  1. Oak Ridge EM Program DOE Oak Ridge Environmental Management Program

    Office of Environmental Management (EM)

    ... Offce of Environmental Management. Expansion of EMWMF (Cells ... Alpha 4 building at Y-12. History of the Oak Ridge EM Program (continued) New 1 megawatt solar array opens at ETTP under a ...

  2. Oak Ridge EM Program Collaborates with Regulators on Groundwater Strategy

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – The Oak Ridge EM program has joined state and federal regulators in a series of workshops to address contaminated groundwater on the Oak Ridge Reservation.

  3. Oak Ridge's EM Program Realizes Successful 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge's EM Program Realizes Successful 2010 Oak Ridge's EM Program Realizes Successful 2010 February 7, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Cleanup at the Oak Ridge Reservation took a major leap forward in 2010, as the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) completed numerous projects that reduced risks, decreased the site's footprint, and paved the way for new development for DOE missions. Major accomplishments were completed across the Oak Ridge

  4. Council Honors Oak Ridge's EM Program with Prestigious Historic

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Preservation Award | Department of Energy Council Honors Oak Ridge's EM Program with Prestigious Historic Preservation Award Council Honors Oak Ridge's EM Program with Prestigious Historic Preservation Award August 15, 2016 - 12:35pm Addthis Left to right, ACHP Chairman Milford Wayne Donaldson; Knox Heritage Executive Director Kim Trent; OREM Manager Sue Cange; and ACHP Expert Member Robert Stanton with the Chairman’s Award for Achievement in Historic Preservation. Left to right, ACHP

  5. Oak Ridge's EM Program Unplugs Former Electrical Switchyard | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy EM Program Unplugs Former Electrical Switchyard Oak Ridge's EM Program Unplugs Former Electrical Switchyard April 14, 2016 - 12:50pm Addthis A worker surveys the switchyard before electrical equipment is taken down as part of demolition and cleanup at the East Tennessee Technology Park. A worker surveys the switchyard before electrical equipment is taken down as part of demolition and cleanup at the East Tennessee Technology Park. The switchyard was constructed in 1944. The

  6. Oak Ridge EM Program Completes K-25 North End Demolition | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Program Completes K-25 North End Demolition Oak Ridge EM Program Completes K-25 North End Demolition January 23, 2013 - 12:00pm Addthis Employees with the K-25 demolition team ...

  7. Oak Ridge EM Program Increases Focus on Mercury Cleanup

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM Senior Advisor Dave Huizenga recently joined local lawmakers and state and federal officials to announce their partnership to increase focus on cleanup of mercury — one of Oak Ridge’s greatest environmental threats — at the Y-12 National Security Complex.

  8. Oak Ridge EM Program Upgrades Environmental Database for Public’s Ease of Use

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – Oak Ridge is working to remediate contaminated areas in one of the EM program’s most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War.

  9. EM Update Highlights Oak Ridge Cleanup Milestone | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Update Highlights Oak Ridge Cleanup Milestone EM Update Highlights Oak Ridge Cleanup Milestone September 13, 2016 - 12:35pm Addthis OAK RIDGE, Tenn. - In this issue of EM Update, we mark the Oak Ridge EM program's world-first accomplishment: completion of decontamination, decommissioning and demolition of its uranium gaseous diffusion enrichment process buildings. On Aug. 30, Oak Ridge achieved its ambitious Vision 2016 when workers demolished the final portion of Building K-27. This in-depth

  10. New EM Facility Treats Groundwater at Oak Ridge

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge’s EM program is operating a new facility that reduces the amount of contaminants entering Mitchell Branch, a stream at DOE’s East Tennessee Technology Park.

  11. Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request | Department

    Office of Environmental Management (EM)

    of Energy 9 : FY 2014 DOE Oak Ridge EM Budget Request Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request At the April 11, 2012, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations regarding the FY 2014 DOE Oak Ridge Environmental Management Program budget request. Recommendation 209 (91.1 KB) DOE response to recommendation 209 (81.13 KB) More Documents & Publications Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request Recommendation

  12. Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request | Department of

    Office of Environmental Management (EM)

    Energy 197: FY 2013 DOE Oak Ridge EM Budget Request Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request At the May 26, 2011, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations regarding the FY 2013 DOE Oak Ridge Environmental Management Program budget request. Recommendation 197 (181.59 KB) DOE response to recommendation 197 (18.48 KB) More Documents & Publications Recommendation 189: FY 2012 DOE Oak Ridge EM Budget Request Recommendation

  13. Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request ...

    Office of Environmental Management (EM)

    6: FY 2015 DOE Oak Ridge EM Budget Request Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request At the May 8, 2013, meeting, the Oak Ridge Site Specific Advisory Board ...

  14. EM's Oak Ridge Office Contractor Scores High in Latest Award...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 27, 2016 - 12:50pm Addthis OAK RIDGE, Tenn. - EM gave URS | CH2M Oak Ridge LLC ... Each year, EM releases information relating to contractor fee payments - earned by ...

  15. EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract July 12, 2012 - 12:00pm Addthis DOE and UCOR employees held an event ...

  16. PIA - Oak Ridge Institute for Science and Education Program Applicant...

    Energy Savers

    Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and ...

  17. Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds

    Energy.gov [DOE]

    Department of Energy’s (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds.

  18. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Science and Education - April 2008 Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities Oak Ridge Institute for Science and Education - April 2008 ...

  19. EM program implements feedback from community | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM program implements feedback from community EM program implements feedback from community June 1, 2015 - 11:28am Addthis Roane County Mayor Ron Woody speaks to OREM leadership and workshop participants. Roane County Mayor Ron Woody speaks to OREM leadership and workshop participants. Oak Ridge, Tenn. - The Oak Ridge Office of Environmental Management (OREM) hosted its annual community budget workshop on April 29. While last year's meeting focused primarily on building strategic community

  20. ORIS: the Oak Ridge Imaging System program listings. [Nuclear...

    Office of Scientific and Technical Information (OSTI)

    program listings. Nuclear medicine imaging with rectilinear scanner and gamma camera Citation Details In-Document Search Title: ORIS: the Oak Ridge Imaging System program...

  1. Oak Ridge Site Specific Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831

    Office of Environmental Management (EM)

    October 16, 2012 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 211 : Recommendation on Availability of DOE Environmental Management Documents At our October 10, 2012, meeting the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation regarding the availability and finding of documents online through the DOE Information Center. The board recommends that steps be taken to

  2. Recommendation 169: Establishment of an Oak Ridge Oral History Program

    Energy.gov [DOE]

    The ORSSAB recommends DOE-ORO fully endorse the establishment of an Oak Ridge Oral History Program and provide necessary assistance.

  3. Oak Ridge Hosts EM Site Specific Advisory Board Spring Chairs Meeting

    Energy.gov [DOE]

    Oak Ridge, Tenn. – More than 60 participants from across the country traveled to Oak Ridge this month to attend the EM Site Specific Advisory Board’s (SSAB) 2016 Spring Chairs Meeting. The event was hosted by the Oak Ridge Site Specific Advisory Board (ORSSAB).

  4. EM Tribal Programs in Indian Country | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in

  5. EM Oak Ridge Manager Reflects on Reaching Vision 2016 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Oak Ridge Manager Reflects on Reaching Vision 2016 EM Oak Ridge Manager Reflects on Reaching Vision 2016 September 13, 2016 - 12:25pm Addthis EM Update spoke with Sue Cange, manager of the DOE Oak Ridge Office of Environmental Management, on recently completing Vision 2016 for the East Tennessee Technology Park (ETTP) cleanup, which entailed decommissioning and demolition of five former gaseous diffusion enrichment plants dating back to World War II, as well as plans for the next

  6. EM ARRA Best Practices and Lessons Learned Workshop: Oak Ridge

    Office of Environmental Management (EM)

    D&D two buildings that were part of the Y-12 ARRA scope. This characterization program should serve DOE-EM well as a new scope s c a ac e a o p og a s ou d se e O e as a e ...

  7. Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education- January 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Recertification of ORISE/ORAU at Oak Ridge as a Star Participant in the Department of Energy Voluntary Protection Program.

  8. Blue Ridge Mountain Electric Membership Corporation- Energy Efficiency Rebate Program

    Energy.gov [DOE]

    Blue Ridge Mountain EMC and TVA, its power supplier, offer the Energy Right and TVA E-Score rebates to qualified members. To qualify for water heater rebates provided by the Energy Right program, a...

  9. Oak Ridge's Reindustrialization Program Named Finalist for National...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reindustrialization Program at the U.S. Department of Energy's (DOE) Oak Ridge Office (ORO) was recently named a finalist in the U.S. General Services Administration's (GSA) 14th...

  10. EM's Oak Ridge Office Contractor Scores High in Latest Award Fee Evaluation

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM gave URS | CH2M Oak Ridge LLC (UCOR) a score of nearly 96 percent, allowing the contractor to earn over $4.4 million of the available fee of more than $4.6 million for the period from April to September 2015. UCOR is responsible for cleaning up the East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, as well as other select sites on DOE’s Oak Ridge Reservation under a contract valued at $2.4 billion.

  11. EM's Oak Ridge Office Launches New Website | Department of Energy

    Energy.gov (indexed) [DOE]

    Conference Highlights Oak Ridge's Progress and Partnerships CRESO Director John Byrd provides direction to students gathering data for their research on the region's box turtle. ...

  12. EM International Cooperative Program

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    June 16-20, 2014 Iraq Technical Assistance Meeting on Rad Waste Cleanup R. Elmetti, EM -2.1 Iraq Washington, D.C. To discuss the possibility of creating linkages to facilitate ...

  13. RIDGE

    Office of Legacy Management (LM)

    ' RIDGE NATIONAL : LABORATORY MANAGED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOG THE UNITED STATES DEPARTMENT OF ENERGY ORNLRASA-X970 RADIOLOGICALSURVEYAT THEJESSOPSTEELCOMPANYS...

  14. Oak Ridge National Laboratory Radiation Control Program - Partners in Site Restoration

    SciTech Connect (OSTI)

    Jones, S. L.; Stafford, M. W.

    2002-02-26

    In 1998, the U.S. Department of Energy (DOE) awarded the Management and Integration (M&I) contract for all five of the Oak Ridge Operations (ORO) facilities to Bechtel Jacobs Company LLC (BJC). At Oak Ridge National Laboratory (ORNL), a world renowned national laboratory and research and development facility, the BJC mission involves executing the DOE Environmental Management (EM) program. In addition to BJC's M&I contract, UT-Battelle, LLC, a not-for-profit company, is the Management and Operating (M&O) contractor for DOE on the ORNL site. As part of ORNL's EM program, legacy inactive facilities (i.e., reactors, nuclear material research facilities, burial grounds, and underground storage tanks) are transferred to BJC and are designated as remediation, decontamination and decommissioning (D&D), or long-term surveillance and maintenance (S&M) facilities. Facilities operated by both UT-Battelle and BJC are interspersed throughout the site and are usually in close proximity. Both UT-Battelle and BJC have DOE-approved Radiation Protection Programs established in accordance with 10 CFR 835. The BJC Radiological Control (RADCON) Program adapts to the M&I framework and is comprised of a combination of subcontracted program responsibilities with BJC oversight. This paper focuses on the successes and challenges of executing the BJC RADCON Program for BJC's ORNL Project through a joint M&I contractor relationship, while maintaining a positive working relationship and partnership with UT-Battelle's Radiation Protection organization.

