National Library of Energy BETA

Sample records for roseville elverta rsc-elv

  1. CX-005938: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Roseville Elverta (RSC-ELV) Optical Ground Wire Replacement ProjectCX(s) Applied: B4.6, B4.7Date: 05/04/2011Location(s): Sacramento, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region

  2. Roseville Electric- Commercial Energy Efficiency Rebate Program

    Energy.gov [DOE]

    Roseville Electric offers incentives for its commercial customers to increase the efficiency of existing facilities. Customers interested in pursuing rebates should contact Roseville Electric...

  3. Roseville Electric- Solar Rebate Program

    Energy.gov [DOE]

    Roseville Electric has implemented solar rebate programs in order to meet the three statewide goals in Senate Bill 1: to install 3,000 megawatts (MW) of distributed solar PV by the end of 2016, to...

  4. Inverted Attic Bulkhead for HVAC Ductwork, Roseville, California...

    Energy Saver

    Inverted Attic Bulkhead for HVAC Ductwork Roseville, California PROJECT INFORMATION ... bathrooms constructed in Roseville, California, for one year as an occupied test home. ...

  5. Roseville, California: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Registered Energy Companies in Roseville, California American River Ventures Green Energy Project Development INC G E P D Solar Power Inc SPI References US Census Bureau...

  6. Roseville Electric- Residential New Construction Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Roseville Electric provides financial incentives to encourage local builders to construct energy efficient homes which incorporate  photovoltaics (PV). Participating builders can choose from three...

  7. Inverted Attic Bulkhead for HVAC Ductwork, Roseville, California (Fact Sheet), Building America Case Study: Whole-House Solutions for Existing Homes, Building Technologies Office (BTO)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Inverted Attic Bulkhead for HVAC Ductwork Roseville, California PROJECT INFORMATION Project Name: Long-Term Monitoring of Occupied Test House Location: Roseville, CA Partners: K. Hovnanian® Homes®, www.khov.com IBACOS www.ibacos.com Building Component: Envelope, structural, HVAC ducts Construction: New Application: New; single and/or multifamily Year Tested: 2012 Applicable Climate Zone(s): Hot-dry climate PERFORMANCE DATA HERS Index: 52 Projected Energy Savings: 11 million Btu/year heating

  8. Comfort and HVAC Performance for a New Construction Occupied Test House in Roseville, California

    SciTech Connect

    Burdick, A.

    2013-10-01

    K. Hovnanian® Homes constructed a 2,253-ft2 single-story slab-on-grade ranch house for an occupied test house (new construction) in Roseville, California. One year of monitoring and analysis focused on the effectiveness of the space conditioning system at maintaining acceptable temperature and relative humidity levels in several rooms of the home, as well as room-to-room differences and the actual measured energy consumption by the space conditioning system. In this home, the air handler unit (AHU) and ducts were relocated to inside the thermal boundary. The AHU was relocated from the attic to a mechanical closet, and the ductwork was located inside an insulated and air-sealed bulkhead in the attic. To describe the performance and comfort in the home, the research team selected representative design days and extreme days from the annual data for analysis. To ensure that temperature differences were within reasonable occupant expectations, the team followed Air Conditioning Contractors of America guidance. At the end of the monitoring period, the occupant of the home had no comfort complaints in the home. Any variance between the modeled heating and cooling energy and the actual amounts used can be attributed to the variance in temperatures at the thermostat versus the modeled inputs.

  9. Comfort and HVAC Performance for a New Construction Occupied Test House in Roseville, California

    SciTech Connect

    Burdick, A.

    2013-10-01

    K. Hovnanian(R) Homes(R) constructed a 2,253-ft2 single-story slab-on-grade ranch house for an occupied test house (new construction) in Roseville, California. One year of monitoring and analysis focused on the effectiveness of the space conditioning system at maintaining acceptable temperature and relative humidity levels in several rooms of the home, as well as room-to-room differences and the actual measured energy consumption by the space conditioning system. In this home, the air handler unit (AHU) and ducts were relocated to inside the thermal boundary. The AHU was relocated from the attic to a mechanical closet, and the ductwork was located inside an insulated and air-sealed bulkhead in the attic. To describe the performance and comfort in the home, the research team selected representative design days and extreme days from the annual data for analysis. To ensure that temperature differences were within reasonable occupant expectations, the team followed Air Conditioning Contractors of America guidance. At the end of the monitoring period, the occupant of the home had no comfort complaints in the home. Any variance between the modeled heating and cooling energy and the actual amounts used can be attributed to the variance in temperatures at the thermostat versus the modeled inputs.

  10. Roseville Electric - Residential Energy Efficiency Rebate Program...

    Energy.gov [DOE] (indexed site)

    Blog Archive News Archive Media Advisories Speeches Photos Videos Maps Data Phonebook Web Policies Web Policies Home Social Media Article Guidance History Offices < Back...

  11. Sacramento Area Voltage Support Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2002-11-15

    The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the ''National Environmental Policy Act'' (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

  12. Sacramento Area Voltage Support Final Environmental Impact Statement

    SciTech Connect

    N /A

    2003-09-19

    The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the National Environmental Policy Act (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: (1) Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; (2) Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and (3) Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

  13. EIS-0294: Record of Decision

    Energy.gov [DOE]

    Interconnection of the Sutter Power Project With the Western Area Power Administration’s Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line (June 1999)

  14. Short-Term Monitoring Results for Advanced New Construction Test House -- Roseville, California

    SciTech Connect

    Stecher, D.; Brozyna, K.; Imm, C.

