  1. Oak Ridge Office of Environmental Management

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... ON FISCAL YEAR 2016 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  2. Oak Ridge Environmental Management: 30 years in 30 minutes |...

    Office of Environmental Management (EM)

    Oak Ridge Environmental Management: 30 years in 30 minutes Oak Ridge Environmental Management: 30 years in 30 minutes Addthis

  3. Oak Ridge Operations Office of Environmental Management Overview...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview PDF icon Oak Ridge Operations Office of...

  4. Oak Ridge National Laboratory Environmental Management Portfolio...

    Office of Environmental Management (EM)

    Ridge Office of Environmental Management (OREM) East Tennessee Technology Park Portfolio Plan Jim Kopotic Portfolio Federal Project Director East Tennessee Technology Park...

  5. Oak Ridge Office of Environmental Management

    Energy.gov [DOE]

    This website highlights activities that support the mission of the Oak Ridge Office of Environmental Management (Oak Ridge Office of EM), which is to remove environmental legacies resulting from more than 60 years of nuclear weapons development and government-sponsored nuclear energy and scientific research.

  6. Oak Ridge EM Program DOE Oak Ridge Environmental Management Program

    Office of Environmental Management (EM)

    ... Offce of Environmental Management. Expansion of EMWMF (Cells ... Alpha 4 building at Y-12. History of the Oak Ridge EM Program (continued) New 1 megawatt solar array opens at ETTP under a ...

  7. Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.gov/EM 2 EM Program Overview ETTP ORNL Y-12 City of Oak Ridge * Work is organized by Cleanup Por7olios * ETTP * Y-12 * ORNL www.energy.gov/EM 3 -3- * Approximately 10-Year Scope of Work * Regulatory Agreements * Partners and Stakeholders U-233 DisposiKon Project ETTP Cleanup and S&M TRU Waste Processing Center * Diverse, complex projects * Ongoing DOE

  8. Oak Ridge Operations Office of Environmental Management Overview |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview (2 MB) More Documents & Publications OREM Hosts Community Workshop ORSSAB Meeting - August 2013 Above on the left is K-25, at Oak Ridge before and after the 844,000 sq-ft demolition. In addition, on the right: K Cooling Tower at Savannah River Site demolition. Deactivation &

  9. Oak Ridge Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Office of Environmental Management Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition After a decade of demolition, Oak Ridge became the world's first to remove all of its uranium enrichment processing buildings. Despite this monumental achievement, the celebration lasted only moments before workers started taking down another structure to bring them closer to the next big goal... Read more Federal Ingenuity Gives

  10. Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request

    Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2016.

  11. Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request

    Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2018.

  12. Summary - Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN

    Office of Environmental Management (EM)

    Oak Ridge, TN EM Project: EM Waste Management Facility ETR Report Date: February 2008 ETR-11 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN Why DOE-EM Did This Review The Environmental Management Waste Management Facility (EMWMF) is a land disposal facility for wastes generated by environmental restoration activities being conducted at the US Department of

  13. 2014 Annual Planning Summary for the Oak Ridge Office of Environmental Management

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Oak Ridge Office of Environmental Management.

  14. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  15. Environmental Management Waste Management Facility (EMWMF) at Oak Ridge

    Office of Environmental Management (EM)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  16. 2016 Annual Workforce Analysis and Staffing Plan Report - DOE Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (4193) United States Government Department of Energy Oak Ridge Office of Environmental Management memorandum DATE: January 19, 2016 REPLY TO ATTN OF: EM-90:Cange SUBJECT: 2015 OAK RIDGE OFFICE OF ENVIRONMENTAL MANAGEMENT ANNUAL WORKFORCE ANALYSIS AND STAFFING PLAN TO: Karen L. Boardman, Chairperson, Federal Technical Capability Panel, HS-70 The Oak Ridge Office of Environmental Management (OREM) has produced the required OREM Annual Workforce Analysis and Staffing Plan. The attached report

  17. Management initiatives to waste management decisions and environmental compliance in Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Jones, C.G.

    1988-01-01

    Martin Marietta Energy Systems, Inc. (MMES) has been the operating contractor for the nuclear production and research facilities at Oak Ridge, Tennessee and Paducah, Kentucky for about four and one-half years. Environmental compliance, regulatory interaction, and public confidence have been very significant issues during this time. This presentation will review the environmental situation in Oak Ridge in 1984 and will discuss management initiatives and experience in the development and implementation of effective environmental and waste management and health and safety programs committed to the protection of the environment, our workers and the public with an overall goal of full compliance with all current and anticipated regulations.

  18. Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds

    Energy.gov [DOE]

    Department of Energy’s (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds.

  19. Oak Ridge Operations Office of Environmental Management Overview

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge Reservation * High levels of rainfall coupled with shallow groundwater carry contaminants to local waterways Oak Ridge is not an isolated or arid site Oak Ridge has a Unique...

  20. The Department of Energy's Use of the Environmental Management Waste Management Facility at the Oak Ridge Reservation, IG-0883

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Use of the Environmental Management Waste Management Facility at the Oak Ridge Reservation DOE/IG-0883 April 2013 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 April 9, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Use of the Environmental Management Waste Management Facility at the Oak Ridge Reservation"

  1. Oak Ridge Office of Environmental Management P.O

    Office of Environmental Management (EM)

    Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... The Department of Energy (DOE) has proceeded with the ... The funding is included in DOE's annual budget request, and ...

  2. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected

  3. Oak Ridge Office of Environmental Management Pursues Vision of Future While

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Remembering Past | Department of Energy Office of Environmental Management Pursues Vision of Future While Remembering Past Oak Ridge Office of Environmental Management Pursues Vision of Future While Remembering Past December 27, 2012 - 12:00pm Addthis Demolition of K-25, DOE’s largest-ever demolition project, is ongoing. Demolition of K-25, DOE's largest-ever demolition project, is ongoing. This graphic shows the status of activities at the East Tennessee Technology Park as of this

  4. Waste Acceptance Decisions and Uncertainty Analysis at the Oak Ridge Environmental Management Waste Management Facility

    SciTech Connect (OSTI)

    Redus, K. S.; Patterson, J. E.; Hampshire, G. L.; Perkins, A. B.

    2003-02-25

    The Waste Acceptance Criteria (WAC) Attainment Team (AT) routinely provides the U.S. Department of Energy (DOE) Oak Ridge Operations with Go/No-Go decisions associated with the disposition of over 1.8 million yd3 of low-level radioactive, TSCA, and RCRA hazardous waste. This supply of waste comes from 60+ environmental restoration projects over the next 15 years planned to be dispositioned at the Oak Ridge Environmental Management Waste Management Facility (EMWMF). The EMWMF WAC AT decision making process is accomplished in four ways: (1) ensure a clearly defined mission and timeframe for accomplishment is established, (2) provide an effective organization structure with trained personnel, (3) have in place a set of waste acceptance decisions and Data Quality Objectives (DQO) for which quantitative measures are required, and (4) use validated risk-based forecasting, decision support, and modeling/simulation tools. We provide a summary of WAC AT structure and performance. We offer suggestions based on lessons learned for effective transfer to other DOE.

  5. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-15

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  6. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  7. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  8. DOE Names Oak Ridge Cleanup Manager

    Energy.gov [DOE]

    Oak Ridge, Tenn. – The U.S. Department of Energy (DOE) announced today the selection of Sue Cange as the manager of the Oak Ridge Office of Environmental Management (EM). Previously, Cange served as the acting manager of EM’s Oak Ridge Office since May 2014, and she has served as the deputy manager since March 2011.

  9. Environmental Management Waste Management Facility (EMWMF) at...

    Office of Environmental Management (EM)

    Waste Management Facility (EMWMF) at Oak Ridge Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Full Document and Summary Versions are available for download ...

  10. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6.

  11. DOE Issues Sources Sought/Request for Information for Oak Ridge Office of Environmental Management Technical Support Services

    Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities to meet all of the requirements for the potential upcoming procurement for Oak Ridge Office of Environmental Management (OREM) Technical Support Services. The purpose of the Sources Sought/RFI is to solicit interested parties’ input from small business concerns, with the intent of assessing set-aside possibilities.

  12. Annual Report for 2008 - 2009 Detection Monitoring at the Environmental Management Waste Management Facility, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Walker J.R.

    2010-03-01

    This annual Environmental Monitoring Report (EMR) presents results of environmental monitoring performed during fiscal year (FY) 2009 (October 1, 2008 - September 30, 2009) at the Environmental Management Waste Management Facility (EMWMF). The EMWMF is an operating state-of-the-art hazardous waste landfill located in Bear Creek Valley (BCV) west of the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Appendix A, Fig. A.1). Opened in 2002 and operated by a DOE prime contractor, Bechtel Jacobs Company LLC (BJC), the EMWMF was built specifically to accommodate disposal of acceptable solid wastes generated from Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial actions for former waste sites and buildings that have been impacted by past DOE operations on the ORR and at DOE sites off the ORR within the state of Tennessee. Environmental monitoring at the EMWMF is performed to detect and monitor the impact of facility operations on groundwater, surface water, stormwater, and air quality and to determine compliance with applicable or relevant and appropriate requirements (ARARs) specified in governing CERCLA decision documents. Annually, the EMR presents an evaluation of the groundwater, surface water, stormwater, and air monitoring data with respect to the applicable EMWMF performance standards. The purpose of the evaluation is to: (1) identify monitoring results that indicate evidence of a contaminant release from the EMWMF to groundwater, surface water, stormwater, or air, and (2) recommend appropriate changes to the associated sampling and analysis requirements, including sampling locations, methods, and frequencies; field measurements; or laboratory analytes that may be warranted in response to the monitoring data. Sect. 2 of this annual EMR provides background information relevant to environmental monitoring at the landfill, including

  13. Environmental Management Waste Management Facility (EMWMF) at...

    Office of Environmental Management (EM)

    Review of the Environmental Management Waste Management Facility (EMWMF) at Oak Ridge ... INTRODUCTION The Environmental Management Waste Management Facility (EMWMF) is a land ...

  14. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The

  15. FTCP Site Specific Information - Oak Ridge Office of Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management | Department of Energy Office of Environmental Management FTCP Site Specific Information - Oak Ridge Office of Environmental Management Annual Workforce Analysis and Staffing Plan Report Calendar Year 2015 Calendar Year 2013 Calendar Year 2012

  16. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory. Environmental Restoration Program

    SciTech Connect (OSTI)

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D&D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities.

  17. Oak Ridge Reservation environmental report for 1989

    SciTech Connect (OSTI)

    Jacobs, V.A.; Wilson, A.R.

    1990-10-01

    This two-volume report, the Oak Ridge Reservation Environmental Report for 1989, is the nineteenth in an annual series that began in 1971. It reports the results of a comprehensive, year-round program to monitor the impact of operations at the three major US Department of Energy (DOE) production and research installations in Oak Ridge on the immediate areas' and surrounding region's groundwater and surface waters, soil, air quality, vegetation and wildlife, and through these multiple and varied pathways, the resident human population. Information is presented for the environmental monitoring Quality Assurance (QA) Program, audits and reviews, waste management activities, land special environmental studies. Data are included for the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory (ORNL), and Oak Ridge Gaseous Diffusion Plant (ORGDP). Volume 1 presents narratives, summaries, and conclusions based on environmental monitoring at the three DOE installations and in the surrounding environs during calendar year (CY) 1989. Volume 1 is intended to be a stand-alone'' report about the Oak Ridge Reservation (ORR) for the reader who does not want an in-depth review of 1989 data. Volume 2 presents the detailed data from which these conclusions have been drawn and should be used in conjunction with Volume 1.

  18. Summary - Environmental Management Waste Management Facility...

    Office of Environmental Management (EM)

    Waste Management Facility (EMWMF) at Oak Ridge, TN Why DOE-EM Did This Review The Environmental Management Waste Management Facility (EMWMF) is a land disposal facility for ...

  19. Waste Management Plan for the Remedial Investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This Waste Management Plan (WMP) supplements the Remedial Investigation/Feasibility Study (RI/FS) Project WMP and defines the criteria and methods to be used for managing and characterizing waste generated during activities associated with the RI of 23 wells near the Old Hydrofracture Facility (OHF). These wells are within the Waste Area Grouping (WAG) 5 area of contamination (AOC) at Oak Ridge National Laboratory (ORNL). Field activities for the limited RI of Operable Unit (OU) 3 of WAG 10 will involve sampling and measurement of various environmental media (e.g., liquids and gases). Many of these activities will occur in areas known to be contaminated with radioactive materials or hazardous chemical substances, and it is anticipated that contaminated solid and liquid wastes and noncontaminated wastes will be generated as a result of these activities. On a project-wide basis, handling of these waste materials will be accomplished in accordance with the RI/FS Project WMP and the procedures referenced throughout the plan.

  20. Manager, Oak Ridge Office

    Energy.gov [DOE]

    A successful candidate in this position will provide overall executive leadership to and integration of the Oak Ridge Integrated Support Center, which houses mission critical activities and support...

  1. Environmental Restoration and Waste Management Site-Specific Plan for the Oak Ridge Reservation. [Appendix contains accromyms list and maps of waste management facilities

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance at its waste sites and facilities, while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities, planned and completed, undertaken to implement these FYP goals at the DOE Field Office-Oak Ridge (DOE/OR) installations and programs; specifically, for the Oak Ridge Reservation (ORR), Oak Ridge Associated Universities (ORAU), and Hazardous Waste Remedial Action Program (HAZWRAP). Activities described in this SSP address hazardous, radioactive, mixed, and sanitary wastes, along with treatment, storage, and disposal of current production waste and legacy waste from past operation. The SSP is presented in sections emphasizing Corrective Activities (A), Environmental Restoration (ER), Waste Management (WM), Technology Development (TD), and Transportation; and includes descriptions of activities, resources, and milestones by installation or program. 87 tabs.

  2. Environmental Management Waste Management Facility Waste Lot Profile 155.5 for K-1015-A Laundry Pit, East Tennessee Technology Park Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs, Raymer J.E.

    2008-06-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets

  3. Oak Ridge National Laboratory: Recent Accomplishments and Challenges in the Environmental Management Program

    Office of Environmental Management (EM)

    Oak Ridge Moves Forward in Mercury Cleanup Oak Ridge Moves Forward in Mercury Cleanup March 28, 2013 - 12:00pm Addthis Workers recently removed five large mercury-contaminated tanks from Y-12. Workers recently removed five large mercury-contaminated tanks from Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Workers recently removed five large

  4. Oak Ridge Reservation Annual Site environmental report for 1994

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1995-10-01

    This report presents the details of the environmental monitoring and management plan for the Oak Ridge Reservation. Topics include: site and operations overview; environmental compliance strategies; environmental management program; effluent monitoring; environmental surveillance; radiation doses; chemical doses; ground water; and quality assurance.

  5. Waste management plan for inactive LLLW tanks 3001-B, 3004-B, 3013, and T-30 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    1995-07-01

    This Project Waste Management Plan identifies the waste that is expected to be generated in connection with the removal and disposition of inactive liquid low-level radioactive waste tanks 3001-B, 3004-B, and T-30, and grouting of tank 3013 at the Oak Ridge National Laboratory and the isolation of these tanks` associated piping systems. The plan also identifies the organization, responsibilities, and administrative controls that will be followed to ensure proper handling of the waste.

  6. ORO Names New Assistant Manager for Environmental Management

    Energy.gov [DOE]

    The U.S. Department of Energy Oak Ridge Office names John Eschenberg as its Assistant Manager for Environmental Management.

  7. 2012 Annual Workforce Analysis and Staffing Plan Report- Oak Ridge Office of Environmental Management

    Energy.gov [DOE]

    Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities.

  8. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  9. EA-1117: Management of Spent Nuclear Fuel on the Oak Ridge Reservation, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal for the management of spent nuclear fuel on the U.S. Department of Energy's Oak Ridge Reservation to implement the preferred alternative...

  10. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  11. ISC-Oak Ridge Office Environmental Assessments (EA) / Environmental Impact

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  12. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Office | Department of Energy Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office (78.91 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA,

  13. Lessons Learned From a Decade of Design, Construction, and Operations of the Environmental Management Waste Management Facility in Oak Ridge, Tennessee - 12062

    SciTech Connect (OSTI)

    Williams, Joe

    2012-07-01

    The Environmental Management Waste Management Facility (EMWMF) is the Department of Energy's on-site disposal facility for radioactive and hazardous waste generated by the CERCLA cleanup of the Oak Ridge Reservation (ORR). EMWMF recently completed building out to its maximum site capacity and is approaching a decade of operating experience. In meeting the challenges of design, construction, and operation of a mixed waste and low-level radioactive waste disposal facility within the framework of CERCLA, the Bechtel Jacobs Company LLC (BJC) project team learned valuable lessons that may be beneficial to other disposal facilities. Since project inception in 1998, the scope of the effort includes five regulator-approved designs, four phases of construction, and utilization of half of EMWMF's 1.63 M m{sup 3} of airspace during disposal of waste streams from across the ORR. Funding came from the broadest possible range of sources - privatization, American Recovery and Reinvestment Act, and two funding appropriation accounts. In the process of becoming the cost effective disposal outlet for the majority of the ORR cleanup waste, EMWMF overcame numerous challenges. Lessons learned were a key factor in achieving that success. Many of EMWMF's challenges are common to other disposal facilities. Sharing the successes and lessons learned will help other facilities optimize design, construction, and operations. (author)

  14. Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Rigsby V.P.

    2009-02-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab

  15. Environmental Management Science Education and Internship Program

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental worker near water Oak Ridge Office of Environmental Management offers students and recent college graduates opportunities to learn about the mission of the DOE-EM...

  16. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    SciTech Connect (OSTI)

    Thompson, Sharon D.

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  17. Oak Ridge Reservation annual site environmental report for 1995

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1996-09-01

    This report presents the details of the environmental monitoring and management program for the Oak Ridge Reservation. Topics discussed include: site background, climate, and operations; environmental compliance strategies; effluent monitoring; environmental management program including environmental restoration, decontamination and decommissioning, technology development, and public involvement; effluent monitoring of airborne discharges, liquid discharges, toxicity control and monitoring, biological monitoring and abatement; environmental surveillance which encompasses meteorological monitoring, ambient air monitoring, surface water monitoring, soils monitoring, sediment monitoring, and contamination of food stuffs monitoring; radiation doses; chemical exposures; ground water monitoring; and quality assurance.

  18. Oak Ridge Reservation environmental report for 1990

    SciTech Connect (OSTI)

    Wilson, A.R.

    1991-09-01

    The purpose of this report is to provide information to the public about the impact of the US Department of Energy's (DOE's) facilities located on the Oak Ridge Reservation (ORR) on the public and the environment. It describes the environmental surveillance and monitoring activities conducted at and around the DOE facilities operated by Martin Marietta Energy Systems, Inc. Preparation and publication of this report is in accordance with DOE Order 5400.1. The order specifies a publication deadline of June of the following year for each calendar year of data. The primary objective of this report is to summarize all information collected for the previous calendar year regarding effluent monitoring, environmental surveillance, and estimates of radiation and chemical dose to the surrounding population. When multiple years of information are available for a program, trends are also evaluated. The first seven sections of Volume 1 of this report address this objective. The last three sections of Volume 1 provide information on solid waste management, special environmental studies, and quality assurance programs.

  19. DOE Releases Request for Proposals for Oak Ridge Office of Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management Technical Support Services | Department of Energy Proposals for Oak Ridge Office of Environmental Management Technical Support Services DOE Releases Request for Proposals for Oak Ridge Office of Environmental Management Technical Support Services October 6, 2016 - 3:00pm Addthis Media Contact: Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Request for Proposals (RFP) for the Oak Ridge Office of

  20. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement; Volume 1, Appendix F, Nevada Test Site and Oak Ridge Reservation Spent Nuclear Fuel Management Programs

    SciTech Connect (OSTI)

    1994-06-01

    This volume addresses the interim storage of spent nuclear fuel (SNF) at two US Department of Energy sites, the Nevada Test Site (NTS) and the Oak Ridge Reservation (ORR). These sites are being considered to provide a reasonable range of alternative settings at which future SNF management activities could be conducted. These locations are not currently involved in management of large quantities of SNF; NTS has none, and ORR has only small quantities. But NTS and ORR do offer experience and infrastructure for the handling, processing and storage of radioactive materials, and they do exemplify a broad spectrum of environmental parameters. This broad spectrum of environmental parameters will provide, a perspective on whether and how such location attributes may relate to potential environmental impacts. Consideration of these two sites will permit a programmatic decision to be based upon an assessment of the feasible options without bias, to the current storage sites. This volume is divided into four parts. Part One is the volume introduction. Part Two contains chapters one through five for the NTS, as well as references contained in chapter six. Part Three contains chapters one through five for the ORR, as well as references contained in chapter six. Part Four is summary information including the list of preparers, organizations contacted, acronyms, and abbreviations for both the NTS and the ORR. A Table of Contents, List of Figures, and List of Tables are included in parts Two, Three, and Four. This approach permitted the inclusion of both sites in one volume while maintaining consistent chapter numbering.

  1. DOE Oak Ridge Operations managers

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    weapons production, and basic scientific research. Additional responsibilities have been placed on the federal offices in Oak Ridge during the years. It can be said, if the...

  2. K-311-1/K-310-3 Purge Cascade Process Description, Oak Ridge Environmental Management Accelerated Cleanup Project, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Shoemaker J.E.

    2009-05-13

    K-311-1 was constructed along with the rest of the K-25 Building in the 1943-1945 timeframe. K-311-1 was equipped with Size 3 converters and Size 38 Allis Chalmers{trademark} single-stage centrifugal compressors driven by 3600 rpm electric motors, and the unit operated as the 'bottom' unit flow-wise in K-25. The depleted flow from the bottom stage in K-311-1 passed through booster compressors and flowed to the K-601 Building where the depleted or 'tails' material was removed. In 1948, after the K-27 Building was completed, the decision was made to operate K-27 and K-25 in series rather than operate the two buildings as separate entities. To facilitate this operation, concrete bases were poured and two sets of booster compressors were installed in the extreme West end of the K-311-1 cell floor. These compressors were enclosed in heated housings and consisted of Size 38 compressors. One pair was to boost the 'B' flow between K-25 and K-27, and one pair was to boost the 'A' flow between the buildings. Each station operated with one compressor on-stream and the other in standby. (Reference 9) Each station also was equipped with a Size 2 after-cooler located in the discharge stream downstream of the junction of the onstream and standby compressors. Additional gaseous diffusion capacity was added at Oak Ridge as K-29, K-31, and K-33 were constructed and placed in service in the early 1950s. As a result of the additional process equipment added by these buildings, in-leakage of light gases to the cascade including light gases introduced into the cascade as a result of purging operations threatened to exceed the capacity of the existing K-312 Purge Cascade facilities in the K-25 Building. As a result, in 1954 K-311-1 was converted to a side purge cascade to remove light gases from the process gas stream as the stream entered K-25 from K-27. Low molecular weight gas in-leakage in K-33, K-31, K-29, and K-27 was removed by the K-311-1 Side Purge Facility and a relatively pure

  3. Oak Ridge Reservation annual site environmental report summary 1998

    SciTech Connect (OSTI)

    Hamilton, L.V.

    1999-12-01

    This report summarizes the information found in the Oak Ridge Reservation Annual Site Environmental for 1998 (DOE/ORO/2091).

  4. Environmental Compliance and Protection Program Description Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2009-02-26

    The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.

  5. RIDGE

    Office of Legacy Management (LM)

    ' RIDGE NATIONAL : LABORATORY MANAGED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOG THE UNITED STATES DEPARTMENT OF ENERGY ORNLRASA-X970 RADIOLOGICALSURVEYAT THEJESSOPSTEELCOMPANYS...

  6. Frequently Asked Questions | Environmental Management Science...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Frequently Asked Questions About the Oak Ridge Environmental Management Science Education and Internship Program 1. What kind of program is the OREM Science Education and...

