National Library of Energy BETA

Sample records for type operating kv

  1. TYPE OF OPERATION

    Office of Legacy Management (LM)

    & RESIDUE 0 AECMED INVOLVEME?JT AT SITE ...----------- Control a Health Physics Protection 0 AECfMED managed operations G Little or None 0 AEUMED respansible far C ...

  2. TYPE OF OPERATION

    Office of Legacy Management (LM)

    . .' .,Ec-itkED I' NVULVEFY l- AT SITE '---------... .Control c Health Physics Protection 0 AECMED managed operations G Little or None :kf AECMED responsible for ...

  3. Development of 230-kV high-pressure, gas-filled, pipe-type cable system: Model test program phase

    SciTech Connect

    Silver, D.A. )

    1990-09-01

    The objective of this project was the development of a 230 kV high-pressure gas-filled (HPGF) pipe-type cable employing paper or laminate of paper-polypropylene-paper (PPP) insulation pressurized with N{sub 2} gas or a blend of 15% SF{sub 6}/85% N{sub 2} gas. Heretofore, HPGF pipe-type cables have been restricted to 138 kV ratings due to technical difficulties in achieving higher voltage ratings. In view of the high cost of manufacturing and testing a large number of full size cables, cable models with 2 mm (80 mils) and 2.5 mm (100 mils) wall thicknesses of insulation enclosed in a test fixture capable of withstanding a test pressure of 2070 kPa (300 psig) and high electrical stresses were employed for dissipation factor versus voltage measurements and for ac and impulse breakdown tests at rated and emergency operating temperatures. In addition, a 36 cm (14 in) full wall cable model enclosed in a pressure vessel was utilized for transient pressure response tests. The results of this investigation attest tot he technical feasibility of the design and manufacture of a 230 kV HPGF pipe-type cable employing paper or PPP insulation pressurized with 100% N{sub 2} gas or a blend of 15% SF{sub 6}/85% N{sub 2} gas for operation under normal and 100 hour emergency conditions at conductor temperatures of 85{degree} and 105{degree}C, respectively. The manufacture of a full size PPP insulated cable pressurized with a blend of 15% SF{sub 6}/85% N{sub 2} gas employing pre-impregnated PPP insulating tapes and an annular conductor based on the design stresses defined in this report is recommended for laboratory evaluation and extended life tests. 11 refs., 45 figs., 11 tabs.

  4. TYPE OF OPERATION

    Office of Legacy Management (LM)

    b RESIDUE q GOUT LECISED CONTReCTOR CONTRCICTOR -EEL ---LEeSED Control Health Physics 0 AEWMED managed operations q Little or No 0 AECMED responsible for AEWMED resp ...

  5. TYPE OF OPERATION

    Office of Legacy Management (LM)

    181 WASTE & RESIDUE q ,r . ,, A&MED I NVOLVEMENI-AT SITE I - . : Control 1 Health Physics Protection ' I, 0 AEWHED managed operations 0 Little or None 13 AEWHED responsible for ...

  6. TYPE OF OPERATION

    Office of Legacy Management (LM)

    WASTE G RESIDUE a i-CtlED INVOLVE"ENT-AT SITE -'---... Control ci Health Physics Protection 0 AECtlED managed operations c Little or None G AECMED rea' poneible for ...

  7. OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS

    SciTech Connect

    W.A. REASS; J.D. DOSS; ET AL

    2001-06-01

    This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

  8. Proposal to amend existing operating permit for the Ault-Craig 345-kV and Hayden-Archer 230-kV transmission lines, Routt, Jackson and Larimer Counties, Colorado

    SciTech Connect

    1997-08-01

    The Western Area Power Administration, Rocky Mountain Region, is proposing to amend an existing US Forest Service operating permit for the Ault-Craig 345-kV and Hayden-Archer 230-kV transmission lines, which are located in Routt, jackson, and Larimer counties, Colorado. These transmission lines cross portions of the Roosevelt and Routt National Forests. The long-term use authorization Western is requesting from the Forest Service would be for the life of the Ault-Craig and Hayden-Archer transmission lines. This environmental assessment addresses those access road and right-of-way maintenance activities identified by Western that would be performed on Forest Service managed lands during the next approximately five years.

  9. Type A Accident Investigation Report on the June 25, 1997, Contractor Inspector Fatality on the Satsop-Aberdeen #2 & #3 230 kV Line

    Energy.gov [DOE]

    On June 27, 1997, I established a Type-A Accident Investigation Board to investigate the June 25, 1997 fatal contractor accident which occurred on BPA’s Satsop-Aberdeen #2 and #3 230-kV transmission lines right-of-way.

  10. Operation of Lanzhou all permanent electron cyclotron resonance ion source No. 2 on 320 kV platform with highly charged ions

    SciTech Connect

    Lu, W.; Li, J. Y.; Kang, L.; Liu, H. P.; Li, H.; Li, J. D.; Sun, L. T.; Ma, X. W.

    2014-02-15

    The 320 kV platform for multi-discipline research with highly charged ions is a heavy ion beam acceleration instrument developed by Institute of Modern Physics, which is dedicated to basic scientific researches such as plasma, atom, material physics, and astrophysics, etc. The platform has delivered ion beams of 400 species for 36?000 h. The average operation time is around 5000 h/year. With the beams provided by the platform, lots of outstanding progresses were made in various research fields. The ion source of the platform is an all-permanent magnet electron cyclotron resonance ion source, LAPECR2 (Lanzhou All Permanent ECR ion source No. 2). The maximum axial magnetic fields are 1.28 T at injection and 1.07 T at extraction, and the radial magnetic field is up to 1.21 T at the inner wall of the plasma chamber. The ion source is capable to produce low, medium, and high charge state gaseous and metallic ion beams, such as H{sup +}, {sup 40}Ar{sup 8+}, {sup 129}Xe{sup 30+}, {sup 209}Bi{sup 33+}, etc. This paper will present the latest result of LAPECR2 and the routine operation status for the high voltage platform.

  11. Type IV COPV Cold Gas Operation Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Type IV COPV Cold Gas Operation Challenges DAVID W. GOTTHOLD November 30, 2015 1 Pacific Northwest National Laboratory Cold Gas Motivation and Challenges November 30, 2015 2 200 K H 2 Lower pressure Higher density H 2 CGO ~25% CF savings Cost Savings from reduced CF use Cold gas operation allows for reduced pressures for the same volume for significant CF and cost reductions. Materials properties change significantly at cold gas temperatures and must be studied. Example: HDPE DBT ~ 200 K Higher

  12. Type A Accident Investigation Board Report of the April 25, 1997, Contractor Fatality on the Olympia-White River #1 230 kV Line

    Energy.gov [DOE]

    On April 25, 1997, at approximately 1510 hours, a lineman for Great Southwestern Construction Inc. was fatally electrocuted when he came in direct contact with a deenergized 230-kilovolt (kV) transmission power line conductor which contained an induced voltage.

  13. New Switches for Utility-Scale Inverters: First In-Class Demonstration of a Completely New Type of SiC Bipolar Switch (15kV-20kV) for Utility-Scale Inverters

    SciTech Connect

    2011-12-31

    Solar ADEPT Project: The SiCLAB is developing a new power switch for utility-scale PV inverters that would improve the performance and significantly reduce the size, weight, and energy loss of PV systems. A power switch controls the electrical energy flowing through an inverter, which takes the electrical current from a PV solar panel and converts it into the type and amount of electricity that is compatible with the electric grid. SiCLAB is using silicon carbide (SiC) semiconductors in its new power switches, which are more efficient than the silicon semiconductors used to conduct electricity in most conventional power switches today. Switches with SiC semiconductors can operate at much higher temperatures, as well as higher voltage and power levels than silicon switches. SiC-based power switches are also smaller than those made with silicon alone, so they result in much smaller and lighter electrical devices. In addition to their use in utility-scale PV inverters, SiCLABs new power switches can also be used in wind turbines, railways, and other smart grid applications.

  14. MEMORANDUM TO: FILE FROM: TYPE OF OPERATION

    Office of Legacy Management (LM)

    : . .. I' AECMED INVOLVEME%T AT SITE ...---------- Control fi Health Physics Protection . 0 AECfnED managed operations ic Little or None @, AECMED responsible for ...

  15. MEMORANDUM TO: FILE TYPE OF OPERATION

    Office of Legacy Management (LM)

    0 %EWtlE' INVOLVE?NT AT SITE ---...L------'------- ---- Control E %5idlth Physics Protection. 0 AECMED managed operations c; Little or None G AECMED responsible for c ...

  16. High voltage studies of inverted-geometry ceramic insulators for a 350 kV DC polarized electron gun

    DOE PAGES [OSTI]

    Hernandez-Garcia, C.; Poelker, M.; Hansknecht, J.

    2016-02-01

    Jefferson Lab is constructing a 350 kV direct current high voltage photoemission gun employing a compact inverted-geometry insulator. This photogun will produce polarized electron beams at an injector test facility intended for low energy nuclear physics experiments, and to assist the development of new technology for the Continuous Electron Beam Accelerator Facility. A photogun operating at 350kV bias voltage reduces the complexity of the injector design, by eliminating the need for a graded-beta radio frequency “capture” section employed to boost lower voltage beams to relativistic speed. However, reliable photogun operation at 350 kV necessitates solving serious high voltage problems relatedmore » to breakdown and field emission. This study focuses on developing effective methods to avoid breakdown at the interface between the insulator and the commercial high voltage cable that connects the photogun to the high voltage power supply. Three types of inverted insulators were tested, in combination with two electrode configurations. Our results indicate that tailoring the conductivity of the insulator material, and/or adding a cathode triple-junction screening electrode, effectively serves to increase the hold-off voltage from 300kV to more than 375kV. In conclusion, electrostatic field maps suggest these configurations serve to produce a more uniform potential gradient across the insulator.« less

  17. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  18. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  19. Simulation of a gigawatt level Ku-band overmoded Cerenkov type oscillator operated at low guiding magnetic field

    SciTech Connect

    Zhang, Hua; Shu, Ting Ju, Jinchuan; Wu, Dapeng

    2014-03-15

    We present the simulation results of a Ku-band overmoded Cerenkov type high power microwave oscillator. A guiding magnetic field as low as 0.6?T has been operated in the device. Overmoded slow wave structures with gradually tapered vanes are used in order to increase power capacity and the efficiency of beam-wave interaction. The drift cavity is adopted to enhance the beam-wave interaction of the device. After numerical optimization, the designed generator with an output microwave power of 1.2?GW, a frequency of 13.8 GHz, and a power conversion efficiency as high as 38% can be achieved, when the diode voltage and current are, respectively, 540?kV and 5.8?kA. The power compositions of TM{sub 0n} modes of the output microwave have been analyzed, the results of which show that TM{sub 01} mode takes over almost 95% of the power proportion.

  20. 500 kV Spare Transformer Procurement

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Procurement capital project is for the acquisition of five, 500 kV spare transformers, which are to be strategically located throughout the system, and for the...

  1. Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation

    SciTech Connect

    Ohler, C.K.

    1991-05-21

    The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

  2. 600 kV modulator design for the SLAC Next Linear Collider Test Accelerator

    SciTech Connect

    Harris, K.; de Lamare, J.; Nesterov, V.; Cassel, R.

    1992-07-01

    Preliminary design for the SLAC Next Linear Collider Test Accelerator (NLCTA) requires a pulse power source to produce a 600 kV, 600 A, 1.4 {mu}s, 0.1% flat top pulse with rise and fall times of approximately 100 ns to power an X-Band klystron with a microperveance of 1.25 at {approx} 100 MW peak RF power. The design goals for the modulator, including those previously listed, are peak modulator pulse power of 340 MW operating at 120 Hz. A three-stage darlington pulse-forming network, which produces a >100 kV, 1.4 {mu}s pulse, is coupled to the klystron load through a 6:1 pulse transformer. Careful consideration of the transformer leakage inductance, klystron capacitance, system layout, and component choice is necessary to produce the very fast rise and fall times at 600 kV operating continuously at 120 Hz.

  3. Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison

    SciTech Connect

    Kelley, Nathan; Corsaro, Pietro

    2004-12-01

    Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

  4. A Thomson-type mass and energy spectrometer for characterizing ion energy distributions in a coaxial plasma gun operating in a gas-puff mode

    SciTech Connect

    Rieker, G. B.; Poehlmann, F. R.; Cappelli, M. A.

    2013-07-15

    Measurements of ion energy distribution are performed in the accelerated plasma of a coaxial electromagnetic plasma gun operating in a gas-puff mode at relatively low discharge energy (900 J) and discharge potential (4 kV). The measurements are made using a Thomson-type mass and energy spectrometer with a gated microchannel plate and phosphor screen as the ion sensor. The parabolic ion trajectories are captured from the sensor screen with an intensified charge-coupled detector camera. The spectrometer was designed and calibrated using the Geant4 toolkit, accounting for the effects on the ion trajectories of spatial non-uniformities in the spectrometer magnetic and electric fields. Results for hydrogen gas puffs indicate the existence of a class of accelerated protons with energies well above the coaxial discharge potential (up to 24 keV). The Thomson analyzer confirms the presence of impurities of copper and iron, also of relatively high energies, which are likely erosion or sputter products from plasma-electrode interactions.

  5. Design and performance of a 30 KV electron gun with ten independent cathodes & a magnetic lens.

    SciTech Connect

    Rudys, Joseph Matthew; Reed, Kim Warren

    2006-08-01

    Measurements on a 30 kV electron gun with ten independent cathodes, operating in a 6.5 Tesla (T) magnetic field are presented. An earlier paper covered the design of this electron gun [1]. Experimental results are compared to model predictions. Beam current is compared to theoretical space charge limited flow.

  6. Wild Horse 69-kV transmission line environmental assessment

    SciTech Connect

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

  7. Type A Accident Investigation Report – Western Area Power Administration Investigation of the June 7, 2004, Construction Contractor Electrical Accident at Double-Circuit Structure 38/1, Watertown-Granite Falls 230-kV Transmission Line East of Watertown, S

    Energy.gov [DOE]

    This report is an independent product of the Type A Accident Investigation board appointed by Timothy J. Meeks, Chief Operating Officer, Western Area Power Administration.

  8. INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS

    Energy.gov [DOE]

    Eaton Corporation – Arden, NC A 15 kilovolt (kV) SiC variable-speed drive will be integrated with a high-speed megawatt motor for gas compression applications. This new drive technology will be developed and tested to operate at greater than 99% efficiency and achieve 10 times the power density of competing drives, providing an integrated, highly-efficient motor and drive system for natural gas applications. Fact sheet coming soon.

  9. Torsional fatigue model for limitorque type SMB/SB/SBD actuators for motor-operated valves

    SciTech Connect

    Somogyi, D.; Alvarez, P.D.; Kalsi, M.S.

    1996-12-01

    Kalsi Engineering, Inc. has recently developed a computer program to predict the torsional fatigue life of Limitorque Type SMB/SB/SBD actuators for motor-operated valves under given loading levels, including those that exceed the ratings. The development effort was an outgrowth of the {open_quote}Thrust Rating Increase{close_quote} test program. The fatigue model computes all pertinent stress components and their variations as a function of the loading ramp. The cumulative damage and fatigue life due to stress cycling is computed by use of a modification of Miner`s rule. Model predictions were validated against actual cyclic loading test results.

  10. Libby (FEC)-Troy 115kV Line Rebuild

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    of McNary Group 2 - Big Eddy to Knight The Big Eddy - Knight 500 kV line and new substation (WOMR Group 2) project is one of five projects recommended out of the 2008 Cluster...

  11. Package substation system type ENK with SF6 insulation

    SciTech Connect

    Wieland, A.; Koglin, B.B.; Leonhardt, G.

    1982-07-01

    This paper addresses ENK design switchgear developed by Brown Boveri and tailored for the 46-72.5 kV voltage level using SF6 insulation for subtransmission systems. The most commonly used switchgear in modular pipe-type designs above 121kV systems is GIS. The ENK design and the standard GIS differ considerably and the ENK design's main characteristics include extremely low operation pressure (only 1.2 bar absolute); cubicle type design; and the use of an SF6/air mixture as insulating medium. The ENK design offers a more economical switchgear type for this voltage range. The paper describes the ENK switchgear technique and its possible applications in subtransmission systems.

  12. Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2002-08-09

    BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability

  13. Theoretical investigation of the design and performance of a dual energy (kV and MV) radiotherapy imager

    SciTech Connect

    Liu, Langechuan; Antonuk, Larry E. El-Mohri, Youcef; Zhao, Qihua; Jiang, Hao

    2015-04-15

    Purpose: In modern radiotherapy treatment rooms, megavoltage (MV) portal imaging and kilovoltage (kV) cone-beam CT (CBCT) imaging are performed using various active matrix flat-panel imager (AMFPI) designs. To expand the clinical utility of MV and kV imaging, MV AMFPIs incorporating thick, segmented scintillators and, separately, kV imaging using a beams eye view geometry have been investigated by a number of groups. Motivated by these previous studies, it is of interest to explore to what extent it is possible to preserve the benefits of kV and MV imaging using a single AMFPI design, given the considerably different x ray energy spectra used for kV and MV imaging. In this paper, considerations for the design of such a dual energy imager are explored through examination of the performance of a variety of hypothetical AMFPIs based on x ray converters employing segmented scintillators. Methods: Contrast, noise, and contrast-to-noise ratio performances were characterized through simulation modeling of CBCT imaging, while modulation transfer function, Swank factor, and signal performance were characterized through simulation modeling of planar imaging. The simulations were based on a previously reported hybrid modeling technique (accounting for both radiation and optical effects), augmented through modeling of electronic additive noise. All designs employed BGO scintillator material with thicknesses ranging from 0.25 to 4 cm and element-to-element pitches ranging from 0.508 to 1.016 mm. A series of studies were performed under both kV and MV imaging conditions to determine the most advantageous imager configuration (involving front or rear x ray illumination and use of a mirror or black reflector), converter design (pitch and thickness), and operating mode (pitch-binning combination). Results: Under the assumptions of the present study, the most advantageous imager design was found to employ rear illumination of the converter in combination with a black reflector

  14. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  15. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line ...

  16. INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS INTEGRATED 15KV SIC VSD AND HIGH-SPEED MW MOTOR FOR GAS COMPRESSION SYSTEMS Eaton Corporation - Arden, NC A 15 ...

  17. ETM (Distribution Network Automation on 10 kV cable line stations...

    OpenEI (Open Energy Information) [EERE & EIA]

    ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

  18. 0.4 kV remote control (Smart Grid Project) | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    .4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392, 9.501785 Loading map......

  19. 220 kV SSSC device for power flow control (Smart Grid Project...

    OpenEI (Open Energy Information) [EERE & EIA]

    20 kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location...

  20. Reliability test for 500 kV GIS

    SciTech Connect

    Terasaka, K.; Aoyagi, H.; Kamata, I.; Ohyama, S.; Tanaka, M.

    1982-07-01

    This paper describes the reliability tests performed when manufacturing the 500 kV GIS. It contains the results of measuring tests for induced surge to the GIS low-voltage control circuit and measuring tests for induced current to the GIS external grounding structure. The paper proposes the methods for suppressing the induced surge and for setting the induced current circuit.

  1. Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle

    SciTech Connect

    Kuz'micheva, K. I.; Merzlyakov, A. S.; Fokin, G. G.

    2013-05-15

    The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.

  2. Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun

    SciTech Connect

    F.E. Hannon, A.S. Hofler, R. Kazimi

    2011-03-01

    Recent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specifically for 100kV operation. It is anticipated that with an increase in gun voltage and optimization of the layout and components for 200kV operation, that the electron bunch length and beam brightness can be improved upon. This paper explores some upgrade possibilities for a 200kV gun CEBAF injector through beam dynamic simulations.

  3. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect

    Not Available

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  4. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  5. Identification of types of businesses with potential interest in operating and/or exporting ocean thermal energy conversion (OTEC) plants

    SciTech Connect

    Not Available

    1982-09-01

    This study describes the characteristics of three selected Ocean Thermal Energy Conversion (OTEC)-based lines of business, examines other lines of business and identifies those with similar characteristics, and indicates the types of businesses/corporations that could be expected to have potential interest in operating and/or exporting OTEC plants. An OTEC line of business model is developed to assist companies in making an internal corporate assessment as to whether OTEC should be in their business plan.

  6. Type B Accident Investigation Board Report on the October 15, 2001, Grout Injection Operator Injury at the Cold Test Pit South, Idaho National Engineering and Environmental Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report is an independent product of the Type B Accident Investigation Board appointed by Mark W. Frei, Acting Manager, Idaho Operations Office, U. S. Department of Energy.

  7. Deployment and Operation of the ES-3100 Type B Shipping Container

    SciTech Connect

    Arbital, J. G.; Tousley, D. R.: Miller, D. B.

    2006-07-27

    The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) is shipping, for disposition purposes, bulk quantities of fissile materials, primarily highly enriched uranium (HEU). The U.S. Department of Transportation (DOT) specification 6M container has been the workhorse for NNSA and many other shippers of radioactive material since the 1980s. However, the 6M does not conform to the packaging requirements in the Code of Federal Regulations (10 CFR 71) and, for that reason, is being phased out for use in the DOE secure transportation system by the end of 2006. BWXT Y-12 developed and licensed the ES-3100 container to replace the DOT 6M. The ES-3100 was certified by the Nuclear Regulatory Commission (NRC) in April 2006. The process of deploying the new package began in June 2005 and is planned to be completed in July 2006. The package will be fully operational and completely replace the DOT 6M at the Y-12 National Security Complex (Y-12) by October 2006. This paper reviews the deployment process and the mock loading station that was installed at National Transportation Research Center (NTRC) of Oak Ridge National Laboratory. Specialized equipment, tools, and instrumentation that support the handling and loading operations of the ES-3100 are described in detail. Loading options for other user sites are explored in preparation for deployment of this new state-of-the-art shipping container throughout the DOE complex and the private sector.

  8. Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado

    SciTech Connect

    1996-05-01

    The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

  9. Operational results of shaft repair by installing stave type cooler at Kimitsu Nos. 3 and 4 blast furnaces

    SciTech Connect

    Oda, Hiroshi; Amano, Shigeru; Sakamoto, Aiichiro; Anzai, Osamu; Nakagome, Michiru; Kuze, Toshisuke; Imuta, Akira

    1997-12-31

    Nos. 3 and 4 blast furnaces in Nippon Steel Corporation Kimitsu Works were both initially fitted with cooling plate systems. With the aging of each furnace, the damage to their respective inner-shaft profiles had become serious. Thus, in order to prevent operational change and prolong the furnace life, the inner-shaft profile of each furnace was repaired by replacing the former cooling plate system with the stave type cooler during the two-week-shutdowns. With this repair, stability of burden descent and gas flow near the wall part of the furnace have been achieved. Thus the prolongation of the furnace life is naturally expected.

  10. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  11. Final environmental assessment: Los Reales 115 kV transmission line alternative routes

    SciTech Connect

    Not Available

    1989-10-01

    The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

  12. Further Notice of 230kV Circuit Planned Outages | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages

  13. The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation

    SciTech Connect

    Gusev, S. I.; Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I.

    2009-09-15

    The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

  14. TYPE OF OPERATION

    Office of Legacy Management (LM)

    ---... 0 Research & Development .a Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Thearetical Studies Cl Sample 84 Analysis 0 Production *i ...

  15. TYPE OF OPERATION

    Office of Legacy Management (LM)

    ORE OR RAW WATL 0 FINAL PRODUCT 3 WASTE .?a RESIDUE n ' - . ..' . : I ,. J . . F%3Zt?ED INVOLVERENT AT SITE ------------ Control q Health Physics Protection : 0 ...

  16. Type B Accident Investigation Board Report of the July 2, 1997, Curium Intake by Shredder Operator at Building 513, Lawrence Livermore National Laboratory, Livermore, California

    Energy.gov [DOE]

    This report is an independent product of the Type B Accident Investigation Board appointed by James M. Turner, Ph.D., Manager of the U.S. Department of Energy, Oakland Operations Office.

  17. Experimental investigations of overvoltages in 6kV station service cable networks of thermal power plants

    SciTech Connect

    Vukelja, P.I.; Naumov, R.M.; Drobnjak, G.V.; Mrvic, J.D.

    1996-12-31

    The paper presents the results of experimental investigations of overvoltages on 6kV isolated neutral station service cable networks of thermal power plants. The overvoltages were recorded with capacitive voltage measurement systems made at the Nikola Tesla Institute. Wideband capacitive voltage measurement systems recorded a flat response from below power frequencies to 10MHz. Investigations of overvoltages were performed for appearance and interruption of metal earth faults, intermittent earth faults, switching operation of HV motors switchgear, switching operation of transformers switchgear, and transfer of the network supply from one transformer to another. On the basis of these investigations, certain measures are proposed for limiting overvoltages and for the reliability of station service of thermal power plants.

  18. Notification of Planned 230kV Outage at Potomac River Generating...

    Office of Environmental Management (EM)

    Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits ...

  19. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...

    Energy Saver

    BPA's proposed action is to interconnect the proposed transmission line to an existing BPA substation. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project Public ...

  20. Solid-State Fault Current Limiter Development : Design and Testing Update of a 15kV SSCL Power Stack

    SciTech Connect

    Dr. Ram Adapa; Mr. Dante Piccone

    2012-04-30

    ABSTRACT The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current

  1. The 345 kV underground/underwater Long Island Sound cable project

    SciTech Connect

    Grzan, J.; Hahn, E.I. ); Casalaina, R.V.; Kansog, J.O.C. )

    1993-07-01

    A high voltage underground/underwater cable system was installed to increase the transmission capacity from the mainland of New York to Long Island. In terms of weight and diameter, the self-contained, fluid-filled (SCFF) cable used for the underwater portion of the project is the largest underwater cable in the world. The use of high-pressure, fluid-filled (HPFF) pipe-type cable on the land portion represents the largest application of paper-polypropylene-paper (PPP) insulated cable in the United States. State-of-the-art technologies were implemented in the use of fiber optic cables for relay protection and SCADA/RTU, temperature monitoring and leak detection systems, SF[sub 6] gas-insulated substations, and underwater cable laying and embedment techniques. This paper discusses the design and installation of a 750 MVA, 43 km (26.6 mi), 345 kV underground/underwater electric transmission system installed by the New York Power Authority (NYPA).

  2. Operating Experience Level 3, Laboratory Tests Indicate Conditions that Could Potentially Impact Certain Type of HEPA Filter Performance

    Energy.gov [DOE]

    OE-3: 2013-02 This Operating Experience Summary provides new information on a potential performance issue associated with certain axial flow high efficiency particulate air (HEPA) filters that do not contain separators in the folded media (separatorless).

  3. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  4. Libby (FEC)-Troy 115kV Line Rebuild

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Tri Cities Maintenance Headquarters This project will construct a new Tri-Cities maintenance headquarters. BPA field operations in Tri-Cities District currently occupy space in a...

  5. Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment

    SciTech Connect

    Not Available

    1992-02-01

    Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

  6. Development of a thyristor valve for next generation 500kV HVDC transmission systems

    SciTech Connect

    Hasegawa, T.; Yamaji, K.; Irokawa, H.; Shirahama, H.; Tanaka, C.; Akabane, K.

    1996-10-01

    A high voltage thyristor valve is the basic component of an HVDC transmission system. Development of a 500kV valve for next generation HVDC transmission systems is described. First, the power loss of the valve is analyzed to decide a reasonable wafer size for the light triggered thyristor. From these results, a six inch diameter wafer size is selected. The light triggered thyristor, with ratings of 8kV and 3.5kA, is developed using the six inch wafer. The designing of the valve employing the thyristor and test results with the prototype valve prove that a 500kV valve can be realized by the design method.

  7. Notification of Planned 230kV Outage at Potomac River Generating Station |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy The next planned outage on xxxxx high voltage circuit between Palmers Corner Substation and the Potomac River Generating Station is scheduled for Sunday, June 3, 2007 and will begin at 4:00 AM with a scheduled return date of Saturday, June 9, 2007 at 2:00 PM. Notification of Planned 230kV Outage at Potomac River Generating Station (34.76 KB) More Documents & Publications Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned

  8. Use of Static Compensators for Voltage Control at 330- and 500-kV Substations

    SciTech Connect

    Dement'ev, Yu. A.; Kochkin, V. I.; Idiatullov, R. M.; Papafanasopulo, S. G.; Smirnov, A. A.; Smirnov, S. G.

