National Library of Energy BETA

Sample records for test procedure sign

  1. CENRTC Project {number_sign}2F3EOA, OCB A-386, acceptance test procedure

    SciTech Connect

    Akerson, A.W.

    1995-03-06

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC {number_sign}2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests.

  2. Operability test procedure for rotary mode core sampling system {number_sign}4

    SciTech Connect

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 4. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 4 will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  3. Operability test procedure for rotary mode core sampling system {number_sign}3

    SciTech Connect

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  4. Acceptance Test Procedure for Project 251W, WBS 3, Substation A-8, Building 251-W, Bus {number_sign}2 switchgear replacement

    SciTech Connect

    VanBaalen, R.A.

    1995-02-01

    This document records the steps taken and results of the acceptance testing of the new 13.8kV switchgear installed at 251W. This gear is under the administrative control of Electrical Utilities.

  5. Limited Test Ban Treaty Signed | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Limited Test Ban Treaty Signed Limited Test Ban Treaty Signed Washington, DC The United States, Great Britain, and the Soviet Union sign the Limited Test Ban Treaty prohibiting underwater, atmospheric, and outer space nuclear tests. Nuclear testing continues underground

  6. Cathodic protection acceptance test procedure

    SciTech Connect

    Nordquist, E.M.

    1994-09-02

    This acceptance test procedure is to document testing of added anodes to existing Rectifier No. 11. Anodes were added under Project W-151, Tank 101-AZ Waste Retrieval System.

  7. Standards and Test Procedures | Department of Energy

    Office of Environmental Management (EM)

    Appliance & Equipment Standards Standards and Test Procedures Standards and Test Procedures The Department of Energy (DOE) establishes energy efficiency standards for certain ...

  8. Specifications and Test Procedures | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Specifications and Test Procedures Grid interoperability requires a complex set of interactions defined by specifications and proven through standardized test procedures. Grid...

  9. TMACS Test Procedure TP007: System administration

    SciTech Connect

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  10. TMACS Test Procedure TP001: Alarm Management

    SciTech Connect

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Alarm management functions.

  11. TMACS Test Procedure TP002: Trending

    SciTech Connect

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  12. TMACS Test Procedure TP009: Acromag Driver

    SciTech Connect

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code).

  13. TMACS Test Procedure TP002: Trending

    SciTech Connect

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  14. TMACS Test Procedure TP011: Panalarm Interface

    SciTech Connect

    Seghers, R.; Washburn, S.J.

    1994-05-24

    The TMACS Software Test Procedures translate the project`s acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions.

  15. Current Test Procedure Waivers | Department of Energy

    Office of Environmental Management (EM)

    Current Test Procedure Waivers Current Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim ...

  16. TEST PROCEDURE VALIDATION TEST OF A DISCRIMINATING TRITIUM MONITOR...

    Office of Environmental Management (EM)

    Test Results For Physical Separation Of Tritium From Noble Gases And It's Implications For ... AIR SAMPLERS NEW FAMILY OF STACK MONITORS TEST PROCEDURE VALIDATION TEST OF A ...

  17. Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Appliance & Equipment Standards » Rulemakings & Notices » Test Procedure Waivers Test Procedure Waivers Products covered by standards change as manufacturers add new features to their products and update designs in order to compete for consumers. Innovation and product development occasionally causes products to change in ways that either (1) make the results of a test procedure unrepresentative of actual energy use or efficiency, or (2) make it impossible to test in accordance with

  18. Test report - caustic addition system operability test procedure

    SciTech Connect

    Parazin, R.E.

    1995-10-13

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ``Caustic Addition System Operability Test Procedure``. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  19. DACS upgrade acceptance test procedure

    SciTech Connect

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  20. DOT-7A packaging test procedure

    SciTech Connect

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  1. DOE Launches Public Test Procedure Guidance Website

    Energy.gov [DOE]

    The Department of Energy this week launched a new online database offering guidance on the Department’s test procedures for appliances and commercial equipment.  The new database will provide a...

  2. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures...

    Energy Saver

    Full-Size Electric Vehicle Specifications and Test Procedures AVTA: Full-Size Electric Vehicle Specifications and Test Procedures EV America Test Specifications (97.12 KB) ...

  3. Test Procedure Development and Revision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure Development and Revision Test Procedure Development and Revision Most energy conservation standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail the protocols that manufacturers must follow when testing their products for compliance with Department of Energy (DOE) standards. DOE also uses the test procedures to determine compliance with the applicable standards in any verification or enforcement testing. The procedures specify how

  4. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent...

    Energy Saver

    4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; ...

  5. ENERGY STAR Test Procedures and Verification | Department of...

    Energy.gov [DOE] (indexed site)

    in the development and revision of all test procedures for products in the ENERGY ... To simplify the process for interested parties, more information on the test procedure ...

  6. Test Procedure for UV Weathering Resistance of Backsheet | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure for UV Weathering Resistance of Backsheet Test Procedure for UV Weathering Resistance of Backsheet Presented at the PV Module Reliability Workshop, February 26 - 27 ...

  7. TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking GSL TP ...

  8. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...

    Office of Environmental Management (EM)

    0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document ...

  9. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled...

    Energy.gov [DOE] (indexed site)

    test procedures for refrigerated bottled or canned beverage vending machines, as issued by ... ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for Refrigerated Bottled ...

  10. 2014-04-11 Issuance: Test Procedures for Residential Clothes...

    Energy.gov [DOE] (indexed site)

    notice of proposed rulemaking regarding test procedure amendments for residential clothes ... access to this document. 2014-04-11 Test Procedures for Residential Clothes ...

  11. Test Procedures for Integrated Light-Emitting Diode Lamps; Final...

    Energy.gov [DOE] (indexed site)

    Test Procedures for Integrated Light-Emitting Diode Lamps - Final Rule (532.58 KB) More Documents & Publications ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures ...

  12. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration...

    Office of Environmental Management (EM)

    6 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; ...

  13. ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    12-18: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Final Rule ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures for ...

  14. AVTA: Urban Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 ...

  15. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ...

  16. 2014-10-16 Issuance: Energy Conservation Program Test Procedures...

    Energy.gov [DOE] (indexed site)

    Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of ... Rulemaking 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External ...

  17. ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for ...

  18. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for ...

  19. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final ...

  20. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures...

    Energy Saver

    27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery ...

  1. ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures for ...

  2. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central ...

  3. Meeting Concerning Potential Test Procedures and Energy Conservation...

    Office of Environmental Management (EM)

    Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation ...

  4. Energy Conservation Program: Test Procedure for Pumps, Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure for Pumps, Notice of Proposed Rulemaking Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking This document is Energy Conservation ...

  5. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures...

    Energy Saver

    6: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule This ...

  6. ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures...

    Energy Saver

    22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for Compressors, ...

  7. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    6: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling ...

  8. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light ...

  9. ISSUANCE 2016-10-21: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    1: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-10-21: Energy Conservation Program: Test Procedures for ...

  10. ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures...

    Energy Saver

    9: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for ...

  11. Energy Conservation Program: Test Procedure for Dedicated-Purpose...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    RIN: 1904-AD66 Energy Conservation Program: Test Procedure for ... to establish and amend energy conservation standards (ECSs) and test procedures ...

  12. DOE Publishes Final Rule for Television Test Procedure | Department...

    Energy.gov [DOE] (indexed site)

    DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

  13. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Energy.gov [DOE] (indexed site)

    issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test Procedure: All...

  14. ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7: Energy Conservation Program: Test Procedures for External Power Supplies, Final Rule ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures for External Power Supplies, ...

  15. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for ...

  16. TMACS Test Procedure TP008: SACS Interface. Revision 5

    SciTech Connect

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions.

  17. TMACS test procedure TP009: Acromag driver. Revision 5

    SciTech Connect

    Bass, R.B.; Washburn, S.J.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system.

  18. Laboratory procedures for waste form testing

    SciTech Connect

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  19. TMACS test procedure TP010: Integration summary. Revision 6

    SciTech Connect

    Spurling, D.G.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed.

  20. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...

    Energy Saver

    Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy ...

  1. CRAD, System Operating Test Procedures - October 23, 2014 (EA...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

  2. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure

    Energy.gov [DOE]

    The Department of Energy (DOE) has published a final rule regarding test procedures for residential furnace fans.

  3. Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP Final_Rule (601.19 KB) More Documents & Publications Energy Conservation Program: Energy Conservation Standards for Ceiling Fans ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule 2014-09-19 Issuance: Energy Conservation Program for Consumer Products: Test Procedure

  4. Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rulemaking | Department of Energy Test Procedure for Pumps, Notice of Proposed Rulemaking Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking This document is Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking. commercial_industrial_pumps_tp_nopr.pdf (1.3 MB) More Documents & Publications 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule Draft PEI Calculator ISSUANCE 2016-08-26: Energy

  5. TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rulemaking | Department of Energy TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking GSL TP SNOPR.pdf (309.44 KB) More Documents & Publications ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General

  6. Test Procedure for Compact Fluorescent Lamps: Final Rule | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Procedure for Compact Fluorescent Lamps: Final Rule Test Procedure for Compact Fluorescent Lamps: Final Rule This final rule amends the U.S. Department of Energy's (DOE) test procedures for medium base compact fluorescent lamps (MBCFLs) and adopts test procedures for new metrics for all CFLs including hybrid CFLs and CFLs with bases other than medium screw base. In this final rule, DOE replaces references to ENERGY STAR® testing requirements with references to the latest versions of

  7. Procedure for Performing In-Plane Membrane Conductivity Testing...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    In-Plane Membrane Conductivity Testing Procedure for Performing In-Plane Membrane Conductivity Testing Presented at the 2009 High Temperature Membrane Working Group Meeting held ...

  8. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures...

    Energy.gov [DOE] (indexed site)

    notice of public meeting for Energy Conservation Program: Test Procedures for External ... More Documents & Publications 2014-10-16 Issuance: Energy Conservation Program Test ...

  9. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures...

    Energy Saver

    Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking ISSUANCE 2016-02-26: Energy Conservation Program: Test ...

  10. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications ISSUANCE 2016-05-19: Energy Conservation Program: Test ... HSVC ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures for Central ...

  11. ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures...

    Energy Saver

    Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2016-08-04: Energy Conservation Program: Test ...

  12. ISSUANCE 2016-10-28 Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps Notice of Proposed Rulemaking ISSUANCE 2016-10-28 Energy Conservation Program: Test ...

  13. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule ISSUANCE 2015-06-08: Energy Conservation Program: Test ...

  14. Heed Work Safety Signs, Cones, Stanchions in the Test Lab High Bay |

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Jefferson Lab Heed Work Safety Signs, Cones, Stanchions in the Test Lab High Bay Heed Work Safety Signs, Cones, Stanchions in the Test Lab High Bay To meet the needs of work underway in the Test Lab High Bay, the area has become very dynamic and congested. The walking paths and boundaries of radiologically controlled areas (RCAs)/radioactive material areas (RMA) may shift or change dramatically from day-to-day or even from morning-to-afternoon. Crane operations (to move equipment across the

  15. Ex Parte Communication on Central Air-Conditioner Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Procedure Ex Parte Communication on Central Air-Conditioner Test Procedure On September 18, 2015, AHRI staff and Manufacturing Representatives met with representatives from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners. AHRI Ex Parte Memo CACTP (39.48 KB) More Documents & Publications Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues Ex Parte Memo on CAC/Dry Charged Units

  16. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Department of Energy Neighborhood Electric Vehicle Specifications and Test Procedures AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures NEVAmerica Technical Specifications (135.99 KB) NEVAmerica Test Sequence (66.19 KB) ETA-NTP002 Implementation of SAE Standard J1666 May 93 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (334.01 KB) ETA-NTP004 Electric Vehicle Constant Speed Range Test (138.66 KB) ETA-NTP005 Electric Vehicle Rough Road

  17. TMACS test procedure TP003: Graphics. Revision 6

    SciTech Connect

    Scanlan, P.K.; Washburn, S.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  18. TMACS test procedure TP001: Alarm management. Revision 6

    SciTech Connect

    Scanlan, P.K.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging.

  19. TMACS test procedure TP004: Reporting. Revision 4

    SciTech Connect

    Washburn, S.J.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addressed the report generation capability of the TMACS. The features to be tested are generation of the alarm history report, equipment failure report, single-shell tank report and double-shell tank report.

  20. TMACS test procedure TP003: Graphics. Revision 5

    SciTech Connect

    Scanlan, P.K.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  1. Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure CEE and DOE staff discussed the importance of relying on the DOE test method as the sole metric for efficiency and energy use reporting. CEE_Notes_ClothesDryerTestProcedure_25Apr2016 (352.34 KB) More Documents & Publications 2015-03-23 Issuance: Energy Conservation Standards for Residential Clothes Dryers; Request for

  2. Light duty utility arm equipment qualification test procedure

    SciTech Connect

    Kiebel, G.R., Westinghouse Hanford

    1996-07-22

    The Equipment Qualification Test described in this test procedure document is the acceptance test procedure (ATP) for the LDUA Baseline System. It verifies that the equipment is complete and in working order, and demonstrates its readiness for being deployed into an actual underground storage tank.

  3. AVTA: Urban Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Department of Energy Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 Implementation of SAE Standard J1263, Feb. 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (50.53 KB) ETA-UTP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (65.68 KB) ETA-UTP003

  4. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Equipment; Final Rule | Department of Energy 0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document is a pre-publication Federal Register final rule regarding test procedures for commercial refrigeration equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014. Though it is not intended or expected, should any discrepancy occur

  5. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Products; Notice of Proposed Rulemaking | Department of Energy 1-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for miscellaneous refrigeration products, as issued by the Deputy Assistant Secretary for Energy Efficiency on

  6. 2014-10-14 Issuance: Test Procedures and Energy Conservation...

    Energy.gov [DOE] (indexed site)

    request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy...

  7. DOE Publishes Final Rule for Plumbing Products Test Procedures

    Energy.gov [DOE]

    The Department of Energy has published a final rule regarding test procedures for showerheads, faucets, water closets, urinals, and commercial prerinse spray valves.

  8. Ex Parte Communication on Central Air-Conditioner Test Procedure...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications Ex Parte Communication on Central Air-Conditioner Test Procedure Ex Parte Memo on CACDry Charged Units ISSUANCE 2016-05-19: Energy Conservation ...

  9. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure...

    Energy.gov [DOE] (indexed site)

    2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2016-05-06: Energy Conservation Program: Energy ...

  10. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure...

    Energy.gov [DOE] (indexed site)

    the Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned ... meeting ISSUANCE 2015-12-24: Energy Conservation Program: Energy Conservation Standards ...

  11. Energy Conservation Program: Test Procedures for External Power...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EERE-2014-BT-TP-0043 RIN: 1904-AD36 Energy Conservation Program: Test Procedures for External Power Supplies AGENCY: Office of Energy Efficiency and Renewable Energy, Department ...

  12. Energy Conservation Program: Test Procedures for Certain Categories...

    Energy.gov [DOE] (indexed site)

    EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for ... service lamps (GSLs) to support the ongoing energy conservation standards rulemaking. ...

  13. TMACS test procedure TP012: Panalarm software bridge

    SciTech Connect

    Washburn, S.J.

    1994-08-25

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date.

  14. AVTA: Oil Bypass Filter Specifications and Test Procedures | Department of

    Energy Saver

    Energy Oil Bypass Filter Specifications and Test Procedures AVTA: Oil Bypass Filter Specifications and Test Procedures PuraDYN Oil Bypass Filtration System Evaluation Test Plan methodology is used in the testing of all oil bypass filters on the buses at the Idaho National Laboratory. PuraDYN Oil Bypass Filtration System Evaluation Test Plan (732.1 KB) More Documents & Publications Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology on Heavy and Light Vehicles Effects of

  15. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Department of Energy Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Fleet Test and Evaluation Procedure (231.85 KB) HEVAmerica Technical Specifications (164.3 KB) HEV Baseline Test Sequence (46.65 KB) HEV End of Life Test Sequence (29.89 KB) ETA-HTP01 Implementation of SAE Standard J1263 February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (118.71 KB) ETA-HTP02 Implementation

  16. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...

    Energy.gov [DOE] (indexed site)

    the notice of proposed rulemaking for a test procedure for set-top boxes and the ... The Energy Department also retains its authority to test set-top boxes under the ENERGY ...

  17. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  18. Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)

    SciTech Connect

    Baum, Gregory A.

    2014-02-01

    A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

  19. Rocky Flats ash test procedure (sludge stabilization)

    SciTech Connect

    Winstead, M.L.

    1995-09-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

  20. AVTA: Transit Vehicle Specifications and Test Procedures | Department of

    Energy Saver

    Energy Transit Vehicle Specifications and Test Procedures AVTA: Transit Vehicle Specifications and Test Procedures All Advanced Vehicle Testing Activity transit projects follow a rigorous data collection and analysis protocol. Refer to "General Evaluation Plan: Fleet Test and Evaluation Projects" for information about fleet selection, data collection, and products related to new evaluation projects. More Documents & Publications Vehicle Technologies Office: 2010 Vehicle and

  1. Rocky Flats Ash test procedure (sludge stabilization)

    SciTech Connect

    Funston, G.A.

    1995-06-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

  2. Test Procedures for Building Energy Simulation Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures for Building Energy Simulation Tools Test Procedures for Building Energy Simulation Tools Lead Performer: -- National Renewable Energy Laboratory - Golden, CO -- J. Neymark & Associates - Golden, CO -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Partners: -- ASHRAE Standing Special Projects Committee 140 -- Residential Energy Services Network (RESNET) -- International Energy Agency (IEA) - Paris, France -- Trane Inc. - Piscataway, NJ -- Carrier Corp. - Alexandria,

  3. Webinar: Test Procedure for Battery Chargers; Notice of Data Availability

    Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of data availability regarding test procedures for battery chargers. 79 FR 27774  (May 15, 2014). For more information, please visit...

