJ Title Standards for Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOJ Title Standards for Acquisition DOJ Title Standards for Acquisition Title Standards 2001 (580.64 KB) More Documents & Publications Acquisition Guide for Federal Agencies REAL ESTATE PROPERTY GUIDE 2014 REAL ESTATE PROPERTY GUIDE 2013

  19. The collision of Title III and Title V: A potential permitting and enforcement nightmare

    SciTech Connect

    Facca, G.; Faler, M.

    1998-12-31

    The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

  20. Title 22 California Code of Regulations | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Abstract Title 22 California Code of Regulations, current through August 7, 2014. Published NA Year Signed or Took Effect 2014 Legal Citation Title 22 California Code...

  1. Should Title 24 Ventilation Requirements Be Amended to include...

    Office of Scientific and Technical Information (OSTI)

    include an Indoor Air Quality Procedure? Citation Details In-Document Search Title: Should Title 24 Ventilation Requirements Be Amended to include an Indoor Air Quality Procedure? ...

  2. Transcript of March 28, 2013, TAP webinar titled Internal Benchmarking...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TAP webinar titled Internal Benchmarking Outreach and Data Collection Techniques Transcript of March 28, 2013, TAP webinar titled Internal Benchmarking Outreach and Data ...

  3. Title 40 CFR 1502 - Environmental Impact Statement | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Regulation: Title 40 CFR 1502 - Environmental Impact StatementLegal Abstract Subpart 1502 Environmental Impact Statement under Title 40: Protection of Environment of the U.S. Code...

  4. File:AlaskaTitleVApplicationSubmittalInstructions.pdf | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    AlaskaTitleVApplicationSubmittalInstructions.pdf Jump to: navigation, search File File history File usage File:AlaskaTitleVApplicationSubmittalInstructions.pdf Size of this...

  5. Final scientific report for DOE award title: Improving the Representat...

    Office of Scientific and Technical Information (OSTI)

    scientific report for DOE award title: Improving the Representation of Ice Sedimentation Rates in Global Climate Models Citation Details In-Document Search Title: Final scientific ...

  6. Title 33 CFR 327 Public Hearings | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hearings (2014). Retrieved from "http:en.openei.orgwindex.php?titleTitle33CFR327PublicHearings&oldid890311" Feedback Contact needs updating Image needs updating...

  7. Title 16 USC 818 Public Lands Included in Project - Reservation...

    OpenEI (Open Energy Information) [EERE & EIA]

    Entry (1996). Retrieved from "http:en.openei.orgwindex.php?titleTitle16USC818PublicLandsIncludedinProject-ReservationofLandsFromEntry&oldid722800" ...

  8. Title 46 Alaska Statutes | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 46 Alaska StatutesLegal Published NA Year Signed or Took Effect 1971 Legal Citation Alaska Stat. tit. 46 (1971) DOI Not Provided Check for DOI availability: http:...

  9. Alaska Statutes: Title 38 | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Alaska Statutes: Title 38Legal Published NA Year Signed or Took Effect 2014 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  10. TITLE XVII PROJECT ELIGIBILITY | Department of Energy

    Office of Environmental Management (EM)

    Applicants are also responsible for payment of fees. To be eligible for a Title XVII loan guarantee, a project must meet all of the following requirements: Be an "Eligible Project" ...

  11. Title 30 Chapter 5 | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Chapter 5 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 30 Chapter 5Legal Published NA Year Signed or Took Effect 1969...

  12. Title II Disposal Sites Annual Report

    Energy.gov [DOE]

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2015 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements.

  13. Title I Disposal Sites Annual Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) in 2015 at the 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements.

  14. What every designated representative should know about Title IV and Title V enforcement provisions

    SciTech Connect

    Bischoff, C.A.; Dayal, P.

    1995-12-31

    Title IV of the Clean Air Act not only created a regulatory program unlike any other under the Clean Air Act, but also established a unique position--the designated representative--as an integral part of the program. The designated representative is required to meet certain basic obligations under Title IV, and a panoply of enforcement mechanisms are available to EPA in the event of noncompliance with these obligations. Also, because a designated representative may take on responsibilities under the permit provisions of Title V of the Clean Air Act, the designated representative can also be subject to an enforcement action for failure to comply with certain Title V permit requirements. This paper considers the basic definition of the designated representative under EPA`s Title IV and Title V regulations, identifies the responsibilities assigned to the designated representative, and then analyzes the enforcement mechanisms that may be applied to the designated representative if a regulatory responsibility has not been satisfied.

  15. News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Available | Department of Energy 2010 UMTRCA Title I and Title II Disposal Sites Reports Available News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports Available February 23, 2011 - 9:51am Addthis News Contact: DOE, Rich Bush, UMTRCA Program Lead (970) 248-6073 Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs (720) 377-9672 Grand Junction, Colo. - The U.S. Department of Energy announces the availability of the 2010 Annual Site Inspection and Monitoring Report

  16. The preparation for and survival of an EPA Title IV and Title V facility audit

    SciTech Connect

    Facca, G.L.; Faler, M.

    1999-07-01

    As part of the 1990 Clean Air Act Amendments, major facilities are required to obtain federally enforceable operating permits (Title V). In a separate permitting action, the electric utilities with units generating more then 25 megawatts are required to obtain permits for NO{sub x} and SO{sub x}, the emissions which contribute to acid rain (Title IV). The Title IV permit is included as part of the Title V permit. This paper will use an actual audit experience at a coal fired generation facility as a case study for the preparation for and outcome of an EPA Title IV Level 3 audit. The paper will document the procedures for preparation, the audit process, and the outcome. The audit is part of the EPA's process for review of the record keeping and instrument calibration methods outlined in Title IV. Both types of permits have many different record keeping and monitoring requirements as well as separate reporting requirements which are submitted to both federal; state and local regulatory agencies for review and evaluation. Title IV units include very specific instrument calibration/audit requirements, and Title V has compliance testing and monitoring requirements. Alliant Power was notified in August 1998 of the intent of EPA Region VII to conduct a Level 3 audit at the Lansing Generation Station. The US EPA and the State of Iowa intended to review all Title IV record keeping (Level 1), continuous emission monitoring calibrations and linearity testing (Level 2) and observe the annual Relative Accuracy Testing Audit performed by an outside contractor. In addition, during this facility site visit, the compliance with Title V permit requirements was also audited.

  17. G Subject: Implementation of Division D, Titles III and V, and...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Section Pub.L. No. 113-76 301(a) and Title V, Sections 501, 502, 503 Division E, Title ... of Division D, Title III and Title V, and Division E, Title VII of the ...

  18. Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6

    Energy.gov [DOE]

    Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6.

  19. Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report

    Energy.gov [DOE]

    Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report.

  20. Review the draft Title V with care

    SciTech Connect

    Romzick, P.G.; Heitz, D.R.

    1998-12-31

    The Title V permitting process is well underway for many industries and just beginning for others. Waste Management recently conducted the first in-depth reviews of draft Title V permits for some of its municipal solid waste (MSW) landfills. The Company`s comments on the draft permits were numerous. The draft permits contained some obvious as well as several less obvious errors. The results of these reviews identified a need to scrutinize carefully each and every draft permit issued to the Company`s landfills. The Company expects to require Title V permits for most of its 140 plus active landfills, due to the recently-enacted New Source Performance Standards for Municipal Solid Waste Landfills. Many issues of concern were encountered during the review. Had these issues not been identified, the facility would have had to live with an unnecessarily burdensome permit consisting of permit conditions that were more strict than the regulations required and lacking protections allowed by the law. This paper discusses many of the issues of concern identified during the draft permit review. Although many of the issues addressed in this paper are specific to MSW landfills, many of the issues are also applicable to Title V permits in general.

  1. ADMIN Citation Item Title Item Summary Sub Item 1 Title Sub Item 2 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ADMIN 1 Revision September 2015 Previous ADMIN 1 guidance edition: http://www.energy.gov/cio/downloads/administrative-records-schedule-1-personnel-records-revision-3 ADMIN Citation Item Title Item Summary Sub Item 1 Title Sub Item 2 Summary Sub Item 2 Applicability Media Applicability Disposition NARA Approved Citation a. Transferred employees. Department-wide Media-neutral See Chapter 7 of The Guide to Personnel Recordkeeping for instructions relating to folders of employees transferred to

  2. Title: Director III Grade: P40 Working Title: Chief Research Officer

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to

  3. Title 43 CFR 3264 Reports - Drilling Operations | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 43 CFR 3264 Reports - Drilling Operations Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  4. crd title p1.ai | Department of Energy

    Energy.gov [DOE] (indexed site)

    24.98 MB) More Documents & Publications crd title p1.ai EIS-0250-S2 and EIS-0369: Amended Notice of Intent To Expand the Scope of the Environmental Impact Statement crd title p1.ai

  5. MCA Title 85 - Water Use | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    MCA Title 85 - Water Use Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: MCA Title 85 - Water UseLegal Abstract Statutory...

  6. Title 18 CFR 131 Forms | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Regulation: Title 18 CFR 131 FormsLegal Abstract Part 131, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  7. Title 18 CFR 381 Fees | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Regulation: Title 18 CFR 381 FeesLegal Abstract Part 381 Fees, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  8. Title 16 USC Chapter 35 - Endangered Species | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 16 USC Chapter 35 - Endangered Species Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC Chapter 35 - Endangered...

  9. Interested Parties - Memo on Halting Title XVII Nuclear Loan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Interested Parties - Memo on Halting Title XVII Nuclear Loan Guarantees in MD, SC, GA, and TX Interested Parties - Memo on Halting Title XVII Nuclear Loan Guarantees in MD, SC, GA, ...

  10. Title 23 CFR 645 Utilities | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 23 CFR 645 UtilitiesLegal Abstract Part 645 - Utilities under Title 23: Highways of the...

  11. Title 23 USC 109 Standards | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 23 USC 109 StandardsLegal Abstract Section 109 - Standards under Title 23: Highways of the...

  12. Title 43 CFR 4120: Grazing Management | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 43 CFR 4120: Grazing Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 43 CFR 4120: Grazing...

  13. Title 16 Alaska Statutes Chapter 20 Fish and Game Conservation...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 16 Alaska Statutes Chapter 20 Fish and Game Conservation Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 Alaska...

  14. Learning About the Equal Employment Opportunity- Title VII- Complaint Process

    Energy.gov [DOE]

    Learn about what is unlawful under Title VII, the legislation behind it, the steps before filing a complaint (mediation), how an individual files an official Title VII complaint, the acceptance or...

  15. File:Title V Checklist.pdf | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title V Checklist.pdf Jump to: navigation, search File File history File usage File:Title V Checklist.pdf Size of this preview: 463 599 pixels. Other resolution: 464 600...

  16. Title 36 CFR 228 Minerals | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Regulation: Title 36 CFR 228 MineralsLegal Abstract Part 228 Minerals under Title 36: Parks, Forests, and Public Property of the U.S. Code of Federal Regulations, current as of...