  15. EM International Program Action Table - June 2014 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Action Table - June 2014 EM International Program Action Table - June 2014 EM International Program Action Table - June 2014 PDF icon EM International Program Action Table - June ...

  16. Update on EM Transportation Program Activities | Department of...

    Office of Environmental Management (EM)

    EM Transportation Program Activities Update on EM Transportation Program Activities Motor Carrier Evaluation Program, DOE Directives, Upcoming Shipping Activities Update on EM ...

  17. EMS Programs Manual

    Energy.gov [DOE]

    The Environmental Management System Programs Manual (LMS/POL/S04388-3.0) is obsolete and has been removed from the LM website.

  18. PIA - Oak Ridge Institute for Science and Education Program Applicant and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Participant Status System (APSS) | Department of Energy Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) (251.67 KB) More

  19. EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee.

  20. EM Quality Assurance Program (EM-QA-001 Revision 1)

    Energy.gov [DOE]

    The purpose of this document is to describe the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Quality Assurance Program (QAP).

  1. Environmental Compliance and Protection Program Description Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2009-02-26

    The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.

  2. Energy Programs at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Sheffield, J.

    1999-05-11

    energy system that is environmentally and economically sustainable'' as the first component of its mission. The strategic goal established for energy resources, identified as one of DOE's four businesses, is for ''the Department of Energy and its partners [to] promote secure, competitive, and environmentally responsible energy systems that serve the needs of the public.'' DOE has also identified four strategic goals for its programs in energy resources: (1) strengthening the economy and raising living standards through improvements in the energy field; (2) protecting the environment by reducing the adverse environmental impacts associated with energy production, distribution, and use; (3) keeping America secure by reducing vulnerabilities to global energy market shocks; and (4) enhancing American competitiveness in a growing world energy market.

  3. EM's National TRU Program and WIPP Recovery

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM's National TRU Program and WIPP Recovery Frank Marcinowski, Associate Principal Deputy Assistant Secretary for Regulatory & Policy Affairs for National Cleanup Workshop September 15, 2016 www.energy.gov/EM 2 Today's DOE Panel Participants DOE Field Office Managers: * Todd Shrader, Manager, Carlsbad Field Office, DOE-EM * Doug Hintze, Manager, Los Alamos Field Office, DOE-EM * Jack Zimmerman, Deputy Manager for the Idaho Cleanup Project, Idaho Operations Office, DOE www.energy.gov/EM 3

  4. EM's Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee EM's Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee July 28, 2016 - 12:45pm Addthis UCOR’s K-27 Building demolition project, pictured here, is ahead of schedule with actual costs projected to be less than planned, according to OREM’s correspondence regarding the contractor’s fee determination. UCOR's K-27 Building demolition project, pictured here, is ahead of schedule with

  5. EM Quality Assurance Program (EM-QA-001 Revision 0)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Previous revision of the Environmental Management Quality Assurance Program. The program is the EM management system to ensure we "do work correctly." This document has been superseded by Revision...

  6. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Institute for Science and Education - January 2015 January 2015 ... of Oak Ridge Institute for Science and Education (ORISE) during the period of January ...

  7. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Science and Education - October 2011 October 2011 Evaluation to determine whether Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education is continuing ...

  8. Oak Ridge National Laboratory Transuranic Waste Certification Program

    SciTech Connect (OSTI)

    Smith, J.H.; Bates, L.D.; Box, W.D.; Aaron, W.S.; Setaro, J.A.

    1988-08-01

    The US Department of Energy (DOE) has requested that all DOE facilities handling defense transuranic (TRU) waste develop and implement a program whereby all TRU waste will be contained, stored, and shipped to the Waste Isolation Pilot Plant (WIPP) in accordance with the requirements set forth in the DOE certification documents WIPP-DOE-069, 114, 120, 137, 157, and 158. The program described in this report describes how Oak Ridge National Laboratory (ORNL) intends to comply with these requirements and the techniques and procedures used to ensure that ORNL TRU wastes are certifiable for shipment to WIPP. This document describes the program for certification of newly generated (NG) contact-handled transuranic (CH-TRU) waste. Previsions have been made for addenda, which will extend the coverage of this document to include certification of stored CH-TRU and NG and stored remote-handled transuranic (RH-TRU) waste, as necessary. 24 refs., 11 figs., 4 tabs.

  9. Oak Ridge’s EM Program Seeks Public Input on Cleanup

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge's EM office held a public meeting this week to discuss the program’s upcoming budget and cleanup priorities.

  10. EM International Program Presentation for Waste Management 2015...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Associate Principal Deputy Assistant Secretary Monica Regalbuto gave a presentation on EM's International Program at the Waste Management Conference in March 2015 in Phoenix. EM ...

  11. EM International Program Action Table

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Design and Operations N. Buschman, EM-22 Germany Albuquerque & Carlsbad, NM Continue ... and Research (BMBF) G. DeLeon, EM-22 Germany Cologne, Germany Follow-up meeting from ...

  12. Oak Ridge’s EM Program Demolishes North America’s Tallest Water Tower

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – Oak Ridge’s EM program recently demolished one of the most iconic structures at the East Tennessee Technology Park (ETTP). The 382-foot checkerboard water tower — the tallest in North America — dominated the site’s skyline since its construction in 1958.

  13. Oak Ridge Reflects on 30 Years of Cleanup

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge’s EM program hosted an event this month that documented the site’s environmental cleanup efforts since 1983, six years before the official founding of the Department’s EM.

  14. Voluntary Protection Program Onsite Review, URS | CH2M Oak Ridge LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 2015 | Department of Energy URS | CH2M Oak Ridge LLC - April 2015 Voluntary Protection Program Onsite Review, URS | CH2M Oak Ridge LLC - April 2015 April 2015 UCOR is admitted to the Department of Energy Voluntary Protection Program as a Star Participant. This report summarizes the results from the evaluation of URS | CH2M OAK RIDGE LLC (UCOR) in Oak Ridge, Tennessee during the period of April 14-23 2015, and provides the Associate Under Secretary for AU with the necessary information

  15. The Oak Ridge National Laboratory and the New Technology Demonstration Program

    SciTech Connect (OSTI)

    Courville, G.E.; Adcock, P.W.

    1995-12-01

    The Oak Ridge National Laboratory is one of four National Labs implementing the Federal Energy Management Program`s New Technology Demonstration Program for the Department of Energy. The Oak Ridge National Laboratory has an extensive history of working on energy-related projects in both the public and private domain. Work on this program is intended to bring the strength of the Oak Ridge National Laboratory technology development abilities and unique facilities to bear on the technical challenges associated with evaluating energy efficient technologies. This paper describes some energy-related experiences at the Oak Ridge National Laboratory and the New Technology Demonstration Program at the Lab. The five technologies that the Lab is supporting in this Program are introduced. One of the technologies being evaluated, a retrofit system for rooftop units, is described in detail.

  16. Oak Ridge Removes Laboratory’s Greatest Source of Groundwater Contamination

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – This month, Oak Ridge’s EM program bid farewell to the last shipment of waste from the Tank W-1A project.

  17. Small Business Administration Honors Oak Ridge Subcontractor

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – The U.S. Small Business Administration (SBA) recently honored an environmental cleanup company that supports Oak Ridge’s EM program as its Subcontractor of the Year in an eight-state region.

  18. Blue Ridge Electric Cooperative- Heat Pump Loan Program

    Energy.gov [DOE]

    Blue Ridge Electric Cooperative (BREC) offers low interest loans to help members finance the purchase of energy efficient heat pumps. Loans under $1,500 can be financed for up to 42 months, and...

  19. Assessment of the Integrated Facility Disposition Project at Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    National Laboratory & Y-12 for Transfer of Facilities & Materials to EM | Department of Energy the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program

  20. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  1. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  2. Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education- October 2011

    Energy.gov [DOE]

    Evaluation to determine whether Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education is continuing to perform at a level deserving DOE-VPP Star recognition.

  3. Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities Oak Ridge Institute for Science and Education- April 2008

    Office of Energy Efficiency and Renewable Energy (EERE)

    Evaluation to determine whether Oak Ridge Associated Universities Oak Ridge Institute for Science and Education is continuing to perform at a level deserving DOE-VPP Star recognition.

  4. Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.gov/EM 2 EM Program Overview ETTP ORNL Y-12 City of Oak Ridge * Work is organized by Cleanup Por7olios * ETTP * Y-12 * ORNL www.energy.gov/EM 3 -3- * Approximately 10-Year Scope of Work * Regulatory Agreements * Partners and Stakeholders U-233 DisposiKon Project ETTP Cleanup and S&M TRU Waste Processing Center * Diverse, complex projects * Ongoing DOE

  5. Risk Communication Within the EM Program

    SciTech Connect (OSTI)

    Edelson, M.

    2003-02-26

    The U.S. Department of Energy Environmental Management program (EM) conducts the most extensive environmental remediation effort in the world. The annual EM budgets have exceeded $6,000,000,000 for approximately ten years and EM has assumed responsibility for the cleanup of the largest DOE reservations (i.e., at Hanford, Washington, Aiken, South Carolina, and Idaho Falls, Idaho) as well as the facilities at Rocky Flats, Colorado and in Ohio. Each of these sites has areas of extensive radioactive and chemical contamination, numerous surplus facilities that require decontamination and removal, while some have special nuclear material that requires secure storage. The EM program has been criticized for being ineffective (1) and has been repeatedly reorganized to address perceived shortcomings. The most recent reorganization was announced in 2001 to become effective at the beginning of the 2003 Federal Fiscal Year (i.e., October 2002). It was preceded by a ''top to bottom'' review (TTBR) of the program (2) that identified several deficiencies that were to be corrected as a result of the reorganization. One prominent outcome of the TTBR was the identification of ''risk reduction'' as an organizing principle to prioritize the activities of the new EM program. The new program also sought to accelerate progress by identifying a set of critical activities at each site that could be accelerated and result in more rapid site closure, with attendant risk, cost, and schedule benefits. This paper investigates how the new emphasis on risk reduction in the EM program has been communicated to EM stakeholders and regulators. It focuses on the Rocky Flats Environmental Technology Site (RFETS) as a case study and finds that there is little evidence for a new emphasis on risk reduction in EM communications with RFETS stakeholders. Discussions between DOE and RFETS stakeholders often refer to ''risk,'' but the word serves as a placeholder for other concepts. Thus ''risk'' communication

  6. Department of Energy Completes Five Recovery Act Projects- Moves Closer to Completing Recovery Act Funded Work at Oak Ridge Site

    Energy.gov [DOE]

    OAK RIDGE, Tenn. - The U.S. Department of Energy’s (DOE) Environmental Management (EM) program recently completed five projects at the Oak Ridge site funded through the American Recovery and Reinvestment Act.