  4. LG DOE Television Test Procedures Ex Parte (10-17)

    Office of Environmental Management (EM)

    OF LG ELECTRONICS USA In response to its Request for Information on test procedures for televisions, the Department received a fair amount of both opinion and data from a variety ...

  5. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures...

    Energy.gov [DOE] (indexed site)

    (118.71 KB) ETA-HTP02 Implementation of SAE Standard J1666 May 1993 - Hybrid Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (230.69 KB) ETA-HTP03 ...

  6. Energy Conservation Program: Test Procedures for Certain Categories...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for ... Title III of the Energy Policy and Conservation Act of 1975 (42 U.S.C. 6291, et seq.; ...

  7. Webinar: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of proposed rulemaking regarding test procedures for residential dehumifiers. 79 FR 29271 (May 22, 2014). For more information, please...

  8. DOE Seeks Comment on Application of Clothes Washer Test Procedure

    Energy.gov [DOE]

    Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer...

  9. Energy Conservation Program: Test Procedures for Certain Categories...

    Energy.gov [DOE] (indexed site)

    1 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 429 and 430 Docket No. EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for Certain Categories of ...

  10. Meeting Concerning Potential Test Procedures and Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Standards for Set-Top Boxes and Network Equipment | Department of Energy Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment In compliance with the Department of Energy's guidance on ex parte communications (74 Fed. Reg. 52795 (Oct. 14, 2009)), this memorandum provides a summary of a March 7, 2012, meeting with DOE

  11. Flammable gas interlock spoolpiece flow response test plan and procedure

    SciTech Connect

    Schneider, T.C., Fluor Daniel Hanford

    1997-02-13

    The purpose of this test plan and procedure is to test the Whittaker electrochemical cell and the Sierra Monitor Corp. flammable gas monitors in a simulated field flow configuration. The sensors are used on the Rotary Mode Core Sampling (RMCS) Flammable Gas Interlock (FGI), to detect flammable gases, including hydrogen and teminate the core sampling activity at a predetermined concentration level.

  12. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  13. LG DOE Television Test Procedures Ex Parte (10-17)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    United States Department of Energy Washington, D.C. 20585 In the Matter of: Energy Efficiency Program: Test Procedure for Televisions; Request for Information Docket No. EERE-2016-BT- TP-0023; RIN 1904-AD70 EX PARTE REPLY COMMENTS OF LG ELECTRONICS USA In response to its Request for Information on test procedures for televisions, the Department received a fair amount of both opinion and data from a variety of parties. There was, however, less effort to connect that opinion and data with the

  14. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  15. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Test Procedure for Pumps Final Rule 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule Test Procedure for Pumps Final Rule Pumps Test Procedure Final Rule.pdf (1.85 MB) More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking Draft PEI Calculator ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking

  16. 100 Area soil washing bench-scale test procedures

    SciTech Connect

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing.

  17. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners...

    Office of Environmental Management (EM)

    2 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed ...

  18. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a ...

  19. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge...

    Energy.gov [DOE] (indexed site)

    notice of proposed rulemaking regarding test procedures for high-intesity discharge ... access to this document. 2014-05-05 Test Procedures for High-Intensity Discharge ...

  20. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting ...

  1. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers...

    Energy Saver

    3 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking This ...

  2. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting ...

  3. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  4. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  5. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  6. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  7. Acceptance Test Procedure: SY101 air pallet system

    SciTech Connect

    Koons, B.M.

    1995-05-30

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

  8. Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

    SciTech Connect

    Tuohig, W.; Mahoney, Patrick A.; Tuttle, Bruce Andrew; Wheeler, Jill Susanne

    2009-02-01

    Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

  9. 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Consumer Furnaces and Boilers

  10. Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

  11. DOE Issues Final Appliance Test Procedure Rule | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    fans and ceiling fan light kits; illuminated exit signs; torchieres; low-voltage dry-type distribution transformers; traffic signal modules and pedestrian modules; unit heaters; ...

  12. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for ...

  13. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    SciTech Connect

    Washburn, S.J.

    1994-08-29

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes.

  14. Pilot test of Pickliq{reg_sign} process to determine energy and environmental benefits & economic feasibility

    SciTech Connect

    Olsen, D.R.

    1997-07-13

    Green Technology Group (GTG) was awarded Grant No. DE-FG01-96EE 15657 in the amount of $99,904 for a project to advance GTG`s Pickliq{reg_sign} Process in the Copper and Steel Industries. The use of the Pickliq{reg_sign} Process can significantly reduce the production of waste acids containing metal salts. The Pickliq{reg_sign} Process can save energy and eliminate hazardous waste in a typical copper rod or wire mill or a typical steel wire mill. The objective of this pilot project was to determine the magnitude of the economic, energy and environmental benefits of the Pickliq{reg_sign} Process in two applications within the metal processing industry. The effectiveness of the process has already been demonstrated at facilities cleaning iron and steel with sulfuric acid. 9207 companies are reported to use sulfuric and hydrochloric acid in the USA. The USEPA TRI statistics of acid not recycled in the US is 2.4 x 10{sup 9} lbs (net) for Hydrochloric Acid and 2.0 x 10{sup 9} lbs (net) for Sulfuric Acid. The energy cost of not reclaiming acid is 10.7 x 10{sup 6} BTU/ton for Hydrochloric Acid and 21.6 x 10{sup 6} BTU/Ton for Sulfuric Acid. This means that there is a very large market for the application of the Pickliq{reg_sign} Process and the widespread use of the process will bring significant world wide savings of energy to the environment.

  15. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    SciTech Connect

    Flanagan, B.D.

    1995-07-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the {open_quotes}Free Drop Test{close_quotes} procedure for the SPM-1 package.

  16. Procedures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Procedures A NSSAB outreach display is available for community events The Nevada Site Specific Advisory Board (NSSAB) abides by a variety of federal and self-imposed procedures....

  17. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits...

    Energy Saver

    7 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking ...

  18. DOE Publishes Notice of Proposed Rulemaking for Commercial Refrigeration Equipment Test Procedure

    Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for commercial refrigeration equipment.

  19. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Dehumidifiers, Final Rule | Department of Energy 6: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule This document is the Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule. dehumid_tp_finalrule.pdf (734.28 KB) More Documents & Publications ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice

  20. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clothes Washers, Final Rule | Department of Energy 17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule This document is the Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule. clothes_washers_tp_finalrule.pdf (1.53 MB) More Documents & Publications 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed

  1. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Battery Chargers, Final Rule | Department of Energy Test Procedure for Battery Chargers, Final Rule ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule This document is the Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule. Battery Chargers TP Final Rule.pdf (449.69 KB) More Documents & Publications 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability ISSUANCE 2015-07-27: Energy

  2. DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure

    Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

  3. AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Department of Energy Plug-in Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures Plug-in Hybrid Electric Vehicle Test Plan DRAFT - Integrated Test Plan and Evaluation Program for Review for Plug-in Hybrid Electric Vehicles (PHEVs) (2.33 MB) More Documents & Publications AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Vehicle Technologies Office: 2010 Vehicle and Systems Simulation and Testing

  4. Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters...

    Energy.gov [DOE] (indexed site)

    Energy Conservation Program for Consumer Products and Certain Industrial Equipment: Test ... Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial ...

  5. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information ISSUANCE 2015-12-04: Energy Conservation Standards and Test ...

  6. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    SciTech Connect

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  7. W-026 acceptance test plan plant control system hardware (submittal {number_sign} 216)

    SciTech Connect

    Watson, T.L., Fluor Daniel Hanford

    1997-02-14

    Acceptance Testing of the WRAP 1 Plant Control System Hardware will be conducted throughout the construction of WRAP I with the final testing on the Process Area hardware being completed in November 1996. The hardware tests will be broken out by the following functional areas; Local Control Units, Operator Control Stations in the WRAP Control Room, DMS Server, PCS Server, Operator Interface Units, printers, DNS terminals, WRAP Local Area Network/Communications, and bar code equipment. This document will contain completed copies of each of the hardware tests along with the applicable test logs and completed test exception reports.

  8. W-026, acceptance test report motor control centers (submittal{number_sign}515.1)

    SciTech Connect

    Watson, T.L.

    1997-01-07

    Westinghouse Energy Services provided start up testing at the WRAP Facility Hanford. This report covers services provided October 9, 1995 to October 18, 1995.

  9. ISSUANCE 2015-04-29: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters Notice of petition to extend test procedure compliance date and request for comment

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters; Notice of petition to extend test procedure compliance date and request for comment.

  10. Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures

    SciTech Connect

    Goetzler, William; Sutherland, Timothy; Kar, Rahul; Foley, Kevin

    2011-09-01

    This study investigated the real-world energy performance of appliances and equipment as it compared with models and test procedures. The study looked to determine whether the U.S. Department of Energy and industry test procedures actually replicate real world conditions, whether performance degrades over time, and whether installation patterns and procedures differ from the ideal procedures. The study first identified and prioritized appliances to be evaluated. Then, the study determined whether real world energy consumption differed substantially from predictions and also assessed whether performance degrades over time. Finally, the study recommended test procedure modifications and areas for future research.

  11. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Incidents in Plug-in Electric Vehicles (EV) | Department of Energy Battery Testing - Best Practices for Responding to Emergency Incidents in Plug-in Electric Vehicles (EV) AVTA: Battery Testing - Best Practices for Responding to Emergency Incidents in Plug-in Electric Vehicles (EV) The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results

  12. Test procedure for measurement of performance vs temperature of Whittaker electrochemical cell

    SciTech Connect

    Vargo, G.F.

    1997-01-23

    This document is the test procedure to systematically test the Whittaker cells between the temperatures of -20 degrees F and +120 degrees F. These sensors are used on the Rotary Mode Core Sampling (RMCS) flammable gas interlock (FGI), to detect and quantify hydrogen gas. This procedure supports the testing, that is being performed after cold weather attempts on the Whittaker cell failed.

  13. ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking | Department of Energy 8-26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking. Dedicated Purpose Pool Pumps TP NOPR.pdf

  14. ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Certain Categories of General Service Lamps, Final Rule | Department of Energy 09-30: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule This document is the Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule. General Service Lamps TP Final Rule.pdf (353.34 KB)

  15. 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers;

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of Proposed Rulemaking | Department of Energy 1 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedure amendments for residential clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 11, 2014. Though it is not

  16. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps;

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Supplemental Notice of Proposed Rulemaking | Department of Energy Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for high-intesity discharge lamps, as issued by the Deputy Assistant Secretary for Energy

  17. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Availability | Department of Energy Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a pre-publication Federal Register notice of data availability regarding test procedures for battery chargers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 8, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted

  18. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lamps; Supplemental Notice of Proposed Rulemaking | Department of Energy 16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for integrated light-emitting diode lamps, as issued by the

  19. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ballasts; Notice of Proposed Rulemaking | Department of Energy 4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14,

  20. 2014-10-16 Issuance: Energy Conservation Program Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Residential Clothes Dryers, Notice of Public Meeting | Department of Energy 6 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting 2014-10-16 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting clothes_dryer_nopm.pdf (194.46 KB) More Documents & Publications 2014-01-31

  1. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Proposed Rulemaking | Department of Energy 2 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 12, 2015. Though it is not intended or

  2. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Proposed Rulemaking | Department of Energy 3 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for furnaces and boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 13, 2015. Though it is not intended or expected, should any

  3. 2016-10-21 Energy Conservation Program: Test Procedure for Commercial

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Packaged Boilers Final Rule | Department of Energy Program: Test Procedure for Commercial Packaged Boilers Final Rule 2016-10-21 Energy Conservation Program: Test Procedure for Commercial Packaged Boilers Final Rule Commercial Packaged Boilers_Final Rule_10.21.16 (708.07 KB) More Documents & Publications ISSUANCE 2016-02-22: Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers, Notice of Proposed Rulemaking

  4. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ceiling Fans, Supplemental Notice of Proposed Rule | Department of Energy 6: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule. ceiling_fans_tp_snopr.pdf (526.51 KB) More Documents & Publications

  5. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Conventional Ovens, Final Rule | Department of Energy 18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule This document is the Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule. conventional_ovens_tp_finalrule.pdf (448.83 KB) More Documents & Publications ISSUANCE 2015-05-29: Energy Conservation Program: Energy Conservation

  6. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Battery Chargers, Notice of Proposed Rulemaking | Department of Energy 27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking. battery_chargers_tp_nopr.pdf (336.62 KB) More Documents & Publications ISSUANCE

  7. ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Compressors, Notice of Proposed Rulemaking | Department of Energy 22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking. Compressors TP NOPR.pdf (970.54 KB) More Documents & Publications Docket # EERE-2014-BT-STD-0051,

  8. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Central Air Conditioners and Heat Pumps Final Rule | Department of Energy 5-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule This document is the Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule. Central Air Conditioners and Heat Pumps TP Final Rule.pdf (2.2 MB) More

  9. ISSUANCE 2016-06-16: Energy Efficiency Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Televisions; Request for Information | Department of Energy 6: Energy Efficiency Program: Test Procedure for Televisions; Request for Information ISSUANCE 2016-06-16: Energy Efficiency Program: Test Procedure for Televisions; Request for Information This document is the Energy Efficiency Program: Test Procedure for Televisions; Request for Information. TV Request for Information.pdf (545.43 KB) More Documents & Publications LG Ex Parte Reply Comments Energy Savings Estimates of Light

  10. ISSUANCE 2016-10-21: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Manufactured Housing, Notice of Proposed Rulemaking | Department of Energy 10-21: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-10-21: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking. Manufactured Housing TP NOPR (775.7 KB) More Documents &

  11. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    External Power Supplies, Notice of Public Meeting | Department of Energy 29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting This document is the notice of public meeting for Energy Conservation Program: Test Procedures for External Power Supplies. externalpowersupplies_tp_nopm.pdf (236.66 KB) More Documents &

  12. DOE Publishes Notice of Proposed Rulemaking for Direct Heating Equipment and Pool Heater Test Procedures

    Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for direct heating equipment and pool heaters.

  13. BESTEST: Test Procedures Building Energy SimulationŽ Tools

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ron.Judkoff@nrel.gov BESTEST: Test Procedures "Building Energy Simulation" Tools 2014 ... and improving building energy simulation tools and associated documentation. -Increase ...

  14. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ceiling Fan Light Kits, Final Rule | Department of Energy 15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule. cflk tp final rule 2015-12-15.pdf (817.76 KB) More Documents & Publications 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light

  15. 2016-10-21 Energy Conservation Program: Test Procedure for Commercial...

    Office of Environmental Management (EM)

    Boilers Final Rule 2016-10-21 Energy Conservation Program: Test Procedure for Commercial ... More Documents & Publications ISSUANCE 2016-02-22: Energy Conservation Program for Certain ...

  16. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking Draft PEI Calculator ISSUANCE 2016-08-26: Energy Conservation ...

  17. 2014-06-27 Issuance: Test Procedures for Residential and Commercial...

    Energy.gov [DOE] (indexed site)

    solely as a means to facilitate the public's access to this document. 2014-06-27 Test Procedures for Residential and Commercial Water Heaters; Final Rule More Documents &...

  18. Argonne Facilitation of PHEV Standard Testing Procedure (SAE...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications SAE Standards Development HEV, PHEV, EV Test Standard Development and Validation Off-Cycle Benchmarking of PHEVs; Wide Range of Temperatures and ...

  19. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    SciTech Connect

    Washburn, S.J.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging.

  20. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  1. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  2. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  3. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  4. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  5. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  6. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  8. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  9. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  10. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  11. Thermal test procedure for a paraboloid concentrator solar cooker

    SciTech Connect

    Mullick, S.C.; Kandpal, T.C.; Kumar, S. )

    1991-01-01

    Suitable thermal tests have been identified for performance evaluation of a concentrating solar cooker. These tests provide parameters that characterize the performance of the solar cooker, and are more or less independent of the climatic variables. The overall heat loss factor is obtained from the cooling curve and the optical efficiency factor is determined from the heating curve - both under full load conditions. The performance characteristic curve for the solar cooker is obtained and discussed. The study indicates that the no load test, which is useful in the case of a box type solar cooker, is not appropriate in the case of concentrator type cookers.

  12. Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Issues | Department of Energy Procedure - ICM Issues Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues On October 8, 2015, AHRI staff and Independent Coil Manufacturer (ICM) Representatives met with a representative from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners and how they would impact ICM manufacturers. 10_8_15AHRI Ex Parte Memo ICM (53.24 KB) More Documents & Publications Ex Parte Communication

  13. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures...

    Energy.gov [DOE] (indexed site)

    NEVAmerica Technical Specifications (135.99 KB) NEVAmerica Test Sequence (66.19 KB) ETA-NTP002 Implementation of SAE Standard J1666 May 93 - Electric Vehicle Acceleration, ...

  14. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  15. ISSUANCE 2016-08-05: Energy Conservation Program: Test Procedures for Cooking Products, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Cooking Products, Supplemental Notice of Proposed Rulemaking

  16. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

  17. ISSUANCE 2015-11-19: Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

  18. ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

  19. 2014-10-02 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

  20. ISSUANCE 2016-03-24: Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

  1. ISSUANCE 2015-05-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

  2. ISSUANCE 2014-12-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

  3. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking

  4. ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking

  5. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  6. Gas characterization system 241-AN-105 field acceptance test procedure

    SciTech Connect

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AN-105. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  7. Gas characterization system 241-AW-101 field acceptance test procedure

    SciTech Connect

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AW-101. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  8. Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

    SciTech Connect

    Kroposki, B.; Englebretson, S.; Pink, C.; Daley, J.; Siciliano, R.; Hinton, D.

    2003-09-01

    This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

  9. In-Plane Conductivity Testing Procedures and Results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    In-Plane Conductivity Testing Procedures and Results In-Plane Conductivity Testing Procedures and Results This presentation on conductivity testing was given at the High Temperature Membrane Working Group Meeting in May 2007. htmwg_bekktech.pdf (354.02 KB) More Documents & Publications Requirements for Samples High Temperature Membrane Working Group Minutes Progress and Status on Through-Plane Resistance and Conductivity Measurement of Fuel Cell Membranes

  10. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    SciTech Connect

    Biyani, R.K.; Hendrickson, D.W.