    2003-05-15

    A scheme for compensating the reactive power and controlling the voltage of high-voltage, intermediate-voltage, and low-voltage buses of 330 - 500-kV substations, which consist of static thyristor compensators (STC) on low-voltage autotransformers and controlled shunting reactors on high-voltage lines, is presented. It is shown that the STC can be created step-by-step beginning with the reactive part on substations with low-loaded lines. Results of installation of reactor groups of STC stepwise-controlled by vacuum switches at 330- and 500-kV substations are presented. Tests of the reactor groups have proved their high efficiency.

  9. EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line

    Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

  10. Development of insulation structure and enhancement of insulation reliability of 500 kV dc GIS

    SciTech Connect

    Hasegawa, T.; Yamaji, K.; Hatano, M.; Endo, F.; Rokunohe, T.; Yamagiwa, T.

    1997-01-01

    The paper describes the development of insulation structure and enhancement of insulation reliability of 500 kV dc GIS. Considering problems of metallic particles and charge accumulation on spacers, the developed insulation structure of GIS consisted of three regions, i.e., the spacer, particle scavenging and non-levitating regions. Particles could be efficiently scavenged, and the developed GIS withstood all insulation specifications with sufficient margins under the clean and particle-contaminated conditions. Now, a long-term site test for one year of the 500 kV dc GIS has been continued since October 1995.

  11. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  12. Operation Redwing. Project 3. 1. Effect of length of positive phase of blast on drag-type and semidrag-time industrial buildings

    SciTech Connect

    Sinnamon, G.K.; Haltiwanger, J.D.; Newmark, N.M.

    1985-09-01

    The primary objective of the project was to obtain information regarding the effect of the length of the positive phase of blast on the response of drag and semidrag structures. A total of six steel-frame buildings were tested during this operation. The structure of each type nearest ground zero was located such that if the yield of the weapon was near the lower limit of its predicted range, it would probably undergo considerable inelastic deformation. Conversely, those structures farthest from ground zero were located such that if the yield of the nuclear device was near the upper limit of its predicted range, they would be substantially deformed, but would not collapse. The third building of each type was located at an intermediate point between these two extremes. Instrumentation was provided to obtain records of the transient structural deflections, strains, and accelerations, as well as of overpressure and dynamic pressure versus time at the sites of the various test structures.

  13. Combined state-adding and state-deleting approaches to type III multi-step rationally extended potentials: Applications to ladder operators and superintegrability

    SciTech Connect

    Marquette, Ian; Quesne, Christiane

    2014-11-15

    Type III multi-step rationally extended harmonic oscillator and radial harmonic oscillator potentials, characterized by a set of k integers m{sub 1}, m{sub 2}, ⋯, m{sub k}, such that m{sub 1} < m{sub 2} < ⋯ < m{sub k} with m{sub i} even (resp. odd) for i odd (resp. even), are considered. The state-adding and state-deleting approaches to these potentials in a supersymmetric quantum mechanical framework are combined to construct new ladder operators. The eigenstates of the Hamiltonians are shown to separate into m{sub k} + 1 infinite-dimensional unitary irreducible representations of the corresponding polynomial Heisenberg algebras. These ladder operators are then used to build a higher-order integral of motion for seven new infinite families of superintegrable two-dimensional systems separable in cartesian coordinates. The finite-dimensional unitary irreducible representations of the polynomial algebras of such systems are directly determined from the ladder operator action on the constituent one-dimensional Hamiltonian eigenstates and provide an algebraic derivation of the superintegrable systems whole spectrum including the level total degeneracies.

  14. Craig-Bonanza 345-kV Transmission Line Project: Environmental assessment

    SciTech Connect

    Not Available

    1988-01-01

    The Department of Energy (DOE), and the Western Area Power Administration (Western) proposes to construct and maintain a 345- kilovolt (kV) transmission line between Craig, Colorado, and Bonanza in eastern Utah. The project began in 1986 and construction is scheduled to be completed in 1989. The project, known as the Craig-Bonanza 345-kV Transmission Line Project (Project), will be located in Moffat and Rio Blanco counties in Colorado and Uintah County in Utah. Western has the lead role for project development and management, including environmental studies and construction. Cooperating federal agencies include the Bureau of Land Management (BLM), Rural Electrification Administration, US Fish and Wildlife Service, and Bureau of Indian Affairs. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ), the DOE and the BLM. 360 refs., 33 figs., 21 tabs.

  15. Power frequency electric and magnetic fields from a 230 kV gas-insulated substation

    SciTech Connect

    Wong, P.S.; Rind, T.M. ); Harvey, S.M.; Scheer, R.R. . Research Div.)

    1994-07-01

    Gas-insulated substations (GIS), owing to their compact nature, offer an attractive alternative to conventional substations where space is limited, such as in urban areas. Consequently, it is important to address the issue of environmental conditions in and around the GIS. This paper presents the results of a survey of power-frequency electric and magnetic fields in and around a 230 kV/28 kV GIS. The survey was designed to cover the electric and magnetic fields from the substation equipment and from the power lines and cables surrounding the substation. It also includes a determination of the shielding effect of the GIS bus sheath. The information provided should allow the prediction of electric and magnetic field levels from other GIS of similar design.

  16. Design and Overview of 100 kV Bushing for the DNB Injector of ITER

    SciTech Connect

    Shah, Sejal; Bandyopadhyay, M.; Rotti, C.; Singh, M. J.; Roopesh, G.; Chakraborty, A. K. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Rajesh, S. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Microelectronics and Materials Physics Labs, P.O.Box 4500, FIN-90014 University of Oulu (Finland); Nishad, S.; Srusti, B. [DesignTech Systems Ltd, Banjara Hills, Hyderabad, Andhra Pradesh-500034 (India); Schunke, B.; Hemsworth, R.; Chareyre, J.; Svensson, L. [ITER Organisation, Route de Vinon, CS 90 046, 13067 St. Paul lez Durance Cedex (France)

    2011-09-26

    The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

  17. Notification of Planned 230kV Outage at Potomac River Generating Station

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to

  18. Results of measuring input capacitance in 35-750 kV transformers and reactors

    SciTech Connect

    Vol'pov, K.D.; Sozinov, A.V.; Khalilov, F.Kh.

    1982-09-01

    The effect of the neutral grounding mode on input capacitance of 110-120 kV transformers was studied, inasmuch as in the system the neutral for a portion of the transformers was not grounded, with the objective of limiting nonsymmetrical short-circuit currents. Measurements showed that the input capacitance with a grounded neutral, as a rule, is greater than with an insulated neutral.

  19. EIS-0365: Imperial-Mexicali 230-kV Transmission Lines

    Energy.gov [DOE]

    On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

  20. Environmental studies for a 1100-kV power line in Oregon. A special report

    SciTech Connect

    Rogers, L.; Hinds, R.

    1983-01-01

    In the first research project to monitor the effects of 1100-kV transmission on a natural ecosystem, researchers at Battelle, Pacific Northwest Laboratories have studied responses of wildlife, native plants, honeybees, and agricultural crops and cattle. No adverse effects were detected on wildlife, crops or cattle. Effects were observed on trees growing within the defined right of way and on honeybee colonies placed beneath the line.

  1. Poster Thur Eve 10: Partial kV CBCT, complete kV CBCT and EPID in breast treatment: a dose comparison study for skin, breasts, heart and lungs

    SciTech Connect

    Roussin, E; Archambault, L K; Wierzbicki, W

    2014-08-15

    The advantages of kilovoltage cone beam CT (kV CBCT) imaging over electronic portal imaging device (EPID) such as accurate 3D anatomy, soft tissue visualization, fast rigid registration and enhanced precision on patient positioning has lead to its increasing use in clinics. The benefits of this imaging technique are at the cost of increasing the dose to healthy surrounding organs. Our center has moved toward the use of daily partial rotation kV CBCT to restrict the dose to healthy tissues. This study aims to better quantify radiation doses from different image-guidance techniques such as tangential EPID, complete and partial kV CBCT for breast treatments. Cross-calibrated ionization chambers and kV calibrated Gafchromic films were used to measure the dose to the heart, lungs, breasts and skin. It was found that performing partial kV CBCT decreases the heart dose by about 36%, the lungs dose by 31%, the contralateral breast dose by 41% and the ipsilateral breast dose by 43% when compared to a full rotation CBCT. The skin dose measured for a full rotation CBCT was about 0.8 cGy for the contralateral breast and about 0.3 cGy for the ipsilateral breast. The study is still ongoing and results on skin doses for partial rotation kV CBCT as well as for tangential EPID images are upcoming.

  2. A Study of Electromagnetic Radiation of Corona Discharge Near 500-Kv Electric Installations

    SciTech Connect

    Korzhov, A. V.; Okrainskaya, I. S.; Sidorov, A. I.; Kufel'd, V. D.

    2004-01-15

    Data on the spectral composition and intensity of electromagnetic radiation of corona discharge are obtained in an experimental study performed on the outdoor switchgear of the Shagol 500-kV substation of the Chelyabinsk Enterprise of Trunk Transmission Grids and under a 500-kV Shagol - Kozyrevo overhead transmission line. The electromagnetic environment on the territory of the 500-kV outdoor switchgear is shown to be determined by narrow-band radiations (harmonics of the frequency of electric supply) and wide-band radiations due to corona discharges of high-voltage sources. This means that the personnel experience the action of a commercial-frequency electric field and electromagnetic radiation of a quite wide range, which is not allowed for by the existing guidelines. It is recommended to continue the study in cooperation with medical institutions in order to create guidelines that would allow for the joint action of commercial-frequency electric field and electromagnetic radiation and for the voltage in the line, the current load, the meteorological situation, and other factors.

  3. A 6 kV arbitrary waveform generator for the Tevatron Electron Lens

    SciTech Connect

    Pfeffer, H.; Saewert, G.

    2011-11-09

    This paper reports on a 6 kV modulator built and installed at Fermilab to drive the electron gun anode for the Tevatron Electron Lens (TEL). The TEL was built with the intention of shifting the individual (anti)proton bunch tunes to even out the tune spread among all 36 bunches with the desire of improving Tevatron integrated luminosity. This modulator is essentially a 6 kV arbitrary waveform generator that enables the TEL to define the electron beam intensity on a bunch-by-bunch basis. A voltage waveform is constructed having a 7 μs duration that corresponds to the tune shift requirements of a 12-bunch (anti)proton beam pulse train. This waveform is played out for any one or all three bunch trains in the Tevatron. The programmed waveform voltages transition to different levels at time intervals corresponding to the 395 ns bunch spacing. In addition, complex voltage waveforms can be played out at a sustained rate of 143 kHz over the full 6 kV output range. This paper describes the novel design of the inductive adder topology employing five transformers. It describes the design aspects that minimize switching losses for this multi-kilovolt, high repetition rate and high duty factor application.

  4. A 120kV IGBT modulator for driving a pierce electron gun

    SciTech Connect

    Earley, L. M.; Brown, R. W.; Carlson, R. L.; Ferguson, P.; Haynes, W. B.; Kirbie, H. C.; Russell, S. J.; Sigler, F. E.; Smirnova, E. I.; Wheat, R. M.

    2004-01-01

    An IGBT modulator has been developed to drive a 120 kV, 23 A Pierce electron gun. The modulator is capable of producing pulses up to 10 {mu}s in width at repetition rates up to 10Hz with no active reset. The pulse rise time on the electron gun will be approximately 2 {mu}s and the remaining 8 {mu}s of flattop is tuned to have a ripple of less than 1 percent rms. The modulator technology was developed from a previous 50 kV prototype. The modulator consists of six boards, each with one EUPEC IGBT that drives a single common step-up transformer wound on METGLAS 2605SC cores. The six transformer cores share a common bi-filar output secondary winding. The modulator uses a fiber optic trigger system and has a high voltage cable output with an epoxy receptacle on the oil end and a ceramic receptacle on the vacuum end. The 120 kV electron gun was manufactured by MDS Co. and will be used to generate sheet electron beams from the standard pencil beam produced by the Pierce electron gun.

  5. A 6 kV arbitrary waveform generator for the Tevatron Electron Lens

    DOE PAGES [OSTI]

    Pfeffer, H.; Saewert, G.

    2011-11-09

    This paper reports on a 6 kV modulator built and installed at Fermilab to drive the electron gun anode for the Tevatron Electron Lens (TEL). The TEL was built with the intention of shifting the individual (anti)proton bunch tunes to even out the tune spread among all 36 bunches with the desire of improving Tevatron integrated luminosity. This modulator is essentially a 6 kV arbitrary waveform generator that enables the TEL to define the electron beam intensity on a bunch-by-bunch basis. A voltage waveform is constructed having a 7 μs duration that corresponds to the tune shift requirements of amore » 12-bunch (anti)proton beam pulse train. This waveform is played out for any one or all three bunch trains in the Tevatron. The programmed waveform voltages transition to different levels at time intervals corresponding to the 395 ns bunch spacing. In addition, complex voltage waveforms can be played out at a sustained rate of 143 kHz over the full 6 kV output range. This paper describes the novel design of the inductive adder topology employing five transformers. It describes the design aspects that minimize switching losses for this multi-kilovolt, high repetition rate and high duty factor application.« less

  6. SU-E-J-22: A Feasibility Study On KV-Based Whole Breast Radiation Patient Setup

    SciTech Connect

    Huang, Q; Zhang, M; Yue, N; Chen, T

    2015-06-15

    Purpose: In room kilovoltage x-ray (kV) imaging provides higher contrast than Megavoltage (MV) imaging with faster acquisition time compared with on-board cone-beam computed tomography (CBCT), thus improving patient setup accuracy and efficiency. In this study we evaluated the clinical feasibility of utilizing kV imaging for whole breast radiation patient setup. Methods: For six breast cancer patients with whole breast treatment plans using two opposed tangential fields, MV-based patient setup was conducted by aligning patient markers with in room lasers and MV portal images. Beam-eye viewed kV images were acquired using Varian OBI system after the set up process. In house software was developed to transfer MLC blocks information overlaying onto kV images to demonstrate the field shape for verification. KV-based patient digital shift was derived by performing rigid registration between kV image and the digitally reconstructed radiography (DRR) to align the bony structure. This digital shift between kV-based and MV-based setup was defined as setup deviation. Results: Six sets of kV images were acquired for breast patients. The mean setup deviation was 2.3mm, 2.2mm and 1.8mm for anterior-posterior, superior-inferior and left-right direction respectively. The average setup deviation magnitude was 4.3±1.7mm for six patients. Patient with large breast had a larger setup deviation (4.4–6.2mm). There was no strong correlation between MV-based shift and setup deviation. Conclusion: A preliminary clinical workflow for kV-based whole breast radiation setup was established and tested. We observed setup deviation of the magnitude below than 5mm. With the benefit of providing higher contrast and MLC block overlaid on the images for treatment field verification, it is feasible to use kV imaging for breast patient setup.

  7. High power operation of an X-band coaxial multi-beam relativistic klystron amplifier

    SciTech Connect

    Liu, Zhenbang; Huang, Hua; Jin, Xiao; Zhao, Yucong; He, Hu; Lei, Lurong; Chen, Zhaofu

    2013-11-15

    An X-band coaxial multi-beam relativistic klystron amplifier is designed in order to increase output microwave power and operating frequency of the amplifier tube. The experiment is performed on a Tesla-type accelerator. The amplifier is driven by an electron beam of 2.8 kA at 720 kV, and a microwave power of 30 kW and frequency of 9.384 GHz is injected into an input cavity by means of an external source, then a microwave power of over 800 MW is extracted, the amplifier gain is about 44 dB, and conversion efficiency is 40%. The experiment proves that output power of nearly GWs can be generated with the X-band coaxial multi-beam relativistic klystron amplifier driven by a kW-level input power.

  8. Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment

    SciTech Connect

    Not Available

    1993-07-01

    Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

  9. Environmental assessment: Warren Air Force Base 115-kV transmission line, Cheyenne, Wyoming

    SciTech Connect

    Not Available

    1986-03-01

    The Western Area Power Administration (Western), is propsoing to construct a new electrical tranmission line and substation in southeastern Wyoming. This proposed line, called the Warren Air Force Base Tranmission Line, will supply power for Western's system to Francis E.Warren Air Force Base (F.E. Warren AFB) near Cheyenne. It would allow for increased tranmission capacity to the air base. F.E. Warren AFB currently is served electrically be Western via a 13.8-kv line. It is a wood-pole, double-circuit line without an overhead ground wire, which extends from Western's Cheyenne Substation, through an urban area, and onto the air base. The Cheyenne Substation is located on the south side of the city of Cheyenne. The electrical load on the base is increasing from 4 megawatts (MW) to 11 or 12 MW, an approximate three-fold increase. Voltage problems occasionally occur at the base due to the present electrial loads and to the age and inadequacy of the 13.8-kv line, which was placed in service in 1941. The existing line has served beyond its designed service life and requires replacement. Replacement would be necessary even without an increasing load. F.E. Warren AFB has several new and expanding programs, including additional housing, shopping centers, and the Peacekeeper Missile Program. Part of this expansion already has occured; the remainder is expected by early 1988. This expansion has created the need for additional electrical service. The present 13.8-kV line is not capable of supporting the additional load. 28 refs., 4 figs., 2 tabs.

  10. Spectroscopic determination of the composition of a 50 kV hydrogen diagnostic neutral beam

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Spectroscopic determination of the composition of a 50 kV hydrogen diagnostic neutral beam X. Feng, M. D. Nornberg, D. Craig, D. J. Den Hartog, and S. P. Oliva Citation: Review of Scientific Instruments 87, 11E543 (2016); doi: 10.1063/1.4961269 View online: http://dx.doi.org/10.1063/1.4961269 View Table of Contents: http://scitation.aip.org/content/aip/journal/rsi/87/11?ver=pdfcov Published by the AIP Publishing Articles you may be interested in The dependence of extracted current on discharge

  11. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  12. Collimated electron beam accelerated at 12 kV from a Penning discharge

    SciTech Connect

    Toader, D.; Oane, M.; Ticoş, C. M.

    2015-01-15

    A pulsed electron beam accelerated at 12 kV with a duration of 40 μs per pulse is obtained from a Penning discharge with a hollow anode and two cathodes. The electrons are extracted through a hole in one of the cathodes and focused by a pair of coils. The electron beam has a diameter of a few mm in the cross section, while the beam current reaches peak values of 400 mA, depending on the magnetic field inside the focussing coils. This relatively inexpensive and compact device is suitable for the irradiation of small material samples placed in high vacuum.

  13. Metal artifact correction for x-ray computed tomography using kV and selective MV imaging

    SciTech Connect

    Wu, Meng; Keil, Andreas; Constantin, Dragos; Star-Lack, Josh; Zhu, Lei; Fahrig, Rebecca

    2014-12-15

    Purpose: The overall goal of this work is to improve the computed tomography (CT) image quality for patients with metal implants or fillings by completing the missing kilovoltage (kV) projection data with selectively acquired megavoltage (MV) data that do not suffer from photon starvation. When both of these imaging systems, which are available on current radiotherapy devices, are used, metal streak artifacts are avoided, and the soft-tissue contrast is restored, even for regions in which the kV data cannot contribute any information. Methods: Three image-reconstruction methods, including two filtered back-projection (FBP)-based analytic methods and one iterative method, for combining kV and MV projection data from the two on-board imaging systems of a radiotherapy device are presented in this work. The analytic reconstruction methods modify the MV data based on the information in the projection or image domains and then patch the data onto the kV projections for a FBP reconstruction. In the iterative reconstruction, the authors used dual-energy (DE) penalized weighted least-squares (PWLS) methods to simultaneously combine the kV/MV data and perform the reconstruction. Results: The authors compared kV/MV reconstructions to kV-only reconstructions using a dental phantom with fillings and a hip-implant numerical phantom. Simulation results indicated that dual-energy sinogram patch FBP and the modified dual-energy PWLS method can successfully suppress metal streak artifacts and restore information lost due to photon starvation in the kV projections. The root-mean-square errors of soft-tissue patterns obtained using combined kV/MV data are 10–15 Hounsfield units smaller than those of the kV-only images, and the structural similarity index measure also indicates a 5%–10% improvement in the image quality. The added dose from the MV scan is much less than the dose from the kV scan if a high efficiency MV detector is assumed. Conclusions: The authors have shown that it

  14. Knowledge engineering tool for training power-substation operators

    SciTech Connect

    Lambert-Torres, G. |; Costa, C.I.A.; Alves da Silva, A.P.; Ribeiro, G.M.; Quintana, V.H.

    1997-04-01

    Artificial intelligence techniques have been applied to create systems that can give answers for different situations and assistance during the substation switching operation. These techniques have also been used for training purposes. This paper presents a computational package for training power substation operators in the control and corrective actions using expert system techniques. Illustrative examples are presented using a 138-kV CEMIG substation.

  15. Long-term stability and mechanical characteristics of kV digital imaging system for proton radiotherapy

    SciTech Connect

    Zhu, Mingyao Botticello, Thomas; Lu, Hsiao-Ming; Winey, Brian

    2014-04-15

    Purpose: To quantitatively evaluate the long-term image panel positioning stability and gantry angle dependence for gantry-mounted kV imaging systems. Methods: For patient setup digital imaging systems in isocentric rotating proton beam delivery facilities, physical crosshairs are commonly inserted into the snout to define the kV x-ray beam isocenter. Utilizing an automatic detection algorithm, the authors analyzed the crosshair center positions in 2744 patient setup kV images acquired with the four imagers in two treatment rooms from January 2012 to January 2013. The crosshair position was used as a surrogate for imaging panel position, and its long-term stability at the four cardinal angles and the panel flex dependency on gantry angle was investigated. Results: The standard deviation of the panel position distributions was within 0.32 mm (with the range of variation less than ± 1.4 mm) in both the X-Z plane and Y direction. The mean panel inplane rotations were not more than 0.51° for the four panels at the cardinal angles, with standard deviations ≤0.26°. The panel position variations with gantry rotation due to gravity (flex) were within ±4 mm, and were panel-specific. Conclusions: The authors demonstrated that the kV image panel positions in our proton treatment system were highly reproducible at the cardinal angles over 13 months and also that the panel positions can be correlated to gantry angles. This result indicates that the kV image panel positions are stable over time; the amount of panel sag is predictable during gantry rotation and the physical crosshair for kV imaging may eventually be removed, with the imaging beam isocenter position routinely verified by adequate quality assurance procedures and measurements.

  16. Suppression of VFT in 1,100 kV GIS by adopting resistor-fitted disconnector

    SciTech Connect

    Yamagata, Y.; Tanaka, K.; Nishiwaki, S.; Miwa, I.; Takahashi, N.; Komukai, T.; Kokumai, T.; Imai, K.

    1996-04-01

    With 1,000 kV transmission lines planned in Japan, very fast transient (VFT) phenomena will be suppressed by installing a resistor in a disconnector o gas insulated switchgear (GIS). In this paper the VFT overvoltage suppressing effect of the resistor and the duty required of the resistor are clarified. A 1,100 kV resistor-fitted disconnector was tested by constructing a charging current interruption test circuit. It has been clarified that the disconnector accepts the required duty. The disconnector tested here will be used for the field test.

  17. Comparison of ANSI, IEC and CSA standards durability requirements on station-type metal oxide surge arresters for EHV power systems

    SciTech Connect

    Hamel, A.; St-Jean, G. , 1800 montee Ste-Julie, Varennes, Quebec J3X 1S1 )

    1992-07-01

    This paper presents an analysis of stresses applied to two actual types of station class surge arresters of the same voltage rating when tested for durability as prescribed by American (ANSI) International (IEC) and Canadian (CSA) standards for 315 kV and 734 kV power systems. The analysis which is made with an experimentally validated arrester model, reveals that the IEC duty cycle test is the most severe of all. In fact it can bring the varistors of an actual station-type arrester to a peak temperature of 129{degrees} C, which leaves a margin of only 46{degrees} C to its thermal stability limit at maximum continuous operating voltage (MCOV). Another actual arrester using lesser V-I-T varistor characteristics but larger varistor volume and better heat transfer from inside to outside the arrester, produces 103{degrees} C which corresponds to a slightly better temperature margin of 49{degrees} C. It is observed that even when using the lower performance V-I-T characteristics of the latter arrester, a thin-wall arrester housing design can improve heat transfer to a point where the margin improves to 101{degrees} C on a hypothetical arrester.

  18. New 500-kV Ion Source Test Strand for HIF

    SciTech Connect

    Sangster, T.C.; Ahle, L.E.; Halaxa, E.F.; Karpenko, V.P.; Oldaker, M.E.; Mitchell, J.W.; Beck, D.N.; Bieniosek, F.M.; Henestroza, E.; Kwan, J.W.

    2000-03-09

    One of the most challenging aspects of ion beam driven inertial fusion energy is the reliable and efficient generation of low emittance, high current ion beams. The primary ion source requirements include a rise time of order 1-{micro}sec, a pulse width of at least 20-{micro}sec, a flattop ripple of less than 0.1% and a repetition rate of at least 5-HZ. Naturally, at such a repetition rate, the duty cycle of the source must be greater than 10{sup 8} pulses. Although these specifications do not appear to exceed the state-of-the-art for pulsed power, considerable effort remains to develop a suitable high current ion source. Therefore, we are constructing a 500-kV test stand specifically for studying various ion source concepts including surface, plasma and metal vapor arc. This paper will describe the test stand design specifications as well as the details of the various subsystems and components.

  19. A New 500-kV Ion Source Test Stand for HIF

    SciTech Connect

    Sangster, T.C.; Ahle, L.E.; Halaxa, E.F.; Karpenko, V.P.; Oldaker, M. E.; Mitchell, J.W.; Beck, D.N.; Bieniosek, F.M.; Henestroza, E.; Kwan, J.W.

    2000-10-05

    One of the most challenging aspects of ion beam driven inertial fusion energy is the reliable and efficient generation of low emittance, high current ion beams. The primary ion source requirements include a rise time of order 1-msec, a pulse width of at least 20-msec, a flattop ripple of less than 0.1% and a repetition rate of at least 5-Hz. Naturally, at such a repetition rate, the duty cycle of the source must be greater than 108 pulses. Although these specifications do not appear to exceed the state-of-the-art for pulsed power, considerable effort remains to develop a suitable high current ion source. Therefore, we are constructing a 500-kV test stand specifically for studying various ion source concepts including surface, plasma and metal vapor arc. This paper will describe the test stand design specifications as well as the details of the various subsystems and components.

  20. Lightning overvoltage protection of the paddock 362-145 kV Gas-Insulated Substation

    SciTech Connect

    Elahi, H.; Sublich, M. ); Anderson, M.E.; Nelson, B.D. )

    1990-01-01

    Backflashovers close to the Paddiock 362-145 kV Gas-Insulated Substation (GIS) have been analyzed with the Electro-Magnetic Transient Program (EMTP) using a frequency dependent multi-conductor system. The severity of the lightning stroke currents were derived based on recent recordings in the eastern United States. Impacts of corona attenuation and distortion were accounted for using a shunt linear model approach. Turn-up effects of both line insulator flashover voltages and surge arrester protective characteristics were represented based on manufacturer's volt-time curves. Wave shaping effects of substation capacitances (ie., PT's transformers, CCPD's) were also modeled. Results show the importance of various modeling details in determining the overvoltages inside the GIS due to close backflashovers, which are caused by lightning strokes with varying intensity. These results are aimed at better evaluation of lightning protection requirements for GIS protected by metal-oxide surge arresters.