    2013-09-01

    A builder (K. Hovnanian Homes), design consultant, and trades collaborated to identify a systems integrated measures package for a 2,253-ft2 slab-on-grade ranch house to achieve a modeled energy savings of 60% with respect to the Building America House Simulation Protocols (Hendron, R. and Engebrecht, C. 'Building America House Simulation Protocols.' Golden, CO: National Renewable EnergyLaboratory, 2010) while minimizing construction costs and without requiring changes to the drawing that would impact local code or zoning approval. The key building improvements were applying R-10 insulation to the slab edge, increasing exterior wall cavity insulation from R-13 to R-15, and increasing attic insulation from R-30 to R-38. Also, the air handling unit was relocated from the attic toconditioned space, and ductwork was relocated along the attic floor with an insulated bulkhead built above it. Short-term testing results showed that duct air leakage was low due to short duct runs and the placement of ductwork in conditioned space. However, during commissioning, the lack of access for servicing the ductwork and dampers in the bulkhead area prevented retroactive balancing ofindividual branches, resulting in significant differences between specified and measured airflow values for some duct runs. Thermal imaging results performed on the house when operating in both heating and cooling modes validated historic stratification issues of ceiling supply registers with high supply air temperatures. Long-term monitoring results will be detailed in a future report.

  15. Short-Term Monitoring Results for Advanced New Construction Test House - Roseville, California

    SciTech Connect

    Stecher, D.; Brozyna, K.; Imm, C.

    2013-09-01

    A builder (K. Hovnanian® Homes®), design consultant, and trades collaborated to identify a systems integrated measures package for a 2,253-ft² slab-on-grade ranch house to achieve a modeled energy savings of 60% with respect to the Building America House Simulation Protocols, while minimizing construction costs and without requiring changes to the drawing that would impact local code or zoning approval. The key building improvements were applying R-10 insulation to the slab edge, increasing exterior wall cavity insulation from R-13 to R-15, and increasing attic insulation from R-30 to R-38. Also, the air handling unit was relocated from the attic to conditioned space, and ductwork was relocated along the attic floor with an insulated bulkhead built above it. Short-term testing results showed that duct air leakage was low due to short duct runs and the placement of ductwork in conditioned space. However, during commissioning, the lack of access for servicing the ductwork and dampers in the bulkhead area prevented retroactive balancing of individual branches, resulting in significant differences between specified and measured airflow values for some duct runs. Thermal imaging results performed on the house when operating in both heating and cooling modes validated historic stratification issues of ceiling supply registers with high supply air temperatures. Long-term monitoring results will be detailed in a future report.

  16. Tax Credits, Rebates & Savings | Department of Energy

    Energy.gov [DOE] (indexed site)

    Roseville Electric- Commercial Energy Efficiency Rebate Program Roseville Electric offers incentives for its commercial customers to increase the efficiency of existing facilities....

  17. EIS-0323-S1: Sacramento Area Voltage Support Project Supplemental Environmental Impact Statement and Environmental Impact Report, Placer, Sacramento, and Sutter Counties, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    Construction and operation has been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV/115kV transmission line between SMUD's Elverta and Natomas substations.

  18. QER SECOND INSTALLMENT PUBLIC MEETING-LOS ANGELES, CALIFORNIA...

    Energy.gov [DOE] (indexed site)

    ... Keith Casey, Vice President of Market and Infrastructure Development, California ... City of Roseville, and President, California Municipal Utilities Association (CMUA) ...

  19. EIS-0323-S1: Draft Supplement Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV115kV ...

  20. CX-014545: Categorical Exclusion Determination

    Energy.gov [DOE]

    Elverta Washrack, Paving, and Drainage Repair CX(s) Applied: B4.6Date: 10/16/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Sierra Nevada Region

  1. CX-006627: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    627: Categorical Exclusion Determination CX-006627: Categorical Exclusion Determination Elverta Maintenance Facility Remodel CX(s) Applied: B1.4, B1.15, B2.1, B2.3, B2.5 Date: 08/24/2011 Location(s): Sacramento County, California Office(s): Western Area Power Administration-Sierra Nevada Region The Elverta Maintenance Facility remodeling project will include an expanded parking garage and workshop facility and also include the following site improvements; (I) mezzanine for storage; (2) two

  2. Solar Power Inc SPI | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Solar Power Inc SPI Jump to: navigation, search Name: Solar Power Inc (SPI) Place: Roseville, California Zip: 95661 Product: US-based manufacturer of PV modules with a factory in...

  3. Green Energy Project Development INC G E P D | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    INC G E P D Jump to: navigation, search Name: Green Energy Project Development INC (G.E.P.D.) Place: Roseville, California Zip: 95661 Product: Body assisting firms in the clean...

  4. Workplace Charging Challenge Partner: Phil Haupt Electric | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Phil Haupt Electric Workplace Charging Challenge Partner: Phil Haupt Electric Workplace Charging Challenge Partner: Phil Haupt Electric Joined the Challenge: March 2014 Headquarters: Roseville, CA Charging Location: Roseville, CA Domestic Employees: 5 Phil Haupt Electric has more than 28 years of experience in the electrical industry. The company demonstrated its commitment to sustainability by adding a PEV as the company vehicle in (INSERT YEAR) and encouraging its employees to adopt

  5. CX-010684: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cottonwood-Roseville Optical Groundwire Project CX(s) Applied: B4.6, B4.7, B4.11, B4.13 Date: 07/03/2013 Location(s): California Offices(s): Western Area Power Administration-Sierra Nevada Region