    1997-07-18

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations.

  11. Project B610 process control configuration acceptance test procedure

    SciTech Connect

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  12. ISSUANCE 2016-10-28 Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Integrated Light-Emitting Diode Lamps Notice of Proposed Rulemaking | Department of Energy ISSUANCE 2016-10-28 Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps Notice of Proposed Rulemaking ISSUANCE 2016-10-28 Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps Notice of Proposed Rulemaking Light-Emitting Diode Lamps_TP_NOPR_10-28-16 (206.05 KB) More Documents & Publications 2014-05-16 Issuance: Test Procedures for

  13. 2014-02-07 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial packaged boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

  14. CRAD, System Operating Test Procedures- October 23, 2014 (EA CRAD 31-05, Rev. 0)

    Energy.gov [DOE]

    This Criteria Review and Approach Document (EA CRAD 31-05, Rev. 0) provides objectives, criteria, and approaches for reviewing startup testing procedures for installed structures, systems, or components.

  15. Supervisory Control and Data Acquisition System (SCADA) Substation C3-3 Acceptance Test Procedure

    SciTech Connect

    ZAKRAJSEK, M.F.

    2000-10-17

    The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

  16. 2014-02-21 Issuance: Test Procedure for Commercial Water Heating Equipment; Request for Information

    Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial water heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency (February 21, 2014).

  17. 2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule

    Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

  18. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors

    Energy.gov [DOE]

    The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

  19. 2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed Rulemaking

    Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 31, 2014.

  20. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting | Department of Energy 01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting This document is a pre-publication Federal Register notice of proposed rulemaking and public meeting regarding

  1. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    SciTech Connect

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  2. Review of Test Procedure for Determining HSPFs of Residential Variable-Speed Heat Pumps

    SciTech Connect

    Rice, C. Keith; Munk, Jeffrey D.; Shrestha, Som S.

    2015-08-01

    This report reviews the suitability of the existing Heating Seasonal Performance Factor (HSPF) ratings and testing requirements for the current generation of variable-speed (VS) air-source heat pumps. Recent field test results indicate larger discrepancies between rated HSPF and field-observed HSPF for VS models than for single-speed models in the same houses. These findings suggest that the heating season test and ratings procedure should be revisited for VS heat pumps. The ratings and testing procedures are described in ANSI/AHRI 210/240 (2008) for single-speed, two-capacity, and variable-speed units. Analysis of manufacturer and independent test performance data on VS units reveals why the current VS testing/ratings procedure results in overly optimistic HSPF ratings for some VS units relative to other types of heat pumps. This is due to a combination of extrapolation of low speed test data beyond the originally anticipated ambient temperature operating range and the constraints of unit controls, which prevent low speed operation over the range of ambient temperatures assumed in the procedure for low speed. As a result, the HSPFs of such units are being overpredicted relative to those for single- and two-capacity designs. This overprediction has been found to be significantly reduced by use in the HSPF ratings procedure of an alternative higher-load heating load line, described in a companion report (Rice et al., 2015).

  3. Accuracy of the European solar water heater test procedure. Part 1: Measurement errors and parameter estimates

    SciTech Connect

    Rabl, A.; Leide, B. ); Carvalho, M.J.; Collares-Pereira, M. ); Bourges, B.

    1991-01-01

    The Collector and System Testing Group (CSTG) of the European Community has developed a procedure for testing the performance of solar water heaters. This procedure treats a solar water heater as a black box with input-output parameters that are determined by all-day tests. In the present study the authors carry out a systematic analysis of the accuracy of this procedure, in order to answer the question: what tolerances should one impose for the measurements and how many days of testing should one demand under what meteorological conditions, in order to be able to quarantee a specified maximum error for the long term performance The methodology is applicable to other test procedures as well. The present paper (Part 1) examines the measurement tolerances of the current version of the procedure and derives a priori estimates of the errors of the parameters; these errors are then compared with the regression results of the Round Robin test series. The companion paper (Part 2) evaluates the consequences for the accuracy of the long term performance prediction. The authors conclude that the CSTG test procedure makes it possible to predict the long term performance with standard errors around 5% for sunny climates (10% for cloudy climates). The apparent precision of individual test sequences is deceptive because of large systematic discrepancies between different sequences. Better results could be obtained by imposing tighter control on the constancy of the cold water supply temperature and on the environment of the test, the latter by enforcing the recommendation for the ventilation of the collector.

  4. Development of an Outdoor Concentrating Photovoltaic Module Testbed, Module Handling and Testing Procedures, and Initial Energy Production Results

    SciTech Connect

    Muller, M.

    2009-09-01

    This report addresses the various aspects of setting up a CPV testbed and procedures for handling and testing CPV modules.

  5. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  6. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  7. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  8. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  9. Evaluation of the unloading compliance procedure for J integral testing in the hot cell. Final report

    SciTech Connect

    Clarke, G.A.

    1980-01-01

    A testing program was initiated to develop a procedure for toughness testing of irradiated materials using J integral methods. An evaluation of presently used procedures and improved techniques was completed to increase the reliability of the unloading compliance method for single specimen J/sub Ic/ determination. Three different heats of pressure vessel steels were used to evaluate the reliability and accuracy of the unloading compliance procedure. A new technique for improved sensitivity of displacement measurements was found to be successful on large 4T specimens. This technique consisted of using a small electrical linear actuator to continuously rezero a 0.635 mm (.025 inch) LVDT. The effects of specimen geometry on both J/sub Ic/ and dJ/da were evaluated using various specimen sizes and varying amounts of side grooving.

  10. Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction

    Office of Energy Efficiency and Renewable Energy (EERE)

    On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

  11. 241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  12. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    SciTech Connect

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE).

  13. Test plan/procedure for the shock limiting device of the radioisotope thermoelectric generator package mounting subsystem 145. Revision 1

    SciTech Connect

    Satoh, J.A.

    1995-05-25

    This document defines the procedure to be used in the 18 inch drop test to be used for design verification of the RTG Transportation System Package Mounting.

  14. DOE Publishes Notice of Proposed Rulemaking for Residential Water Heater and Certain Commercial Water Heater Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for residential water heaters and certain commercial water heaters.

  15. 2014-11-24 Issuance: Test Procedures for Conventional Cooking Products; Supplementary Notice of Proposed Rulemaking

    Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplementary Notice of Proposed Rulemaking regarding test procedures for conventional cooking products, as issued by the Deputy Asisstant Secretary for Energy Efficiency. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  16. 2014-05-05 Issuance: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for dehumidifiers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 2, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  17. 2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction

    Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  18. 2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule

    Energy.gov [DOE]

    This document is a pre-publication Federal Register Final Rule regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on November 24, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  19. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance. [Contains Glossary

    SciTech Connect

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs.

  20. ISSUANCE 2016-02-22: Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers

  1. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking

  2. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of nickel to nickel-copper

    SciTech Connect

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2301-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel, NO2200 or NO2201 (P-41) to nickel-copper NO4400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  3. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of nickel-copper

    SciTech Connect

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-1302-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel-copper NO4400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  4. Performance testing of HEPA filters: Progress towards a European standard procedure

    SciTech Connect

    Dyment, J.

    1997-08-01

    Proposals for a future European testing procedure for {open_quotes}High Efficiency Particulate Air Filters (HEPA and ULPA){close_quotes} are being developed by CEN (Comite Europeen de Normalisation). The new standard will be given the status of national standard in participating countries, conflicting national standards being withdrawn. The standard will comprise 5 parts covering the grouping and classification of HEPA and ULPA filters according to their efficiency, fundamental principles of testing, marking etc (in part 1). Part 2 will cover aerosol production, measurement principles, counting equipment and statistics. Parts 3-5 will cover testing flat sheet media, leak testing of filter elements and the efficiency testing of filter elements respectively. The efficiency test methods allow the use of either homogeneous monodisperse or polydisperse aerosols for the determination of particulate filtration efficiencies as a function of particle size. The particle size at which maximum penetration occurs is first determined in flat sheet media tests; tests on filter elements (constructed using the same filter medium) may be carried out using either a homogeneous monodisperse aerosol of the size at which maximum penetration occurs (MPPS) or a polydisperse aerosol whose median size is close to the MPPS. Tests with monodisperse aerosols may be conducted using condensation nucleus counting equipment; tests using polydisperse test aerosols require the use of optical sizing particle counters. When determining the efficiency of filter elements the downstream aerosol concentrations may be determined from air samples obtained using either an overall method (single point sampling after mixing) or a scan method. The scan method also allows {open_quotes}local{close_quotes} efficiency values to be determined. 1 ref., 1 fig., 1 tab.

  5. Lagoon Seepage Testing Procedures for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory Butte County, Idaho April 2014

    SciTech Connect

    Alan Giesbrecht

    2014-05-01

    The lagoon seepage testing procedures are documented herein as required by the Wastewater Rules (IDAPA 58.01.16.493). The Wastewater Rules and Wastewater Reuse Permit LA-000141-03 require that the procedure used for performing a seepage test be approved by IDEQ prior to conducting the seepage test. The procedures described herein are based on a seepage testing plan that was developed by J-U-B ENGINEERS, Inc. (J-U-B) and has been accepted by several IDEQ offices for lagoons in Idaho.

  6. 2014-06-27 Issuance: Test Procedures for Residential and Commercial Water Heaters; Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register final rule regarding test procedures for residential and commercial water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  7. 2014-05-05 Issuance: Test Procedure for Portable Air Conditioners; Notice of Data Availability

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register notice of data availabilty regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  8. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking

    Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for ceiling fan light kits, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  9. Illuminated Exit Signs

    Energy.gov [DOE]

    The Department of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by third-party laboratories under contract with DOE that conduct testing in support of ENERGY STAR® verification, DOE rulemakings, and enforcement of the federal energy conservation standards.

  10. Test report on the Abacus 30 kW bimode{reg_sign} inverter and maximum power tracker (MPT)

    SciTech Connect

    Bonn, R.; Ginn, J.; Zirzow, J.

    1995-06-01

    Sandia National Laboratories conducts the photovoltaic balance of systems (BOS) program, which is sponsored by the US Department of Energy`s Office of Energy Management. Under this program, SNL lets commercialization contracts and conducts a laboratory program designed to advance BOS technology, improve BOS component reliability, and reduce the BOS life-cycle-cost. This report details the testing of the first large US manufactured hybrid inverter and its associated maximum power tracker.

  11. Developing standard performance testing procedures for material control and accounting components at a site

    SciTech Connect

    Scherer, Carolynn P; Bushlya, Anatoly V; Efimenko, Vladimir F; Ilyanstev, Anatoly; Regoushevsky, Victor I

    2010-01-01

    The condition of a nuclear material control and accountability system (MC&A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC&A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC&A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC&A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC&A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC&A performance-testing procedures were the basis for a Guide for MC&A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

  12. Acceptance test procedure bldg. 271-U remote monitoring of project W-059 B-Plant canyon exhaust system

    SciTech Connect

    MCDANIEL, K.S.

    1999-09-01

    The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.

  13. Operability test procedure for the TK-900 beta/gamma liquid effluent monitoring system

    SciTech Connect

    Weissenfels, R.D.

    1995-02-24

    This operability test procedure will verify that the 221-B beta/gamma liquid effluent monitoring system, installed near the east end of the six inch chemical sewer header, functions as intended by design. An off-line, skid mounted, beta/gamma radiation monitor and pH monitor was installed near stairwell three in the 221-B electrical gallery by Project W-007H. The skid mounted monitoring system includes two radiation detectors and a pH meter, both with local digital displays. Output signals from each monitor are also received and displayed by the Facility Process Monitor and Control System (FPMCS). Pumps, motors, gauges, valves and transport lines complement the skid monitoring system. The system is part of BAT/AKART for the BCE liquid effluent system.

  14. Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint

    SciTech Connect

    Kramer, W.; Chakraborty, S.; Kroposki, B.; Hoke, A.; Martin, G.; Markel, T.

    2012-03-01

    Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. The objective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires to provide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

  15. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

    Energy.gov [DOE]

    Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

  16. ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  17. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

  18. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking (version2)

  19. ISSUANCE 2016-08-01: Energy Conservation Program: Corrction; Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  20. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

  1. ISSUANCE 2015-05-12: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

  2. ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

  3. ISSUANCE 2016-08-01: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  4. W-026, acceptance test report gamma energy assay (GEA) system A(submittal {number_sign}39.8) C3

    SciTech Connect

    Watson, T. L.

    1997-01-28

    This test procedure is designed to test all of the functions of the GEA system at the WRAP facility at Hanford, Washington. The procedure is designed to be executed in the sequence given, starting with: * verification of components and labeling * verification or entry of all of the setup parameters * performing the calibrations (energy, efficiency, transmission, and reference peak) * performing the measurements in local mode * performing the measurements in remote mode * confirming the message formats * utility operations (LN2 fill, archiving, password maintenance) The system is designed to be operated in a remote mode in which all commands are received over a network, and the results are returned over the same network. A manual mode is provided for the setup and calibration operations, and for maintenance functions. The system is designed to start up in remote mode. The user can go to local mode when at the keyboard by selecting Exit on the screen shown during remote mode. A user logon screen, requiring 2 username and password, limits access to local mode.

  5. Proposal for a Vehicle Level Test Procedure to Measure Air Conditioning Fuel Use: Preprint

    SciTech Connect

    Rugh, J.

    2010-02-01

    A procedure is described to measure approximate real-world air conditioning fuel use and assess the impact of thermal load reduction strategies in plug-in hybrid electric vehicles.

  6. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes

    Energy.gov [DOE]

    The Department of Energy (DOE) has issued pre-publication Federal Register notices withdrawing the notice of proposed rulemaking for a test procedure for set-top boxes and the proposed coverage determination for set-top boxes and network equipment.

  7. Test procedure for use of the shear vane in tanks 103-SY, 103-AN, and 103-AW

    SciTech Connect

    LeClair, M.D.; Waters, E.

    1995-01-01

    This is a record copy of a test procedure for application of the full-scale shear vane to underground waste tanks at Hanford. The introduction of the report provides background information on the development and proof-testing of the shear vane, as well as information about its current location. The document was originally prepared in 1988, and the work as shelved temporarily for lack of funds. Activities to utilize the shear vane will be expedited by use of this information.

  8. Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

    SciTech Connect

    Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

    2011-06-01

    The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

  9. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect

    Judkoff, Ron

    2010-08-01

    This report documents the initial Phase 1 test process for testing the reliability of software models that predict retrofit energy savings of existing homes, including their associated calibration methods.

  10. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

    Energy.gov [DOE]

    Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

  11. DOE Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure; Docket No. EERE–2014–BT–TP–0043 / RIN 1904–AD36

    Energy.gov [DOE]

    On 12/19/2014, Apple Inc. met with DOE to discuss the Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure.

  12. ISSUANCE 2015-06-25: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

  13. Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Industrial Equipment: Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002, specifically issues surrounding the Conversion...

  14. Cone penetrometer acceptance test report

    SciTech Connect

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  17. Accuracy of the European solar water heater test procedure. Part 2: Prediction of long-term performance

    SciTech Connect

    Rabl, A. ); Carvalho, M.J.; Collares-Pereira, M. ); Bourges, B.

    1991-01-01

    This paper continues the evaluation of the European test procedure for solar water heaters, by considering what consequences the errors of the parameters (derived in Part 1, the companion paper) will have for the prediction of the long-term performance. A simple criterion is derived for the required length of the test period, as a function of climatic variables and desired accuracy of the long-term performance prediction. Typically a duration of 10 to 50 days will suffice. Since the actual conditions during a test cannot be foreseen, it will be more efficient to calculate the error of the long-term performance prediction on line at the end of each test day and terminate the series whenever acceptable accuracy is reached.

  18. A rating procedure for solar domestic hot water systems based on ASHRAE-95 test results

    SciTech Connect

    Minnerly, B.V.; Klein, S.A.; Beckman, W.A. )

    1991-01-01

    A rating method for solar domestic hot water (SDHW) systems is presented that provides site-specific annual performance estimates based on ASHRAE-95 test results. An overall loss and overall gain coefficient are estimated by lumping the entire thermal behavior of the actual system exhibited during the ASHRAE-95 test into the collector parameters of a simplified system model. The performance of the simplified model can then be predicted using either the F-chart or TRNSYS and presented as an estimate of the annual performance of the actual system. Experimental performance measurements taken from relevant literature as well as extensive simulations, indicate that this method is capable of predicting the annual performance of a wide range of SDHW system types to within 5%, independent of location.

  19. W-026, acceptance test report imaging passive/active neutron(IPAN) (submittal {number_sign}54.3 - C3)

    SciTech Connect

    Watson, T.L.

    1997-02-21

    In the Spring of 1996, Site Acceptance Tests were performed for the 2 Imaging Passive/Active Neutron (IPAN) assay systems installed in the WRAP I Facility. This report includes the test documentation and the completed test checklists, with comments and resolutions. All testing was completed, with comments resolved by August 1996.

  20. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking

    Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplemental Notice of Proposed Rulemaking regarding Test Procedures for Integrated Light-Emitting Diode Lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 18, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  1. 2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction

    Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  2. 2014-10-14 Issuance: Test Procedures and Energy Conservation Standards for Residential Solar Water Heaters; Request for Information

    Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  3. 2014-03-31 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information, Reopening of the Comment Period

    Energy.gov [DOE]

    This document is a pre-publication Federal Register notice reopening the comment period for the request for information regarding the commercial packaged boiler test procedure rulemaking, as issued by the Deputy Assistant Secretary for Energy Efficiency on March 31, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  4. Volunteers - Sign Up

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Volunteers - Sign Up About Science Bowl Curriculum and Activities How to Build a Motor The Great Marble Drop How to Build a Turbine How to Build a Tower Classroom...