  1. Type B accident investigation board report of the July 2, 1997 curium intake by shredder operator at Building 513 Lawrence Livermore National Laboratory, Livermore, California. Final report

    SciTech Connect

    1997-08-01

    On July 2, 1997 at approximately 6:00 A.M., two operators (Workers 1 and 2), wearing approved personal protective equipment (PPE), began a shredding operation of HEPA filters for volume reduction in Building 513 (B-513) at Lawrence Livermore National Laboratory (LLNL). The waste requisitions indicated they were shredding filters containing {le} 1 {micro}Ci of americium-241 (Am-241). A third operator (Worker 3) provided support to the shredder operators in the shredding area (hot area) from a room that was adjacent to the shredding area (cold area). At Approximately 8:00 A.M., a fourth operator (Worker 4) relieved Worker 2 in the shredding operation. Sometime between 8:30 A.M. and 9:00 A.M., Worker 3 left the cold area to make a phone call and set off a hand and foot counter in Building 514. Upon discovering the contamination, the shredding operation was stopped and surveys were conducted in the shredder area. Surveys conducted on the workers found significant levels of contamination on their PPE and the exterior of their respirator cartridges. An exit survey of Worker 1 was conducted at approximately 10:05 A.M., and found contamination on his PPE, as well as on the exterior and interior of his respirator. Contamination was also found on his face, chest, back of neck, hair, knees, and mustache. A nose blow indicated significant contamination, which was later determined to be curium-244.

  2. SU-E-J-15: Automatically Detect Patient Treatment Position and Orientation in KV Portal Images

    SciTech Connect

    Qiu, J; Yang, D

    2015-06-15

    Purpose: In the course of radiation therapy, the complex information processing workflow will Result in potential errors, such as incorrect or inaccurate patient setups. With automatic image check and patient identification, such errors could be effectively reduced. For this purpose, we developed a simple and rapid image processing method, to automatically detect the patient position and orientation in 2D portal images, so to allow automatic check of positions and orientations for patient daily RT treatments. Methods: Based on the principle of portal image formation, a set of whole body DRR images were reconstructed from multiple whole body CT volume datasets, and fused together to be used as the matching template. To identify the patient setup position and orientation shown in a 2D portal image, the 2D portal image was preprocessed (contrast enhancement, down-sampling and couch table detection), then matched to the template image so to identify the laterality (left or right), position, orientation and treatment site. Results: Five day’s clinical qualified portal images were gathered randomly, then were processed by the automatic detection and matching method without any additional information. The detection results were visually checked by physicists. 182 images were correct detection in a total of 200kV portal images. The correct rate was 91%. Conclusion: The proposed method can detect patient setup and orientation quickly and automatically. It only requires the image intensity information in KV portal images. This method can be useful in the framework of Electronic Chart Check (ECCK) to reduce the potential errors in workflow of radiation therapy and so to improve patient safety. In addition, the auto-detection results, as the patient treatment site position and patient orientation, could be useful to guide the sequential image processing procedures, e.g. verification of patient daily setup accuracy. This work was partially supported by research grant from

  3. Investigation on abnormal phenomena of contacts using disconnecting switch and detachable bus in 300kV GIS

    SciTech Connect

    Mukaiyama, Y.; Takagi, I. ); Izumi, K.; Sekiguchi, T. ); Kobayashi, A.; Sumikawa, T. )

    1990-01-01

    This paper deals with abnormal phenomena caused by contact failure in gas-insulated switchgear (GIS). It covers simulation tests using an actual 300kV-2000A rated GIS and its evaluation regarding the deteriorative behavior of abnormal conditions.

  4. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

    Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 230-kV transmission line in Washington State. BPA’s proposed action is to interconnect the proposed transmission line to an existing BPA substation.

  5. Type A Accident Investigation of the June 21, 2001, Drilling Rig Operator Injury at the Fermi National Accelerator Laboratory, August 2001

    Office of Energy Efficiency and Renewable Energy (EERE)

    On June 21, 2001, at approximately 9:40 A.M., a construction sub-tier contractor employee (the “Operator”) at the Fermi National Accelerator Laboratory (Fermilab) received serious head injuries requiring hospitalization when he was struck by part of the drilling rig (a “tong”) that he was operating.

  6. 1.9 kV AlGaN/GaN Lateral Schottky Barrier Diodes on Silicon

    SciTech Connect

    Zhu, Mingda; Song, Bo; Qi, Meng; Hu, Zongyang; Nomoto, Kazuki; Yan, Xiaodong; Cao, Yu; Johnson, Wayne; Kohn, Erhard; Jena, Debdeep; Xing, Grace Huili

    2015-02-16

    In this letter, we present AlGaN/GaN lateral Schottky barrier diodes on silicon with recessed anodes and dual field plates. A low specific on-resistance RON,SP (5.12 mΩ · cm2), a low turn-on voltage (<0.7 V) and a high reverse breakdown voltage BV (>1.9 kV), were simultaneously achieved in devices with a 25 μm anode/cathode separation, resulting in a power figure-of-merit (FOM) BV2/RON,SP of 727 MW·cm2. The record high breakdown voltage of 1.9 kV is attributed to the dual field plate structure.

  7. 1.9 kV AlGaN/GaN Lateral Schottky Barrier Diodes on Silicon

    DOE PAGES [OSTI]

    Zhu, Mingda; Song, Bo; Qi, Meng; Hu, Zongyang; Nomoto, Kazuki; Yan, Xiaodong; Cao, Yu; Johnson, Wayne; Kohn, Erhard; Jena, Debdeep; et al

    2015-02-16

    In this letter, we present AlGaN/GaN lateral Schottky barrier diodes on silicon with recessed anodes and dual field plates. A low specific on-resistance RON,SP (5.12 mΩ · cm2), a low turn-on voltage (<0.7 V) and a high reverse breakdown voltage BV (>1.9 kV), were simultaneously achieved in devices with a 25 μm anode/cathode separation, resulting in a power figure-of-merit (FOM) BV2/RON,SP of 727 MW·cm2. The record high breakdown voltage of 1.9 kV is attributed to the dual field plate structure.

  8. Templates for Approval to Continue Sponsorship as a Federally Funded Research Development Center (FFRDC) and Authorization for a Management and Operating (M&O) Type of Contract

    Energy.gov [DOE]

    The purpose of this Flash is to provide you copies of the subject templates. These templates were developed to standardize the format for approving sponsorship as a FFRDC and authorization to enter into an M&O type of contract. Two versions of each template were developed. One version covers non-competitive extensions and the other covers competitions. Word versions of the four templates will be available in the STRIPES Library.

  9. EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota

    Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana, Hettinger, North Dakota, and New Underwood, South Dakota, in Custer and Fallon Counties in Montana, Adams, Bowman, and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

  10. Heavy duty insulator assemblies for 500-kV bulk power transmission line with large diameter octagonalbundled conductor

    SciTech Connect

    Tsujimoto, K.; Hayase, I.; Hirai, J.; Inove, M.; Naito, K.; Yukino, T.

    1982-11-01

    This paper describes the design procedure and the results of field tests on mechanical performances of insulator assemblies newly developed to support octagonal-bundled conductors for 500-kV bulk power transmission. Taking account of conductor-motion-induced peak tensile load, fatigue, torsional torque and others, a successful design has been achieved in two prototype assemblies for such heavy mechanical duties as encountered during conductor galloping or swing. This has been proved throughout three years of the field tests.

  11. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  12. Adaptation of the control equipment to permit 3-terminal operation of the HVDC link between Sardinia, Corsica and mainland Italy

    SciTech Connect

    Mazzoldi, F.; Taisne, J.P.; Martin, C.J.B.; Rowe, B.A.

    1989-04-01

    After more than 20 years service as a conventional 2-terminal HVdc link, the Sardinia-Mainland Italy hvdc link (200MW, 200kV) is now operating as a three-terminal system. The original control equipment has been modified to allow the introduction of a tapping station on the line for 3-terminal operation. The adaptations to the control equipment, including the means to ensure that the convertors are operated within their capabilities, are explained.

  13. Extended application in three phase enclosure type GIS to higher voltage

    SciTech Connect

    Ando, K.; Jyogo, Y.; Ohta, M. ); Hayashi, K.; Marutani, T.; Takatsuka, K.; Yamamoto, H. )

    1988-10-01

    GIS has remarkable features that enable to construct an EHV substation within the extremely restricted space indoors in urban areas. Three phase enclosure type GIS has been successfully applied at the voltages below 204kV for reliable power transmission to the congested areas in big cities. The voltage is now extended to EHV rated at 300kV. The key technologies in the development are 300kV one-break circuit breaker, reliable confinement of three phase components within a limited size of transportable enclosure and the suitable arrangement of GIS to minimize on-site works under restricted conditions. The new developments in these key technologies are presented in this paper.

  14. A compact 300 kV solid-state high-voltage nanosecond generator for dielectric wall accelerator

    SciTech Connect

    Shen, Yi; Wang, Wei; Liu, Yi; Xia, Liansheng Zhang, Huang; Pan, Haifeng; Zhu, Jun; Shi, Jinshui; Zhang, Linwen; Deng, Jianjun

    2015-05-15

    Compact solid-state system is the main development trend in pulsed power technologies. A compact solid-state high-voltage nanosecond pulse generator with output voltage of 300 kV amplitude, 10 ns duration (FWHM), and 3 ns rise-time was designed for a dielectric wall accelerator. The generator is stacked by 15 planar-plate Blumlein pulse forming lines (PFL). Each Blumlein PFL consists of two solid-state planar transmission lines, a GaAs photoconductive semiconductor switch, and a laser diode trigger. The key components of the generator and the experimental results are reported in this paper.

  15. SPEAR Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations SPEAR Status SPEAR Status SPEAR Status Web Message Management (authorized access only) ED's stuff Run statistic (preliminary and unofficial) Training Sessions 10/20/03 rev-3 The schedule of talks listed below have a machine operations focus and are intended for operators, physicists and support personnel who will participate in SPEAR3 commissioning and operation. The talks are video taped and stored in the control room along with any pertinent hardcopies for future reference. Date

  16. TYPE OF OPERATION R Research & Development T& Facility Type

    Office of Legacy Management (LM)

    6 Contractor had total control a unknown Lyec (on basis of records reviewed) E Health Physics Protectid? c Little or None I &AECMED responsibility c Contractoi 'responaibiil q No ...

  17. SU-D-207-03: Development of 4D-CBCT Imaging System with Dual Source KV X-Ray Tubes

    SciTech Connect

    Nakamura, M; Ishihara, Y; Matsuo, Y; Ueki, N; Iizuka, Y; Mizowaki, T; Hiraoka, M

    2015-06-15

    Purpose: The purposes of this work are to develop 4D-CBCT imaging system with orthogonal dual source kV X-ray tubes, and to determine the imaging doses from 4D-CBCT scans. Methods: Dual source kV X-ray tubes were used for the 4D-CBCT imaging. The maximum CBCT field of view was 200 mm in diameter and 150 mm in length, and the imaging parameters were 110 kV, 160 mA and 5 ms. The rotational angle was 105°, the rotational speed of the gantry was 1.5°/s, the gantry rotation time was 70 s, and the image acquisition interval was 0.3°. The observed amplitude of infrared marker motion during respiration was used to sort each image into eight respiratory phase bins. The EGSnrc/BEAMnrc and EGSnrc/DOSXYZnrc packages were used to simulate kV X-ray dose distributions of 4D-CBCT imaging. The kV X-ray dose distributions were calculated for 9 lung cancer patients based on the planning CT images with dose calculation grid size of 2.5 x 2.5 x 2.5 mm. The dose covering a 2-cc volume of skin (D2cc), defined as the inner 5 mm of the skin surface with the exception of bone structure, was assessed. Results: A moving object was well identified on 4D-CBCT images in a phantom study. Given a gantry rotational angle of 105° and the configuration of kV X-ray imaging subsystems, both kV X-ray fields overlapped at a part of skin surface. The D2cc for the 4D-CBCT scans was in the range 73.8–105.4 mGy. Linear correlation coefficient between the 1000 minus averaged SSD during CBCT scanning and D2cc was −0.65 (with a slope of −0.17) for the 4D-CBCT scans. Conclusion: We have developed 4D-CBCT imaging system with dual source kV X-ray tubes. The total imaging dose with 4D-CBCT scans was up to 105.4 mGy.

  18. Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks

    SciTech Connect

    Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S.

    2006-11-15

    An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

  19. Operations Videos

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or

  20. operations center

    National Nuclear Security Administration (NNSA)

    servers and other critical Operations Center equipment

  21. Independent air supply system filtered to protect against biological and radiological agents (99.7%).
  22. <...

  1. Laboratory Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Hockaday is the associate director of the Experimental Physical Sciences Directorate and Cabbil is associate director for Nuclear and High Hazard Operations. - 12513 Norris ...

  2. Reduction/Transformation Operators

    Energy Science and Technology Software Center

    2006-09-01

    RTOp (reduction/transformation operators) is a collection of C++ software that provides the basic mechanism for implementinig vector operations in a flexible and efficient manner. This is the main interface utilized by Thyra to allow for the specification of specific vector reduction and/or transformation operations. The RTOp package contains three different types of software. (a) a small number of interoperability interfaces. (b) support software including code for the parallel SPMD mode based on only Teuchos::Comm(and notmore » MPl directly(, and (c) a library of pre-implemented RTOp subclasses for everything from simple AXPYs and norms, to more specialized vector operations. RTOp allows an algorithm developer to implement their own RTOp subclasses in a way that is independent from any specific serial, parallel, out-of-core or other type of vector implementation. RTOp is a required package by Thyra and MOOCHO. (c)« less

  3. EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection

    Energy.gov [DOE]

    The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance, and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability. Phase 2 of this project is detailed in EIS-0129.

  4. EIS-0129: New England/Hydro-Quebec 450 kV Transmission Line Interconnection- Phase II

    Energy.gov [DOE]

    The Economic Regulatory Administration issued this EIS to explore the impacts of amending Presidential Permit PP-76 to allow the Vermont Electrical Company to operate at power levels above those stipulated in the permit and to build additional transmission facilities to distribute the increased power. Phase I of this project is detailed in EIS-0103.

  5. High speed transfer switch with 50 kA and 50 kV

    SciTech Connect

    Reass, W.A.; Kasik, R.J.; Wilds, W.A.

    1989-01-01

    This paper gives the mechanical design and electrical parameters of a pneumatically operated transfer switch. This design is used to switch 3-second 50-kA current pulses, and is easily capable of 75 kA operation (2 {times} 10{sup 10} I{sup 2}t); with water-cooled versions capable of 20 kA continuously. Although the switch is not specifically designed to make or break 50 kA, it is provided with auxiliary Elkonite arcing contacts have proven their value in protecting the main electrodes even under repetitive (50 kA) fault conditions. Included in this presentation will be the results of extensive life testing and associated criteria. 6 figs., 1 tab.

  6. SU-E-I-07: Response Characteristics and Signal Conversion Modeling of KV Flat-Panel Detector in Cone Beam CT System

    SciTech Connect

    Wang, Yu; Cao, Ruifen; Pei, Xi; Wang, Hui; Hu, Liqin

    2015-06-15

    Purpose: The flat-panel detector response characteristics are investigated to optimize the scanning parameter considering the image quality and less radiation dose. The signal conversion model is also established to predict the tumor shape and physical thickness changes. Methods: With the ELEKTA XVI system, the planar images of 10cm water phantom were obtained under different image acquisition conditions, including tube voltage, electric current, exposure time and frames. The averaged responses of square area in center were analyzed using Origin8.0. The response characteristics for each scanning parameter were depicted by different fitting types. The transmission measured for 10cm water was compared to Monte Carlo simulation. Using the quadratic calibration method, a series of variable-thickness water phantoms images were acquired to derive the signal conversion model. A 20cm wedge water phantom with 2cm step thickness was used to verify the model. At last, the stability and reproducibility of the model were explored during a four week period. Results: The gray values of image center all decreased with the increase of different image acquisition parameter presets. The fitting types adopted were linear fitting, quadratic polynomial fitting, Gauss fitting and logarithmic fitting with the fitting R-Square 0.992, 0.995, 0.997 and 0.996 respectively. For 10cm water phantom, the transmission measured showed better uniformity than Monte Carlo simulation. The wedge phantom experiment show that the radiological thickness changes prediction error was in the range of (-4mm, 5mm). The signal conversion model remained consistent over a period of four weeks. Conclusion: The flat-panel response decrease with the increase of different scanning parameters. The preferred scanning parameter combination was 100kV, 10mA, 10ms, 15frames. It is suggested that the signal conversion model could effectively be used for tumor shape change and radiological thickness prediction. Supported by

  7. Operating Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  8. EIS-0112: Rifle to San Juan 345-kV Transmission Line and Associated Facilities

    Energy.gov [DOE]

    The U.S. Department of Agriculture - Rural Electrification Administration developed this statement to evaluate the environmental impacts of the Colorado-Ute Electric Association Inc. and the U.s. Department of Energy's Western Area Power Administration (WAPA) constructing and operating a 345-kilovolt transmission line from Rifle, Colorado, to the San Juan Generating Station near Farmington, New Mexico. WAPA served as a cooperating agency in the preparation of this statement and adopted it on 10/30/1984. WAPA assumed the lead role for project implementation after issuance of the final statement.

  9. The first operation of 56 MHz SRF cavity in RHIC

    SciTech Connect

    Wu, Q.; Belomestnykh, S.; Ben-Zvi, I.; Blaskiewicz, M.; DeSanto, L.; Goldberg, D.; Harvey, M.; Hayes, T.; McIntyre, G.; Mernick, K.; Orfin, P.; Seberg, S.; Severino, F.; Smith, K.; Than, R.; Zaltsman, A.

    2015-05-03

    A 56 MHz superconducting RF cavity has been designed, fabricated and installed in the Relativistic Heavy Ion Collider (RHIC). The cavity operates at 4.4 K with a “quiet helium source” to isolate the cavity from environmental acoustic noise. The cavity is a beam driven quarter wave resonator. It is detuned and damped during injection and acceleration cycles and is brought to operation only at store energy. For a first test operation, the cavity voltage was stabilized at 300 kV with full beam current. Within both Au + Au and asymmetrical Au + He3 collisions, luminosity improvement was detected from direct measurement, and the hourglass effect was reduced. One higher order mode (HOM) coupler was installed on the cavity. We report in this paper on our measurement of a broadband HOM spectrum excited by the Au beam.

  10. International 345 kV transmission line to Highgate, Vermont: environmental assessment

    SciTech Connect

    Not Available

    1985-02-01

    The action under consideration is the issuance of a Presidential permit to the Vermont Electric Power Company, Inc. (VELCO) for the construction, operation, maintenance and connection of a facility that will cross the United States-Canada border for international transmission of electric energy. The proposed transmission facilities will consist of a 7.5 mile, alternating current (ac) transmission line and a 200 MW back-to-back direct current (dc) converter terminal station. None of the facilities will involve any polluting emissions. The construction and maintenance of the proposed converter terminal station and transmission facilities will have little or no impact on the geologic features of the region. The transmission line will have little or no effect on agricultural land. Impacts on commercial forestry in the area will be minimal. The proposed route will require clearing about 36 acres of forest. The proposed transmission line and converter terminal site will have no effect on recreational activities, mining activites, residential, commercial, or industrial land use. The proposed corridor will have a minimal impact on area terrestrial wildlife and plant communities. The proposed project will have little or no impact on future population distribution, the operation of local services, employment and economic benefit, or housing in either Franklin or Highgate. 16 references, 3 figures. (ACR)

  11. Development and interrupting tests on 250KV 8KA HVDC circuit breaker

    SciTech Connect

    Tokuyama, S.; Arimatsu, K.; Hirata, K.; Kato, Y.; Yoshioka, Y.

    1985-09-01

    This paper describes the circuit and component selections, development and equivalent circuit test results on an HVDC circuit breaker for an HVDC transmission line. A puffer type SF/sub 6/ gas interrupter for AC circuit breakers is utilized for interrupting DC current with injection of high-frequency inverse current from a commutating capacitor precharged to HVDC line voltage. Also, the effectiveness of application of the HVDC breaker to an HVDC system with two parallel transmission lines is demonstrated through the EMTP simulation.

  12. SU-E-J-14: A Comparison of a 2.5MV Imaging Beam to KV and 6MV Imaging Beams

    SciTech Connect

    Nitsch, P; Robertson, D; Balter, P

    2015-06-15

    Purpose: To compare image quality metrics and dose of TrueBeam V2.0’s 2.5MV imaging beam and kV and 6MV images. Methods: To evaluate the MV image quality, the Standard Imaging QC-3 and Varian Las Vegas (LV) phantoms were imaged using the ‘quality’ and ‘low dose’ modes and then processed using RIT113 V6.3. The LEEDS phantom was used to evaluate the kV image quality. The signal to noise ratio (SNR) was also evaluated in patient images using Matlab. In addition, dose per image was evaluated at a depth of 5cm using solid water for a 28.6 cm × 28.6 cm field size, which is representative of the largest jaw settings at an SID of 150cm. Results: The 2.5MV images had lower dose than the 6 MV images and a contrast to noise ratio (CNR) about 1.4 times higher, when evaluated using the QC-3. When energy was held constant but dose varied, the different modes, ‘low dose’ and ‘quality’, showed less than an 8% difference in CNR. The ‘quality’ modes demonstrated better spatial resolution than the ‘low dose’; however, even with the ‘low dose’ all line pairs were distinct except for the 0.75lp/mm on the 2.5MV. The LV phantom was used to measure low contrast detectability and showed similar results to the QC-3. Several patient images all confirmed that SNR were highest in kV images followed by 2.5MV and then 6MV. Qualitatively, for anatomical areas with large variability in thickness, like lateral head and necks, 2.5MV images show more anatomy, such as shoulder position, than kV images. Conclusions: The kV images clearly provide the best image metrics per unit dose. The 2.5MV beam showed excellent contrast at a lower dose than 6MV and may be superior to kV for difficult to image areas that include large changes in anatomical thickness. P Balter: Varian, Sun Nuclear, Philips, CPRIT.

  13. Nanosecond pulsed power generator for a voltage amplitude up to 300 kV and a repetition rate up to 16 Hz for fine disintegration of quartz

    SciTech Connect

    Krastelev, E. G. Sedin, A. A.; Tugushev, V. I.

    2015-12-15

    A generator of high-power high-voltage nanosecond pulses is intended for electrical discharge disintegration of mineral quartz and other nonconducting minerals. It includes a 320 kV Marx pulsed voltage generator, a high-voltage glycerin-insulated coaxial peaking capacitor, and an output gas spark switch followed by a load, an electric discharge disintegration chamber. The main parameters of the generator are as follows: a voltage pulse amplitude of up to 300 kV, an output impedance of ≈10 Ω, a discharge current amplitude of up to 25 kA for a half-period of 80–90 ns, and a pulse repetition rate of up to 16 Hz.

  14. Development and experience of large conductor cable 35-kV joints at the Los Angeles Department of Water and Power

    SciTech Connect

    Calderon, F.; Findon, E.J. )

    1990-01-01

    The Los Angeles Department of Water and Power (LADWP) places a high priority on developing its distribution system in the most reliable and cost-effective manner. At higher distribution voltages, such as 34.5-kV, jointing systems which are easily, consistently, and quickly installed by both utility and contracted personnel offer significant economic advantages. With increasing loads and higher load densities at LADWP, the use of 34.5-kV, cross-linked polyethylene (CLP) aluminum, 1000-kcmil cable is becoming more common to meet customer load requirements. Two methods of jointing this large conductor cable were historically used, although each method had limitations. This paper provides an overview of LADWP's distribution system, past jointing techniques, the investigation and evaluation of alternate approaches, and the field experience with the joint selected for use.

  15. Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.

    SciTech Connect

    Lee, Jack M.

    1992-06-01

    Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

  16. Level 1 Accident Investigation Report of August 17, 2004, Fatal Aircraft Accident on the Grand Coulee-Bell No.6, 500 kV Line

    Energy.gov [DOE]

    On August 17, 2004, at approximately 0940, a Bonneville Power Administration (BPA) pilot was killed in the crash of a Bell 206BIII helicopter while stringing "sock line" to enable the subsequent stringing of new conductors and static wire on the Grand Coulee-Bell #6 500-kV line between tower 84/2 and BPA’s Bell Substation in Mead, Washington. (See Appendix 7, Site Map.)

  17. Type B Accident Investigation Board Report of the Plutonium Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report is an independent product of an accident investigation board appointed by Dr. Mario P. Fiori, Manager, Savannah River Operations Office, U.S. Department of Energy.

  18. Coiled tubing; Operations and services

    SciTech Connect

    Welch, J.L.; Stephens, R.K. )

    1992-09-01

    This paper reports on coiled tubing units which are used for many types of remedial well operations, including sand plugbacks, cement squeezes, fill cleanouts, underreaming, acid stimulations, and fishing. Fishing operations include removal of inflatable bridge plugs, lock mandrels stuck in profile nipples, coiled tubing, coiled tubing bottomhole assemblies (BHAs) and wireline. Recommended guidelines for selecting candidates, proper tool string configuration and operational techniques are presented here to assist coiled tubing supervisors and company representatives in the planning and implementation of efficient and effective fishing operations. Treatment of these areas are not intended to be exhaustive, but rather generally representative of common applications. Each fishing operation requires individualized analysis and planning.

  19. Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    (~ii~,Richland Operations Office ~Z4TESO~Richland, Washington 99352 SEP 2 2009 CERTIFIED MAIL Ms. Sarah Washburn Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Ms. Washburn: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0067) You requested, pursuant to the Freedom of Information Act (FOJA), the following documents relating to: 1 . "The authorization, decision to use, and actual use of any and all pesticides and herbicides anywhere within the

  20. Operating internationally

    SciTech Connect

    Seeley, R.S.

    1994-02-01

    When Enron Power Corp. took over a 28 MW power facility at the former US Naval base in Subic Bay, the Philippines, the company was required to employ 139 people to run the plant. This large labor force was necessary not because of the plant's operational needs, but because of local labor practices and unemployment pressures. Independent power companies have become all too familiar with the high cost and complexity of developing projects in emerging international markets. Some of the most significant issues involve taxation, unfamiliar legal systems, changing regulations, and foreign investment restrictions. In addition, questions about currency exchange, national credit worthiness, and political stability add to the difficulty of international development. However, one of the most daunting challenges centers not on development, but on long-term operations and maintenance (O M). A key concern is finding qualified labor. Most developers and O M companies agree that local people should run the plant, with the top person, or persons, thoroughly trained in the developer's company philosophy.

  1. About APPLE II Operation

    SciTech Connect

    Schmidt, T.; Zimoch, D.

    2007-01-19

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180 deg. requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented.

  2. Beam extraction and high stability operation of high current electron cyclotron resonance proton ion source

    SciTech Connect

    Roychowdhury, P. Mishra, L.; Kewlani, H.; Mittal, K. C.; Patil, D. S.

    2014-03-15

    A high current electron cyclotron resonance proton ion source is designed and developed for the low energy high intensity proton accelerator at Bhabha Atomic Research Centre. The plasma discharge in the ion source is stabilized by minimizing the reflected microwave power using four stub auto tuner and magnetic field. The optimization of extraction geometry is performed using PBGUNS code by varying the aperture, shape, accelerating gap, and the potential on the electrodes. While operating the source, it was found that the two layered microwave window (6 mm quartz plate and 2 mm boron nitride plate) was damaged (a fine hole was drilled) by the back-streaming electrons after continuous operation of the source for 3 h at beam current of 2040 mA. The microwave window was then shifted from the line of sight of the back-streaming electrons and located after the water-cooled H-plane bend. In this configuration the stable operation of the high current ion source for several hours is achieved. The ion beam is extracted from the source by biasing plasma electrode, puller electrode, and ground electrode to +10 to +50 kV, ?2 to ?4 kV, and 0 kV, respectively. The total ion beam current of 3040 mA is recorded on Faraday cup at 40 keV of beam energy at 6001000 W of microwave power, 8001000 G axial magnetic field and (1.23.9) 10{sup ?3} mbar of neutral hydrogen gas pressure in the plasma chamber. The dependence of beam current on extraction voltage, microwave power, and gas pressure is investigated in the range of operation of the ion source.

  3. Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line

    Office of Energy Efficiency and Renewable Energy (EERE)

    On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

  4. Calutron Operations | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Calutron Operations

  5. Some remarks on quasi-Hermitian operators

    SciTech Connect

    Antoine, Jean-Pierre; Trapani, Camillo

    2014-01-15

    A quasi-Hermitian operator is an operator that is similar to its adjoint in some sense, via a metric operator, i.e., a strictly positive self-adjoint operator. Whereas those metric operators are in general assumed to be bounded, we analyze the structure generated by unbounded metric operators in a Hilbert space. Following our previous work, we introduce several generalizations of the notion of similarity between operators. Then we explore systematically the various types of quasi-Hermitian operators, bounded or not. Finally, we discuss their application in the so-called pseudo-Hermitian quantum mechanics.