  7. Oak Ridge Reservation annual site environmental report for 2008

    SciTech Connect (OSTI)

    none,

    2009-09-01

    The Oak Ridge Reservation (ORR) consists of three major government-owned, contractor-operated facilities: the Y-12 National Security Complex, Oak Ridge National Laboratory, and East Tennessee Technology Park. The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced materials for the first atomic bombs. The reservation’s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried out for the war effort and subsequent research, development, and production activities have involved, and continue to involve, the use of radiological and hazardous materials. The Oak Ridge Reservation Annual Site Environmental Report and supporting data are available at http://www.ornl.gov/sci/env_rpt or from the project director. This document is prepared annually to summarize environmental activities, primarily environmental monitoring activities, on the Oak Ridge Reservation (ORR) and within the ORR surroundings. The document fulfills the requirement of Department of Energy (DOE) Order 231.1A, Environment, Safety and Health Reporting, for an annual summary of environmental data to characterize environmental performance. The environmental monitoring criteria are described in DOE Order 450.1A, Environmental Protection Program. The results summarized in this report are based on data collected prior to and through 2008. This report is not intended to provide the results of all sampling on the ORR. Additional data collected for other site and regulatory purposes, such as environmental restoration/remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws and are referenced herein as appropriate. Corrections to the report for the previous year are found in Appendix

  8. Oak Ridge Reservation Waste Management Plan

    SciTech Connect (OSTI)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  9. Environmental data and analyses for the proposed management of spent nuclear fuel on the DOE Oak Ridge Reservation

    SciTech Connect (OSTI)

    Socolof, M.L.; Curtis, A.H.; Blasing, T.J.

    1995-08-01

    DOE needs to continue the safe and efficient management of SNF on ORR, based on the requirement for future SNF storage capacity and implementation of the ROD for the PEIS. DOE is proposing to implement the ROD through proper management of SNF on ORR, including the possible construction and operation of a dry cask storage facility. This report describes the potentially affected environment and analyzes impacts on various resources due to the proposed action. The information provided in this report is intended to support the Environmental Assessment being prepared for the proposed activities. Construction of the dry cask storage facility would result in minimal or no impacts on groundwater, surface water, and ecological resources. Contaminated soils excavated during construction would result in negligible risk to human health and to biota. Except for noise from trucks and equipment, operation of the dry cask storage facility would not be expected to have any impact on vegetation, wildlife, or rare plants or animals. Noise impacts would be minimal. Operation exposures to the average SNF storage facility worker would not exceed approximately 0.40 mSv/year (40 mrem/year). The off-site population dose within an 80-km (50-mile) radius of ORR from SNF operations would be less than 0.052 person-Sv/year (5.2 person-rem/year). Impacts from incident-free transportation on ORR would be less than 1.36 X 10{sup -4} occupational fatal cancers and 4.28 X 10{sup -6} public fatal cancers. Credible accident scenarios that would result in the greatest probable risks would cause less than one in a million cancer fatalities to workers and the public.

  10. EM Oak Ridge Manager Reflects on Reaching Vision 2016 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Oak Ridge Manager Reflects on Reaching Vision 2016 EM Oak Ridge Manager Reflects on Reaching Vision 2016 September 13, 2016 - 12:25pm Addthis EM Update spoke with Sue Cange, manager of the DOE Oak Ridge Office of Environmental Management, on recently completing Vision 2016 for the East Tennessee Technology Park (ETTP) cleanup, which entailed decommissioning and demolition of five former gaseous diffusion enrichment plants dating back to World War II, as well as plans for the next

  11. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  12. Transmittal of the Calculation Package that Supports the Analysis of Performance of the Environmental Management Waste Management Facility Oak Ridge, Tennessee (Based 5-Cell Design Issued 8/14/09)

    SciTech Connect (OSTI)

    Williams M.J.

    2009-09-14

    This document presents the results of an assessment of the performance of a build-out of the Environmental Management Waste Management Facility (EMWMF). The EMWMF configuration that was assessed includes the as-constructed Cells 1 through 4, with a groundwater underdrain that was installed beneath Cell 3 during the winter of 2003-2004, and Cell 5, whose proposed design is an Addendum to Remedial Design Report for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee, DOE/OR/01-1873&D2/A5/R1. The total capacity of the EMWMF with 5 cells is about 1.7 million cubic yards. This assessment was conducted to determine the conditions under which the approved Waste Acceptance Criteria (WAC) for the EMWMF found in the Attainment Plan for Risk/Toxicity-Based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee [U.S. Department of Energy (DOE) 2001a], as revised for constituents added up to October 2008, would remain protective of public health and safety for a five-cell disposal facility. For consistency, the methods of analyses and the exposure scenario used to predict the performance of a five-cell disposal facility were identical to those used in the Remedial Investigation and Feasibility Study (RI/FS) and its addendum (DOE 1998a, DOE 1998b) to develop the approved WAC. To take advantage of new information and design changes departing from the conceptual design, the modeling domain and model calibration were upaded from those used in the RI/FS and its addendum. It should be noted that this analysis is not intended to justify or propose a change in the approved WAC.

  13. Oak Ridge Office

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Ms. ... ON FISCAL YEAR 2014 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  14. Calculation Package for the Analysis of Performance of Cells 1-6, with Underdrain, of the Environmental Management Waste Management Facility Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Gonzales D.

    2010-03-30

    This calculation package presents the results of an assessment of the performance of the 6 cell design of the Environmental Management Waste Management Facility (EMWMF). The calculations show that the new cell 6 design at the EMWMF meets the current WAC requirement. QA/QC steps were taken to verify the input/output data for the risk model and data transfer from modeling output files to tables and calculation.

  15. 2013 Federal Energy and Water Management Award Winner Oak Ridge National

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Laboratory | Department of Energy 2013 Federal Energy and Water Management Award Winner Oak Ridge National Laboratory 2013 Federal Energy and Water Management Award Winner Oak Ridge National Laboratory Poster showing the 2013 Federal Energy and Water Management award winner, Oak Ridge National Laboratory. High Resolution Poster (3.58 MB) Low Resolution Poster (708.34 KB) More Documents & Publications An Approach to Sustainability that Improves Environmental and Safety Performance

  16. Environmental Survey preliminary report, Oak Ridge National Laboratory (X-10), Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1988-07-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL), X-10 site, conducted August 17 through September 4, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with ORNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for ORNL. The Interim Report will reflect the final determinations of the ORNL Survey. 120 refs., 68 figs., 71 tabs.

  17. Oak Ridge Reservation Environmental report for 1990

    SciTech Connect (OSTI)

    Wilson, A.R.

    1991-09-01

    The first two volumes of this report are devoted to a presentation of environmental data and supporting narratives for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and surrounding environs during 1990. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the ORR for the reader who does not want to review in detail all of the 1990 data. Volume 2 includes the detailed data summarized in a format to ensure that all environmental data are represented in the tables. Narratives are not included in Vol. 2. The tables in Vol. 2 are addressed in Vol. 1. For this reason, Vol. 2 cannot be considered a stand-alone report but is intended to be used in conjunction with Vol. 1.

  18. Oak Ridge Reservation environmental report for 1989

    SciTech Connect (OSTI)

    Jacobs, V.A.; Wilson, A.R.

    1990-10-01

    The first two volumes of this report are devoted to a presentation of environmental data and supporting narratives for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and surrounding environs during 1989. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the ORR for the reader who does not want to review in detail all of the 1989 data. Volume 2 includes the detailed data summarized in a format to ensure that all environmental data are represented in the tables. Narratives are not included in Vol. 2. The tables in Vol. 2 are addressed in Vol. 1. For this reason, Vol. 2 cannot be considered a stand-alone report but is intended to be used in conjunction with Vol. 1. 16 figs., 194 tabs.

  19. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  20. Contaminated scrap metal management on the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Hayden, H.W.; Stephenson, M.J.; Bailey, J.K.; Weir, J.R.; Gilbert, W.C.

    1993-09-01

    Large quantities of scrap metal are accumulating at the various Department of Energy (DOE) installations across the country as a result of ongoing DOE programs and missions in concert with present day waste management practices. DOE Oak Ridge alone is presently storing around 500,000 tons of scrap metal. The local generation rate, currently estimated at 1,400 tons/yr, is expected to increase sharply over the next couple of years as numerous environmental restoration and decommissioning programs gain momentum. Projections show that 775,000 tons of scrap metal could be generated at the K-25 Site over the next ten years. The Y-12 Plant and Oak Ridge National Laboratory (ORNL) have similar potentials. The history of scrap metal management at Oak Ridge and future challenges and opportunities are discussed.

  1. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs.

  2. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    SciTech Connect (OSTI)

    1999-06-01

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.

  3. Waste Management Conference Highlights Oak Ridge's Progress and...

    Office of Environmental Management (EM)

    Management Conference Highlights Oak Ridge's Progress and Partnerships Waste Management ... Council President Mike Thompson Mike Thompson speak at the Waste Management Conference. ...

  4. Environmental Management

    ScienceCinema (OSTI)

    None

    2016-07-12

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  5. Environmental Management

    SciTech Connect (OSTI)

    2014-11-12

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  6. The Oak Ridge Reservation Annual Site Environmental Report Summary, 2007

    SciTech Connect (OSTI)

    None, None

    2009-02-28

    The Oak Ridge Reservation Annual Site Environmental Report is prepared and published each year to inform the public of the environmental activities that take place on the reservation and in the surrounding areas. It is written to comply with DOE Order 231.1A, Environment, Safety, and Health Reporting. This document has been prepared to present the highlights of the Oak Ridge Reservation Annual Site Environmental Report 2007 in an easy-to-read, summary format.

  7. Oak Ridge Reservation Annual Site Environmental Report for 2006

    SciTech Connect (OSTI)

    McMahon, Wayne; Hughes, Joan; Coffey, Mike; Thompson, Sharon

    2007-09-01

    This document is prepared annually to summarize environmental activities, primarily environmental-monitoring activities, on the Oak Ridge Reservation (ORR) and within the ORR surroundings. The document fulfills the requirement of Department of Energy (DOE) Order 23l.IA, 'Environment, Safety and Health Reporting,' for an annual summary of environmental data to characterize environmental performance. The environmental-monitoring criteria are described in DOE Order 450.1, 'Environmental Protection Program.' The results summarized in this report are based on data collected prior to and through 2006. This report is not intended to provide the results of all sampling on the ORR. Additional data collected for other site and regulatory purposes, such as environmental restoration remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws and are referenced herein as appropriate. Corrections to the report for the previous year are found in Appendix A. Environmental monitoring on the ORR consists primarily of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents at the point of release to the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation and chemical exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; these activities provide direct measurement of contaminant concentrations in air, water, groundwater, soil, foods, biota, and other media. Environmental surveillance data provide information regarding conformity with

  8. ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT

    Office of Environmental Management (EM)

    ... 290 1,483 Moab 245 320 *Mound 0 54 Nevada National Security Site 63 748 Oak Ridge ... Demonstration Project 77 408 Title X UraniumThorium Reimbursements 9 9 Management & ...

  9. Oak Ridge National Laboratory Waste Management Plan. Revision 1

    SciTech Connect (OSTI)

    Forgy, Jr., J. R.

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  10. M E Environmental Management Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D

  11. Recommendation 233: Recommendations on the Proposed Environmental Managment

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Disposal Facility at the U.S. DOE Oak Ridge Reservation | Department of Energy 3: Recommendations on the Proposed Environmental Managment Disposal Facility at the U.S. DOE Oak Ridge Reservation Recommendation 233: Recommendations on the Proposed Environmental Managment Disposal Facility at the U.S. DOE Oak Ridge Reservation ORSSAB supports onsite disposal of Oak Ridge EM CERCLA wastes that meet the onsite waste acceptance criteria. The board affirms its commitment to the recommendations

  12. Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2005-03-02

    This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for

  13. MEMORANDUM FOR JOHN R. ESCHENBERG ASSISTANT MANAGER FOR ENVIRONMENTAL...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    0 ENVIRONMENTAL MANAGEMENT SUBJECT: Delegation of Acquisition Executive Authority for Capital Asset Projects at Oak Ridge Office In accordance with the guidelines of Department of...

  14. Health Education Specialist/Project Manager Oak Ridge Institute...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    to addressing minority health disparities in your community, please contact: rose marie Womble, mSSW Health Education SpecialistProject Manager Oak Ridge Institute for...

  15. Oak Ridge Reservation Annual Site Environmental Report for 2009

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2010-09-01

    The Oak Ridge Reservation Annual Site Environmental Report is prepared animally and presents summary environmental data to (1) characterize environmental performance, (2) summarize environmental occurrences reported during the year, (3) confirm compliance with environmental standards and requirements, and (4) highlight significant program activities. The report fulfills the requirement contained in DOE Order 231.1 A, Environment, Safety and Health Reporting (DOE 2004) that an integrated annual site environmental report be prepared. The results summarized in this report are based on data collected prior to and through 2009. This report is not intended to nor does it present the results of all environmental monitoring associated with the ORR. Data collected for other site and regulatory purposes, such as environmental restoration/remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws and are referenced herein as appropriate. Appendix A to this report identifies corrections to the 2008 report. Appendix B contains a glossary of technical terms that may be useful for understanding the terminology used in this document. Environmental monitoring on the ORR consists primarily of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents at the points of release to the environment; these measurements allow the quantification and official reporting of contaminant levels, assessment of radiation and chemical exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of direct measurements and collection and analysis of samples taken from the site and its environs exclusive of effluents

  16. Oak Ridge Reservation Annual Site Environmental Report for 2009

    SciTech Connect (OSTI)

    Thompson, Sharon D; Loffman, Regis S

    2010-10-01

    The Oak Ridge Reservation Annual Site Environmental Report is prepared annually and presents summary environmental data to (1) characterize environmental performance, (2) summarize environmental occurrences reported during the year, (3) confirm compliance with environmental standards and requirements, and (4) highlight significant program activities. The report fulfills the requirement contained in DOE Order 231.1A, Environment, Safety and Health Reporting (DOE 2004) that an integrated annual site environmental report be prepared. The results summarized in this report are based on data collected prior to and through 2009. This report is not intended to nor does it present the results of all environmental monitoring associated with the ORR. Data collected for other site and regulatory purposes, such as environmental restoration/remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws and are referenced herein as appropriate. Appendix A to this report identifies corrections for the 2008 report. Appendix B contains a glossary of technical terms that may be useful for understanding the terminology used in this document. Environmental monitoring on the ORR consists primarily of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents at the points of release to the environment; these measurements allow the quantification and official reporting of contaminant levels, assessment of radiation and chemical exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of direct measurements and collection and analysis of samples taken from the site and its environs exclusive of effluents

  17. Oak Ridge Reservation Annual Site Environmental Report for 2010

    SciTech Connect (OSTI)

    Thompson, Sharon D

    2011-10-01

    The Oak Ridge Reservation Annual Site Environmental Report is prepared annually and presents summary environmental data to (1) characterize environmental performance, (2) summarize environmental occurrences reported during the year, (3) confirm compliance with environmental standards and requirements, and (4) highlight significant program activities. The report fulfills the requirement contained in DOE Order 231.1A, Environment, Safety and Health Reporting (DOE 2004) that an integrated annual site environmental report be prepared. The results summarized in this report are based on data collected prior to and through 2010. This report is not intended to nor does it present the results of all environmental monitoring associated with the ORR. Data collected for other site and regulatory purposes, such as environmental restoration/remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws and are referenced herein as appropriate. Appendix A to this report identifies corrections to the 2009 report. Appendix B contains a glossary of technical terms that may be useful for understanding the terminology used in this document. Environmental monitoring on the ORR consists primarily of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents at the points of release to the environment; these measurements allow the quantification and official reporting of contaminant levels, assessment of radiation and chemical exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of direct measurements and collection and analysis of samples taken from the site and its environs exclusive of effluents

  18. Environmental Management System

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System (EMS) is a set of processes and practices that enable an organization to reduce its...

  19. DOE - Office of Legacy Management -- Oak Ridge TN Warehouse Site...

    Office of Legacy Management (LM)

    FACT SHEET This fact sheet provides information about the Oak Ridge, Tennessee, Warehouses Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. ...

  20. Environmental Management System

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM

  1. CRAD, Environmental Protection- Oak Ridge National Laboratory High Flux Isotope Reactor

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Environmental Compliance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  2. Oak Ridge Reservation, annual site environmental report for 1993

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The US DOE currently oversees activities on the Oak Ridge Reservation, a government-owned, contractor-operated facility. Three sites compose the reservation; Y-12, Oak Ridge National Laboratory, and K-25. This document contains a summary of environmental monitoring activities on the Oak Ridge Reservation (ORR) and its surroundings. The results summarized in this report are based on the data collected during calendar year (CY) 1993 and compiled in; Environmental Monitoring in the Oak Ridge Reservation: CY 1993 Results. Annual environmental monitoring on the ORR consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring is the collection and analysis of samples or measurements of liquid, gaseous, or airborne effluents for the purpose of characterizing and quantifying contaminants and process stream characteristics, assessing radiation and chemical exposures to members of the public, and demonstrating compliance with applicable standards. Environmental surveillance is the collection and analysis of samples of air, water, soil, foodstuffs, biota, and other media from DOE sites and their environs and the measurement of external radiation for purposes of demonstrating compliance with applicable standards, assessing radiation and chemical exposures to members of the public, and assessing effects, if any, on the local environment.

  3. Environmental Management Waste Management Facility Waste Lot Profile for the K-770 Scrap Yard Soils and Miscellaneous Debris, East Tennessee Technology Park, Oak Ridge, Tennessee - EMWMF Waste Lot 4.12

    SciTech Connect (OSTI)

    Davenport M.

    2009-04-15

    Waste Lot 4.12 consists of approximately 17,500 yd{sup 3} of low-level, radioactively contaminated soil, concrete, and incidental metal and debris generated from remedial actions at the K-770 Scrap Metal Yard and Contaminated Debris Site (the K-770 Scrap Yard) at the East Tennessee Technology Park (ETTP). The excavated soil will be transported by dump truck to the Environmental Management Waste Management Facility (EMWMF). This profile provides project-specific information to demonstrate compliance with Attainment Plan for Risk/Toxicity-based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee (DOE 2001). The K-770 Scrap Yard is an approximately 36-acre storage area located southwest of the main portion of ETTP, outside the security perimeter fence in the Powerhouse Area adjacent to the Clinch River. The K-770 area was used to store radioactively contaminated or suspected contaminated materials during and previous to the K-25 Site cascade upgrading program. The waste storage facility began operation in the 1960s and is estimated to at one time contain in excess of 40,000 tons of low-level, radioactively contaminated scrap metal. Scrap metal was taken to the site when it was found to contain alpha or beta/gamma activity on the surface or if the scrap metal originated from a process building. The segregated metal debris was removed from the site as part of the K-770 Scrap Removal Action (RA) Project that was completed in fiscal year (FY) 2007 by Bechtel Jacobs Company LLC (BJC). An area of approximately 10 acres is located in EUs 29 and 31 where the scrap was originally located in the 100-year floodplain. In the process of moving the materials around and establishing segregated waste piles above the 100-year floodplain, the footprint of the site was expanded by 10-15 acres in EUs 30 and 32. The area in EUs 29 and 31 that was cleared of metallic debris in the floodplain was sown with grass. The areas in EUs 30 and 32 have some scattered

  4. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Environmental Management (EM)

    ... Assistant Secretary for Safety and Management Operations ... Management Advisory Board EM SSAB - Environmental ... ETR - External Technical Review ETTP - East Tennessee ...

  5. OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE

    Energy.gov [DOE]

    Oak Ridge, TN - The Environmental Management Waste Management Facility (EMWMF) provides the onsite disposal capability for the majority of cleanup-generated wastes on the Oak Ridge Reservation....

  6. Best management practices plan for the Chestnut Ridge-Filled Coal Ash Pond at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-05-01

    The Chestnut Ridge Filled Coal Ash Pond (FCAP) Project has been established to satisfy Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements for the Chestnut Ridge Operable Unit 2. FCAP is on Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant. A 62-foot high earthen dam across Upper McCoy Branch was constructed in 1955 to create a pond to serve as a settling basin for fly and bottom ashes generated by burning coal at the Y-12 Steam Plant. Ash from the steam was mixed with water to form a slurry and then pumped to the crest of Chestnut Ridge and released through a large pipe to flow across the Sluice Channel area and into the pond. The ash slurry eventually overtopped the dam and flowed along Upper McCoy Branch to Rogers Quarry. The purpose of this document is to provide a site-specific Best Management Practices (BMP) Plan for construction associated with environmental restoration activities at the FCAP Site.

  7. The Oak Ridge Reservation Annual Site Environmental Report, 2007

    SciTech Connect (OSTI)

    Hughes, Joan; Thompson, Sharon; Page, David

    2008-09-30

    The Oak Ridge Reservation (ORR) consists of three major government-owned, contractor-operated facilities: the Y-12 National Security Complex, Oak Ridge National Laboratory, and East Tennessee Technology Park. The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced materials for the first atomic bombs. The reservation’s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried out for the war effort and subsequent research, development, and production activities have involved, and continue to involve, the use of radiological and hazardous materials. The Oak Ridge Reservation Annual Site Environmental Report and supporting data are available at Http://www.ornl.gov/sci/env_rpt or from the project director.

  8. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

  9. Routine environmental audit of the K-25 Site, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report documents the results of the Routine Environmental Audit of the K-25 Site in Oak Ridge, Tennessee, conducted February 14 through February 25, 1994, by the US Department of Energy`s (DOE`s) Office of Environmental Audit (EH-24) located within the Office of Environment, Safety and Health (EH). The Routine Environmental Audit for the K-25 site was conducted as an environmental management assessment, supported through reviews of the Waste Management Program and the Decontamination and Decommissioning Program. The assessment was conducted jointly with, and built upon, the results provided by the ``DOE Oak Ridge Operations Office Environment, Safety, health and Quality Assurance Appraisal at the K-25 Site.`` DOE 5482.1B, ``Environment, Safety and Health Appraisal Program,`` established the mission of EH-24 to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The purpose of this assessment is to provide the Secretary of Energy and senior DOE managers with concise independent information as part of DOE`s continuing effort to improve environmental program performance. The ultimate goal of EH-24 is enhancement of environmental protection and the minimization of risk to public health and the environment. The routine environmental audit is one method by which EH-24 accomplishes its mission, utilizing systematic and periodic evaluations of the Department`s environmental programs within line organizations.

  10. Summary of available waste forecast data for the Environmental Restoration Program at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This report identifies patterns of Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) waste generation that are predicted by the current ER Waste Generation Forecast data base. It compares the waste volumes to be generated with the waste management capabilities of current and proposed treatment, storage, or disposal (TSD) facilities. The scope of this report is limited to wastes generated during activities funded by the Office of the Deputy Assistant Secretary for Environmental Restoration (EM-40) and excludes wastes from the decontamination and decommissioning of facilities. Significant quantities of these wastes are expected to be generated during ER activities. This report has been developed as a management tool supporting communication and coordination of waste management activities at ORNL. It summarizes the available data for waste that will be generated as a result of remediation activities under the direction of the U.S. Department of Energy Oak Ridge Operations Office and identifies areas requiring continued waste management planning and coordination. Based on the available data, it is evident that most remedial action wastes leaving the area of contamination can be managed adequately with existing and planned ORR waste management facilities if attention is given to waste generation scheduling and the physical limitations of particular TSD facilities. Limited use of off-site commercial TSD facilities is anticipated, provided the affected waste streams can be shown to satisfy the requirements of the performance objective for certification of non-radioactive hazardous waste and the waste acceptance criteria of the off-site facilities. Ongoing waste characterization will be required to determine the most appropriate TSD facility for each waste stream.

  11. Oak Ridge Reservation annual site environmental report for 1996

    SciTech Connect (OSTI)

    1997-10-01

    The US Department of Energy currently oversees activities on the Oak Ridge Reservation (ORR), a government-owned, contractor-operated facility. Three sites compose the reservation: the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Site). The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced the materials for the first atomic bombs. The reservation`s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the US. Both the work carried out for the war effort and subsequent research, development, and production activities have produced (and continue to produce) radiological and hazardous wastes. This document contains a summary of environmental monitoring activities on the ORR and its surroundings. Environmental monitoring on the ORR consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents prior to release into the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; this provides direct measurement of contaminants in air, water, groundwater, soil, foods, biota, and other media subsequent to effluent release into the environment. Environmental surveillance data verify ORR`s compliance status and, combined with data from effluent monitoring, allow the determination of chemical and radiation dose/exposure assessment of ORR operations and effects, if any, on the local environment.