  17. Title 24 Chapter 117 Municipal and Regional Planning and Development...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 24 Chapter 117 Municipal and Regional Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 24...

  18. Title 24 Chapter 117 Municipal Planning and Development | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 24 Chapter 117 Municipal Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 24 Chapter 117...

  19. Title 43 CFR 1601 Planning | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 43 CFR 1601 Planning Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1601 PlanningLegal...

  20. Title 40 CFR 355 Emergency Planning and Notification | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 40 CFR 355 Emergency Planning and Notification Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title...

  1. Gearing up for Title 5 operating permits

    SciTech Connect

    Klaber, K.; Weiss, K. )

    1994-06-01

    Title 5 of the 1990 Clean Air Act Amendments (CAAA) establishes a massive new operating permit program, which will be administered by state agencies in accordance with federal guidelines. Formal requirements regarding operating-permits were promulgated by the US Environmental Protection Agency (EPA) on July 21, 1992 (40 CFR 70). The Title 5 program will require many chemical manufacturing facilities to apply for and obtain operating permits that address air emissions from the entire facility. A major impact of the Title 5 program is that facilities will now be required to implement measures to routinely demonstrate that they are operating in compliance with the terms of the permit. Otherwise, facilities will be considered out of compliance. Once the new permits are in place, the burden will be on the facility to prove routine compliance to prevent any enforcement action. According to EPA, the new permits are not intended to impose any new regulatory requirements on a facility. Rather, they will serve as an enforcement tool.

  2. Challenges in implementing efficient Title IV and Title V permit programs

    SciTech Connect

    Sprott, R.

    1997-12-31

    Integrating title IV acid rain and title V operating permits in an efficient manner poses numerous challenges. Federal rules and policy memos about these programs often conflict or lead to actions that are difficult to implement at best. Both permitting programs are complex and controversial, but the title IV permitting rules are particularly difficult to use and understand. Clear lines of jurisdiction for various aspects of the acid rain program are lacking in some cases, and regulators have been slow to recognize and solve these problems. There are numerous issues that have arisen during the initial stages of developing permits for title IV affected sources. Some have or are being resolved; others remain as potential impediments to efficient permitting. Utah and other western states have been working with the utility industry and US Environmental Protection Agency (EPA) to resolve these and other issues and some problems have been resolved. However, some state and industry officials feel that EPA should take the lead to conduct a series title IV implementation workshops in partnership with states and the utilities. This paper describes solutions to some common implementation problems and identifies challenges that remain to be solved.

  3. Policy Flash 2014-27 Implementation of Division D, Titles III...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Division D, Titles III and V, and Division E, Title VII of the ... Policy Flash 2014-27 Implementation of Division D, Titles III and V, and Division E, Title ...

  4. Catalytic oxidizers and Title V requirements

    SciTech Connect

    Uberoi, M.; Rach, S.E.

    1999-07-01

    Catalytic oxidizers have been used to reduce VOC emissions from various industries including printing, chemical, paint, coatings, etc. A catalytic oxidizer uses a catalyst to reduce the operating temperature for combustion to approximately 600 F, which is substantially lower than thermal oxidation unit. Title V requirements have renewed the debate on the best methods to assure compliance of catalytic oxidizers, with some suggesting the need for continuous emission monitoring equipment. This paper will discuss the various aspects of catalytic oxidation and consider options such as monitoring inlet/outlet temperatures, delta T across the catalyst, periodic laboratory testing of catalyst samples, and preventive maintenance procedures as means of assuring continuous compliance.

  5. Count Directive No. Title OPI Approval Date

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Due for Review Before 9/30/2016 Count Directive No. Title OPI Approval Date 1 DOE G 414.1-2B Quality Assurance Program Guide AU 8/16/2011 2 DOE G 414.1-4 Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance AU 6/17/2005 3 DOE G 421.1-2A Implementation Guide for Use in Developing Documented Safety Analyses to Meet Subpart B of 10 CFR 830 AU 12/19/2011 4 DOE G 424.1-1B Implementation Guide for Use in Addressing Unreviewed

  6. WIPP Documents - All documents by title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    All documents by title A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 40 CFR Part 191 Environmental radiation protection standards for management and disposal of spent nuclear fuel, high-level and transuranic radioactive wastes. 40 CFR Part 194 Criteria for the certification and re-certification of theWaste Isolation Pilot Plant's compliance with the 40 CFR Part 191 disposal regulations. A Back to top Accelerating Cleanup: Paths to Closure The Department of Energy Carlsbad Field Office's

  7. Microsoft Word - Title X Reimbursements.doc

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Office of Inspector General Office of Audit Operations Audit Report Management Controls Over Title X Claims Reimbursement at the West Chicago Thorium Processing Facility OAS-M-04-08 September 2004 previously approved by the Department from the 1994 through 2001 claims. This occurred because the Department had not developed an assurance strategy that included both adequate technical and financial reviews of the Kerr-McGee claims. As a result, the Department could pay Kerr-McGee up to $164

  8. Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program

    SciTech Connect

    Goldstein, D.R.; Cressman, A.W.

    1999-07-01

    Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

  9. Memorandum, Clarification of Requirements for Certification in Title 10

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Code of Federal Regulations Part 712, Human Reliability Program | Department of Energy Clarification of Requirements for Certification in Title 10 Code of Federal Regulations Part 712, Human Reliability Program Memorandum, Clarification of Requirements for Certification in Title 10 Code of Federal Regulations Part 712, Human Reliability Program August 20, 2013 Clarification of Requirements for Certification in Title 10 Code of Federal Regulations Part 712, Human Reliability Program

  10. Clarifying Technology Eligibility for Title XVII Loan Guarantee

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solicitations | Department of Energy Clarifying Technology Eligibility for Title XVII Loan Guarantee Solicitations Clarifying Technology Eligibility for Title XVII Loan Guarantee Solicitations July 22, 2015 - 10:50am Addthis Clarifying Technology Eligibility for Title XVII Loan Guarantee Solicitations Douglas Schultz Douglas Schultz Director of Loan Guarantee Origination During the latest three solicitations issued by the Department's Loan Programs Office (LPO) for approximately $24 billion

  11. Title III of the Defense Production Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Title III of the Defense Production Act Title III of the Defense Production Act Matthew Seaford presentation on Title III of the Defense Production Act at the Industry Roundtable. 2_seaford_roundtable.pdf (1.21 MB) More Documents & Publications A National Strategic Plan For Advanced Manufacturing Market Drivers for Biofuels Networking and Information Technology Research and Development Supplement to the President's Budget (February 2010)

  12. LM's New Role for the DOE Title X Reimbursement Program

    Energy.gov [DOE]

    In May 2011, the Title X claim review and audit function was transferred from the DOE Office of Environmental Management (EM) to the Office of Legacy Management (LM).

  13. Experience in automating the Title V permit application

    SciTech Connect

    Ashcraft, T.; O`Brien, J.

    1995-12-31

    Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

  14. Title 2 CFR 25 Universal Identifier and Central Contractor Registratio...

    OpenEI (Open Energy Information) [EERE & EIA]

    CFR 25 Universal Identifier and Central Contractor Registration Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 2...

  15. Title 27 California Code of Regulations: Environmental Protection...

    OpenEI (Open Energy Information) [EERE & EIA]

    7 California Code of Regulations: Environmental Protection Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 27...

  16. Equal Employment Opportunity -Title VII | Department of Energy

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Equal Employment Opportunity -Title VII The Department of Energy does not discriminate on the basis of race, color, sex (including sexual harassment), religion, national origin, ...

  17. Title 43 USC 1702 Definitions | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    in Subchapter I: General Provisions under Title 43: Public Lands, Chapter 35: Federal Land Policy and Management of the United States Code, effective February 1, 2010....

  18. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    the University of Pennsylvania Project title Modular Designed Protein Constructions for Solar Generated H sub sub From Water Dutton P Leslie Univ of Pennsylvania Philadelphia PA...

  19. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    University of Pennsylvania. Project title- ""Modular Designed Protein Constructions for Solar Generated H2 From Water","Dutton, P. Leslie Univ. of Pennsylvania,...

  20. Title V Operation Permit Application Webpage | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    to library Web Site: Title V Operation Permit Application Webpage Author Division of Air Quality Published State of Alaska, Date Not Provided DOI Not Provided Check for DOI...

  1. Alaska - Alaska Administrative Code - Title 3 - Commerce, Community...

    OpenEI (Open Energy Information) [EERE & EIA]

    Alaska Administrative Code - Title 3 - Commerce, Community and Economic Development - January 2012 Supplement Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  2. Title 40 CFR 260: Hazardous Waste Management System: General...

    OpenEI (Open Energy Information) [EERE & EIA]

    : Hazardous Waste Management System: General Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 CFR 260: Hazardous...

  3. Title 42 USC 4332 Cooperation of Agencies, Reports, Availability...

    OpenEI (Open Energy Information) [EERE & EIA]

    Coordination of Efforts Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 42 USC 4332 Cooperation of Agencies,...

  4. Title 43 CFR 3272 Utilization Plan and Facility Construction...

    OpenEI (Open Energy Information) [EERE & EIA]

    2 Utilization Plan and Facility Construction Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title...

  5. Title 16 USC 470a Historic Preservation Program | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Historic Preservation Program Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 470a Historic Preservation...

  6. Title 32 CFR 989 Environmental Impact Analysis Process (EIAP...

    OpenEI (Open Energy Information) [EERE & EIA]

    Impact Analysis Process (EIAP) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 32 CFR 989...

  7. Alaska Administrative Code - Title 11, Chapter 195 - Anadromous...

    OpenEI (Open Energy Information) [EERE & EIA]

    1, Chapter 195 - Anadromous Fish Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Alaska Administrative Code - Title 11,...

  8. Title 5 Alaska Administrative Code Chapter 95 Protection of Fish...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 5 Alaska Administrative Code Chapter 95 Protection of Fish and Game Habitat Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  9. Title 11 Alaska Administrative Code 87 Geothermal Drilling and...

    OpenEI (Open Energy Information) [EERE & EIA]

    7 Geothermal Drilling and Conservation Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code...

  10. TITLE V-CONFIDENTIAL INFORMATION PROTECTION AND STATISTICAL EFFI...

    Gasoline and Diesel Fuel Update

    or maintain the systems for handling or storage of data received under this title; and ... data anomalies, produce statistical samples that are consistently adjusted for the ...

  11. Title 15 USC 3416 Judicial Review | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 15 USC 3416 Judicial ReviewLegal Abstract These statutes outline the procedures for judicial review of decisions made by the Federal Energy Regulatory Commission....

  12. Title 40 CFR 1508 Terminology and Index | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Regulation: Title 40 CFR 1508 Terminology and IndexLegal Abstract Regulations setting forth terminology under NEPA. Published NA Year Signed or Took Effect 2014 Legal Citation...