  6. Agreement Type Union

    National Nuclear Security Administration (NNSA)

    Type Union Local #/Name Number of Employees Project Labor Agreement International Association of Heat and Frost Insulators and Allied Workers 135 2 International Brothehood of Boilermakers, Iron Ship Builders, Blacksmith Forgers and Helpers 92 0 International Union of Bricklayers & Allied Craftsmen 13 0 Regional Council of Carpenters 1780 & 1977 13 Operative Plasterers and Cement Mason International Association Operative Plasterers and Cement Mason International Association 1

  7. Development of NS-TACSR with extremely suppressed aeolian noise and its application to 500 kV overhead transmission lines

    SciTech Connect

    Tsujimoto, K.; Furukawa, S. (Kansai Electric Power Co., Inc., Osaka (Japan)); Shimojima, K.; Yamamoto, K. (Hitachi Cable, Ltd., Hitachi (JP))

    1991-10-01

    Recently in Japan, with the unprecedented advance of residential area development in the suburbs of large cities, it has become quite difficult to secure the routes of EHV transmission lines from nuclear power plants in remote places to the suburbs of large cities, urging resolution of environmental problems related to transmission lines. In Japan, aerodynamic sound produced by conductors and insulators frequently caused noise problems. Having an opportunity of constructing a 500 kV transmission line through a residential are, we made a research to resolve this noise problem. This paper describes the characteristics of aeolian noise and preventive measures against it.

  8. Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage

    SciTech Connect

    Dreifuerst, G R; Chew, D B; Mangonon, H L; Swyers, P W

    2011-08-25

    The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.

  9. THERMALLY OPERATED VAPOR VALVE

    DOEpatents

    Dorward, J.G. Jr.

    1959-02-10

    A valve is presented for use in a calutron to supply and control the vapor to be ionized. The invention provides a means readily operable from the exterior of the vacuum tank of the apparatuss without mechanical transmission of forces for the quick and accurate control of the ionizing arc by a corresponding control of gas flow theretos thereby producing an effective way of carefully regulating the operation of the calutron. The invention consists essentially of a tube member extending into the charge bottle of a calutron devices having a poppet type valve closing the lower end of the tube. An electrical heating means is provided in the valve stem to thermally vary the length of the stem to regulate the valve opening to control the flow of material from the charge bottle.

  10. Operations | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations November 2016 « Prev Next » Event Type - Any - Audit/Review Holiday Lab Wide Retirement Speaker/Demo Training Visitors Apply Sun Mon Tue Wed Thu Fri Sat 30 31 1 2 3 4 5 6 7 8 9 10 11 12 4th Japan-US Bilateral Meeting on Rare Metals Spedding A/B 8:00am to 5:00pm General Employee Training (AL-001) 140 TASF 9:00am Spill Prevention, Control & Countermeasures (AL-218) 140 TASF 10:00am Sprains & Strains Prevention (AL-183) 140 TASF 2:00pm Aerial Lift Training (AL-179) 140 TASF

  11. EIS-0079: 300-kV International Submarine Transmission Line- Erie, Pennsylvania to Nanticoke, Ontario, Canada General Public Utilities Corporation

    Energy.gov [DOE]

    The U.S. Department of Energy Office of Energy Emergency Operations developed this statement to assess the potential environmental and socioeconomic impacts of the construction and operation of 44 miles of cable between the Erie West Substation and the Canadian border.

  12. Line Equipment Operator

    Energy.gov [DOE]

    There are several Line Equipment Operator positions located in Washington and Oregon. A successful candidate in this position will perform Line Equipment Operator work operating trucks and all...

  13. Reducing the Risk of Damage to Power Transformers of 110 kV and Above Accompanying Internal Short Circuits

    SciTech Connect

    L’vova, M. M.; L’vov, S. Yu.; Komarov, V. B.; Lyut’ko, E. O.; Vdoviko, V. P.; Demchenko, V. V.; Belyaev, S. G.; Savel’ev, V. A.; L’vov, M. Yu. L’vov, Yu. N.

    2015-03-15

    Methods of increasing the operating reliability of power transformers, autotransformers and shunting reactors in order to reduce the risk of damage, which accompany internal short circuits and equipment fires and explosions, are considered.

  14. Award Types

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Awards Team (505) 667-7824 Email Types of Awards The Awards Office, sponsored by the Technology Transfer Division and the Science and Technology Base Program Office, coordinates...

  15. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  16. TH-C-18A-10: The Influence of Tube Current On X-Ray Focal Spot Size for 70 KV CT Imaging

    SciTech Connect

    Duan, X; Grimes, J; Yu, L; Leng, S; McCollough, C

    2014-06-15

    Purpose: Focal spot blooming is an increase in the focal spot size at increased tube current and/or decreased tube potential. In this work, we evaluated the influence of tube current on the focal spot size at low kV for two CT systems, one of which used a tube designed to reduce blooming effects. Methods: A slit camera (10 micron slit) was used to measure focal spot size on two CT scanners from the same manufacturer (Siemens Somatom Force and Definition Flash) at 70 kV and low, medium and maximum tube currents, according to the capabilities of each system (Force: 100, 800 and 1300 mA; Flash: 100, 200 and 500 mA). Exposures were made with a stationary tube in service mode using a raised stand without table movement or flying focal spot technique. Focal spot size, nominally 0.8 and 1.2 mm, respectively, was measured parallel and perpendicular to the cathode-anode axis by calculating the full-width-at-half-maximum of the slit profile recording using computed radiographic plates. Results: Focal spot sizes perpendicular to the anode-cathode axis increased at the maximum mA by 5.7% on the Force and 39.1% on the Flash relative to that at the minimal mA, even though the mA was increased 13-fold on the Force and only 5- fold on the Flash. Focal spot size increased parallel to the anode-cathode axis by 70.4% on Force and 40.9% on Flash. Conclusion: For CT protocols using low kV, high mA is typically required. These protocols are relevant in children and smaller adults, and for dual-energy scanning. Technical measures to limit focal spot blooming are important in these settings to avoid reduced spatial resolution. The x-ray tube on a recently-introduced scanner appears to greatly reduce blooming effects, even at very high mA values. CHM has research support from Siemens Healthcare.

  17. Operating Experience Committee Charter

    Energy.gov [DOE]

    The Operating Experience Committee (OEC) charter provides a description of the OEC's purpose, background, membership, functions, and operations.

  18. and Operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    and Operations

  19. The effect of fast transient overvoltages on 550 kV SF{sub 6}/oil transformer bushings

    SciTech Connect

    Martins, H.J.A.; Neves, A.; Amorim, I.B.; Maranhao, F.

    1996-12-31

    This paper presents the results of the studies in a GIS (Gas-insulated substation) about disconnector operations and short-circuit and their dielectric stress in the form of steep front wave on the main power transformer bushings of Itaipu hydroelectric power plant. As a singular point is presented also the results of some tests specially developed to confirm and determine safe operational level and some modifications required in the equipment in order to enable them to live with these kinds of stresses.

  20. Type A Accident Investigation of the June 21, 2001, Drilling...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    June 21, 2001, Drilling Rig Operator Injury at the Fermi National Accelerator Laboratory, August 2001 Type A Accident Investigation of the June 21, 2001, Drilling Rig Operator ...

  1. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation

    SciTech Connect

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

  2. Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado

    SciTech Connect

    N /A

    2000-03-20

    The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

  3. A long-pulse repetitive operation magnetically insulated transmission line oscillator

    SciTech Connect

    Fan, Yu-Wei; Zhong, Hui-Huang; Zhang, Jian-De; Shu, Ting; Liu, Jin Liang

    2014-05-15

    The improved magnetically insulated transmission line oscillator (MILO) is a gigawatt-class L-band high power microwave tube. It has allowed us to generate 3.1 GW pulse of 40 ns duration in the single-pulse operation and 500 MW pulse of 25 ns duration in the repetition rate operation. However, because of the severe impedance mismatch, the power conversion efficiency is only about 4% in the repetition rate operation. In order to eliminate the impedance mismatch and obtain repetitive long-pulse high-power microwave (HPM), a series of experiments are carried out and the recent progress is presented in this paper. In the single-pulse operation, when the diode voltage is 466 kV and current is 41.6 kA, the radiated microwave power is above 2.2 GW, the pulse duration is above 102 ns, the microwave frequency is about 1.74 GHz, and the power conversion efficiency is about 11.5%. In the repetition rate operation, under the condition of the diode voltage about 400 kV, beam current about 38 kA, the radiated microwave power is about 1.0 GW, the pulse duration is about 85 ns. Moreover, the radiated microwave power and the pulse duration decline little by little when the shot numbers increase gradually. The experimental results show that the impedance matching is a vital factor for HPM systems and one of the major technical challenges is to improve the cathode for the repetition rate operation MILO.

  4. Richland Operations Office - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office...

  5. ARM - AMF2 Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    AMF2 Organization and Contacts Management and Operations Operations Overview ARM Links BCR | ECR ECO, EWO Extraview PIF, CAR, DQR & DQPR Operations Status System i.arm.gov AMF2 ...

  6. Development of an optical current transducer with a bulk type Faraday sensor for metering

    SciTech Connect

    Katsukawa, H.; Ishikawa, H.; Okajima, H.; Cease, T.W.

    1996-04-01

    An optical current transducer (OCT) with a bulk type Faraday sensor demonstrated 0.3% class accuracy for metering. The Faraday sensor had Bi{sub 12}SiO{sub 20} (BSO) single crystals with right and left optical rotatory power to cancel out temperature dependency. A prototype 161 kV OCT installed in a TVA substation verified 0.3% class performance. The OCT had the Faraday sensor, a gapped magnetic iron core, a 1.6 m optical insulator, and an optical interface.

  7. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    SciTech Connect

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these

  8. Operation of the 56 MHz superconducting RF cavity in RHIC during run 14

    SciTech Connect

    Wu, Q.; Belomestnykh, S.; Ben-Zvi, I.; Blaskiewicz, M.; Hayes, T.; Mernick, K.; Severino, F.; Smith, K.; Zaltsman, A.

    2015-09-11

    A 56 MHz superconducting RF cavity was designed and installed in the Relativistic Heavy Ion Collider (RHIC). It is the first superconducting quarter wave resonator (QWR) operating in a high-energy storage ring. We discuss herein the cavity operation with Au+Au collisions, and with asymmetrical Au+He3 collisions. The cavity is a storage cavity, meaning that it becomes active only at the energy of experiment, after the acceleration cycle is completed. With the cavity at 300 kV, an improvement in luminosity was detected from direct measurements, and the bunch length has been reduced. The uniqueness of the QWR demands an innovative design of the higher order mode dampers with high-pass filters, and a distinctive fundamental mode damper that enables the cavity to be bypassed during the acceleration stage.

  9. Experimental investigation of a Ka band high power millimeter wave generator operated at low guiding magnetic field

    SciTech Connect

    Zhu Jun; Shu Ting; Zhang Jun; Li Guolin; Zhang Zehai; Fan Yuwei

    2011-05-15

    An overmoded slow wave type Ka band generator is investigated experimentally to produce high power millimeter waves in this paper. The experiments were carried out at the TORCH-01 accelerator. The produced microwave frequency was measured by dispersive line method, and the power was estimated by integrating over the radiation pattern at far field. With relatively low guiding magnetic field of 0.8 T and diode voltage and beam current of 590 kV and 5.2 kA, respectively, a 33.56 GHz millimeter wave with an output power of 320 MW was generated, and the microwave mode was quasi-TM{sub 01} mode.

  10. Nuclear reactor characteristics and operational history

    Gasoline and Diesel Fuel Update

    Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: TBD See also: Table 1. Capacity and Generation, Table 2. Ownership Data Table 3. Nuclear Reactor Characteristics and Operational History PDF XLS Plant Name Generator ID Type Reactor Supplier and Model Construction Start Grid Connection Original Expiration Date License Renewal Application License Renewal Issued Extended Expiration Arkansas Nuclear One 1

  11. Operating Experience Committee Charter

    Energy.gov [DOE]

    The Operating Experience Committe Charter explains the purpose of the Department of Energy (DOE) Operating Experience Committee (OEC), which is to support line management within DOE and the DOE community in developing and sustaining effective oeprating experience programs so that lessons from inernal and external operating experience lead to improvement in future operational and safety performance.

  12. Operation Warfighter Internship Fair

    Energy.gov [DOE]

    Attendees: Participants of Operation Warfighter Program Cost: Free Supports: Veteran and Disability Employment Programs

  13. SU-E-T-548: Modeling of Breast IORT Using the Xoft 50 KV Brachytherapy Source and 316L Steel Rigid Shield

    SciTech Connect

    Burnside, W

    2015-06-15

    Purpose: Xoft provides a set of 316L Stainless Steel Rigid Shields to be used with their 50 kV X-ray source for Breast IORT treatments. Modeling the different shield sizes in MCNP provides information to help make clinical decisions for selecting the appropriate shield size. Methods: The Xoft Axxent 50 kV Electronic Brachytherapy System has several applications in radiation therapy, one of which is treating cancer of the breast intraoperatively by placing the miniaturized X-ray tube inside an applicator balloon that is expanded to fill the lumpectomy bed immediately following tumor removal. The ribs, lung, and muscular chest wall are all regions at risk to receive undesired dose during the treatment. A Xoft 316L Stainless Steel Rigid Shield can be placed between the intracostal muscles of the chest wall and the remaining breast tissue near the balloon to attenuate the beam and protect these organs. These shields are provided in 5 different sizes, and the effects on dose to the surrounding tissues vary with shield size. MCNP was used to model this environment and tally dose rate to certain regions of interest. Results: The average rib dose rate calculated using 0cm (i.e., no shield), 3cm, and 5cm diameter shields were 26.89, 15.43, and 8.91 Gy/hr respectively. The maximum dose rates within the rib reached 94.74 Gy/hr, 53.56 Gy/hr, and 31.44 Gy/hr for the 0cm, 3cm, and 5cm cases respectively. The shadowing effect caused by the steel shields was seen in the 3-D meshes and line profiles. Conclusion: This model predicts a higher dose rate to the underlying rib region with the 3cm shield compared to the 5cm shield; it may be useful to select the largest possible diameter when choosing a shield size for a particular IORT patient. The ability to attenuate the beam to reduce rib dose was also confirmed. Research sponsored by Xoft Inc, a subsidiary of iCAD.

  14. SU-E-J-214: Comparative Assessment On IGRT On Partial Bladder Cancer Treatment Between CT-On-Rails (CTOR) and KV Cone Beam CT (CBCT)

    SciTech Connect

    Lin, T; Ma, C

    2014-06-01

    Purpose: Image-Guided radiation therapy(IGRT) depends on reliable online patient-specific anatomy information to address random and progressive anatomy changes. Large margins have been suggested to bladder cancer treatment due to large daily bladder anatomy variation. KV Cone beam CT(CBCT) has been used in IGRT localization prevalently; however, its lack of soft tissue contrast makes clinicians hesitate to perform daily soft tissue alignment with CBCT for partial bladder cancer treatment. This study compares the localization uncertainties of bladder cancer IGRT using CTon- Rails(CTOR) and CBCT. Methods: Three T2N0M0 bladder cancer patients (total of 66 Gy to partial bladder alone) were localized daily with either CTOR or CBCT for their entire treatment course. A total of 71 sets of CTOR and 22 sets of CBCT images were acquired and registered with original planning CT scans by radiation therapists and approved by radiation oncologists for the daily treatment. CTOR scanning entailed 2mm slice thickness, 0.98mm axial voxel size, 120kVp and 240mAs. CBCT used a half fan pelvis protocol from Varian OBI system with 2mm slice thickness, 0.98axial voxel size, 125kVp, and 680mAs. Daily localization distribution was compared. Accuracy of CTOR and CBCT on partial bladder alignment was also evaluated by comparing bladder PTV coverage. Results: 1cm all around PTV margins were used in every patient except target superior limit margin to 0mm due to bowel constraint. Daily shifts on CTOR averaged to 0.48, 0.24, 0.19 mms(SI,Lat,AP directions); CBCT averaged to 0.43, 0.09, 0.19 mms(SI,Lat,AP directions). The CTOR daily localization showed superior results of V100% of PTV(102% CTOR vs. 89% CBCT) and bowel(Dmax 69.5Gy vs. 78Gy CBCT). CTOR images showed much higher contrast on bladder PTV alignment. Conclusion: CTOR daily localization for IGRT is more dosimetrically beneficial for partial bladder cancer treatment than kV CBCT localization and provided better soft tissue PTV

  15. ARM - Historical Operational Statistics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operational Statistics 2016 Quarterly Reports First Quarter (PDF) Second Quarter (PDF) Third Quarter (PDF) Fourth Quarter (PDF) Past Quarterly Reports Historical Statistics Field Campaigns Operational Visitors and Accounts Data Archive and Usage (October 1995 - Present) Historical Operational Statistics The reporting requirements for DOE national user facilities are based on time. These requirements concern the actual hours of operation (ACTUAL) and the established maximum operation or uptime

  16. Type B Accident Investigation Board Report Grout Injection Operator...

    Energy Saver

    and no damage to any structures inside the calvareum (i.e., no evidence of brain injury). Page 16 2.4. Investigation Readiness and Accident Scene Preservation The...

  17. Guideline for the preparation of safe operating procedures

    SciTech Connect

    Stinnett, L.; Carroll, M.M.; Crooks, D.L.; Doyle, J.R.; Jeblick, H.G.; Kessel, D.S.; Tippy, M.W.; Stuckey, J.M.

    1981-03-01

    These procedures are written for activities that involve the use of explosives, dangerous chemicals, radioactive materials, hazardous sytems, and for certain types of operational facilities which present hazards. This guideline presents a suggested Safe Operating Procedures format.

  18. Impact Mitigation and Monitoring of the BPA 500-kV Garrison-Taft Transmission Line : Effects on Elk Security and Hunter Opportunity, Final Report.

    SciTech Connect

    Canfield, Jodie E.

    1988-11-01

    This study was conducted by the Montana Department of Fish, Wildlife and Parks from 1984--1988 to assess the impacts of the Garrison-Taft segment of a 500-kV powerline on elk summer-fall habitat. Construction of the powerline began in 1983, and the powerline was energized in 1985. The Garrison-Taft powerline corridor crossed 251 km of mountainous terrain in western Montana; about 465 km of new roads were constructed to provide permanent access to the powerline towers. The objectives of the study were: (1) to monitor the effectiveness of mitigation measures, including timing restrictions on construction activities and road closures on newly-built access roads, and (2) to determine if opening previously-unroaded elk security habitats to hunters by powerline access roads affected elk habitat use, distribution, use of security areas, or elk harvest. In addition, both the potential for accelerated timber harvest in areas crossed by the powerline that would not have otherwise been logged because of marginal economics and lack of haul roads and the potential effect of powerline flashovers on future prescribed burning of elk winter-ranges were evaluated. 83 refs., 88 figs., 15 tabs.

  19. Atomic and electronic structures of SrTiO3/GaAs heterointerfaces: An 80-kV atomic-resolution electron energy-loss spectroscopy study

    SciTech Connect

    Qiao, Q.; Klie, Robert F; Ogut, Serdar; Idrobo Tapia, Juan C

    2012-01-01

    We have examined the atomic and electronic structures of epitaxially grown, ultrathin SrTiO{sub 3} (100) films on GaAs (001) using 80-kV aberration-corrected atomic-resolution Z-contrast imaging and electron energy-loss spectroscopy (EELS) to develop a fundamental understanding of the interfacial structure-property relationships. We find that the interface is atomically abrupt and no surface reconstruction of the GaAs (001) surface is observed. Using atomic-column resolved EELS, we examine the oxygen vacancy and Ti concentrations in the SrTiO{sub 3} film and across the heterointerface. We show that Ti diffuses into the first few monolayers of GaAs. Using a combination of EELS and first-principles calculations, we present evidence for the formation of As oxides at the interface depending on the thin-film growth conditions. These findings are used to explain the differences in the transport behavior of the films.

  20. Coiled tubing; Operations and services

    SciTech Connect

    Welch, J.L. ); Whitlow, R.R. )

    1992-07-01

    This paper reports that pulling tubing to clean out a production liner at Prudhoe Bay Unit Western Operating Area (PBU WOA) averages $600,000 to $800,000. Coiled tubing underreaming was developed to accomplish this objective at lower costs. Beginning in 1988, these operations have been improved through several generations of procedures and tool designs. Using current technology, the underreamer, in conjunction with coiled tubing, can reduce the cost of drilling out to a liner to about $50,000 or $100,000, depending on the amount and type of material to be removed. PBU WOA, operated by BP Exploration, produces about 600,000 bopd from 395 wells. Another 61 wells are used to inject produced water, seawater and miscible fluids. Most of the remedial well servicing operations are conducted using coiled tubing (CT). Three contract coiled tubing units (CTUs) work daily, performing wellbore cleanouts, stimulations, inflatable bridge plug installations and cement squeeze operations. About 42 underreaming jobs were performed from 1990 to 1991 at PBU WOA for an average cost of between $75,000 and $100,000, a cost savings of $500,000 power well compared to pulling tubing and cleaning out the wells conventionally.

  1. Climate Data Operators (CDO)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 34, GRIB including SZIP compression, ...

  2. Paducah Operations Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Timeline Paducah Operations Timeline Paducah Operations Timeline

  3. Calutron Operators | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operators Calutron Operators Young women recruited to operate the calutrons

  4. 2.3-MW Medium-Voltage, Three-Level Wind Energy Inverter Applying a Unique Bus Structure and 4.5-kV Si/SiC Hybrid Isolated Power Modules: Preprint

    SciTech Connect

    Erdman, W.; Keller, J.; Grider, D.; VanBrunt, E.

    2014-11-01

    A high-efficiency, 2.3-MW, medium-voltage, three-level inverter utilizing 4.5-kV Si/SiC (silicon carbide) hybrid modules for wind energy applications is discussed. The inverter addresses recent trends in siting the inverter within the base of multimegawatt turbine towers. A simplified split, three-layer laminated bus structure that maintains low parasitic inductances is introduced along with a low-voltage, high-current test method for determining these inductances. Feed-thru bushings, edge fill methods, and other design features of the laminated bus structure provide voltage isolation that is consistent with the 10.4-kV module isolation levels. Inverter efficiency improvement is a result of the (essential) elimination of the reverse recovery charge present in 4.5-kV Si PIN diodes, which can produce a significant reduction in diode turn-off losses as well as insulated-gate bipolar transistor (IGBT) turn-on losses. The hybrid modules are supplied in industry-standard 140 mm x 130 mm and 190 mm x 130 mm packages to demonstrate direct module substitution into existing inverter designs. A focus on laminated bus/capacitor-bank/module subassembly level switching performance is presented.

  5. ICDF Complex Operations Waste Management Plan

    SciTech Connect

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  6. ARM - NSA Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    AlaskaNSA Operations NSA Related Links Virtual Tour Facilities and Instruments Barrow Atqasuk Oliktok Point (AMF3) ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site NSA Fact Sheet Images Information for Guest Scientists Contacts NSA Operations Barrow Facility Instrumentation at the Barrow facility operates 7 days a week, 24 hours a day, year around. The instrumentation is routinely maintained using an extensive "daily rounds" checklist 5 days a week,

  7. SWPF Crane Lift Operation

    SciTech Connect

    2010-01-01

    A multiple vview shot of the SWPF crane lift operation at the Savannah River Site. Funded by the Recovery Act.

  8. Property:EIA/861/OperatesGeneratingPlant | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    type Boolean. Description: Operates Generating Plant Entity operates power generating plants (Y or N) 1 References EIA Form EIA-861 Final Data File for 2008 - F861 File...

  9. Web Operational Status Boards

    SciTech Connect

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information?support the timely sharing of information?with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharing methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB?s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new

  10. Web Operational Status Boards

    Energy Science and Technology Software Center

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information—support the timely sharing of information—with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharingmore » methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB’s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any

  11. Reducing power consumption while performing collective operations on a plurality of compute nodes

    DOEpatents

    Archer, Charles J.; Blocksome, Michael A.; Peters, Amanda E.; Ratterman, Joseph D.; Smith, Brian E.

    2011-10-18

    Methods, apparatus, and products are disclosed for reducing power consumption while performing collective operations on a plurality of compute nodes that include: receiving, by each compute node, instructions to perform a type of collective operation; selecting, by each compute node from a plurality of collective operations for the collective operation type, a particular collective operation in dependence upon power consumption characteristics for each of the plurality of collective operations; and executing, by each compute node, the selected collective operation.

  12. Electric circuit breaker comprising a plurality of vacuum interrupters simultaneously operated by a common operator

    DOEpatents

    Barkan, Philip; Imam, Imdad

    1980-01-01

    This circuit breaker comprises a plurality of a vacuum-type circuit interrupters, each having a movable contact rod. A common operating device for the interrupters comprises a linearly-movable operating member. The interrupters are mounted at one side of the operating member with their movable contact rods extending in a direction generally toward the operating member. Means is provided for mechanically coupling the operating member to the contact rods, and this means comprises a plurality of insulating operating rods, each connected at one end to the operating member and at its opposite end to one of the movable contact rods. The operating rods are of substantially equal length and have longitudinal axes that converge and intersect at substantially a common point.

  13. Fermilab SRF cryomodule operational experience

    SciTech Connect

    Martinez, A.; Klebaner, A.L.; Theilacker, J.C.; DeGraff, B.D.; White, M.; Johnson, G.S.; /Fermilab

    2011-06-01

    Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the initial phase of the facility consists of two Tevatron style standalone refrigerators, cryogenic distribution system as well as an ambient temperature pumping system to achieve 2K operations with supporting purification systems. During this phase of the project a single Type III plus 1.3 GHz cryomodule was installed, cooled and tested. Design constraints of the cryomodule required that the cryomodule individual circuits be cooled at predetermined rates. These constraints required special design solutions to achieve. This paper describes the initial cooldown and operational experience of a 1.3 GHz cryomodule using the New Muon Lab cryogenic system.

  14. Coiled tubing. operations and services

    SciTech Connect

    Hightower, C.M. )

    1992-11-01

    Coiled tubing is being used with increasing frequency in conventional or traditional production operations. Demand for coiled pipe in these types of applications is expected to experience rapid growth as standard 2 (3/8) and 2 (7/8)-in. OD tubing sizes and units equipped to run larger pipe become more readily available. This paper reports on a recent market survey which indicated that coiled tubing used for velocity strings and standard production tubing installations are two areas with the most potential for immediate and near-term expansion. Other applications include: well casing and liners, gravel packing, artificial lift, flowlines and pipelines.

  15. Site Operator Program

    SciTech Connect

    Warren, J.F.

    1991-01-01

    Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

  16. Site Operator Program

    SciTech Connect

    Warren, J.F.

    1991-12-31

    Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

  17. Cask fleet operations study

    SciTech Connect

    Not Available

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  18. First operation of the LBL ERC ion source with the 88-inch cyclotron

    SciTech Connect

    Lyneis, C.M.; Clark, D.J.

    1985-05-01

    The LBL ECR ion source and new injection system are now in regular operation with the 88-Inch Cyclotron supplying stable, reliable heavy ion beams for both nuclear physics and applied research. The ions accelerated to date cover the mass range from nitrogen to xenon, and the energy range of 3 to 27 MeV/nucleon. Overall transmission of up to 14% from source to external cyclotron beam has been obtained. A beam from solid material, magnesium, has been used successfully for an experimental run. The emittance has been measured, at 10 kV accelerating voltage, for a variety of ions and has been found to vary from 100..pi.. mm mrad for the low charge states to 20..pi.. mm mrad for high charge states, for about 50% of the beam. 10 refs., 1 fig., 2 tabs.

  19. Current distribution measurements inside an electromagnetic plasma gun operated in a gas-puff mode

    SciTech Connect

    Poehlmann, Flavio R.; Cappelli, Mark A.; Rieker, Gregory B.

    2010-12-15

    Measurements are presented of the time-dependent current distribution inside a coaxial electromagnetic plasma gun. The measurements are carried out using an array of six axially distributed dual-Rogowski coils in a balanced circuit configuration. The radial current distributions indicate that operation in the gas-puff mode, i.e., the mode in which the electrode voltage is applied before injection of the gas, results in a stationary ionization front consistent with the presence of a plasma deflagration. The effects of varying the bank capacitance, transmission line inductance, and applied electrode voltage were studied over the range from 14 to 112 {mu}F, 50 to 200 nH, and 1 to 3 kV, respectively.