  12. CRAD, Management- Oak Ridge National Laboratory High Flux Isotope Reactor

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Management in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  13. CRAD, Management- Oak Ridge National Laboratory TRU ALPHA LLWT Project

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

  14. Oak Ridge Office

    Office of Environmental Management (EM)

    Martin , Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 I Oak Ridge, Tennessee 37831 Dear Mr. Martin : May 22, 2013 RESPONSE TO YOUR LETTER DATED MAY 9, 2013, RECOMMENDATION 216: RECOMMENDATIONS ON FISCAL YEAR 2015 DOE OAK RIDGE ENVIRONMENT AL MANAGEMENT BUDGET REQUEST Reference: Letter from David Martin to Mark Whitney, Recommendation 216: Recommendation on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request, dated May 9, 2013. I would like to express my

  15. Oak Ridge Reservation environmental report for 1992. Volume 1: Narrative

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1993-09-01

    The two volumes of this report present data and supporting narratives regarding the impact of the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on its environs and the public during 1992. This Volume (Volume 1) includes all narrative descriptions, summaries, and conclusions and is intended to be a ``stand-alone`` report for the reader who does not want to review in detail all of the 1992 data for the ORR. Volume 2 includes the detailed data in formats that ensure all the environmental data are represented. Narratives are not included in Vol. 2.

  16. Environmental Management Advisory Board (EMAB) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board ...

  17. Multimedia environmental management

    SciTech Connect (OSTI)

    Soesilo, J.A.; Wiley, W.D.

    1999-09-01

    This book explores and supports the argument that effective environmental management must be based on a multimedia approach, which focuses simultaneously on air, water, and waste and enables managers to assess the resulting financial, operation, and management benefits. The multimedia approach, which can be used to design an effective compliance program, includes proper waste and material handling management, systematic monitoring, and record keeping requirements. This approach integrates a wide array of environmental requirements and decision processes, which the authors examine in sixteen chapters, organized into four parts: the role of environmental management; environmental aspects of business operation, environmental processes; and environmental management trends. Within these parts, the authors highlight the development of modern environmental management and provide an overview of federal laws pertinent to multimedia environmental management. They examine such issues as chemical storage and transportation, tank system operations and requirements, waste determination, spill response procedures, and employee training. Environmental processes addressed in the book include the management of solid and hazardous waste, wastewater treatment systems, stormwater management, air emission control, and site remediation. The authors also briefly discuss significant initiatives in US environmental management and look toward corporate sustainable development.

  18. Environmental Management Site-Specific Advisory Board Chairs Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 20-21, 2016 DoubleTree Hotel, 215 S. Illinois Ave., Oak Ridge, TN Wednesday, April 20 8:00 am Registration 8:30 am Welcome and Opening Remarks  David Borak, EM SSAB Designated Federal Officer  Warren Gooch, Mayor, City of Oak Ridge  Jay Mullis, Deputy Manager for Environmental Management, Oak Ridge  Belinda Price, Chair, Oak Ridge Site Specific Advisory Board 8:50 am Meeting Overview  Eric Roberts, Facilitator 9:00 am EM Program Update  Mark Whitney, Principal Deputy

  19. Oak Ridge Reservation Annual Site Environmental Report Summary, 2002

    SciTech Connect (OSTI)

    Hughes, JF

    2003-11-25

    The ''State-of-the-Environment'' on and around the Oak Ridge Reservation is a mission of highest importance to the Department of Energy and our contractors. In order to be fully aware of the consequences of our operations and cleanup, an annual multimillion-dollar monitoring and surveillance program collects and analyzes tens of thousands of samples from air, surface and groundwater, soil, mud, plants, and animals. A mission of equal importance is to provide our stakeholders a complete understanding of this program. To do this we publish a detailed Annual Site Environmental Report and this summary document. The raw data is published separately in the Data Volume. All three documents can be found on the web, along with past documents, at http://www.ornl.gov/aser. Though I work on numerous technical documents throughout the year, no document is more important to me than the Annual Site Environmental Report and its Summary because: (1) they represent the efforts of many dedicated environmental scientists who carry out this extensive program, and who work hard to protect and enhance the environment; (2) they set out the programs in great detail to our legislatures, stakeholders, and the public; and (3) the Summary is directed to the public with the hope that the information is understandable and of value in gaining an accurate picture of the Oak Ridge Reservation as a neighbor. I thank the Karns High School students and their teacher for accepting my challenge in writing this Annual Site Environmental Report Summary, for thinking out of the box, for doing such a fine job, and for all the artwork and photographs (the morning coffee in the classroom was greatly appreciated, leaks and all). They were an especially enjoyable class to work with, and I hope you, our stakeholders and the public, find their efforts of value.

  20. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2, Sections 4 through 9: Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU`s) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment and baseline human health evaluation including a toxicity assessment, and a baseline environmental evaluation.

  1. Environmental Survey Report for ORNL: Small Mammal Abundance and Distribution Survey Oak Ridge National Environmental Research Park 2009 - 2010

    SciTech Connect (OSTI)

    Giffen, Neil R; Reasor, R. Scott; Campbell, Claire L.

    2009-12-01

    This report summarizes a 1-year small mammal biodiversity survey conducted on the Oak Ridge National Environmental Research Park (OR Research Park). The task was implemented through the Oak Ridge National Laboratory (ORNL) Natural Resources Management Program and included researchers from the ORNL Environmental Sciences Division, interns in the Oak Ridge Institute for Science and Education Higher Education Research Experiences Program, and ORNL Environmental Protection Services staff. Eight sites were surveyed reservation wide. The survey was conducted in an effort to determine species abundance and diversity of small mammal populations throughout the reservation and to continue the historical inventory of small mammal presence for biodiversity records. This data collection effort was in support of the approved Wildlife Management Plan for the Oak Ridge Reservation, a major goal of which is to maintain and enhance wildlife biodiversity on the Reservation. Three of the sites (Poplar Creek, McNew Hollow, and Deer Check Station Field) were previously surveyed during a major natural resources inventory conducted in 1996. Five new sites were included in this study: Bearden Creek, Rainy Knob (Natural Area 21), Gum Hollow, White Oak Creek and Melton Branch. The 2009-2010 small mammal surveys were conducted from June 2009 to July 2010 on the Oak Ridge National Environmental Research Park (OR Research Park). The survey had two main goals: (1) to determine species abundance and diversity and (2) to update historical records on the OR Research Park. The park is located on the Department of Energy-owned Oak Ridge Reservation, which encompasses 13,580 ha. The primary focus of the study was riparian zones. In addition to small mammal sampling, vegetation and coarse woody debris samples were taken at certain sites to determine any correlations between habitat and species presence. During the survey all specimens were captured and released using live trapping techniques including

  2. Environmental Management System

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous...

  3. E M Environmental Management

    Office of Environmental Management (EM)

    E M Environmental Management safety performance cleanup closure EM RECOVERY ACT TOP LINE MESSAGES * The Department estimates the 6 billion Recovery Act investment has allowed us ...

  4. 1987 Oak Ridge model conference: Proceedings: Volume 2, Environmental protection

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    See the abstract for Volume I for general information on the conference. Topics discussed in Volume II include data management techiques for environmental protection efforts, the use of models in environmental auditing, in emergency plans, chemical accident emergency response, risk assessment, monitoring of waste sites, air and water monitoring of waste sites, and in training programs. (TEM)

  5. Oak Ridge National Laboratory DOE Oak Ridge Environmental Management...

    Office of Environmental Management (EM)

    ... of Nevada to ad- dress their concerns with the planned disposition of the Consoli- dated Edison Uranium Solidifcation Project (CEUSP) material at the Nevada National Security Site. ...

  6. 2014 Oak Ridge Reservation Annual Site Environmental Report

    SciTech Connect (OSTI)

    Hughes, Joan F.

    2015-09-01

    The US Department of Energy’s (DOE’s) Oak Ridge Reservation (ORR) is located in Roane and Anderson counties in East Tennessee, about 40 km (25 miles) from Knoxville. ORR is one of DOE’s most unique and complex sites. It encompasses three major facilities and thousands of employees that perform every mission in the DOE portfolio—energy research, environmental restoration, national security, nuclear fuel supply, reindustrialization, science education, basic and applied research in areas important to US security, and technology transfer. ORR was established in the early 1940s as part of the Manhattan Project for the purposes of enriching uranium and pioneering methods for producing and separating plutonium. Today, scientists at the Oak Ridge National Laboratory (ORNL), DOE’s largest multipurpose national laboratory, conduct world-leading research in advanced materials, alternative fuels, climate change, and supercomputing. The Y-12 National Security Complex (Y-12 or Y-12 Complex) is vital to maintaining the safety, security, and effectiveness of the US nuclear weapons stockpile and reducing the global threat posed by nuclear proliferation and terrorism. The East Tennessee Technology Park (ETTP), a former uranium enrichment complex, is being transitioned to a clean, revitalized industrial park.

  7. Environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1995-09-01

    This document presents an Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG 6) at Oak Ridge National Laboratory (ORNL). This document updates a draft monitoring plan developed in 1993. The draft plan was never finalized awaiting resolution of the mechanisms for addressing RCRA concerns at a site where the CERCLA process resulted in a decision to defer action, i.e., postpone closure indefinitely. Over the past two years the Tennessee Department of Environment and Conservation (TDEC), US Department of Energy (DOE), and US Environmental Protection Agency (EPA) Region IV, have agreed that RCRA authority at the site will be maintained through a post- closure permit; ``closure`` in this case referring to deferred action. Both a Revised Closure Plan (DOE 1995a) and a Post-Closure Permit Application (DOE 1995b) have been developed to document this agreement; relevant portions of the EMP will be included in the RCRA Post-Closure Permit Application. As the RCRA issues were being negotiated, DOE initiated monitoring at WAG 6. The purpose of the monitoring activities was to (1) continue to comply with RCRA groundwater quality assessment requirements, (2) install new monitoring equipment, and (3) establish the baseline conditions at WAG 6 against which changes in contaminant releases could be measured. Baseline monitoring is scheduled to end September 30, 1995. Activities that have taken place over the past two years are summarized in this document.

  8. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    May 9, 2013 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 215:...

  9. Initial site characterization, environmental assessment, and corrective actions for underground storage tank 2315-U, Pine Ridge East Repeater Station, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Eaton, J.M.; Ingram, E.M. )

    1991-02-01

    This document presents the Initial Site Characterization Report and information to date regarding environmental assessment and corrective actions for Underground Storage Tank (UST) 2315-U at the Pine Ridge East Repeater Station, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This document was prepared following guidance in US Environmental Protection Agency (EPA) regulations promulgated under 40 CFR 280. The Pine Ridge East Repeater Station is located on Pine Ridge, which borders the Y-12 Plant to the north. One 64-gallon, asphalt-coated steel tank was located adjacent to the Repeater Station. This tank was used to store gasoline for the station's emergency power generator. Tank 2315-U was exempted from regulation under 40 CFR 280 and Tennessee Department of Health and Environment (TDHE) Rules 1200-1-15.-01 through 1200-1-15-.07 due to size and emergency generator exemptions. Because of an identified release discovered during initial corrective actions, TDHE requirements in revised Rule 1200-1-15-.06, promulgated April 15, 1990, regarding release response and corrective actions, apply to the site (TDHE, 1990). This report documents all activities, including initial abatement, initial site characterization, environmental assessment sampling, and corrective actions conducted to comply with TDHE regulations. Initial site characterization sampling data revealed that benzene, toluene, and xylene (BTX) concentrations exceeded applicable regulatory guidelines and lead values were elevated above levels expected for clean soils. 17 refs., 10 figs., 8 tabs.

  10. Environmental Survey preliminary report, Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1987-11-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the Department of Energy (DOE), Y-12 Plant, conducted November 10 through 21 and December 9 through 11, 1986. This Survey is being conducted by a multidisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Y-12 Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Y-12, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by DOE's Argonne National Laboratory. When completed, the results will be incorporated into the Y-12 Plant Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Y-12 Plant Survey. 80 refs., 76 figs., 61 tabs.

  11. Oak Ridge National Laboratory Environmental Management Portfolio...

    Office of Environmental Management (EM)

    challenges * More than 20 million pounds of mercury were used in early processing of lithium; over 700,000 pounds suspected to have been released to the environment * Four large...

  12. Oak Ridge National Laboratory Environmental Management Portfolio...

    Office of Environmental Management (EM)

    gas handling equipment and 250 ft stack Miles of underground piping and underground tanks Radioactive liquid processing equipment and facilities Contaminated soils ...

  13. Oak Ridge Office of Environmental Management

    Office of Environmental Management (EM)

    ... long-term stewardship, provides for lower cost in terms of needed infrastructure, and ... new disposal facility similar to that for EMWMF. The RIFS incorporates the expense of a ...

  14. Oak Ridge Reservation Annual Site Environmental Report, 2003

    SciTech Connect (OSTI)

    Hughes, JF

    2004-08-24

    This document is prepared annually to summarize environmental activities, primarily environmental-monitoring activities, on the ORR and within the ORR surroundings. The document fulfills the requirement of U.S. Department of Energy (DOE) Order 231.1, ''Environment, Safety and Health Reporting,'' for an annual summary of environmental data to characterize environmental performance. The environmental monitoring criteria are described in DOE Order 450.1, ''Environmental Protection Program''. The results summarized in this report are based on data collected prior to and through 2003. This report is not intended to provide the results of all sampling on the ORR. Additional data collected for other site and regulatory purposes, such as environmental restoration remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws. Corrections to the report for the previous year are found in Appendix A. Environmental monitoring on the ORR consists primarily of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents at the point of release to the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation and chemical exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; these activities provide direct measurement of contaminants in air, water, groundwater, soil, foods, biota, and other media subsequent to effluent release into the environment. Environmental surveillance data provide information regarding conformity with applicable DOE orders

  15. Oak Ridge Reservation Annual Site Environmental Report for 2003

    SciTech Connect (OSTI)

    2004-09-30

    This document is prepared annually to summarize environmental activities, primarily environmental-monitoring activities, on the ORR and within the ORR surroundings. The document fulfills the requirement of U.S. Department of Energy (DOE) Order 231.1, “Environment, Safety and Health Reporting,” for an annual summary of environmental data to characterize environmental performance. The environmental monitoring criteria are described in DOE Order 450.1, “Environmental Protection Program.” The results summarized in this report are based on data collected prior to and through 2003. This report is not intended to provide the results of all sampling on the ORR. Additional data collected for other site and regulatory purposes, such as environmental restoration remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws. Corrections to the report for the previous year are found in Appendix A. Environmental monitoring on the ORR consists primarily of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents at the point of release to the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation and chemical exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; these activities provide direct measurement of contaminants in air, water, groundwater, soil, foods, biota, and other media subsequent to effluent release into the environment. Environmental surveillance data provide information regarding conformity with applicable DOE

  16. 2011 Annual Planning Summary for Oak Ridge Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Oak Ridge Operations Office (OR) (See Environmental Management ...

  17. Environmental baseline survey report for West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge and parcel 21D in the vicinity of the East Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    King, David A.

    2012-11-29

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy?s (DOE?s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only no-further-investigation (NFI) reports. Groundwater sampling was also conducted to support a Parcel 21d decision. Based on available data West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, and West Pine Ridge are not impacted by site operations and are not subject to actions per the Federal Facility Agreement (FFA). This determination is supported by visual inspections, records searches and interviews, groundwater conceptual modeling, approved NFI reports, analytical data, and risk analysis results. Parcel 21d data, however, demonstrate impacts from site

  18. Wildlife Management Plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Giffen, Neil R; Evans, James W.; Parr, Patricia Dreyer

    2007-10-01

    This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

  19. Environmental Requirements Management

    SciTech Connect (OSTI)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  20. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Update and Discussion of Charges to the Board Mark Whitney, Principal Deputy Assistant Secretary for Environmental Management 2:30 p.m. Break 2:45 p.m. Public Comment Period ...

  1. Native Grass Community Management Plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Ryon, Michael G; Parr, Patricia Dreyer; Cohen, Kari

    2007-06-01

    Land managers at the Department of Energy's Oak Ridge National Laboratory in East Tennessee are restoring native warm-season grasses and wildflowers to various sites across the Oak Ridge Reservation (ORR). Some of the numerous benefits to planting native grasses and forbs include improved habitat quality for wildlife, improved aesthetic values, lower long-term maintenance costs, and compliance with Executive Order 13112 (Clinton 1999). Challenges to restoring native plants on the ORR include the need to gain experience in establishing and maintaining these communities and the potentially greater up-front costs of getting native grasses established. The goals of the native grass program are generally outlined on a fiscal-year basis. An overview of some of the issues associated with the successful and cost-effective establishment and maintenance of native grass and wildflower stands on the ORR is presented in this report.

  2. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ENVIRONMENTAL MANAGEMENT ADVISORY BOARD to the U.S. DEPARTMENT OF ENERGY PUBLIC MEETING MINUTES Applied Research Center 301 Gateway Drive, Aiken, South Carolina 29803 May 11, 2016 2 PROCEEDINGS Ms. Kristen Ellis, the EMAB Designated Federal Officer called the Environmental Management Advisory Board meeting to order at 9:00 a.m. EST on Wednesday, May 11, 2016. Board members present: Mr. Sherrell R. Greene, Advanced Technology Insights, LLC Ms. Jane Hedges, Consultant Dr. Carolyn Huntoon,

  3. Environmental Management System

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  4. Comprehensive Environmental Management Process

    SciTech Connect (OSTI)

    Hjeresen, D.L.; Roybal, S.L.

    1994-08-01

    This report contains information about Los Alamos National Laboratory`s Comprehensive Environmental Management Plan. The topics covered include: waste minimization, waste generation, environmental concerns, public relations of the laboratory, and how this plan will help to answer to the demands of the laboratory as their mission changes.

  5. Oak Ridge Reservation Annual Site Environmental Report Summary, 2004

    SciTech Connect (OSTI)

    Hughes, JF

    2005-11-30

    The Department of Energy (DOE) and our contractors strive to provide our stakeholders a comprehensive understanding of the consequences of DOE operations past and present. Toward this end a far-reaching multimillion-dollar annual monitoring and surveillance program collects and analyzes tens of thousands of air, surface and groundwater, soil, mud, plant, and animal samples. This effort represents the work of many dedicated environmental scientists who carry out these extensive programs and work hard to protect and enhance the environment. We publish the results in a detailed Annual Site Environmental Report (ASER), and a separate Data Volume for those who wish to see the supporting data. These documents present all the facts and figures, but are highly technical and not easily understood, and it's essential we provide a summary document simple to read and understand. So each year I team with Karns High School and ask students to write an Annual Site Environmental Report Summary that will be both informative and enjoyable to read. These environmental documents are perhaps the most important DOE reports because they explain the environmental monitoring programs and show the consequences of our operations in great detail to our legislatures, stakeholders, and the public. This ASER summary is written for you, the public, our most important stakeholder, with the hope that you find it comprehensible and of value in gaining an accurate understanding of the Oak Ridge Reservation. All three documents can be found on the web, along with previous publications, at http://www.ornl.gov/aser. It's a great pleasure to meet my new class each year and capture fresh creative ideas. I'm always delighted to see their interest and desire to learn and to produce a document for the public that reflects their personality and skills, and one the public will utilize and find of value. I sincerely thank these talented Karns High School students and their exceptional teacher, Mrs. Heather Bock

  6. DOE - Office of Legacy Management -- Oak Ridge Gaseous Diffusion...

    Office of Legacy Management (LM)

    Oak Ridge Gaseous Diffusion Plant - TN 02 FUSRAP Considered Sites Site: Oak Ridge Gaseous Diffusion Plant (TN.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site ...

  7. Environmental Management Associates | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Environmental Management Associates Jump to: navigation, search Name: Environmental Management Associates Abbreviation: EMA Website: www.emacorp.com Environmental Management...

  8. Oak Ridge Reservation Annual Site Environmental Report Summary, 2003

    SciTech Connect (OSTI)

    Hughes, JF

    2004-12-02

    A mission of foremost importance to the Department of Energy and our contractors is to provide our stakeholders with a complete understanding of the consequences of our operations, both past and present. To do this, an extensive annual multimillion-dollar monitoring and surveillance program collects and analyzes tens of thousands of samples from air, surface and groundwater, soil, mud, plants, and animals. The results are published in a detailed Annual Site Environmental Report available to all. We also publish a separate Data Volume for those who wish to see the raw data. Though these documents present all the facts and figures, they are long, technical, and not always easy to read. Thus, I team with a local high school each year and ask students to write an Annual Site Environmental Report Summary specifically for the public. These documents are perhaps the most important reports the Department of Energy produces. Why? First, they lay out the environmental monitoring programs and the consequences of Department of Energy operations in great detail to our legislatures, stakeholders, and the public; second, they represent the efforts of many dedicated environmental scientists who carry out these extensive programs and work hard to protect and enhance the environment; and third, the summary is written for you, the public, our most important stakeholder, with the hope that you find it understandable and of value in gaining an accurate understanding of the Oak Ridge Reservation. All three documents can be found on the web, along with previous years, at http://www.ornl.gov/aser. Working with a new class each year brings new faces, new personalities, and new creative ideas. The students always amaze me with their interest and desire to produce a document the public will utilize and find of value. I personally thank the Karns High School students and their teacher, Ms Evelyn Hammonds, for accepting my challenge in writing this public document and for thinking out of the

  9. Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1994-09-01

    This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE`s environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  10. DOE Issues Sources Sought/Request for Information for Oak Ridge...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sources SoughtRequest for Information for Oak Ridge Office of Environmental Management Technical Support Services DOE Issues Sources SoughtRequest for Information for Oak Ridge ...

  11. ENVIRONMENTAL BASELINE SURVEY REPORT FOR WEST BLACK OAK RIDGE, EAST BLACK OAK RIDGE, MCKINNEY RIDGE, WEST PINE RIDGE, AND PARCEL 21D IN THE VICINITY OF THE EAST TENNESSEE TECHNOLOGY PARK, OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    David A. King

    2012-11-29

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy’s (DOE’s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. The goal is to obtain all media no-further-investigation (NFI) determinations for the subject parcels considering existing soils. To augment the existing soils-only NFI determinations, samples of groundwater, surface water, soil, and sediment were collected to support all media NFI decisions. The only updates presented here are those that were made after the original issuance of the NFI documents. In the subject parcel where the soils NFI determination was not completed for approval (Parcel 21d), the full process has been performed to address the soils as well. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only NFI

  12. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 228: Recommendation on Fiscal Year 2017 DOE Oak Ridge Environmental Management Budget Request At our June 10, ...

  13. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    on Fiscal Year 2016 DOE Oak Ridge Environmental Management Budget Request At our May 14, 2014, ... Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ...

  14. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Whitney: Recommendation 216: Recommendations on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request At our May 8, ...

  15. Environmental Management Disposal Facility overview

    Energy.gov [DOE]

    This fact sheet provides a brief overview for the need behind the Environmental Management Disposal Facility.

  16. Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-09-01

    The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.

  17. Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3

    SciTech Connect (OSTI)

    Turner, J.W.

    1993-12-01

    US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.

  18. Environmental Monitoring Report - United States Department of Energy, Oak Ridge Facilities, Calendar Year 1984

    SciTech Connect (OSTI)

    Jordan, R.G.

    1999-01-01

    Each year since 1972, a report has been prepared on the environmental monitoring activities for the DOE facilities in oak Ridge, Tennessee, for the previous calendar year. previously, the individual facilities published quarterly and annual progress reports that contained some environmental monitoring data. The environmental monitoring program for 1984 includes sampling and analysis of air, water from surface streams, groundwater, creek sediment, biota, and soil for both radioactive and nonradioactive (including hazardous) materials. Special environmental studies that have been conducted in the Oak Ridge area are included in this report, primarily as abstracts or brief summaries. The annual report for 1984 on environmental monitoring and surveillance of the Oak Ridge community by Oak Ridge Associated Universities (ORAU) is included as an appendix. A brief description of the topography and climate of the Oak Ridge area and a short description of the three DOE facilities are provided below to enhance the reader's understanding of the direction and contents of the environmental monitoring program for Oak Ridge.

  19. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  20. Business Opportunities Session Office of Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Opportunities Session Office of Environmental Management Business Opportunities Session Office of Environmental Management Environmental Clean up PDF icon Business Opportunities ...

  1. PNNL: About - Environmental Management System

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    EMS Graphic The purpose of the Environmental Management System is to achieve and demonstrate environmental excellence by assessing and controlling the impact of Laboratory...

  2. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect (OSTI)

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  3. Environmental Management Advisory Board Subcommittees | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EMAB Environmental Management Advisory Board Subcommittees Environmental Management Advisory Board Subcommittees ACQUISITION AND PROJECT MANAGEMENT SUBCOMMITTEE SUBCOMMITTEE ...