  5. Base program interim phase test procedure - Coherent Laser Vision System (CLVS). Final report, September 27, 1994--January 30, 1997

    SciTech Connect

    1997-05-01

    The purpose of the CLVS research project is to develop a prototype fiber-optic based Coherent Laser Vision System suitable for DOE`s EM Robotics program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update geometrics on the order of once per second. The CLVS project plan required implementation in two phases of the contract, a Base Contract and a continuance option. This is the Test Procedure and test/demonstration results presenting a proof-of-concept for a system providing three-dimensional (3D) vision with the performance capability required to update geometrics on the order of once per second.

  6. 2014-03-06 Issuance: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps; Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for packaged terminal air conditioners and packaged terminal heat pumps, as issued by the Deputy Assistant Secretary on March 6, 2014.

  7. A Discussion of Procedures and Equipment for the Comprehensive Test Ban Treaty On-Site Inspection Environmental Sampling and Analysis

    SciTech Connect

    Wogman, Ned A.; Milbrath, Brian D.; Payne, Rosara F.; Seifert, Carolyn E.; Friese, Judah I.; Miley, Harry S.; Bowyer, Ted W.; Hanlen, Richard C.; Onishi, Yasuo; Hayes, James C.; Wigmosta, Mark S.

    2011-02-01

    This paper is intended to serve as a scientific basis to start discussions of the available environmental sampling techniques and equipment that have been used in the past that could be considered for use within the context of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site inspections (OSI). This work contains information on the techniques, equipment, costs, and some operational procedures associated with environmental sampling that have actually been used in the past by the United States for the detection of nuclear explosions. This paper also includes a discussion of issues, recommendations, and questions needing further study within the context of the sampling and analysis of aquatic materials, atmospheric gases, atmospheric particulates, vegetation, sediments and soils, fauna, and drill-back materials.

  8. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of chromium-nickel steel to nickel-copper

    SciTech Connect

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2602-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of 300 series Cr-Ni steels (P-8-1) to nickel-copper N04400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  9. Welding procedure specification: gas tungsten arc welding of nickel-copper to nickel-chromium-iron. Supplement 1. Records of procedure qualification tests

    SciTech Connect

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2303-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel-copper N04400 (P-42) to nickel-chromium-iron N06600 (P-43), in thickness range of 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  10. Development of an integrated in-situ remediation technology. Draft topical report for Task {number_sign}7.2 entitled ``Field scale test`` (January 10, 1996--December 31, 1997)

    SciTech Connect

    Athmer, C.; Ho, S.V.; Hughes, B.M.

    1997-11-01

    Contamination in low-permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, and pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. The technology is an integrated in-situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. The present Topical Report for Task {number_sign}7.2 summarizes the Field Scale Test conducted by Monsanto Company, DuPont, and General Electric.

  11. Designing radiation protection signs

    SciTech Connect

    Rodriguez, M.A.; Richey, C.L.

    1995-03-01

    Entry into hazardous areas without the proper protective equipment is extremely dangerous and must be prevented whenever possible. Current postings of radiological hazards at the Rocky Flats Environmental Technology Site (RFETS) do not incorporate recent findings concerning effective warning presentation. Warning information should be highly visible, quickly, and easily understood. While continuing to comply with industry standards (e.g., Department of Energy (DOE) guidelines), these findings can be incorporated into existing radiological sign design, making them more effective in terms of usability and compliance. Suggestions are provided for designing more effective postings within stated guidelines.

  12. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards & Labeling Programs for Copy Machines, External Power Supplies, LED Displays, Residential Gas Cooktops and Televisions

    SciTech Connect

    Zheng, Nina; Zhou, Nan; Fridley, David

    2012-03-01

    This report presents a technical review of international minimum energy performance standards (MEPS), voluntary and mandatory energy efficiency labels and test procedures for five products being considered for new or revised MEPS in China: copy machines, external power supply, LED displays, residential gas cooktops and flat-screen televisions. For each product, an overview of the scope of existing international standards and labeling programs, energy values and energy performance metrics and description and detailed summary table of criteria and procedures in major test standards are presented.

  13. Unions, Lab sign labor agreements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Unions, Lab sign labor agreements Unions, Lab sign labor agreements The New Mexico Building and Construction Trades Council and Los Alamos National Security LLC, announced the signing of a series of labor agreements that affect nearly 750 construction and maintenance workers. September 21, 2012 Jay Johnson renews the contracts with the Laboratory's union workers. Jay Johnson (left) associate director for maintenance and infrastructure planning, renews the contracts with the Laboratory's union

  14. ISSUANCE 2014-12-23: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

  15. ISSUANCE 2015-06-30: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

  16. ISSUANCE 2015-04-01: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

  17. ISSUANCE 2016-08-15: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Supplemental Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Supplemental Notice of Proposed Rulemaking

  18. ISSUANCE 2015-03-27: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

  19. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

  20. Sign Up For Email Updates

    Energy.gov [DOE]

    Be the first to know of the latest developments from the Energy.gov team -- from videos to infographics to live Q&A’s -- by signing up for email updates.

  1. Nevada Rules of Appellate Procedure | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    appellate procedure in Nevada. Published NA Year Signed or Took Effect 2014 Legal Citation NRAP DOI Not Provided Check for DOI availability: http:crossref.org Online Internet...

  2. Title 7 CFR 1794 Environmental Policies and Procedures | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    CFR 1794 Environmental Policies and ProceduresLegal Abstract These regulations govern the Rural Utilities Services' implementation of NEPA. Published NA Year Signed or Took Effect...

  3. Optimizing surface quality of stainless alloys and using a modified ASTM G 48B procedure for acceptance testing

    SciTech Connect

    Maurer, J.R.

    1999-01-01

    The formation of high-temperature oxide scales and Cr-depleted zones on stainless alloys, such as 6% Mo superaustenitic steels, can significantly reduce their corrosion resistance. Effective methods to remove these layers and restore the surface to an optimized condition are detailed. Also, an acceptance test using a modified ASTM G 48B method at 35 C (95 F) for 72 h with a specimen having a crevice, and special corrosion criteria for failure, are described. Comparison of this test method with one using an uncreviced specimen at lower temperatures and for less time is discussed.

  4. Plans, Procedures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Plans, Procedures Plans, Procedures The following plans and procedures are cited in environmental reports prepared by the Laboratory. Contact Environmental Communication & Public Involvement Email Environmental Plans & Procedures DISCLAIMER: The following is a list of procedures (titles and numbers) cited in reports that have been prepared by the Laboratory's Associate Directorate for Environmental Management (ADEM). To view each procedure, visit the Electronic Public Reading Room (EPRR)

  5. Operability test report for rotary mode core sampling system number 3

    SciTech Connect

    Corbett, J.E.

    1996-03-01

    This report documents the successful completion of operability testing for the Rotary Mode Core Sampling (RMCS) system {number_sign}3. The Report includes the test procedure (WHC-SD-WM-OTP-174), exception resolutions, data sheets, and a test report summary.

  6. START Signed | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    START Signed START Signed Russia Moscow, USSR President Bush signs the Strategic Arms Reduction Treaty (START), which will reduce nuclear weapon stockpiles to 6,000 "accountable" warheads

  7. TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM

    SciTech Connect

    WYRWAS RB; PAGE JS; COOKE GS

    2012-04-19

    This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

  8. Test procedures and protocols: Their relevance to the figure of merit for thermal distribution systems. Volume 1: Informal report

    SciTech Connect

    Andrews, J.W.

    1993-09-01

    A conceptual framework is developed that categorizes measurement protocols for forced-air thermal distribution systems in small buildings. This framework is based on the distinction between two generic approaches. The {open_quote}system-comparison{close_quote} approach seeks to determine, via a pair of whole-house energy-use measurements, the difference in energy use between the house with the as-found duct system and the same house with no energy losses attributable to the thermal distribution system. The {open_quote}component loss-factor{close_quote} approach identifies and measures the individual causes of duct losses, and then builds up a value for the net overall duct efficiency, usually with the help of computer simulation. Examples of each approach are analyzed and related to a proposed Figure of Merit for thermal distribution systems. This Figure of Merit would serve as the basis for a Standard Method of Test analogous to those already in place for furnaces, boilers, air conditioners, and heat pumps.

  9. Developing Fatigue Pre-crack Procedure to Evaluate Fracture Toughness of Pipeline Steels Using Spiral Notch Torsion Test

    SciTech Connect

    Wang, Jy-An John; Tan, Ting; Jiang, Hao; Zhang, Wei; Feng, Zhili

    2012-10-01

    The spiral notch torsion test (SNTT) has been utilized to investigate the crack growth behavior of X52 steel base and welded materials used for hydrogen infrastructures. The X52 steel materials are received from a welded pipe using friction stir welding techniques. Finite element models were established to study the crack growth behavior of steel SNTT steel samples, which were assumed to be isotropic material. A series SNTT models were set up to cover various crack penetration cases, of which the ratios between crack depth to diameter (a/D ratio) ranging from 0.10 to 0.45. The evolution of compliance and energy release rates in the SNTT method have been investigated with different cases, including different geometries and materials. Indices of characteristic compliance and energy release rates have been proposed. Good agreement has been achieved between predictions from different cases in the same trend. These work shed lights on a successful protocol for SNTT application in wide range of structural materials. The further effort needed for compliance function development is to extend the current developed compliance function to the deep crack penetration arena, in the range of 0.55 to 0.85 to effectively determine fracture toughness for extremely tough materials.

  10. Microwave power coupler for a superconducting multiple-cell cavity for accelerator application and its testing procedures

    SciTech Connect

    Li, Jianjian

    2008-12-01

    Superconducting cavity resonators offer the advantage of high field intensity for a given input power, making them an attractive contender for particle accelerator applications. Power coupling into a superconducting cavity employed in a particle accelerator requires unique provisions to maintain high vacuum and cryogenic temperature on the cavity side, while operating with ambient conditions on the source side. Components introduced to fulfill mechanical requirements must show negligible obstruction of the propagation of the microwave with absence of critical locations that may give rise to electron multipaction, leading to a multiple section design, instead of an aperture, a probe, or a loop structure as found in conventional cavities. A coaxial power coupler for a superconducting multiple-cell cavity at 3.9 GHz has been developed. The cavity is intended to be employed as an accelerator to provide enhanced electron beam quality in a free-electron laser in Hamburg (FLASH) user facility. The design of the coupler called for two windows to sustain high vacuum in the cavity and two bellows to accommodate mechanical dimensional changes resulting from cryogenics. Suppression of multipacting was accomplished by the choice of conductor dimensions and materials with low second yield coefficients. Prior to integration with the cavity, the coupler was tested for intrinsic properties in a back-to-back configuration and conditioned for high-power operation with increasing power input. Maximum incident power was measured to be 61 kW. When integrated with the superconducting cavity, a loaded quality factor of 9 x 10 5 was measured by transient method. Coupler return loss and insertion loss were estimated to be around -21 dB and -0.2 dB, respectively.

  11. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards and Labeling Programs for Clothes Washers, Water Dispensers, Vending Machines and CFLs

    SciTech Connect

    Fridley, David; Zheng, Nina; Zhou, Nan

    2010-06-01

    Since the late 1970s, energy labeling programs and mandatory energy performance standards have been used in many different countries to improve the efficiency levels of major residential and commercial equipment. As more countries and regions launch programs covering a greater range of products that are traded worldwide, greater attention has been given to harmonizing the specific efficiency criteria in these programs and the test methods for measurements. For example, an international compact fluorescent light (CFL) harmonization initiative was launched in 2006 to focus on collaboration between Australia, China, Europe and North America. Given the long history of standards and labeling programs, most major energy-consuming residential appliances and commercial equipment are already covered under minimum energy performance standards (MEPS) and/or energy labels. For these products, such as clothes washers and CFLs, harmonization may still be possible when national MEPS or labeling thresholds are revised. Greater opportunity for harmonization exists in newer energy-consuming products that are not commonly regulated but are under consideration for new standards and labeling programs. This may include commercial products such as water dispensers and vending machines, which are only covered by MEPS or energy labels in a few countries or regions. As China continues to expand its appliance standards and labeling programs and revise existing standards and labels, it is important to learn from recent international experiences with efficiency criteria and test procedures for the same products. Specifically, various types of standards and labeling programs already exist in North America, Europe and throughout Asia for products in China's 2010 standards and labeling programs, namely clothes washers, water dispensers, vending machines and CFLs. This report thus examines similarities and critical differences in energy efficiency values, test procedure specifications and other

  12. Emergency Procedures

    Energy.gov [DOE]

    Note: This page is pending deletion, please refer to the Safety and health main page for emergency procedure information:

  13. ISSUANCE 2016-03-10: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

    Energy.gov [DOE]

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

  14. ISSUANCE 2016-04-14: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

  15. Product consistency test and toxicity characteristic leaching procedure results of the ceramic waste form from the electrometallurgical treatment process for spent fuel

    SciTech Connect

    Johnson, S. G.; Adamic, M. L.: DiSanto, T.; Warren, A. R.; Cummings, D. G.; Foulkrod, L.; Goff, K. M.

    1999-11-11

    The ceramic waste form produced from the electrometallurgical treatment of sodium bonded spent fuel from the Experimental Breeder Reactor-II was tested using two immersion tests with separate and distinct purposes. The product consistency test is used to assess the consistency of the waste forms produced and thus is an indicator of a well-controlled process. The toxicity characteristic leaching procedure is used to determine whether a substance is to be considered hazardous by the Environmental Protection Agency. The proposed high level waste repository will not be licensed to receive hazardous waste, thus any waste forms destined to be placed there cannot be of a hazardous nature as defined by the Resource Conservation and Recovery Act. Results are presented from the first four fully radioactive ceramic waste forms produced and from seven ceramic waste forms produced from cold surrogate materials. The fully radioactive waste forms are approximately 2 kg in weight and were produced wit h salt used to treat 100 driver subassemblies of spent fuel.

  16. Limited Test Ban Treaty

    National Nuclear Security Administration (NNSA)

    Detection System (USNDS), which monitors compliance with the international Limited Test Ban Treaty (LTBT). The LTBT, signed by 108 countries, prohibits nuclear testing in the...

  17. SciTech Connect: Sign In

    Office of Scientific and Technical Information (OSTI)

    Sign In Sign In If you already have a SciTech Connect account, enter your email address and password below to sign in. You will be taken to your account management screen, where you can view saved searches, export bibliographies and create content alerts. Email Address: (required) Please leave blank: Password: (required) Sign In Create Account Forgot Password? × Password Reset Request In order to again access your SciTech account, please complete and submit the request below. You will receive

  18. Yacyreta hydroelectric project contract signed

    SciTech Connect

    Not Available

    1987-09-01

    On June 26, 1987 the $270 million contract for the supply of 20 large hydraulic turbines for the Yacyreta Hydroelectric Project was signed by the Entidad Binacional Yacyreta, (a binational agency created by the governments of Argentina and Paraguay for the development of Yacyreta), and by Voith Hydro, Inc., of York, Pennsylvania, and Canadian General Electric of Montreal, Canada. Under the terms of the contract, 9 turbine units will be supplied by Voith Hydro, Inc. from its York, Pennsylvania plant, 4 units by Canadian General Electric of Montreal, and 7 units by Metanac, a consortium of Argentine manufacturers, who will utilize technology and technical assistance from Voith and CGE. The Yacyreta Project is being built on the Parana River on the border between Argentina and Paraguay. Construction at the site commenced in late 1983. Voith's portion of this contrast represents approximately $130 million dollars worth of business for its York, Pennsylvania facility.

  19. Laboratory Analytical Procedures | Bioenergy | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    biofuels and pyrolysis bio-oils research. Biomass Compositional Analysis These lab procedures provide tested and accepted methods for performing analyses commonly used in biofuels ...

  20. 30 TAC, part 1, chapter 116, rule 116.136 Public Comment Procedures...

    OpenEI (Open Energy Information) [EERE & EIA]

    This rule explains the public comment procedures for new source review permits for air quality control in Texas. Published NA Year Signed or Took Effect 1993 Legal Citation...

  1. Uranium Processing Facility team signs partnering agreement ...

    National Nuclear Security Administration (NNSA)

    Uranium Processing Facility team signs partnering agreement Thursday, July 24, 2014 - 9:40am Officials from NNSA's Uranium Processing Facility Project Office and Consolidated ...

  2. Lighting Test Facilities

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Lighting-Test-Facilities Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE Sectors Technology &...

  3. Testing

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Test photo gallery Test photo gallery Addthis University of Texas Leadership Panel short 1 of 6 University of Texas Leadership Panel short University of Texas Leadership Panel short University of Kentucky Panel short 2 of 6 University of Kentucky Panel short University of Kentucky Panel short University of New Mexico Panel short 3 of 6 University of New Mexico Panel short University of New Mexico Panel short University of Texas Leadership Panel wide 4 of 6 University of Texas Leadership Panel

  4. Participant Registration Procedure

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    PPE. Read and sign the appropriate IWS (12639 for TitanJanusCallistoCOMET and Europa). Read and sign any IWS specific to your experiment. For non-DOE employees, obtain...

  5. Million Solar Strong Signs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    In addition to some in-person events in Washington, D.C. and elsewhere, there will a big social media push on Tuesday, May 3rd. Download these printable signs, and use them to take ...

  6. SciTech Connect: Sign In

    Office of Scientific and Technical Information (OSTI)

    If you already have a SciTech Connect account, enter your email address and password below to sign in. You will be taken to your account management screen, where you can view saved ...

  7. SciTech Connect: Sign In

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    If you already have a SciTech Connect account, enter your email address and password below ... Email Address: (required) Please leave blank: Password: (required) Sign In Create Account ...

  8. Policies and Procedures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    procedures Policies and Procedures Guidelines Safety Computer Security Conduct of Operations JLF Forms Publication Policy

  9. United States and France Sign Joint Statement on Civil Liability...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and France Sign Joint Statement on Civil Liability for Nuclear Damage United States and France Sign Joint Statement on Civil Liability for Nuclear Damage Joint Statement Signed.pdf ...