  20. Operations Research Analysts

    Energy Information Administration (EIA) (indexed site)

    Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or

  1. APS Operational Statistics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Downtime Log Yearly Operation Statistics 2016 Statistics 2015 Statistics 2014 Statistics 2013 Statistics 2012 Statistics 2011 Statistics 2010 Statistics 2009 Statistics 2008...

  2. ARM - AMF Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2009-2010 Shouxian, China, 2008 Black Forest, Germany, 2007 Niamey, Niger, 2006 Point Reyes, California, 2005 AMF Operations Members of the AMF1 installation team prepare the...

  3. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 ...

  4. APS User Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Schedules APS Schedule Useful Links Beamline Design Library (former Design Exchange) Machine Status Link Bunch Clock Information APS Systems Status Storage Ring Operating Status...

  5. Operator interface for vehicles

    DOEpatents

    Bissontz, Jay E

    2015-03-10

    A control interface for drivetrain braking provided by a regenerative brake and a non-regenerative brake is implemented using a combination of switches and graphic interface elements. The control interface comprises a control system for allocating drivetrain braking effort between the regenerative brake and the non-regenerative brake, a first operator actuated control for enabling operation of the drivetrain braking, and a second operator actuated control for selecting a target braking effort for drivetrain braking. A graphic display displays to an operator the selected target braking effort and can be used to further display actual braking effort achieved by drivetrain braking.

  6. Operating Experience Summaries

    Energy.gov [DOE]

    The Office of Environment, Health, Safety and Security (AU) Office of Analysis publishes the Operating Experience Summary to exchange lessons-learned information between DOE facilities.

  7. Operations Committee Report

    Energy.gov [DOE] (indexed site)

    Presented to the Commission to Review Effectiveness of National Energy Laboratories Jeff Smith Deputy for Operations Oak Ridge National Laboratory February 24, 2015 The Importance ...

  8. Status and operation of the Linac4 ion source prototypes

    SciTech Connect

    Lettry, J. Aguglia, D.; Andersson, P.; Bertolo, S.; Butterworth, A.; Coutron, Y.; Dallocchio, A.; Chaudet, E.; Gil-Flores, J.; Guida, R.; Hansen, J.; Koszar, I.; Mahner, E.; Mastrostefano, C.; Mathot, S.; Mattei, S.; Midttun, Ø.; Moyret, P.; Nisbet, D.; O’Neil, M.; and others

    2014-02-15

    CERN's Linac4 45 kV H{sup −} ion sources prototypes are installed at a dedicated ion source test stand and in the Linac4 tunnel. The operation of the pulsed hydrogen injection, RF sustained plasma, and pulsed high voltages are described. The first experimental results of two prototypes relying on 2 MHz RF-plasma heating are presented. The plasma is ignited via capacitive coupling, and sustained by inductive coupling. The light emitted from the plasma is collected by viewports pointing to the plasma chamber wall in the middle of the RF solenoid and to the plasma chamber axis. Preliminary measurements of optical emission spectroscopy and photometry of the plasma have been performed. The design of a cesiated ion source is presented. The volume source has produced a 45 keV H{sup −} beam of 16–22 mA which has successfully been used for the commissioning of the Low Energy Beam Transport (LEBT), Radio Frequency Quadrupole (RFQ) accelerator, and chopper of Linac4.

  9. Business Operations Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of Business Operations Organization Chart Office of Business Operations Michael Budney, Director Project Management Coordination Office Scott Hine, Director Information and Technology Services Office Steve VonVital, Director (Acting) Workforce Management Office Jennifer Blankenheim, Director Golden Field Office Timothy Meeks, Director

  10. Stirling machine operating experience

    SciTech Connect

    Ross, B.; Dudenhoefer, J.E.

    1991-01-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that Stirling machines are capable of reliable and lengthy lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and were not expected to operate for any lengthy period of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered.

  11. schedule6_2001.xls

    Energy Information Administration (EIA) (indexed site)

    1, by North American Electric Reliability Council, 2002 Through 2011 (Various) Geographic Area Voltage Capacity Rating (MVa) In- Service Date Electrical Connection Locations Line Information Conductor Characteristics Circuits Company Information Country NERC Region NERC Sub-region Type Operating (kV) Design (kV) From Terminal To Terminal Length (Miles) Type Pole Type Pole Material Size (MCM) Material Bundling Arrangement Present Ultimate Company Code Organizational Type Ownership (Percent) U

  12. schedule6_2003.xls

    Energy Information Administration (EIA) (indexed site)

    3, by North American Electric Reliability Council, 2003 Through 2008 (Various) Geographic Area Voltage Capacity Rating (MVa) In- Service Date Electrical Connection Locations Line Information Conductor Characteristics Circuits Company Information Country NERC Region NERC Sub-region Type Operating (kV) Design (kV) From Terminal To Terminal Length (Miles) Type Pole Type Pole Material Size (MCM) Material Bundling Arrangement Present Ultimate Company Code Organizational Type Ownership (Percent) U

  13. Hazardous waste operational plan for site 300

    SciTech Connect

    Roberts, R.S.

    1982-02-12

    This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department.

  14. Stirling machine operating experience

    SciTech Connect

    Ross, B.; Dudenhoefer, J.E.

    1994-09-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that stirling machines are capable of reliable and lengthy operating lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and are not expected to operate for lengthy periods of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered. The record in this paper is not complete, due to the reluctance of some organizations to release operational data and because several organizations were not contacted. The authors intend to repeat this assessment in three years, hoping for even greater participation.

  15. Operations & Administration - JCAP

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operational Management Operational Management Operational Management Leadership Contact Information Office of Resource Management and Planning U.S. Department of Energy, MA-1.1 1000 Independence Ave., SW Washington, DC 20585 Marilyn L. Dillon Director marilyn.dillon@hq.doe.gov 202-586-4919 Sustainability Performance Office U.S. Department of Energy, MA-20 1000 Independence Ave., SW Washington, DC 20585 John Shonder Director john.shonder@hq.doe.gov 202-586-8645 Office of Aviation Management U.S.

  16. SU-E-J-89: Comparative Analysis of MIM and Velocity’s Image Deformation Algorithm Using Simulated KV-CBCT Images for Quality Assurance

    SciTech Connect

    Cline, K; Narayanasamy, G; Obediat, M; Stanley, D; Stathakis, S; Kirby, N; Kim, H

    2015-06-15

    Purpose: Deformable image registration (DIR) is used routinely in the clinic without a formalized quality assurance (QA) process. Using simulated deformations to digitally deform images in a known way and comparing to DIR algorithm predictions is a powerful technique for DIR QA. This technique must also simulate realistic image noise and artifacts, especially between modalities. This study developed an algorithm to create simulated daily kV cone-beam computed-tomography (CBCT) images from CT images for DIR QA between these modalities. Methods: A Catphan and physical head-and-neck phantom, with known deformations, were used. CT and kV-CBCT images of the Catphan were utilized to characterize the changes in Hounsfield units, noise, and image cupping that occur between these imaging modalities. The algorithm then imprinted these changes onto a CT image of the deformed head-and-neck phantom, thereby creating a simulated-CBCT image. CT and kV-CBCT images of the undeformed and deformed head-and-neck phantom were also acquired. The Velocity and MIM DIR algorithms were applied between the undeformed CT image and each of the deformed CT, CBCT, and simulated-CBCT images to obtain predicted deformations. The error between the known and predicted deformations was used as a metric to evaluate the quality of the simulated-CBCT image. Ideally, the simulated-CBCT image registration would produce the same accuracy as the deformed CBCT image registration. Results: For Velocity, the mean error was 1.4 mm for the CT-CT registration, 1.7 mm for the CT-CBCT registration, and 1.4 mm for the CT-simulated-CBCT registration. These same numbers were 1.5, 4.5, and 5.9 mm, respectively, for MIM. Conclusion: All cases produced similar accuracy for Velocity. MIM produced similar values of accuracy for CT-CT registration, but was not as accurate for CT-CBCT registrations. The MIM simulated-CBCT registration followed this same trend, but overestimated MIM DIR errors relative to the CT

  17. CH Packaging Operations Manual

    SciTech Connect

    Washington TRU Solutions LLC

    2005-06-13

    This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

  18. Nuclear material operations manual

    SciTech Connect

    Tyler, R.P.

    1981-02-01

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion.

  19. Continuity of Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2005-01-14

    The notice defines requirements and responsibilities for continuity of operations planning within the DOE to ensure the capability to continue essential Departmental functions across a wide range of all hazard emergencies. Does not cancel other directives.

  20. Operations Security Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1992-04-30

    To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

  1. Operating plan FY 1998

    SciTech Connect

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  2. Deputy Chief Operating Officer

    Energy.gov [DOE]

    This position will be filled at either Morgantown, WV or Pittsburgh, PA. A successful candidate in this position will serve as the Deputy Chief Operating Officer assigned to the Laboratory...

  3. Conduct of Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Admin Chg 2, dated 12-3-14, supersedes Admin Chg 1.

  4. Corporate Operating Experience Program

    Energy.gov [DOE]

    The DOE Corporate Operating Experience Program helps to prevent the recurrence of significant adverse events/trends by sharing performance information, lessons learned and good practices across the DOE complex.

  5. Conduct of Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, 6-25-13

  6. Protection Program Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2014-10-14

    This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

  7. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    /: -. !~t. Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 Nav 0 4 ?nn~ 05-AMCP-OO46 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin, Suite 135 Richland, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) ADVICE #166 -FUND U PLANT AREA REMEDIATION ACTIVITIES In response to your letter dated September 10, 2004, the U.S. Department of Energy, Richland Operations Office (RL), appreciates your recommendations contained in HAB Consensus

  8. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  9. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  10. Accident Investigation Reports - Type B | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    is an independent product of the Type B Accident Investigation Board appointed by John Kennedy, Acting Manager, Chicago Operations Office, U.S. Department of Energy (DOE). October...

  11. infrastructure and operations

    National Nuclear Security Administration (NNSA)

    5%2A en Performance Evaluations http:nnsa.energy.govaboutusouroperationsapmperfevals

    type-text field-field-page-name">
    Page...

  12. infrastructure and operations

    National Nuclear Security Administration (NNSA)

    5%2A en Performance Evaluations http:www.nnsa.energy.govaboutusouroperationsapmperfevals

    type-text field-field-page-name">
    P...

  13. Chapter 10: FTU Operation

    SciTech Connect

    Angelini, B.M.; Apicella, M.L.; Buceti, G.; Centioli, C.; Crisanti, F.; Iannone, F.; Mazza, G.; Mazzitelli, G.; Panella, M.; Vitale, V.

    2004-05-15

    Some specific points of the Frascati Tokamak Upgrade (FTU) operation are presented for plasma performance as well as for the machine availability and the development of new tools needed to operate in a complex scenario needed for tokamak research. The different techniques adopted for wall conditioning of the FTU are reviewed. Plasmas with low Z{sub eff} have been achieved including those at low density and high additional heating power. The obtained experimental results are discussed in terms of better operation and plasma performance achieved. As with any other large - and thus long-lasting - experiments, a mixture of old and new technological solutions inserted in an open source framework characterizes the FTU data control and acquisition systems. We give some information on the original architecture and try to detail its current state. The high level of reliability presently achieved is discussed.

  14. Types of Fuel Cells | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fuel Cells » Types of Fuel Cells Types of Fuel Cells Fuel cells are classified primarily by the kind of electrolyte they employ. This classification determines the kind of electro-chemical reactions that take place in the cell, the kind of catalysts required, the temperature range in which the cell operates, the fuel required, and other factors. These characteristics, in turn, affect the applications for which these cells are most suitable. There are several types of fuel cells currently under

  15. schedule6_2002.xls

    Energy Information Administration (EIA) (indexed site)

    Next Update: October 2008 Table 6. Existing and Proposed High-voltage Transmission Line Additions Filed in Calendar Year 2002, by North American Electric Reliability Council, 2003 Through 20012 (Various) Geographic Area Voltage Capacity Rating (MVa) In- Service Date Electrical Connection Locations Line Information Conductor Characteristics Circuits Company Information Country NERC Region NERC Sub-region Type Operating (kV) Design (kV) From Terminal To Terminal Length (Miles) Type Pole Type Pole

  16. Operational Area Monitoring Plan

    Office of Legacy Management (LM)

    ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan

  17. Stack Monitor Operating Experience Review

    SciTech Connect

    L. C. Cadwallader; S. A. Bruyere

    2009-05-01

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative “all modes” failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  18. Coiled tubing - Operations and services

    SciTech Connect

    Gronseth, J.M. )

    1993-04-01

    Drilling with a continuous (rather than jointed) drill string is an old concept that is gaining new attention as a result of recent advances made in coiled tubing and drilling technology. The development of larger diameter, reliable, high-strength coiled tubing and smaller diameter, positive displacement motors, orienting tools, surveying systems and fixed cutting drill bits have given drilling with a continuous drill string a capability that was previously unattainable. Like its many other uses, (e.g., squeeze cementing, wellbore cleanouts, flow initiation, logging) the continuity of coiled tubing gives it several advantages over conventional drill strings. These include: drilling underbalanced safely, significantly reduced trip time, continuous circulation, smaller surface requirements. Coiled tubing drilling operations have smaller surface lease requirements than most conventional rigs due to the smaller footprint of the coiled tubing unit and associated equipment. Current coiled tubing drilling operations have the following limitations: conventional rig assistance is required for well preparation; conventional rigs must assist in running long protective and production casing strings or liners; hole sizes are smaller; working depth capabilities are shallower, coiled tubing life is less. This paper goes on to discuss the history of continuous drill strings and includes information on tubing units, circulating systems, drilling fluids, well control systems, downhole tools, orientation tools, and bottomhole assemblies. It then gives a cost comparison and an application of this type of drilling.

  19. Concept of Operations: Essence

    SciTech Connect

    Hutton, William J.

    2014-04-01

    This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

  20. LCLS Operating Schedule

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 103009 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S...

  1. Manually operated coded switch

    DOEpatents

    Barnette, Jon H.

    1978-01-01

    The disclosure relates to a manually operated recodable coded switch in which a code may be inserted, tried and used to actuate a lever controlling an external device. After attempting a code, the switch's code wheels must be returned to their zero positions before another try is made.

  2. Office of Business Operations

    Energy.gov [DOE]

    The Office of Business Operations manages financial and acquisition management programs throughout the Associate Under Secretary for the Office of Environment, Health, Safety and Security (AU), including the formulation and execution of the AU budget; funding control and accounting activities; preparation of management studies; and provision of acquisition management support.

  3. Protection Program Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2016-03-23

    The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Supersedes DOE O 473.3. NOTE: Safeguards and Security Alarm Management and Control Systems, of DOE O 473.3, is retained as Attachment 3, Annex 1.

  4. Guiding drilling operations

    SciTech Connect

    Not Available

    1985-06-01

    Artificial intelligence (AI) was the overriding theme at this year's Offshore Technology Conference (OTC) exhibition and conference, with the emphasis more on drilling rather than production methods. A wide range of electronic aids to improve accuracy and speed in drilling operations - from calculators to computers - is described.

  5. Intelligent Potroom Operation

    SciTech Connect

    Jan Berkow; Larry Banta

    2003-07-29

    The Intelligent Potroom Operation project focuses on maximizing the performance of an aluminum smelter by innovating components for an intelligent manufacturing system. The Intelligent Potroom Advisor (IPA) monitors process data to identify reduction cells exhibiting behaviors that require immediate attention. It then advises operational personnel on those heuristic-based actions to bring the cell back to an optimal operating state in order to reduce the duration and frequency of substandard reduction cell performance referred to as ''Off-Peak Modes'' (OPMs). Techniques developed to identify cells exhibiting OPMs include the use of a finite element model-based cell state estimator for defining the cell's current operating state via advanced cell noise analyses. In addition, rule induction was also employed to identify statistically significant complex behaviors that occur prior to OPMs. The intelligent manufacturing system design, concepts and formalisms developed in this project w ere used as a basis for an intelligent manufacturing system design. Future research will incorporate an adaptive component to automate continuous process improvement, a technology platform with the potential to improve process performance in many of the other Industries of the Future applications as well.

  6. Electromagnetically Operated Counter

    DOEpatents

    Goldberg, H.D.; Goldberg, M.I.

    1951-12-18

    An electromagnetically operated counter wherein signals to be counted are applied to cause stepwise rotation of a rotatable element which is connected to a suitable register. The mechanism involved consists of a rotatable armature having three spaced cores of magnetic material and a pair of diametrically opposed electromagnets with a suitable pulsing circuit to actuate the magnets.

  7. Conduct of Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, dated 6-25-13, cancels DOE O 422.1. Certified 12-3-14.

  8. Operational Pause at Savannah River Site Benefits Safety Culture, Operations

    Energy.gov [DOE]

    AIKEN, S.C. – EM and the Savannah River Site (SRS) management and operations contractor are seeing positive impacts on safety culture as the site works to restore operations following last year’s operational pause.

  9. Operations building | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations building Operations building Chemical recycling columns in an operations building

  10. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    j;. ~.Department of Energy Richland Operations Office P.O. Box 550 ZATES~Richland, Washington 99352 July 29, 2010 Certified Mail Mr. Alec Osenbach Heart of America Northwest 1314 NE 56 1hStreet Suite 100 Seattle, Washington 98105 Dear Mr. Osenbach: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-01599) You requested, pursuant to the Freedom of Information Act (FOJA), the following information: 1 . Documents and records relating to the potential duration of storage for soil excavated since 2009

  11. San Francisco Operations Office

    Office of Legacy Management (LM)

    San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is

  12. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - Packing - Blowdowns * Capture vs Flare 2 SNAPSHOT * DTE Gas - 41 Units * Age Range: 8-59yrs (Average 45yrs) - 118,200HP * 1,000-15,000HP - 7 different manufacturers * Cooper-Bessemer, Solar, Waukesha, DeLaval, IR, CAT, Ariel - Complete Mixture *

  13. Fermilab | Tevatron | Tevatron Operation

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Tevatron Operation Fermilab's Accelerator Complex Fermilab's Accelerator Complex has 10 accelerators. The Tevatron, which shuts down on Sept. 30, is one of those accelerators. The Cockcroft Walton accelerates negative hydrogen ions to 740 kilo electron volts (KeV). The negative ions are then accelerated down the LINAC to 400 MeV. The particles enter the booster where the electrons are stripped off, leaving the protons. In the Booster, the protons are then accelerated to 8 GeV. Once the protons

  14. Operational health physics training

    SciTech Connect

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  15. Richland Operations Office - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office Richland Operations Office Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size RL2016LogoVert DougShoop Welcome to the Richland Operations Office page! At the Richland office, our 235 employees work toward protecting the workers, public, and environment by further reducing risk, providing the necessary infrastructure for continued safe and effective cleanup operations, and restoring

  16. Richland Operations Office - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Forward UNITED STATES DEPARTMENT OF ENERGY Richland Operations Office RL2016LogoVert DougShoop Welcome to the Richland Operations Office page! At the Richland office, our 235 employees work toward protecting the workers, public, and

  17. Total Number of Operable Refineries

    Energy Information Administration (EIA) (indexed site)

    Data Series: Total Number of Operable Refineries Number of Operating Refineries Number of Idle Refineries Atmospheric Crude Oil Distillation Operable Capacity (B/CD) Atmospheric Crude Oil Distillation Operating Capacity (B/CD) Atmospheric Crude Oil Distillation Idle Capacity (B/CD) Atmospheric Crude Oil Distillation Operable Capacity (B/SD) Atmospheric Crude Oil Distillation Operating Capacity (B/SD) Atmospheric Crude Oil Distillation Idle Capacity (B/SD) Vacuum Distillation Downstream Charge

  18. Operating Experience Level 3: Safety Concern: Occurrences of...

    Energy Saver

    of crushing injuries faced by workers who operate various types of equipment, including electric cars, skid-steers, and life equipment. PDF icon OE-3 2012-05: Safety Concern:...

  19. ARM - Measurement - Cloud type

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Measurement : Cloud type Cloud type such as cirrus, stratus, cumulus etc Categories Cloud Properties Instruments The above measurement is considered scientifically relevant for the...

  20. Nuclear reactor characteristics and operational history

    Gasoline and Diesel Fuel Update

    2. Ownership Data, Table 3. Characteristics and Operational History Table 1. Nuclear Reactor, State, Type, Net Capacity, Generation, and Capacity Factor PDF XLS Plant/Reactor Name Generator ID State Type 2009 Summer Capacity Net MW(e)1 2010 Annual Generation Net MWh2 Capacity Factor Percent3 Arkansas Nuclear One 1 AR PWR 842 6,607,090 90 Arkansas Nuclear One 2 AR PWR 993 8,415,588 97 Beaver Valley 1 PA PWR 892 7,119,413 91 Beaver Valley 2 PA PWR 885 7,874,151 102 Braidwood Generation Station 1

  1. Equipment Operational Requirements

    SciTech Connect

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  2. GMRES and integral operators

    SciTech Connect

    Kelley, C.T.; Xue, Z.Q.

    1994-12-31

    Many discretizations of integral equations and compact fixed point problems are collectively compact and strongly convergent in spaces of continuous functions. These properties not only lead to stable and convergent approximations but also can be used in the construction of fast multilevel algorithms. Recently the GMRES algorithm has become a standard coarse mesh solver. The purpose of this paper is to show how the special properties of integral operators and their approximations are reflected in the performance of the GMRES iteration and how these properties can be used to strengthen the norm in which convergence takes place. The authors illustrate these ideas with composite Gauss rules for integral equations on the unit interval.

  3. Rich land Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    TG Department of Energy Rich land Operations Office P.O. Box 550 AES Richland, Washington 99352 CERTIFIED MAIL NOV~ 2 10 2009 Mr. Gerald Pollet Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Pollet: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) The purpose of this letter is to inform you that we have withdrawn our response dated September 14, 2009, and have issued the following determination regarding item 8 of your request. In response to

  4. Rich land Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Rich land Operations Office P.O. Box 550 July 10, 2009 CERTIFIED MAIL Mr. Ryan Jarvis Heart of America Northwest 1314 N.E. 56h" Street Suite 100 Seattle, Washington 98105 Dear Mr. Jarvis: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) Pursuant to the Freedom of Information Act (FOJA), you requested the following information as stated below: 1. "The RCRA permit (both Parts A and B) for the mixed waste disposal trenches 31 and 34 located in the 200 West area of Hanford, including,

  5. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    to) Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 r OV( 4 2009 CERTIFIED MAIL Mr. Bryan Evenson Thorner, Kennedy & Gano P.S. P.O. Box 1410 Yakima, Washington 98907-14 10 Dear Mr. Evenson: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-00208) Pursuant to the Freedom of Information Act, you requested two prints, a negative, and a high resolution digital scan of May 1943 aerial photographs L26-12 and L-26-3. In addition, you requested the photographs be

  6. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    :4Tsc1 ~Richland, Washington 99352 December 18, 2009 CERTIFIED MAIL Ms. Shannon Dininny The Associated Press P.O. Box 1349 Yakima, Washington 98901 Dear Ms. Dininny: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-00644) Your Freedom of Information Act (FOIA) request dated December 2, 2009, addressed to the U.S. Department of Energy, Headquarters FOJA Office has been forwarded to this office for response as well as to the DOE Office of Environmental Management (EM), the Oak Ridge Operations Office

  7. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    c~t2 Richland Operations Office P.O. Box 550 ArES Richland, Washington 99352 July 7, 2010 Certified Mail Mr. Tom Carpenter Hanford Challenge 219 1 St Avenue South Suite 120 Seattle, Washington 98104 Dear Mr. Carpenter: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-015 17) You requested, pursuant to the Freedom of Information Act (FOIA), "any and all DOE Surveillance reports generated at or related to the Hanford Site since January 1, 2009, to the present, and any and all responses to such

  8. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 TL~ Rich land, Washington 99352 APR 0 22012 1 2-EMD-0057 Addressees - See Attached SUPPLEMENT TO DOE/RL-201 1-27, HANFORD SITE AIR OPERATING PERMIT (AOP) RENEWAL APPLICATION: COVERING THE PERIOD JANUARY 1, 2011, THROUGH DECEMBER 31, 2011 (DOE/RL-201 2-04, REV. 0) Enclosed is DOE/RL-20 12-04, Supplement to DOE/RL-20 11-27, "Hanford Site AOP Renewal Application: Covering the period January 1, 2011, through December 31, 2011." The AOP Renewal Application Supplement is being submitted in

  9. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ITEM 1 Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 15-PRO-0175 APR 3 0 205 Mr. J. A. Ciucci, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Ciucci: CONTRACT NO. DE-ACO6-08RL 14788 - FISCAL YEAR (FY) 2014 FINAL FEE DETERMINATION FOR PLATEAU REMEDIATION CONTRACT The purpose of this letter is to provide the final fee determination for the FY 2014 evaluation period. Pursuant to the

  10. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ATESORichland, Washington 99352 16-PRO-0061 DEC 17 2015 Ms. H. P. Mooers, President HPM Corporation 4304 West 2 4 th Aye, Suite 100 Kennewick, Washington 99338 Dear Ms. Mooers: CONTRACT NO. DE-EM0002043 - HPM CORPORATION (HPMC) FISCAL YEAR 2015 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy Richland Operation Office (RL) has completed its evaluation of I-PMC's performance for the period of October 1, 2014, through September 30, 2015. As the Fee

  11. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    otoM of 06735761 53 ~ Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 05-AMRC-OO38 Distribution TRANSMITTAL OF COMMENT RESPONSE MATRIX FOR THE, "RlSK ASSESSMENT WORK PLAN FOR THE 100 AREA AND 300 AREA COMPONENT OF THE RCBRA" (DOE/RL-2004-37 DRAFT A) Thank you for your comments submitted on Draft A of the Risk Assessment Work Plan for the 100 Area and 300 Area Component of the RCBRA (DOE~2004-37, Draft A). Attached is the comment-response matrix

  12. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0~Richland, Washington 99352 10O-AMSE-0054 A PR I~ ~~ Mr. J. G. Lehew III, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J.2, List B:

  13. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  14. Idaho Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    31,2010 Rod Wetsch 420 County Road 26 Beulah, ND 58523 SUBJECT: FOIA Response (10-035) (ID-2010-01986-F) (OM-PA-I0-061) Dear Mr. Wetsch: This is in final response from the Idaho Operations Office (DOE-ID), regarding your June 2, 2010, Freedom of Information Act Request. In that e-mail you requested documents relating to: "vulnerabilities of running desktop applications (Word, Excel, and PowerPoint) on the same platform as the process control systems applications." The administrator for

  15. Operating experience of double-flash geothermal power plant (Hatchobaru)

    SciTech Connect

    Yoshida, K.; Tanaka, K.; Kusunoki, K.

    1983-09-01

    Hatchobaru No. 1 Unit (55 MW) was completed in 1977 as the world's first double-flash type geothermal power plant and has been operating satisfactorily since that time. The operating record of the Hatchobaru Power Plant and group of wells, including recent findings are described.

  16. Acquisition Letter 2014-01: Management and Operating Contractors' Audit

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Coverage of Cost_Reimbursement Subcontracts | Department of Energy 2014-01: Management and Operating Contractors' Audit Coverage of Cost_Reimbursement Subcontracts Acquisition Letter 2014-01: Management and Operating Contractors' Audit Coverage of Cost_Reimbursement Subcontracts The subject Acquisition Letter's purpose is to achieve greater Department-wide emphasis on auditing cost type subcontracts by providing guidance for monitoring management and operating contractors' fulfillment of

  17. Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment

    SciTech Connect

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  18. Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. Addendum to the final environmental assessment

    SciTech Connect

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  19. Concept of Operations for Data Fusion Visualization

    SciTech Connect

    T.R. McJunkin; R.L. Boring; M.A. McQueen; L.P. Shunn; J.L. Wright; D.I. Gertman; O. Linda; K. McCarty; M. Manic

    2011-09-01

    Situational awareness in the operations and supervision of a industrial system means that decision making entity, whether machine or human, have the important data presented in a timely manner. An optimal presentation of information such that the operator has the best opportunity accurately interpret and react to anomalies due to system degradation, failures or adversaries. Anticipated problems are a matter for system design; however, the paper will focus on concepts for situational awareness enhancement for a human operator when the unanticipated or unaddressed event types occur. Methodology for human machine interface development and refinement strategy is described for a synthetic fuels plant model. A novel concept for adaptively highlighting the most interesting information in the system and a plan for testing the methodology is described.