  4. The Office of Environmental Management (EM) Defense Environmental...

    Office of Environmental Management (EM)

    The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management (EM) Defense Environmental Cleanup Microsoft Word - 271C2C7B.doc ...

  5. Environmental management activities

    SciTech Connect (OSTI)

    1997-07-01

    The Office of Environmental Management (EM) has been delegated the responsibility for the Department of Energy`s (DOE`s) cleanup of the nuclear weapons complex. The nature and magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. Within the United States, operational DOE facilities, as well as the decontamination and decommissioning of inactive facilities, have produced significant amounts of radioactive, hazardous, and mixed wastes. In order to ensure worker safety and the protection of the public, DOE must: (1) assess, remediate, and monitor sites and facilities; (2) store, treat, and dispose of wastes from past and current operations; and (3) develop and implement innovative technologies for environmental restoration and waste management. The EM directive necessitates looking beyond domestic capabilities to technological solutions found outside US borders. Following the collapse of the Soviet regime, formerly restricted elite Soviet scientific expertise became available to the West. EM has established a cooperative technology development program with Russian scientific institutes that meets domestic cleanup objectives by: (1) identifying and accessing Russian EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) increasing US private sector opportunities in Russian in EM-related areas.

  6. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.

  7. Resource management plan for the Oak Ridge Reservation. Volume 29, Rare plants on the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Cunningham, M.; Pounds, L.; Oberholster, S.; Parr, P.; Mann, L.; Edwards, L.; Rosensteel, B.

    1993-08-01

    Rare plant species listed by state or federal agencies and found on or near the Department of Energy`s Oak Ridge Reservation (ORR) are identified. Seventeen species present on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these are under review by the US Fish and Wildlife Service for possible listing as threatened or endangered species. Ten species listed by the state occur near and may be present on the ORR; four are endangered in Tennessee, and one is a candidate for federal listing. A range of habitats supports the rare taxa on the ORR: River bluffs, calcareous barrens, wetlands, and deciduous forest. Sites for listed rare species on the ORR have been designated as Research Park Natural Areas. Consideration of rare plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival. In addition, the National Environmental Policy Act requires that federally funded projects avoid or mitigate impacts to listed species. The list of rare plant species and their location on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated.

  8. Categorical Exclusion Determinations: Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued ...

  9. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Oak Ridge Site Specific Advisory Board Recommendation 233: Recommendations on the Proposed Environmental Management Disposal Facility at the U.S. DOE Oak Ridge Reservation Background Much of the Manhattan Project legacy waste for which the Department of Energy (DOE) Oak Ridge Environmental Management (OREM) program is responsible falls under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 (also known as the Superfund Act), which is a federal law

  10. SUSTAINABILITY SUPERSTAR Environmental Management's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management's Donna Green is retiring! Donna began her DOE career at Argonne National Lab in 1998 before moving to EM in 2008 and quickly assuming the lead on their Sustainability program. She has led the charge to integrate sustainable practices into all aspects of the EM mission, and is one of the 2012 DOE Sustainability Award winners for that effort. We wish her well in her new endeavors! Send us your champion! SUSTAINABILITY NEWS 11 DOE Sites Win Awards in EPA 2012 Federal

  11. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    March 14, 2008 Mr. Steve McCracken Assistant Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. McCracken: Recommendation 165: Recommendation on Conducting Future Verifications of Cleanup At our March 12 meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation. The successes of independent verification of cleanup on the Oak Ridge Reservation, the David Witherspoon Site in Knoxville, and at many other sites

  12. Meteorological monitoring sampling and analysis plan for the environmental monitoring plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1995-09-01

    This Sampling and Analysis Plan addresses meteorological monitoring activities that wall be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Lockheed Martin Energy Systems, Inc. Meteorological monitoring of various climatological parameters (e.g., temperature, wind speed, humidity) will be collected by instruments installed at WAG 6. Data will be recorded electronically at frequencies varying from 5-min intervals to 1-h intervals, dependent upon parameter. The data will be downloaded every 2 weeks, evaluated, compressed, and uploaded into a WAG 6 data base for subsequent use. The meteorological data will be used in water balance calculations in support of the WAG 6 hydrogeological model.

  13. Third annual environmental restoration monitoring and assessment report for FY 1994 of the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Clapp, R.B.; Watts, J.A.; Guth, M.A.S.

    1994-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring, field investigations, and assessments conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, providing an ORNL site-wide perspective on types, distribution, and transport of contamination. The results presented are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) Project. WAG 2 is the lower portion of the White Oak Creek system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The Remedial Investigation Plan (DOE 1992) for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and the major conduit of contaminants from the ORNL site. During FY 1992, the remedial investigation activities were integrated with a series of environmental monitoring and SI activities at ORNL that address pathways and processes important for contaminant movement to gain a more integrated perspective of contamination movement at the watershed scale.

  14. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  15. Environmental monitoring and surveillance on the Oak Ridge Reservation: 1995 data

    SciTech Connect (OSTI)

    Hamilton, L.V.

    1996-10-01

    Environmental monitoring and surveillance are conducted on the Oak Ridge Reservation and its environs throughout the year. Environmental monitoring ensures that (1) the reservation is a safe place to work, (2) activities on the reservation do not adversely affect the neighboring communities, and (3) compliance is made with federal and state regulations. This document is a compilation of the monitoring and surveillance data for calendar year 1995. It is a tool for analysts in the fields of environmental monitoring and environmental restoration. The summary information found in the annual site environmental report was drawn from the contents of this document.

  16. Environmental Management Associates | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Environmental Management Associates (Redirected from EMA Associates) Jump to: navigation, search Name: Environmental Management Associates Abbreviation: EMA Website:...

  17. Fernald Environmental Management Project Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald ...

  18. Miamisburg Environmental Management Project Archived Soil & Groundwate...

    Office of Environmental Management (EM)

    Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports ...

  19. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... actions for addressing Office of Environmental Management (EM) Headquarters (HQ) ...

  20. Biomedical and environmental sciences programs at the Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Richmond, C.R.; Johnson, C.A.

    1988-02-01

    This progress report summarizes the research and development activities conducted in the Biomedical and Environmental Sciences Programs of Oak Ridge National Laboratory. The report is structured to provide descriptions of current activities and accomplishments in each of the major organizational units. Following the accounts of research programs, is a list of publications and awards to its members. 6 figs., 14 tabs.

  1. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.; Manis, L.W.; Barre, W.L.

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S&H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures.

  2. Oak Ridge Focuses on Old and New in 2013

    Energy.gov [DOE]

    OAK RIDGE, Tenn. - In 2013, the Oak Ridge Office of Environmental Management completed numerous projects. Some of the major accomplishments involved reaching two long-standing goals and progressing on the design of a new construction project.

  3. Environmental Management (EM) Cleanup Projects

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  4. DOE - Office of Legacy Management -- Fernald Environmental Management...

    Office of Legacy Management (LM)

    Fernald Environmental Management Project - 027 FUSRAP Considered Sites Site: Fernald Environmental Management Project (027) Designated Name: Alternate Name: Location: Evaluation ...

  5. Data Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Bryd, P.

    1994-01-01

    The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.

  6. Assessment of Nonnative Invasive Plants in the DOE Oak Ridge National Environmental Research Park

    SciTech Connect (OSTI)

    Drake, S.J.

    2002-11-05

    The Department of Energy (DOE) National Environmental Research Park at Oak Ridge, Tennessee, is composed of second-growth forest stands characteristic of much of the eastern deciduous forest of the Ridge and Valley Province of Tennessee. Human use of natural ecosystems in this region has facilitated the establishment of at least 167 nonnative, invasive plant species on the Research Park. Our objective was to assess the distribution, abundance, impact, and potential for control of the 18 most abundant invasive species on the Research Park. In 2000, field surveys were conducted of 16 management areas on the Research Park (14 Natural Areas, 1 Reference Area, and Walker Branch Watershed) and the Research Park as a whole to acquire qualitative and quantitative data on the distribution and abundance of these taxa. Data from the surveys were used to rank the relative importance of these species using the ''Alien Plant Ranking System, Version 5.1'' developed by the U.S. Geological Survey. Microstegium (Microstegium vimineum) was ranked highest, or most problematic, for the entire Research Park because of its potential impact on natural systems, its tendency to become a management problem, and how difficult it is to control. Microstegium was present in 12 of the 16 individual sites surveyed; when present, it consistently ranked as the most problematic invasive species, particularly in terms of its potential impact on natural systems. Japanese honeysuckle (Lonicera japonica) and Chinese privet (Ligustrum sinense) were the second- and third-most problematic plant species on the Research Park; these two species were present in 12 and 9 of the 16 sites surveyed, respectively, and often ranked second- or third-most problematic. Other nonnative, invasive species, in decreasing rank order, included kudzu (Pueraria montma), multiflora rose (Rosa multiflora), Chinese lespedeza (Lespedeza cuneara), and other species representing a variety of life forms and growth forms. Results of

  7. ISO 14000 environmental management standard

    SciTech Connect (OSTI)

    Block, M.R.

    1995-12-01

    National standards organizations around the world are developing an environmental management standard to help organizations address significant environmental aspects of their activities. This standard, designated ISO 14000, will provide guidance for environmental management systems: environmental audits: Environmental performance evaluation: Environmental labeling and life-cycle assessment. The environmental management system specification, the lynch-pin of ISO 14000, will be published as an international standard in early 1996. Audit documents will follow shortly thereafter. Although conformance to ISO 14000 will be voluntary, US multinational companies are likely to discover that failure to participate creates trade barriers in Europe. The Environmental Commission created by NAFTA also is considering whether to make adherence to ISO 14000 a condition of trade. This presentation will provide an understanding of the ISO process to create the standard, key elements of ISO 14000, and implications for US companies. Such an understanding will enable organizations to determine whether adoption of ISO 14000 is strategically sound.

  8. Approach and Strategy for Performing Ecological Risk Assessments for the Department of Energy Oak Ridge Field Office Environmental Restoration Program

    SciTech Connect (OSTI)

    Suter, G.W. II

    1992-01-01

    This technical memorandum provides guidance for planning and performing ecological risk assessments (ERAs) on the Oak Ridge Reservation (ORR). This work was performed under Work Breakdown Structure 1.4.12.2.3.04.07.02 (Activity Data Sheet 8304) and meets an Environmental Restoration Program milestone for FY 95. The strategy discussed in this report is consistent with the overall strategy for site management and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) compliance developed for the ORR and relevant U.S. Environmental Protection Agency documents and guidance. The general approach and strategy presented herein was developed for the ORR, but it could be applicable to other complex CERCLA sites that possess significant ecological resources.

  9. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.

  10. Independent Oversight Environment, Oak Ridge National Laboratory - June

    Office of Environmental Management (EM)

    2006 | Department of Energy Environment, Oak Ridge National Laboratory - June 2006 Independent Oversight Environment, Oak Ridge National Laboratory - June 2006 June 2006 Inspection of the Environmental Management Program at the Oak Ridge National Laboratory This report documents the results of an inspection of the environment, safety, and health programs for the environmental management program activities at the Department of Energy's (DOE) Oak Ridge National Laboratory. The inspection was

  11. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  12. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This report is the 1992--1994 Program Director`s Overview Report for Oak Ridge National Laboratory`s (ORNL`s) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  13. Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

    Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

  14. Update of the management strategy for Oak Ridge National Laboratory Liquid Low-Level Waste

    SciTech Connect (OSTI)

    Robinson, S.M.; Abraham, T.J.; DePaoli, S.M.; Walker, A.B.

    1995-04-01

    The strategy for management of the Oak Ridge National Laboratory`s (ORNL) radioactively contaminated liquid waste was reviewed in 1991. The latest information available through the end of 1990 on waste characterization, regulations, US Department of Energy (DOE) budget guidance, and research and development programs was evaluated to determine how the strategy should be revised. Few changes are needed to update the strategy to reflect new waste characterization, research, and regulatory information. However, recent budget guidance from DOE indicates that minimum funding will not be sufficient to accomplish original objectives to upgrade the liquid low-level waste (LLLW) system to comply with the Federal Facilities Agreement, provide long-term LLLW treatment capability, and minimize environmental, safety, and health risks. Options are presented that might allow the ORNL LLLW system to continue operations temporarily, but they would significantly reduce its capabilities to handle emergency situations, provide treatment for new waste streams, and accommodate waste from the Environmental Restoration Program and from decontamination and decommissioning of surplus facilities. These options are also likely to increase worker radiation exposure, risk of environmental insult, and generation of solid waste for on-site and off-site disposal/storage beyond existing facility capacities. The strategy will be fully developed after receipt of additional guidance. The proposed budget limitations are too severe to allow ORNL to meet regulatory requirements or continue operations long term.

  15. Oak Ridge's EM Program Realizes Successful 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge's EM Program Realizes Successful 2010 Oak Ridge's EM Program Realizes Successful 2010 February 7, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Cleanup at the Oak Ridge Reservation took a major leap forward in 2010, as the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) completed numerous projects that reduced risks, decreased the site's footprint, and paved the way for new development for DOE missions. Major accomplishments were completed across the Oak Ridge

  16. Environmental health and safety plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Burman, S.N.; Tiner, P.F.; Gosslee, R.C.

    1998-01-01

    The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Molten Salt Reactor Experiment (MSRE) facility at the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) are guided by an overall plan and consistent proactive approach to environmental protection and safety and health (S and H) issues. The policy and procedures in this plan apply to all MSRE operations. The provisions of this plan are to be carried out whenever activities are initiated at the MSRE that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and the best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air.

  17. Total Quality Management at an Oak Ridge laboratory and the establishment of an internal quality program

    SciTech Connect (OSTI)

    Dorsey, J.G.

    1993-11-01

    In order for any laboratory to be successful today, it is imperative that a total commitment to quality management be the keystone of that laboratory. Modern industry has begun to recognize that it must reach beyond traditional Quality Assurance methods and enlist the participation of all members of the organization for their unique contributions to make their organizations truly excellent. This report discusses Total Quality Management in the Analytical Services Organization at Oak Ridge, Tennessee. Laboratories are in the Y-12 Plant, which is one of three government sites located in Oak Ridge that are managed by Martin Marietta Energy Systems for the Department of Energy (DOE).

  18. 2013 Federal Energy and Water Management Award Winner Oak Ridge...

    Energy.gov (indexed) [DOE]

    More Documents & Publications An Approach to Sustainability that Improves Environmental and Safety Performance EA-1575: Final Environmental Assessment EA-1575: Finding of No ...

  19. CRAD, Configuration Management- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Configuration Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory, High Flux Isotope Reactor.

  20. CRAD, Emergency Management- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Emergency Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  1. CRAD, Management- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Management portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  2. CRAD, Configuration Management- Oak Ridge National Laboratory High Flux Isotope Reactor

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Configuration Management Program in preparation for restart of the Oak Ridge National Laboratory, High Flux Isotope Reactor.

  3. CRAD, Emergency Management- Oak Ridge National Laboratory High Flux Isotope Reactor

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Emergency Management Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  4. Total quality environmental management: Integrating environmental and quality management systems

    SciTech Connect (OSTI)

    Carley, J.A.; Kubala, G.; Hudson, T.

    1996-11-01

    As the oilfield industry strives to globally sustain continuous movement of environmental and quality performance, companies have come to realize Total Quality Environmental Management (TQEM) is essential in product research, development manufacturing and services. As our industry endeavors to continuously improve, more emphasis is being placed upon the management systems we apply such as ISO 14000 and ISO 9000. These standards are tools for improving environmental and quality performance, meeting customer requirements, and increasing profitability. lbs paper presents actual examples of the successful integration of environmental and quality management systems into an operational TQEM system. Also presented are pilot study evaluations of the draft ISO 14000 standards by two certified ISO 9000 facilities. Examples of continuous improvement and cross-functional teams as means to merge environment and quality management into the functions of process control, corrective and preventive action, document control, and waste management are presented. Results and improvements from facilities involved with TQEM discussed along with their strategies and progress in consolidating the environmental and quality programs into a single, viable management system. The case histories from various facilities demonstrate the implementation of TQEM and in TQEM promotes a cleaner environment, reduces costs, con- serves energy and raw materials, minimizes pollutants and wastes, and reduces redundant paperwork.

  5. Oak Ridge Cleanup Areas | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Management » Environmental Stewardship » Oak Ridge Cleanup Areas Oak Ridge Cleanup Areas Employees conduct soil and water samples to determine which areas require cleanup. Employees conduct soil and water samples to determine which areas require cleanup. On November 21, 1989, the Environmental Protection Agency placed the Department of Energy's Oak Ridge site on its National Prioritization List (NPL). The list names national priorities where there are known or threatened releases of

  6. FY 2014 Economic Impact Analysis for DOE's Oak Ridge Office of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management | Department of Energy FY 2014 Economic Impact Analysis for DOE's Oak Ridge Office of Environmental Management FY 2014 Economic Impact Analysis for DOE's Oak Ridge Office of Environmental Management The primary mission of the Department of Energy's Oak Ridge Office of Environmental Management (OREM) is to protect the region's health and environment, enable the Department's vital missions locally, and make clean land available for future use. To accomplish this, we

  7. Keynote Address: Update on Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Address: Update on Environmental Management Keynote Address: Update on Environmental Management Keynote presentation made by David G. Huizenga for the NTSF annual meeting held from ...

  8. Advanced simulation capability for environmental management ...

    Office of Scientific and Technical Information (OSTI)

    environmental management (ASCEM): An overview of initial results Citation Details In-Document Search Title: Advanced simulation capability for environmental management (ASCEM): An ...

  9. Report to the Environmental Management Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Report to the Environmental Management Advisory Board Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted ...

  10. Transition of Sites from Environmental Management Memorandum...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from ...

  11. Environmental Management and Remediation Committee Roster | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management and Remediation Committee Roster Environmental Management and Remediation Committee Roster List of NNMCAB members that participate on the Environmental Monitoring and ...

  12. Waste Management Programmatic Environmental Impact Statement...

    Office of Environmental Management (EM)

    Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) ...

  13. Environmental Management Consolidated Business Center (EMCBC) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Services » Program Management » Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) SITE OVERVIEW The Department of Energy (DOE) established the EMCBC in Cincinnati, OH, on June 7, 2004, to provide Environmental Management customers with required and improved business and technical support services. Establishing the EMCBC allowed EM's Closure

  14. Joint Environmental Management System (EMS) Declaration of Conformance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of ...

  15. Groundwater level monitoring sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This Sampling and Analysis Plan addresses groundwater level monitoring activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Groundwater level monitoring will be conducted at 129 sites within the WAG. All of the sites will be manually monitored on a semiannual basis. Forty-five of the 128 wells, plus one site in White Oak Lake, will also be equipped with automatic water level monitoring equipment. The 46 sites are divided into three groups. One group will be equipped for continuous monitoring of water level, conductivity, and temperature. The other two groups will be equipped for continuous monitoring of water level only. The equipment will be rotated between the two groups. The data collected from the water level monitoring will be used to support determination of the contaminant flux at WAG 6.

  16. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995

    SciTech Connect (OSTI)

    1995-07-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  17. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 2: January--March 1995

    SciTech Connect (OSTI)

    1995-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  18. Oak Ridge Site Specific Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831

    Office of Environmental Management (EM)

    October 16, 2012 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 211 : Recommendation on Availability of DOE Environmental Management Documents At our October 10, 2012, meeting the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation regarding the availability and finding of documents online through the DOE Information Center. The board recommends that steps be taken to

  19. Annual Report on Environmental Monitoring Activities for FY 1995 (Baseline Year) at Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-06-01

    This report describes baseline contaminant release conditions for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). The sampling approach and data analysis methods used to establish baseline conditions were presented in ``Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (EMP).`` As outlined in the EMP, the purpose of the baseline monitoring year at WAG 6 was to determine the annual contaminant releases from the site during fiscal year 1995 (FY95) against which any potential changes in releases over time could be compared. The baseline year data set provides a comprehensive understanding of release conditions from all major waste units in the WAG through each major contaminant transport pathway. Due to a mandate to reduce all monitoring work, WAG 6 monitoring was scaled back and reporting efforts on the baseline year results are being minimized. This report presents the quantified baseline year contaminant flux conditions for the site and briefly summarizes other findings. All baseline data cited in this report will reside in the Oak Ridge Environmental Information system (OREIS) database, and will be available for use in future years as the need arises to identify potential release changes.

  20. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA...

    Energy Savers

    Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA,...

  1. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA...

    Office of Environmental Management (EM)

    Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 ...

  2. Environmental Management Science Program Workshop

    SciTech Connect (OSTI)

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  3. Oak Ridge Reservation environmental report for 1992. Volume 2: Data presentation

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1993-09-01

    The two volumes of this report present data and supporting narratives regarding the impact of the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on its environs and the public during 1992. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a ``stand-alone`` report for the reader who does not want to review in detail all of the 1992 data for the ORR. This volume (volume 2) includes the detailed data in formats that ensure all the environmental data are presented. Narratives are not included in Vol. 2.

  4. Heritage Is a Part of DOE Advisory Board Secretary’s Interest in Environmental Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE)

    Oak Ridge Site Specific Advisory Board secretary Lisa Hagy says the board is an important link between the community and the DOE Oak Ridge Environmental Management Program.

  5. Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

  6. DOE seeks candidates for environmental advisory board vacancies

    Energy.gov [DOE]

    OAK RIDGE, Tenn.—The Department of Energy’s Oak Ridge Office of Environmental Management is seeking volunteers to fill vacancies on the Oak Ridge Site Specific Advisory Board (ORSSAB).

  7. REPORT OF SURVEY OF OAK RIDGE BUILDING 3597 HOT STORAGE GARDEN

    Office of Environmental Management (EM)

    OF SURVEY OF OAK RIDGE BUILDING 3597 HOT STORAGE GARDEN U.S. Department of Energy Office of Environmental Management & Office of Science Report of Survey of Oak Ridge Building 3597 ...

  8. DOE Office of Environmental Management Project and Contract Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Improvement Timeline | Department of Energy Acquisition » DOE Office of Environmental Management Project and Contract Management Improvement Timeline DOE Office of Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. View some highlights of EM's improvement actions here. DOE Office of Environmental Management Contract and Project Management

  9. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3, Appendixes 1 through 8: Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU`S) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment from doses to humans and animals and associated cancer risks, exposure via food chains, and historical data. (CBS)

  10. The Office of Environmental Management Non-Defense Environmental...

    Energy Savers

    Non-Defense Environmental Cleanup The Office of Environmental Management Non-Defense Environmental Cleanup Microsoft Word - 8E2A4440.doc (100.45 KB) More Documents & Publications ...

  11. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    SciTech Connect (OSTI)

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  12. PIA - Environmental Management Consolidated Business Center (EMCBC) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) (3.42 MB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 LM Records Handling System (LMRHS01) - Rocky

  13. Project management plan for the isotopes facilities deactivation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-08-01

    Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project.

  14. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Oak Ridge National Laboratory Site Office (OSO) OSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 National Environmental Policy Act

  15. Bechtel Environmental Integrated Database Management System

    Energy Science and Technology Software Center (OSTI)

    1995-04-11

    Bechtel Environmental Integrated Data Management System (BEIDMS1.4) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  16. Alaska Tribal Conference on Environmental Management

    Energy.gov [DOE]

    The Alaska Tribal Conference on Environmental Management is hosting its annual gathering that bring together tribes, nonprofits, and state and federal organizations for a week of environmental conversations.

  17. Final Environmental Impact Statement for Treating Transuranic (TRU)/Alpha Low-level Waste at the Oak Ridge National Laboratory Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    N /A

    2000-06-30

    The DOE proposes to construct, operate, and decontaminate/decommission a TRU Waste Treatment Facility in Oak Ridge, Tennessee. The four waste types that would be treated at the proposed facility would be remote-handled TRU mixed waste sludge, liquid low-level waste associated with the sludge, contact-handled TRU/alpha low-level waste solids, and remote-handled TRU/alpha low-level waste solids. The mixed waste sludge and some of the solid waste contain metals regulated under the Resource Conservation and Recovery Act and may be classified as mixed waste. This document analyzes the potential environmental impacts associated with five alternatives--No Action, the Low-Temperature Drying Alternative (Preferred Alternative), the Vitrification Alternative, the Cementation Alternative, and the Treatment and Waste Storage at Oak Ridge National Laboratory (ORNL) Alternative.