  10. Nuclear Waste Policy Act Signed | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    | (NNSA) Waste Policy Act Signed Nuclear Waste Policy Act Signed Washington, DC President Reagan signs the Nuclear Waste Policy Act of 1982, the Nation's first comprehensive nuclear waste legislation

  11. Truman Signs Atomic Energy Act | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Truman Signs Atomic Energy Act Truman Signs Atomic Energy Act Washington, DC President Truman signs the Atomic Energy Act of 1946, leading to the creation of the Atomic Energy Commission

  12. Generation IV International Forum Signs Agreement to Collaborate...

    Energy Saver

    Forum Signs Agreement to Collaborate on Sodium Cooled Fast Reactors Generation IV International Forum Signs Agreement to Collaborate on Sodium Cooled Fast Reactors February 17, ...

  13. Global Science Gateway Agreement Signed in London | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Global Science Gateway Agreement Signed in London Global Science Gateway Agreement Signed in London January 22, 2006 - 10:15am Addthis DOE Partners With British Library on...

  14. United States and Japan Sign Joint Nuclear Energy Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy ...

  15. Energy Department to Sign MOU with Interior Department to Assist...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    to Sign MOU with Interior Department to Assist Indian Tribes to Develop Energy Resources Energy Department to Sign MOU with Interior Department to Assist Indian Tribes to Develop ...

  16. DOE and Japanese Ministry of Economy, Trade, and Industry Sign...

    Energy Saver

    DOE and Japanese Ministry of Economy, Trade, and Industry Sign Memorandum of Cooperation DOE and Japanese Ministry of Economy, Trade, and Industry Sign Memorandum of Cooperation ...

  17. Energy Department and Edison Electric Institute Sign Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Edison Electric Institute Sign Agreement to Advance Electric Vehicle Technologies Energy Department and Edison Electric Institute Sign Agreement to Advance Electric Vehicle ...

  18. President Obama Signs New Directive to Strengthen our Work to...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    President Obama Signs New Directive to Strengthen our Work to Advance Gender Equality Worldwide President Obama Signs New Directive to Strengthen our Work to Advance Gender ...

  19. Impact of ethanol and butanol as oxygenates on SIDI engine efficiency and emissions using steady-state and transient test procedures

    Energy.gov [DOE]

    Alcohols as gasoline blending agent at up to 85 vol-% levels were evaluated in a 2.2L direct injection SI engine for combustion, engine efficiency, and engine-out emissions effects at steady-state and transient test conditions

  20. Curiosity rover zaps Mars for life signs

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Curiosity rover zaps Mars for life signs Mars rover depends on three LANL technologies Curiosity zaps Mars for vital signs: Designed by Lab team, ChemCam looks for crucial elements such as carbon, nitrogen and oxygen. July 30, 2012 Curiosity rover zapping rocks on Mars Power up! The third part of the "LANL Visits Mars" trio is an essential component of the heat-producing Multi-Mission Radioisotope Thermoelectric Generator unit. It powers the rover and keeps the instruments from

  1. test | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Discussions Polls Q & A Events Notices My stuff Energy blogs Login | Sign Up Search test Home There are currently no posts in this category. Syndicate content About us...

  2. Software Verification and Validation Procedure

    SciTech Connect

    Olund, Thomas S.

    2008-09-15

    This Software Verification and Validation procedure provides the action steps for the Tank Waste Information Network System (TWINS) testing process. The primary objective of the testing process is to provide assurance that the software functions as intended, and meets the requirements specified by the client. Verification and validation establish the primary basis for TWINS software product acceptance.

  3. Open%20Sign.jpg | OSTI, US Dept of Energy Office of Scientific and

    Office of Scientific and Technical Information (OSTI)

    Technical Information Open%20Sign

  4. Additional Guidance Regarding Application of Current Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance...

  5. Second order multidimensional sign-preserving remapping for ALE methods

    SciTech Connect

    Hill, Ryan N; Szmelter, J.

    2010-12-15

    A second-order conservative sign-preserving remapping scheme for Arbitrary Lagrangian-Eulerian (ALE) methods is developed utilising concepts of the Multidimensional Positive Definite Advection Transport Algorithm (MPDATA). The algorithm is inherently multidimensional, and so does not introduce splitting errors. The remapping is implemented in a two-dimensional, finite element ALE solver employing staggered quadrilateral meshes. The MPDATA remapping uses a finite volume discretization developed for volume coordinates. It is applied for the remapping of density and internal energy arranged as cell centered, and velocity as nodal, dependent variables. In the paper, the advection of scalar fields is examined first for test cases with prescribed mesh movement. A direct comparison of MPDATA with the performance of the van Leer MUSCL scheme indicates advantages of a multidimensional approach. Furthermore, distinctly different performance between basic MPDATA and the infinite gauge option is illustrated using benchmarks involving transport of a sign changing velocity field. Further development extends the application of MPDATA remapping to the full ALE solver with a staggered mesh arrangement for density, internal energy and momentum using volume coordinates. At present, two options of the algorithm - basic and infinite gauge - are implemented. To ensure a meaningful assessment, an identical Lagrangian solver and computational mesh update routines are used with either MPDATA or van Leer MUSCL remapping. The evaluation places particular focus on the abilities of both schemes to accurately model multidimensional problems. Theoretical considerations are supported with numerical examples. In addition to the prescribed mesh movement cases for advection of scalars, the demonstrations include two-dimensional Eulerian and ALE flow simulations on quadrilateral meshes with both fixed and variable timestep control. The key comparisons include the standard test cases of Sod and Noh

  6. Procedures - 88-Inch Cyclotron

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Procedures You must be logged in with your Berkeley Lab LDAP to view these documents PUB-3000 Cyclotron Procedures Mechanical Procedures Electrical Procedures Ion Source Procedures Accelerator Safety (SAD & ASE) Cyclotron Policies & Plans Radiological Work Authorizations Memorandums Forms Abbreviations & Acronyms

  7. Full-scale demonstration of low-NO{sub x} cell{trademark} burner retrofit: Addendum to long-term testing report, September 1994 outage: Examination of corrosion test panel and UT survey in DP&L Unit {number_sign}4

    SciTech Connect

    Kung, S.C.; Kleisley, R.J.

    1995-06-01

    As part of this DOE`s demonstration program, a corrosion test panel was installed on the west sidewall of Dayton Power & Light Unit no.4 at the J. M. Stuart Station (JMSS4) during the burner retrofit outage in November 1991. The test panel consisted of four sections of commercial coatings separated by bare SA213-T2 tubing. During the retrofit outage, a UT survey was performed to document the baseline wall thicknesses of the test panel, as well as several furnace wall areas outside the test panel. The purpose of the UT survey was to generate the baseline data so that the corrosion wastage associated with the operation of Low NO{sub x} Cell Burners (LNCB{trademark} burner) could be quantitatively determined. The corrosion test panel in JMSS4 was examined in April 1993 after the first 15-month operation of the LNCB{trademark} burners. Details of the corrosion analysis and UT data were documented in the Long-Term Testing Report. The second JMSS4 outage following the LNCB{trademark} burner retrofit took place in September 1944. Up to this point, the test panel in JMSS4 had been exposed to the corrosive combustion environment for approximately 31 months under normal boiler operation of JMSS4. This test period excluded the down time for the April 1993 outage. During the September 1994 outage, 70 tube samples of approximately one-foot length were cut from the bottom of the test panel. These samples were evaluated by the Alliance Research Center of B&W using the same metallurgical techniques as those employed for the previous outage. In addition, UT measurements were taken on the same locations of the lower furnace walls in JMSS4 as those during the prior outages. Results of the metallurgical analyses and UT surveys from different exposure times were compared, and the long-term performance of waterwall materials was analyzed. The corrosion data obtained from the long-term field study at JMSS4 after 32 months of LNCB{trademark} burner operation are summarized in this report.

  8. Awardee Share Procedures

    Energy.gov [DOE] (indexed site)

    Share Procedures Procedures for Correctly Reporting Awardee Share on the FAADSFAADS Plus reporting screen in STRIPES To ensure proper reporting by DOE to USASpending.gov, you...

  9. President Obama Signs Two Bills to Boost Small Hydropower Projects...

    Energy Saver

    President Obama Signs Two Bills to Boost Small Hydropower Projects August 14, 2013 - 12:06pm Addthis President Obama on August 9 signed into law two bills aimed at boosting ...

  10. U.S. and Russia Sign Plutonium Disposition Agreement | National...

    National Nuclear Security Administration (NNSA)

    Our Jobs Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline U.S. and Russia Sign Plutonium Disposition Agreement U.S. and Russia Sign Plutonium...

  11. A Good Sign for the Building Energy Modeling Industry | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SketchUp is a good sign for the BEM industry. Image credit: Sefaira. DOE. Trimble's recent acquisition of Sefaira and its pairing with SketchUp is a good sign for the BEM industry. ...

  12. Procedure for Performing PEM Single Cell Testing

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia

  13. J1634 SAE BEV Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C.

  14. CAMAC Crate Controller diagnostic test procedures

    SciTech Connect

    Meadows, J.T.

    1981-07-01

    The basic idea of this diagnostic routine is to check out a parallel type A1 CAMAC Crate Controller using CDL.

  15. Energy Conservation Program: Test Procedure for Refrigerated...

    Energy.gov [DOE] (indexed site)

    is an action issued by the Department of Energy. Though it is not intended or expected, ... to this document. 1 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 429 and 431 Docket No. ...

  16. List of LED Exit Signs Incentives | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    upgrades Water Heaters Whole House Fans LED Exit Signs CHPCogeneration Biomass Photovoltaics Yes Energy Optimization (Electric) - Commercial Efficiency Program...

  17. Major New Mexico employers sign STEM education proclamation

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Major New Mexico employers sign STEM education proclamation Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:November 2, 2016 all issues All Issues » submit Major New Mexico employers sign STEM education proclamation Press conference to be held Nov. 22 November 1, 2014 Top section of a one-page proclamation recently signed by major New Mexico employers. Top section of a one-page proclamation recently signed by major New Mexico

  18. Media Advisory: Jefferson Lab Signs Partnership Agreement With Virginia

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    STEAM Academy | Jefferson Lab Advisory: Jefferson Lab Signs Partnership Agreement With Virginia STEAM Academy Media Advisory: Jefferson Lab Signs Partnership Agreement With Virginia STEAM Academy Date: Monday, Nov. 26, 2012 Time: The signing will take place at 2:30 p.m. Place: CEBAF Center at Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA 23606 Event: Jefferson Science Associates/Jefferson Lab will sign a Memorandum of Understanding (MOU) with the Virginia Science Technology

  19. President Ford Signs the Energy Reorganization Act of 1974 | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Ford Signs the Energy Reorganization Act of 1974 President Ford Signs the Energy Reorganization Act of 1974 Washington, DC President Ford signs the Energy Reorganization Act of 1974. The Atomic Energy Commission is abolished. The Energy Research and Development Administration, Nuclear Regulatory Commission, and Energy Resources Council are established

  20. Computerized procedures system

    SciTech Connect

    Lipner, Melvin H.; Mundy, Roger A.; Franusich, Michael D.

    2010-10-12

    An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

  1. Federal Agency NEPA Procedures

    Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  2. Contract Closeout Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    .804 August 2016 ______________________________________________________________________________ 1 Contract Closeout Procedures [References: FAR 4.805; FAR 42.705; FAR 42.708; and FAR 45.] 1.0 Summary of Latest Changes This update: (1) considers Final Rule June 2011 which amended the Federal Acquisition Regulation (FAR) procedures for closing out contract files and revised procedures for clearing final patent reports and quick-closeout procedure (from unsettled indirect rates on the contract as a

  3. Federal Test Procedure Emissions Test Results from Ethanol Variable...

    Alternative Fuels and Advanced Vehicles Data Center

    ... Alcohol sam- ples were collected by drawing dilute air and exhaust gas sam- ples through primary and secondary impingers filled with pure water and chilled in an ice-bath to ...

  4. Secretary Chu Signs Memorandum of Cooperation with Chilean Energy Minister

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Tokman | Department of Energy Signs Memorandum of Cooperation with Chilean Energy Minister Tokman Secretary Chu Signs Memorandum of Cooperation with Chilean Energy Minister Tokman June 23, 2009 - 12:00am Addthis Washington, DC - The Department of Energy announced today that U.S. Energy Secretary Steven Chu and Minister Marcelo Tokman of the Chilean National Energy Commission signed a Memorandum of Cooperation to further collaboration between the two nations on a series of energy issues. The

  5. Energy Department and American Public Power Association Sign Agreement to

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Accelerate Growth of Electric Vehicle Market | Department of Energy American Public Power Association Sign Agreement to Accelerate Growth of Electric Vehicle Market Energy Department and American Public Power Association Sign Agreement to Accelerate Growth of Electric Vehicle Market July 22, 2016 - 1:47pm Addthis News Media Contact 202-586-8604 DOENews@hq.doe.gov WASHINGTON - Today, Acting Assistant Secretary for the Office of Energy Efficiency and Renewable Energy David Friedman signed a

  6. Signed_Charter_August_9_2010.pdf

    Energy Saver

    Signed Quality Assurance Hub Memo Signed Quality Assurance Hub Memo In a memorandum to the Field/Site Managers dated July 10, 2009, it was announced that the Office of Standards and Quality Assurance (EM-23) had deployed a pilot prototype web-based system (Hub) to facilitate providing real-time status of Quality Assurance (QA) performance assessments and associated corrective actions and commitments. Signed Quality Assurance Hub Memo (84.47 KB) More Documents & Publications SOPP-43, EM-23

  7. United States and Italy Sign Nuclear Energy Agreements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Italy Sign Nuclear Energy Agreements United States and Italy Sign Nuclear Energy Agreements September 30, 2009 - 1:23pm Addthis U.S. Secretary of Energy Steven Chu and Italian Minister for Economic Development Claudio Scajola today signed two important nuclear energy agreements that may lead to construction of new nuclear power plants and improved cooperation on advanced nuclear energy systems and fuel cycle technologies in both countries. The U.S.-Italy Joint Declaration Concerning

  8. MOU signed between CIAE and Jefferson National Lab, USA. (China...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    https:www.jlab.orgnewsarticlesmou-signed-between-cia...-and-jefferson-national-lab-usa-china-nuclear-industry-news-ge... ... USA visited the China Institute of Atomic Energy (CIAE). ...

  9. United States and Italy Sign Agreements to Advance Developments...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    today signed two important nuclear energy agreements that may lead to construction of new nuclear power plants and improved cooperation on advanced nuclear energy systems and fuel...

  10. Signs of a Heart Attack - HPMC Occupational Health Services

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    attack. Heart Image Related Links: Presentation (pdf) Heart Attack Warning Signs Handout (pdf) "Cough CPR:" Urban Myth Heart Health Interactive Quizzes Last Updated 10202014 9:22...

  11. NNSA, China Sign Agreement to Prevent Nuclear Smuggling | National...

    National Nuclear Security Administration (NNSA)

    NNSA, China Sign Agreement to Prevent Nuclear Smuggling August 15, 2013 WASHINGTON, D.C. - ... of China's General Administration of China Customs (GACC) to renew cooperative ...

  12. MA-2009-000093Signed.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications Invitation to the 2012 DOE Project Management Workshop United States and France Sign Joint Statement on Civil Liability for Nuclear Damage FY2012 ...

  13. MOU signed between CIAE and Jefferson National Lab, USA. (China...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    MOU signed between CIAE and Jefferson National Lab, USA. (China Nuclear Industry News, ... of Jefferson National Lab, USA visited the China Institute of Atomic Energy (CIAE). ...

  14. Critical Materials Institute signs new member United Technologies...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    signs new member United Technologies Research Center Contacts: For release: Aug. 18, 2015 Alex King, Director, Critical Materials Institute, (515) 296-4505 Laura Millsaps, Ames...

  15. Statement on Signing of the Administrative Arrangement to the...

    National Nuclear Security Administration (NNSA)

    Statement on Signing of the Administrative Arrangement to the Agreement for Cooperation between the United States and Republic of Korea Concerning Peaceful Uses of Nuclear Energy ...

  16. NREL, Xcel Energy Sign Photovoltaic Development Agreement - News...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NREL, Xcel Energy Sign Photovoltaic Development Agreement September 29, 2005 Denver, Colo. ... Statewide standards for the installation of photovoltaic systems must be in place by the ...

  17. So you have customers signed up to participate, now what?

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Efficiency Programs Conference Call December 21, 2011 Facilitated by Summer Goodwin, BPA LESSONS LEARNED ON HOW TO KEEP CUSTOMERS ENGAGED So you have customers signed up to...

  18. HEV, PHEV, BEV Test Standard Validation | Department of Energy

    Energy.gov [DOE] (indexed site)

    More Documents & Publications HEV, PHEV, EV Test Standard Development and Validation J1634 SAE BEV Test Procedures Argonne Facilitation of PHEV Standard Testing Procedure (SAE ...

  19. AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test...

    Energy Saver

    Plug-in Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures Plug-in Hybrid Electric Vehicle Test ...

  20. Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  1. Participant Registration Procedure

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    operations / participant registration procedure Participant Registration Procedure Under The "Safety" banner in the JLF Website "Policies and Procedures" Section: Complete Laser Eye Examination. Complete in LTRAIN HS5200-W Laser Safety. Complete in LTRAIN HS4258-W Beryllium (Be) Awareness. Complete in LTRAIN HS4261-W Lead (Pb) Awareness. Complete in LTRAIN HS5229-W Electrical Safety Awareness. Complete in LTRAIN HS-6001-W General Employee Radiological Training. Complete in

  2. Quality Procedure- Stop Work

    Energy.gov [DOE]

    This Quality Procedure establishes the Office of Standards and Quality Assurance authority, responsibilities, and instructions to direct that unsafe work be stopped, during the execution and operations of its activities, specifically in oversight activities. this procedure is utilized and accomplished upon coordination with management of the Environmental Management (EM) Headquarters and Field Office. This procedure also provides provisions for the restart of work that has been stopped under provisions of this document.

  3. Text Delegation Procedures

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed.