  7. EM Program Update -- McNeil

    Office of Environmental Management (EM)

    to the Transportation External Coordination Working Group February 6, 2008 Ella McNeil Acting Director Office of Packaging and Transportation Office of Environmental Management U.S. Department of Energy Environmental Management Program Update There's a New EM Transportation Organization * Combines all packaging and transportation functions in a single office * Office of Transportation * Packaging and Certification Program * Reorganization will be transparent * Underlying principles and

  8. Fiscal year 1996 well plugging and abandonment program Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-04-01

    This report is a synopsis of the progress of the well plugging and abandonment program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, from August 1995 through August 1996. A total of 27 wells, piezometers, and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the U.S. Department of Energy, Y-12 Plant, Oak Ridge, Tennessee (HSW, Inc. 1991).

  9. EM's National TRU Program and WIPP Recovery | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM's National TRU Program and WIPP Recovery EM's National TRU Program and WIPP Recovery Presentation from the 2016 DOE National Cleanup Workshop by Frank Marcinowski, Associate Principal Deputy Assistant Secretary for Regulatory & Policy Affairs. EM's National TRU Program and WIPP Recovery (1015.93 KB) More Documents & Publications Welcome - Opening Remarks Agenda for the 2016 National Cleanup Workshop Resuming Operations at WIPP

  10. Summary of available waste forecast data for the Environmental Restoration Program at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This report identifies patterns of Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) waste generation that are predicted by the current ER Waste Generation Forecast data base. It compares the waste volumes to be generated with the waste management capabilities of current and proposed treatment, storage, or disposal (TSD) facilities. The scope of this report is limited to wastes generated during activities funded by the Office of the Deputy Assistant Secretary for Environmental Restoration (EM-40) and excludes wastes from the decontamination and decommissioning of facilities. Significant quantities of these wastes are expected to be generated during ER activities. This report has been developed as a management tool supporting communication and coordination of waste management activities at ORNL. It summarizes the available data for waste that will be generated as a result of remediation activities under the direction of the U.S. Department of Energy Oak Ridge Operations Office and identifies areas requiring continued waste management planning and coordination. Based on the available data, it is evident that most remedial action wastes leaving the area of contamination can be managed adequately with existing and planned ORR waste management facilities if attention is given to waste generation scheduling and the physical limitations of particular TSD facilities. Limited use of off-site commercial TSD facilities is anticipated, provided the affected waste streams can be shown to satisfy the requirements of the performance objective for certification of non-radioactive hazardous waste and the waste acceptance criteria of the off-site facilities. Ongoing waste characterization will be required to determine the most appropriate TSD facility for each waste stream.

  11. Biomedical and environmental sciences programs at the Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Richmond, C.R.; Johnson, C.A.

    1988-02-01

    This progress report summarizes the research and development activities conducted in the Biomedical and Environmental Sciences Programs of Oak Ridge National Laboratory. The report is structured to provide descriptions of current activities and accomplishments in each of the major organizational units. Following the accounts of research programs, is a list of publications and awards to its members. 6 figs., 14 tabs.

  12. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request Background Each year the U.S. Department of Energy (DOE) Environmental Management (EM) Program develops its budget request for the fiscal year two years beyond the current fiscal year, incorporating budget requests from DOE field offices to develop the EM Program budget request to the president. DOE EM Headquarters typically issues guidelines to the field offices advising them how much

  13. Independent review of Oak Ridge HCTW test program and development of seismic evaluation criteria

    SciTech Connect (OSTI)

    1995-05-01

    Many of the existing buildings at the Oak Ridge Y-12 Plant are steel frame construction with unreinforced hollow clay tile infill walls (HCTW). The HCTW infill provides some lateral seismic resistance to the design/evaluation basis earthquake; however acceptance criteria for this construction must be developed. The basis for the development of seismic criteria is the Oak Ridge HCTW testing and analysis program and the target performance goals of DOE 5480.28 and DOE-STD-1020-94. This report documents and independent review of the testing and analysis program and development of recommended acceptance criteria for Oak Ridge HCTW construction. The HCTW test program included ``macro`` wall in-plane and out-of-plane tests, full-scale wall in-plane and out-of-plane tests, in-situ out-of-plane test, shake table tests, and masonry component tests.

  14. In-Process Analysis Program for the Isolock sampler at the Gunite and Associated Tanks, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1998-05-01

    The In-Process Analysis Program documents the requirements for handling, transporting, and analyzing waste slurry samples gathered by the Bristol Isolock slurry sampler from the Gunite and Associated Tanks at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Composite samples will be gathered during sludge retrieval operations, labeled, transported to the appropriate laboratory, and analyzed for physical and radiological characteristics. Analysis results will be used to support occupational exposure issues, basic process control management issues, and prediction of radionuclide flow.

  15. Oak Ridge Lays Out Big Plans for 2012

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Last year, Oak Ridge’s Environmental Management (EM) program logged one of its most successful years due to sound project management and achievements in American Recovery and Reinvestment Act work.

  16. Questions remain on funding for cleanup of Oak Ridge Reservation

    Energy.gov [DOE]

    There is great uncertainty on what the looming federal budget cuts will be and what effect they will have on funding for the Department of Energy’s (DOE) Environmental Management (EM) program at the Oak Ridge Reservation (ORR).

  17. ORIS: the Oak Ridge Imaging System program listings. [Nuclear...

    Office of Scientific and Technical Information (OSTI)

    program listings. Nuclear medicine imaging with rectilinear scanner and gamma camera Bell, P. R.; Dougherty, J. M. 62 RADIOLOGY AND NUCLEAR MEDICINE; 46 INSTRUMENTATION RELATED...

  18. Accomplishments of the Oak Ridge National Laboratory Seed Money program

    DOE R&D Accomplishments [OSTI]

    1986-09-01

    In 1974, a modest program for funding new, innovative research was initiated at ORNL. It was called the "Seed Money" program and has become part of a larger program, called Exploratory R and D, which is being carried out at all DOE national laboratories. This report highlights 12 accomplishments of the Seed Money Program: nickel aluminide, ion implantation, laser annealing, burn meter, Legionnaires' disease, whole-body radiation counter, the ANFLOW system, genetics and molecular biology, high-voltage equipment, microcalorimeter, positron probe, and atom science. (DLC)

  19. Oak Ridge Environmental Management Program Completes Work at...

    Energy.gov (indexed) [DOE]

    program recently completed upgrades and soil remediation work at the Bethel Valley ... and 3. This included removing contaminated soil ("hot spots"), diverting clean groundwater ...

  20. Accomplishments of the Oak Ridge National Laboratory Seed Money program

    SciTech Connect (OSTI)

    Not Available

    1986-09-01

    In 1974, a modest program for funding new, innovative research was initiated at ORNL. It was called the ''Seed Money'' program and has become part of a larger program, called Exploratory R and D, which is being carried out at all DOE national laboratories. This report highlights 12 accomplishments of the Seed Money Program: nickel aluminide, ion implantation, laser annealing, burn meter, Legionnaires' disease, whole-body radiation counter, the ANFLOW system, genetics and molecular biology, high-voltage equipment, microcalorimeter, positron probe, and atom science. (DLC)

  1. Oak Ridge Site Specific Advisory Board Monthly Meeting Olive Garden

    Office of Environmental Management (EM)

    Olive Garden 7206 Kingston Pike Knoxville, Tennessee 37919 The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks opportunities for input through collaborative

  2. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995

    SciTech Connect (OSTI)

    1995-07-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  3. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 2: January--March 1995

    SciTech Connect (OSTI)

    1995-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  4. Publications of the Oak Ridge National Laboratory Fossil Energy Program, October 1, 1991--March 31, 1993

    SciTech Connect (OSTI)

    Carlson, P.T.

    1993-06-01

    The Oak Ridge National Laboratory (ORNL) Fossil Energy Program, organized in FY 1974 as the Coal Technology Program, involves research and development activities for the Department of Energy (DOE) Assistant Secretary for Fossil Energy that cover a wide range of fossil energy technologies. The principal focus of the Laboratory`s fossil energy activities relates to coal, with current emphasis on materials research and development; environmental, health, and safety research; and the bioprocessing of coal to produce liquid or gaseous fuels. This bibliography covers the period of October 1, 1991, through March 31, 1993.

  5. Oak Ridge National Laboratory (ORNL): Industrial Collaborations with the Fuel Cell Technologies Program: Accelerating Widespread Commercialization

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FCTO T2M Event at the 2014 Fuel Cell Seminar (11/11/14) Industrial Collaborations with the ORNL Fuel Cell Technologies Program: Accelerating Widespread Commercialization David L. Wood, III, Ph.D. Senior Scientist & Fuel Cell Technologies Program Manager T2M Event at the 2014 Fuel Cell Seminar Los Angeles, CA 11/11/14 2 FCTO T2M Event at the 2014 Fuel Cell Seminar (11/11/14) ORNL Overview * Founded: 1943 as a key Manhattan Project location. * Location: Oak Ridge, TN * 4250 Employees * Budget:

  6. EM Removes Radioactive Components from Former Reactor at Oak Ridge National Laboratory

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Surveillance and maintenance — a process to monitor and maintain safe conditions in facilities awaiting demolition — is not a subject that often grabs headlines. But it’s an important part of EM’s portfolio.

  7. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ... * Internet: www.oakridge.doe.govemssab Oak Ridge Site ... and maintenance budget, funding, and personnel ...

  8. The National Teacher Enhancement Program (K-8) coordinated by the Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Richmond, C.R.

    1991-01-01

    Teachers need help, not harassment. So do the establishments in which teachers practice their profession. Community resources must be marshalled to provide help to local schools and teachers. In 1990 the National Science Foundation (NSF) established a unique educational activity named the National Teacher Enhancement Program (NTEP). NSF took advantage of the Department of Energy (DOE) sponsored educational programs and resources at several large DOE contractor labs that had had prior experience with DOE supported teacher enhancement programs. While DOE concentrated on teacher enhancement activities for secondary teachers, the NSF concentrated on teachers from grades K-8. The Oak Ridge National Laboratory (ORNL) is the lead organization for both administering and coordinating the grant. Other participating laboratories are Argonne National Laboratory (ANL), Fermi National Accelerator Laboratory (FERMI), Battelle-Pacific Northwest Laboratory (PNL), Lawrence Livermore Laboratory (LLNL) with some support functions provided by Brookhaven National Laboratory (BNL) and the Oak Ridge Associated Universities (ORAU). The program calls for a three week duration workshop to be conducted at each lab followed by in-service training and other activities during the year. The NSF/NTEP protocol calls for networking among the participating organizations and some of the teachers. An assessment effort is also an integral part of the program. 2 refs.