  13. Title 36 CFR 220 National Environmental Policy Act (NEPA) Compliance...

    OpenEI (Open Energy Information) [EERE & EIA]

    0 National Environmental Policy Act (NEPA) Compliance Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title...

  14. Title 30 USC 1001 Geothermal Resources Definitions | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    DefinitionsLegal Abstract Section 1001 - Definitions under Title 30: Mineral Lands and Mining, Chapter 23: Geothermal Resources of the United States Code, last amended August 8,...

  15. Optimizing operational flexibility and enforcement liability in Title V permits

    SciTech Connect

    McCann, G.T.

    1997-12-31

    Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

  16. Title XVII Incentives for Innovative Technologies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Incentives for Innovative Technologies Title XVII Incentives for Innovative Technologies Announcement from the Loan Program Office Title XVII Incentives for Innovative Technologies (50.02 KB) More Documents & Publications Energy Policy Act of 2005 Energy Policy Act of 2005 Section 20320 of the Revised Continuing Appropriations Resolution

  17. Reducing Nitrogen Oxide Emissions: 1996 Compliance with Title IV Limits

    Reports and Publications

    1998-01-01

    The purpose of this article is to summarize the existing federal nitrogen oxide (Nox) regulations and the 1996 performance of the 239 Title IV generating units. It also reviews the basics of low-Nox burner technology and presents cost and performance data for retrofits at Title IV units.

  18. TITLE XVII PROGRAM OVERVIEW (October 2016) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TITLE XVII PROGRAM OVERVIEW (October 2016) TITLE XVII PROGRAM OVERVIEW (October 2016) DOE-LPO_Outreach_LPO-Overview_CSP_Oct-2016.pdf (2.79 MB) More Documents & Publications LPO Update, 29-Sep-2016 LPO Update, 28-Jun-2016 LPO Update, 28-Jul-2016

  19. TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ...

  20. Title 18 USC 641 Public Money, Property or Records | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Records (1943). Retrieved from "http:en.openei.orgwindex.php?titleTitle18USC641PublicMoney,PropertyorRecords&oldid793311" Feedback Contact needs updating Image...

  1. Title 43 USC 961 Rights-of-way Through Public Lands, Indian,...

    OpenEI (Open Energy Information) [EERE & EIA]

    from "http:en.openei.orgwindex.php?titleTitle43USC961Rights-of-wayThroughPublicLands,Indian,andOtherReservationsforPowerandCommunicationsFacilities&oldid...

  2. Title 16 USC 79 Rights-of-way for Public Utilities | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Retrieved from "http:en.openei.orgwindex.php?titleTitle16USC79Rights-of-wayforPublicUtilities&oldid801045" Feedback Contact needs updating Image needs updating...

  3. Title 50 CFR 226 Designated Critical Habitat | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    26 Designated Critical Habitat Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 50 CFR 226 Designated...

  4. Title 16 USC 824p Siting of Interstate Electric Transmission...

    OpenEI (Open Energy Information) [EERE & EIA]

    p Siting of Interstate Electric Transmission Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 824p Siting...

  5. TAC Title 30 - Environmental Quality | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    30 - Environmental QualityLegal Published NA Year Signed or Took Effect 2013 Legal Citation TAC Title 30 DOI Not Provided Check for DOI availability: http:crossref.org Online...

  6. Title 25 CFR 2 Appeals from Administrative Actions | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    CFR 2 Appeals from Administrative Actions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 25 CFR 2 Appeals from...

  7. Title 48 CFR 1 Federal Acquisition Regulations System | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    8 CFR 1 Federal Acquisition Regulations System Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 48 CFR...

  8. Title 43 CFR 1610 Resource Management Planning | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    10 Resource Management Planning Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610 Resource...

  9. Title 7 CFR 658 Farmland Protection Policy Act | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    CFR 658 Farmland Protection Policy Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 7 CFR 658...

  10. Title 40 CFR 1500 Purpose, Policy, and Mandate | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Purpose, Policy, and Mandate Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 1500 Purpose,...

  11. Title 36 CFR 251 Land Uses | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    51 Land Uses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 36 CFR 251 Land UsesLegal Abstract...

  12. Title 50 CFR 29 Land Use Management | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    9 Land Use Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 50 CFR 29 Land Use ManagementLegal Abstract...

  13. Title 18 Alaska Administrative Code Chapter 70 Water Quality...

    OpenEI (Open Energy Information) [EERE & EIA]

    0 Water Quality Standards Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 70...

  14. Title 43 CFR 3261 Drilling Operations: Getting a Permit | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    61 Drilling Operations: Getting a Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 3261...

  15. Title 49 USC 44718 Structures Interfering With Air Commerce ...

    OpenEI (Open Energy Information) [EERE & EIA]

    4718 Structures Interfering With Air Commerce Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 49 USC 44718 Structures...

  16. Title 33 USC 403 Obstruction of Navigable Waters Generally; Wharves...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 33 USC 403 Obstruction of Navigable Waters Generally; Wharves; Piers, etc.; Excavations and Filling in Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  17. Title 16 USC 1600 Congressional Findings | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    600 Congressional Findings Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 1600 Congressional FindingsLegal Abstract...

  18. Title 16 USC 1539 Exceptions | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    16 USC 1539 Exceptions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 1539 ExceptionsLegal Abstract This...

  19. Title 18 CFR 366 Books and Records | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    18 CFR 366 Books and RecordsLegal Abstract Part 366 Books and Records under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  20. PBS ABB Title ABB Description/Scope ORP-0014

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Title ABB DescriptionScope ORP-0014 242A Evaporator222-S Laboratory * Operate and ... to the TRU Packaging interface or the WRF Scope excludes the WRF and the TRU packaging ...

  1. Title 43 CFR 45 Conditions and Prescriptions in FERC Hydropower...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 Conditions and Prescriptions in FERC Hydropower Licenses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 43 CFR 45...

  2. Title 41 Alaska Statutes Chapter 35 Historic Preservation | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Login | Sign Up Search Page Edit with form History Title 41 Alaska Statutes Chapter 35 Historic Preservation Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  3. Title 11 Alaska Administrative Code Chapter 5 Fees | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code Chapter 5 FeesLegal Abstract...

  4. Title 18 CFR 5 Integrated License Application Process | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 Integrated License Application Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 5 Integrated License...

  5. TNRC, Title 5, Chapter 141 Geothermal Resources | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    5, Chapter 141 Geothermal Resources Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: TNRC, Title 5, Chapter 141 Geothermal...

  6. Title 18 Alaska Administrative Code Chapter 50 Air Quality Control...

    OpenEI (Open Energy Information) [EERE & EIA]

    50 Air Quality Control Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 50 Air...

  7. Title 40 Code of Federal Regulations Chapter I, Subchapter C...

    OpenEI (Open Energy Information) [EERE & EIA]

    Page Edit with form History Title 40 Code of Federal Regulations Chapter I, Subchapter C - Air Programs Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

  8. Title 16 USC 823d Alternative Conditions and Prescriptions |...

    OpenEI (Open Energy Information) [EERE & EIA]

    d Alternative Conditions and Prescriptions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 823d Alternative...

  9. Title 50 CFR 17 Endangered and Threatened Wildlife and Plants...

    OpenEI (Open Energy Information) [EERE & EIA]

    17 Endangered and Threatened Wildlife and Plants Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 50...

  10. Title 40 CFR 261 Identification and Listing of Hazardous Waste...

    OpenEI (Open Energy Information) [EERE & EIA]

    1 Identification and Listing of Hazardous Waste Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40...

  11. Title 40 CFR 270: EPA Administered Programs: The Hazardous Waste...

    OpenEI (Open Energy Information) [EERE & EIA]

    270: EPA Administered Programs: The Hazardous Waste Program Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 CFR...

  12. Title 18 Alaska Administrative Code Section 60.020 Hazardous...

    OpenEI (Open Energy Information) [EERE & EIA]

    60.020 Hazardous Waste Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Section 60.020...

  13. Title 10 Chapter 159 Waste Management | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    159 Waste Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 10 Chapter 159 Waste ManagementLegal Abstract Statute...

  14. Title 18 Alaska Administrative Code Chapter 60 Solid Waste Management...

    OpenEI (Open Energy Information) [EERE & EIA]

    60 Solid Waste Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 60...

  15. Proposal Title: Community Earth System Model (CESM) Tutorial

    Office of Scientific and Technical Information (OSTI)

    Proposal Title: Community Earth System Model (CESM) Tutorial PI: James W. Hurrell In fiscal year 2011, the Community Earth System Model (CESM) tutorial was taught at NCAR from 1-5 ...

  16. Title 10 Chapter 45 Connecticut River Flood Control Compact ...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 Connecticut River Flood Control Compact Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 10 Chapter 45 Connecticut River...

  17. Title 10 Chapter 47 Water Pollution Control | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    7 Water Pollution Control Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 10 Chapter 47 Water Pollution ControlLegal...

  18. Title 40 CFR 144 Underground Injection Control Program | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    44 Underground Injection Control Program Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 144...

  19. Title 40 USC 102 Public Buildings, Property, and Works: Definitions...

    OpenEI (Open Energy Information) [EERE & EIA]

    USC 102 Public Buildings, Property, and Works: Definitions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 40 USC 102...

  20. Title 43 CFR 2807: Grant Administration and Operation | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    3 CFR 2807: Grant Administration and Operation Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 43 CFR 2807: Grant...

  1. Title 43 CFR 3204 Noncompetitive Leasing Other Than Direct Use...

    OpenEI (Open Energy Information) [EERE & EIA]

    Than Direct Use LeasesLegal Abstract Subpart 3204 - Noncompetitive Leasing Other Than Direct Use Leases under Title 43: Public Lands: Interior of the U.S. Code of Federal...

  2. Montana MCA Title 85, Water Use | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Montana MCA Title 85, Water UseLegal Abstract Water Use regulations under Montana Code...

  3. Title 33 USC 401 Construction of Bridges, Causeways, Dams or...

    OpenEI (Open Energy Information) [EERE & EIA]

    1 Construction of Bridges, Causeways, Dams or Dikes Generally; Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title...

  4. Title 43 CFR 4 Department Hearings and Appeals Procedures | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Department Hearings and Appeals Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 4...

  5. Title 11 Alaska Administrative Code 82 Mineral Leasing Procedures...

    OpenEI (Open Energy Information) [EERE & EIA]

    2 Mineral Leasing Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code 82 Mineral...

  6. Title 40 CFR 124 Procedures for Decisionmaking | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    4 Procedures for Decisionmaking Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 124 Procedures...

  7. Title 16 USC 2705 Simplified and Expeditious Licensing Procedures...

    OpenEI (Open Energy Information) [EERE & EIA]

    2705 Simplified and Expeditious Licensing Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 2705 Simplified...

  8. Title 18 Alaska Administrative Code Chapter 78 Underground Storage...

    OpenEI (Open Energy Information) [EERE & EIA]

    8 Underground Storage Tanks Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 Alaska Administrative Code Chapter 78...