  20. EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

    Energy.gov [DOE]

    The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

  1. Plant Operational Status - Pantex Plant

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Plant Operational Status Plant Operational Status Page Content Shift 1 - Day The Pantex Plant is open for normal Day Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 2 - Swing The Pantex Plant is open for normal Swing Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 3 - Grave The Pantex Plant is open for normal Graveyard Shift operations.

  2. Business Operations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Business Operations The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) organizational products and services, processes, and systems. The four main offices and managers of Business Operations - the Project Management Coordination Office, the Information Technology and Services Office, Workforce Management Office and the Golden Field Office - are outlined in the Business Operations organization chart. Offices

  3. Step 5: Operations and Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  4. REMOTELY OPERATED MANIPULATOR

    DOEpatents

    Hutto, E.L.

    1961-08-15

    A manipulator is described for performing, within an entirely enclosed cell containling radioactive materials, various mechanical operations. A rod with flexible fingers is encompassed by a tubular sleeve shorter than the rod. Relative movement between the rod and sleeve causes the fingers to open and close. This relative movement is effected by relative movement of permanent magnets in magnetic coupling relation to magnetic followers affixed to the ends of the rod and sleeve. The rod and its sleeve may be moved as a unit axially or may be rotated by means of the magnetic couplings. The manipulator is enclosed within a tubular member which is flexibly sealed to an opening in the cell. (AEC)

  5. RHIC Polarized proton operation

    SciTech Connect

    Huang, H.; Ahrens, L.; Alekseev, I.G.; Aschenauer, E.; Atoian, G.; Bai, M.; Bazilevsky, A.; Blaskiewicz, M.; Brennan, J.M.; Brown, K.A.; Bruno, D.; Connolly, R.; Dion, A.; D'Ottavio, T.; Drees, K.A.; Fischer, W.; Gardner, C.; Glenn, J.W.; Gu, X.; Harvey, M.; Hayes, T.; Hoff, L.; Hulsart, R.L.; Laster, J.; Liu, C.; Luo, Y.; MacKay, W.W.; Makdisi, Y.; Marr, G.J.; Marusic, A.; Meot, F.; Mernick, K.; Michnoff, R,; Minty, M.; Montag, C.; Morris, J.; Nemesure, S.; Poblaguev, A.; Ptitsyn, V.; Ranjibar, V.; Robert-Demolaize, G.; Roser, T.; J.; Severino, F.; Schmidke, B.; Schoefer, V.; Severino, F.; Smirnov, D.; Smith, K.; Steski, D.; Svirida, D.; Tepikian, S.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J. Wang, G.; Wilinski, M.; Yip, K.; Zaltsman, A.; Zelenski, A.; Zeno, K.; Zhang, S.Y.

    2011-03-28

    The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above

  6. FRMAC Operations Manual

    SciTech Connect

    Frandsen, K.

    2010-05-01

    In the event of a major radiological incident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities. The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. This manual describes the FRMAC’s response activities in a radiological incident. It also outlines how FRMAC fits in the National Incident Management System (NIMS) under the National Response Framework (NRF) and describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the affected areas. In the event of a potential or existing major radiological incident, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is responsible for establishing and managing the FRMAC during the initial phases.

  7. Operating experience review of an INL gas monitoring system

    DOE PAGES [OSTI]

    Cadwallader, Lee C.; DeWall, K. G.; Herring, J. S.

    2015-03-01

    This article describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored in the lab room are hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and both actual and unwanted alarms are described. The calibration session time durations are described. Some simple calculations are given to estimate the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

  8. Operating experience review of an INL gas monitoring system

    SciTech Connect

    Cadwallader, Lee C.; DeWall, K. G.; Herring, J. S.

    2015-03-12

    This article describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored in the lab room are hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and both actual and unwanted alarms are described. The calibration session time durations are described. In addition, some simple calculations are given to estimate the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

  9. Motor-operated gearbox efficiency

    SciTech Connect

    DeWall, K.G.; Watkins, J.C.; Bramwell, D.; Weidenhamer, G.H.

    1996-12-01

    Researchers at the Idaho National Engineering Laboratory recently conducted tests investigating the operating efficiency of the power train (gearbox) in motor-operators typically used in nuclear power plants to power motor-operated valves. Actual efficiency ratios were determined from in-line measurements of electric motor torque (input to the operator gearbox) and valve stem torque (output from the gearbox) while the operators were subjected to gradually increasing loads until the electric motor stalled. The testing included parametric studies under reduced voltage and elevated temperature conditions. As part of the analysis of the results, the authors compared efficiency values determined from testing to the values published by the operator manufacturer and typically used by the industry in calculations for estimating motor-operator capabilities. The operators they tested under load ran at efficiencies lower than the running efficiency (typically 50%) published by the operator manufacturer.

  10. High capacity fossil fuel fired plant operator training program. Student handbook. Final report

    SciTech Connect

    Pearson, S.; Gardner, M.; Nguyen, Q.

    1994-09-30

    The operator of fossil fuel-fired boilers has a significant responsibility in assuring that the unit is continuously operated in a manner which complies with the various state and federal regulations. The course will emphasize the operating principles for all types of boilers and for all types of control equipment used for controlling air emissions from boilers. The course will emphasize the significant operating parameters that directly influence air emissions.

  11. Electro Catalytic Oxidation (ECO) Operation

    SciTech Connect

    Morgan Jones

    2011-03-31

    The power industry in the United States is faced with meeting many new regulations to reduce a number of air pollutants including sulfur dioxide, nitrogen oxides, fine particulate matter, and mercury. With over 1,000 power plants in the US, this is a daunting task. In some cases, traditional pollution control technologies such as wet scrubbers and SCRs are not feasible. Powerspan's Electro-Catalytic Oxidation, or ECO{reg_sign} process combines four pollution control devices into a single integrated system that can be installed after a power plant's particulate control device. Besides achieving major reductions in emissions of sulfur dioxide (SO{sub 2}), nitrogen oxides (NOx), fine particulate matter (PM2.5) and mercury (Hg), ECO produces a highly marketable fertilizer, which can help offset the operating costs of the process system. Powerspan has been operating a 50-MW ECO commercial demonstration unit (CDU) at FirstEnergy Corp.'s R.E. Burger Plant near Shadyside, Ohio, since February 2004. In addition to the CDU, a test loop has been constructed beside the CDU to demonstrate higher NOx removal rates and test various scrubber packing types and wet ESP configurations. Furthermore, Powerspan has developed the ECO{reg_sign}{sub 2} technology, a regenerative process that uses a proprietary solvent to capture CO{sub 2} from flue gas. The CO{sub 2} capture takes place after the capture of NOx, SO{sub 2}, mercury, and fine particulate matter. Once the CO{sub 2} is captured, the proprietary solution is regenerated to release CO{sub 2} in a form that is ready for geological storage or beneficial use. Pilot scale testing of ECO{sub 2} began in early 2009 at FirstEnergy's Burger Plant. The ECO{sub 2} pilot unit is designed to process a 1-MW flue gas stream and produce 20 tons of CO{sub 2} per day, achieving a 90% CO{sub 2} capture rate. The ECO{sub 2} pilot program provided the opportunity to confirm process design and cost estimates, and prepare for large scale capture and

  12. Types of Reuse

    Energy.gov [DOE]

    The following provides greater detail regarding the types of reuse pursued for LM sites. It should be noted that many actual reuses combine several types of the uses listed below.

  13. LCLS Operating Schedule

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD

  14. Types of Radiation Exposure

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    External Irradiation Contamination Incorporation Biological Effects of Acute, Total Body Irradiation Managing Radiation Emergencies Procedure Demonstration Types of radiation ...

  15. The Bender-Dunne basis operators as Hilbert space operators

    SciTech Connect

    Bunao, Joseph; Galapon, Eric A. E-mail: eric.galapon@upd.edu.ph

    2014-02-15

    The Bender-Dunne basis operators, T{sub ?m,n}=2{sup ?n}?{sub k=0}{sup n}(n/k )q{sup k}p{sup ?m}q{sup n?k} where q and p are the position and momentum operators, respectively, are formal integral operators in position representation in the entire real line R for positive integers n and m. We show, by explicit construction of a dense domain, that the operators T{sub ?m,n}'s are densely defined operators in the Hilbert space L{sup 2}(R)

  16. DOE Corporate Operating Experience Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-04-08

    The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Supersedes DOE O 210.2.

  17. Postdoc Appointment Types

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Appointment Types Postdoc Appointment Types Most postdocs will be offered a postdoctoral research associate appointment. Each year, approximately 30 Postdoctoral Fellow appointments, including the Distinguished Fellows, are awarded. Postdoc appointment types offer world of possibilities Meet the current LANL Distinguished Postdocs Research Associates Research Associates pursue research as part of ongoing LANL science and engineering programs. Sponsored postdoctoral candidate packages are

  18. State Energy Program Operations Manual

    Energy.gov [DOE]

    The State Energy Program Operations Manual is a reference tool for the SEP network states and program officials within DOE.

  19. ARM - ARM Operations Quarterly Reports

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Quarterly Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library...

  20. Jefferson Lab Chief Operating Officer

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    COO Privacy and Security Notice Skip over navigation Search the JLab Site Chief Operating Officer Please upgrade your browser. This site's design is only visible in a graphical browser that supports web standards, but its content is accessible to any browser. Concerns? Group Navigation COO Home Lab Contracts print version Mike Maier Chief Operating Officer mmaier@jlab.org, ext. 7538 Chief Operating Officer (COO) The Chief Operating Officer is responsible for the business functions of Jefferson

  1. PNNL Electricity Infrastructure Operations Center | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Electricity Infrastructure Operations Center Jump to: navigation, search Logo: Electricity Infrastructure Operations Center Name Electricity Infrastructure Operations Center...

  2. Agreement Type Union

    National Nuclear Security Administration (NNSA)

    Operative Plasterers and Cement Mason International Association 1 International Brotherhood of Electrical Workers 396 6 International Brotherhood of Electrical Workers 357 50 ...

  3. Operating Reserves and Variable Generation

    SciTech Connect

    Ela, E.; Milligan, M.; Kirby, B.

    2011-08-01

    This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

  4. Remotely operated pipe connector

    DOEpatents

    Josefiak, Leonard J.; Cramer, Charles E.

    1988-01-01

    An apparatus for remotely assembling and disassembling a Graylock type coctor between a pipe and a closure for the pipe includes a base and a receptacle on the base for the closure. The pipe is moved into position vertically above the closure by a suitable positioning device such that the flange on the pipe is immediately adjacent and concentric with the flange on the closure. A moving device then moves two semicircular collars from a position free of the closure to a position such that the interior cam groove of each collar contacts the two flanges. Finally, a tensioning device automatically allows remote tightening and loosening of a nut and bolt assembly on each side of the collar to cause a seal ring located between the flanges to be compressed and to seal the closure. Release of the pipe and the connector is accomplished in the reverse order. Preferably, the nut and bolt assembly includes an elongate shaft portion on which a removable sleeve is located.

  5. Energy Consumption of Die Casting Operations

    SciTech Connect

    Jerald Brevick; clark Mount-Campbell; Carroll Mobley

    2004-03-15

    Molten metal processing is inherently energy intensive and roughly 25% of the cost of die-cast products can be traced to some form of energy consumption [1]. The obvious major energy requirements are for melting and holding molten alloy in preparation for casting. The proper selection and maintenance of melting and holding equipment are clearly important factors in minimizing energy consumption in die-casting operations [2]. In addition to energy consumption, furnace selection also influences metal loss due to oxidation, metal quality, and maintenance requirements. Other important factors influencing energy consumption in a die-casting facility include geographic location, alloy(s) cast, starting form of alloy (solid or liquid), overall process flow, casting yield, scrap rate, cycle times, number of shifts per day, days of operation per month, type and size of die-casting form of alloy (solid or liquid), overall process flow, casting yield, scrap rate, cycle times, number of shifts per day, days of operation per month, type and size of die-casting machine, related equipment (robots, trim presses), and downstream processing (machining, plating, assembly, etc.). Each of these factors also may influence the casting quality and productivity of a die-casting enterprise. In a die-casting enterprise, decisions regarding these issues are made frequently and are based on a large number of factors. Therefore, it is not surprising that energy consumption can vary significantly from one die-casting enterprise to the next, and within a single enterprise as function of time.

  6. TRANSIENT HEAT TRANSFER MODEL FOR SRS WASTE TANK OPERATIONS

    SciTech Connect

    Lee, S; Richard Dimenna, R

    2007-03-27

    A transient heat balance model was developed to assess the impact of a Submersible Mixer Pump (SMP) on waste temperature during the process of waste mixing and removal for the Type-I Savannah River Site (SRS) tanks. The model results will be mainly used to determine the SMP design impacts on the waste tank temperature during operations and to develop a specification for a new SMP design to replace existing long-shaft mixer pumps used during waste removal. The model will also be used to provide input to the operation planning. This planning will be used as input to pump run duration in order to maintain temperature requirements within the tank during SMP operation. The analysis model took a parametric approach. A series of the modeling analyses was performed to examine how submersible mixer pumps affect tank temperature during waste removal operation in the Type-I tank. The model domain included radioactive decay heat load, two SMP's, and one Submersible Transfer Pump (STP) as heat source terms. The present model was benchmarked against the test data obtained by the tank measurement to examine the quantitative thermal response of the tank and to establish the reference conditions of the operating variables under no SMP operation. The results showed that the model predictions agreed with the test data of the waste temperatures within about 10%. Transient modeling calculations for two potential scenarios of sludge mixing and removal operations have been made to estimate transient waste temperatures within a Type-I waste tank. When two 200-HP submersible mixers and 12 active cooling coils are continuously operated in 100-in tank level and 40 C initial temperature for 40 days since the initiation of mixing operation, waste temperature rises about 9 C in 48 hours at a maximum. Sensitivity studies for the key operating variables were performed. The sensitivity results showed that the chromate cooling coil system provided the primary cooling mechanism to remove process

  7. Multimegawatt power sources for commercial space operations

    SciTech Connect

    Dearien, J.A.; Martinell, J.S.

    1988-01-01

    There is a great deal of interest in commercial operation in space today, but very little consideration of where the power to run such an operation is to come from. For any commercial operation in space, the power source, especially those involving kilowatts and megawatts of power, must be considered at the very onset of the venture. The Multimegawatt Space Reactor Program at the Idaho National Engineering Laboratory is working this problem in conjunction with the development of Strategic Defense Initiative needs. The same type of up-front power development program needs to be considered in all discussions associated with commercial development in space. A system developed for a commercial operation in space will most likely be a hybrid system utilizing both electrical and thermal energy. Even if the commercial process consists totally of high power thermal energy usage, there will be a certain amount of electricity required for controls, mass transport, environmental control (if manned), and communications. The optimum system will thus require a great deal of planning and coordination with the development of the commercial process. 2 refs., 4 figs.

  8. SU-E-J-13: Six Degree of Freedom Image Fusion Accuracy for Cranial Target Localization On the Varian Edge Stereotactic Radiosurgery System: Comparison Between 2D/3D and KV CBCT Image Registration

    SciTech Connect

    Xu, H; Song, K; Chetty, I; Kim, J; Wen, N

    2015-06-15

    Purpose: To determine the 6 degree of freedom systematic deviations between 2D/3D and CBCT image registration with various imaging setups and fusion algorithms on the Varian Edge Linac. Methods: An anthropomorphic head phantom with radio opaque targets embedded was scanned with CT slice thicknesses of 0.8, 1, 2, and 3mm. The 6 DOF systematic errors were assessed by comparing 2D/3D (kV/MV with CT) with 3D/3D (CBCT with CT) image registrations with different offset positions, similarity measures, image filters, and CBCT slice thicknesses (1 and 2 mm). The 2D/3D registration accuracy of 51 fractions for 26 cranial SRS patients was also evaluated by analyzing 2D/3D pre-treatment verification taken after 3D/3D image registrations. Results: The systematic deviations of 2D/3D image registration using kV- kV, MV-kV and MV-MV image pairs were within ±0.3mm and ±0.3° for translations and rotations with 95% confidence interval (CI) for a reference CT with 0.8 mm slice thickness. No significant difference (P>0.05) on target localization was observed between 0.8mm, 1mm, and 2mm CT slice thicknesses with CBCT slice thicknesses of 1mm and 2mm. With 3mm CT slice thickness, both 2D/3D and 3D/3D registrations performed less accurately in longitudinal direction than thinner CT slice thickness (0.60±0.12mm and 0.63±0.07mm off, respectively). Using content filter and using similarity measure of pattern intensity instead of mutual information, improved the 2D/3D registration accuracy significantly (P=0.02 and P=0.01, respectively). For the patient study, means and standard deviations of residual errors were 0.09±0.32mm, −0.22±0.51mm and −0.07±0.32mm in VRT, LNG and LAT directions, respectively, and 0.12°±0.46°, −0.12°±0.39° and 0.06°±0.28° in RTN, PITCH, and ROLL directions, respectively. 95% CI of translational and rotational deviations were comparable to those in phantom study. Conclusion: 2D/3D image registration provided on the Varian Edge radiosurgery, 6 DOF

  9. Computer control for remote wind turbine operation

    SciTech Connect

    Manwell, J.F.; Rogers, A.L.; Abdulwahid, U.; Driscoll, J.

    1997-12-31

    Light weight wind turbines located in harsh, remote sites require particularly capable controllers. Based on extensive operation of the original ESI-807 moved to such a location, a much more sophisticated controller than the original one has been developed. This paper describes the design, development and testing of that new controller. The complete control and monitoring system consists of sensor and control inputs, the control computer, control outputs, and additional equipment. The control code was written in Microsoft Visual Basic on a PC type computer. The control code monitors potential faults and allows the turbine to operate in one of eight states: off, start, run, freewheel, low wind shut down, normal wind shutdown, emergency shutdown, and blade parking. The controller also incorporates two {open_quotes}virtual wind turbines,{close_quotes} including a dynamic model of the machine, for code testing. The controller can handle numerous situations for which the original controller was unequipped.

  10. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9 O&M Ideas for Major Equipment Types 9.1 Introduction At the heart of all O&M lies the equipment. Across the Federal sector, this equipment varies greatly in age, size, type, model, fuel used, condition, etc. While it is well beyond the scope of this guide to study all equipment types, we tried to focus our efforts on the more common types prevalent in the Federal sector. The objectives of this chapter are the following: * Present general equipment descriptions and operating principles

  11. CHRPR Operations Manual

    SciTech Connect

    Windsor, Bradford T.; Woodring, Mitchell L.; Myjak, Mitchell J.

    2012-08-21

    1.0 Overview The TSA systems VM-250AGN portal monitor is a set of two pillars made to detect nuclear material in a vehicle. Each pillar contains two polyvinyl toluene (PVT) plastic gamma ray detectors and four 3He neutron detectors, as well as a power supply and electronics to process the output from these detectors. Pacific Northwest National Laboratory has designed and built a continuous high-resolution PVT readout (CHRPR) for the TSA portal to allow spectral readout from the gamma and neutron detectors. The CHRPR helps differentiate between different types of radioactive material through increased spectroscopic capability and associated developments. The TSA VM-250AGN continually monitors the natural neutron and gamma ray background which occurs around the pillars. When the system is installed, the two pillars are placed on either side of a roadway, and a vehicle presence sensor records the passage of cars between them. When radiation measurements exceed a preset alarm threshold, the system alarms to let the user know that a radioactive material is present. Time-stamped measurements are continually sent to a computer, where they can be recorded via a Windows terminal or the TSA RAVEN software. For each pillar in the original TSA model, output from each detector is amplified and shaped by a single channel analyzer, the SCA-775. Information from both SCA-775’s are passed to the SC-770 in the master pillar. This is the detector interface module and main data processor. It counts electrical pulses and uses program software to output total readings to the computer, as well as trigger any appropriate alarms. The CHRPR allows a parallel approach to recording radiation readings from the TSA system. After installing the CHRPR system, all TSA power and signal connections are unchanged. The CHRPR captures electrical pulses containing detector and occupancy sensor information from the SCA-775 on either side. These pulses are converted to a signal with a time width

  12. Gigawatt-class radiation generated by a Ka-band overmoded Cherenkov-type high power millimeter wave generator

    SciTech Connect

    Wu, Dapeng Shu, Ting; Ju, Jinchuan; Peng, Shengren

    2015-08-15

    Particle simulation and experimental results are presented about a Ka-band overmoded Cherenkov-type high power millimeter wave generator in this paper. The relativistic electron beam with peak current of 8.4 kA was generated by a pulsed power accelerator working at the voltage of 625 kV, which was guided by an axial magnetic field of 1.05 T and transported through the beam-wave interaction structures. After careful calibration, the microwave power radiated in the far field was as high as about 500 MW, with a frequency of 32.1 GHz and a pulse width of 20 ns. The radiation mode was well controlled to be TM{sub 0n} mode.

  13. Operations & Maintenance Best Practices Guide: Chapter 3

    Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Operations Team | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Team Operations Team Ebony Vauss Headshot Ebony-Vauss.jpg Ebony Vauss is the operations supervisor for the Solar Energy Technologies Office, a position that she has held since March 2014. Prior to joining SETO, Ebony served as a lead budget analyst managing the Weatherization and Intergovernmental Programs portfolio. Ebony began her federal service in 1999 in the Office of Science and went on to manage the Office of Science's internship and fellowship programs within the Office of

  15. Operating Innovative Networks Workshop Series

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operating Innovative Networks Workshop Series Science Engagement Move your data Programs & Workshops CrossConnects Workshop Series Operating Innovative Networks Workshop Series Enlighten Your Research Global Program Science Requirements Reviews Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Operating Innovative

  16. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    07, 2013 DOE-ID Operations Summary For the Period July 8, 2013 through July 28, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  17. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  18. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    10, 2013 DOE-ID Operations Summary For the Period August 12, 2013 through August 26, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  19. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, 2013 DOE-ID Operations Summary For the Period August 26, 2013 through September 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  20. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  1. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  2. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    27, 2014 DOE-ID Operations Summary For the Period December 01, 2013 through January 15, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  3. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3, 2015 Updated on April 28, 2015 DOE-ID Operations Summary For the Period September 30, 2014 through November 1, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle

  4. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period January 1, 2015 - January 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  5. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2015 DOE-ID Operations Summary For the Period February 1, 2015 - February 28, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  6. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3, 2015 DOE-ID Operations Summary For the Period March 1, 2015 -March 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  7. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1, 2015 DOE-ID Operations Summary For the Period April 1, 2015 - April 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information about health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  8. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4, 2015 DOE-ID Operations Summary For the Period May 1, 2015 - May 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  9. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    25, 2015 DOE-ID Operations Summary For the Period June 1, 2015 - June 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  10. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 2, 2015 DOE-ID Operations Summary For the Period September 1, 2015 - September 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  11. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period August 1, 2015 - August 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  12. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    February 11, 2016 DOE-ID Operations Summary For the Period November 1, 2015 - November 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  13. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 1, 2015 -December 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Idaho Operations Office (DOE-ID) December 17: The

  14. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    31, 2016 DOE-ID Operations Summary For the Period April 1-April 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  15. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1, 2016 DOE-ID Operations Summary For the Period March 1-March 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  16. schedule6_2004.xls

    Energy Information Administration (EIA) (indexed site)

    e Form EIA-411 for 2005 Released: February 07, 2008 Next Update: October 2008 Table 6. Existing and Proposed High-voltage Transmission Line Additions Filed For Calendar Year 2004, by North American Electric Reliability Council, 2004 Through 2009 (Various) Geographic Area Voltage Capacity Rating (MVa) In-Service Date Electrical Connection Locations Line Information Conductor Characteristics Circuits Company Information Country NERC Region NERC Sub-region Type Operating (kV) Design (kV) From

  17. Vice President, Transmission System Operations

    Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  18. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  19. Sustainability in Real Estate Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Convention Center * Phoenix, Arizona Sustainability in Real Estate Operations Sustainability Sustainability Planning Eleni Reed GSA Public Buildings Service August 11, 2015 ...

  20. SPECTR System Operational Test Report

    SciTech Connect

    W.H. Landman Jr.

    2011-08-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  1. Operations Division at Berkeley Lab

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    deliver exceptional operational services in support of the scientific mission of Berkeley Lab. Vision Berkeley Lab will be the best place in the world to conduct scientific...

  2. Jefferson Lab Chief Operating Officer

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    COO Privacy and Security Notice Skip over navigation Search the JLab Site Chief Operating Officer Please upgrade your browser. This site's design is only visible in a graphical ...

  3. State Energy Program Operations Manual

    Energy.gov [DOE] (indexed site)

    ENERGY PROGRAM Operations Manual (This page intentionally left blank) Introduction 3 Table ... Table of Contents, Using the Manual, Terms, Acronyms Chapter 1: State Energy Program ...

  4. Energy San Francisco Operations Office

    Office of Legacy Management (LM)

    Depariment of ' Energy San Francisco Operations Office 1333 Broadway Oakland, California 94612 FEB 6 1984 Mr. c:c. canners Energy Systems Group Rockwell International Corporation ...

  5. TYPE OF UPERATICIN

    Office of Legacy Management (LM)

    >' d;tiED INVtiLVE.' EYT AT SITE .i .I' ---...IL---... Control ? Health Physics Protectior 0 AECMED managed operations ci Little or None G AECMED responsible for ...

  6. Accident Investigation Reports - Type B | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    independent product of the Type B Accident Investigation Board appointed by James M. Turner, Ph.D., Manager of the U.S. Department of Energy, Oakland Operations Office. July 7,...

  7. Office of Emergency Operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Office of Emergency Operations

  8. DOE Corporate Operating Experience Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2006-06-12

    The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

  9. Modal Analysis for Grid Operation

    Energy Science and Technology Software Center

    2011-03-03

    MANGO software is to provide a solution for improving small signal stability of power systems through adjusting operator-controllable variables using PMU measurement. System oscillation problems are one of the major threats to the grid stability and reliability in California and the Western Interconnection. These problems result in power fluctuations, lower grid operation efficiency, and may even lead to large-scale grid breakup and outages. This MANGO software aims to solve this problem by automatically generating recommendedmore » operation procedures termed Modal Analysis for Grid Operation (MANGO) to improve damping of inter-area oscillation modes. The MANGO procedure includes three steps: recognizing small signal stability problems, implementing operating point adjustment using modal sensitivity, and evaluating the effectiveness of the adjustment. The MANGO software package is designed to help implement the MANGO procedure.« less

  10. Kinetics of interaction of Cotton Leaf Curl Kokhran Virus-Dabawali (CLCuKV-Dab) coat protein and its mutants with ssDNA

    SciTech Connect

    Priyadarshini, C.G. Poornima; Savithri, H.S.

    2009-04-10

    Gemini viral assembly and transport of viral DNA into nucleus for replication, essentially involve DNA-coat protein interactions. The kinetics of interaction of Cotton Leaf Curl Kokhran Virus-Dabawali recombinant coat protein (rCP) with DNA was studied by electrophoretic mobility shift assay (EMSA) and surface plasmon resonance (SPR). The rCP interacted with ssDNA with a K{sub A}, of 2.6 +- 0.29 x 10{sup 8} M{sup -1} in a sequence non-specific manner. The CP has a conserved C2H2 type zinc finger motif composed of residues C68, C72, H81 and H85. Mutation of these residues to alanine resulted in reduced binding to DNA probes. The H85A mutant rCP showed the least binding with approximately 756 fold loss in the association rate and a three order magnitude decrease in the binding affinity as compared to rCP. The CP-DNA interactions via the zinc finger motif could play a crucial role in virus assembly and in nuclear transport.