  9. Final report on the waste area grouping perimeter groundwater quality monitoring well installation program at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Greene, J.A.

    1991-06-01

    A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included.

  10. EmPOWER Maryland Low Income Energy Efficiency Program

    Energy.gov [DOE]

    The Maryland Department of Housing and Community Development (DHCD) EmPOWER Maryland Low Income Energy Efficiency Program helps qualifying low-income residents increase the energy efficiency of t...

  11. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  12. Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

  13. EM Program Update by Dr. Ines Triay

    Office of Environmental Management (EM)

    Goal 2: Goal 2: Reduce the life cycle costs and accelerate the cleanup of the Cold War ... EM's Mission To safely transform the environmental legacy of the Cold War into assets ...

  14. New Career Development Program Equips EM Employees with Leadership Skills |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Career Development Program Equips EM Employees with Leadership Skills New Career Development Program Equips EM Employees with Leadership Skills May 30, 2013 - 12:00pm Addthis Members of the 2013 AAGEN SES Development Program class gather for a photo at the program’s kickoff at the White House in March 2012. EM’s John Moon and Dr. Ming Zhu are in the second row; Moon is second from left and Zhu is third from left. Melvin G. Williams, Jr., former Associate Deputy

  15. Finding of no significant impact: Changes in the sanitary sludge land application program on the Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-10-01

    The U.S. Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1042) that evaluates potential impacts of proposed changes in the sanitary sludge land application program on the DOE Oak Ridge Reservation (ORR), Oak Ridge, Tennessee. Changes in lifetime sludge land application limits and radionuclide loading are proposed, and two new sources of sewage sludge from DOE facilities would be transported to the City of Oak Ridge Publicly Owned Treatment Works (COR POTW). Lifetime sludge land application limits would increase from 22 tons/acre to 50 tons/acre, which is the limit approved and permitted by the Tennessee Department of Environment and Conservation (TDEC). With the approval of TDEC, the permissible radiological dose from sludge land application would change from the current limit of 2x background radionuclide concentrations in receiving soils to a risk-based dose limit of 4 millirem (mrem) per year for the maximally exposed individual. Sludge land application sites would not change from those that are currently part of the program. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this Finding of No Significant Impact (FONSI). 70 refs., 2 figs., 17 tabs.

  16. Biological Monitoring and Abatement Program for the Oak Ridge K-25 Site

    SciTech Connect (OSTI)

    Kszos, L.A.; Adams, S.M.; Ashwood, T.L.; Blaylock, B.G.; Greeley, M.S.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Hinzman, R.L.; Shoemaker, B.A.

    1993-04-01

    A proposed Biological Monitoring and Abatement Program (BMAP) for the Oak Ridge K-25 Site was prepared in December 1992 as required by the renewed National Pollutant Discharge Elimination System permit that was issued on October 1, 1992. The proposed BMAP is based on results of biological monitoring conducted from 1986 to 1992 and discussions held on November 12, 1992, between staff of Martin Marietta Energy Systems, Inc. (Oak Ridge National Laboratory and the K-25 Site), and the Tennessee Department of Environment and Conservation, Department of Energy Oversight Division. The proposed BMAP consists of four tasks that reflect different but complementary approaches to evaluating the effects of K-25 Site effluents on the ecological integrity of Mitchell Branch, Poplar Creek, and the Poplar Creek embayment of the Clinch River. These tasks include (1) ambient toxicity monitoring, (2) bioaccumulation monitoring, (3) assessment of fish health, and (4) instream monitoring of biological communities. This overall BMAP plan combines established protocols with current biological monitoring techniques to assess environmental compliance and quantify ecological recovery. The BMAP will also determine whether the effluent limits established for the K-25 Site protect the designated use of the receiving streams (Mitchell Branch, Poplar Creek, and Clinch River) for growth and propagation of fish and other aquatic life. Results obtained from this biological monitoring program will also be used to document the ecological effects (and effectiveness) of remedial actions.

  17. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  18. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This report is the 1992--1994 Program Director`s Overview Report for Oak Ridge National Laboratory`s (ORNL`s) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  19. Data base management activities for the Remedial Action Program at Oak Ridge National Laboratories (ORNL)

    SciTech Connect (OSTI)

    Hook, L.A.; Voorhees, L.D.; Gentry, M.J.; Faulkner, M.A.; Shaakir-Ali, J.A.; Newman, K.A.; McCord, R.A.; Goins, L.F.; Owen, P.T.

    1990-07-01

    The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP) was established in 1985 in response to state and federal regulations requiring comprehensive control over facility discharges and cleanup of contaminated sites. A computerized Data and Information Management System (DIMS) was developed for RAP to (1) provide a centralized repository for data pertinent to RAP and (2) provide support for the investigations and assessments leading to the long-term remediation of contaminated facilities and sites. The current status of DIMS and its role in supporting RAP during 1989 are described. The DIMS consists of three components: (1) the Numeric Data Base, (2) the Bibliographic Data Base, and (3) the Records Control Data Base. This report addresses all three data bases, but focuses on the contents of the Numeric Data Base. Significant progress was made last year with the geographic information system (GIS) and ARC/INFO, which can be interfaced with SAS/GRAPH to provide combined mapping and statistical graphic products. Several thematic layers of GIS data for the Oak Ridge Reservation are now available. 18 refs., 8 figs., 19 tabs.

  20. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.; Manis, L.W.; Barre, W.L.

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S&H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures.

  1. Report on the biological monitoring program for Bear Creek at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, 1989-1994

    SciTech Connect (OSTI)

    Hinzman, R.L.; Beauchamp, J.J.; Cada, G.F.; Peterson, M.J.

    1996-04-01

    The Bear Creek Valley watershed drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in the Bear Creek Valley resulted in the contamination of Bear Creek and consequent ecological damage. Ecological monitoring by the Biological Monitoring and Abatement Program (BMAP) was initiated in the Bear Creek watershed in May 1984 and continues at present. Studies conducted during the first year provided a detailed characterization of the benthic invertebrate and fish communities in Bear Creek. The initial characterization was followed by a biological monitoring phase in which studies were conducted at reduced intensities.

  2. Fiscal year 1995 well plugging and abandonment program Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1995-09-01

    This report is a synopsis of the progress of the well plugging and abandonment program at the Y-12 Plant, Oak Ridge, Tennessee, from September 1994 through August 1995. A total of 67 wells, piezometers, and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned if (1) its construction did not meet current standards (substandard construction); (2) it was irreparably damaged or had deteriorated beyond practical repair; (3) its location interfered with or otherwise impeded site operations, construction, or closure activities; or (4) special circumstances existed as defined on a case-by-case basis and approved by the Y-12 Plant Groundwater Protection Program (GWPP) Manager. This summary report contains: general geologic setting of the Y-12 Plant and vicinity; discussion of well plugging and abandonment methods, grouting procedures, and waste management practices (a Waste Management Plan for Drilling Activities is included in Appendix C); summaries of plugging and abandonment activities at each site; and quality assurance/quality control (QA/QC) and health and safety protocols used during the FY 1995 Plugging and Abandonment Program.

  3. Bechtel Jacobs Company LLC Sampling and Analysis Plan for the Water Resources Restoration Program for Fiscal Year 2009, Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Ketelle R.H.

    2008-09-25

    The Oak Ridge Reservation (ORR) Water Resources Restoration Program (WRRP) was established by the U. S. Department of Energy (DOE) in 1996 to implement a consistent approach to long-term environmental monitoring across the ORR. The WRRP has four principal objectives: (1) to provide the data and technical analysis necessary to assess the performance of completed Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) actions on the ORR; (2) to perform monitoring to establish a baseline against which the performance of future actions will be gauged and to support watershed management decisions; (3) to perform interim-status and post-closure permit monitoring and reporting to comply with Resource Conservation and Recovery Act of 1976 (RCRA) requirements; and (4) to support ongoing waste management activities associated with WRRP activities. Water quality projects were established for each of the major facilities on the ORR: East Tennessee Technology Park (ETTP); Oak Ridge National Laboratory (ORNL), including Bethel Valley and Melton Valley; and the Y-12 National Security Complex (Y-12 Complex or Y-12), including Bear Creek Valley (BCV), Upper East Fork Poplar Creek (UEFPC), and Chestnut Ridge. Off-site (i.e., located beyond the ORR boundary) sampling requirements are also managed as part of the Y-12 Water Quality Project (YWQP). Offsite locations include those at Lower East Fork Poplar Creek (LEFPC), the Clinch River/Poplar Creek (CR/PC), and Lower Watts Bar Reservoir (LWBR). The Oak Ridge Associated Universities (ORAU) South Campus Facility (SCF) is also included as an 'off-site' location, although it is actually situated on property owned by DOE. The administrative watersheds are shown in Fig. A.l (Appendix A). The WRRP provides a central administrative and reporting function that integrates and coordinates the activities of the water quality projects, including preparation and administration of the WRRP Sampling and Analysis Plan

  4. FY2011 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    SciTech Connect (OSTI)

    Olszewski, Mitchell

    2011-10-01

    The U.S. Department of Energy (DOE) announced in May 2011 a new cooperative research effort comprising DOE, the U.S. Council for Automotive Research (composed of automakers Ford Motor Company, General Motors Company, and Chrysler Group), Tesla Motors, and representatives of the electric utility and petroleum industries. Known as U.S. DRIVE (Driving Research and Innovation for Vehicle efficiency and Energy sustainability), it represents DOE's commitment to developing public-private partnerships to fund high risk-high reward research into advanced automotive technologies. The new partnership replaces and builds upon the partnership known as FreedomCAR (derived from 'Freedom' and 'Cooperative Automotive Research') that ran from 2002 through 2010 and the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machines (PEEM) subprogram within the DOE Vehicle Technologies Program (VTP) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor (EM), and traction drive system technologies that will leapfrog current on-the-road technologies. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of advanced vehicle propulsion systems, the PEEM subprogram has enabled the development of technologies that will significantly improve efficiency, costs, and fuel economy. The PEEM subprogram supports the efforts of the U.S. DRIVE partnership through a three phase approach intended to: (1) identify overall propulsion and vehicle related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then

  5. Oak Ridge National Laboratory Annual Progress Report for the Electric Drive Technologies Program

    SciTech Connect (OSTI)

    Ozpineci, Burak

    2015-10-01

    The US Department of Energy (DOE) announced in May 2011 a new cooperative research effort comprising DOE, the US Council for Automotive Research (composed of automakers Ford Motor Company, General Motors Company, and Chrysler Group), Tesla Motors, and representatives of the electric utility and petroleum industries. Known as U.S. DRIVE (Driving Research and Innovation for Vehicle efficiency and Energy sustainability), it represents DOE’s commitment to developing public–private partnerships to fund high-risk–high-reward research into advanced automotive technologies. The new partnership replaces and builds upon the partnership known as FreedomCAR (derived from “Freedom” and “Cooperative Automotive Research”) that ran from 2002 through 2010 and the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. Oak Ridge National Laboratory’s (ORNL’s) Electric Drive Technologies (EDT) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor (EM), and traction drive system (TDS) technologies that will leapfrog current on-the-road technologies, leading to lower cost and better efficiency in transforming battery energy to useful work. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow’s automobiles will function as a unified system to improve fuel efficiency through research in more efficient TDSs. In supporting the development of advanced vehicle propulsion systems, the EDT subprogram fosters the development of technologies that will significantly improve efficiency, costs, and fuel economy

  6. Transuranic Waste Processing Center Oak Ridge Site Specific...

    Office of Environmental Management (EM)

    Transuranic Waste Processing Update Oak Ridge Site Specific Advisory Board May 14, 2014 ...EM 3 Oak Ridge Transuranic (TRU) Waste Inventory * TRU waste is waste ...