  9. Title 43 CFR 3279 Utilization Relief and Appeals | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    9 Utilization Relief and Appeals Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 3279...

  10. Title 40 CFR 230 Definitions - Clean Water Act | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    RegulationRegulation: Title 40 CFR 230 Definitions - Clean Water ActLegal Abstract Sets forth regulatory definitions under the Clean Water Act including the definition of waters of...

  11. Title 16 USC 823a Conduit Hydroelectric Facilities | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    a Conduit Hydroelectric Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 823a Conduit Hydroelectric...

  12. Title 36 CFR 800 Protection of Historic Properties | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    PropertiesLegal Abstract Part 800, Protection of Historic Properties under Title 36: Parks, Forests, and Public Property of the U.S. Code of Federal Regulations, current as of...

  13. Title 40 CFR 1505 NEPA and Agency Decisionmaking | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    NEPA and Agency Decisionmaking Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 1505 NEPA and...

  14. Title 40 CFR 112 Oil Pollution Prevention | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    12 Oil Pollution Prevention Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 112 Oil Pollution...

  15. Title 1 Chapter 3 Construction of Statutes | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 1 Chapter 3 Construction of StatutesLegal Abstract Vermont statutory chapter governing the...

  16. HUD Title 1 PowerSaver Lenders | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon HUD Title 1 PowerSaver Lenders More Documents & Publications PowerSaver Approved Lenders List HUD 203(k) PowerSaver Lenders Introducing the New PowerSaver Loan Program ...

  17. Title 10 Chapter 37 Wetlands Protection and Water Resources Management...

    OpenEI (Open Energy Information) [EERE & EIA]

    37 Wetlands Protection and Water Resources Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 10 Chapter 37...

  18. Poster Abstract of Eighteenth ARM STM: Sort by Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 Science Team Meeting 2008 Proceedings Proceedings Sorted by Title Proceedings Sorted by Author Proceedings Sorted by Category Cover image Poster Abstract of the Eighteenth Atmospheric Radiation Measurement (ARM) Science Team Meeting ARM-CONF-2008, March 2008 Norfolk, Virginia View poster abstract by Author or Category or Title. 3D Shortwave Radiative Transfer in the Multiscale Modelling Framework ABSTRACT, POSTER Cole, J., Barker, H., Khairoutdinov, M., and Randall, D. 4STAR Spectrometer for

  19. Poster Abstract of Nineteenth ARM STM: Sort by Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9 Science Team Meeting 2009 Proceedings Proceedings Sorted by Title Proceedings Sorted by Author Proceedings Sorted by Category Poster Abstract of the Nineteenth Atmospheric Radiation Measurement (ARM) Science Team Meeting ARM-CONF-2009, March-April 2009 Louisville, Kentucky View poster abstract by Author or Category or Title. A 10-year Climatology of Arctic Cloud Fractions and Their Impact on Surface Radiation Budget at Barrow, Alaska ABSTRACT Dong, X., Xi, B., Crosby, K., Long, C., and Stone,

  20. Poster Abstract of Seventeenth ARM STM: Sort by Title

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 Science Team Meeting 2007 Proceedings Proceedings Sorted by Title Proceedings Sorted by Author Proceedings Sorted by Category Cover image Poster Abstract of the Seventeenth Atmospheric Radiation Measurement (ARM) Science Team Meeting ARM-CONF-2007, March 2007 Monterey, California View poster abstract by Author or Category or Title. 10 Years of External Data ABSTRACT, POSTER Ma, L., Wagener, R., Gregory, L., Liang, M., Tilp, A., and Cialella, A. A Comparison of Broad-band Fluxes at the Main and

  1. DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" | Department of Energy RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband

  2. Office of Cyber Assessments - Report Titles | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cyber Assessments - Report Titles Office of Cyber Assessments - Report Titles 2016 Independent Assessment of the Cyber Security Program at the Special Technologies Laboratory Field Intelligence Element, March 2016 (OUO) Independent Assessment of the Classified Cyber Security Program at the Pantex Plant, April 2016 (OUO) Independent Assessment of the Cyber Security Program at the Pantex Plant Field Intelligence Element, April 2016 (OUO) Independent Assessment of the Cyber Security Program of the

  3. Office of Security Assessments - Report Titles | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Security Assessments - Report Titles Office of Security Assessments - Report Titles 2016 (U) Results of Limited-Notice Performance Tests at the Y-12 National Security Complex Conducted on November 3-4, 2015 [January 5, 2016] (UCNI) (U) Results of the Limited-Scope Assessment of Protective Force Management and Capabilities at the Portsmouth Gaseous Diffusion Plant, November 3-5, 2015 [January 8, 2016] (OUO) (U) Results of Limited-Notice-Performance Tests at Office of Secure Transportation

  4. Equal Employment Opportunity -Title VII | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Equal Employment Opportunity -Title VII Equal Employment Opportunity -Title VII The Department of Energy does not discriminate on the basis of race, color, sex (including sexual harassment), religion, national origin, age, disability (physical or mental), sexual orientation, reprisal, parental status, protected genetic information, or any other non-merit factor. We are committed to equal employment opportunity principles and practices in all of our management decisions and personnel practices.

  5. Impending impacts of Title III and Title V of the Clean Air Act Amendments of 1990 on the coal industry

    SciTech Connect

    Kerch, R.L.

    1994-12-31

    The coal industry has already begun to feel the affects of the acid deposition title, particularly in Illinois. Two challenges to the producers and sellers of coal; i.e., (1) Title III, Hazardous Air Pollutants and what is in store for customers, and (2) Title V, Operating Permits, which may affect production facilities are discussed. The utilities are temporarily exempted from Title III. The Great Waters report suggests that mercury will be regulated, and it looks like risk assessments will be based on coal analysis rather than on actual emission measurements. Stack sampling is difficult, expensive and slow. Coal cleaning is important in reducing trace elements. Electrostatic precipitators also remove trace elements. ESPs are less effective for mercury and selenium because they are emitted in the gas phase. FGD can remove hazardous air pollutants, but it is not well documented.

  6. Implementation of Division D, Titles III and V, and Division E, Title VII of the Consolidated Appropriations Act, 2014, Pub. L. No. 113-76.

    Energy.gov [DOE]

    Acquisition Letter (AL) 2014-04 and Financial Assistance Letter (FAL) 2014-01 provides implementing instructions and guidance for Division D, Titles III and V, and Division E, Title VII of the...

  7. Effect of Title V air permitting on pipeline operations

    SciTech Connect

    Bost, R.C.; Donnan, G.T.

    1995-12-31

    Pursuant to the passage of the Clean Air Act Amendments of 1990, the US Environmental Protection Agency has promulgated what are known as Title V permitting requirements for major sources of air pollutants, including pipeline operations. In contrast to most existing air permitting programs, the new Title V regulations will require periodic certification of compliance with applicable air regulations. In the same way that water dischargers report their own discharge violations to regulatory agencies pursuant to the NPDES permitting system, Title V permittees must implement an acceptable monitoring program and similarly report violations of permit conditions or applicable air regulations. Only those facilities whose potential emissions are less than or can be controlled to be less than certain regulatory limits will be exempt from standard Title V permitting. If a facility`s throughput or the concentration levels of certain volatile toxic levels in a particular crude or natural gas were to exceed corresponding regulatory limits, then the facility could be in violation. If an operator were to expand a field, then the changes in the gathering system and emission levels could constitute a violation. Constraints on operations can be avoided by careful strategizing of an operator`s Title V permit application.

  8. Experience implementing Title V at a large utility

    SciTech Connect

    Toeroek, D.

    1998-12-31

    Implementation of a Clean Air Act Title V program at a large utility in Colorado involved the following activities: Generation of Operating Permit Applications; Identification of areas of non-compliance and self-reporting to the regulatory agency; Development and implementation of better record-keeping systems; Development and implementation of training programs; and, Development and implementation of a pilot program. This paper discusses in detail eight ``lessons learned`` from the experience gained during a one-year pilot program. (1) The whole process of record-keeping at the plant level had to be improved. Under Title V, regulators will go directly to a facility and ask to see documentation of compliance. Facility personnel must be prepared to show regulators the appropriate documentation. (2) Recordkeeping must be electronic. Trying to comply using manual record-keeping will generate too much paper. (3) By monitoring for a year as if Title V were in effect, deficiencies were identified early and corrected. In this way, the Utility was ready when their permit was issued. (4) One person at each facility was designated as the Title V representative, giving one focal point for the plant and one person responsible for the Title V information. (5) Training was conducted for everyone at the plant, from the receptionist to the manager. This was important for getting cooperation from plant personnel. More specific training was given to Title V representatives from all the plants. (6) A multi-disciplinary implementation team is necessary, consisting of personnel from legal, operations, environmental, etc., to ensure successful implementation. (7) Internal audits were conducted during the pilot program so that plants can self-report to the regulatory agency, thereby gaining regulatory relief from severe fines. (8) A Quality Assurance Manual/User`s Guide was prepared that pulls together all aspects of the program. This ensures consistency in implementation when personnel

  9. Implementation Plan Synopsis Directive Number, Title Summary of Implementation Plan:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Implementation Plan Synopsis Directive Number, Title Summary of Implementation Plan: How does the OPI plan to implement the new/revised directive? Training provided (Classroom, site visits, webcasts. etc.) Length of training Timeline for Implementation/ Anticipated Implementation Date OPI's Remarks (not covered in the aforementioned): Date to return to DRB to provide an update on implementation (6 months): (To be completed by MA-90)

  10. Title 29 Chapter 11 Management of Lakes and Ponds | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 29 Chapter 11 Management of Lakes and Ponds Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 29 Chapter 11 Management...

  11. Title 10 Chapter 151 State Land Use and Development Plans | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 10 Chapter 151 State Land Use and Development Plans Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 10 Chapter 151...

  12. Tex. Water Code, Title 2, Chapter 11 Water Rights | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Tex. Water Code, Title 2, Chapter 11 Water Rights Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Tex. Water Code, Title 2,...

  13. Title 43 CFR 1610.5-6 Revision | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610.5-6 RevisionLegal Abstract 1610.5-6 Revision under Title 43: Public Lands: Interior of...

  14. Title 18 CFR 6.2 Surrender of License | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 18 CFR 6.2 Surrender of License Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 6.2 Surrender of...

  15. Title 43 CFR 3273 How To Apply for a Site License | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 43 CFR 3273 How To Apply for a Site License Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  16. Title 36 CFR 14 Rights-of-way | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 36 CFR 14 Rights-of-wayLegal Abstract Part 14 - Rights-of-way under Title 36: Parks, Forests, and Public Property of the U.S. Code of Federal Regulations, current as of...

  17. Title Tags for Websites Outside of the Energy.gov Drupal Environment

    Energy.gov [DOE]

    These standards are required when coding title tags on websites and applications outside the Energy.gov Drupal environment.