  11. ARM: 915-MHz Radar Wind Profiler: Wind Moments, operating in low power mode

    Office of Scientific and Technical Information (OSTI)

    (Dataset) | Data Explorer 915-MHz Radar Wind Profiler: Wind Moments, operating in low power mode Title: ARM: 915-MHz Radar Wind Profiler: Wind Moments, operating in low power mode 915-MHz Radar Wind Profiler: Wind Moments, operating in low power mode Authors: Timothy Martin ; Paytsar Muradyan ; Richard Coulter Publication Date: 2014-07-25 OSTI Identifier: 1256091 DOE Contract Number: DE-AC05-00OR22725 Resource Type: Dataset Data Type: Numeric Data Research Org: Atmospheric Radiation

  12. Transportation System Concept of Operations

    SciTech Connect

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower level

  13. General Operational Procedure for Pedestrian Radiation Portal Monitors

    SciTech Connect

    Belooussov, Andrei V.

    2012-08-08

    This document outlines the basic conduct of operation (CONOPS) for a pedestrian radiation portal monitor (RPM), provided that the CONOPS is not facility or RPM specific and that it is based on a general understanding of a pedestrian RPM operation. The described CONOPS for a pedestrian RPM is defined by: (1) RPM design and operational characteristics, (2) type of pedestrian traffic, and (3) goal for RPM installation. Pedestrian RPMs normally are deployed for the continuous monitoring of individuals passing through point of control to detect the unauthorized traffic of radioactive/nuclear materials. RPMs generally are designed to detect gamma- and neutron-emitting materials.

  14. Parylene coated microspheres: Operational parameters and round robin results

    SciTech Connect

    Williams, J.M.; Foreman, L.R.

    1987-01-01

    Achieving less than 0.1 micrometer defect and close thickness tolerances with parylene coatings has proven a challenge. Los Alamos has investigated how some parameters of coater design and operation affect coating quality. Numerous coater configurations (home-built and commercial) are being used at our Laboratory and elsewhere. In an effort to evaluate the ability of these various types of units to meet desired tolerances, we ran a round robin evaluation involving six coating operations (US and UK). Each participant received an identical and precharacterized set of targets. Results of both the round robin and coater design/operation evaluation are presented.

  15. On almost surely bounded semigroups of random linear operators

    SciTech Connect

    Zhang, Xia; Liu, Ming

    2013-05-15

    Menger proposed transferring the probabilistic notions of quantum mechanics to the underlying geometry. Following Menger's idea, the notion of random metric spaces is a random generalization of that of metric spaces and also plays an important role in the study of random operator equations. The main difficulty of this article is to work out a skill to give a property peculiar to a special semigroup of random operators, which is not involved in the classical case. Subsequently, some random operators equations are studied, in particular, we discuss the Schroedinger-type random equation, which considerably generalizes the corresponding result in the sense of Skorohod.

  16. Operation and biasing for single device equivalent to CMOS

    SciTech Connect

    Welch, James D.

    2001-01-01

    Disclosed are semiconductor devices including at least one junction which is rectifying whether the semiconductor is caused to be N or P-type, by the presence of field induced carriers. In particular, inverting and non-inverting gate voltage channel induced semiconductor single devices with operating characteristics similar to conventional multiple device CMOS systems, which can be operated as modulators, are disclosed as are a non-latching SCR and an approach to blocking parasitic currents. Operation of the gate voltage channel induced semiconductor single devices with operating characteristics similar to multiple device CMOS systems under typical bias schemes is described, and simple demonstrative five mask fabrication procedures for the inverting and non-inverting gate voltage channel induced semiconductor single devices with operating characteristics similar to multiple device CMOS systems are also presented.

  17. Human Factors Aspects of Operating Small Reactors

    SciTech Connect

    OHara, J.M.; Higgins, J.; Deem, R.; Xing, J.; DAgostino, A.

    2010-11-07

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. They are considering small modular reactors (SMRs) as one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants, and so may require a concept of operations (ConOps) that also is different. The U.S. Nuclear Regulatory Commission (NRC) has begun examining the human factors engineering- (HFE) and ConOps- aspects of SMRs; if needed, they will formulate guidance to support SMR licensing reviews. We developed a ConOps model, consisting of the following dimensions: Plant mission; roles and responsibilities of all agents; staffing, qualifications, and training; management of normal operations; management of off-normal conditions and emergencies; and, management of maintenance and modifications. We are reviewing information on SMR design to obtain data about each of these dimensions, and have identified several preliminary issues. In addition, we are obtaining operations-related information from other types of multi-module systems, such as refineries, to identify lessons learned from their experience. Here, we describe the project's methodology and our preliminary findings.

  18. DOE - NNSA/NFO -- Operation Clean Desert

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ZONE > Operation Clean Desert NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Operation Clean Desert FUN FOR ALL AGES Dr. Proton Graphic Adam - Smiling Operation ...

  19. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  20. Operational Awareness Records and Activity Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operational Awareness Records and Activity Reports Operational Awareness Records and Activity Reports December 10, 2015 Enterprise Assessments Operational Awareness Record for the...

  1. Coiled tubing; Operations and services

    SciTech Connect

    Sas-Jaworsky, A. II )

    1991-12-01

    This article outlines the minimum safety requirements that should be considered for onshore and offshore oil well service operations with coiled tubing equipment. These guidelines comply with Minerals Management Service (MMS) regulations issued on May 31, 1988, for offshore work. Where specific MMS regulations are sited, the regulation reference, Incident of Non-Compliance (INC), number is provided. These guidelines can be used by operators and contractors, and although U.S. offshore operations are emphasized, they are applicable wherever coiled tubing services are used.

  2. Operational Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operational Management Operational Management Operational Management Leadership Contact Information Office of Resource Management and Planning U.S. Department of Energy, MA-1.1 1000 Independence Ave., SW Washington, DC 20585 Marilyn L. Dillon Director marilyn.dillon@hq.doe.gov 202-586-4919 Sustainability Performance Office U.S. Department of Energy, MA-20 1000 Independence Ave., SW Washington, DC 20585 John Shonder Director john.shonder@hq.doe.gov 202-586-8645 Office of Aviation Management U.S.

  3. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  4. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    24, 2013 DOE-ID Operations Summary For the Period May 30, 2013 through June 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  5. Type B Accident Investigation of the March 20, 2003, Stair Installatio...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications Type A Investigation - Subcontractor Fatality at the Savannah River Site Pond B Dam Upgrade Project, July 26, 2004 Operating Experience Summary - ...

  6. Type B Accident Investigation of the Arc Flash at Brookhaven National Laboratory, April 14, 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report is an independent product of the Type B Accident Investigation Board appointed by Elizabeth D. Sellers, Manager, Idaho Operations Office, U.S. Department of Energy.

  7. DIII-D research operations

    SciTech Connect

    Baker, D.

    1993-05-01

    This report discusses the research on the following topics: DIII-D program overview; divertor and boundary research program; advanced tokamak studies; tokamak physics; operations; program development; support services; contribution to ITER physics R D; and collaborative efforts.

  8. LCLS Operations Schedule January February...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Schedule January February March April May June July August September October November December 2009 Run 1 Oct. 1-Dec. 17 2010 Run 2 Run 3 May 6 - Sep. 13 Oct. 7 - Dec....

  9. WIPP Activates Emergency Operations Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    August 5, 2015 WIPP Activates Emergency Operations Center At approximately 7:00 p.m. MDT on Tuesday, August 4, the Waste Isolation Pilot Plant (WIPP) activated the Emergency...

  10. Midcontinent Independent System Operator, Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Midcontinent Independent System Operator, Inc. 317.249-5400 www.misoenergy.org PO Box 4202 ... Inc. 317.249-5400 www.misoenergy.org PO Box 4202 Carmel, Indiana 46037 2985 Ames ...

  11. An operational subsea wireline system

    SciTech Connect

    Dines, C.; Cowan, P.; Headworth, C.

    1989-02-01

    This paper describes an operational subsea wireline system that is self-contained and flexible and offers a safe, economical, and proven method for riserless re-entry into any subsea well.

  12. Lease Operations Environmental Guidance Document

    SciTech Connect

    Bureau of Land Management

    2001-02-14

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  13. Operation Periods: Single Column Model

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 Fall 2002 Intensive Operation Periods: Single Column Model and Unmanned Aerospace Vehicle In an Intensive Operation Period (IOP) on November 3-23, 2002, researchers at the SGP CART site are collecting a detailed data set for use in improving the Single Column Model (SCM), a scaled- down climate model. The SCM represents one vertical column of air above Earth's surface and requires less computation time than a full-scale global climate model. Researchers first use the SCM to efficiently improve

  14. Conduct of operations implementation plan

    SciTech Connect

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  15. Reactor operation safety information document

    SciTech Connect

    Not Available

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  16. operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    operations NNSA Achieves Major Milestone in BUILDER Implementation WASHINGTON, D.C. - The Department of Energy's National Nuclear Security Administration (DOE/NNSA) achieved a major milestone in improving the management of the Nuclear Security Enterprise's infrastructure through the successful migration of all current information on building... Infrastructure and Operations NNSA's missions require a secure production and laboratory infrastructure meeting immediate and long term needs. The

  17. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    November 1, 2014 - November 30, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  18. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 1, 2014 - December 31, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  19. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    January 1, 2016 -February 29, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  20. External Independent Review (EIR) Standard Operating Procedure...

    Energy.gov [DOE] (indexed site)

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  1. Operations & Maintenance Best Practices Guide: Chapter 6

    Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. PNNL Electricity Infrastructure Operations Center | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    PNNL Electricity Infrastructure Operations Center (Redirected from Electricity Infrastructure Operations Center) Jump to: navigation, search Logo: Electricity Infrastructure...

  3. Operations & Maintenance Best Practices Guide: Chapter 9

    Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Environmental Management (EM)

    Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - March 2015 March 2015 Enterprise Assessments Operational Awareness Record, Waste ...

  5. Management and Operating Contractors' Subcontract Audit Coverage...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management and Operating Contractors' Subcontract Audit Coverage DOEIG-0885 April 2013 ... INFORMATION: Special Report on "Management and Operating Contractors' Subcontract ...

  6. Operations & Maintenance Best Practices Guide: Appendix a

    Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Front Matter

    Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Appendix d

    Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Chapter 2

    Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Chapter 1

    Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Chapter 5

    Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 8

    Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Operations & Maintenance Best Practices Guide: Chapter 7

    Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Operations & Maintenance Best Practices Guide: Chapter 10

    Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Operations & Maintenance Best Practices Guide: Appendix c

    Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Appendix B

    Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Operations & Maintenance Best Practices Guide: Chapter 11

    Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Defense waste processing facility radioactive operations. Part 1 - operating experience

    SciTech Connect

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and the world`s largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge{trademark} level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs.

  19. Focused cathode design to reduce anode heating during vircator operation

    SciTech Connect

    Lynn, Curtis F.; Dickens, James C.; Neuber, Andreas A.

    2013-10-15

    Virtual cathode oscillators, or vircators, are a type of high power microwave device which operates based on the instability of a virtual cathode, or cloud of electrons, which forms when electron current injected into the drift tube exceeds the space charge limited current within the drift tube. Anode heating by the electron beam during vircator operation ultimately limits achievable pulse lengths, repetition rates, and the duration of burst mode operation. This article discusses a novel cathode design that focuses electrons through holes in the anode, thus significantly reducing anode heating by the electrons emitted from the cathode during the first transit through the A-K gap. Reflexing electrons continue to deposit energy on the anode; however, the discussed minimization of anode heating by main beam electrons has the potential to enable higher repetition rates as well as efficiency and longer diode lifetime. A simulation study of this type of cathode design illustrates possible advantages.

  20. Shasta/Mustique subsea equipment platform interface and operability

    SciTech Connect

    Jefferies, A.T.; Loegering, C.; Steib, D.; Schlater, D.

    1996-12-31

    The economic benefits of all inclusive systems engineering approach is now recognized in the offshore industry. Nowhere is this more evident than in the area of deepwater subsea tiebacks to existing facilities. This type of development requires effective management of the interfaces between personnel on the existing facility and the new project team, the interfaces between the new subsea facilities and the existing platform, and the interface of the new operating procedures with the existing platform daily routine. A second factor in the economic viability of many of these projects is the need to minimize operating costs by avoiding the need for subsea system repair intervention. An operability analysis focusing on the subsea system and platform interface engineering was used on the Hardy projects to address the concerns with the potential for interventions. With minimum operating costs as a primary goal, Hardy encouraged participation from both host platform operating groups from the outset of both projects. This cooperation was critical since both projects were planned to more than double the throughput for both host platforms without adding platform operating personnel. The approach of operator involvement also ensured a safe, reliable, and economic transition between the installation and operating phases of the developments.

  1. Performing a local barrier operation

    DOEpatents

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value of the counter, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  2. Performing a local barrier operation

    DOEpatents

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value of the counter, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  3. Electrochemical cell operation and system

    DOEpatents

    Maru, Hansraj C.

    1980-03-11

    Thermal control in fuel cell operation is affected through sensible heat of process gas by providing common input manifolding of the cell gas flow passage in communication with the cell electrolyte and an additional gas flow passage which is isolated from the cell electrolyte and in thermal communication with a heat-generating surface of the cell. Flow level in the cell gas flow passage is selected based on desired output electrical energy and flow level in the additional gas flow passage is selected in accordance with desired cell operating temperature.

  4. Turnaround team revitalizes mining operations

    SciTech Connect

    Buchsbaum, L.

    2005-11-01

    Starting from scratch, the Broe Companies' Century Coal trains the next generation. The article describes how the newly created Century Coal LLC, controlled by Denver-based Broe Companies investment firm, is rebuilding and expanding its highwall mining operations, increasing production from a current 1 million tons to 5 to 6 million tons in 2006 and 2007. The company has a $100,000 outreach program with 95% of these funds going to local communities. Present coal mining operations are spread around Bell, Clay, Harlan Knox and Leslie Counties. A priority is the renovation of the WenLar preparation plant in Bell County. 5 photos.

  5. Collective operations in a file system based execution model

    DOEpatents

    Shinde, Pravin; Van Hensbergen, Eric

    2013-02-19

    A mechanism is provided for group communications using a MULTI-PIPE synthetic file system. A master application creates a multi-pipe synthetic file in the MULTI-PIPE synthetic file system, the master application indicating a multi-pipe operation to be performed. The master application then writes a header-control block of the multi-pipe synthetic file specifying at least one of a multi-pipe synthetic file system name, a message type, a message size, a specific destination, or a specification of the multi-pipe operation. Any other application participating in the group communications then opens the same multi-pipe synthetic file. A MULTI-PIPE file system module then implements the multi-pipe operation as identified by the master application. The master application and the other applications then either read or write operation messages to the multi-pipe synthetic file and the MULTI-PIPE synthetic file system module performs appropriate actions.

  6. Collective operations in a file system based execution model

    DOEpatents

    Shinde, Pravin; Van Hensbergen, Eric

    2013-02-12

    A mechanism is provided for group communications using a MULTI-PIPE synthetic file system. A master application creates a multi-pipe synthetic file in the MULTI-PIPE synthetic file system, the master application indicating a multi-pipe operation to be performed. The master application then writes a header-control block of the multi-pipe synthetic file specifying at least one of a multi-pipe synthetic file system name, a message type, a message size, a specific destination, or a specification of the multi-pipe operation. Any other application participating in the group communications then opens the same multi-pipe synthetic file. A MULTI-PIPE file system module then implements the multi-pipe operation as identified by the master application. The master application and the other applications then either read or write operation messages to the multi-pipe synthetic file and the MULTI-PIPE synthetic file system module performs appropriate actions.

  7. Operating temperatures for a convectively cooled recessed incandescent light fixture

    SciTech Connect

    Yarbrough, D.W.; Toor, I.

    1980-12-01

    Test results are given for the operation of a recessed incandescent light fixture intended for residential use. The fixture is labeled for use in direct contact with attic thermal insulation. Temperature control of the powered fixture is provided by convective heat transfer from the ceiling side of the fixture. The fixture was operated at power levels up to two times the rated power of 75 watts and under thermal insulations up to R-40. In all operating configurations tested the fixture surface in contact with attic insulation was found to be less than 175/sup 0/C. The observed surface temperatures are judged to be safe for operation in contact with loose-fill or batt-type insulations. It was observed that the power leads inside one fixture configuration are exposed to temperatures as high as 168/sup 0/C. The electrical insulation could, therefore, have a limited life. The properties of the internal fixture wiring were not, however, studied in detail.

  8. Type B Accident Investigation Report of the Arc Flash at Brookhaven...

    Energy Saver

    ... CAS electronic technician 1 began cleaning up the tools used. CAS electronic technician 2 began positioning the screw-drive motor for re-racking the13.8-kV circuit breaker for the ...

  9. Auditing of Programs and Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2001-03-22

    To set forth audit responsibilities for the promotion of economy and efficiency in the administration of, or the prevention or detection of fraud, waste, and abuse in, programs and operations of the Department of Energy (DOE). Cancels DOE 2321.1B. Canceled by DOE O 224.2A.

  10. Risk assessment in international operations

    SciTech Connect

    Stricklin, Daniela L.

    2008-11-15

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently.

  11. Transparent communications permit unmanned operations

    SciTech Connect

    1995-07-01

    Not-normally-manned platforms are not a new development. However, their use in harsher environments has until recently, been limited. Development of reliable communications networks capable of handling the large amounts of data required for process control in real time with distributed control systems (DCSs) has been a key factor in making the concept viable for harsher, more remote environments. The article below examines the transparent communications network and DCS installed on Pickerill field, offshore UK, by Fisher-Rosemount Systems and its operational parameters. Pickerill field, some 50 mi off the Lincolnshire coast, comprises two small unmanned platforms producing gas under remote control from Arco`s operations base at Great Yarmouth about 60 mi south. Reliable communication is required both with the two platforms offshore and with Conoco`s gas processing operators at Theddlethorpe. Fundamental to project success was the ability of the process control system to provide entirely secure and transparent communication with equipment offshore and thus enable operators at Great Yarmouth to interact with the process as if it were local to their control center.

  12. Coiled tubing operations and services

    SciTech Connect

    Jaworsky, A.S. II )

    1991-11-01

    Coiled tubing offers many advantages over conventional jointed tubing used for drilling in oil fields, including time savings, pumping flexibility, fluid placement, reduced formation damage and safety. The article gives an overview of coiled tubing history and development. Operating concepts are explained, along with descriptions of the major equipment and components associated with coiled tubing use in the oil field today.

  13. Signal and Image Processing Operations

    Energy Science and Technology Software Center

    1995-05-10

    VIEW is a software system for processing arbitrary multidimensional signals. It provides facilities for numerical operations, signal displays, and signal databasing. The major emphasis of the system is on the processing of time-sequences and multidimensional images. The system is designed to be both portable and extensible. It runs currently on UNIX systems, primarily SUN workstations.

  14. Emergency Operating Records Protection Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1991-10-23

    To establish the policy, responsibilities, and requirements for a Departmental Emergency Operating Records Protection Program to safeguard that core or records deemed necessary to assure continuity of essential Governmental activities during and following disaster and attack-related emergency conditions. Cancels DOE 5500.7A. Chanceled by DOE O 151.1 of 9-25-1995.

  15. COE1 Calorimeter Operations Manual

    SciTech Connect

    Santi, Peter Angelo

    2015-12-15

    The purpose of this manual is to describe the operations of the COE1 calorimeter which is used to measure the thermal power generated by the radioactive decay of plutonium-bearing materials for the purposes of assaying the amount of plutonium within the material.

  16. Safety of Nuclear Explosive Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2001-08-07

    This directive establishes responsibilities and requirements to ensure the safety of routine and planned nuclear explosive operations and associated activities and facilities. Cancels DOE O 452.2A and DOE G 452.2A-1A. Canceled by DOE O 452.2C.

  17. Auditing of Programs and Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2007-11-09

    To set forth audit requirements and responsibilities for the promotion of economy and efficiency in the administration of or the prevention or detection of fraud, waste, and abuse in programs and operations of the Department of Energy. Supersedes DOE O 224.2.

  18. Richland Operations Office technology summary

    SciTech Connect

    Not Available

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  19. Electric Power Annual 2011

    Energy Information Administration (EIA) (indexed site)

    Capacity Conductor Characteristics Data Year Country NERC Region NERC Sub- region Type Operating (kV) Design (kV) Rating (MVa) Month Year From Terminal To Terminal Length (Miles) Type Pole Type Pole Material Size (MCM) Material Bundling Arrange- ment Present Ultimate Company Code Company Name Organizational Type Ownership (Percent) Project Name Level of Certainty Primary Driver 1 Primary Driver 2 2011 US TRE ERCOT AC 300-399 5 2018 DeCordova Benbrook 27 OH 44372 Delivery 100 00TPIT0004

  20. Energy.gov Page Types

    Energy.gov [DOE]

    Learn about the standard page types available in the Energy.gov Drupal content management system. For information about other available page types, or to request a new kind of page type, contact...

  1. LANL continuity of operations plan

    SciTech Connect

    Senutovitch, Diane M

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an

  2. Design and operation of small biogas plants

    SciTech Connect

    Abdel-Dayem, A.M.; Hamad, M.A.

    1980-12-01

    This paper concentrates on the experience gained from the adaptation of the Chinese biogas technology to rural areas of Egypt. Three different prototype digesters have been constructed. The first is a 10 M/sup 3/ rectangular digester of the water pressure type, the second is a 6 M/sup 3/ circular and shallow digester with domed roof and dished bottom. The third prototype unit with a capacity of 7 M/sup 3/ has been recently constructed. It combines the features of both plug flow and the Indian movable cap types. Provisions for solar heating of feed water, composting of effluent and attachments to both latrine and animal shed were incorporated in the unit. The structural theory, design criteria, construction technique and cost estimation of the circular digester are described. Some operation and performance data of the circular digester are presented. This covers the effects of variation of ambient temperature on internal temperature, effects of temperature and pressure on the gas production rate and composition.

  3. VISAR2KV1.0Beta

    Energy Science and Technology Software Center

    2001-01-01

    The software provides a rapid and robust method for reducing fringe records obtained using eithe a line-imaging optically recording velocity interferometry system (ORVIS) or stop-motion imaging of the moving fringe field. The reduced records result in spatially resolved velocity profiles of rapidly accelerating objects. Complex, time-dependent fringe motion (corresponding to local velocity variations) can be evaluated and interpreted using this program.

  4. Emergency Operations Training Academy | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Emergency Operations Training Academy Emergency Operations Training Academy The Office of Emergency Operations, NA-40-The Emergency Operations Training Academy (EOTA) EOTA provides training and education to enhance the readiness of personnel in the radiological-nuclear emergency operations community. For more information or to contact us, visit the EOTA website at

  5. Human Factors for Situation Assessment in Grid Operations

    SciTech Connect

    Guttromson, Ross T.; Schur, Anne; Greitzer, Frank L.; Paget, Mia L.

    2007-08-08

    literature review, we advocate a new perspective on SA in terms of sensemaking, also called situated or ecological decision making, where the focus of the investigation is to understand why the decision maker(s) experienced the situation the way they did, or why what they saw made sense to them at the time. This perspective is distinct from the traditional branch of human factors research in the field which focuses more on ergonomics and the transactional relationship between the human operator and the systems. Consistent with our findings from the literature review, we recognized an over-arching need to focus SA research on issues surrounding the concept of shared knowledge; e.g., awareness of what is happening in adjacent areas as well as ones own area of responsibility. Major findings were: a) Inadequate communication/information sharing is pervasive, b) Information is available, but not used. Many tools and mechanisms exist for operators to build awareness of the physical grid system, yet the transcripts reveal that they still need to call and exchange information with operators of neighboring areas to improve or validate their SA. The specific types of information that they request are quite predictable and, in most cases, cover information that could be available to both operators and reliability coordinators through readily available displays or other data sources, c) Shared Knowledge is Required on Operations/Actions as Well as Physical Status. In an ideal, technologically and organizationally perfect world, every control room and every reliability coordinator may have access to complete data across all regional control areas and yet, there would still be reason for the operators to call each other to gain and improve their SA of power grid operations, and d) Situation Awareness as sensemaking and shared knowledge.

  6. Recovering entanglement by local operations

    SciTech Connect

    D’Arrigo, A.; Lo Franco, R.; Benenti, G.; Paladino, E.; Falci, G.

    2014-11-15

    We investigate the phenomenon of bipartite entanglement revivals under purely local operations in systems subject to local and independent classical noise sources. We explain this apparent paradox in the physical ensemble description of the system state by introducing the concept of “hidden” entanglement, which indicates the amount of entanglement that cannot be exploited due to the lack of classical information on the system. For this reason this part of entanglement can be recovered without the action of non-local operations or back-transfer process. For two noninteracting qubits under a low-frequency stochastic noise, we show that entanglement can be recovered by local pulses only. We also discuss how hidden entanglement may provide new insights about entanglement revivals in non-Markovian dynamics.

  7. Reactor operation environmental information document

    SciTech Connect

    Haselow, J.S.; Price, V.; Stephenson, D.E.; Bledsoe, H.W.; Looney, B.B.

    1989-12-01

    The Savannah River Site (SRS) produces nuclear materials, primarily plutonium and tritium, to meet the requirements of the Department of Defense. These products have been formed in nuclear reactors that were built during 1950--1955 at the SRS. K, L, and P reactors are three of five reactors that have been used in the past to produce the nuclear materials. All three of these reactors discontinued operation in 1988. Currently, intense efforts are being extended to prepare these three reactors for restart in a manner that protects human health and the environment. To document that restarting the reactors will have minimal impacts to human health and the environment, a three-volume Reactor Operations Environmental Impact Document has been prepared. The document focuses on the impacts of restarting the K, L, and P reactors on both the SRS and surrounding areas. This volume discusses the geology, seismology, and subsurface hydrology. 195 refs., 101 figs., 16 tabs.

  8. TWP-ICE Operations Plan

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Plan Peter May, Jim Mather, Christian Jakob, Jay Mace, Greg McFarquhar With contributions from many people Overview The TWPICE experiment will take place from January 21, 2006 through February 13, 2006. During this period, there will be a substantial ground and sea based component as well as NASA, ARM, ARA and UK aircraft. The UK aircraft will also be participating in an experiment in Darwin during November- December 2005. This earlier experiment also involves aircraft associated with

  9. Challenge # 3 … Operational Issues

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Potential for a renewable heating oil substitution Challenge # 3 - Operational Issues What are the most significant barriers to overcome in each market segment? Fernando Preto The challenge is to identify the technical knowledge gaps that need to be closed order for industry to establish the infrastructure to address wide-spread utilization of pyrolysis oils: - compatability (blending) with existing hydrocarbon fuels - long term storage stability - containment, handling and corrosivity -

  10. Facility design, construction, and operation

    SciTech Connect

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.

  11. Wave-operated power plant

    SciTech Connect

    Ghesquiere, H.

    1980-08-12

    This wave-operated power plant comprises a perforated caisson breakwater in which propellers, or turbines, are mounted in the perforations or openings and drives hydraulic pumps connected thereto, which in turn drives a hydraulic motor coupled to an electric generator. One-way flap valves are mounted in the openings. Some of said flap valves allow the rushing waves to enter the caisson, while the other flap valves allow the water to flow out of the caisson.

  12. Operation of thoriated tungsten cathodes

    SciTech Connect

    Polk, J.E. )

    1993-01-20

    The operating temperature of thoriated tungsten cathodes used in electric thrusters depends on the surface coverage of thorium, which is determined by a balance of rate processes which supply and deplete the surface layer. The fundamental processes and rates are first reviewed in detail, then a phenomenological model based on these rate processes is described. The model indicates that the thermionic emission capabilities of thoriated tungsten cathodes decay rapidly because of thorium depletion at temperatures encountered in electric thrusters.

  13. Office of Headquarters Security Operations

    Energy.gov [DOE]

    The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions for Headquarters; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive.

  14. NEUTRONIC REACTOR CONSTRUCTION AND OPERATION

    DOEpatents

    West, J.M.; Weills, J.T.

    1960-03-15

    A method is given for operating a nuclear reactor having a negative coefficient of reactivity to compensate for the change in reactor reactivity due to the burn-up of the xenon peak following start-up of the reactor. When it is desired to start up the reactor within less than 72 hours after shutdown, the temperature of the reactor is lowered prior to start-up, and then gradually raised after start-up.

  15. Operational Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management Operational Management The Office of Management supports many leadership responsibilities for the Department of Energy (DOE), providing support for project and contract management and other administrative functions. For example, the office oversees more than $22 billion in annual contract obligations and $2 billion in financial assistance obligations. It supports the management of the Department's multi-billion dollar project portfolio, and provides the Secretary of Energy and senior

  16. Operating Experience Review of Tritium-in-Water Monitors

    SciTech Connect

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  17. Kill operation requires thorough analysis

    SciTech Connect

    Abel, L.W.