  7. First annual report on the Biological Monitoring and Abatement Program at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Blaylock, B.G.; Boston, H.L.; Frank, M.L.; Garten, C.T.; Houston, M.A.; Kimmel, B.L.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Berry, J.B.; Talmage, S.S. ); Amano, H. ); Jimenez, B.D. ); Kitchings, J.T.

    1992-08-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. BMAP consists of seven major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring; (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota; (3) biological indicator studies; (4) instream ecological monitoring; (5) assessment of contaminants in the terrestrial environment; (6) radioecology of WOC and White Oak Lake (WOL); and (7) contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system. This document, the first of a series of annual reports presenting the results of BMAP, describes studies that were conducted from March through December 1986.

  8. University Launches Website for FIU Research Sponsored by EM...

    Office of Environmental Management (EM)

    The applied research at the center develops technical solutions for the EM cleanup program at the Hanford, Oak Ridge, Savannah River, Idaho and Moab sites. The center also runs the ...

  9. The US DOE-EM International Program - 13004

    SciTech Connect (OSTI)

    Elmetti, Rosa R.; Han, Ana M.; Williams, Alice C.

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eight international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into FY 2013 and beyond. (authors)

  10. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192&D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for {approximately}4 years.

  11. A Big Step Increase in the EM Technology Development (TD) Program - Opening

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Opening A Big Step Increase in the EM Technology Development (TD) Program - Opening Presentation from the 2015 DOE National Cleanup Workshop by Rod Rimando, Senior Technical Adviser, DOE-EM. A Big Step Increase in the EM Technology Development (TD) Program - Opening (2.05 MB) More Documents & Publications A Big Step Increase in the EM Technology Development (TD) Program - Closing Office of River Protection (ORP) and Washingotn River Protection Solutions, LLC (WRPS)

  12. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992

    SciTech Connect (OSTI)

    Clapp, R.B.

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described.

  13. Third report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect (OSTI)

    Hinzman, R.L.; Adams, S.M.; Ashwood, T.L.

    1995-08-01

    As a condition of the modified National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site) on September 11, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream (Mitchell Branch or K-1700 stream). On October 1, 1992, a renewed NPDES permit was issued for the K-25 Site. A biological monitoring plan was submitted for Mitchell Branch, Poplar Creek, Poplar Creek Embayment of the Clinch River and any unnamed tributaries of these streams. The objectives of BMAP are to (1) demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life and (2) document the effects on stream biota resulting from operation of major new pollution abatement facilities, including the Central Neutralization Facility (CNF) and the Toxic Substances Control Act (TSCA) incinerator. The BMAP consists of four tasks: (1) toxicity monitoring; (2) bioaccumulation monitoring; (3) assessment of fish health; and (4) instream monitoring of biological communities, including benthic macroinvertebrates and fish. This document, the third in a series, reports on the results of the Oak Ridge K-25 Site BMAP; it describes studies that were conducted over various periods of time between June 1990 and December 1993, although monitoring conducted outside this time period is included, as appropriate.

  14. EM-Led Radiological Incident Response Program Receives Honors | Department

    Office of Environmental Management (EM)

    of Energy Top Official Underscores Commitment to Meet with Tribes EM's Top Official Underscores Commitment to Meet with Tribes November 29, 2012 - 12:00pm Addthis Senior Advisor for Environmental Management David Huizenga, center, speaks with Pilar Thomas, deputy director of the Office of Indian Energy Policy and Programs, left, and John Moon, acting principal deputy director of the Office of Economic Impact and Diversity, at DOE's event this week recognizing contributions of Native

  15. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  16. Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Blaylock, B.G.; Boston, H.L.; Huston, M.A.; Kimmel, B.L.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Kitchings, J.T.; Olsen, C.R.

    1991-09-01

    On April 1, 1986, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge National Laboratory (ORNL) (EPA 1986). As specified in Part 3: Special Conditions (Item H) of the permit, a plan for biological monitoring of the Clinch River, White Oak Creek (WOC), Northwest Tributary (NWT) of WOC, Melton Branch (MB), Fifth Creek, and First Creek shall be submitted for approval to the US Environmental Protection Agency (EPA) and the Tennessee Department of Health and Environment (TDHE) within 90 days of the effective date of the permit. The plan, which is referred to in Part 3 (H) of the permit as the Biological Monitoring Plan and Abatement Program (BMPAP), describes characterization monitoring studies to be conducted for the duration of the permit (5 years). In order to be consistent with the terminology used for the Biological Monitoring and Abatement Programs for the Oak Ridge Y-12 Plan and the Oak Ridge K-25 Plant, BMPAP will subsequently be referred to as the Biological Monitoring and Abatement Program (BMAP). The proposed BMAP outlined in this document is based on preliminary discussions held on December 9, 1985, between staff of Martin Marietta Energy Systems, Inc. (ORNL and Central Management), the US Department of Energy (DOE), EPA, and TDHE. 232 refs., 11 figs., 7 tabs.

  17. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory. Environmental Restoration Program

    SciTech Connect (OSTI)

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D&D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities.

  18. Improving EM&V for Energy Efficiency Programs (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-07-01

    This fact sheet describes the objectives of the U.S. Department of Energy Uniform Methods Project to bring consistency to energy savings calculations in U.S. energy efficiency programs. The U.S. Department of Energy (DOE) is developing a framework and a set of protocols for determining gross energy savings from energy efficiency measures and programs. The protocols represent a refinement of the body of knowledge supporting energy efficiency evaluation, measurement, and verification (EM&V) activities. They have been written by technical experts within the field and reviewed by industry experts. Current EM&V practice allows for multiple methods for calculating energy savings. These methods were developed to meet the needs of energy efficiency program administrators and regulators. Although they served their original objectives well, they have resulted in inconsistent and incomparable savings results - even for identical measures. The goal of the Uniform Methods Project is to strengthen the credibility of energy savings determinations by improving EM&V, increasing the consistency and transparency of how energy savings are determined.

  19. Independent Oversight Review, Oak Ridge Office- August 2011

    Energy.gov [DOE]

    Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation

  20. Science and technology for a sustainable energy future: Accomplishments of the Energy Efficiency and Renewable Energy Program at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Brown, M.A.; Vaughan, K.H.

    1995-03-01

    Accomplishments of the Energy Efficiency and Renewable Energy Program at the Oak Ridge National Laboratory are presented. Included are activities performed in the utilities, transportation, industrial, and buildings technology areas.

  1. Cleanup of the Oak Ridge Reservation Building the Future by Cleaning up the Past

    Office of Environmental Management (EM)

    orem 1 Oak Ridge Environmental Management Program Positioned for Success in 2016 and Beyond Jay Mullis, Deputy Manager Oak Ridge Office of Environmental Management October 12, 2016 www.energy.gov/orem 2 We are well organized to execute the cleanup mission in Oak Ridge www.energy.gov/orem 3 Oak Ridge EM has a clearly defined near-term cleanup plan Vision 2016  Completion of all Gaseous Diffusion Plant demolition at ETTP Vision 2020 Remaining portion of ETTP cleaned up and reindustrialized

  2. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    2 2 2 , , , 2 2 2 0 0 0 1 1 1 4 4 4 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks

  3. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    1 1 1 , , , 2 2 2 0 0 0 1 1 1 4 4 4 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks

  4. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    u u u n n n e e e 1 1 1 0 0 0 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge

  5. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    May 9, 2013 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 215:...

  6. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 228: Recommendation on Fiscal Year 2017 DOE Oak Ridge Environmental Management Budget Request At our June 10, ...

  7. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    on Fiscal Year 2016 DOE Oak Ridge Environmental Management Budget Request At our May 14, 2014, ... Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ...

  8. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Whitney: Recommendation 216: Recommendations on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request At our May 8, ...

  9. EM/Stewardship Committee

    Energy.gov [DOE]

    The Oak Ridge Site Specific Advisory Board's EM/Stewardship Committee meeting is open to the public.

  10. Cleanup of the Oak Ridge Reservation Building the Future by Cleaning up the Past

    Office of Environmental Management (EM)

    Groundwater Strategy Status Dennis Mayton DOE Groundwater Program Project Manager, P.G. Oak Ridge Office of Environmental Management www.energy.gov/EM 2 Groundwater Strategy put in place to document path forward for managing legacy groundwater challenges * Workshops held with regulators in 2013 * DOE/EPA/TDEC agreement on Groundwater Strategy document in 2014 www.energy.gov/EM 3 Groundwater Program put in place to implement the strategy * Resources assigned and program initiated in 2014

  11. Oak Ridge National Laboratory: Recent Accomplishments and Challenges in the Environmental Management Program

    Office of Environmental Management (EM)

    Oak Ridge Moves Forward in Mercury Cleanup Oak Ridge Moves Forward in Mercury Cleanup March 28, 2013 - 12:00pm Addthis Workers recently removed five large mercury-contaminated tanks from Y-12. Workers recently removed five large mercury-contaminated tanks from Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Workers recently removed five large

  12. Total Quality Management at an Oak Ridge laboratory and the establishment of an internal quality program

    SciTech Connect (OSTI)

    Dorsey, J.G.

    1993-11-01

    In order for any laboratory to be successful today, it is imperative that a total commitment to quality management be the keystone of that laboratory. Modern industry has begun to recognize that it must reach beyond traditional Quality Assurance methods and enlist the participation of all members of the organization for their unique contributions to make their organizations truly excellent. This report discusses Total Quality Management in the Analytical Services Organization at Oak Ridge, Tennessee. Laboratories are in the Y-12 Plant, which is one of three government sites located in Oak Ridge that are managed by Martin Marietta Energy Systems for the Department of Energy (DOE).

  13. Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    SciTech Connect (OSTI)

    Olszewski, M.