  18. Engineering scale mixing system tests for MWTF title II design

    SciTech Connect

    Chang, S.C.

    1994-10-10

    Mixing tests for the Multifunction Waste Tank Facility (MWTF) were conducted in 1/25 and 1/10 scale test tanks with different slurry levels, solids concentrations, different jet mixers and with simulated in-tank structures. The same test procedure was used as in the Title I program, documented in WHC-SD-W236A-ER-005. The test results support the scaling correlation derived previously in the Title I program. The tests also concluded that a partially filled tank requires less mixing power, and horizontal and angled jets in combination (H/A mixer) are significantly more effective than the two horizontal jet mixers (H/H mixer) when used for mixing slurry with a high solids concentrations.

  19. Using EnergyPlus for California Title-24 compliancecalculations

    SciTech Connect

    Huang, Joe; Bourassa, Norman; Buhl, Fred; Erdem, Ender; Hitchcock, Rob

    2006-08-26

    For the past decade, the non-residential portion of California's Title-24 building energy standard has relied on DOE-2.1E as the reference computer simulation program for development as well as compliance. However, starting in 2004, the California Energy Commission has been evaluating the possible use of Energy Plus as the reference program in future revisions of Title-24. As part of this evaluation, the authors converted the Alternate Compliance Method (ACM) certification test suite of 150 DOE-2 files to Energy Plus, and made parallel DOE-2 and Energy Plus runs for this extensive set of test cases. A customized version of DOE-2.1E named doe2ep was developed to automate the conversion process. This paper describes this conversion process, including the difficulties in establishing an apples-to-apples comparison between the two programs, and summarizes how the DOE-2 and Energy Plus results compare for the ACM test cases.

  20. MENTEE QUESTIONNAIRE Name: Title: Email: Office Phone Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    MENTEE QUESTIONNAIRE Name: Title: Email: Office Phone Number: Office Address: Why are you interested in the mentoring program? (This information will be included with the invitation to your potential mentor.) What goals do you want to work on during your participation in the mentoring program? Is there someone you would like to be your mentor? Yes No If yes, please list their name and any other possible mentors in order of preference: Expectations of the Mentoring Program How long? 6-months

  1. Notices Title of Collection: HEAL Program: Physician's Certification of Borrower's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2736 Federal Register / Vol. 81, No. 176 / Monday, September 12, 2016 / Notices Title of Collection: HEAL Program: Physician's Certification of Borrower's Total and Permanent Disability. OMB Control Number: 1845-0124. Type of Review: An extension of an existing information collection. Respondents/Affected Public: State, Local, and Tribal Governments; Private Sector. Total Estimated Number of Annual Responses: 70. Total Estimated Number of Annual Burden Hours: 18. Abstract: This is a request for

  2. TYPES OF COMPLIANCE REQUIREMENTS: CFDA Number Program Title

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Number Program Title Activities Allowed or Unallowed Allowable Costs/Cost Principles Cash Management Davis Bacon Act Eligibility Equipment and Real Property Management Matching, Level of Effort, Earmarking Period of Availability of Federal Funds Procurement/ Suspension/ Debarment Program Income Real Property Acquisition/ Relocation Reporting Subrecipient Monitoring NEPA National Historic Preservation Act Special Tests and Provisions 81.036 Inventions and Innovations Yes Yes Yes Yes Yes Yes Yes

  3. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 1: Title II design report

    SciTech Connect

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 1 provides a comprehensive narrative description of the proposed facility and systems, the basis for each of the systems design, and the engineering assessments that were performed to support the technical basis of the Title II design. The intent of the system description presented is to provide WHC an understanding of the facilities and equipment provided and the A/E`s perspective on how these systems will operate.

  4. Optimizing electric utility air toxics compliance with other titles of the Clean Air Act

    SciTech Connect

    Loeb, A.P.; South, D.W.

    1993-12-31

    This paper provides an overview of regulatory issues under Title III of the Clean Air Act Amendments that could affect electric utilities. Title III contains provisions relating to hazardous air pollutants (HAPs) and provides special treatment for electric utilities. Generally, this discussion documents that if utility toxic emissions are regulated, one of the chief difficulties confronting utilities will be the lack of coordination between Title III and other titles of the Act. The paper concludes that if the US Environmental Protection Agency (EPA) determines that regulation of utility HAPs is warranted under Title III, savings can be realized from flexible compliance treatment.

  5. U.S. Department of Energy Office of Legacy Management 2015 UMTRCA Title I

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Title II Disposal Sites Reports Available | Department of Energy U.S. Department of Energy Office of Legacy Management 2015 UMTRCA Title I and Title II Disposal Sites Reports Available U.S. Department of Energy Office of Legacy Management 2015 UMTRCA Title I and Title II Disposal Sites Reports Available June 6, 2016 - 6:22pm Addthis News Contacts Rich Bush, DOE LM UMTRCA Program Lead; (970) 248-6073; richard.bush@lm.doe.gov Bob Darr, Navarro Public Affairs; (720) 377-9672;

  6. Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings

    SciTech Connect

    Bloomfield, C.

    1995-12-31

    Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

  7. Title I implementation: Status report on nonattainment areas

    SciTech Connect

    Kenkeremath, L.D.; Snyder, T.C.

    1993-01-01

    Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA's new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency's (EPA's) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO[sub x]) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO[sub x] to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO[sub x] control strategy. The NO[sub x] emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO[sub x] control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

  8. Title I implementation: Status report on nonattainment areas

    SciTech Connect

    Kenkeremath, L.D.; Snyder, T.C.

    1993-01-01

    Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA`s new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency`s (EPA`s) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO{sub x}) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO{sub x} to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO{sub x} control strategy. The NO{sub x} emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO{sub x} control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

  9. Clean Air Act Title V: Knocking on your door

    SciTech Connect

    Hosford, R.B. )

    1993-01-15

    The Clean Air Act Amendments of 1990 made several significant changes in the clean air program. One of the key elements of the Amendments was the inclusion of an operating permit program in Title V. The purpose of the program is to establish a central point for tracking all applicable air quality requirements for every source required to obtain a permit. This article provides a brief description of the most significant provisions. In addition, the subject of permit modification is discussed in some detail.

  10. MENTOR QUESTIONNAIRE Name: Title: Email: Office Phone Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    MENTOR QUESTIONNAIRE Name: Title: Email: Office Phone Number: Office Address: is interested in this program because: Are you willing to act as a mentor for ? Yes No Expectations of the Mentoring Program How long? 6-months minimum commitment. Are you willing to commit to the 6-months minimum timeframe? Yes No How much time? You decide with your mentee; 1-4 hours/month is recommended. Please return completed form to Ames Lab Human Resources, 105 TASF. Are you willing to commit 1-4 hours per month

  11. Poster Title LA-UR Number Author(s) Thumbnail

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Water Individual Permit Posters 1 December 4, 2013 Poster Title LA-UR Number Author(s) Thumbnail Contributions of Nitrite-Nitrogen, Nitrate-Nitrogen, and Orthophosphate Levels in Surface Water Runoff from Wildfire Severity Classes from the Las Conchas Fire in the Jemez Mountains, New Mexico, 2012 July 2013 Student Symposium LA-UR-13-25819 Anita Lavadie Solid and Dissolved Phase Aluminum in Storm Water Runoff on the Pajarito Plateau July 2013 Student Symposium LA-UR-13-25505 Daria Cuthbertson

  12. Credit-Based Interest Rate Spread for Title XVII

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Credit-Based Interest Rate Spread for Title XVII The Loan Programs Office (LPO) is announcing that a credit-based interest rate spread will be added to certain loans that are issued by the Federal Financing Bank (FFB) and backed by a 100 percent loan guarantee issued by the Department of Energy. Loans issued by the FFB will carry an interest rate calculated by the following formula: Interest Rate = Applicable U.S. Treasury Rate for the tenor of the loan + 37.5 basis points (bps) FFB liquidity

  13. High schools compete for Nevada Science Bowl title | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) High schools compete for Nevada Science Bowl title Monday, February 15, 2016 - 3:37pm NNSA Blog The winner of the 2016 Nevada Science Bowl was the team from Reno's Davidson Academy of Nevada. From left: Matthew Bauer, Rinik Kumar, Haydn Bradstreet, Paolo Adajar, Eric Liu, and Coach Brett Guisti. While sports fans across the U.S. prepared for last weekend's game day, 160 Nevada high school students went head-to-head in a different kind of competition.

  14. An alternate compliance strategy for Title III regulations

    SciTech Connect

    Brothers, H.S.

    1996-12-31

    The EPA is attempting to incorporate pollution prevention into the Title III regulations and an example of their efforts is evident in the Hazardous Organic NESHAP (HON) rule. The HON rule includes provisions that partially encourage pollution prevention, but compliance for most facilities relies on implementation of reference control technologies (RCT). This paper proposes an Alternative Control Strategy (ACS) for the HON rule that incorporates pollution prevention and flexibility, while encouraging innovative technology. The ACS is defined by converting existing language in the HON rule into a performance based standard permitting regulated facilities to design compliance programs to meet the required hazardous air pollutant (HAP) emission reduction. The ACS meets all emission reduction and other requirements of the HON rule. The ACS was applied to an example facility and assessed using three evaluation methods. The ACS program reduced risk to the local community to a greater extent than the comparable RCT compliance program at a comparable total cost. The ACS concept is applicable to similar Title III and many other regulations, and provides a major step in the progression of moving regulations from the traditional end-of-pipe treatment philosophy to pollution prevention performance based standards. 5 refs., 3 tabs.

  15. Format and Content Guide for Title 40 CFR 191 and Title 40 CFR 268.6 Compliance Reports

    SciTech Connect

    Not Available

    1994-05-01

    This Format and Content Guide was followed in preparing the WIPP Compliance Status Report submitted in March 1994 and will be used for the compliance documents scheduled for submittal in the Spring of 1995. The Compliance Status Report was issued to stakeholders in March 1994 and describes the status of associated activities on compliance with the requirements in Title 40 CFR 268.6 and Title 40 CFR 191. The Compliance Status Report focuses on (1) the information required for a demonstration of compliance, (2) preliminary results, (3) the areas of the WIPP program that are either not currently mature enough, or do not provide adequate margin for a demonstration of compliance, and (4) the areas of the WIPP program that will be focused upon to provide the remaining necessary information for use in the 1995 compliance demonstration reports. The Compliance Status Report is not intended to constitute a statement of compliance or a demonstration of compliance. It is intended to report the status of progress made to date in project efforts to achieve the required level of data/information necessary for the required compliance demonstrations. Comments on the Compliance Status Report from stakeholders will likely result in a modified Format and Content Guide, as will the promulgation of the EPA`s Compliance Criteria for WIPP (40 CFR 194).