  18. Oak Ridge Site Specific Advisory Board | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Site Specific Advisory Board Oak Ridge Site Specific Advisory Board 2016 ORSSAB members are pictured with representatives from DOE, EPA, and TDEC. 2016 ORSSAB members are pictured with representatives from DOE, EPA, and TDEC. The Oak Ridge Site Specific Advisory Board (ORSSAB) is a federally appointed citizens' panel that provides independent advice and recommendations to the U.S. Department of Energy (DOE)'s Oak Ridge Office of Environmental Management. History The board, formed in

  19. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Energy OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART Download Printable Version Mission & Functions Statement for the Office of Environmental Management

    Tim Jackson (208) 526-8484 For Immediate Release May 29, 2014 Public invited to comment on Draft Environmental Assessment on the Disposition of Five Signature Properties at Idaho National Laboratory The

  20. Hanford Site environmental management specification

    SciTech Connect (OSTI)

    Grygiel, M.L.

    1998-06-10

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  1. Department of Energy Idaho - Environmental Management

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final...

  2. Environmental Resources Management ERM | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Resources Management ERM Jump to: navigation, search Name: Environmental Resources Management (ERM) Place: United Kingdom Sector: Services Product: ERM is a provider of consulting...

  3. West Valley Demonstration Project Waste Management Environmental...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Waste Management Environmental Impact Statement ... June 7, 2006 WVDP Waste Management US - Supplement Analysis Table of Contents 1.0 PURPOSE ...

  4. Alaska Tribal Conference on Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alaska Tribal Conference on Environmental Management Alaska Tribal Conference on Environmental Management October 26, 2015 8:00AM PDT to October 29, 2015 5:00PM PDT Anchorage,...

  5. WIPP Documents - Environmental Management and Sustainability

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Management and Sustainability WIPP Environmental Policy Statement DOE/WIPP 04-3310, Rev 6 Environmental Management System Description DOE/WIPP-05-3318, Rev 6 WIPP Site Sustainability Plan DOE/WIPP-14-3542

  6. Environmental Management Performance Report 11/1999

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  7. ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ENERGY ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD (EM SSAB) HANFORD Application No. (Please leave blank) MEMBERSHIP APPLICATION (December 2015)...

  8. Oak Ridge Office of Environmental Management Pursues Vision of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    December 27, 2012 - 12:00pm Addthis Demolition of K-25, DOEs largest-ever demolition project, is ongoing. Demolition of K-25, DOE's largest-ever demolition project, is ...

  9. Oak Ridge Environmental Management Program Completes Work at...

    Energy.gov (indexed) [DOE]

    program recently completed upgrades and soil remediation work at the Bethel Valley ... and 3. This included removing contaminated soil ("hot spots"), diverting clean groundwater ...

  10. Independent Oversight Review, URS CH2M Oak Ridge - June 2013...

    Energy.gov (indexed) [DOE]

    Oak Ridge Environmental Management Radiological Controls Activity Level Implementation The purpose of this set of facility specific Independent Oversight targeted reviews is to...

  11. Oak Ridge Lays Out Big Plans for 2012

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Last year, Oak Ridge’s Environmental Management (EM) program logged one of its most successful years due to sound project management and achievements in American Recovery and Reinvestment Act work.

  12. Environmental Management Advisory Board Subcommittees | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy EMAB » Environmental Management Advisory Board Subcommittees Environmental Management Advisory Board Subcommittees ACQUISITION AND PROJECT MANAGEMENT SUBCOMMITTEE SUBCOMMITTEE PURPOSE: The Subcommittee will provide advice, information, and recommendations to the Assistant Secretary for Environmental Management (EM) relating to project management. Although, EM has a solid performance record for cleanup projects, EM must improve its ability to deliver all projects within cost and on

  13. Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request | Department

    Office of Environmental Management (EM)

    of Energy 9 : FY 2014 DOE Oak Ridge EM Budget Request Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request At the April 11, 2012, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations regarding the FY 2014 DOE Oak Ridge Environmental Management Program budget request. Recommendation 209 (91.1 KB) DOE response to recommendation 209 (81.13 KB) More Documents & Publications Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request Recommendation

  14. Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request | Department of

    Office of Environmental Management (EM)

    Energy 197: FY 2013 DOE Oak Ridge EM Budget Request Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request At the May 26, 2011, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations regarding the FY 2013 DOE Oak Ridge Environmental Management Program budget request. Recommendation 197 (181.59 KB) DOE response to recommendation 197 (18.48 KB) More Documents & Publications Recommendation 189: FY 2012 DOE Oak Ridge EM Budget Request Recommendation

  15. Line Management Perspective: Office of Environmental Management (EM)

    Energy.gov [DOE]

    Slide Presentation by Matthew Moury, Deputy Assistant Secretary for Safety, Security and Quality Programs, Office of Environmental Management. EFCOG Integrated Safety Management Work Planning and Control.

  16. FY 2015 Environmental Management Budget Request to Congress ...

    Office of Environmental Management (EM)

    Environmental Management Budget Request to Congress FY 2015 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2015 ...

  17. Protocol_for_Environmental_Management_Cleanup_Projects_(clean...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf PDF icon ProtocolforEnvironmentalManagement...

  18. FY 2012 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Environmental Management Budget Request to Congress FY 2012 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2012 ...

  19. FY 2014 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Budget Request to Congress FY 2014 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2014 ...

  20. FY 2010 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0 Environmental Management Budget Request to Congress FY 2010 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2010 ...

  1. DOE - NNSA/NFO -- Photo Library Environmental Management

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental Management NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Photo Library - Environmental Management The Environmental Management Program VisionMission ...

  2. 2012 Annual Planning Summary for Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management 2012 Annual Planning Summary for Environmental Management The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 ...

  3. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Danielle Miller (208) 526-5709 For Immediate Release May 30, 2014 OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER Idaho Falls, ID - The U.S. Department of Energy Office of Environmental Management today announced that John (Jack) Zimmerman has been named Deputy Manager of its highly-successful Idaho Cleanup program, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Mr. Zimmerman has more than 25 years of experience in nuclear

  4. Department of Energy Completes Five Recovery Act Projects- Moves Closer to Completing Recovery Act Funded Work at Oak Ridge Site

    Energy.gov [DOE]

    OAK RIDGE, Tenn. - The U.S. Department of Energy’s (DOE) Environmental Management (EM) program recently completed five projects at the Oak Ridge site funded through the American Recovery and Reinvestment Act.

  5. Environmental Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Systems Environmental Management Systems DOE uses Environmental Management Systems already in place at DOE facilities as a management framework to determine and achieve sustainability goals and targets. The Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade, directs agencies to continue implementation of formal EMS where those systems have

  6. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    SciTech Connect (OSTI)

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

  7. Hanford Site Environmental Management Specification

    SciTech Connect (OSTI)

    DAILY, J.L.

    2001-05-25

    The US Department of Energy, Richland Operations Office (RL) has established a document hierarchy as part of its integrated management system. The Strategic Plan defines the vision, values, missions, strategic goals, high-level outcomes, and the basic strategies in achieving those outcomes. As shown in Figure 1-1, the Site Specification derives requirements from the Strategic Plan and documents the top-level mission technical requirements for the work involved in the RL Hanford Site cleanup and infrastructure activities under the responsibility of the U.S. Department of Energy, Office of Environmental Management (EM). It also provides the basis for all contract technical requirements. Since this is limited to the EM work, neither the Fast Flux Test Facility (FFTF) nor the Pacific Northwest National Laboratory (PNNL) non-EM science activities are included. Figure 1-1 also shows the relationship between this Site Specification and the other Site management and planning documents. Similarly, the documents, orders, and laws referenced in this document represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  8. OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART Download Printable Version Mission & Functions Statement for the Office of Environmental Management

  9. Phase 1 environmental report for the Advanced Neutron Source at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Blasing, T.J.; Brown, R.A.; Cada, G.F.; Easterly, C.; Feldman, D.L.; Hagan, C.W.; Harrington, R.M.; Johnson, R.O.; Ketelle, R.H.; Kroodsma, R.L.; McCold, L.N.; Reich, W.J.; Scofield, P.A.; Socolof, M.L.; Taleyarkhan, R.P.; Van Dyke, J.W.

    1992-02-01

    The US Department of Energy (DOE) has proposed the construction and operation of the Advanced Neutron Source (ANS), a 330-MW(f) reactor, at Oak Ridge National Laboratory (ORNL) to support neutron scattering and nuclear physics experiments. ANS would provide a steady-state source of neutrons that are thermalized to produce sources of hot, cold, and very coal neutrons. The use of these neutrons in ANS experiment facilities would be an essential component of national research efforts in basic materials science. Additionally, ANS capabilities would include production of transplutonium isotopes, irradiation of potential fusion and fission reactor materials, activation analysis, and production of medical and industrial isotopes such as {sup 252}Cf. Although ANS would not require licensing by the US Nuclear Regulatory Commission (NRC), DOE regards the design, construction, and operation of ANS as activities that would produce a licensable facility; that is, DOE is following the regulatory guidelines that NRC would apply if NRC were licensing the facility. Those guidelines include instructions for the preparation of an environmental report (ER), a compilation of available data and preliminary analyses regarding the environmental impacts of nuclear facility construction and operation. The ER, described and outlined in NRC Regulatory Guide 4.2, serves as a background document to facilitate the preparation of environmental impact statements (EISs). Using Regulatory Guide 4.2 as a model, this ANS ER provides analyses and information specific to the ANS site and area that can be adopted (and modified, if necessary) for the ANS EIS. The ER is being prepared in two phases. Phase 1 ER includes many of the data and analyses needed to prepare the EIS but does not include data or analyses of alternate sites or alternate technologies. Phase 2 ER will include the additional data and analyses stipulated by Regulatory Guide 4.2.

  10. Environmental analysis of the operation of Oak Ridge National Laboratory (X-10 site)

    SciTech Connect (OSTI)

    Boyle, J.W.; Blumberg, R.; Cotter, S.J.

    1982-11-01

    An environmental analysis of the operation of the Oak Ridge National Laboratory (ORNL) facilities in Bethel Valley and Melton Valley was conducted to present to the public information concerning the extent to which recognizable effects, or potential effects, on the environment may occur. The analysis addresses current operations of the ORNL X-10 site and completed operations that may continue to have residual effects. Solid wastes from ORNL operations at the Y-12 site which are transported to the X-10 site for burial (e.g., Biology Division animal wastes) are included as part of X-10 site operation. Socioeconomic effects are associated primarily with the communities where employees live and with the Knoxville Bureau of Economic Analysis economic area as a whole. Therefore, ORNL employees at both Y-12 and X-10 sites are included in the ORNL socioeconomic impact analysis. An extensive base of environmental data was accumulated for this report. Over 80 reports related to ORNL facilities and/or operations are cited as well as many open-literature citations. Environmental effects of the operation of ORNL result from operational discharges from the onsite facilities; construction and/or modification of facilities, transportation to and from the site of persons, goods and services; socioeconomic impacts to the local, regional, and general population; and accidental discharges if they should occur. Operational discharges to the environnment are constrained by federal, state, and local regulations and by criteria established by the US Department of Energy to minimize adverse impacts. It is the purpose of this document to evaluate the operation of the ORNL insofar as impacts beyond the site boundary may occur or have the potential for occurrence.

  11. Environmental Management and Planning Solutions, Inc | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Environmental Management and Planning Solutions, Inc Jump to: navigation, search Name: Environmental Management and Planning Solutions, Inc Abbreviation: EMPSi Website:...

  12. 2013 Annual Planning Summary for the Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Consolidated Business Center 2013 Annual Planning Summary for the Environmental Management Consolidated Business Center The ongoing and projected...

  13. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

  14. Oak Ridge EM Program Upgrades Environmental Database for Public’s Ease of Use

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – Oak Ridge is working to remediate contaminated areas in one of the EM program’s most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War.

  15. Categorical Exclusion Determinations: Environmental Management | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Categorical Exclusion Determinations: Environmental Management Categorical Exclusion Determinations issued by Environmental Management. DOCUMENTS AVAILABLE FOR DOWNLOAD October 13, 2011 CX-006923: Categorical Exclusion Determination Design and Install a Modification to the HB-Line Exhaust Fan Dampers CX(s) Applied: B2.5 Date: 10/13/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management October 13, 2011 CX-006920: Categorical Exclusion Determination Install

  16. Advanced Simulation Capability for Environmental Management (ASCEM) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) ASCEM is being developed to provide a tool and approach to facilitate robust and standardized development of performance and risk assessments for cleanup and closure activities throughout the EM complex. The ASCEM team is composed of scientists from eight National

  17. 2014 Annual Planning Summary for the Office of Environmental Management

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Environmental Management.

  18. Oak Ridge National Laboratory Technology Logic Diagram. Volume 3, Technology evaluation data sheets: Part C, Robotics/automation, Waste management

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Oak Ridge National Laboratory Technology Logic Diagram (TLD) was developed to provide a decision support tool that relates environmental restoration (ER) and waste management (WM) problems at Oak Ridge National Laboratory (ORNL) to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to decontamination and decommissioning (D&D), remedial action (RA), and WM activities. The TLD consists of three fundamentally separate volumes: Vol. 1, Technology Evaluation; Vol. 2, Technology Logic Diagram and Vol. 3, Technology EvaLuation Data Sheets. Part A of Vols. 1 and 2 focuses on RA. Part B of Vols. 1 and 2 focuses on the D&D of contaminated facilities. Part C of Vols. 1 and 2 focuses on WM. Each part of Vol. 1 contains an overview of the TM, an explanation of the problems facing the volume-specific program, a review of identified technologies, and rankings of technologies applicable to the site. Volume 2 (Pts. A. B. and C) contains the logic linkages among EM goals, environmental problems, and the various technologies that have the potential to solve these problems. Volume 3 (Pts. A. B, and C) contains the TLD data sheets. This volume provides the technology evaluation data sheets (TEDS) for ER/WM activities (D&D, RA and WM) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than is given for the technologies in Vol. 2.

  19. Designation of Environmental Management Federal Project Director...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  20. Designation of Environmental Management Federal Project Director...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental Management Federal Project Director for Separations Process Research Unit by feinberg DesignationofEMFedProjDir-SeparationsProcessResearchUnit-FeinbergEM.pdf -- PDF...

  1. Environmental Management Performance Reports - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Impact Statements Environmental Management Performance Reports FY 2016 Reports FY 2015 Reports FY 2014 Reports FY 2013 Reports FY 2012 Reports FY 2011 Reports FY 2010 ...

  2. Bureau of Land Management - Final Programmatic Environmental...

    Open Energy Information (Open El) [EERE & EIA]

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the...

  3. Vermont Department of Environmental Conservation, Watershed Management...

    Open Energy Information (Open El) [EERE & EIA]

    Strategy Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Department of Environmental Conservation, Watershed Management Division Surface Water...

  4. Vermont Department of Environmental Conservation, Watershed Management...

    Open Energy Information (Open El) [EERE & EIA]

    Strategy Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Department of Environmental Conservation, Watershed Management Division...

  5. ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT

    Office of Scientific and Technical Information (OSTI)

    Key words: Environmental management; Simulation; Model; ... (GS-3, GS-4). 5. Develop predictive capabilities to ... to queue systems that control access Usability ...

  6. Fernald Environmental Management Project Director's Findings...

    Office of Environmental Management (EM)

    minimize potential environmental impacts to Paddy's Run, a best management practices (BMP) plan for the control of industrial wastes and other wastes that may be discharge from ...

  7. Department of Energy Environmental Management Consolidated Business...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Consolidated Business Center 250 East 5 th Street, Suite 500 Cincinnati, Ohio 45202 Media Contact: Lynette Chafin 513-246-0461 December 17, 2015 ...

  8. Contract Awarded for Environmental Management Consolidated Business...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Consolidated Business Center Mission Support Contract Awarded for ... DeliveryIndefinite Quantity (IDIQ) contract to SUNSi JV, LLC, of Pocatello, ID. ...

  9. Environmental Management Los Alamos Field Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alamos National Laboratory in northern New Mexico. The Environmental Management Los Alamos Field Office (EM-LA) is located at Los Alamos National Laboratory in northern New Mexico. ...

  10. Integrated Safety Management and Environmental Management

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Laboratory | Department of Energy Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory (265.91 KB) More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory PIA -

  11. Environmental Management Performance Report July 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  12. Type B Accident Investigation of the Subcontractor Employee Injuries from a November 15, 2000, Fall Accident at the Oak Ridge National Laboratory

    Energy.gov [DOE]

    On November 15, 2000, an accident occurred at the U. S. Department of Energy (DOE) Oak Ridge National Laboratory located in Oak Ridge, Tennessee. An employee of Decon and Recovery Services of Oak Ridge, LLC (DRS), working on an Oak Ridge Operations Office (ORO) Environmental Management decommissioning and demolition project received serious injuries from a fall (approximately 13 feet) from a fixed ladder.

  13. Competitive energy management and environmental technologies: Proceedings

    SciTech Connect (OSTI)

    1995-03-01

    This book contains the proceedings of the 17th World Energy Engineering Congress 4th Environmental Technology Expo held in December of 1994. The topics of the papers presented at this meeting include environmental management, water resource efficiency, energy management strategies, advances in lighting efficiency and applications, HVAC systems, competitive power technologies, federal energy management programs, and demand-side management. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  14. Environmental Management Richland Operations Office FY 2014 President's Budget FY 2015 Budget Request Regulator Briefing

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management

  15. Federal-Contractor Partnership Allows Continued Waste Processing in Oak Ridge

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM’s Oak Ridge Office of Environmental Management and two of its contractors — URS I CH2M Oak Ridge, LLC (UCOR) and Wastren Advantage, Inc. (WAI) — have developed a plan that allows the site to continue processing transuranic waste and maintain its cleanup schedule.

  16. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992

    SciTech Connect (OSTI)

    Clapp, R.B.

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described.

  17. Department of Energy Office of Environmental Management 2015...

    Office of Environmental Management (EM)

    Department of Energy Office of Environmental Management 2015 Year in Review Department of Energy Office of Environmental Management 2015 Year in Review DOE Office of Environmental...

  18. FY 2016 Environmental Management Budget Request to Congress ...

    Energy.gov (indexed) [DOE]

    More Documents & Publications FY 2013 Environmental Management Budget Request to Congress FY 2011 Environmental Management Budget Request to Congress FY 2015 Environmental ...

  19. Department of Energy Office of Environmental Management 2015...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Office of Environmental Management 2015 Year in Review Department of Energy Office of Environmental Management 2015 Year in Review DOE Office of Environmental ...

  20. Categorical Exclusion Determinations: Environmental Management Consolidated

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Business Service Center | Department of Energy Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued by Environmental Management Consolidated Business Service Center. DOCUMENTS AVAILABLE FOR DOWNLOAD No downloads found for this office.

  1. Waste Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management Waste Management Oak Ridge has an onsite CERCLA disposal facility, the Environmental Management Waste Management Facility, that reduces cleanup and transportation costs. Oak Ridge has an onsite CERCLA disposal facility, the Environmental Management Waste Management Facility, that reduces cleanup and transportation costs. Years of diverse research and uranium and isotope production led to numerous forms of waste in Oak Ridge. However, our EM program has worked to identify,

  2. 2013 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Environmental Management | Department of Energy Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management 2013 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process

  3. 2015 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Environmental Management | Department of Energy Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management 2015 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process

  4. FY 2009 Environmental Management Budget Request to Congress | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy FY 2009 Environmental Management Budget Request to Congress FY 2009 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2009 Congressional Budget Request Department of Energy - Environmental Management FY 2009 Congressional Budget Request (3.67 MB) More Documents & Publications FY 2013 Environmental Management Budget Request to Congress FY 2011 Environmental Management Budget Request to Congress FY 2010 Environmental Management

  5. Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  6. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  7. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    SciTech Connect (OSTI)

    1995-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

  8. Questions remain on funding for cleanup of Oak Ridge Reservation

    Energy.gov [DOE]

    There is great uncertainty on what the looming federal budget cuts will be and what effect they will have on funding for the Department of Energy’s (DOE) Environmental Management (EM) program at the Oak Ridge Reservation (ORR).

  9. Including environmental concerns in management strategies for depleted uranium hexafluoride

    SciTech Connect (OSTI)

    Goldberg, M.; Avci, H.I.; Bradley, C.E.

    1995-12-31

    One of the major programs within the Office of Nuclear Energy, Science, and Technology of the US Department of Energy (DOE) is the depleted uranium hexafluoride (DUF{sub 6}) management program. The program is intended to find a long-term management strategy for the DUF{sub 6} that is currently stored in approximately 46,400 cylinders at Paducah, KY; Portsmouth, OH; and Oak Ridge, TN, USA. The program has four major components: technology assessment, engineering analysis, cost analysis, and the environmental impact statement (EIS). From the beginning of the program, the DOE has incorporated the environmental considerations into the process of strategy selection. Currently, the DOE has no preferred alternative. The results of the environmental impacts assessment from the EIS, as well as the results from the other components of the program, will be factored into the strategy selection process. In addition to the DOE`s current management plan, other alternatives continued storage, reuse, or disposal of depleted uranium, will be considered in the EIS. The EIS is expected to be completed and issued in its final form in the fall of 1997.

  10. Data base management activities for the Remedial Action Program at Oak Ridge National Laboratories (ORNL)

    SciTech Connect (OSTI)

    Hook, L.A.; Voorhees, L.D.; Gentry, M.J.; Faulkner, M.A.; Shaakir-Ali, J.A.; Newman, K.A.; McCord, R.A.; Goins, L.F.; Owen, P.T.

    1990-07-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations requiring comprehensive control over facility discharges and cleanup of contaminated sites. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current status of DIMS and its role in supporting RAP during 1989 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on the contents of the Numeric Data Base. Significant progress was made last year with the geographic information system (GIS) and ARC/INFO, which can be interfaced with SAS/GRAPH to provide combined mapping and statistical graphic products. Several thematic layers of GIS data for the Oak Ridge Reservation are now available. 18 refs., 8 figs., 19 tabs.

  11. Oak Ridge Site Specific Advisory Board Monthly Meeting Olive Garden

    Office of Environmental Management (EM)

    Olive Garden 7206 Kingston Pike Knoxville, Tennessee 37919 The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks opportunities for input through collaborative

  12. Oak Ridge Environmental Information System (ORIES) site workstation information packet for OREIS V1. 2

    SciTech Connect (OSTI)

    Voorhees, L.D.; McCord, R.A.; Durfee, R.C.; Land, M.L.; Olson, R.J.; Palmer, M.R.; Thomas, J.K.; Tinnel, E.P.; Zygmunt, B.C.

    1993-02-01

    The OREIS site workstation information packet was developed to accompany the OREIS site workstations, which are being delivered to the Environmental Restoration programs at the five DOE-OR sites. The packet is written specifically for the Site ER program staff at each of the five Sites who have been designated the OREIS contact by their ER program manager, and is not intended for general distribution. The packet provides an overview of the components of OREIS, points to more detailed information provided in the accompanying vendor and OREIS developed manuals, and includes information on training opportunities and user support.

  13. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect (OSTI)

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  14. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Clapp, R.B.

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described.

  15. Oak Ridge Environmental Information System (ORIES) site workstation information packet for OREIS V1.2. Environmental Restoration Program

    SciTech Connect (OSTI)

    Voorhees, L.D.; McCord, R.A.; Durfee, R.C.; Land, M.L.; Olson, R.J.; Palmer, M.R.; Thomas, J.K.; Tinnel, E.P.; Zygmunt, B.C.

    1993-02-01

    The OREIS site workstation information packet was developed to accompany the OREIS site workstations, which are being delivered to the Environmental Restoration programs at the five DOE-OR sites. The packet is written specifically for the Site ER program staff at each of the five Sites who have been designated the OREIS contact by their ER program manager, and is not intended for general distribution. The packet provides an overview of the components of OREIS, points to more detailed information provided in the accompanying vendor and OREIS developed manuals, and includes information on training opportunities and user support.

  16. Oak Ridge Reservation annual site environmental report for 1997: Color your tomorrow

    SciTech Connect (OSTI)

    Hamilton, L.V.

    1998-10-01

    The U.S. Department of Energy currently oversees activities on the Oak Ridge Reservation (ORR), a government-owned, contractor-operated facility. The reservation contains three major operating sites: the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Site). The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced the materials for the first atomic bombs. The reservation's role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried out for the war effort and subsequent research, development, and production activities have involved (and continue to involve) radiological and hazardous materials.