    2008-10-15

    performance targets at the vehicle level have been achieved. The research performed under this subprogram will help remove technical and cost barriers to enable the development of technology for use in such advanced vehicles as hybrid electric vehicles (HEVs), plug-in HEVs, and fuel-cell-powered automobiles that meet the goals of the Vehicle Technologies Program. A key element in making HEVs practical is providing an affordable electric traction drive system. This will require attaining weight, volume, and cost targets for the power electronics and electrical machines subsystems of the traction drive system. Areas of development include these: (1) novel traction motor designs that result in increased power density and lower cost; (2) inverter technologies involving new topologies to achieve higher efficiency and the ability to accommodate higher-temperature environments; (3) converter concepts that employ means of reducing the component count and integrating functionality to decrease size, weight, and cost; (4) more effective thermal control and packaging technologies; and (5) integrated motor/inverter concepts. The Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machinery Research Center conducts fundamental research, evaluates hardware, and assists in the technical direction of the DOE Vehicle Technologies Program, APEEM subprogram. In this role, ORNL serves on the FreedomCAR Electrical and Electronics Technical Team, evaluates proposals for DOE, and lends its technological expertise to the direction of projects and evaluation of developing technologies.

  14. Cleanup of the Oak Ridge Reservation Building the Future by Cleaning up the Past

    Office of Environmental Management (EM)

    FY 2018 DOE-Oak Ridge Environmental Management Program Budget and Prioritization Karen Thompson Oak Ridge Site Specific Advisory Board Meeting March 2016 1 www.energy.gov/EM 2 * FY16 Budget Enacted * FY17 President's Budget Requested in February * FY18 Budget Being Developed DOE has three active budgets at any given time www.energy.gov/EM 3 Development of the President's budget submittal to Congress takes about one year JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB Issuance of EM

  15. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Clapp, R.B.

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described.

  16. Second report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect (OSTI)

    Smith, J.G.; Adams, S.M.; Hinzman, R.L.; Kszos, L.A.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Southworth, G.R.; Crumby, W.D.

    1994-03-01

    On September 11, 1986, a modified National Pollutant Discharge Elimination System permit was issued for the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site), a former uranium-enrichment production facility. As required in Part III of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed for the biological monitoring of Mitchell Branch (K-1700 stream) and submitted for approval to the US EPA and the Tennessee Department of Environment and Conservation. The plan described biomonitoring activities that would be conducted over the duration of the permit. The objectives of the BMAP are to demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life, and to document the effects on stream biota resulting from operation of major new pollution abatement facilities. The BMAP consists of four tasks: ambient toxicity testing; bioaccumulation studies; biological indicator studies; and ecological surveys of stream communities, including benthic macroinvertebrates and fish. This document is the second in a series of reports presenting the results of the studies that were conducted over various periods of time between August 1987 and June 1990.

  17. First report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    SciTech Connect (OSTI)

    Smith, J.G.; Adams, S.M.; Kszos, L.A.; Ryon, M.G.; Southworth, G.R.; Loar, J.M.

    1993-08-01

    A modified National Pollutant Discharge Elimination System permit was issued to the Oak Ridge Gaseous Diffusion Plant (now referred to as the Oak Ridge K-25 Site) on September 11, 1986. The Oak Ridge K-25 Site is a former uranium-enrichment production facility, which is currently managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy. As required in Part III (L) of that permit, a plan for the biological monitoring of Mitchell Branch (K-1700 stream) was prepared and submitted for approval to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation [formerly the Tennessee Department of Health and Environment (Loar et al. 1992b)]. The K-25 Site Biological Monitoring and Abatement Program (BMAP) described biomonitoring activities that would be conducted over the duration of the permit. Because it was anticipated that the composition of existing effluent streams entering Mitchell Branch would be altered shortly after the modified permit was issued, sampling of the benthic invertebrate and fish communities (Task 4 of BMAP) was initiated in August and September 1986 respectively.

  18. Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  19. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  20. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    SciTech Connect (OSTI)

    1995-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

  1. Directors Advance EM Mission with Help from Rigorous Project Management Program

    Energy.gov [DOE]

    WASHINGTON, D.C. – Nearly 160 EM employees maintain certifications from a project management program that helps them achieve successful outcomes in the Cold War cleanup.

  2. DOE Recertifies EM Contractors in Star Program Recognizing Excellence in Safety

    Energy.gov [DOE]

    EM congratulated two of its contractors at the Savannah River Operations and Portsmouth/Paducah Project offices for their recent Voluntary Protection Program (VPP) Star recertifications.

  3. Waste and Water Top 2013 Accomplishments for Los Alamos EM Program...

    Office of Environmental Management (EM)

    Waste and Water Top 2013 Accomplishments for Los Alamos EM Program December 24, 2013 - ... biggest environmental cleanup accomplishments during 2013 centered around waste and water. ...

  4. Sludge application and monitoring program on the Oak Ridge Reservation, 1986--1993

    SciTech Connect (OSTI)

    Gunderson, C.A.; Larsen, I.L.; Boston, H.L.; Bradburn, D.M.; Van Miegroet, H.; Morris, J.L.; Walzer, A.E.; Adler, T.C.; Huq, M.

    1995-09-01

    Municipal sewage sludge has been applied to forests and pastures on the Oak Ridge Reservation since 1983 as a method of both disposal and beneficial reuse. Application was carried out under Tennessee permits issued to the city of Oak Ridge for land disposal of sewage sludge. In conjunction with these applications, information has been collected concerning sludge quantity and characteristics, soil parameters, soil water constituents, groundwater quality, surface runoff water quality, and various chemical constituents in vegetation on application sites. This information provides (1) a record of sludge application on the DOE reservations and (2) documentation of changes in soil parameters following sludge application. The information also provides a basis for evaluating the implications of the land application of municipal sewage sludge for soil and water quality and for evaluating the fate of sludge constituents when sludge is either sprayed or injected on pasture sites or surface applied in forested sites. This report covers in detail sludge applications conducted from 1986 through 1993, with some data from the period between 1983 and 1986. Anaerobically digested liquid sludge (2% to 4% solids) from the city of Oak Ridge had a relatively high nitrogen content (8% dry weight) and average to low concentrations of potentially problematic metals, compared with typical municipal sludges. Few potentially hazardous organic chemicals were detected in the sludge, and when found, these were at very low concentrations. Oak Ridge sludge is somewhat unique in that it contains radionuclides ({sup 137}Cs, {sup 60}Co, {sup 131}I, uranium isotopes, {sup 90}Sr, and occasionally {sup 99}Tc) at concentrations much higher than typical municipal sludges. Land application of sewage sludge can dilute or destroy problematic sludge constituents while improving soil fertility. Correct management has made these sludge applications a model of environmentally responsible waste management.

  5. Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    SciTech Connect (OSTI)

    Olszewski, M.

    2006-10-31

    , subsystems, and component research and development activities; (2) Develop and validate individual subsystems and components, including electric motors, emission control devices, battery systems, power electronics, accessories, and devices to reduce parasitic losses; and (3) Determine how well the components and subsystems work together in a vehicle environment or as a complete propulsion system and whether the efficiency and performance targets at the vehicle level have been achieved. The research performed under the Vehicle Systems subprogram will help remove technical and cost barriers to enable the development of technology for use in such advanced vehicles as hybrid and fuel-cell-powered automobiles that meet the goals of the FreedomCAR Program. A key element in making hybrid electric vehicles practical is providing an affordable electric traction drive system. This will require attaining weight, volume, and cost targets for the power electronics and electrical machines subsystems of the traction drive system. Areas of development include these: (1) Novel traction motor designs that result in increased power density and lower cost; (2) Inverter technologies involving new topologies to achieve higher efficiency and the ability to accommodate higher-temperature environments; (3) Converter concepts that employ means of reducing the component count and integrating functionality to decrease size, weight, and cost; (4) More effective thermal control and packaging technologies; and (5) Integrated motor/inverter concepts. The Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machinery Research Center conducts fundamental research, evaluates hardware, and assists in the technical direction of the DOE Office of FreedomCAR and Vehicle Technologies Program, Power Electronics and Electric Machinery Program. In this role, ORNL serves on the FreedomCAR Electrical and Electronics Technical Team, evaluates proposals for DOE, and lends its technological expertise to

  6. Annual summary report of the decontamination and decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1991

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1991-09-01

    The Surplus Facilities Management Program and Defense Facilities Decommissioning Program were established at Oak Ridge National Laboratory (ORNL) in 1976 in order to provide collective management of all surplus sites under ORNL control on the Oak Ridge Reservation. Some 34 facilities, classified into 3 civilian-related and 8 defense-related projects, are currently managed by the recently integrated Decontamination and Decommissioning Program. Support includes (1) surveillance and maintenance (S M) planning, (2) routine S M, and (3) special maintenance projects. This report documents routine S M, special projects, and special maintenance performed on these facilities for the period of October 1990 through September 1991.

  7. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  8. First report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Boston, H.L.; Huston, M.A.; McCarthy, J.F.; Smith, J.G.; Southworth, G.R.; Stewart, A.J. ); Black, M.C. ); Gatz, A.J. Jr. ); Hinzman, R.L. ); Jimenez, B.D. (Puerto Rico Univ.,

    1992-07-01

    As stipulated in the National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of the BMAP are (1) to demonstrate that the current effluent limitations established for the Oak Ridge Y-12 Plant protect the uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) [formerly the Tennessee Department of Health and Environment (TDHE)], and (2) to document the ecological effects resulting from implementation of a water pollution control program that includes construction of several large wastewater treatment facilities. The BMAP consists of four major tasks: (1) ambient toxicity testing, (2) bioaccumulation studies, (3) biological indicator studies, and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic macroinvertebrates, and fish. This document, the first in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted from May 1985 through September 1986.

  9. A Big Step Increase in the EM Technology Development (TD) Program - Closing

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Closing A Big Step Increase in the EM Technology Development (TD) Program - Closing Presentation from the 2015 DOE National Cleanup Workshop by Rod Rimando, Senior Technical Adviser, DOE-EM. A Big Step Increase in the EM Technology Development (TD) Program - Closing (7.58 MB) More Documents & Publications NSU Norfolk State University Nuclear Rocket Development Station at the Nevada Test Site National Laboratory Concentrating Solar Power Research and Development

  10. Hanford Site performance summary -- EM funded programs, July 1995

    SciTech Connect (OSTI)

    Schultz, E.A.

    1995-07-01

    Performance data for July 1995 reflects a 4% unfavorable schedule variance and is an improvement over June 1995. The majority of the behind schedule condition is attributed to EM-30, (Office of Waste Management). The majority of the EM-30 schedule variance is associated with the Tank Waste Remediation System (TWRS) Program. The TWRS schedule variance is attributed to the delay in obtaining key decision 0 (KD-0) for Project W-314, ``Tank Farm Restoration and Safe Operations`` and the Multi-Function Waste Tank Facility (MWTF) workscope still being a part of the baseline. Baseline Change Requests (BCRs) are in process rebaselining Project W-314 and deleting the MWTF from the TWRS baseline. Once the BCR`s are approved and implemented, the overall schedule variance will be reduced to $15.0 million. Seventy-seven enforceable agreement milestones were scheduled FYTD. Seventy-one (92%) of the seventy-seven were completed on or ahead of schedule, two were completed late and four are delinquent. Performance data reflects a continued significant favorable cost variance of $124.3 million (10%). The cost variance is attributed to process improvements/efficiencies, elimination of low-value work, workforce reductions and is expected to continue for the remainder of this fiscal year. A portion of the cost variance is attributed to a delay in billings which should self-correct by fiscal year-end.