  16. Interested Parties - Memo on Halting Title XVII Nuclear Loan Guarantees in

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    MD, SC, GA, and TX | Department of Energy Interested Parties - Memo on Halting Title XVII Nuclear Loan Guarantees in MD, SC, GA, and TX Interested Parties - Memo on Halting Title XVII Nuclear Loan Guarantees in MD, SC, GA, and TX Halting_Title_XVII_Nuclear_Loan_Guarantees.pdf (67.7 KB) More Documents & Publications July 2010, Status and Outlook for Nuclear Energy In the United States Quarterly Nuclear Deployment Scorecard - October 2012 Quarterly Nuclear Deployment Scorecard - April 2014

  17. Response to Request for Information titled "Addressing Policy and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Logistical Challenges to Smart Grid Implementation" | Department of Energy to Request for Information titled "Addressing Policy and Logistical Challenges to Smart Grid Implementation" Response to Request for Information titled "Addressing Policy and Logistical Challenges to Smart Grid Implementation" Response to Request for Information titled "Addressing Policy and Logistical Challenges to Smart Grid Implementation." urrent smart grid initiatives are

  18. TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    OF ELECTRICITY GRID | Department of Energy TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID Energy Independence and Security Act of 2007 - SEC. 1301 - 1308 TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID (125.69 KB) More Documents & Publications 2009 Smart Grid System Report (July 2009) Energy Policy

  19. Determining enforceability of air quality requirements for the Title V permit

    SciTech Connect

    Raasch, C.W.; Trinkle, J.A.; Radocha, D.

    1997-12-31

    The focus of this paper is two-fold: (1) Outline the importance, from the perspective of the regulated source, of the identification of state-only enforceable requirements versus federally enforceable requirements in a Title V permit; (2) Describe how to determine the enforceability of requirements as part of a Title V permitting study, including available tools. Contained also in this paper is a case study of enforceability determinations of requirements included in the Title V permit for an integrated pulp and paper mill. The case study is presented to provide an impetus for sources to thoroughly review their draft Title V permits to ensure correct determinations of enforceability.

  20. Title 49 United States Code (USC) Section 40118 01/03/05 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Title 49 United States Code (USC) Section 40118 010305 (20.07 KB) More Documents & Publications Appendix B Patent and copyright cases GuidanceApplicationFederalVacanciesRefor...

  1. Idaho Statutes Title 61 Chapter 1 61-118 | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 61 Chapter 1 61-118Legal Abstract Public Utility Regulation - Public Utilities Law - Application and Definitions - Electric Plant Published NA Year Signed or Took Effect...

  2. Idaho Statutes Title 61 Chapter 1 61-129 | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 61 Chapter 1 61-129Legal Abstract Public Utility Regulation - Public Utilities Law - Application and Definitions - Public Utility Published NA Year Signed or Took Effect...

  3. Title 11 Alaska Administrative Code 82.400 - 82.475 Competitive...

    OpenEI (Open Energy Information) [EERE & EIA]

    Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code 82.400 - 82.475 Competitive BiddingLegal Abstract Implementing...

  4. ESF (exploratory shaft facility) title 2 90% design review findings report

    SciTech Connect

    Not Available

    1988-01-01

    The document includes facilities, systems, component design along with specifications and drawings at the Title II design level. This is part of technology transfer activity.

  5. Categorical Excluslon DeterminatIon 11'orn1 Project Title: Bear...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DeterminatIon 11'orn1 ...... Project Title: Bear Creek Road Deferred Maintenance Reduction Project (4550) Program or Program Office: Y-12 Site Office Oak Ridge Tennessee Project...

  6. Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling...

    Energy Saver

    Mirant's Potomac River Power Plant" Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Docket No. ...

  7. Title 20 AAC 25.705-.740 Geothermal Resources | Open Energy Informatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    ResourcesLegal Abstract Title 20 of the Alaska Administrative Code Chapter 25, Alaska Oil and Gas Conservation Commission Article 7, Geothermal Resources, Sections 705-740....

  8. Title 44 Part 60 Criteria for Land Management and Use | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 44 Part 60 Criteria for Land Management and UseLegal Abstract Sets forth the criteria by which the Federal Insurance Administrator will determine the adequacy...

  9. Federal operating permits program under Title V of the Clean Air Act. Final report

    SciTech Connect

    1996-08-01

    ;Table of Contents: Introduction; Transition Between Parts 70 and 71; Title V Obligations and Applicability; Synthetic Minors, Potential to Emit, and Transition Policy; Permit Application Step and Content; Flexible Permit Approaches; Hazardous Air Pollution Program Requirements for Title V; Information Sources; Appendix A. EPA Memoranda; and Appendix B. Seminar Overhead Transparencies.

  10. Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300

    SciTech Connect

    MacDonnell, B.A.; Obenauf, K.S.

    1996-08-01

    The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline.

  11. 3D Printed Tool for Building Aircraft Achieves Guinness World Records Title

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy 3D Printed Tool for Building Aircraft Achieves Guinness World Records Title 3D Printed Tool for Building Aircraft Achieves Guinness World Records Title August 30, 2016 - 2:07pm Addthis Official measurement of the 3D printed trim tool co-developed by Oak Ridge National Laboratory and The Boeing Company exceeded the required minimum size to achieve the Guinness World Records title of largest solid 3D printed item. Official measurement of the 3D printed trim tool

  12. Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    with the coupled THM code FEHM | Department of Energy Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM presentation at the April 2013 peer review meeting held in Denver, Colorado. kelkar_peer2013.pdf (496.77 KB) More

  13. Implementation of Division D, Titles III and V, and Division E, Title VII of the Consolidated Appropriations Act, 2014, Pub. L. No. 113-76.

    Energy.gov [DOE]

    Acquisition Letter (AL) 2014-04 and Financial Assistance Letter (FAL) 2014-01 have been revised to remove language from Section 502 that was not carried forward from previous appropriation acts. FAL 2014-01 was also revised to update the Corporate Felony Conviction and Federal Tax Liability Representations and Assurances and the Conference Spending term. As a result, AL 2014-04 (Rev 1) and FAL 2014-01 (Rev 1) provide implementing instructions and guidance for Division D, Titles III and V, and Division E, Title VII of the Consolidated Appropriations Act, 2014, Pub. L. No. 113-76.

  14. Title 33 CFR 325 Appendix B Processing of Department of the Army...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 Appendix B Processing of Department of the Army Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 33 CFR 325...

  15. Final Scientific/Technical Report Grant title: Use of ARM Measurements...

    Office of Scientific and Technical Information (OSTI)

    Final ScientificTechnical Report Grant title: Use of ARM Measurements of Spectral Zenith Radiance for Better Understanding of 3D Cloud-Radiation Processes and Aerosol-Cloud ...

  16. Title 43 CFR 1610.2 Public Participation | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    2 Public Participation Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610.2 Public...

  17. Title 7 CFR 1.601 et seq. Conditions in FERC Hydropower Licenses...

    OpenEI (Open Energy Information) [EERE & EIA]

    7 CFR 1.601 et seq. Conditions in FERC Hydropower Licenses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 7 CFR...

  18. Title 7 CFR 1b National Environmental Policy Act | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    b National Environmental Policy Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 7 CFR 1b National Environmental...

  19. Title 43 CFR 1601.0-6 Environmental Impact Statement Policy ...

    OpenEI (Open Energy Information) [EERE & EIA]

    .0-6 Environmental Impact Statement Policy Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  20. Title 14 CFR 77 Safe, Efficient Use, and Preservation of the...

    OpenEI (Open Energy Information) [EERE & EIA]

    77 - Safe, Efficient Use, and Preservation of the Navigable Airspace under Title 14: Aeronautics and Space of the U.S. Code of Federal Regulations, current as of April 14, 2014....

  1. Title 10 Chapter 41 Regulation of Stream Flow | Open Energy Informatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    41 Regulation of Stream Flow Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 10 Chapter 41 Regulation of Stream...

  2. Title 50 CFR 600 Magnuson-Stevens Act Provisions | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    50 CFR 600 Magnuson-Stevens Act Provisions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 50 CFR 600...

  3. Title 43 CFR 2800: Rights-of-Way Under the Federal Land Policy...

    OpenEI (Open Energy Information) [EERE & EIA]

    0: Rights-of-Way Under the Federal Land Policy Management Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 43 CFR...

  4. Title 18 CFR 385 Rules of Practice and Procedure | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    and ProcedureLegal Abstract Part 385 Rules of Practice and Procedure under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  5. Title 18 CFR 292 Regulations Under Sections 201 and 210 of the...

    OpenEI (Open Energy Information) [EERE & EIA]

    Act of 1978 With Regard to Small Power Production and Cogeneration, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  6. Title 16 USC 796 Regulation of the Development of Water Power...

    OpenEI (Open Energy Information) [EERE & EIA]

    6 Regulation of the Development of Water Power and Resources Definitions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16...

  7. Title 43 CFR Part 45 Conditions and Prescriptions in FERC Hydropower...

    OpenEI (Open Energy Information) [EERE & EIA]

    Part 45 Conditions and Prescriptions in FERC Hydropower Licenses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 43...

  8. Idaho Statutes Title 61 Chapter 5 61-526 | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    61-526 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Idaho Statutes Title 61 Chapter 5 61-526Legal Abstract Public Utility...

  9. Title 43 CFR 1610.5-3 Conformity and Implementation | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610.5-3 Conformity and ImplementationLegal Abstract 1610.5-3 Conformity and implementation...

  10. Idaho Statutes Title 61 Chapter 17 61-1705-5 | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    17 61-1705-5 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Idaho Statutes Title 61 Chapter 17 61-1705-5Legal Abstract...

  11. Title 43 CFR 1610.5-5 Amendment | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    5 Amendment Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610.5-5 AmendmentLegal Abstract...

  12. Title 43 CFR 1610.4-5 Formulation of Alternatives | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 Formulation of Alternatives Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610.4-5...

  13. Idaho Statutes Title 61 Chapter 5 61-541 | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    LibraryAdd to library Legal Document- StatuteStatute: Idaho Statutes Title 61 Chapter 5 61-541Legal Published NA Year Signed or Took Effect 2009 Legal Citation Not provided...

  14. Idaho Statutes Title 61 Chapter 5 61-516 | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    61-516 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Idaho Statutes Title 61 Chapter 5 61-516Legal Abstract Public Utility...

  15. Title 30 Public Service Chapter 5 Section 248 | Open Energy Informatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    Public Service Chapter 5 Section 248 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 30 Public Service Chapter 5...

  16. Title 43 CFR 3204.5 How Can I Obtain a Noncompetitive Lease?...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 How Can I Obtain a Noncompetitive Lease? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  17. Title 30 Chapter 5 Powers and Duties of Department of Public...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 30 Chapter 5 Powers and Duties of Department of Public Service and Public Service Board Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  18. Title 18 CFR 4.34(i) Alternative Procedures | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    34(i) Alternative Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 4.34(i) Alternative...