  4. NNMCAB Processes and Procedures

    Energy.gov [DOE]

    At the January 8, 2014 Committee meeting NNMCAB Staff, Covered the Procedures and Processes that are used in Running the Board.

  5. DOE and State Sign Natural Resources Damages Settlement Agreement

    Energy.gov [DOE]

    Officials from TDEC and DOE signed a Natural Resources Damages settlement agreement. The signed document designates DOE’s plans to compensate the state for ecological and human use impacts associated with contaminant releases from facilities at the Oak Ridge Reservation.

  6. Composite molding of SPECTRA{reg_sign} extended chain polyethylene fibers in a flexible rubber matrix

    SciTech Connect

    McKeehan, K.

    1997-08-01

    THETA Technologies, Inc. is a multidisciplinary research and development firm involved in the design and development of affordable, lightweight, high ballistic protection modular body armor ensemble for future military, law enforcement, and specialized commercial market applications. In the course of their research, THETA Technologies, Inc. identified that current state-of-the-art in ballistic protection and overall composite reinforcement is a high density extended chain polyethylene (HDECPE) fiber known as SPECTRA{reg_sign}, a product of AlliedSignal Fibers, Petersburg, VA. SPECTRA{reg_sign} is ten times stronger than steel of equal weight. As a non-aramid polyethylene, it offers highly desirable properties in areas of resistance to chemical degradation, virtual neutral buoyancy (0.97), and increased capacity for composite bonding over competing nylon-based fibers, such as KEVLAR{reg_sign}. SPECTRA Shield{trademark}, a woven ballistic-resistant fabric using the SPECTRA{reg_sign} fiber, is presently the most effective ballistic-resistant component for both flexible and hard plate composite armors. THETA Technologies, Inc. identified a market need for a boot sole design that would measurably increase protection to the wearer without significantly degrading performance in other areas, such as flexibility and overall weight. THETA Technologies, Inc. proposed a nitrile rubber and SPECTRA{reg_sign} fiber matrix to produce an optimal boot sole. The objective of this CRADA effort was to develop and test a process for combining the SPECTRA{reg_sign} fiber, in both chopped fiber and SPECTRA Shield{trademark} form, within a semiflexible nitrile composite having desirable and marketable properties in areas of resistance to penetration and mechanical stress.

  7. Quality Procedure- Document Review

    Office of Energy Efficiency and Renewable Energy (EERE)

    This procedure establishes the process for the review and approval of Environmental Management (EM) Quality Assurance (QA) program documents as performed by the Office of Standards and Quality Assurance. This procedure also establishes the process for review and approval of other EM documents external to the EM Headquarters Office of Standards and Quality Assurance.

  8. Bush and Putin Sign Arms Reduction Accord | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Bush and Putin Sign Arms Reduction Accord Bush and Putin Sign Arms Reduction Accord Washington, DC President Bush and President Vladimir Putin of Russia signed agreement to reduce each country's nuclear arsenal to between 1,700 and 2,200 warhead. "Each country," the agreement states, "shall determine for itself the composition and structure of its strategic offensive arms." The two leaders also agreed to establish two new bilateral working groups

  9. Quality Procedure- Audits

    Energy.gov [DOE]

    This procedure establishes the responsibilities and process for scheduling, planning, performing, and reporting Quality Assurance (QA) audits of EM-QA-001, Environmental Management Quality Assurance Program implementation at EM Headquarters and Field Office programs, facilities and projects.

  10. Quality Procedure- Document Control

    Office of Energy Efficiency and Renewable Energy (EERE)

    This procedure establishes the responsibilities and process for preparing, managing, and revising EM Headquarters Office of Standards and Quality Assurance controlled documents in accordance with EM-QA-001, Environmental Management Quality Assurance Program.

  11. LSU/CAMD Procedure

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    whether the person has a pulse, then call 911. If you are trained in first aid andor CPR, you may, at your discretion, initiate emergency procedures. The AED is located in the...

  12. Quality Procedure- Supplier Qualification

    Energy.gov [DOE]

    This procedure establishes the responsibilities and process for supplier qualification activities conducted by Environmental Management (EM) Headquarters (HQ) Office of Standards and Quality Assurance in accordance with EM-QA-001, Environmental Management Quality Assurance Program.

  13. Environmental Management (EM) Quality Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Quality Procedure - Records Management Quality Procedure - MemoCorrespondence Control and Tracking Quality Procedure - Stop Work Quality Procedure - Supplier Qualification ...

  14. ARM - Publications Procedures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    govPublicationsPublications Procedures Page Contents Types of ARM Publications Process for Publishing Planning Documents Science Reports Conference Documents Public Information Materials Recommendation for Journal Articles Proper Acknowledgments Publications Procedures Types of ARM Publications There are two main types of publications in ARM: (1) planning documents and (2) science reports. Planning documents include the ARM Program Plan, Science Plan, Locale Recommendation Plan, and Site

  15. Idaho Settlement Agreement Signed at Idaho National Laboratory

    Energy.gov [DOE]

    Idaho Settlement Agreement was signed by DOE and the state of Idaho. It outlined legally binding spent nuclear fuel and waste removal milestones that must be accomplished by 2035.

  16. U.S. and Russia Sign Statement of Intent

    Energy.gov [DOE]

    Secretary Chu and Sergei Kiriyenko, Director General of Russia’s State Corporation for Atomic Energy (Rosatom), signed a Statement of Intent (SOI) concerning collaboration in innovative technologies for environmental restoration and radioactive waste management.

  17. Secretary Bodman Signs Order to Help Restore Electricity to East...

    Energy Saver

    September 28, 2005 - 10:58am Addthis WASHINGTON, DC - U.S. Department of Energy Secretary Samuel W. Bodman today signed an order to authorize and direct CenterPoint Energy to ...

  18. DOE's Oak Ridge Office and UCOR Sign Partnering Agreement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (DOE) Oak Ridge Office and URS | CH2M Oak Ridge, LLC (UCOR) met to sign a partnering agreement that defines the working arrangement and expectations between the two entities. ...

  19. DOE signs Record of Decision selecting Hot Isostatic Pressing...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NEWS MEDIA CONTACT: Brad Bugger (208) 526-0833 Danielle Miller (208) 526-5709 FOR IMMEDIATE RELEASE: December 28, 2009 DOE signs Record of Decision selecting Hot Isostatic...

  20. Key energy efficiency measures signed into law by President Obama...

    OpenEI (Open Energy Information) [EERE & EIA]

    Key energy efficiency measures signed into law by President Obama Home > Groups > OpenEI Community Central Graham7781's picture Submitted by Graham7781(2017) Super contributor 2...

  1. U.S. Geothermal Signs Interconnection Agreement for Neal Hot...

    OpenEI (Open Energy Information) [EERE & EIA]

    Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Signs Interconnection Agreement for Neal Hot Springs Power Project Abstract...

  2. Critical Materials and Rare Futures: Ames Laboratory Signs a...

    Energy Saver

    Critical Materials and Rare Futures: Ames Laboratory Signs a New Agreement on Rare-Earth Research June 15, 2011 - 7:07pm Addthis The plasma torch in the Retech plasma furnace is ...

  3. Distributed PV Interconnection Screening Procedures and Online Tools

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Distributed PV Interconnection Screening Procedures and Online Tools" Joel Dickinson with Salt River Project Solar Initiatives Group August 27, 2014 2 Speakers Joel Dickinson Sr. Engineer Salt River Project Kristen Ardani Solar Analyst National Renewable Energy Laboratory (DGIC moderator) August 27th, 2014 Joel Dickinson, P.E. Sr. Engineer Solar Initiatives Distributed PV Interconnection Screening and Online Tools Salt River Project  Established in 1903 after Theodore Roosevelt signed

  4. NREL Signs Agreement With China's National Utility - News Releases | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NREL Signs Agreement With China's National Utility Scope of MOU Covers Coordination on Research Projects September 11, 2015 Representatives of the Energy Department's National Renewable Energy Laboratory (NREL) and China's State Grid Energy Research Institute today signed a first-ever memorandum of understanding between the two organizations. The State Grid Energy Research Institute (SGERI), located in Beijing, is a subsidiary of China's national utility, State Grid Corporation of China (SGCC).

  5. Secretaries Chu and Donovan Sign Agreement to Help Working Families

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Weatherize Their Homes | Department of Energy Donovan Sign Agreement to Help Working Families Weatherize Their Homes Secretaries Chu and Donovan Sign Agreement to Help Working Families Weatherize Their Homes May 6, 2009 - 12:00am Addthis WASHINGTON - U.S. Department of Housing and Urban Development (HUD) Secretary Shaun Donovan and U.S. Department of Energy (DOE) Secretary Steven Chu today announced an important step forward in the partnership between HUD and DOE to streamline and better

  6. Secretary Chu Joins with World Leaders to Sign International Partnership

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Energy Efficiency Cooperation | Department of Energy Joins with World Leaders to Sign International Partnership for Energy Efficiency Cooperation Secretary Chu Joins with World Leaders to Sign International Partnership for Energy Efficiency Cooperation May 24, 2009 - 12:00am Addthis The Department of Energy announced today that U.S. Energy Secretary Steven Chu joined with top energy leaders from around the world to launch the International Partnership for Energy Efficiency Cooperation

  7. Secretary of Energy Signs Memorandum of Understanding to Strengthen

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    U.S.-Portugal Cooperation in Renewable Energy Technologies | Department of Energy Signs Memorandum of Understanding to Strengthen U.S.-Portugal Cooperation in Renewable Energy Technologies Secretary of Energy Signs Memorandum of Understanding to Strengthen U.S.-Portugal Cooperation in Renewable Energy Technologies May 27, 2008 - 11:59am Addthis MOU will further joint efforts to advance wave power as a clean, viable energy source LISBON, PORTUGAL - U.S. Secretary of Energy Samuel W. Bodman

  8. Energy Department Secretary Ernest Moniz Signs Memorandum of Understanding

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    with Morocco for Solar Decathlon Africa Competition in 2019 | Department of Energy Department Secretary Ernest Moniz Signs Memorandum of Understanding with Morocco for Solar Decathlon Africa Competition in 2019 Energy Department Secretary Ernest Moniz Signs Memorandum of Understanding with Morocco for Solar Decathlon Africa Competition in 2019 November 14, 2016 - 7:17pm Addthis Today, U.S. Department of Energy (DOE) Secretary Ernest Moniz and Minister Moulay Hafid Elalamy, Ministry of

  9. United States and Latvian Governments Sign Agreement to Allow

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Nonproliferation and Threat Reduction Cooperation | Department of Energy Latvian Governments Sign Agreement to Allow Nonproliferation and Threat Reduction Cooperation United States and Latvian Governments Sign Agreement to Allow Nonproliferation and Threat Reduction Cooperation April 25, 2005 - 12:25pm Addthis WASHINGTON, D.C. - As part of the Bush administration's ongoing efforts to secure vulnerable nuclear materials worldwide, the Department of Energy (DOE) and the Latvian Ministry of

  10. Attorney General's signed concurrence letter approved October 9, 2009 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Attorney General's signed concurrence letter approved October 9, 2009 Attorney General's signed concurrence letter approved October 9, 2009 Attorney General Consulation on binding Arbitration Guidance AG Concurrence for BPA (149.57 KB) More Documents & Publications Letter from DOJ regarding Boneeville Power Administration's Guidance on the Use of Binding Arbitration for BPA Contracts Oct 2009 final concurrence letter for BPA BPA FINAL Binding Arbitration policy

  11. Load test of the 3701U Building roof deck and support structure

    SciTech Connect

    McCoy, R.M.

    1994-09-14

    The 3701U Building roof area was load tested according to the approved load-test procedure. The 3701U Building is located in the 300 Area of the Hanford Site and has the following characteristics: Roof deck--metal decking supported by steel purlins; Roof membrane--tar and gravel; Roof slope--flat (<10 deg); and Roof elevation--height of about 12.5 ft. The 3701U Building was visited in August 1992 for a visual inspection, but because of insulation an inspection could not be performed. The building was revisited in March 1994 for the purpose of writing this test report. Because the roof could not be inspected, a test was determined to be the best way to qualify the roof for personnel access. The test procedure called for the use of a remotely-controlled robot. The conclusions are that the roof has been qualified for 500-lb total roof load and that the ``No Roof Access`` signs can be changed to ``Roof Access Restricted`` signs.

  12. Battery systems performance studies - HIL components testing...

    Energy.gov [DOE] (indexed site)

    (1.92 MB) More Documents & Publications HEV, PHEV, BEV Test Standard Validation J1634 SAE BEV Test Procedures HEV, PHEV, EV Test Standard Development and Validation

  13. Quality Procedure- Records Management

    Energy.gov [DOE]

    This procedure establishes the responsibilities and process for identifying and managing records, including quality records, generated by EM Headquarters Office of Standards and Quality Assurance personnel as well as Office of Standards and Quality Assurance representatives located in DOE EM Field Offices in accordance with EM-QA-001, Environmental Management Quality Assurance Program.

  14. Procedure for Planning and Conducting

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Lift Plan Procedure Stanford Synchrotron Radiation Laboratory Lead Author ... Oct 16, 2006 SSRL Lift Plan Procedure (SSRL-LPP-000-R1) Page 1 of 7 ...

  15. Sign problem in Z-coefficient for particle emission angular distributi...

    Office of Scientific and Technical Information (OSTI)

    Sign problem in Z-coefficient for particle emission angular distributions Citation Details In-Document Search Title: Sign problem in Z-coefficient for particle emission angular ...

  16. Sign problem in Z-coefficient for particle emission angular distributi...

    Office of Scientific and Technical Information (OSTI)

    Sign problem in Z-coefficient for particle emission angular distributions Citation Details In-Document Search Title: Sign problem in Z-coefficient for particle emission angular...

  17. 30 TAC, part 1, chapter 39, rule 39.604 Sign Posting | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Abstract These rules outline the sign posting requirements for public notice of air quality permit applications in Texas. Published NA Year Signed or Took Effect 1999...

  18. Jefferson Lab Signs Contract Wth SensL For Silicon Photomultiplier...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    articlesjefferson-lab-signs-contract-wth-sensl-silicon-photomultiplier-technology-photonics-o... Jefferson Lab Signs Contract Wth SensL For Silicon Photomultiplier Technology...

  19. Announcement Sign-up | U.S. DOE Office of Science (SC)

    Office of Science (SC)

    Community IRB Member Resources Announcement Sign-up Human Subjects Protection Program ... Announcement Sign-up Other Resources Human Subjects Research Database (HSRD) IRB7 ...

  20. test document for group | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Discussions Polls Q & A Events Notices My stuff Energy blogs Login | Sign Up Search test document for group Home There are currently no posts in this category. Syndicate...

  1. DOE signs Record of Decision selecting Hot Isostatic Pressing Technology

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    for Treatment of High Level Waste Calcine DOE signs Record of Decision selecting Hot Isostatic Pressing Technology for Treatment of High Level Waste Calcine The U.S. Department of Energy (DOE) has signed the Record of Decision (ROD) for the treatment of high level waste calcine at the Department's Idaho Site, meeting a legal commitment to the State of Idaho for a decision no later than the end of 2009. Hot Isostatic Pressing Unit DOE today announced its decision to treat high-level waste

  2. DOE, Tribes sign a renewal of the Agreement in Principle

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE, Tribes sign a renewal of the Agreement in Principle FORT HALL--The Shoshone-Bannock Tribes and the Department of Energy - Idaho Operations Office recently signed a new Agreement in Principle, thus renewing the formal relationship between the two parties for another five-year period. Lee Juan Tyler, Vice Chairman of the Shoshone-Bannock Tribes (left) and Elizabeth Sellers, manager, DOE Idaho Operations Office (Right) Photo courtesy of Lori Edmo-Suppah, Sho-Ban News. The photo shows the

  3. Resolving the sign ambiguity in the singular value decomposition.

    SciTech Connect

    Bro, Rasmus; Acar, Evrim; Kolda, Tamara Gibson

    2007-10-01

    Many modern data analysis methods involve computing a matrix singular value decomposition (SVD) or eigenvalue decomposition (EVD). Principal components analysis is the time-honored example, but more recent applications include latent semantic indexing, hypertext induced topic selection (HITS), clustering, classification, etc. Though the SVD and EVD are well-established and can be computed via state-of-the-art algorithms, it is not commonly mentioned that there is an intrinsic sign indeterminacy that can significantly impact the conclusions and interpretations drawn from their results. Here we provide a solution to the sign ambiguity problem and show how it leads to more sensible solutions.

  4. US, Russian Federation Sign Joint Statement on Reactor Conversion |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy US, Russian Federation Sign Joint Statement on Reactor Conversion US, Russian Federation Sign Joint Statement on Reactor Conversion June 26, 2012 - 12:00pm Addthis News Media Contact (202) 586-4940 This release is cross-posted from NNSA.energy.gov. MOSCOW - The U.S. and Russian Federation jointly announced today that the first stage of work defined in the Implementing Agreement between the Russian State Corporation for Atomic Energy (Rosatom) and the Department of Energy

  5. Subsea HIPPS design procedure

    SciTech Connect

    Aaroe, R.; Lund, B.F.; Onshus, T.

    1995-12-31

    The paper is based on a feasibility study investigating the possibilities of using a HIPPS (High Integrity Pressure Protection System) to protect a subsea pipeline that is not rated for full wellhead shut-in pressure. The study was called the Subsea OPPS Feasibility Study, and was performed by SINTEF, Norway. Here, OPPS is an acronym for Overpressure Pipeline Protection System. A design procedure for a subsea HIPPS is described, based on the experience and knowledge gained through the ``Subsea OPPS Feasibility Study``. Before a subsea HIPPS can be applied, its technical feasibility, reliability and profitability must be demonstrated. The subsea HIPPS design procedure will help to organize and plan the design activities both with respect to development and verification of a subsea HIPPS. The paper also gives examples of how some of the discussed design steps were performed in the Subsea OPPS Feasibility Study. Finally, further work required to apply a subsea HIPPS is discussed.