  17. Audit of Work Force Restructuring at the Fernald Environmental Management Project, ER-B-96-01

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    U.S. Department of Energy Office of Inspector General AUDIT OF WORK FORCE RESTRUCTURING AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT Report Number: ER-B-96-01 Eastern Regional Audit Office Date of Issue: April 23, 1996 Oak Ridge, Tennessee 37830 AUDIT OF WORK FORCE RESTRUCTURING AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT TABLE OF CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . 1 PART I - APPROACH AND OVERVIEW 3 Introduction . . . . . . . . . . . . . . . 3 Scope and

  18. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    SciTech Connect (OSTI)

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  19. Reengineering of waste management at the Oak Ridge National Laboratory. Volume 2

    SciTech Connect (OSTI)

    Myrick, T.E.

    1997-08-01

    A reengineering evaluation of the waste management program at the Oak Ridge National Laboratory (ORNL) was conducted during the months of February through July 1997. The goal of the reengineering was to identify ways in which the waste management process could be streamlined and improved to reduce costs while maintaining full compliance and customer satisfaction. A Core Team conducted preliminary evaluations and determined that eight particular aspects of the ORNL waste management program warranted focused investigations during the reengineering. The eight areas included Pollution Prevention, Waste Characterization, Waste Certification/Verification, Hazardous/Mixed Waste Stream, Generator/WM Teaming, Reporting/Records, Disposal End Points, and On-Site Treatment/Storage. The Core Team commissioned and assembled Process Teams to conduct in-depth evaluations of each of these eight areas. The Core Team then evaluated the Process Team results and consolidated the 80 process-specific recommendations into 15 overall recommendations. Volume 2 consists of nine appendices which contain the Process Team reports and Benchmarking reports.

  20. Results of the measurement survey of elevation and environmental media in surface impoundments 3513 (B) and 3524 (A) at Oak Ridge National Laboratory, Oak Ridge, TN

    SciTech Connect (OSTI)

    Murray, M.E.; Rose, D.A.; Brown, K.S.; Coe, R.H.C. III; Lawrence, J.D.; Winton, W.

    1998-07-01

    A measurement survey of the elevation and environmental media in impoundments 3513 (B) and 3524 (A) at the Oak Ridge National Laboratory (ORNL) was conducted during April 1998. The investigation was performed by the Measurement Applications and Development Group of the Life Sciences Division of ORNL at the request of Bechtel Jacobs Company. Measurement activities were conducted at selected locations in order to determine the depth and appearance of the sediment and describe the clay underlying the impoundments prior to remediation. The survey was a follow-up to a previous elevation survey. The survey included the following: collection of sediment/clay cores from selected locations in each impoundment; measurement and documentation of the elevation at the water surface, at the top of sediment, at the top of clay, and at the bottom of each core; visual inspection of each core by a soil scientist to confirm the presence of clay and not material such as fly ash and soda lime compacted over the last 50 years; measurement and documentation of the background beta-gamma radiation level at the time and location of collection of each core, the highest beta-gamma level along the sediment portion of each core, and the highest beta-gamma level along the clay portion of each core; measurement and documentation of the length of the clay and of the sediment portion of each core; photographic documentation of each core; and replacement of each core in the impoundment.

  1. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field.

  2. Cleanup of the Oak Ridge Reservation Building the Future by Cleaning up the Past

    Office of Environmental Management (EM)

    orem 1 Oak Ridge Environmental Management Program Positioned for Success in 2016 and Beyond Jay Mullis, Deputy Manager Oak Ridge Office of Environmental Management October 12, 2016 www.energy.gov/orem 2 We are well organized to execute the cleanup mission in Oak Ridge www.energy.gov/orem 3 Oak Ridge EM has a clearly defined near-term cleanup plan Vision 2016  Completion of all Gaseous Diffusion Plant demolition at ETTP Vision 2020 Remaining portion of ETTP cleaned up and reindustrialized

  3. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Release Phase I | Department of Energy I Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase I The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified 31

  4. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Release Phase II | Department of Energy II Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase II The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified

  5. Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of Environmental Management Office of Environmental Management Energy By The Numbers: Recovery Act EM's Paducah Site Completes Building Removals Savannah River Site Museum Ribbon Cutting F Reactor Inspection SRNL Laboratory Directed Research and Development Poster Session 351 Substation Demolition -- B Roll Hanford F Reactor Inspection B-roll footage Energy Secretary Talks About SRNL Hanford workers begin cleaning out historic McCluskey Room Traffic Safety Demo of below ground site that

  6. US - Former Soviet Union environmental management activities

    SciTech Connect (OSTI)

    1995-09-01

    The Office of Environmental Management (EM) has been delegated the responsibility for US DOE`s cleanup of nuclear weapons complex. The nature and the magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. This booklet makes comparisons and describes coordinated projects and workshops between the USA and the former Soviet Union.

  7. Report to the Environmental Management Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the Environmental Management Advisory Board Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted by the Risk Communications Subcommittee September 2015 Additional Evaluations: In addition to the evaluation of the strategic planning tool, the EMAB Risk Communications Subcommittee had presentations of other studies and tools currently in use or under development at various DOE cleanup sites to understand their current or

  8. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D&D) Program is part of the Department of Energy (DOE) Environmental Restoration D&D Program and has continued to provide surveillance and maintenance (S&M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S&M planning, (2) routine S&M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  9. PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) A briefing to the SEAB Task Force on Technology Development for Environmental Management on the DOE Ofiice of Environmental Management. Overview of the Office of Environmental Management (2.12 MB) Overview of the Office of Environmental Management's Technology Development Program (658.68 KB) More Documents & Publications Focus on

  10. FY 2013 Environmental Management Budget Request to Congress ...

    Energy Savers

    FY 2013 Environmental Management Budget Request to Congress (4.02 MB) More Documents & Publications FY 2015 Environmental Management Budget Request to Congress FY 2011 ...

  11. Environmental Management and Planning Solutions, Inc | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Environmental Management and Planning Solutions, Inc (Redirected from EMPSi) Jump to: navigation, search Name: Environmental Management and Planning Solutions, Inc Abbreviation:...

  12. The New Gold Standard: Environmental Management Introduces the...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility The New Gold Standard: Environmental Management Introduces the First LEED Gold ...

  13. FY 2011 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FY 2011 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2011 Congressional Budget Request PDF icon Department of Energy - ...

  14. Office of Environmental Management Taps Small Business for Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant...

  15. Annex IV Environmental Webinar: Adaptive Management in the Marine...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Annex IV Environmental Webinar: Adaptive Management in the Marine Renewable Energy Industry Annex IV Environmental Webinar: Adaptive Management in the Marine Renewable Energy ...

  16. Environmental Management Internships | Argonne National Laboratory

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Minority Serving Institution (MSI) MSIs are institutions of higher education enrolling populations with significant percentages of undergraduate minority students. Eligible Minority Serving Institutions Featured Videos Student Intern: Water Table Management Student Intern: Citizen Science Student Intern: Non-Traditional Water Resources Contact undergrad@anl.gov Environmental Management Internships The Minority Serving Institutions Partnership Program (MSIPP) was created by the Department of

  17. Warehouses in New York, New York To: J. LaGrone Manager Oak Ridge...

    Office of Legacy Management (LM)

    This expedited procedure requires close cooperation between Headquarters, Oak Ridge Operations, and involved contractors. This project will be the first demonstration of this ...

  18. Oak Ridge K-25 Site Technology Logic Diagram. Volume 3, Technology evaluation data sheets; Part B, Remedial action, robotics/automation, waste management

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration (ER) and waste management (WN) problems at the Oak Ridge K-25 Site. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remediation, decontamination, and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume 3 B provides the Technology Evaluation Data Sheets (TEDS) for ER/WM activities (Remedial Action Robotics and Automation, Waste Management) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than each technology in Vol. 2. The TEDS are arranged alphanumerically by the TEDS code number in the upper right corner of each data sheet. Volume 3 can be used in two ways: (1) technologies that are identified from Vol. 2 can be referenced directly in Vol. 3 by using the TEDS codes, and (2) technologies and general technology areas (alternatives) can be located in the index in the front of this volume.

  19. History of mercury use and environmental contamination at the Oak Ridge Y-12 Plant

    SciTech Connect (OSTI)

    Brooks, Scott C; Southworth, George R

    2010-01-01

    Between 1950 and 1963 approximately 11 million kilograms of mercury (Hg) were used at the Oak Ridge Y-12 National Security Complex (Y-12 NSC) for lithium isotope separation processes. About 3% of the Hg was lost to the air, soil and rock under facilities, and East Fork Poplar Creek (EFPC) which originates in the plant site. Smaller amounts of Hg were used at other Oak Ridge facilities with similar results. Although the primary Hg discharges from Y-12 NSC stopped in 1963, small amounts of Hg continue to be released into the creek from point sources and diffuse contaminated soil and groundwater sources within Y-12 NSC. Mercury concentration in EFPC has decreased 85% from 2000 ng/L in the 1980s. In general, methylmercury concentrations in water and in fish have not declined in response to improvements in water quality and exhibit trends of increasing concentration in some cases.

  20. Environmental Restoration Information Resource Management Program Plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  1. 2011 Annual Planning Summary for Environmental Management (EM)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Environmental Management (EM).

  2. Environmental management system objectives & targets results summary :

    SciTech Connect (OSTI)

    Vetter, Douglas Walter

    2014-04-01

    Sandia National Laboratories/New Mexicos (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NMs operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL/NM Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2013.

  3. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request Background Each year the U.S. Department of Energy (DOE) Environmental Management (EM) Program develops its budget request for the fiscal year two years beyond the current fiscal year, incorporating budget requests from DOE field offices to develop the EM Program budget request to the president. DOE EM Headquarters typically issues guidelines to the field offices advising them how much

  4. Environmental Management Performance Report April 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  5. Environmental Management Performance Report for December 1999

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  6. Environmental Management Performance Report November 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  7. Evaluation of the environmental effects of stormwater pollutants for Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Hinzman, R.L.; Southworth, G.R.; Stewart, A.J.; Filson, M.J.

    1995-07-01

    Despite Best Management Practices (BMP), total suspended solids (TSS) and oil and grease (O and G) concentrations in stormwater runoff frequently have been above the National Pollutant Discharge Elimination System (NPDES) Permit effluent limits at ORNL. Although the effects of stormwater pollutants to aquatic ecosystems are of concern regionally and nationally, NPDES permit violations at ORNL are best addressed on a site-specific basis. This document explores several key questions to determine whether the TSS and O and G noncompliances at ORNL are primarily a regulatory problem (i.e., Category 1 and 2 effluent limits are neither reasonably achievable nor effective in achieving environmental protection), or a legitimate ecological concern that will require effective remediation. The three tasks outlined in the study plan were to (1) clarify the degree of TSS and O and G noncompliances at ORNL, (2) provide guidance as to appropriate limits for TSS and O and G in Category 1 and 2 discharges, and (3) provide information about the effectiveness of possible mitigation or remediation measures for TSS and O and G in stormwater releases, assuming that such measures are needed for one or more ORNL Category 1 or 2 outfalls.

  8. OSTIblog Articles in the Office of Environmental Management Topic | OSTI,

    Office of Scientific and Technical Information (OSTI)

    US Dept of Energy Office of Scientific and Technical Information Environmental Management

  9. Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management

    Energy.gov [DOE]

    Full text of Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.

  10. Partnering Policy for the Office of Environmental Management | Department

    Office of Environmental Management (EM)

    of Energy Policy for the Office of Environmental Management Partnering Policy for the Office of Environmental Management Partnering Policy for the Office of Environmental Management (448.69 KB) More Documents & Publications DOE Project Management Risk Committee (PMRC) SOP Microsoft Word - ADR Revised Policy82508Reformatted.doc OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution (CEQ, 2012)

  11. Environmental remediation and waste management information systems

    SciTech Connect (OSTI)

    Harrington, M.W.; Harlan, C.P.

    1993-12-31

    The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

  12. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    14, 2016, 6:00 p.m. Olive Garden Restaurant 7206 Kingston Pike, Knoxville, Tenn. AGENDA I. Welcome and Announcements (E. Trujillo) ........................................................................ 6:00-6:05 A. Next Meeting: Wednesday, October 12 Presentation Topic: State of the Oak Ridge Environmental Management Program II. Comments from the EPA and TDEC Liaisons (C. Jones, K. Czartoryski)

  13. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Frappaolo, C.

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records` life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites.

  14. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  15. Environmental planning and priorities for the manager

    SciTech Connect (OSTI)

    Eggleston, T.E. )

    1993-01-01

    Industry and government spend in excess of $100 billion each year on pollution control. These funds are producing cleaner land, air, and water. They have also spawned a pollution control industry which today employs more than 175,000 people. While significant, this is only the initial investment of capital and human talent that cleaning up the environment will demand through the 1990's and into the next century. Industry is in the early phases of an explosion of environmentally-oriented activity. Industries who manage their priorities and respond proactively on environmental issues will be the more profitable in an economy increasingly influenced by environmental regulations and consumer activism. A series of issues will most likely dominate management of environmental concerns, including: pollution prevention--reducing pollutants before having to clean them up; recycling--reuse limits disposal problems while reducing pollutants generated by new manufacturing; private-public partnerships--these contractual relationships between public and private partners will become increasingly popular; energy use although large strides have been made in energy conservation, much remains to be done; technology innovation--this is the most fundamental tool for use in improving environmental quality. In order for industry to respond to the need, government will have to implement a series of economic, environmental, and social policies. Business then becomes the key element in advancing the policies established by government.

  16. Executive Order 12898, Federal Actions to Address Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Safety, and Health; Oak Ridge Office King, Karin L.; Environmental Engineer; ... Nuclear Security Administration Weil, Stephen R.; Program Manager; Richland Operations ...

  17. Quality assurance plan for the design and construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The WAG 6 Closure Quality Assurance Plan establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 Closure project that are subject to the application of the Martin Marietta Energy Systems, Inc. (Energy Systems) QA Program, the Environmental Restoration Division QA Program, and other quality requirements. These activities may be performed by Energy Systems organizations, a subcontractor to Energy Systems, an architect-engineer (A-E) under prime contract to the Department of Energy (DOE), and/or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems Engineering quality requirements for the project. The WAG 6 Closure QA Plan will be supplemented by subproject QA plans that will identify additional requirements pertaining to each subproject.

  18. The Environmental Assessment Management modification of CADET

    Energy Science and Technology Software Center (OSTI)

    1996-05-01

    The original CADET system (finalized in September 1995 as version 1.3) is a data collection and transfer system developed for the Headquarters Air Force Space Command (HQAFSPC) Environmental Compliance Assessment and Management Program (ECAMP). The system was designed as a tool for ECAMP evaluators to use to enter compliance related data while in the field and to subsequently store, modify, sort, query, and print the data and to electronically transfer the data into the Airmore » Force''s Work Information Management System Environmental Subsystem (WIMSES). The original CADET system was designed to match the database structure of the WIMSES ECAMP module that came on-line in 1992. In June 1995, the Department of Defense issued The Environmental Assessment Management (TEAM) Guide and ECAMP Supplement to the TEAM Guide. These included changes to the type and amount of data collected during an ECAMP assessment. The WIMSES database structure was not modified to match the TEAM Guide; however, the need for collecting and storing the ECAMP data remained. The HQAFSC decided to modify the CADET system to incorporate the changes specified in the ECAMP Supplement and to convert the system from simply a data entry and transfer tool to a data entry and storage system to manage ECAMP findings in lieu of the WIMSES ECAMP module. The revised software is designated as version 2.0 and nicknamed TEAM CADET to distinguish it from the original CADET system.« less

  19. A Science Data Gateway for Environmental Management

    SciTech Connect (OSTI)

    Agarwal, Deborah, A; Faybishenko, Boris; Freedman, Vicky, L; Krishnan, Harinarayan; Kushner, Gary; Lansing, Carina; Porter, Ellen; Romosan, Alexandru; Shoshani, Arie; Wainwright, Haruko; Weidmer, Arthur; Wu, Kesheng

    2015-10-12

    Science data gateways are effective in providing complex science data collections to the world-wide user communities. In this paper we describe a gateway for the Advanced Simulation Capability for Environmental Management (ASCEM) framework. Built on top of established web service technologies, the ASCEM data gateway is specifically designed for environmental modeling applications. Its key distinguishing features include: (1) handling of complex spatiotemporal data, (2) offering a variety of selective data access mechanisms, (3) providing state of the art plotting and visualization of spatiotemporal data records, and (4) integrating seamlessly with a distributed workflow system using a RESTful interface. ASCEM project scientists have been using this data gateway since 2011.

  20. Terrestrial mapping of the Oak Ridge Reservation: Phase 1. Environmental Restoration Program

    SciTech Connect (OSTI)

    Washington-Allen, R.A.; Ashwood, T.L.; Christensen, S.W.; Offerman, H.; Scarbrough-Luther, P.

    1995-06-01

    This report presents the results of the first phase in development of a habitat map of the terrestrial ecosystem on the Oak Ridge Reservation (ORR). During this phase, a satellite image of the ORR was classified into land use/land cover types, the classified image was incorporated into a geographic information system map of the ORR, and the accuracy of the map was assessed. A habitat map is a critical foundation for evaluation of the potential impact of historical (or ongoing) contamination on terrestrial biota of the ORR. The abundance and distribution of wildlife species and plant communities of concern are intrinsically linked to the abundance and distribution of habitat on which those species and communities rely. Thus, the impact of spatially discrete patches of contamination on those biota is directly proportional to the degree of overlap between habitat and contamination. Landsat 5 Thematic Mapper satellite imagery was used to create the land use/land cover map. A Thematic Mapper image consists of seven images of the same point on the earth produced by seven separate sensors, each of which detects a unique part of the electromagnetic spectrum. Separately and in various combinations, these spectral images can be correlated with vegetation type or other land cover type. The image selected for this map was from April 13, 1994, and covers 189,000 ha.

  1. BEIDMS1. 3. Bechtel Environmental Integrated Database Management System

    SciTech Connect (OSTI)

    Forstrom, K.; Wallace, J.; Goodwin, D. )

    1994-09-09

    Bechtel Environmental Integrated Data Management System (BEIDMS1.3) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  2. BEIDMS1.4. Bechtel Environmental Integrated Database Management System

    SciTech Connect (OSTI)

    Wallace, J.; Goodwin, D.

    1994-09-09

    Bechtel Environmental Integrated Data Management System (BEIDMS1.4) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  3. BEIDMS1.3. Bechtel Environmental Integrated Database Management System

    SciTech Connect (OSTI)

    Forstrom, K.; Wallace, J.; Goodwin, D.

    1994-09-09

    Bechtel Environmental Integrated Data Management System (BEIDMS1.3) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  4. Waste characterization data manual for the inactive liquid low-level waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-06-01

    This Waste Characterization Data Manual contains the results of an analysis of the contents of liquid low-level waste (LLLW) tanks that have been removed from service in accordance with the requirements of the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA), Sect. IX.G.1. This manual contains the results of sampling activities that were conducted at the Oak Ridge National Laboratory in 1988. Thirty-three tanks were sampled and analyzed at that time. Sampling of the remaining inactive tanks is currently underway, and data from these tanks will be added to this manual as they become available. Data are presented from analysis of volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, radiochemical compounds, and inorganic compounds.

  5. OAK RIDGE

    Office of Legacy Management (LM)

    or _^ *ORNL/RASA-89/1 I : OAK RIDGE _NATIONAL LABORATORY |*H~~~~~ -~~Results of the I'I-------_____ ~ Preliminary Radiological * "~ i, .irri uSurvey at B&T Metals, _" 425 West Town Street, i * !' V Columbus, Ohio (C0001) I i. U Wo. 0aa-. r m ~~~~~~~~~ if? _ ~ W. D. Cottrell J. L Quillen J. W. Crutcher , I OPERATED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOR THE UNITED STATES DEPARTMENT OF ENERGY ORNL/RASA-89/1 3*1~~ ~HEALTH AND SAFETY RESEARCH DIVISION Waste Management Research

  6. Office of Environmental Management MAJOR CONTRACTS SUMMARY

    Office of Environmental Management (EM)

    Environmental Management MAJOR CONTRACTS SUMMARY As of 10/11/2016 Page 1 of 12 Site Contract Description Contractor and Contract Number Current Contract Period Total Value Contract Type Carlsbad Field Office Waste Isolation Pilot Project Management and Operating Contract Nuclear Waste Partnership, LLC DE-EM0001971 Base Period: 10/01/2012 to 09/30/2017 Option 1 (1 Year): 10/01/2017 to 09/30/2018 Option 2 (4 Years): 10/01/2018 to 09/30/2022 $1.9B Cost Plus Award Fee Carlsbad Technical Assistance

  7. Analysis of DOE international environmental management activities

    SciTech Connect (OSTI)

    Ragaini, R.C.

    1995-09-01

    The Department of Energy`s (DOE) Strategic Plan (April 1994) states that DOE`s long-term vision includes world leadership in environmental restoration and waste management activities. The activities of the DOE Office of Environmental Management (EM) can play a key role in DOE`s goals of maintaining U.S. global competitiveness and ensuring the continuation of a world class science and technology community. DOE`s interest in attaining these goals stems partly from its participation in organizations like the Trade Policy Coordinating Committee (TPCC), with its National Environmental Export Promotion Strategy, which seeks to strengthen U.S. competitiveness and the building of public-private partnerships as part of U.S. industrial policy. The International Interactions Field Office task will build a communication network which will facilitate the efficient and effective communication between DOE Headquarters, Field Offices, and contractors. Under this network, Headquarters will provide the Field Offices with information on the Administration`s policies and activities (such as the DOE Strategic Plan), interagency activities, as well as relevant information from other field offices. Lawrence Livermore National Laboratory (LLNL) will, in turn, provide Headquarters with information on various international activities which, when appropriate, will be included in reports to groups like the TPCC and the EM Focus Areas. This task provides for the collection, review, and analysis of information on the more significant international environmental restoration and waste management initiatives and activities which have been used or are being considered at LLNL. Information gathering will focus on efforts and accomplishments in meeting the challenges of providing timely and cost effective cleanup of its environmentally damaged sites and facilities, especially through international technical exchanges and/or the implementation of foreign-development technologies.

  8. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    Washington, D.C. 20585 April 25, 2013 2 Environmental Management Site-Specific Advisory Board - April 25, 2013 Meeting Minutes LIST OF ACRONYMS AB - Advisory Board ANL - Argonne National Laboratory ARP - Accelerator Retrieval Project BNL - Brookhaven National Laboratory BRC - Blue Ribbon Commission CAB - Citizens Advisory Board D&D - Decontamination & Decommissioning DDFO - Deputy Designated Federal Officer DOE - Department of Energy DUF6 - Depleted Uranium Hexafluoride DWPF - Defense

  9. Office of Environmental Management | Department of Energy

    Office of Environmental Management (EM)

    Office of Environmental Management EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment IDAHO FALLS, Idaho - EM's Idaho Site program and contractor Fluor Idaho have completed a significant cleanup accomplishment that further protects the underlying Snake River Plain Aquifer, the primary drinking and irrigation water source for more than 300,000 Idahoans. Read more EM Releases Supporting Materials from 2016 National

  10. Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of Environmental Management EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment IDAHO FALLS, Idaho - EM's Idaho Site program and contractor Fluor Idaho have completed a significant cleanup accomplishment that further protects the underlying Snake River Plain Aquifer, the primary drinking and irrigation water source for more than 300,000 Idahoans. Read more EM Releases Supporting Materials from 2016 National

  11. Environmental management technology demonstration and commercialization

    SciTech Connect (OSTI)

    Daly, D.J.; Erickson, T.A.; Groenewold, G.H.

    1995-12-31

    The Energy & Environmental Research Center (EERC), a contract-supported organization focused on technology research, development, demonstration, and commercialization (RDD&C), is entering its second year of a Cooperative Agreement with the U.S. Department of Energy (DOE) Morgantown Energy Technology Center (METC) to facilitate the development, demonstration, and commercialization of innovative environmental management (EM) technologies in support of the activities of DOE`s Office of Environmental Science and Technology (EM-50) under DOE`s EM Program. This paper reviews the concept and approach of the program under the METC-EERC EM Cooperative Agreement and profiles the role the program is playing in the commercialization of five EM technologies.

  12. User-centered guidelines for environmental management

    SciTech Connect (OSTI)

    Eike, D.R.; Fox, J.A.; Dailey, R.