  19. Title 43 CFR 3000.12 What is the Fee Schedule for Fixed Fees...

    OpenEI (Open Energy Information) [EERE & EIA]

    000.12 What is the Fee Schedule for Fixed Fees? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  20. Title 43 CFR 3206.12 What are the Minimum and Maximum Lease Sizes...

    OpenEI (Open Energy Information) [EERE & EIA]

    .12 What are the Minimum and Maximum Lease Sizes? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  1. Title 43 CFR 3203.12 What Fees Must I Pay to Nominate Lands?...

    OpenEI (Open Energy Information) [EERE & EIA]

    .12 What Fees Must I Pay to Nominate Lands? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  2. Title 18 CFR Subpart E Application for License for Major Unconstructed...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 18 CFR Subpart E Application for License for Major Unconstructed Project and Major Modified Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

  3. Title 40 CFR 260-270 Hazardous Waste | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    -270 Hazardous Waste Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 CFR 260-270 Hazardous WasteLegal Abstract...

  4. Title 46 Alaska Statutes Section 03.302 Hazardous Waste Permit...

    OpenEI (Open Energy Information) [EERE & EIA]

    02 Hazardous Waste Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 46 Alaska Statutes Section 03.302 Hazardous Waste...

  5. Results of readiness review for start of Title II Design of ESF in salt

    SciTech Connect

    Not Available

    1986-04-15

    The Readiness Review Board recommends that the ESF Title II Design be initiated after approval of revised Functional Design Criteria for Title II design. This review was conducted assuming a Deaf Smith location for ESF. Seventy-four open items and eight technical holds were identified during the Readiness Review that must be addressed and resolved to ensure successful completion of the ESF Title II Design. These items include definition and approval of surface based, EDH, and subsurface testing requirements; development of an approved OCRWM/SRPO licensing position for the ESF; and acquisition and availability of site-specific confirmatory data. A Risk Assessment should be conducted to define corrective action data and technical, cost and schedule impacts and associated program risks of continuation of Title II design activities beyond those dates.

  6. ARS Title 49-200 Water Quality Control | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    -200 Water Quality Control Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: ARS Title 49-200 Water Quality ControlLegal Abstract...

  7. Title 10 V.S.A. Chapter 47 Water Pollution Control | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    V.S.A. Chapter 47 Water Pollution Control Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 10 V.S.A. Chapter 47 Water...

  8. Title 40 C.F.R. 1500 - Council on Environmental Quality | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    C.F.R. 1500 - Council on Environmental Quality Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 C.F.R. 1500 -...

  9. Title 40 CFR 1508 Terminology and Index for the Council on Environment...

    OpenEI (Open Energy Information) [EERE & EIA]

    Terminology and Index for the Council on Environmental Quality Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40...

  10. Title 40 CFR 1500-1508 Council on Environmental Quality | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    0-1508 Council on Environmental Quality Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 CFR 1500-1508 Council on...

  11. Title 18 CFR 4.95 Surrender of Exemption | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 4.95 Surrender of ExemptionLegal Abstract Provision for those that are voluntarily...

  12. Title 43 CFR 1610.4-1 Identification of Issues | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610.4-1 Identification of IssuesLegal Abstract 1610.4-1 Identification of issues...

  13. Title 43 CFR 1610.4-2 Development of Planning Criteria | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610.4-2 Development of Planning CriteriaLegal Abstract 1610.4-2 Development of...

  14. Title 18 CFR 4.200 et seq. Application for Amendment of License...

    OpenEI (Open Energy Information) [EERE & EIA]

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 4.200 et seq. Application for Amendment of LicenseLegal Abstract Regulations providing for...

  15. Title 40 CFR 1503.4 Response to Comments | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    .4 Response to Comments Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 1503.4 Response to...

  16. Title 40 CFR 122.26 Storm water discharges | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    122.26 Storm water discharges Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 CFR 122.26 Storm water...

  17. Title 32 CFR 651 Environmental Analysis of Army Actions (AR 200...

    OpenEI (Open Energy Information) [EERE & EIA]

    of Army Actions (AR 200-2) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 32 CFR 651...

  18. Title 16 Alaska Statutes Chapter 5 Fish and Game | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Page Edit with form History Title 16 Alaska Statutes Chapter 5 Fish and Game Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute:...

  19. Title 5 Alaska Administrative Code Section 95.011 Waters Important...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 5 Alaska Administrative Code Section 95.011 Waters Important to Anadromous Fish Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  20. Title 43 CFR 3214 Personal and Surety Bonds | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    14 Personal and Surety Bonds Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 3214 Personal and...

  1. Title 43 CFR 1610.4-6 Estimation of Effects of Alternatives ...

    OpenEI (Open Energy Information) [EERE & EIA]

    4-6 Estimation of Effects of Alternatives Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  2. Title 40 CFR 1502.14 Alternatives Including the Proposed Action...

    OpenEI (Open Energy Information) [EERE & EIA]

    .14 Alternatives Including the Proposed Action Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR...

  3. Title 40 CFR 231 Section 404(c) Procedures | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    1 Section 404(c) Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 40 CFR 231 Section 404(c) ProceduresLegal...

  4. Title 16 USC 825l Review of Orders | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 16 USC 825l Review of OrdersLegal Abstract These statutes outline the procedures for requesting a rehearing on an order of the Federal Energy Regulatory Commission....

  5. EA-1175: Proposed Title Transfer of East Tennessee Technology Park Land and Facilities, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to transfer the title of unneeded DOE real property located at the U.S. Department of Energy East Tennessee Technology Park (ETTP) in...

  6. Title 43 CFR 3620 Free Use of Petrified Wood | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    620 Free Use of Petrified Wood Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 3620 Free Use...

  7. Policy Flash 2013-53 Implementation of Division F, Title I, II...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Questions concerning conference spending, should be directed to Jason Taylor at ...

  8. Title 25 CFR 169 Rights-of-Way Over Indian Lands | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    9 Rights-of-Way Over Indian Lands Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 25 CFR 169...

  9. Title 40 CFR 1502.9 Draft, Final, and Supplemental Statements...

    OpenEI (Open Energy Information) [EERE & EIA]

    9 Draft, Final, and Supplemental Statements Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR...

  10. Title 40 CFR 1506.1 Limitations On Actions During NEPA Process...

    OpenEI (Open Energy Information) [EERE & EIA]

    .1 Limitations On Actions During NEPA Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR...

  11. Title 40 CFR 1506 Other Requirements of NEPA | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Other Requirements of NEPA Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 1506 Other...

  12. Title 40 CFR 1501 NEPA and Agency Planning | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    1 NEPA and Agency Planning Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 1501 NEPA and...

  13. Title 33 CFR 323 Permits for Discharges of Dredged or Fill Material...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 33 CFR 323 Permits for Discharges of Dredged or Fill Material Into Waters of the United States Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

  14. Title 20 Alaska Administrative Code Section 25.112 Oil & Gas...

    OpenEI (Open Energy Information) [EERE & EIA]

    12 Oil & Gas Well Plugging Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 20 Alaska Administrative Code...

  15. Title 30 USC 226 Lease of Oil and Gas Lands | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    226 Lease of Oil and Gas Lands Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 30 USC 226 Lease of Oil and Gas LandsLegal...

  16. Title 20 Alaska Administrative Code Section 25.105 Oil & Gas...

    OpenEI (Open Energy Information) [EERE & EIA]

    Alaska Administrative Code Section 25.105 Oil & Gas Well Abandonment Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title...

  17. TNRC, Title 2, Chapter 52.186 Oil and Gas | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    2, Chapter 52.186 Oil and Gas Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: TNRC, Title 2, Chapter 52.186 Oil and GasLegal...

  18. U.S. Department of Energy 2013 UMTRCA Title I Annual Report

    Office of Legacy Management (LM)

    ...AL62350-60F, Rev. 1, U.S. Department of Energy DOE, September 1994) and in procedures ... Title I Annual Report U.S. Department of Energy Shiprock, New Mexico March 2014 Page 16-2 ...

  19. U.S. Department of Energy 2014 UMTRCA Title I Annual Report

    Office of Legacy Management (LM)

    ...AL62350-60F, Rev. 1, U.S. Department of Energy DOE, September 1994) and in procedures ... Title I Annual Report U.S. Department of Energy Shiprock, New Mexico March 2015 Page 16-2 ...

  20. Title 16 USC 703 Migratory Bird Treaty Act of 1918 | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    703 Migratory Bird Treaty Act of 1918 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 703 Migratory Bird Treaty Act...

  1. Title 43 CFR 1610.3-1 Coordination of Planning Efforts | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 43 CFR 1610.3-1 Coordination of Planning Efforts Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation:...

  2. Title: Freedom of Information Request DIR DIV NAME MGR DEP AMA

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Title: Freedom of Information Request DIR DIV NAME MGR DEP AMA FMD HRM PRO AMCP AMMS ISI PIC SES DIR DIV NAME SSD AMRC AMSE EMD OOD SED OCC OCE Riehle, Dorothy (Actionee) ORP PNSO...

  3. Determining the PTE and formulating a Title V permitting strategy for a bulk gasoline terminal

    SciTech Connect

    Wilder, A.A.; Turner, R.S.

    1996-12-31

    Bulk gasoline terminals may take operational restrictions and maintain operational flexibility while avoiding requirements of Title III and Title V of the Clean Air Act Amendments (CAA-A). Title V establishes a federally enforceable renewable operating permit program for major sources. Title III regulates Hazardous Air Pollutants (HAPs) to reduce emissions from all sources to a degree sufficient to protect the public by using Maximum Achievable Control Technology (MACT) standards achieved in practice within the industry. Volatile Organic Compounds (VOCs) and HAPs are emitted from storage tanks, loading operations, and components at gasoline terminals. To calculate the potential to emit (PTE) and assess regulation applicability, maximum facility throughputs should be determined by physical limitations of the loadrack. Loadrack throughputs can be correlated to storage tanks throughputs based on type of tank and the highest volatility product stored in that tank. Component emissions should be based on continuous service of the highest volatility product. To avoid recordkeeping and reporting requirements of Title III and/or Title V, VOC and HAP emissions may be restricted to below thresholds determined by the region`s ozone attainment status by limiting loadrack throughput and/or by meeting higher control equipment efficiencies. However, careful consideration must be given to operational flexibility and the potential future expansion of the facility.