  6. Records Management Exit Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Records Management Exit Procedures For Departing Federal and contractor Employees PRESERVATION OF FEDERAL RECORDS The Federal Records Act requires the Department of Energy (DOE) Records Officer to remind departing Federal and contractor employees that Federal records may not be removed from Government custody nor may they be destroyed except in accordance with a records disposition schedule that has been approved by the Archivist of the United States. The creation of adequate documentation and

  7. Quality Procedure- Lessons Learned

    Energy.gov [DOE]

    The purpose of this Quality Procedure is to assist the Office of Standards and Quality Assurance personnel during the execution and operation of its activities, specifically in oversight activities, to compile and disseminate information related to lessons learned. The purpose of lessons learned is to share and use knowledge derived from experience to promote the recurrence of desirable outcomes, or preclude the recurrence of undesirable outcomes.

  8. DOE Reasonable Accommodation Procedures

    Energy.gov [DOE]

    Pursuant to Executive Order 13164, the Department of Energy (hereinafter referred to as the “department”), is charged with establishing written procedures for the facilitation of reasonable accommodation for: (1) individuals with disabilities in the application process for employment with the Department; (2) Department employees with disabilities to perform the essential functions of a position; and (3) Department employees with disabilities to enjoy benefits and privileges of employment equal to those enjoyed by employees without disabilities.

  9. Lurgi's MPG gasification plus Rectisol{reg_sign} gas purification - advanced process combination for reliable syngas production

    SciTech Connect

    2005-07-01

    Lurgi's Multi Purpose Gasification Process (MPG) is the reliable partial oxidation process to convert hydrocarbon liquids, slurries and natural gas into valuable syngas. The MPG burner has once again proven its capabilities in an ammonia plant based on asphalt gasification. Lurgi is operating the HP-POX demonstration plant together with the University of Freiberg, Germany. Gasification tests at pressures of up to 100 bar have shown that syngas for high pressure synthesis such as methanol and ammonia can be produced more economically. The Rectisol{reg_sign} gas purification process yields ultra clean synthesis gas which is required to avoid problems in the downstream synthesis. Pure carbon dioxide is produced as a separate stream and is readily available for sequestration, enhanced oil recovery or other uses. The reliability of the Rectisol{reg_sign} process and the confidence of plant operators in this process are acknowledged by the fact that more than 75% of the syngas produced world wide by coal, oil and waste gasification is purified in Rectisol{reg_sign} units. Virtually all coal gasification plants currently under construction rely on Rectisol{reg_sign}. The new, large GTL plants and hydrogen production facilities require effective CO{sub 2} removal. New developments make Rectisol{reg_sign} attractive for this task. 10 figs., 3 tabs., 2 photos.

  10. OREM and North Wind Solutions Sign Partnering Agreement

    Energy.gov [DOE]

    On April 6, senior officials from DOE's Oak Ridge Office of Environmental Management and North Wind Solutions, LLC met to sign a partnering agreement that defines the working arrangement and expectations between the two organizations. North Wind assumed responsibility for the Transuranic Waste Processing Center in December 2015.

  11. Sign me up to receive news and event updates

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Mailing List Sign me up to receive news and event updates Find out what's happening @ the Bradbury Science Museum by joining our mailing list. Your Name Your Email Additional Comments Reset Submit News & Events Events Calendar Events Mailing List Lecture Videos Newsletter Archive All Issues

  12. Microalgal Biofuels Analysis Laboratory Procedures | Bioenergy...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Microalgal Biofuels Analysis Laboratory Procedures NREL develops laboratory analytical procedures (LAPs) for analyzing microalgal biofuels. These procedures help scientists and ...

  13. Surface cleanliness measurement procedure

    DOEpatents

    Schroder, Mark Stewart; Woodmansee, Donald Ernest; Beadie, Douglas Frank

    2002-01-01

    A procedure and tools for quantifying surface cleanliness are described. Cleanliness of a target surface is quantified by wiping a prescribed area of the surface with a flexible, bright white cloth swatch, preferably mounted on a special tool. The cloth picks up a substantial amount of any particulate surface contamination. The amount of contamination is determined by measuring the reflectivity loss of the cloth before and after wiping on the contaminated system and comparing that loss to a previous calibration with similar contamination. In the alternative, a visual comparison of the contaminated cloth to a contamination key provides an indication of the surface cleanliness.

  14. NNMCAB Meeting Procedure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meeting Procedure NNMCAB Meeting Procedure A quick guide to the parliamentary procedure used by the NNMCAB during full Board Meetings. NNMCAB Meeting Procedure Guide (198.19

  15. Procedures for Departing Employees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures for Departing Employees Procedures for Departing Employees RM Exit Procedures (2)3.12.12.pdf (39.89 KB) More Documents & Publications Procedures for Departing Employees ...

  16. Procedures for Departing Employees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures for Departing Employees Procedures for Departing Employees RM Exit Procedures.doc (337 KB) More Documents & Publications Procedures for Departing Employees Records ...

  17. Nevada Work Instruction Laboratory Dynamic Rock/Soil Testing

    SciTech Connect

    M. Schweppe; T.R. Scotese

    2005-08-29

    This procedure defines processes for performance and reporting of geotechnical laboratory tests supporting geotechnical investigations.

  18. HIsmelt{reg_sign} technology: the future of ironmaking

    SciTech Connect

    Leczo, T.

    2009-03-15

    The unique liquid ironmaking process of HIsmelt{reg_sign} technology produces LD-quality hot metal or pig iron using lower-quality iron ore and non-coking coal, and a variety of iron and carbon-bearing mill wastes, without blending or agglomeration. A HIsmelt facility can replace an obsolete blast furnace in a brownfield application or can be the iron-producing component of a greenfield state-of-the-art steelmaking plant. Two companies in China have signed license agreements to build HIsmelt facilities, but are waiting until the plant in Kwinana, Australia operates for 3 months without any shutdowns or delays before they start construction on their plants.

  19. Text Delegation Procedures - DOE Directives, Delegations, and

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements Text Delegation Procedures Delegation Procedures Re-Delegation Procedures by Website Administrator Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed. Delegation Procedures Redelegation Procedures Procedures for Delegations of Authority Please use the following procedures when Proposing New Delegations; Redelegating Existing

  20. Procedures for ground-water investigations

    SciTech Connect

    Not Available

    1989-09-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water investigations are carried out to fulfill the requirements for the US Department of Energy (DOE) to meet the requirements of DOE Orders. Investigations are also performed for various clients to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). National standards including procedures published by the American Society for Testing and Materials (ASTM) and the US Geological Survey were utilized in developing the procedures contained in this manual.

  1. LED exit signs: Improved technology leads the way to energy savings

    SciTech Connect

    Sardinsky, R.; Hawthorne, S.

    1994-12-31

    Recent innovations in light-emitting diode (LED) exit signs may make LED signs the best choice among the energy efficient options available. In the past, LED signs have offered low power consumption, projected long lamp life, and low maintenance requirements. Now, the best of the LED signs also offer improved optical designs that reduce their already low power consumption while improving visibility and appearance, and even reduce their cost. LED exit signs are gaining market share, and E Source expects this technology to eventually dominate over incandescent, compact fluorescent, and electroluminescent signs. More research is needed, however, to confirm manufacturers` claims of 20-year operating lives for LED signs. Conservative estimates place the number of exit signs in US buildings at about 40 million. Although each sign represents a very small part of a building`s load, exit signs are ready targets for energy efficiency upgrades -- they operate continuously and most use inefficient incandescent sources. With an LED sign, annual energy and maintenance costs can be reduced by more than 90 percent compared to a typical incandescent sign. Low annual costs help to offset the LED sign`s relatively high first cost. More than 25 utilities offer DSM incentives for energy efficient exit signs, and efficient alternatives are becoming more readily available. Recent improvements in optical designs enable many LED signs to visually out perform other sources. In addition to these benefits, LED exit signs have lower life cycle cost than most other options. The biggest barrier to their success, however, is that their first cost has been considerably higher than competing technologies. LED sign prices are falling rapidly, though, because manufacturers are continually improving optical designs of the fixtures to use fewer LEDs and thus even less energy while providing better performance.

  2. A Preclinical Study of the Safety and Efficacy of Occlusin Trade-Mark-Sign 500 Artificial Embolization Device in Sheep

    SciTech Connect

    Owen, Richard J.; Nation, Patrick N.; Polakowski, Robert; Biliske, Jennifer A.; Tiege, Paul B.

    2012-06-15

    Introduction: This study evaluated the safety, effectiveness, and biodegradation of a new embolic agent, Occlusin Trade-Mark-Sign 503 Artificial Embolization Device (OCL 503). The agent consists of biodegradable poly-lactic-co-glycolic acid microspheres (150-212 {mu}m) coated with type I bovine collagen and was compared with Embosphere{sup Registered-Sign} Microspheres (300-500 {mu}m) in this controlled study of uterine artery embolization (UAE) in sheep. Methods: Unilateral UAE was performed in 32 adult ewes randomly assigned. Vessels were embolized to effective stasis. The cohort was divided into four groups, which were sacrificed at 1, 3, 6, and 12 months. Results: Both agents were 100% effective in achieving stasis. At 6 months, all OCL 503-treated arteries were occluded, the microspheres degraded with time, and at 12 months all four animals examined demonstrated recanalization. OCL 503 was found in the untreated uterine artery in one animal with no other evidence of non target embolization. In the Embosphere-treated group, all vessels remained occluded and microspheres were detected in the contralateral uterine artery in 6 of 15 examined vessels and in 10 vaginal, 2 ovarian, and 1 vesical artery. No procedural-related complications were seen in either group. Conclusions: OCL 503 is as effective an embolic agent as Embosphere{sup Registered-Sign} Microspheres when embolizing ovine uterine arteries and resorbs with time, allowing recanalization of the treated arteries. No device-related issues or adverse events were observed.

  3. Solderability test system

    DOEpatents

    Yost, F.; Hosking, F.M.; Jellison, J.L.; Short, B.; Giversen, T.; Reed, J.R.

    1998-10-27

    A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time. 11 figs.

  4. Solderability test system

    DOEpatents

    Yost, Fred; Hosking, Floyd M.; Jellison, James L.; Short, Bruce; Giversen, Terri; Reed, Jimmy R.

    1998-01-01

    A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time.

  5. The HART{reg_sign} Protocol -- A solution enabling technology

    SciTech Connect

    Helson, R.B.

    1996-09-01

    HART{reg_sign} Field Communications Protocol is widely accepted in the industry as the standard for digitally enhanced 4--20mA communication with smart field instruments. A wide range of products from an increasing number of suppliers are available today, and many more are in development. The enhanced two-way communication capability of instruments using the HART protocol can significantly improve plant information management, provide solutions to today`s business challenges, and yield substantial cost savings. Initial installation/commissioning savings of $400 to $500 per instrument and annual maintenance/operations savings of $100 to $200 per instrument are commonly reported.

  6. Kuwaiti oil sector shows more signs of recovery

    SciTech Connect

    Not Available

    1992-04-06

    This paper reports that Kuwait's oil sector continues to show signs of recovery from the Persian Gulf war. On Mar. 23 Kuwait Petroleum Co. (KPC) loaded the country's first shipment of liquefied petroleum gas for export since the Iraqi invasion in August 1990. In addition, the first shipment of Kuwaiti crude recovered from giant oil lakes formed by hundreds of wild wells sabotaged in the war was to arrive by tanker in Naples, Italy, late last month. The tanker is carrying 210,000 bbl of crude. However, the project to clean up the lakes and recover more oil, undertaken by Bechtel Corp. with Kuwait Oil Co. (KOC), has reached a stand still.

  7. Charcoal filter testing

    SciTech Connect

    Lyons, J.

    1997-08-01

    In this very brief, informal presentation, a representative of the US Nuclear Regulatory Commission outlines some problems with charcoal filter testing procedures and actions being taken to correct the problems. Two primary concerns are addressed: (1) the process to find the test method is confusing, and (2) the requirements of the reference test procedures result in condensation on the charcoal and causes the test to fail. To address these problems, emergency technical specifications were processed for three nuclear plants. A generic or an administrative letter is proposed as a more permanent solution. 1 fig.

  8. U.S. and Russia Sign Bratislava Accord | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Our Jobs Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline U.S. and Russia Sign Bratislava Accord U.S. and Russia Sign Bratislava Accord February 01,...

  9. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  10. MOU signed between CIAE and Jefferson National Lab, USA. (China Nuclear

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Industry News, General News) | Jefferson Lab MOU signed between CIAE and Jefferson National Lab, USA. (China Nuclear Industry News, General News) External Link: https://www.jlab.org/news/articles/mou-signed-between-ciae-and-jefferson-nationa... MOU signed between CIAE and Jefferson National Lab, USA. (News) Recently, the deputy director of Jefferson National Lab, USA visited the China Institute of Atomic Energy (CIAE). An MOU on the collaboration between the two institutions were signed

  11. U.S. and Canada Sign Statement of Intent on Nuclear Cleanup

    Energy.gov [DOE]

    DOE and the Atomic Energy of Canada Limited (AECL) signed a Statement of Intent (SOI) at the Waste Management Conference.

  12. Y-12, UT sign agreement to continue, expand collaborative work | Y-12

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    National Security Complex UT sign agreement to ... Y-12, UT sign agreement to continue, expand collaborative work Posted: December 18, 2014 - 6:22pm UT Chancellor Jimmy G. Cheek (left) and CNS President and CEO Jim Haynes sign a Memorandum of Understanding to expand collaboration between the university and CNS. Joining them for the signing are Dr. Taylor Eighmy, UT Vice Chancellor for Research and Engagement, and Tom Berg, CNS Director of Technology Development and Technology Transfer

  13. Delegation Procedures - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Breadcrumb >> Breadcrumb Delegation Procedures by Website Administrator Text Delegation Procedures - by Website Administrator - last modified Mar 23, 2015 11:12 AM Procedures for...

  14. Federal Agency NEPA Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Agency NEPA Procedures Federal Agency NEPA Procedures Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in...

  15. EXOPLANETS FROM THE ARCTIC: THE FIRST WIDE-FIELD SURVEY AT 80 Degree-Sign N

    SciTech Connect

    Law, Nicholas M.; Sivanandam, Suresh; Carlberg, Raymond; Salbi, Pegah; Ngan, Wai-Hin Wayne; Kerzendorf, Wolfgang; Ahmadi, Aida; Steinbring, Eric; Murowinski, Richard

    2013-03-15

    Located within 10 Degree-Sign of the North Pole, northern Ellesmere Island offers continuous darkness in the winter months. This capability can greatly enhance the detection efficiency of planetary transit surveys and other time domain astronomy programs. We deployed two wide-field cameras at 80 Degree-Sign N, near Eureka, Nunavut, for a 152 hr observing campaign in 2012 February. The 16 megapixel camera systems were based on commercial f/1.2 lenses with 70 mm and 42 mm apertures, and they continuously imaged 504 and 1295 deg{sup 2}, respectively. In total, the cameras took over 44,000 images and produced better than 1% precision light curves for approximately 10,000 stars. We describe a new high-speed astrometric and photometric data reduction pipeline designed for the systems, test several methods for the precision flat fielding of images from very-wide-angle cameras, and evaluate the cameras' image qualities. We achieved a scintillation-limited photometric precision of 1%-2% in each 10 s exposure. Binning the short exposures into 10 minute chunks provided a photometric stability of 2-3 mmag, sufficient for the detection of transiting exoplanets around the bright stars targeted by our survey. We estimate that the cameras, when operated over the full Arctic winter, will be capable of discovering several transiting exoplanets around bright (m{sub V} < 9.5) stars.

  16. Heat exchanger bypass test report

    SciTech Connect

    De Vries, M.L.

    1995-01-26

    This test report documents the results that were obtained while conducting the test procedure which bypassed the heat exchangers in the HC-21C sludge stabilization process. The test was performed on November 15, 1994 using WHC-SD-CP-TC-031, ``Heat Exchanger Bypass Test Procedure.`` The primary objective of the test procedure was to determine if the heat exchangers were contributing to condensation of moisture in the off-gas line. This condensation was observed in the rotameters. Also, a secondary objective was to determine if temperatures at the rotameters would be too high and damage them or make them inaccurate without the heat exchangers in place.

  17. Inverter Ground Fault Overvoltage Testing

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Task Force on Effective Grounding, ITFEG), led by Brian Lydic of Fronius USA, for providing the test plan that served as the basis for the test procedure used in this study. ...

  18. OPS 9.16 Procedure Content and Use 8/24/98 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 Procedure Content and Use 8/24/98 OPS 9.16 Procedure Content and Use 8/24/98 The objective of this surveillance is to evaluate the effectiveness of the contractor's program for development and use of procedures. The Facility Representative reviews selected operating, surveillance or testing, and maintenance procedures and observes use of the procedures in the facility. This surveillance provides the basis for evaluating contractor performance and for establishing compliance with specific DOE

  19. Load test of the 277W Building high bay roof deck and support structure

    SciTech Connect

    McCoy, R.M.

    1994-12-02

    The 277W Building high bay roof area was load tested according to the approved load-test procedure, WHC-SD-GN-TP-30015, Revision 1. The 277W Building is located in the 200 West Area of the Hanford Site and has the following characteristics: roof deck -- wood decking supported by 4 x 14 timber purlins; roof membrane -- tar and gravel; roof slope -- flat (<10 deg); and roof elevation -- maximum height of about 63 ft. The 227W Building was visited in March 1994 for a visual inspection. During this inspection, cracked areas were visible in the decking, but it was not possible to determine whether these cracks extended completely through the decking, which is 2-in. thick. The building was revisited in March 1994 for the purpose of writing this test report. Because the roof requires personnel access, a test was determined to be the best way to qualify the roof. The conclusions are that the roof has been qualified for 500-lb total roof load and that the ``No Roof Access`` signs can be changed to ``Roof Access Restricted`` signs.