    1993-08-01

    Environmental Management requirements facing US Department of Energy (DOE) facilities are detailed, complex, and often subject to rapid change. DOE`s Office of Environmental Guidance, RCRA/CERCLA Division (EH-231), is responsible for developing and issuing guidance to assist DOE facilities in interpreting and complying with Federal, State, and local requirements. Recognizing the potential for computerization of the guidance, EH-231 requested that Pacific Northwest Laboratory (PNL) develop an approach for preparing automated guidance. The approach developed by PNL, termed ``user-centered guidance,`` combines participatory design and traditional rapid prototyping techniques to produce a new form of environmental guidance that emphasizes the user`s needs. This paper describes the objectives, processes and current status of this effort.

  13. Environmental management technology demonstration and commercialization

    SciTech Connect (OSTI)

    Daly, D.J.; Erickson, T.A.; Groenewold, G.H.

    1995-10-01

    The Energy & Environmental Research Center (EERC), a contract-supported organization focused on technology research, development, demonstration, and commercialization (RDD&C), is entering its second year of a Cooperative Agreement with the U.S. Department of Energy (DOE) Morgantown Energy Technology Center (METC) to facilitate the development, demonstration, and commercialization of innovative environmental management (EM) technologies in support of the activities of DOE`s Office of Environmental Science and Technology (EM-50) under DOE`s EM Program. This paper reviews the concept and approach of the program under the METC-EERC EM Cooperative Agreement and profiles the role the program is playing in the commercialization of five EM technologies.

  14. Small Businesses Pave the Way to $20 Million in Savings at Oak Ridge

    Energy.gov [DOE]

    Earlier this week, the Office of Environmental Management shared the news that a new enclosure at Oak Ridge that processes radioactive casks has saved nearly $20 million by putting the facility on...

  15. Environmental Management Los Alamos Field Office Corrective Action...

    Energy Savers

    for management of the environmental restoration and the ... Nuclear Security Administration Los Alamos Field Office (NA-LA) continues with the responsibility for the management of ...

  16. Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-05-27

    This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

  17. EIS-0387: Y-12 National Security Complex Site-Wide Environmental Impact Statement, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This Final Y-12 Site-wide EIS analyzed the potential environmental impacts of the reasonable alternatives for ongoing and foreseeable future operations and activities at Y-12, including alternatives for changes to site infrastructure and levels of operation (using production capacity as the key metric for comparison).

  18. Mission & Functions Statement for the Office of Environmental Management |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Mission & Functions Statement for the Office of Environmental Management Mission & Functions Statement for the Office of Environmental Management The mission of the Office of Environmental Management (EM) is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. The program is one of the largest and most diverse and technically complex environmental

  19. Office of Environmental Management (EM) Organization Chart | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart (200.68 KB) More Documents & Publications Chairs Meeting - August 2016 EM SSAB Conference Calls - August 11, 2015 EM SSAB Conference Calls - December 15, 2014

  20. Office of Environmental Management: A Journey to Excellence | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management: A Journey to Excellence Office of Environmental Management: A Journey to Excellence Office of Environmental Management: A Journey to Excellence (5.44 MB) More Documents & Publications Assistant Secretary Triay's FY 2012 EM Budget Rollout Presentation Chairs Meeting - June 2011 2012 Congressional Nuclear Cleanup Caucus Briefings

  1. Letter: The Environmental Management SSABs Recommendations on Transuranic

    Office of Environmental Management (EM)

    Activities of the Environmental Management SSABs | Department of Energy Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs From: Assistant Secretary, Jessie H. Roberson (EM-1) To: The Honorable J. Gresham Barrett U.S. House of Representatives This letter is in response to an August 8, 2003 letter

  2. Assessment of the Integrated Facility Disposition Project at Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    National Laboratory & Y-12 for Transfer of Facilities & Materials to EM | Department of Energy the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program

  3. TECHNICAL INTEGRATION ENVIRONMENTAL MANAGEMENT FOCUS AREAS

    SciTech Connect (OSTI)

    Carey R. Butler

    2001-10-01

    This contract involved a team of companies led by WPI (formerly the Waste Policy Institute). In addition to WPI, the team included four subcontractors--TRW (formerly BDM Federal), SAIC, Energetics, and the University of North Dakota Energy and Environmental Research Center (EERC). The team of companies functioned as a ''seamless team'' assembled to support the Environmental Management Program Focus Areas. Staff resources were applied in the following offices: Richland, Washington, Idaho Falls, Idaho, Morgantown, West Virginia, Grand Forks, North Dakota, Aiken, South Carolina, Gaithersburg, Maryland, and Blacksburg, Virginia. These locations represented a mixture of site support offices at the field focus area locations and central staff to support across the focus areas. The management of this dispersed resource base relied on electronic communication links to allow the team to function as a ''virtual office'' to address tasks with the best qualified staff matched to the task assignments. A variety of tasks were assigned and successfully completed throughout the life of the contract that involved program planning and analysis, program execution, program information management and communication and data transmission.

  4. Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program

    SciTech Connect (OSTI)

    Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

    1993-07-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

  5. Toxicological benchmark for screening of potential contaminants of concern for effects on aquatic biota on the Oak Ridge Reservation, Oak Ridge, Tennessee; Environmental Restoration Program

    SciTech Connect (OSTI)

    Suter, G.W. II; Futrell, M.A.; Kerchner, G.A.

    1992-09-01

    One of the initial stages in ecological risk assessment of hazardous waste sites is the screening of contaminants to determine which of them are worthy of further consideration. This report presents potential screening benchmarks for protection of aquatic life from contaminants in water. Because there is no guidance for screening benchmarks, a set of alternative benchmarks is presented here. The alternative benchmarks are based on different conceptual approaches to estimating concentrations causing significant effects. To the extent that toxicity data are available, this report presents the alternative benchmarks for chemicals that have been detected on the Oak Ridge Reservation. It also presents the data used to calculate the benchmarks, and the sources of the data. It compares the benchmarks and discusses their relative conservatism and utility.

  6. Environmental Management Performance Report June 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

  7. Environmental Management Performance Report May 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-05-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

  8. Environmental Management Performance Report March 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  9. Establishing the Office of Environmental Management Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Corporate Board | Department of Energy Establishing the Office of Environmental Management Quality Assurance Corporate Board Establishing the Office of Environmental Management Quality Assurance Corporate Board The purpose of this memorandum is to introduce the Office of Environmental Management (EM) Quality Assurance (QA) Corporate Board which implements EM's policy and guidance and promotes lessons learned and best practices across the sites. Establishing the Office of Environmental

  10. Independent Oversight Assessment, DOE Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Headquarters - November 2012 | Department of Energy DOE Office of Environmental Management Headquarters - November 2012 Independent Oversight Assessment, DOE Office of Environmental Management Headquarters - November 2012 November 2012 Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters This report provides the results of an independent assessment of the safety culture at the Department of Energy's (DOE) Office of Environmental

  11. NETL-EERC ENVIRONMENTAL MANAGEMENT COOPERATIVE AGREEMENT

    SciTech Connect (OSTI)

    Christina B. Behr-Andres; Daniel J. Daly

    2001-07-31

    This final report summarizes the accomplishments of the 6-year Environmental Management Cooperative Agreement (EMCA) between the Energy and Environmental Research Center (EERC), a nonprofit, contract-supported unit of the University of North Dakota, and the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). The first portion of the report summarizes EMCA's structure, activities, and accomplishments. The appendix contains profiles of the individual EMCA tasks. Detailed descriptions and results of the tasks can be found separately in published Final Topical Reports. EMCA (DOE Contract No. DE-FC21-94MC31388) was in place from the fall of 1994 to the summer of 2001. Under EMCA, approximately $5.4 million was applied in three program areas to expedite the commercialization of 15 innovative technologies for application in DOE's EM Program ($3.8 million, or 69% of funds), provide technical support to the Deactivation and Decommissioning Focus Area (DDFA; $1.04 million, or 19% of funds), and provide for the coordination of the EMCA activities ($0.62 million, or 11% of funds). The following sections profile the overall accomplishments of the EMCA program followed by a summary of the accomplishments under each of the EMCA areas: commercialization, DDFA technical support, and management. Table 1 provides an overview of EMCA, including program areas, program activities, the duration and funding of each activity, and the associated industry partner, if appropriate.

  12. Environmental Management Advisory Board Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Services » Communication & Engagement » EMAB » Environmental Management Advisory Board Charter Environmental Management Advisory Board Charter The Environmental Management Advisory Board's (EMAB)'s most recent charter outlines the objective, structure, and scope of the Board. EMAB Charter (120.69 KB) More Documents & Publications EM SSAB Charter EM SSAB Conference Calls - September 19, 2011 EMAB Meeting - April 2009 Waste Management Nuclear Materials & Waste Tank Waste and Waste

  13. Environmental Management Los Alamos Field Office Corrective Action Plan -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Radiological Release Phase II | Department of Energy Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II On March 22, 2015, the Department of Energy established an Environmental Management Los Alamos Field Office (EM-LA) responsible for management of the environmental restoration and the legacy waste management programs at Los Alamos National Laboratory (LANL).

  14. Department of Energy Environmental Management Workshop | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management Workshop Department of Energy Environmental Management Workshop Presentation from the 2016 DOE National Cleanup Workshop by Ralph E. Holland, Deputy Assistant Secretary for Acquisition and Project Management. Department of Energy Environmental Management Workshop (935.92 KB) More Documents & Publications Update on Procurement Opportunities and Acquisition Process EM Major Contracts Awarded Since 2006 DUF6-Operations-Contract-DE-EM0004559-Conformed-Mod-02

  15. Resources of the future in environmental management

    SciTech Connect (OSTI)

    Bhada, R.K.; Morgan, D.; Jacquez, R.

    1994-12-31

    A major issue facing the generation and application of environmental technology is that of educating and training the work force that is needed to resolve the problems of the past and those for the next few decades. By necessity, this professional level workforce must have multidisciplinary education combined with research experience at the leading edge of technology. In order to satisfy this critical need, a unique type of organization was created for education and technology development in environmental areas. The Waste-management Education and Research Consortium (WERC) was created in 1990 by a cooperative agreement with the U.S. Department of Energy as a partnership of New Mexico State University, The University of New Mexico, and the New Mexico Institute of Mining and Technology in collaboration with Los Alamos National Laboratory and Sandia National Laboratories; the Navajo Community College joined as an affiliate in 1991. WERC has conclusively demonstrated that such a partnership collaborating with industry can be an effective tool to expand the nation`s resources to address issues related to the management of all forms of waste, via education, technology development and information transfer. The WERC program has implemented the following items: (1) College education at the technologist, undergraduate and graduate level; (2) Pre-college programs to involve young students in environmental activities; (3) Professional development and restraining series by satellite TV; (4) Technology development projects for solutions at the leading edge; (5) Four measurement and testing laboratories; (6) Technology transfer for information to communities, industry and government; (7) A University Design Contest for interaction between universities; and (8) A First Response Training Academy for emergency personnel. Currently this program is serving over 2000 students and professionals on an international bases.

  16. 2012 Annual Planning Summary for Oak Ridge Office

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Oak Ridge Office.

  17. 2013 Annual Planning Summary for the Oak Ridge Office

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Oak Ridge Office.

  18. 2013 Annual Planning Summary for the Oak Ridge National Laboratory

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Oak Ridge National Laboratory.

  19. Environmental Management Assessment of the Continuous Electron Beam Accelerator Facility (CEBAF)

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This report documents the results of the Environmental Management Assessment performed at the Continuous Electron Beam Accelerator Facility (CEBAF) in Newport News, Virginia. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the CEBAF Site Office; the CEBAF management and operating contractor (M&O), Southeastern Universities Research Association, Inc. (SURA); the Oak Ridge Field Office (OR); and the responsible DOE Headquarters Program Office, the Office of Energy Research (ER). The onsite portion of the assessment was conducted from March 8 through March 19, 1993, by the US Department of Energy`s (DOE`s) Office of Environmental Audit (EH-24) located within the office of Environment, Safety and Health (EH). DOE 5482.1 B, ``Environment, Safety and Health Appraisal Program,`` and Secretary of Energy Notice (SEN)-6E-92, ``Departmental Organizational and Management Arrangements,`` establish the mission of EH-24 to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission utilizing systematic and periodic evaluations of the Department`s environmental programs within line organizations, and through use of supplemental activities which serve to strengthen self-assessment and oversight functions within program, field, and contractor organizations.

  20. Data evaluation technical memorandum on the K-1407C Retention Basin at the Oak Ridge K-25 Site, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Beal, D.; Bock, J.; Hatmaker, T.; Zolyniak, J.; Goddard, P.; Kucsmas, D.

    1991-10-01

    The K-1407-C Retention Basin was a surface impoundment at the Oak Ridge K-25 Site. The basin was used primarily for storing potassium hydroxide scrubber sludge generated at the K-25 Site. In addition, from 1960 to 1973, metal hydroxide sludges that were removed from the K-1407-B Holding Pond were discharged to the K-1407-C Retention Basin. The sludge in the K-1407-B Pond contained discharge from the K-1420 Decontamination and Uranium Recovery, the K-1501 Steam Plant, the K-1413 Laboratory, and the K-1401 Maintenance Building. Radioactive material is also present in the K-1407-C Retention Basin, probably the result of cleaning and decontamination activities at some of the aforementioned facilities. The discharge of waste materials to K-1407-C was discontinued before November of 1988, and all sludge was removed from the retention basin. Some of the sludge was stored, and the remainder was fixed in concrete. This report is specific to the K-1407-C Retention Basin and includes information pertinent to the evaluation of soil contamination. The focus of this evaluation is the effectiveness of the Phase 1 investigation of the K-1407-C Retention Basin to define site conditions adequately to support decisions regarding appropriate closure alternatives. This includes the physical characterization of the site area and the characterization of the nature and extent of contamination at the site in relation to risk characterization and statistical evaluation.

  1. Waste Characterization Data Manual for the inactive liquid low-level waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    This Waste Characterization Data Manual contains the results of an analysis of the contents of liquid low-level waste (LLLW) tanks that have been removed from service in accordance with the requirements of the Oak Ridge National Laboratory (ORNL) Federal Facility Agreement (FFA), Section IX.G.1. Section IX.G.1 of the FFA requires waste characterizations be conducted and provided to EPA and TDEC for all LLLW tanks that are removed from service. These waste characterizations shall include the results of sampling and analysis of the tank contents, including wastes, liquids, and sludges. This manual was first issued as ORNL/ER-80 in June 1992. The waste characterization data were extracted from ORNL reports that described tank sampling and analysis conducted in 1988 for 32 out-of-service tanks. This revision of the manual contains waste characterization data for 54 tanks, including the 32 tanks from the 1988 sampling campaign (Sects. 2.1 through 2.32) and the 22 additional tanks from a subsequent sampling campaign in 1992 and 1993 (Sects. 2.33 through 2.54). Data are presented from analyses of volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls (PCBs), pesticides, radiochemical compounds, and inorganic compounds. As additional data resulting from analyses of out-of-service tank samples become available, they will be added to this manual.

  2. Construction and installation summary for fiscal year 1992 of the hydraulic head monitoring stations at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Dreier, R.B.; Switek, J.; Couzens, B.A.

    1992-12-01

    During FY 1992, as part of the Hydraulic Head Monitoring Station (HHMS) Project, three multiport wells (HHMS 12, 13, and 14) were constructed along or near the boundaries of Waste Area Grouping (WAG) 2 at Haw Ridge water gap. The purpose of this report is to document well construction and multiport component installation activities. The hydraulic head monitoring stations (HHMS) are well clusters and single multiport wells that provide data required for evaluation of the transition between shallow and deep groundwater systems and of the nature of these systems. This information is used for required characterization of the hydrologic framework as dictated by state and federal regulatory agencies. Groundwater contaminants may move laterally across WAG boundaries or offsite; they may also move in a vertical direction. Because the HHMS Project was designed to address otential contamination problems, the project provides a means for defining the bounds of the uppermost aquifer; identifying potential pathways for offsite contamination for shallow; intermediate, and deep groundwater flow; and evaluating the capacity for contaminant transport in intermediate and deep groundwater flow systems.

  3. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    2 2 2 , , , 2 2 2 0 0 0 1 1 1 4 4 4 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks

  4. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    1 1 1 , , , 2 2 2 0 0 0 1 1 1 4 4 4 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks

  5. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    u u u n n n e e e 1 1 1 0 0 0 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge

  6. Environmental Management Assessment of the National Renewable Energy Laboratory (NREL)

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This report documents the results of the environmental management assessment performed at the National Renewable Energy Laboratory (NREL) in Golden, Colorado. The onsite portion of the assessment was conducted from September 14 through September 27, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). During this assessment, the activities conducted by the assessment team included reviews of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and NREL contractor personnel; and inspections and observations of selected facilities and operations. The environmental management assessment of NREL focused on the adequacy of environmental management systems and assessed the formality of programs employing an approach that recognizes the level of formality implementing environmental programs may vary commensurate with non-nuclear research and development operations. The Assessment Team evaluated environmental monitoring, waste management and National Environmental Policy Act (NEPA) activities at NREL, from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section of this report. The scope of the NREL Environmental Management Assessment was comprehensive and included all areas of environmental management. At the same time, environmental monitoring, waste management, and NEPA activities were evaluated to develop a programmatic understanding of these environmental disciplines, building upon the results of previous appraisals, audits, and reviews performed at the NREL.

  7. Colorado Environmental Coalition v. Office of Legacy Management, Civil

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Action No. 08-cv-01624 (February 27, 2012) | Department of Energy February 27, 2012) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012) U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No.

  8. SRNS Environmental Management System External Audit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SRNS Environmental Management System External Audit SRNS Environmental Management System External Audit August 2009 Presenter: Eloy Saldivar, SRNS Track 7-1 Topics Covered: EMS Customer Satisfaction Contractor Profile/Integration Integration of EMS into ISM EMS External Audit EMS "Declaration of Conformance" EMS Configuration Control EMS Impact on SRS Processes, Products and Services SRNS Environmental Management System External Audit (973.43 KB) More Documents & Publications

  9. ORODocumentManagementStstem(HummingbirdDM)PIA.pdf

    Energy Savers

    Hosts Community Workshop OREM Hosts Community Workshop The Oak Ridge Office of Environmental Management (OREM) hosted a community workshop on June 24. The purpose of the workshop was to develop a set of ideas that OREM and the Oak Ridge community can work on together to help maintain momentum in the Oak Ridge environmental cleanup program. More than 80 members of the Oak Ridge community were present for the interactive dialogue. OREM community workshop presentation (8.03 MB) Community Workshop

  10. Environmental Management Completed Projects 2005-Present | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Completed Projects 2005-Present Environmental Management Completed Projects 2005-Present This document provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project's performance related to cost, schedule, and scope. Environmental Management Completed Projects 2005-Present (389.48 KB) More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental

  11. Environmental Management System Steering Committee | The Ames Laboratory

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental Management System Steering Committee The Environmental Management System Steering Committee (EMSSC) is a standing Ames Laboratory committee that advises the members of the Laboratory's Executive Council on environmentally-related objects and targets to help meet the Laboratory's and DOE's sustainability goals. For more information please see http://www.ameslab.gov/operations/esha/environmental EMS Charter The current members of the committee include David Byrd (Science and

  12. Tank Closure and Waste Management Environmental Impact Statement...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    1 APPENDIX V RECHARGE SENSITIVITY ANALYSIS In the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM...

  13. Environmental Management Los Alamos Field Corrective Action Plan...

    Energy Savers

    Los Alamos Field Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Corrective Action Plan - Radiological Release Phase II On March...

  14. Mr. Ken Blower, Manager Corporate Environmental Affairs Standard...

    Office of Legacy Management (LM)

    Ken Blower, Manager Corporate Environmental Affairs Standard Oil Company of Ohio Midland ... Research Laboratory (now Standard Oil Company of Ohio) to determine whether it ...

  15. Celebrating Successes of Environmental Management Recovery Act Projects

    Energy.gov [DOE]

    The Office of Environmental Management marked a milestone at the end of last month as they completed 84 American Recovery and Reinvestment Act-funded projects across America.

  16. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015

    Energy.gov [DOE]

    DOE's Oak Ridge Environmental Management Office told URS | CH2M Oak Ridge LLC (UCOR) in a letter that it had completed its evaluation of the company's performance for the award fee period of April to September 2015 and determined that UCOR earned a fee of more than $4.4 million for the period.

  17. Environmental management 1994. Progress and plans of the environmental restoration and waste management program

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

  18. "Name","Work Phone","Contact","E-Mail","Location","Manager Group...

    Office of Scientific and Technical Information (OSTI)

    ... Ridge Office","Technical Information Officers" "Smith, Tania","(202) 586-5008","","tania.smith@em.doe.gov","Office of Environmental Management","Headquarters" ...

  19. Environmental Management FY 2006 Budget Request DRAFT

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Justice Environmental Justice The Department of Energy (DOE) is committed to promoting environmental justice in all its activities in keeping with Executive Order (EO) 12898: Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations. This EO directs each Federal agency to "make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects

  20. National Environmental Policy Act (NEPA) Documents | U.S. DOE Office of

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Science (SC) National Environmental Policy Act (NEPA) Documents Oak Ridge National Laboratory Site Office (OSO) OSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 National Environmental Policy Act (NEPA) Documents Print Text Size: A A A

  1. 1987 Oak Ridge model conference: Proceedings: Volume I, Part 3, Waste Management

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    A conference sponsored by the United States Department of Energy (DOE), was held on waste management. Topics of discussion were transuranic waste management, chemical and physical treatment technologies, waste minimization, land disposal technology and characterization and analysis. Individual projects are processed separately for the data bases. (CBS)

  2. Postconstruction report of the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.

    1993-06-01

    Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutions to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.

  3. Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately, develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.

  4. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD AGENDA Pacific Northwest...

    Energy.gov (indexed) [DOE]

    Hanford Site Welcome Doug Shoop, Richland Operations Office Site Deputy Manager Kevin Smith, Office of River Protection Site Manager Susan Leckband, Hanford Advisory ...

  5. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  6. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  7. US Department of Energy environmental management advisory board public meeting

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    Contents of this publication include: list of participants; March 14, 1994--opening of public meeting and subcommittee reports, and public comment session; March 15, 1994--presentation by Thomas P. Grumbly, assistant secretary for environmental management, presentations by senior environmental management officials, and committee business.

  8. EMS - Environmental Management System | Princeton Plasma Physics Lab

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Directory Diversity and Inclusion Environment, Safety & Health Environmental Management System Joint Working Group for Fusion Safety Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer Contact Us Business Operations Careers/ Human Resources Directory Diversity and Inclusion Environment, Safety & Health Environmental Management System Joint Working Group for Fusion Safety Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer EMS

  9. Fernald Environmental Management Project 1995 site environmental report

    SciTech Connect (OSTI)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  10. Oak Ridge National Laboratory Technology Logic Diagram. Volume 1, Technology Evaluation: Part C, Waste Management

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This report documents activities at ORNL including waste management and remedial action at the site; also waste processing and disposal; robotics and automation of the laboratory; and regulatory compliance

  11. Environment, Environmental Restoration, and Waste Management Field Organization Directory

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers.

  12. Oak Ridge completes field work on Recovery Act-projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Ridge completes field work on Recovery Act-projects Oak Ridge completes field work on Recovery Act-projects May 8, 2014 - 12:00pm Addthis The U.S. Department of Energy's Oak Ridge Office of Environmental Management (EM) has finished field work on the last Recovery Act-funded environmental cleanup project. Since 2009, EM has used the $751 million in Recovery Act funds to accomplish 27 projects, many of which included multiple subcomponents and extensive scopes. "This is a landmark

  13. Role of the environmental management commission in North Carolina

    SciTech Connect (OSTI)

    Watkins, R.V. )

    1993-01-01

    The state of North Carolina's 17-member Environmental Management Commission is the principal regulatory and environmental policy-making body in the state for issues affecting water, air, and land resources. The author traces the evolution of environmental programs in the state, and the history of the Environmental Management Commission from its origin in 1927, and reviews the Commission's role, mission, structure, organization, function, and regulatory/public participation process. The state's environmental regulatory rulemaking process and established provisions against conflict of interest are also reviewed.

  14. The Office of Environmental Management technical reports: A bibliography

    SciTech Connect (OSTI)

    1998-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995--that were published from October 1, 1996--September 30, 1997. This information is divided into the following categories: Miscellaneous, Focus Areas and Crosscutting Programs, Support Programs, Technology Integration and International Technology Exchange, are now included in the Miscellaneous category. The Office of Environmental Management within the Department of Energy (DOE) is responsible for environmental restoration, waste management, technology development and facility transition and management. Subjects include: subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations. 880 refs.