  4. Inclusion of cool roofs in nonresidential Title 24 prescriptive requirements

    SciTech Connect

    Levinson, Ronnen; Akbari, Hashem; Konopacki, Steve; Bretz, Sarah

    2002-12-15

    Roofs that have high solar reflectance (high ability to reflect sunlight) and high thermal emittance (high ability to radiate heat) tend to stay cool in the sun. The same is true of low-emittance roofs with exceptionally high solar reflectance. Substituting a cool roof for a noncool roof tends to decrease cooling electricity use, cooling power demand, and cooling-equipment capacity requirements, while slightly increasing heating energy consumption. Cool roofs can also lower the ambient air temperature in summer, slowing ozone formation and increasing human comfort. DOE-2.1E building energy simulations indicate that use of a cool roofing material on a prototypical California nonresidential building with a low-sloped roof yields average annual cooling energy savings of approximately 300 kWh/1000 ft2 [3.2 kWh/m2], average annual natural gas deficits of 4.9 therm/1000 ft2 [5.6 MJ/m2], average source energy savings of 2.6 MBTU/1000 ft2 [30 MJ/m2], and average peak power demand savings of 0. 19 kW/1000 ft2 [2.1 W/m2]. The 15-year net present value (NPV) of energy savings averages $450/1000 ft2 [$4.90/m2] with time dependent valuation (TDV), and $370/1000 ft2 [$4.00/m2] without TDV. When cost savings from downsizing cooling equipment are included, the average total savings (15-year NPV + equipment savings) rises to $550/1000 ft2 [$5.90/m2] with TDV, and to $470/1000 ft2 [$5.00/m2] without TDV. Total savings range from 0.18 to 0.77 $/ft2 [1.90 to 8.30 $/m2] with TDV, and from 0.16 to 0.66 $/ft2 [1.70 to 7.10 $/m2] without TDV, across California's 16 climate zones. The typical cost premium for a cool roof is 0.00 to 0.20 $/ft2 [0.00 to 2.20 $/m2]. Cool roofs with premiums up to $0.20/ft2 [$2.20/m2] are expected to be cost effective in climate zones 2 through 16; those with premiums not exceeding $0.18/ft2 [$1.90/m2] are expected to be also cost effective in climate zone 1. Hence, this study recommends that the year-2005 California building energy efficiency code (Title 24

  5. Inclusion of cool roofs in nonresidential Title 24 prescriptiverequirements

    SciTech Connect

    Levinson, Ronnen; Akbari, Hashem; Konopacki, Steve; Bretz, Sarah

    2003-07-01

    Roofs that have high solar reflectance (high ability toreflect sunlight) and high thermal emittance (high ability to radiateheat) tend to stay cool in the sun. The same is true of low-emittanceroofs with exceptionally high solar reflectance. Substituting a cool rooffor a non-cool roof tends to decrease cooling electricity use, coolingpower demand, and cooling-equipment capacity requirements, while slightlyincreasing heating energy consumption. Cool roofs can also lower citywideambient air temperature in summer, slowing ozone formation and increasinghuman comfort.DOE-2.1E building energy simulations indicate that use of acool roofing material on a prototypical California nonresidential (NR)building with a low-sloped roof yields average annual cooling energysavings of approximately 3.2 kW h/m2 (300 kW h/1000 ft2), average annualnatural gas deficits of 5.6 MJ/m2 (4.9 therm/1000 ft2), average annualsource energy savings of 30 MJ/m2 (2.6 MBTU/1000 ft2), and average peakpower demand savings of 2.1 W/m2 (0.19 kW/1000 ft2). The 15-year netpresent value (NPV) of energy savings averages $4.90/m2 ($450/1000 ft2)with time-dependent valuation (TDV), and $4.00/m2 ($370/1000 ft2) withoutTDV. When cost savings from downsizing cooling equipment are included,the average total savings (15-year NPV+equipment savings) rises to$5.90/m2 ($550/1000 ft2) with TDV, and to $5.00/m2 ($470/1000 ft2)without TDV.Total savings range from 1.90 to 8.30 $/m2 (0.18 0.77 $/ft2)with TDV, and from 1.70 to 7.10 $/m2 (0.16 0.66 $/ft2) without TDV,across California's 16 climate zones. The typical cost premium for a coolroof is 0.00 2.20 $/m2 (0.00 0.20 $/ft2). Cool roofs with premiums up to$2.20/m2 ($0.20/ft2) are expected to be cost effective in climate zones 216; those with premiums not exceeding $1.90/m2 ($0.18/ft2) are expectedto be also cost effective in climate zone 1. Hence, this study recommendsthat the year-2005 California building energy efficiency code (Title 24,Part 6 of the California Code of

  6. Trials and tribulations implementing the Clean Air Act Title V in fourteen air districts

    SciTech Connect

    Moore, C.

    1998-12-31

    Santa Fe pacific Pipeline Partners, L.P. (SFPP) is a refined petroleum pipeline operating in six states in the western United States. Sixteen terminals are subject to the Title V permit to operate requirements. There are many obstacles to overcome, not only when preparing applications for Title V operating permits, but in the implementation phase of the project as well. Each Air District has its own set of rules and regulations that must be adhered to in preparing the application. For example, some districts required the insignificant sources to be documented and included in compliance plans and some do not. The format required for the application varies from stringent forms that must be completed to no forms at all. In preparing the Title V application for SFPP, the author quickly realized if this confusion was transferred to the implementation phase, compliance would be a failure. Therefore, early on the environmental manager instituted a training program. Beginning with a pilot program in one district the author began training managers and supervisors. This program quickly was expanded to include senior vice presidents and technicians. This training session was a one hour of general overview to visually describe how the Title V process would affect the facilities. As a result of this training, virtually every employee became familiar with how the Title V program was affecting the facilities. Engineering and Customer Service is instructed to notify the manager of any and every new project so it could undergo a review to determine if it affected a Title V facility. The field acts as a check of the system. Any change or modification at any facility is immediately under scrutiny for Title V implications. Another obstacle to overcome is to help the facility deal with something that is new and basically a different way of operating.

  7. News Item

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7, 2016 Time: 11:00 am Speaker: Christopher Kemper Ober, Cornell University Title: Molecular Foundry/ALS Joint Seminar: Fifty Years of Moore's Law - Towards Fabrication at Molecular Dimensions Location: Building 66 Auditorium Abstract: In the last half century, critical dimensions in electronic devices have been reduced from micrometers to a few tens of nanometers on a pace that has been consistent for decades. Lithography now touches many areas of science ranging from electronics to biology and

  8. Overview of the effect of Title III of the 1990 Clean Air Act Amendments on the natural gas industry

    SciTech Connect

    Child, C.J.

    1995-12-31

    The regulation of hazardous air pollutants by Title III of the Clean Air Act Amendments of 1990 has a potential wide-ranging impact for the natural gas industry. Title III includes a list of 189 hazardous air pollutants (HAPs) which are targeted for reduction. Under Title III, HAP emissions from major sources will be reduced by the implementation of maximum achievable control technology (MACT) standards. If the source is defined as a major source, it must also comply with Title V (operating permit) and Title VII (enhanced monitoring) requirements. This presentation will review Title III`s effect on the natural gas industry by discussing the regulatory requirements and schedules associated with MACT as well as the control technology options available for affected sources.

  9. Title list of documents made publicly available, May 1--31, 1988

    SciTech Connect

    Not Available

    1988-07-01

    The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. As used here, docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. The docketed information contained in the Title List includes the information formerly issued through the Department of Energy publication Power Reactor Docket Information, last published in January 1979. Microfiche of the docketed information listed in the Title List is available for sale on a subscription basis from the National Technical Information Service (NTIS).

  10. Title List of Documents Made Publicly Available, October 1-31, 1984. Volume 6, No. 10

    SciTech Connect

    Not Available

    1984-01-01

    The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. The docketed information contained in the Title List includes the information formerly issued through the Department of Energy publication Power Reactor Docket Information, last published in January 1979. Microfiche of the docketed information listed in the Title List is available for sale on a subscription basis from the National Technical Infomation Service (NTIS).

  11. Title list of documents made publicly available, July 1--31, 1989

    SciTech Connect

    Not Available

    1989-10-01

    The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission. This information includes docketed material associated with civilian nuclear power plants and other uses of radioactive materials and nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. As used here, docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. The docketed information contained in the Title List includes the information formerly issued through the Department of Energy publication Power Reactor Docket Information. Microfiche of the docketed information listed in the Title List is available for sale on a subscription basis from the National Technical Information Service (NTIS).

  12. Title list of documents made publicly available, March 1--31, 1989

    SciTech Connect

    Not Available

    1989-05-01

    The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. As used here, docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. The docketed information contained in the Title List includes the information formerly issued through the Department of Energy publication Power Reactor Docket Information, last published in January 1979. Microfiche of the docketed information listed in the Title List is available for sale on a subscription basis from the National Technical Information Service (NTIS).

  13. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    SciTech Connect

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclear Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.

  14. Title list of documents made publicly available, April 1--30, 1991

    SciTech Connect

    Not Available

    1991-06-01

    The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes docketed material associated with civilian nuclear power plants and other uses of radioactive materials and nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. The docketed information contained in the Title List includes the information formerly issued through the Department of Energy publication Power Reactor Docket Information, last published in January 1979.

  15. The Ohio State University Defends Title, Wins Second Year of EcoCAR 3

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Competition | Department of Energy Defends Title, Wins Second Year of EcoCAR 3 Competition The Ohio State University Defends Title, Wins Second Year of EcoCAR 3 Competition May 27, 2016 - 4:06pm Addthis The Ohio State University won year two of the four-year EcoCAR 3 Competition. | Photo by Advanced Vehicle Technology Competition The Ohio State University won year two of the four-year EcoCAR 3 Competition. | Photo by Advanced Vehicle Technology Competition NEWS MEDIA CONTACT (202) 586-4940

  16. Title 10, Chapter 641 Pertaining to Naval Petroleum Reserves in U.S.C. |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Title 10, Chapter 641 Pertaining to Naval Petroleum Reserves in U.S.C. Title 10, Chapter 641 Pertaining to Naval Petroleum Reserves in U.S.C. CITE: 10USC7420 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7421 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7422 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7423 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7424 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7425 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE:

  17. Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Analysis of Downwash from Mirant's Potomac River Power Plant" | Department of Energy Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Docket No. EO-05-01. Sullivan Environmental Consulting, Inc. has prepared a review of the "Update 1 to: A Dispersion

  18. EIS-0409: EPA Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    Kemper County Integrated Gasification Combined-Cycle (IGCC) Project, Mississippi Notice of Availability for the Draft Environmental Impact Statement Kemper County Integrated...

  19. Overview of the Clean Air Act Title V operating permit program

    SciTech Connect

    Williamson, T.L. Sr.

    1996-12-31

    A review of the Clean Air Act Title V Operating Permit Program is presented. Information is presented on applicability, hazardous air pollutants, major sources of pollutants, conventional pollutants, counting fugitive emissions at a source, determining potential to emit, managing potential to emit; permit applications, and streamlining application completeness.

  20. Design review completion report for Exploratory Shaft Facility: Title I design

    SciTech Connect

    Comar, M.M.

    1986-03-13

    This design review completion report is the formal documentation that concludes the design review of the ESF Title I design in accordance with PMP (05). This report contains the summary conclusion of the design review, including the responses to all design review comments identified in the earlier finding report.