  20. Model of Procedure Usage – Results from a Qualitative Study to Inform Design of Computer-Based Procedures

    SciTech Connect

    Johanna H Oxstrand; Katya L Le Blanc

    2012-07-01

    , sharing procedures between fellow coworkers, the use of multiple procedures at once, etc. were considered. The model describes which affordances associated with paper based procedures should be transferred to computer-based procedures as well as what features should not be incorporated. The model also provides a means to identify what new features not present in paper based procedures need to be added to the computer-based procedures to further enhance performance. The next step is to use the requirements and specifications to develop concepts and prototypes of computer-based procedures. User tests and other data collection efforts will be conducted to ensure that the real issues with field procedures and their usage are being addressed and solved in the best manner possible. This paper describes the baseline study, the construction of the model of procedure use, and the requirements and specifications for computer-based procedures that were developed based on the model. It also addresses how the model and the insights gained from it were used to develop concepts and prototypes for computer based procedures.

  1. Microgrid Testing

    SciTech Connect

    Shirazi, M.; Kroposki, B.

    2012-01-01

    With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

  2. Evaluation of the Geotech Smart24 data acquisition system with active Fortezza crypto card data signing and authentication.

    SciTech Connect

    Hart, Darren M.

    2008-05-01

    Sandia National Laboratories has tested and evaluated Geotech Smart24 data acquisition system with active Fortezza crypto card data signing and authentication. The test results included in this report were in response to static and tonal-dynamic input signals. Most test methodologies used were based on IEEE Standards 1057 for Digitizing Waveform Recorders and 1241 for Analog to Digital Converters; others were designed by Sandia specifically for infrasound application evaluation and for supplementary criteria not addressed in the IEEE standards. The objective of this work was to evaluate the overall technical performance of the Geotech Smart24 digitizer with a Fortezza PCMCIA crypto card actively implementing the signing of data packets. The results of this evaluation were compared to relevant specifications provided within manufacturer's documentation notes. The tests performed were chosen to demonstrate different performance aspects of the digitizer under test. The performance aspects tested include determining noise floor, least significant bit (LSB), dynamic range, cross-talk, relative channel-to-channel timing, time-tag accuracy, analog bandwidth and calibrator performance.

  3. External Independent Review (EIR) Standard Operating Procedure...

    Energy.gov [DOE] (indexed site)

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  4. Quality Procedure - Personnel Training and Qualification | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications Quality Procedure - Supplier Qualification Quality Procedure - MemoCorrespondence Control and Tracking CRAD, Training - Los Alamos National ...

  5. FASTPLOT: An interface to Microsoft{reg_sign} FORTRAN graphics

    SciTech Connect

    Ward, R.C.

    1994-03-01

    Interface routines to the Microsoft{reg_sign} FORTRAN graphics library (GRAPHICS.LIB) are provided to facilitate development of graphics codes. These routines are collected into the FASTPLOT library (FASTPLOT.LIB). The FASTPLOT routines simplified the development of applications utilizing graphics and add capabilities not available in GRAPHICS.LIB such as plotting histograms, splines, symbols, and error bars. Specifically, these routines were utilized in the development of the mortality data viewing code, MORTVIEW, for the US Environmental Protection Agency. Routines for color imaging, developed for use with the X-ray Computer Tomography (XCT) imaging code, and examples are also provided in the FASTPLOT library. Many example uses of FASTPLOT.LIB are contained in this document to facilitate applications development. The FASTPLOT.LIB library, source, and applications programs are supplied on the accompanying FASTPLOT diskette.

  6. AVTA: Airport Ground Support Equipment Specifications and Test Procedures |

    Energy Saver

    Energy Information Administration's Information Technology Program DOE-OIG-16-04 November 2015 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 November 17, 2015 MEMORANDUM FOR THE SECRETARY FROM: Rickey R. Hass Acting Inspector General SUBJECT: INFORMATION: Audit Report: "The Energy Information Administration's Information Technology Program" BACKGROUND The Energy Information Administration (EIA) is a

  7. Energy Conservation Program: Test Procedures for Commercial Prerinse...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Acceptable alternate forms of Photo-ID include: U.S. Passport or Passport Card; an Enhanced Driver's License or Enhanced ID-Card issued by the States of Minnesota, New York or ...

  8. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating ... Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of ...

  9. Standard-E hydrogen monitoring system shop acceptance test procedure

    SciTech Connect

    Schneider, T.C.

    1997-10-02

    The purpose of this report is to document that the Standard-E Hydrogen Monitoring Systems (SHMS-E), fabricated by Mid-Columbia Engineering (MCE) for installation on the Waste Tank Farms in the Hanford 200 Areas, are constructed as intended by the design. The ATP performance will verify proper system fabrication.

  10. Energy Conservation Program: Test Procedure for Integrated Light...

    Energy.gov [DOE] (indexed site)

    LED's is an action issued by the Department of Energy. Though it is not intended or ... to this document. 1 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 429 and 430 Docket No. ...

  11. Energy Conservation Program: Test Procedures for Certain Categories...

    Energy.gov [DOE] (indexed site)

    of general service lamps, is a rulemaking action issued by the Department of Energy. ... to this document. 1 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 429 and 430 Docket No. ...

  12. Heavy Duty Powertrain System Optimization and Emissions Test Procedure Development

    Office of Energy Efficiency and Renewable Energy (EERE)

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  13. Energy Conservation Program: Test Procedures for High-Intensity...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... To better represent differences in manufacturing variability between HID lamp types, DOE revises its proposed confidence intervals in this SNOPR (as discussed in section ...

  14. ETA-FEP 001 - Fleet Test and Evaluation Procedure

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1. Objectives 1 2. Purpose 1 3. Documentation 1 4. Fleet Selection 1 4.1 Fleet Diversity 1 4.2 Vehicle ...

  15. Energy Conservation Program: Final Rule; Test Procedures for...

    Energy.gov [DOE] (indexed site)

    Ceiling Fans TP FinalRule (601.19 KB) More Documents & Publications Energy Conservation Program: Energy Conservation Standards

  16. Argonne Facilitation of PHEV Standard Testing Procedure (SAE J1711)

    Energy.gov [DOE]

    2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

  17. Specified assurance level sampling procedure

    SciTech Connect

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

  18. Surface Environmental Surveillance Procedures Manual

    SciTech Connect

    Hanf, RW; Dirkes, RL

    1990-02-01

    This manual establishes the procedures for the collection of environmental samples and the performance of radiation surveys and other field measurements. Responsibilities are defined for those personnel directly involved in the collection of samples and the performance of field measurements.

  19. Quality Procedure- Approved Suppliers List

    Energy.gov [DOE]

    This procedure establishes the responsibilities, process, and records for developing and maintaining the Approved Suppliers List (ASL) for EM Headquarters Office of Standards and Quality Assurance in accordance with EM-QA-001, Environmental Management Quality Assurance Program.

  20. Forrestal Security and Safety Procedures

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1983-02-02

    To establish uniform procedures for the security and safety of the Forrestal Building and to inform all personnel of precautionary measures. This directive does not cancel another directive. Canceled by DOE N 251.11.

  1. Vehicle Technologies Office: Integration, Validation and Testing Tools and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures | Department of Energy Modeling, Testing, Data & Results » Vehicle Technologies Office: Integration, Validation and Testing Tools and Procedures Vehicle Technologies Office: Integration, Validation and Testing Tools and Procedures The Vehicle Technologies Office supports facilities and tools such as Oak Ridge National Laboratory's Vehicle Systems Integration Laboratory to integrate, validate, and test advanced vehicle technologies. Read the text version. The Vehicle

  2. A MAGNETAR-LIKE EVENT FROM LS I +61 Degree-Sign 303 AND ITS NATURE AS A GAMMA-RAY BINARY

    SciTech Connect

    Torres, Diego F.; Rea, Nanda; Esposito, Paolo; Li Jian; Chen Yupeng; Zhang Shu

    2012-01-10

    We report on the Swift Burst Alert Telescope detection of a short burst from the direction of the TeV binary LS I +61 Degree-Sign 303, resembling those generally labeled as magnetar-like. We show that it is likely that the short burst was indeed originating from LS I +61 Degree-Sign 303 (although we cannot totally exclude the improbable presence of a far-away, line-of-sight magnetar) and that it is a different phenomenon with respect to the previously observed ks-long flares from this system. Accepting the hypothesis that LS I +61 Degree-Sign 303 is the first magnetar detected in a binary system, we study those implications. We find that a magnetar-composed LS I +61 Degree-Sign 303 system would most likely be (i.e., for the usual magnetar parameters and mass-loss rate) subject to a flip-flop behavior, from a rotationally powered regime (in the apastron) to a propeller regime (in the periastron) along each of the LS I +61 Degree-Sign 303 eccentric orbital motion. We prove that, unlike near an apastron, where an interwind shock can lead to the normally observed LS I +61 Degree-Sign 303 behavior, during TeV emission the periastron propeller is expected to efficiently accelerate particles only to sub-TeV energies. This flip-flop scenario would explain the system's behavior when a recurrent TeV emission only appears near the apastron, the anti-correlation of the GeV and TeV emission, and the long-term TeV variability (which seems correlated to LS I +61 Degree-Sign 303's super-orbital period), including the appearance of a low TeV state. Finally, we qualitatively put the multi-wavelength phenomenology into the context of our proposed model and make some predictions for further testing.

  3. REM Handling Procedures | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    REM Handling Procedures Below are recommended handling procedures for the Rare Earth Metals. Keep in mind that these procedures are intended for very high purity metals, and alternative procedures may exist or be better suited to your facilities' capabilities. Please consult with your safety officer(s) before employing any of these procedures. The procedures are grouped by element: La, Ce, Pr & Nd Sc, Y, Gd, Tb, Dy, Ho, Er, Tm and Lu Sm & Yb Eu RECOMMENDED HANDLING PROCEDURES FOR: La,

  4. Nye County Community Groundwater Program - Signed Determination.pdf

    National Nuclear Security Administration (NNSA)

    NEPA Compliance Officer Rationale Office of Acquisition and Project Management APM 15-001 Application of DOE NEPA Procedure: Categorical Exclusions B3.1, Site characterization and environmental monitoring (10 CFR Part 1021, Subpart D, Appendix B). Rationale: The proposed action in the attached checklist (APM 15-001, Nye County Preemptive Review and Community-Based Groundwater Sampling Program) describes development and implementation of a groundwater monitoring program involving Nye County's

  5. AZ-101 Gamma Cart Operational Test Report

    SciTech Connect

    MENDOZA, R.E.

    2000-03-30

    Test Report documenting the successful completion of the Operational Test Procedure for the AZ-101 Gamma Carts. Gamma carts are in support of the AZ-101 Mixer Pump Test.

  6. Corps of Engineers, SEPA, TVA, and TVPPA sign memorandum of agreement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Corps of Engineers, SEPA, TVA, and TVPPA sign memorandum of agreement Corps of Engineers, SEPA, TVA, and TVPPA sign memorandum of agreement June 28, 2016 - 12:00pm Addthis Corps of Engineers, SEPA, TVA, and TVPPA sign memorandum of agreement The U.S. Army Corps of Engineers, Nashville District joined forces with the Southeastern Power Administration, the Tennessee Valley Authority, the Tennessee Valley Public Power Association, Inc., and their preference customers on

  7. U.S. Signs International Fusion Energy Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Signs International Fusion Energy Agreement U.S. Signs International Fusion Energy Agreement November 21, 2006 - 9:25am Addthis Large-Scale, Clean Fusion Energy Project to Begin Construction PARIS, FRANCE - Representing the United States, Dr. Raymond L. Orbach, Under Secretary for Science of the U.S. Department of Energy (DOE), today joined counterparts from China, the European Union, India, Japan, the Republic of Korea and the Russian Federation to sign an agreement to build the international

  8. U.S. and Canada Sign Agreement to Enhance Collaboration in Civilian Nuclear

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Research and Development | Department of Energy U.S. and Canada Sign Agreement to Enhance Collaboration in Civilian Nuclear Energy Research and Development U.S. and Canada Sign Agreement to Enhance Collaboration in Civilian Nuclear Energy Research and Development January 13, 2015 - 5:12pm Addthis U.S. and Canada Sign Agreement to Enhance Collaboration in Civilian Nuclear Energy Research and Development Maisah Khan Maisah Khan Special Advisor, Office of International Affairs Joint

  9. U.S. and China Sign Agreement to Increase Industrial Energy Efficiency |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Sign Agreement to Increase Industrial Energy Efficiency U.S. and China Sign Agreement to Increase Industrial Energy Efficiency September 14, 2007 - 2:33pm Addthis DOE to Conduct Energy Efficiency Audits on up to 12 Facilities SAN FRANCISCO, CA - U.S. Department of Energy (DOE) Assistant Secretary for Policy and International Affairs Karen Harbert and Vice Chairman of the National Development and Reform Committee (NDRC) Chen Deming, this week signed a Memorandum of

  10. U.S. and Italy Sign Agreement to Collaborate on Carbon Capture and Storage

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technologies | Department of Energy Italy Sign Agreement to Collaborate on Carbon Capture and Storage Technologies U.S. and Italy Sign Agreement to Collaborate on Carbon Capture and Storage Technologies May 23, 2009 - 12:00am Addthis ROME, ITALY - U.S. Energy Secretary Steven Chu today joined with Italian Minister of Economic Development Claudio Scajola to sign a bilateral agreement to advance carbon capture and storage (CCS) technologies in each country. Working together, the U.S. and Italy

  11. U.S. and Mongolia Sign MOU to Increase Cooperation in Preventing Nuclear

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Smuggling | Department of Energy Mongolia Sign MOU to Increase Cooperation in Preventing Nuclear Smuggling U.S. and Mongolia Sign MOU to Increase Cooperation in Preventing Nuclear Smuggling October 23, 2007 - 3:21pm Addthis WASHINGTON, DC - Today the governments of the United States and Mongolia strengthened their efforts in the fight against nuclear terrorism. U.S. Deputy Secretary of Energy Clay Sell and Mongolia's Minister of Finance Nadmid Bayartsaikhan signed a Memorandum of

  12. U.S. and Portugal Sign Agreement for Climate Research Collaboration |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Portugal Sign Agreement for Climate Research Collaboration U.S. and Portugal Sign Agreement for Climate Research Collaboration March 27, 2009 - 12:00am Addthis WASHINGTON, DC - The United States signed an agreement with Portugal today to launch the installation of a portable climate observatory on Graciosa Island in the Azores. The mobile observatory will obtain measurements of cloud and aerosol properties from the island's marine environment for 20 months, beginning in

  13. United Arab Emirates and United States Sign MOU at Strategic Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Dialogue | Department of Energy Arab Emirates and United States Sign MOU at Strategic Energy Dialogue United Arab Emirates and United States Sign MOU at Strategic Energy Dialogue October 1, 2014 - 1:50pm Addthis Secretary Moniz and UAE Minister of Energy Suhail Al Mazrouei signed a Memorandum of Understanding that reaffirms their commitment to a strong bilateral energy relationship, joint cooperation and exchange of ideas in the areas of energy and the energy-water nexus. Photo by

  14. United States and Italy Sign Agreements to Advance Developments in Nuclear

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy | Department of Energy Italy Sign Agreements to Advance Developments in Nuclear Energy United States and Italy Sign Agreements to Advance Developments in Nuclear Energy September 30, 2009 - 12:00am Addthis Washington, D.C. - U.S. Secretary of Energy Steven Chu and Italian Minister for Economic Development Claudio Scajola today signed two important nuclear energy agreements that may lead to construction of new nuclear power plants and improved cooperation on advanced nuclear energy

  15. United States and South Africa Sign Agreement on Cooperation in Nuclear

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Research and Development | Department of Energy South Africa Sign Agreement on Cooperation in Nuclear Energy Research and Development United States and South Africa Sign Agreement on Cooperation in Nuclear Energy Research and Development September 16, 2009 - 12:00am Addthis Vienna, Austria - U.S. Secretary of Energy Steven Chu and South African Minister of Energy Dipuo Peters signed a bilateral Agreement on Cooperation in Research and Development of Nuclear Energy on September 14 in

  16. United States and Ukraine Sign Agreement to Improve Security of Ukraine's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Radioactive Materials | Department of Energy Ukraine Sign Agreement to Improve Security of Ukraine's Radioactive Materials United States and Ukraine Sign Agreement to Improve Security of Ukraine's Radioactive Materials May 26, 2005 - 12:57pm Addthis KIEV, UKRAINE -- US Secretary of Energy Samuel Bodman and his Ukrainian counterpart David Zhvaniya, Minister for Emergencies, today signed an Implementing Arrangement to partner together to advance international nonproliferation goals by

  17. United States and France Sign Joint Statement on Civil Liability for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Nuclear Damage | Department of Energy and France Sign Joint Statement on Civil Liability for Nuclear Damage United States and France Sign Joint Statement on Civil Liability for Nuclear Damage Joint Statement Signed.pdf (130.32 KB) More Documents & Publications Open Government Plan 1.0 Fiscal Year 2010 Agency Financial Report Secretary Chu's Remarks to the 2011 IAEA General Conference (As Prepared for Delivery)

  18. Sandia Energy - Sandia, SRI International Sign Pact to Advance...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Sandia and SRI International, an independent research and innovation center, will join forces to explore, test, and evaluate a broad range of hydrogen and natural gas fuel...

  19. May 24, 2002: Bush and Putin sign agreement to reduce nuclear arsenal |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 4, 2002: Bush and Putin sign agreement to reduce nuclear arsenal May 24, 2002: Bush and Putin sign agreement to reduce nuclear arsenal May 24, 2002: Bush and Putin sign agreement to reduce nuclear arsenal May 24, 2002 President Bush and President Vladimir Putin of Russia sign agreement to reduce each country's nuclear arsenal to between 1,700 and 2,200 warhead. "Each country," the agreement states, "shall determine for itself the composition and structure

  20. STAR Heavy Flavor Tracker Detects Signs of Charm at RHIC | U...

    Office of Science (SC)

    STAR Heavy Flavor Tracker Detects Signs of Charm at RHIC Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP Funding Opportunities Nuclear ...