  15. Integrated Safety & Environmental Management System | Stanford Synchrotron

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Radiation Lightsource Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation

  16. Integrating Environmental, Safety, and Quality Management System Audits |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Integrating Environmental, Safety, and Quality Management System Audits Integrating Environmental, Safety, and Quality Management System Audits August 2009 Presenter: David Skipper, UT-Battelle Track 7-2 Topics Covered: External registration/validation of management systems is desirableUT-Battelle registrations ISO 9001 for isotope development process ISO 14001 for all UT-Battelle activities OHSAS 18001 for all UT-Battelle activities ISO 17025 for metrology laboratory

  17. Office of Environmental Management Work Planning and Control Oversight |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Office of Environmental Management Work Planning and Control Oversight Office of Environmental Management Work Planning and Control Oversight May 16, 2013 Presenter: Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office Topics Covered: Contractor Good Practices: All contractors evaluate WP&C as part of their CAS URS performing corporate Phase II implementation reviews at sites where they are EM's lead contractor NWP (WIPP contractor) implemented

  18. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  19. The Environmental Management Project Manager`s Handbook for improved project definition

    SciTech Connect (OSTI)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.

  20. Waste Management Plan for the Oak Ridge National Remedial Investigation/Feasibility Study

    SciTech Connect (OSTI)

    Not Available

    1988-04-01

    In accordance with the requirements of the Remedial Investigation/Feasibility Study (RI/FS) Project Quality Assurance Plan, this Waste Management Plan establishes clear lines of responsibility and authority, documentation requirements, and operational guidance for the collection, identification, segregation, classification, packaging, certification, and storage/disposal of wastes. These subjects are discussed in the subsequent sections of this document.

  1. Applications of low-cost radio-controlled airplanes to environmental restoration at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Nyquist, J.E.

    1996-10-01

    The US DOE is endeavoring to clean up contamination created by the disposal of chemical and nuclear waste on the Oak Ridge Reservation (ORR), Tennessee, with an emphasis on minimizing off-site migration of contaminated surface and ground water. The task is complicated by inadequate disposal records and by the complexity of the local geology. Remote sensing data, including aerial photography and geophysics, have played an important role in the ORR site characterization. Are there advantages to collecting remote sensing data using Unmanned Aerial Vehicles (UAV`s)? In this paper, I will discuss the applications of UAV`s being explored at Oak Ridge National Laboratory (ORNL) under the sponsorship of the Department of Energy`s Office of Science and technology. These applications are : aerial photography, magnetic mapping, and Very Low Frequency (VLF) electromagnetic mapping.

  2. Environmental Management (EM) Quality Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Quality Procedure - Records Management Quality Procedure - MemoCorrespondence Control and Tracking Quality Procedure - Stop Work Quality Procedure - Supplier Qualification ...

  3. DOE methods for evaluating environmental and waste management samples.

    SciTech Connect (OSTI)

    Goheen, S C; McCulloch, M; Thomas, B L; Riley, R G; Sklarew, D S; Mong, G M; Fadeff, S K

    1994-04-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) provides applicable methods in use by. the US Department of Energy (DOE) laboratories for sampling and analyzing constituents of waste and environmental samples. The development of DOE Methods is supported by the Laboratory Management Division (LMD) of the DOE. This document contains chapters and methods that are proposed for use in evaluating components of DOE environmental and waste management samples. DOE Methods is a resource intended to support sampling and analytical activities that will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the US Environmental Protection Agency (EPA), or others.

  4. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    Environmental Protection Agency ("Ohio EPA") in Ohio Revised Code ("ORC") ... I-V. FINDINGS OF FACT The Director of the Ohio EPA has determined the following findings ...

  5. Integrating Environmental, Safety, and Quality Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    An Approach to Sustainability that Improves Environmental and Safety Performance Utilizing Bacteria for Sustainable Manufacturing of Low-Cost Nanoparticles Performance Analysis of ...

  6. Tiger team assessment of the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    none,

    1990-02-01

    This document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Y-12 Plant in Oak Ridge, Tennessee. The Y-12 Plant Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environmental, Safety, and Health (including Occupational Safety and Health Administration (OSHA) compliance), and Management areas and determines the plant's compliance with applicable federal (including DOE), state, and local regulations and requirements. 4 figs., 12 tabs.

  7. EA-1936: Proposed Changes to Parcel ED-1 Land Uses, Utility Infrastructure, and Natural Area Management Responsibility, Oak Ridge, Tennessee

    Energy.gov [DOE]

    NOTE: This EA has been cancelled. This EA will evaluate the environmental impacts of DOE’s proposed modifications to the allowable land uses, utility infrastructure, and Natural Area management responsibility for Parcel ED-1. The purpose of the modifications is to enhance the development potential of the Horizon Center business/industrial park, while ensuring protection of the adjacent Natural Area. The area addressed by the proposed action was evaluated for various industrial/business uses in the Environmental Assessment Addendum for the Proposed Title Transfer of Parcel ED-1, DOE/EA-1113-A.

  8. EA-1044: Melton Valley Storage Tanks Capacity Increase Project- Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to construct and maintain additional storage capacity at the U.S. Department of Energy's Oak Ridge National Laboratory, Oak Ridge,...

  9. Deputy Secretary visits Oak Ridge

    Energy.gov [DOE]

    As Deputy Secretary Sherwood-Randall traveled across the Oak Ridge Reservation, she stopped at the East Tennessee Technology Park for a first-hand perspective of the environmental cleanup happening there.

  10. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  11. The Oak Ridge Reservation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Reservation 41,1EsEiiS WORKING GROUP July, 1998 This report was written and edited by members of the Stewardship Committee with the assistance of Phoenix Environmental Corporation of Alexandria, Virginia. Additional copies and information can be found on the DOE Oak Ridge Operations site on the world wide web: ornl.gov/doe~oro/em/emhome.html or by calling the Information Resource Center at 423-241-4582 Stakeholder R e ~ o r t on stewards hi^ TABLE OF CONTENTS 1 . 0 INTRODUCTION

  12. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    Restoration Management Corporation U.S. EPA ID No.: OH6890008976 CERTIFIED MAIL ... Snyder, OFFO, SWDO Pmeu on recyeo paper EPA 1613 (rev 94) I BEFORE OHIO ENWRONMENTAL ...

  13. Environmental Management FY 2006 Budget Request DRAFT

    Office of Environmental Management (EM)

    ... Validation * Independent reviews dramatically increased - All Recovery Act scope had EIR, IPR or Program Review - Five acquisition management reviews in 2009 (V&V in 2010) - EM ...

  14. Advanced Simulation Capability for Environmental Management ...

    Office of Scientific and Technical Information (OSTI)

    The modular and open source high performance computing tool will facilitate integrated ... Country of Publication: United States Language: English Subject: 12 MANAGEMENT OF ...

  15. ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    of non-stockpile nuclear materials; excess facilities; future land use and long-term stewardship; risk assessment and management; and clean-up science and technology activities. ...

  16. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    & Orders U.S. Department of Energy Cincinnati, Ohio U.S. EPA ID No: OH6890008976 Mr. ... Environmental Protection Agency ("Ohio EPA") in Ohio Revised Code (lfORCIV) Sections ...

  17. Definition of Environmental Management (EM) Completion

    Energy.gov [DOE]

    The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2)...

  18. Environmental Management FY 2006 Budget Request DRAFT

    Office of Environmental Management (EM)

    Environmental Contractor Mentors Young Students Environmental Contractor Mentors Young Students November 26, 2014 - 12:00pm Addthis Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Middle school students use water bottles and powdered drink mix to learn how contamination

  19. The Office of Environmental Management Uranium Enrichment D&D...

    Energy Savers

    Uranium Enrichment D&D The Office of Environmental Management Uranium Enrichment D&D Microsoft Word - B996F741.doc (100.04 KB) More Documents & Publications Microsoft Word - PSRP ...

  20. Environmental Enterprise Risk Management Benefits for a Government Contractor

    SciTech Connect (OSTI)

    Linda Guinn

    2012-05-01

    An often overlooked advantage that an Environmental Enterprise Risk Management System (ERMS) has to organizations is the added protection from the Civil False Claims Act (FCA) for activities under a government contract.

  1. In-Situ Decommissioning: A Strategy for Environmental Management

    Office of Environmental Management (EM)

    In-Situ Decommissioning A Strategy for Environmental Management Reducing the Footprint of the Cold War For over a decade, the Department of Energy has focused on reducing the ...

  2. Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-08-20

    This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

  3. Environmental Management Headquarters Corrective Action Plan - Truck Fire |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant (WIPP) February 5, 2014. The report identified 22 Conclusions and 35 Judgments of

  4. Environmental Management Scientist Sets His Sights on Mars | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  5. Environmental Management American Recovery & Reinvestment Act (ARRA)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lessons Learned | Department of Energy Environmental Management American Recovery & Reinvestment Act (ARRA) Lessons Learned Environmental Management American Recovery & Reinvestment Act (ARRA) Lessons Learned EM has compiled many valuable lessons learned from the American Recovery and Reinvestment Act Program. Here are a few examples: Use a phased approached to the release of funding based on performance; conduct monthly project reviews to track and monitor project performance and

  6. The New Gold Standard: Environmental Management Introduces the First LEED

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Gold Industrial Facility | Department of Energy The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility September 13, 2012 - 1:02pm Addthis The 200 West Groundwater Treatment Facility is shown here after completion of construction this summer. | Photo courtesy of Zachary Carter with Mission Support Alliance (MSA) at Hanford. The 200 West Groundwater

  7. Office of Environmental Management MAJOR CONTRACTS SUMMARY

    Office of Environmental Management (EM)

    12 - 93017 1.33B Waste Isolation Pilot Project Management and Operating Contract Cost plus award fee 5-Yr Option 100117 - 93022 Portage, Inc. DE-EM0004007 Base Period 116...

  8. Summary - Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN

    Office of Environmental Management (EM)

    & ORNL, Oak Ridge, TN EM Project: Integrated Facility Disposition Project (IFDP) ETR Report Date: August 2008 ETR-15 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN Why DOE-EM Did This Review Approximately two million pounds of mercury are unaccounted for at Y-12 and mercury contamination has been detected in both soils and groundwater. The IFDP will

  9. Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision

    Energy.gov [DOE]

    The Final Waste Management Programmatic Environmental Impact Statement (WM PEIS) is a nationwide study examining the environmental impacts of managing more than 2 million cubic meters of...

  10. Statement from DOE Assistant Secretary for Environmental Management James Rispoli on the National Academy of Public Administration's Management Review of DOE's Office of Environmental Management

    Energy.gov [DOE]

    "Today the National Academy of Public Administration released their comprehensive management review of the Department of Energy's Office of Environmental Management (EM).  EM is a $5.6 billion per...

  11. Issuance of the Final Tank Closure and Waste Management Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement December 5, 2012 - 12:00pm Addthis Media Contacts Carrie Meyer, DOE (509) 376-0810 Carrie_C_Meyer@orp.doe.gov Erika Holmes, Ecology (509) 372-7880 Erika.Holmes@ecy.wa.gov Richland, WA - The U.S. Department of Energy (DOE) is issuing its Final Tank Closure and Waste Management

  12. The Office of Environmental Management technical reports: a bibliography

    SciTech Connect (OSTI)

    1997-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.

  13. Oak Ridge, Tennessee, Warehouses Site Fact Sheet

    Office of Legacy Management (LM)

    Oak Ridge, Tennessee, Warehouses Site. This site is managed by the U.S. Department of Energy Office of Legacy Management under the Formerly Utilized Sites Remedial Action Program. Oak Ridge, Tennessee, Warehouses Site Oak Ridge Warehouses Site Knoxville Oak Ridge 40 75 640 140 75 321 411 70 441 11 129 27 25W M:\LTS\111\0001\10\S03066\S0306600.mxd smithw 09/13/2011 2:35:09 PM 0 10 20 Miles Nashville TENNESSEE Location of the Oak Ridge, Tennessee, Warehouses Site Site Description and History The

  14. 2014 Annual Planning Summary for the Environmental Management Energy Technology Engineering Center

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Environmental Management Energy Technology Engineering Center.

  15. 2013 Annual Planning Summary for the Environmental Management Consolidated Business Center

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Environmental Management Consolidated Business Center.

  16. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    J J J a a a n n n u u u a a a r r r y y y 1 1 1 4 4 4 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts

  17. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    O O O c c c t t t o o o b b b e e e r r r 1 1 1 4 4 4 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts

  18. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  19. Feasibility study on consolidation of Fernald Environmental Management Project depleted uranium materials

    SciTech Connect (OSTI)

    1995-11-30

    In 1991, the DOE made a decision to close the FMPC located in Fernald, Ohio, and end its production mission. The site was renamed FEMP to reflect Fernald`s mission change from uranium production to environmental restoration. As a result of this change, the inventory of strategic uranium materials maintained at Fernald by DOE DP will need to be relocated to other DOE sites. Although considered a liability to the Fernald Plant due to its current D and D mission, the FEMP DU represents a potentially valuable DOE resource. Recognizing its value, it may be important for the DOE to consolidate the material at one site and place it in a safe long-term storage condition until a future DOE programmatic requirement materializes. In August 1995, the DOE Office of Nuclear Weapons Management requested, Lockheed Martin Energy Systems (LMES) to assess the feasibility of consolidating the FEMP DU materials at the Oak Ridge Reservation (ORR). This feasibility study examines various phases associated with the consolidation of the FEMP DU at the ORR. If useful short-term applications for the DU fail to materialize, then long-term storage (up to 50 years) would need to be provided. Phases examined in this report include DU material value; potential uses; sampling; packaging and transportation; material control and accountability; environmental, health and safety issues; storage; project management; noneconomic factors; schedule; and cost.

  20. Oak Ridge National Laboratory | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Tool 4 References 4.1 References Overview "Oak Ridge National Laboratory (ORNL) is a science and technology laboratory managed for the United States Department of Energy by...

  1. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect (OSTI)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  2. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1993. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D&D) Program has continued to provide surveillance and maintenance (S&M) support for 34 surplus facilities. The objectives are to (1) ensure adequate containment of residual radioactive materials remaining in the facilities, (2) provide safety and security controls to minimize the potential hazards to on-site personnel and the general public, and (3) manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S&M planning, (2) routine S&M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  3. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Not Available

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National

  4. Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment

    SciTech Connect (OSTI)

    Irving, John S

    2003-04-01

    DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.

  5. Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment - April 2003

    SciTech Connect (OSTI)

    Irving, J.S.

    2003-04-30

    DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.

  6. Environmental Management Performance Report October 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-10-01

    This section provides an executive level summary of the performance information covered in this report and is intended to bring to Management's attention that information considered to be most noteworthy. All cost, schedule, milestone commitments, performance measures. and safety data is current as of August 31. Accomplishments, Issues and Integration items are current as of September 18 unless otherwise noted. The section begins with a description of notable accomplishments that have occurred since the last report and are considered to have made the greatest contribution toward safe, timely, and cost-effective clean up. Following the accomplishment section is an overall fiscal year-to-date summary analysis addressing cost, schedule, and milestone performance. Overviews of safety ensue. The next segment of the Executive Summary, entitled Critical Issues, is designed to identify the high-level challenges to achieving cleanup progress. The next section includes FY 2000 EM Management Commitment High Visibility Project Milestones and Critical Few Performance Measures. The Key Integration Activities section follows next, highlighting PHMC activities that cross contractor boundaries and demonstrate the shared value of partnering with other Site entities to accomplish the work. Concluding the Executive Summary, a forward-looking synopsis of Upcoming Planned Key Events is provided.

  7. Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

    Energy.gov [DOE]

    Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

  8. Joint Environmental Management System (EMS) Declaration of Conformance

    Energy Savers

    Jason Bordoff About Us Jason Bordoff - Associate Director for Energy and Climate Change at the White House Council on Environmental Quality and a Senior Advisor for Energy and Environmental Policy at the National Economic Council Most Recent Unlocking the Power of Energy Data May 23

    Jason Hartke About Us Jason Hartke - Commercial Buildings Integration Program Manager Most Recent Game On: DOE Initiative Supports Leadership in Sports Venues August 29 UC Berkeley Captures Energy Savings by

  9. DOE model conference on waste management and environmental restoration

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately.

  10. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups

  11. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect (OSTI)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New

  12. Colorado Environmental Coalition v. Office of Legacy Management, Civil

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Action No. 08-cv-01624 (October 18, 2011) | Department of Energy October 18, 2011) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). The Court has issued the injunctive relief described on pages 51-52 of the Order. U.S. District Court's Order of October 18, 2011, in Colorado

  13. Plutonium working group report on environmental, safety and health vulnerabilities associated with the department`s plutonium storage. Volume II, Appendix B, Part 9: Oak Ridge site site team report

    SciTech Connect (OSTI)

    1994-09-01

    This report provides the input to and results of the Department of Energy (DOE) - Oak Ridge Operations (ORO) DOE Plutonium Environment, Safety and Health (ES & H) Vulnerability Assessment (VA) self-assessment performed by the Site Assessment Team (SAT) for the Oak Ridge National Laboratory (ORNL or X-10) and the Oak Ridge Y-12 Plant (Y-12) sites that are managed by Martin Marietta Energy Systems, Inc. (MMES). As initiated (March 15, 1994) by the Secretary of Energy, the objective of the VA is to identify and rank-order DOE-ES&H vulnerabilities associated for the purpose of decision making on the interim safe management and ultimate disposition of fissile materials. This assessment is directed at plutonium and other co-located transuranics in various forms.

  14. Implications of pollution prevention experience for environmental management

    SciTech Connect (OSTI)

    Schramm, W.

    1993-06-01

    Conventional wisdom in the US is that firms face a trade-off between environmental efforts and profit because of the belief that environmental protection invariably involves costs that reduce profits. Firms, therefore, generally perceive environmental protection as an impediment to their goal of profit maximization. Environmental efforts are viewed as an added hurdle in producing a product, rather than an as intrinsic part of well-designed operations. From this perspective, firms have no incentive to engage in environmental protection efforts, and will do so only if they are forced (or are given incentives) by government or if they perceive in advance potential profits from their efforts (e.g., a market for environmental products). The concept of a trade-off between the environment and profit, however, has been challenged recently. A common argument raised for questioning this trade-off is that efforts directed at environmental protection will lead to the development of new technologies and will give US firms a competitive advantage in the emerging environmental industry. It is argued that opportunities available within this growth field outweigh costs of entry and research. Recent publications (World Wildlife Fund, 1992; Resources for the Future, 1993) have proposed that government actions, may encourage the development of the environmental industry and, thus, improve both economic and environmental performance. Suggested governmental actions include using market incentives rather than command and control regulation to achieve environmental goals, integrating environmental values into governmental policy analysis, and supporting investments in environmental technologies. This paper details the economics and benefits of various waste management efforts.

  15. Remedial Investigation Report on the Abandoned Nitric Acid Pipeline at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Energy Systems Environmental Restoration Program; Y-12 Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    Upper East Fork Poplar Creek Operable Unit 2 consists of the Abandoned Nitric Acid pipeline (ANAP). This pipeline was installed in 1951 to transport liquid wastes {approximately}4800 ft from Buildings 9212, 9215, and 9206 to the S-3 Ponds. Materials known to have been discharged through the pipeline include nitric acid, depleted and enriched uranium, various metal nitrates, salts, and lead skimmings. During the mid-1980s, sections of the pipeline were removed during various construction projects. A total of 19 locations were chosen to be investigated along the pipeline for the first phase of this Remedial Investigation. Sampling consisted of drilling down to obtain a soil sample at a depth immediately below the pipeline. Additional samples were obtained deeper in the subsurface depending upon the depth of the pipeline, the depth of the water table, and the point of auger refusal. The 19 samples collected below the pipeline were analyzed by the Oak Ridge Y-12 Plant`s laboratory for metals, nitrate/nitrite, and isotopic uranium. Samples collected from three boreholes were also analyzed for volatile organic compounds because these samples produced a response with organic vapor monitoring equipment. Uranium activities in the soil samples ranged from 0.53 to 13.0 pCi/g for {sup 238}U, from 0.075 to 0.75 pCi/g for {sup 235}U, and from 0.71 to 5.0 pCi/g for {sup 238}U. Maximum total values for lead, chromium, and nickel were 75.1 mg/kg, 56.3 mg/kg, and 53.0 mg/kg, respectively. The maximum nitrate/nitrite value detected was 32.0 mg-N/kg. One sample obtained adjacent to a sewer line contained various organic compounds, at least some of which were tentatively identified as fragrance chemicals commonly associated with soaps and cleaning solutions. The results of the baseline human health risk assessment for the ANAP contaminants of potential concern show no unacceptable risks to human health.

  16. U.S. Department of Energy ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (Rev 1) 1 U.S. Department of Energy ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Report of Activities for May 22, 2014 Public Meeting Submitted by the EMAB Acquisition and Project Management Subcommittee (APMS) May 22, 2014 Background: The APMS presented its last written report on its efforts at the EMAB meeting on June 14, 2013. The public meeting scheduled for November 19, 2013 was cancelled because of scheduling issues with the partial government shutdown. The Subcommittee has continued to hold

  17. ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS PROGRESS CY2014

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Objectives & Targets Rev. 1.2, 8/29/2014 Page 1 of 3 ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS PROGRESS CY2014 for SOUTHWESTERN POWER ADMINISTRATION Activity Legal Requirement Aspect Objective Target** see important note 2014 Target Achievements Real Estate Management DOE O 436.1 E.O. 13423 & 13514 EPAct 1992 and 2005 EISA 2007 NECPA 1978 Natural resource depletion and GHG emissions from resource intensive facilities Increase sustainability of facility resources, reduce

  18. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  19. Environmental Baseline Survey Report for the Title Transfer of Land Parcel ED-4 at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2008-05-01

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of a land parcel referred to as 'ED-4' (ED-4) at the U. S. Department of Energy's (DOE's) East Tennessee Technology Park (ETTP). DOE is proposing to transfer the title of this land to the Heritage Center, LLC. Parcel ED-4 is a land parcel that consists of two noncontiguous areas comprising a total of approximately 18 acres located east of the ETTP. The western tract of ED-4 encompasses approximately 8.5 acres in the northeastern quadrant of the intersection of Boulevard Road and Highway 58. The eastern tract encompasses an area of approximately 9.5 acres in the northwestern quadrant of the intersection of Blair Road and Highway 58 (the Oak Ridge Turnpike). Aerial photographs and site maps from throughout the history of the ETTP, going back to its initial development in the 1940s as the Oak Ridge Gaseous Diffusion Plant (ORGDP), indicate that this area has been undeveloped woodland with the exception of three support facilities for workers constructing the ORGDP since federal acquisition in 1943. These three support facilities, which were located in the western tract of ED-4, included a recreation hall, the Town Hall Camp Operations Building, and the Property Warehouse. A railroad spur also formerly occupied a portion of Parcel ED-4. These former facilities only occupied approximately 5 percent of the total area of Parcel ED-4. This report provides supporting information for the transfer of this government-owned property at ETTP to a non-federal entity. This EBS is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). In order to support a Clean Parcel Determination (CPD) in accordance with CERCLA Sect. 120(h)(4)(d), groundwater and sediment samples were collected within, and adjacent to, the Parcel ED-4 study area. The potential for DOE to make a CPD for ED-4 is further supported by a No

  20. An interim report to the manager of the Paducah Gaseous Diffusion Plant from the Paducah Environmental Advisory Committee

    SciTech Connect (OSTI)

    Jackson, G.D.

    1987-10-01

    The Paducah Environmental Advisory Committee was formed as: (1) an outgrowth of other Environmental Advisory Committees already in existence at Oak Ridge and other Martin Marietta Energy Systems plants; (2) a result of public concern following significant nuclear incidents at Bhopal and Chernobyl; (3) a result of the new direction and commitment of the management of the Paducah Gaseous Diffusion Plant following contract acquisition by Martin Marietta Energy Systems; and (4) a means of reducing and/or preventing local and/or public concern regarding the activities of and potential risks created by PGDP. This report discusses the following issues and concerns of the Committee arrived at through a series of meetings: (1) groundwater monitoring; (2) long-range tails storage; C-404, scrap yrads, and PCB and TCE cleanup; nuclear criticality plan and alarm systems; documentation of historical data regarding hazardous waste burial grounds; dosimeter badges; and asbestos handling and removal.