    1995-05-15

    Full control of a blowout well requires a properly designed post-capping kill operation because failures in regaining well control usually occur during the kill operation, not during capping. Capping (the installation of pressure control or diverter equipment on the wellhead) is generally very reliable in gaining control of a blowout well. The following techniques are some of the viable means of killing blowout wells once the capping assemblies are in place: direct shut in of the flow; bullheading; momentum kill; volumetric control for migration of fluids or lubrication after migration ceases; and dynamic kills (friction-based dynamic kills or mass flow rate kills) The objective of most post-capping operations is to stop the flow and put the well under hydrostatic control. The means of killing a blowout once capping assemblies are in place should be chosen with care to avoid problems such as cratering, equipment failure, and underground blowouts. The particular circumstances and well integrity will dictate which kill method will be the most viable. Each of these five methods are explained.

  18. Operations Security (OPSEC) Reminder | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Security (OPSEC) Reminder Operations Security (OPSEC) Reminder June 2, 2016 - 1:20pm Addthis Operations Security (OPSEC) Reminder Operations Security (OPSEC) Considerations - All personnel have a responsibility to ensure that no information that might harm our operations, give our competitors an unfair advantage, or be of use to our adversaries is posted to DOE websites that are readily accessible to the public. Such information includes technical information, operation plans,

  19. Atmospheric Radiation Measurement Climate Research Facility Operations...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    27 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report ... DOESC-ARM-16-027 Atmospheric Radiation Measurement Climate Research Facility Operations ...

  20. Atmospheric Radiation Measurement Climate Research Facility Operations...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report ... DOESC-ARM-16-037 Atmospheric Radiation Measurement Climate Research Facility Operations ...

  1. Atmospheric Radiation Measurement Climate Research Facility Operations...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    01 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report ... DOESC-ARM-16-001 Atmospheric Radiation Measurement Climate Research Facility Operations ...

  2. Sandia Energy - Utility Operations and Programs

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Utility Operations and Programs Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Utility Operations and Programs Utility...

  3. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  4. PROJECT PROFILE: Regional Test Center Operations | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regional Test Center Operations PROJECT PROFILE: Regional Test Center Operations Funding Opportunity: SuNLaMP SunShot Subprogram: Photovoltaics Location: Sandia National ...

  5. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard ... The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ...

  6. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External ...

  7. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  8. External Independent Review (EIR) Standard Operating Procedure...

    Energy.gov [DOE] (indexed site)

    The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ... PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP), Revision 3, ...

  9. Data Management Facility Operations Plan (Program Document) ...

    Office of Scientific and Technical Information (OSTI)

    Program Document: Data Management Facility Operations Plan Citation Details In-Document Search Title: Data Management Facility Operations Plan The Data Management Facility (DMF) is ...

  10. KJC Operating Company | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    KJC Operating Company Jump to: navigation, search Name: KJC Operating Company Place: Boron, California Zip: 93516 Sector: Solar Product: Developed solar thermal electricity...

  11. AG Plus Co operative | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Plus Co operative Jump to: navigation, search Name: AG Plus Co-operative Place: SE Kindred, North Dakota Zip: 58051 Product: Cooperative offering membership stock to agricultural...

  12. Extending the Operating Lives of Materials

    ScienceCinema

    Paul Jablonski

    2010-09-01

    Metallurgist Paul Jablonski discusses his role in developing processes that extend the operating temperatures and operating lives of materials used in energy applications.

  13. Supervisory Operations Research Analyst | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Supervisory Operations Research Analyst Supervisory Operations Research Analyst Submitted by admin on Sat, 2016-01-16 00:16 Job Summary Organization Name Department Of Energy...

  14. Reservoir-Stimulation Optimization with Operational Monitoring...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reservoir-Stimulation Optimization with Operational Monitoring for Creation of Enhanced Geothermal Systems Reservoir-Stimulation Optimization with Operational Monitoring for ...

  15. Midwest Independent Transmission System Operator | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Midwest Independent Transmission System Operator Jump to: navigation, search Name: Midwest Independent Transmission System Operator Place: Carmel, IN References: SGIC1 This...

  16. Our Operations | National Nuclear Security Administration | ...

    National Nuclear Security Administration (NNSA)

    Operations Infrastructure and Operations NNSA's missions require a secure production and ... Acquisition and Project Management NNSA's missions require an industrial and laboratory ...

  17. Operations Strategic Planning Committee | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Strategic Planning Committee The Operations Strategic Planning Committee has come up with an initial list of new opportunities and opportunities for improvement over the...

  18. Student Trainee (Operations Research Analyst) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Student Trainee (Operations Research Analyst) Student Trainee (Operations Research Analyst) Submitted by admin on Fri, 2016-01-08 00:16 Job Summary Organization Name Department Of ...

  19. Facilities Operations Specialist | Department of Energy

    Office of Environmental Management (EM)

    Announcement Number DOE-BPA-16-11659-DE Job Summary Ross Facilities Operations and Maintenance operates and maintains the office and light industrial facilities, buildings and...

  20. Oregon Department of Transportation - Maintenance and Operations...

    OpenEI (Open Energy Information) [EERE & EIA]

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  1. Operational Awareness Records and Activity Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2011 Independent Activity Report, Richland Operations Office - June 2011 Hanford Cold Vacuum Drying Facility, Multi-Canister Overpack, Operational Proficiency Demonstration...

  2. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  3. Accelerator Operations and Technology, AOT: LANL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ADE Accelerator and Operations Technology, AOT About Us AOT Home Groups High Power Electrodynamics Instrumentation, Controls Mechanical Design Engineering Operations Radio...

  4. Enterprise Assessments Operational Awareness Record of Observations...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Enterprise Assessments Operational Awareness Record of Observations of the Design and ... March 2016 Enterprise Assessments Operational Awareness Record of Observations of the ...

  5. Facility Operations Specialist | Department of Energy

    Energy Saver

    in Germantown, Maryland within Facilities Management Operations (FMO), Office of Logistics and Facility Operations, Office of Administration. The FMO is responsible for...

  6. operations center | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Operations Center The Office of Emergency Operations Support maintains situational awareness of the nation's energy infrastructure and nuclear weapons complex and facilitates...

  7. Infrastructure and Operations | National Nuclear Security Administrati...

    National Nuclear Security Administration (NNSA)

    term needs. The Associate Administrator for Infrastructure and Operations develops and executes NNSA's infrastructure investment, maintenance, and operations programs and policies....

  8. Feasibility study report for the 200-BP-1 operable unit

    SciTech Connect

    Not Available

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  9. Structural Dimensions, Fabrication, Materials, and Operational History for Types I and II Waste Tanks

    SciTech Connect

    Wiersma, B.J.

    2000-08-16

    Radioactive waste is confined in 48 underground storage tanks at the Savannah River Site. The waste will eventually be processed and transferred to other site facilities for stabilization. Based on waste removal and processing schedules, many of the tanks, including those with flaws and/or defects, will be required to be in service for another 15 to 20 years. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a leak-tight barrier to the environment and by maintaining acceptable structural stability during design basis event which include loading from both normal service and abnormal conditions.

  10. Continuity of Operations Plan (COOP)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    You are here: DOE-ID Home > COOP Continuity of Operations Plan (COOP) Call-In Number: 1-208-526-COOP (2667) or 1-877-DOE-DOE1 (1-877-363-3631) Wait for recording to start then Dial 382: If you are directed or forced to evacuate your current location to an alternate site, please contact us as soon as possible to advise us that you are safe and with a means of contacting you. This toll free or local number can be used by employees or their families to report their whereabouts or the

  11. Coiled tubing; Operations and services

    SciTech Connect

    Sas-Jaworsky, A. II )

    1992-03-01

    Operations involving sand or solids washing are the most common of today's coiled tubing workover services. Wellbore cleanouts require pumping fluid that will entrain solids and return them to the surface. In most cases, wash fluids and solids are captured in surface tanks of sufficient volume to allow solids to settle out. Where practical, fluids are recirculated to reduce cost. An important concern when designing sand wash programs is correct fluid system selection. Wash fluids should closely balance BHP and provide piston like displacement for solids removal. This paper is an overview of compressible and incompressible fluids commonly used for coiled tubing services.

  12. Next Update: November 2016 Geographic Area Capacity In-Service

    Energy Information Administration (EIA) (indexed site)

    Geographic Area Capacity In-Service Data Year NERC Region Type Operating (kV) Design (kV) Rating (MVa) Month/Year From Terminal To Terminal Length (Miles) Type Company Code Company Name Organizational Type Ownership (Percent) Project Name Level of Certainty Primary Driver 1 Primary Driver 2 2014 FRCC AC 200-299 115 460 1/2016 SUB 4 230.00 SUB 7 230.00 3.8 OH 18445 of Tallahassee M 100% 0.00 - SUB 7 230.00 Under Constructio Reliability 2014 FRCC AC 100-120 115 232 12/2016 Sub 14 115 Sub 7 115 6.0

  13. U. S. Department of Energy Savannah River Operations Office - Contacts

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Natural Gas Storage Report Types of Possible Survey Errors in Estimates Published in the Weekly Natural Gas Storage Report Release date: March 1, 2016 The U.S. Energy Information Administration (EIA) collects and publishes natural gas storage information on a monthly and weekly basis. The Form EIA-191, Monthly Underground Natural Gas Storage Report, is a census survey that collects field-level information from all underground natural gas storage operators in the United States known to EIA.

  14. Microsecond delays on non-real time operating systems

    SciTech Connect

    Angstadt, R.; Estrada, J.; Diehl, H.T.; Flaugher, B.; Johnson, M.; /Fermilab

    2007-05-01

    We have developed microsecond timing and profiling software that runs on standard Windows and Linux based operating systems. This software is orders of magnitudes better than most of the standard native functions in wide use. Our software libraries calibrate RDTSC in microseconds or seconds to provide two different types of delays: a ''Guaranteed Minimum'' and a precision ''Long Delay'', which releases to the kernel. Both return profiling information of the actual delay.

  15. Anyons in the operational formalism

    SciTech Connect

    Neori, Klil H.; Goyal, Philip

    2015-01-13

    The operational formalism to quantum mechanics seeks to base the theory on a firm foundation of physically well-motivated axioms [1]. It has succeeded in deriving the Feynman rules [2] for general quantum systems. Additional elaborations have applied the same logic to the question of identical particles, confirming the so-called Symmetrization Postulate [3]: that the only two options available are fermions and bosons [4, 5]. However, this seems to run counter to results in two-dimensional systems, which allow for anyons, particles with statistics which interpolate between Fermi-Dirac and Bose-Einstein (see [6] for a review). In this talk we will show that the results in two dimensions can be made compatible with the operational results. That is, we will show that anyonic behavior is a result of the topology of the space in two dimensions [7], and does not depend on the particles being identical; but that nevertheless, if the particles are identical, the resulting system is still anyonic.

  16. Miniature electrically operated diaphragm valve

    DOEpatents

    Adkins, Douglas R.; Spletzer, Barry L.; Wong, Chungnin C.; Frye-Mason, Gregory C.; Fischer, Gary J.; Hesketh, Peter J.

    2001-01-01

    The present invention provides a miniature electrically operated valve that can stand off significant pressures, that can be inexpensively produced, and that can be made to operate without continuous electrical power. A valve according to the present invention comprises a housing and a beam mounted with the housing. A diaphragm mounted with the housing forms a sealed fluid volume. An electromagnetic energy source, such as an electromagnetic coil, mounts with the housing and when energized urges the beam in one direction. The beam can be urged in the opposing direction by passive means or by reversing the polarity of the electromagnetic energy source or by a second electromagnetic energy source. Two fluid ports mount with the housing. A first fluid port mounts so that, as the beam is urged in one direction or the opposite, the beam urges the diaphragm to move between engaging and substantially sealing the fluid port and disengaging and not substantially sealing the fluid port. A seat can be mounted with the diaphragm to aid in sealing the fluid port. Latching mechanisms such as permanent magnets can be mounted so that the valve remains in the open or closed positions without continuous electrical power input. Fluid can flow through the housing between the two fluid ports when the diaphragm does not seal the first fluid port, but can be prevented from flowing by urging the beam so that the diaphragm seals the first fluid port. Various embodiments accommodate various latching mechanisms, electromagnetic energy sources, number of fluid ports, and diaphragm design considerations.

  17. A battery-operated, stabilized, high-energy pulsed electron gun for the production of rare gas excimers

    SciTech Connect

    Barcellan, L.; Carugno, G.; Berto, E.; Galet, G.; Galeazzi, G.; Borghesani, A. F.

    2011-09-15

    We report on the design of a new type of hot-filament electron gun delivering fairly high current (a few hundreds of {mu} A) at high voltage (up to 100 kV) in continuous or pulsed mode. Its novel features are that the filament is heated by means of a pack of rechargeable batteries floated atop the high-voltage power supply in order to get rid of bulky isolation transformers, and that the filament current and, hence, the electron gun current, is controlled by a feedback circuit including a superluminescent diode decoupled from the high voltage by means of an optical fiber. This electron gun is intended for general purposes, although we have especially developed it to meet the needs of our experiment on the infrared emission spectroscopy of rare gas excimers. Our experiment requires that the charge injection into the sample is pulsed and constant and stable in time. The new electron gun can deliver several tens of nC per pulse of electrons of energy up to 100 keV into the sample cell. The new design also eliminates ripples in the emission current and ensures up to 12 h of stable performance.

  18. Decision Support for Operations and Maintenance IV

    Energy Science and Technology Software Center

    2011-12-22

    DSOM (Decision Support for Operations and Maintenance) is an expert operations and maintenance system that integrates plant operations, fuel management, and maintenance processes. The DSOM package provides operators with the information they need for cost-effective operating decisions creating savings in fuel, personnel, maintenance, and plant life extension. DSOM provides operators real-time system performance information to allow them to determine if the plant is malfunctioning or running below expectations. By catching potential problems, DSOM enables plantsmore » to operate safely at peak efficiency, while providing a higher level of reliability and safety.« less

  19. Five years operating experience at the Fast Flux Test Facility

    SciTech Connect

    Baumhardt, R. J.; Bechtold, R. A.

    1987-04-01

    The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 figs., 2 tabs.

  20. Pulverized coal injection operation on CSC No. 3 blast furnace

    SciTech Connect

    Chan, C.M.; Hsu, C.H.

    1996-12-31

    The pulverized coal injection system was introduced for the first time in No. 1 and No. 2 blast furnace at China Steel Corporation (CSC) in 1988. Currently the coal injection rate for both blast furnaces has steadily risen to 70--89 kg/thm (designed value). No 3 blast furnace (with an inner volume of 3400 m3) was also equipped with a PCI system of Armco type and started coal injection on November 17, 1993. During the early period, some problems such as injection lance blocking, lance-tip melting down, flexible hose wear, grind mill tripping occasionally interrupted the stable operation of blast furnace. After a series of efforts offered on equipment improvement and operation adjustment, the PC rate currently reaches to 90--110 kg/thm and furnace stable operation is still being maintained with productivity more than 2.20.

  1. Type B Accident Investigation Board Report on the September 7, 2001, Burn Accident at Oak Ridge National Laboratory, Building 9210

    Energy.gov [DOE]

    This report is an independent product of the Type B Investigation Board appointed by G. Leah Dever, Manager, Oak Ridge Operations Office, U.S. Department of Energy.

  2. Type B Investigation Board Report on the June 19, 1997, Occupational Illness at the Y-12 Plant, Oak Ridge, Tennessee

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report is an independent product of the Type B Investigation Board (Board) appointed by James C. Hall, Manager, Oak Ridge Operations.

  3. Tornado type wind turbines

    DOEpatents

    Hsu, Cheng-Ting

    1984-01-01

    A tornado type wind turbine has a vertically disposed wind collecting tower with spaced apart inner and outer walls and a central bore. The upper end of the tower is open while the lower end of the structure is in communication with a wind intake chamber. An opening in the wind chamber is positioned over a turbine which is in driving communication with an electrical generator. An opening between the inner and outer walls at the lower end of the tower permits radially flowing air to enter the space between the inner and outer walls while a vertically disposed opening in the wind collecting tower permits tangentially flowing air to enter the central bore. A porous portion of the inner wall permits the radially flowing air to interact with the tangentially flowing air so as to create an intensified vortex flow which exits out of the top opening of the tower so as to create a low pressure core and thus draw air through the opening of the wind intake chamber so as to drive the turbine.

  4. On some operations suggested by genome evolution

    SciTech Connect

    Dassow, J.; Mitrana, V.

    1996-12-31

    Three operations involved in the genome evolution namely, inversion, transposition and duplication, are considered as operations on strings and languages. We show that, for any pair of these operations, there is a language family which is closed under one of the operations and not closed under the second one; however, under some mild conditions the closure of a language family under one of the operations implies that it also closed with respect to another one. 15 refs.

  5. DUF6 Operations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DUF6 Operations DUF6 Operations DUF6conversionFacility.jpg The construction and operation of the DUF6 Conversion plants was mandated by Congress. In August 2002, DOE awarded a contract for design, construction and initial operation of the two facilities. Since 2010, BWXT Conversion Services, LLC is the contractor for the operation of the both facilities at the Paducah and Portsmouth Sites. The DUF6 Conversion Process involves five parts: Cylinder recycling Vaporization Conversion Oxide powder

  6. Idaho Operations Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facility Operations » Idaho Operations Office Idaho Operations Office Idaho Operations Office INL combines the expertise of government, industry and academia in a single laboratory under the leadership of Battelle Energy Alliance (BEA), a team comprised of Battelle Memorial Institute, Washington Group International, BWXT Services, Inc., the Electric Power Research Institute and Massachusetts Institute of Technology. BEA manages the laboratory under a Management and Operating contract. This

  7. Business Operations Organization Chart | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    About Us » Business Operations » Business Operations Organization Chart Business Operations Organization Chart A chart showing how the Office of Energy Efficiency and Renewable Energy's Business Operations office is organized. Business Operations org chart (93.51 KB) More Documents & Publications Office of Energy Efficiency and Renewable Energy Organization Chart Federal Information Technology Acquisition Reform Act (FITARA) Data Resources Amped Up! Volume 1, No.2 Blog News Leadership

  8. Reactor operation environmental information document

    SciTech Connect

    Wike, L.D.; Specht, W.L.; Mackey, H.E.; Paller, M.H.; Wilde, E.W.; Dicks, A.S.

    1989-12-01

    The Savannah River Site (SRS) is a large United States Department of Energy installation on the upper Atlantic Coastal Plain of South Carolina. The SRS contains diverse habitats, flora, and fauna. Habitats include upland terrestrial areas, varied wetlands including Carolina Bays, the Savannah River swamp system, and impoundment related and riparian wetlands, and the aquatic habitats of several stream systems, two large cooling reservoirs, and the Savannah River. These diverse habitats support a large variety of plants and animals including many commercially or recreational valuable species and several rare, threatened or endangered species. This volume describes the major habitats and their biota found on the SRS, and discuss the impacts of continued operation of the K, L, and P production reactors.

  9. Safety aspects of cryochamber operation

    SciTech Connect

    Chorowski, M.; Piotrowska, A.; Sieron, A.; Stanek, A.

    2014-01-29

    Local and whole body cryotherapy is well recognized, developed and appreciated both from medical and technical point of view. Poland is a country with a highest number of medical cryochambers in operation (above 200) and more than 3 millions of whole body cryotherapeutic sessions have been performed since 1989. Cryogenic temperatures applied for whole-body apart from medical effects have also significant influence on patient's psyche. A number of cryochambers is constantly increasing in hospitals, sport centers and spas. A temperature inside a cryochamber should be below 150 K. To achieve and stabilize such low temperature, either cascade compressor unit or liquid cryogens evaporation (N{sub 2} or synthetic air) are used. This paper presents safety oriented review of cryochamber design and constructions.

  10. METHOD OF OPERATING NUCLEAR REACTORS

    DOEpatents

    Untermyer, S.

    1958-10-14

    A method is presented for obtaining enhanced utilization of natural uranium in heavy water moderated nuclear reactors by charging the reactor with an equal number of fuel elements formed of natural uranium and of fuel elements formed of uranium depleted in U/sup 235/ to the extent that the combination will just support a chain reaction. The reactor is operated until the rate of burnup of plutonium equals its rate of production, the fuel elements are processed to recover plutonium, the depleted uranium is discarded, and the remaining uranium is formed into fuel elements. These fuel elements are charged into a reactor along with an equal number of fuel elements formed of uranium depleted in U/sup 235/ to the extent that the combination will just support a chain reaction, and reuse of the uranium is continued as aforesaid until it wlll no longer support a chain reaction when combined with an equal quantity of natural uranium.

  11. Coiled tubing - Operations and services

    SciTech Connect

    Blount, C.G. )

    1993-05-01

    Perhaps the most exciting area of coil tubing technology in the oil and gas industry is the development and testing of specialized tools for improving existing operations or meeting the requirements of new applications and techniques. A new generation of surface equipment and downhole tools will greatly expand through-tubing well servicing utility. This paper provides descriptions of current peripheral devices for concentric well work. It also includes a look at what's needed to meet future challenges and advance this technology. It specifically discusses various forms of fishing tools, power tongs used for bring drill stem, orienting tools for drilling, downhole adjustment tools, steering tools, well casing materials, perforation tools, and various other support equipment.

  12. Chicago Operations Office: Technology summary

    SciTech Connect

    Not Available

    1994-12-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation (RDDT and E) activities funded through the Chicago Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US Industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents which highlight technology development activities within each of the OTD program elements. OTD technologies addresses three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  13. Pressurized-fluid-operated engine

    SciTech Connect

    Holleyman, J.E.

    1990-01-30

    This patent describes a pressurized-fluid-operated reciprocating engine for providing output power by use of a pressurized gas that expands within the engine without combustion. It comprises: an engine block having a plurality of cylinders within which respective pistons are reciprocatable to provide a rotary power output; gas inlet means connected with the engine block for introducing a pressurized gas into the respective cylinders in a predetermined, timed relationship to provide a smooth power output from the engine; gas outlet means connected with the engine block for conveying exhaust gas from the respective cylinders after the gas expanded to move the pistons within the cylinders; and recirculation means extending between the inlet means and the outlet means for recirculation a predetermined quantity of exhaust gas. The recirculation means including ejector means for drawing exhaust gas into the recirculation means.

  14. Augmented reality building operations tool

    DOEpatents

    Brackney, Larry J.

    2014-09-09

    A method (700) for providing an augmented reality operations tool to a mobile client (642) positioned in a building (604). The method (700) includes, with a server (660), receiving (720) from the client (642) an augmented reality request for building system equipment (612) managed by an energy management system (EMS) (620). The method (700) includes transmitting (740) a data request for the equipment (612) to the EMS (620) and receiving (750) building management data (634) for the equipment (612). The method (700) includes generating (760) an overlay (656) with an object created based on the building management data (634), which may be sensor data, diagnostic procedures, or the like. The overlay (656) is configured for concurrent display on a display screen (652) of the client (642) with a real-time image of the building equipment (612). The method (700) includes transmitting (770) the overlay (656) to the client (642).

  15. Operating an induction melter apparatus

    DOEpatents

    Roach, Jay A.; Richardson, John G.; Raivo, Brian D.; Soelberg, Nicholas R.

    2006-01-31

    Apparatus and methods of operation are provided for a cold-crucible-induction melter for vitrifying waste wherein a single induction power supply may be used to effect a selected thermal distribution by independently energizing at least two inductors. Also, a bottom drain assembly may be heated by an inductor and may include an electrically resistive heater. The bottom drain assembly may be cooled to solidify molten material passing therethrough to prevent discharge of molten material therefrom. Configurations are provided wherein the induction flux skin depth substantially corresponds with the central longitudinal axis of the crucible. Further, the drain tube may be positioned within the induction flux skin depth in relation to material within the crucible or may be substantially aligned with a direction of flow of molten material within the crucible. An improved head design including four shells forming thermal radiation shields and at least two gas-cooled plenums is also disclosed.

  16. STANDARD OPERATING PROTOCOLS FOR DECOMMISSIONING

    SciTech Connect

    Foss, D. L.; Stevens, J. L.; Gerdeman, F. W.

    2002-02-25

    Decommissioning projects at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites are conducted under project-specific decision documents, which involve extensive preparation time, public comment periods, and regulatory approvals. Often, the decision documents must be initiated at least one year before commencing the decommissioning project, and they are expensive and time consuming to prepare. The Rocky Flats Environmental Technology Site (RFETS) is a former nuclear weapons production plant at which hazardous substances and wastes were released or disposed during operations. As a result of the releases, RFETS was placed on the National Priorities List in 1989, and is conducting cleanup activities under a federal facilities compliance agreement. Working closely with interested stakeholders and state and federal regulatory agencies, RFETS has developed and implemented an improved process for obtaining the approvals. The key to streamlining the approval process has been the development of sitewide decision documents called Rocky Flats Cleanup Agreement Standard Operating Protocols or ''RSOPs.'' RSOPs have broad applicability, and could be used instead of project-specific documents. Although no two decommissioning projects are exactly the same and they may vary widely in contamination and other hazards, the basic steps taken for cleanup are usually similar. Because of this, using RSOPs is more efficient than preparing a separate project-specific decision documents for each cleanup action. Over the Rocky Flats cleanup life cycle, using RSOPs has the potential to: (1) Save over 5 million dollars and 6 months on the site closure schedule; (2) Eliminate preparing one hundred and twenty project-specific decision documents; and (3) Eliminate writing seventy-five closure description documents for hazardous waste unit closure and corrective actions.

  17. Operation and control software for APNEA

    SciTech Connect

    McClelland, J.H.; Storm, B.H. Jr.; Ahearn, J.

    1997-11-01

    The human interface software for the Lockheed Martin Specialty Components (LMSC) Active/Passive Neutron Examination & Analysis System (APENA) provides a user friendly operating environment for the movement and analysis of waste drums. It is written in Microsoft Visual C++ on a Windows NT platform. Object oriented and multitasking techniques are used extensively to maximize the capability of the system. A waste drum is placed on a loading platform with a fork lift and then automatically moved into the APNEA chamber in preparation for analysis. A series of measurements is performed, controlled by menu commands to hardware components attached as peripheral devices, in order to create data files for analysis. The analysis routines use the files to identify the pertinent radioactive characteristics of the drum, including the type, location, and quantity of fissionable material. At the completion of the measurement process, the drum is automatically unloaded and the data are archived in preparation for storage as part of the drum`s data signature. 3 figs.

  18. Bucket-type steam traps removed in $82K retrofit

    SciTech Connect

    Poplett, J.

    1985-08-19

    A retrofit of 481 mostly failed steam traps at Martin Marietta's Aerospace Division should reduce steam costs by $70,000 and require little or no maintenance. Payback should occur within 14 months. The new traps include orifice, bellow-type thermostatic, and float-type traps that have few or no moving parts. Lack of maintenance was responsible for the poor performance of the bucket traps that were replaced, although manufacturers of the bucket traps disagree that replacement of certain parts is necessary every six months. The author describes the design and operation of each type of trap.

  19. Window Types | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Window Types Window Types A wood-frame window with insulated window glazing. | Photo courtesy of ©iStockphoto/chandlerphoto A wood-frame window with insulated window glazing. | Photo courtesy of ©iStockphoto/chandlerphoto Windows come in a number of different frame and glazing types. By combining an energy-efficient frame choice with a glazing type tailored to your climate and application, you can customize each of your home's windows. Types of Window Frames Improving the thermal resistance

  20. A thermal battery operational reliability evaluation study

    SciTech Connect

    Herzberg, M.; Jaeger, M.; Shalev, H.

    1994-12-31

    A thermal battery is a one shot device. Its overall reliability is given as the product of its technical and operational reliability. This work evaluates operational reliability. The operational reliability for various performance requirements was estimated by analyzing data received from qualification tests of a certain thermal battery. A lower bound of its operational reliability was evaluated by use of the statistical tolerance method for each specific electrical performance requirement. A conservative overall lower bound for the operational reliability of the thermal battery was calculated as the product of the individual operational reliability estimates corresponding to each performance requirement.