  11. CHARACTERIZATION REPORT FOR STRONTIUM TITANATE IN SWSA 7 AND ADJACENT PARCELS IN SUPPORT OF THE NATIONAL PRIORITIES LIST SITE BOUNDARY DEFINITION PROGRAM OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    David A. King

    2011-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office requested support from the Oak Ridge Institute for Science and Education (ORISE) contract to delineate the extent of strontium titanate (SrTiO3) contamination in and around Solid Waste Storage Area (SWSA) 7 as part of the Oak Ridge National Priorities List Site boundary definition program. The study area is presented in Fig. 1.1 relative to the Oak Ridge Reservation (ORR). The investigation was executed according to Sampling and Analysis Plan/Quality Assurance Project Plan (SAP/QAPP) (DOE 2011) to supplement previous investigations noted below and to determine what areas, if any, have been adversely impacted by site operations.

  12. Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Transportation Technology Program Annual Report Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology Program Annual Report ornlttpreportfy08.pdf (4.58 ...

  13. DOE Names Oak Ridge Cleanup Manager

    Energy.gov [DOE]

    Oak Ridge, Tenn. – The U.S. Department of Energy (DOE) announced today the selection of Sue Cange as the manager of the Oak Ridge Office of Environmental Management (EM). Previously, Cange served as the acting manager of EM’s Oak Ridge Office since May 2014, and she has served as the deputy manager since March 2011.

  14. Oak Ridge National Laboratory (ORNL) Superconducting Technology Program for electric power systems. Annual report for FY 1994

    SciTech Connect (OSTI)

    Koncinski, W.S.; Hawsey, R.A.

    1994-12-01

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy`s Office of Energy Efficiency and Renewable Energy to develop the technology base needed by US industry for commercial development of electric power applications of high-temperature superconductivity. The three major elements of this program are conductor development, applications development, and the Superconductivity Partnership Initiative. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from information prepared for the FY 1994 Annual Program Review held July 19--20, 2994. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to industrial competitiveness projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire products.

  15. Head of EM Program Tours Hanford Site Facilities | Department...

    Office of Environmental Management (EM)

    EM Office of River Protection (ORP) Manager Kevin Smith, right, discusses the Low-Activity ... EM Office of River Protection (ORP) Manager Kevin Smith, right, discusses the Low-Activity ...

  16. Sludge application and monitoring program on the Oak Ridge Reservation, 1986 through 1993

    SciTech Connect (OSTI)

    Gunderson, C.A.; Boston, H.L.; Van Miegroet, H., Morris, J.L.; Larsen, I.L.; Walzer, A.E.; Adler, T.C.; Bradburn, D.M.; Huq, M.

    1995-08-01

    Municipal sewage sludge has been applied to forests and pastures on the DOE (U.S. Department of Energy) Oak Ridge Reservation (ORR) since 1983 as a method of both disposal and beneficial reuse. Application was carried out under State of Tennessee permits issued to the City of Oak Ridge for land disposal of. sewage sludge. In conjunction with these applications, information has been collected concerning sludge quantity and characteristics, soil parameters, soil water constituents, groundwater quality, surface runoff water quality, and various chemical constituents in vegetation on application sites. This information provides (1) a record of sludge application on the DOE ORR, and (2) documentation of changes in soil parameters following sludge application. The information also provides a basis for evaluating the implications of the land application of municipal sewage sludge for soil and water quality and for evaluating the fate of sludge constituents when sludge is either sprayed onto or injected into pasture sites or applied to the surface of forested sites. This report covers in detail sludge applications conducted from 1986 through 1993, with some data from the period between 1983 and 1986. Land application has been recommended by the U.S. Environmental Protection Agency as a desirable alternative for disposal of ORR waste. Municipal sewage sludge is in many ways similar to dilute animal manure fertilizer, but it also contains metals, organic chemicals, human pathogens, and other constituents reflective of inputs into the municipal sewage treatment plant. When applied to land, nutrients in the sludge improve soil fertility, and minerals and organic matter in the sludge improve soil structure. Under optimal conditions, metals are immobilized, and organic chemicals and pathogens are immobilized or destroyed. If the sludge is not managed effectively, however, sludge constituents have the potential to affect human health and the environment.

  17. Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2013-09-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tables of well inspections and well maintenance activities during the reference time period.

  18. Waste characterization data manual for the inactive liquid low-level waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-06-01

    This Waste Characterization Data Manual contains the results of an analysis of the contents of liquid low-level waste (LLLW) tanks that have been removed from service in accordance with the requirements of the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA), Sect. IX.G.1. This manual contains the results of sampling activities that were conducted at the Oak Ridge National Laboratory in 1988. Thirty-three tanks were sampled and analyzed at that time. Sampling of the remaining inactive tanks is currently underway, and data from these tanks will be added to this manual as they become available. Data are presented from analysis of volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, radiochemical compounds, and inorganic compounds.

  19. EM/Stewardship Committee meeting

    Energy.gov [DOE]

    The Oak Ridge Site Specific Advisory Board's EM/Stewardship Committee meeting is open to the public.

  20. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3, Appendixes 1 through 8: Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU`S) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment from doses to humans and animals and associated cancer risks, exposure via food chains, and historical data. (CBS)

  1. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2, Sections 4 through 9: Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU`s) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment and baseline human health evaluation including a toxicity assessment, and a baseline environmental evaluation.

  2. Waste management plan for inactive LLLW tanks 3001-B, 3004-B, 3013, and T-30 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    1995-07-01

    This Project Waste Management Plan identifies the waste that is expected to be generated in connection with the removal and disposition of inactive liquid low-level radioactive waste tanks 3001-B, 3004-B, and T-30, and grouting of tank 3013 at the Oak Ridge National Laboratory and the isolation of these tanks` associated piping systems. The plan also identifies the organization, responsibilities, and administrative controls that will be followed to ensure proper handling of the waste.

  3. Approach and Strategy for Performing Ecological Risk Assessments for the Department of Energy Oak Ridge Field Office Environmental Restoration Program

    SciTech Connect (OSTI)

    Suter, G.W. II

    1992-01-01

    This technical memorandum provides guidance for planning and performing ecological risk assessments (ERAs) on the Oak Ridge Reservation (ORR). This work was performed under Work Breakdown Structure 1.4.12.2.3.04.07.02 (Activity Data Sheet 8304) and meets an Environmental Restoration Program milestone for FY 95. The strategy discussed in this report is consistent with the overall strategy for site management and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) compliance developed for the ORR and relevant U.S. Environmental Protection Agency documents and guidance. The general approach and strategy presented herein was developed for the ORR, but it could be applicable to other complex CERCLA sites that possess significant ecological resources.

  4. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    March 14, 2008 Mr. Steve McCracken Assistant Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. McCracken: Recommendation 165: Recommendation on Conducting Future Verifications of Cleanup At our March 12 meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation. The successes of independent verification of cleanup on the Oak Ridge Reservation, the David Witherspoon Site in Knoxville, and at many other sites

  5. Publications of the Oak Ridge National Laboratory Fossil Energy Program and the AR and TD Materials Program, April 1, 1995--March 31, 1997

    SciTech Connect (OSTI)

    Carlson, P.T.

    1997-07-01

    The Oak Ridge National Laboratory (ORNL) Fossil Energy Program, organized in FY 1974 as the Coal Technology Program, involves research and development activities that cover a wide range of fossil energy technologies. The principal focus of the Laboratory`s fossil energy activities relates to coal, with current emphasis on materials research and development; environmental, health, and safety research; and the bioprocessing of coal to produce liquid or gaseous fuels. This bibliography covers the period of April 1, 1995, through March 31, 1997, and is a supplement to the earlier bibliographies in this series. The publications listed in this document have been limited to topical reports, open literature publications, full-length papers in published proceedings of conferences, and books and book articles. A major activity of the Fossil Energy Program is the Advanced Research and Technology Development (AR and TD) Materials Program. The objective of the AR and TD Materials Program is to conduct research and development on materials for fossil energy applications, with a focus on the longer-term needs for materials with general applicability to the various fossil fuel technologies. Beginning with this report, publications of the AR and TD Materials Program, previously compiled in separate reports, and publications from non-materials activities of the Fossil Energy Program will be combined in a single report.

  6. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    J J J a a a n n n u u u a a a r r r y y y 1 1 1 4 4 4 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts

  7. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    O O O c c c t t t o o o b b b e e e r r r 1 1 1 4 4 4 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts

  8. The Oak Ridge Reservation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Reservation 41,1EsEiiS WORKING GROUP July, 1998 This report was written and edited by members of the Stewardship Committee with the assistance of Phoenix Environmental Corporation of Alexandria, Virginia. Additional copies and information can be found on the DOE Oak Ridge Operations site on the world wide web: ornl.gov/doe~oro/em/emhome.html or by calling the Information Resource Center at 423-241-4582 Stakeholder R e ~ o r t on stewards hi^ TABLE OF CONTENTS 1 . 0 INTRODUCTION

  9. Terrestrial mapping of the Oak Ridge Reservation: Phase 1. Environmental Restoration Program

    SciTech Connect (OSTI)

    Washington-Allen, R.A.; Ashwood, T.L.; Christensen, S.W.; Offerman, H.; Scarbrough-Luther, P.

    1995-06-01

    This report presents the results of the first phase in development of a habitat map of the terrestrial ecosystem on the Oak Ridge Reservation (ORR). During this phase, a satellite image of the ORR was classified into land use/land cover types, the classified image was incorporated into a geographic information system map of the ORR, and the accuracy of the map was assessed. A habitat map is a critical foundation for evaluation of the potential impact of historical (or ongoing) contamination on terrestrial biota of the ORR. The abundance and distribution of wildlife species and plant communities of concern are intrinsically linked to the abundance and distribution of habitat on which those species and communities rely. Thus, the impact of spatially discrete patches of contamination on those biota is directly proportional to the degree of overlap between habitat and contamination. Landsat 5 Thematic Mapper satellite imagery was used to create the land use/land cover map. A Thematic Mapper image consists of seven images of the same point on the earth produced by seven separate sensors, each of which detects a unique part of the electromagnetic spectrum. Separately and in various combinations, these spectral images can be correlated with vegetation type or other land cover type. The image selected for this map was from April 13, 1994, and covers 189,000 ha.

  10. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D&D) Program is part of the Department of Energy (DOE) Environmental Restoration D&D Program and has continued to provide surveillance and maintenance (S&M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S&M planning, (2) routine S&M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  11. 2015-09-25 EM Contractor List.xls

    Office of Environmental Management (EM)

    Project INL Idaho National Laboratory CD0 TBD TBD EM 001021 OR-0041.C2 Outfall 200 Mercury Treatment Facility Oak Ridge Oak Ridge CD0 UCOR URS CH2M Hill Oak Ridge, LLC EM...

  12. EM Supports Program that Fosters Region's Safety Culture | Department...

    Office of Environmental Management (EM)

    The event's training includes 40 topics, most of which align with EM's diverse field work. They include combustible dust, confined space, electrical, power tool, scaffolding, ...

  13. ORTEP-III: Oak Ridge Thermal Ellipsoid Plot Program for crystal structure illustrations

    SciTech Connect (OSTI)

    Burnett, M.N.; Johnson, C.K.

    1996-07-01

    This report describes a computer program for drawing crystal structure illustrations. Ball-and-stick type illustrations of a quality suitable for publication are produced with either spheres or thermal-motion probability ellipsoids on the atomic sites. The program can also produce stereoscopic pairs of illustrations which aid in the visualization of complex packing arrangements of atoms and thermal motion patterns. Interatomic distances, bond angles, and principal axes of thermal motion are also calculated to aid the structural study.

  14. Oak Ridge National Laboratory`s (ORNL) ecological and physical science study center: A hands-on science program for K-12 students

    SciTech Connect (OSTI)

    Bradshaw, S.P.

    1994-12-31

    In our tenth year of educational service and outreach, Oak Ridge National Laboratory`s Ecological and Physical Science Study Center (EPSSC) provides hands-on, inquiry-based science activities for area students and teachers. Established in 1984, the EPSSC now hosts over 20,000 student visits. Designed to foster a positive attitude towards science, each unit includes activities which reinforce the science concept being explored. Outdoor science units provide field experience at the Department of Energy`s Oak Ridge National Environmental Research Park and outreach programs are offered on-site in area schools. Other programs are offered as extensions of the EPSSC core programs, including on-site student science camps, all-girl programs, outreach science camps, student competitions, teacher in-service presentations and teacher workshops.

  15. Project quality assurance plan for research and development services provided by Oak Ridge National Laboratory in support of the Hanford Grout Disposal Program

    SciTech Connect (OSTI)

    Spence, R.D.; Gilliam, T.M.

    1991-11-01

    This Project Quality Assurance Plan (PQAP) is being published to provide the sponsor with referenceable documentation for work conducted in support of the Hanford WHC Grout Disposal Program. This plan, which meets NQA-1 requirements, is being applied to work performed at Oak Ridge National Laboratory (ORNL) during FY 1991 in support of this program. It should also be noted that with minor revisions, this plan should be applicable to other projects involving research and development that must comply with NQA-1 requirements.

  16. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  17. Second report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    SciTech Connect (OSTI)

    Hinzman, R.L.; Adams, S.M.; Black, M.C.

    1993-06-01

    As stipulated in the National Pollutant Discharge Elimination System (NDPES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of BMAP are (1) to demonstrate that the current effluent limitations established for the Y-12 Plant protect the classified uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) and (2) to document the ecological effects resulting from implementation of a Water Pollution Control Program that includes construction of several large wastewater treatment facilities. BMAP consists of four major tasks: (1) ambient toxicity testing; (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic (bottom-dwelling) macroinvertebrates, and fish. This document, the second in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted between July 1986 and July 1988, although additional data collected outside this time period are included, as appropriate.

  18. DOE’s Worker-Focused Safety Program Honors Contractors Across EM Complex

    Energy.gov [DOE]

    Several contractors across the EM complex received honors in recent months in an important DOE safety program that turns to workers to assess, prevent, and control potential health and safety hazards.

  19. Oak Ridge Project Opens Possibilities for Future Mission Work, Development

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM is refining the picture of uncontaminated areas within the 33,500-acre Oak Ridge Reservation through a review of historic documents and extensive sampling, analysis and characterization.

  20. Oak Ridge Site Specific Advisory Board Meetings | Department...

    Energy.gov (indexed) [DOE]

    Meeting with Oak Ridge City Manager about the city's perspective on DOE EM work on the Oak Ridge Reservation. March 6, 2015 ORSSAB Meeting - March 2015 Discussion about the FY 2017 ...

  1. Oak Ridge Site Specific Advisory Board Contacts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-942 Oak Ridge, TN ... Melyssa Noe, Alternate Deputy Designated Federal Officer U.S. DOE-OREM, P.O. Box 2001, ...

  2. Oak Ridge Reservation Compliance Order, September 26, 1995

    Office of Environmental Management (EM)

    Box 2001, Oak Ridge, TN 37831. Go to Table of Contents http:www.em.doe.govffaaorrffca.html 4252001 Oak Ridge Reservation Compliance Order, September 26, 1995 Page 2 of 5...

  3. Toxicological benchmark for screening of potential contaminants of concern for effects on aquatic biota on the Oak Ridge Reservation, Oak Ridge, Tennessee; Environmental Restoration Program

    SciTech Connect (OSTI)

    Suter, G.W. II; Futrell, M.A.; Kerchner, G.A.

    1992-09-01

    One of the initial stages in ecological risk assessment of hazardous waste sites is the screening of contaminants to determine which of them are worthy of further consideration. This report presents potential screening benchmarks for protection of aquatic life from contaminants in water. Because there is no guidance for screening benchmarks, a set of alternative benchmarks is presented here. The alternative benchmarks are based on different conceptual approaches to estimating concentrations causing significant effects. To the extent that toxicity data are available, this report presents the alternative benchmarks for chemicals that have been detected on the Oak Ridge Reservation. It also presents the data used to calculate the benchmarks, and the sources of the data. It compares the benchmarks and discusses their relative conservatism and utility.

  4. Archived EM SSAB Correspondence & Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Communication & Engagement EM SSAB Archived EM SSAB Correspondence & Briefings Archived EM SSAB Correspondence & Briefings 2006 June 21, 2006 Letter: Congratulating Oak Ridge ...

  5. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1993. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D&D) Program has continued to provide surveillance and maintenance (S&M) support for 34 surplus facilities. The objectives are to (1) ensure adequate containment of residual radioactive materials remaining in the facilities, (2) provide safety and security controls to minimize the potential hazards to on-site personnel and the general public, and (3) manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S&M planning, (2) routine S&M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  6. Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge National Laboratory Oak Ridge National Laboratory An aerial view of the Oak Ridge National Laboratory campus. An aerial view of the Oak Ridge National Laboratory campus. The U.S. Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) is the nation's largest multi-program science and technology laboratory. ORNL's mission is to deliver scientific discoveries and technical breakthroughs that will accelerate the development and deployment of solutions in clean energy and global

  7. Report for EM-Initiated Program Supporting Cleanup is Available

    Energy.gov [DOE]

    WASHINGTON, D.C. – EM is leading a multi-laboratory team that is developing a state-of-the-art tool for the scientific community to improve understanding of complex contaminated subsurface systems.

  8. EM-21 Multi-Year Program Plan Prioritization Process

    Office of Environmental Management (EM)

    McCabe (SRNL) Spent Nuclear Fuel (WBS 1.7) Al Baione* (EM-21) Lead - Bill Hurt (INL) Brady Hansen (PNNL) Natraj Iyer (SRNL) Challenging Materials (WBS 1.6) Hoyt Johnson*Monica...

  9. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    SciTech Connect (OSTI)

    NONE

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems` ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL`s groundwater problems.

  10. Waste Management Plan for the Remedial Investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This Waste Management Plan (WMP) supplements the Remedial Investigation/Feasibility Study (RI/FS) Project WMP and defines the criteria and methods to be used for managing and characterizing waste generated during activities associated with the RI of 23 wells near the Old Hydrofracture Facility (OHF). These wells are within the Waste Area Grouping (WAG) 5 area of contamination (AOC) at Oak Ridge National Laboratory (ORNL). Field activities for the limited RI of Operable Unit (OU) 3 of WAG 10 will involve sampling and measurement of various environmental media (e.g., liquids and gases). Many of these activities will occur in areas known to be contaminated with radioactive materials or hazardous chemical substances, and it is anticipated that contaminated solid and liquid wastes and noncontaminated wastes will be generated as a result of these activities. On a project-wide basis, handling of these waste materials will be accomplished in accordance with the RI/FS Project WMP and the procedures referenced throughout the plan.

  11. Data evaluation technical memorandum on the K-1407C Retention Basin at the Oak Ridge K-25 Site, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Beal, D.; Bock, J.; Hatmaker, T.; Zolyniak, J.; Goddard, P.; Kucsmas, D.

    1991-10-01

    The K-1407-C Retention Basin was a surface impoundment at the Oak Ridge K-25 Site. The basin was used primarily for storing potassium hydroxide scrubber sludge generated at the K-25 Site. In addition, from 1960 to 1973, metal hydroxide sludges that were removed from the K-1407-B Holding Pond were discharged to the K-1407-C Retention Basin. The sludge in the K-1407-B Pond contained discharge from the K-1420 Decontamination and Uranium Recovery, the K-1501 Steam Plant, the K-1413 Laboratory, and the K-1401 Maintenance Building. Radioactive material is also present in the K-1407-C Retention Basin, probably the result of cleaning and decontamination activities at some of the aforementioned facilities. The discharge of waste materials to K-1407-C was discontinued before November of 1988, and all sludge was removed from the retention basin. Some of the sludge was stored, and the remainder was fixed in concrete. This report is specific to the K-1407-C Retention Basin and includes information pertinent to the evaluation of soil contamination. The focus of this evaluation is the effectiveness of the Phase 1 investigation of the K-1407-C Retention Basin to define site conditions adequately to support decisions regarding appropriate closure alternatives. This includes the physical characterization of the site area and the characterization of the nature and extent of contamination at the site in relation to risk characterization and statistical evaluation.

  12. Waste Characterization Data Manual for the inactive liquid low-level waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    This Waste Characterization Data Manual contains the results of an analysis of the contents of liquid low-level waste (LLLW) tanks that have been removed from service in accordance with the requirements of the Oak Ridge National Laboratory (ORNL) Federal Facility Agreement (FFA), Section IX.G.1. Section IX.G.1 of the FFA requires waste characterizations be conducted and provided to EPA and TDEC for all LLLW tanks that are removed from service. These waste characterizations shall include the results of sampling and analysis of the tank contents, including wastes, liquids, and sludges. This manual was first issued as ORNL/ER-80 in June 1992. The waste characterization data were extracted from ORNL reports that described tank sampling and analysis conducted in 1988 for 32 out-of-service tanks. This revision of the manual contains waste characterization data for 54 tanks, including the 32 tanks from the 1988 sampling campaign (Sects. 2.1 through 2.32) and the 22 additional tanks from a subsequent sampling campaign in 1992 and 1993 (Sects. 2.33 through 2.54). Data are presented from analyses of volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls (PCBs), pesticides, radiochemical compounds, and inorganic compounds. As additional data resulting from analyses of out-of-service tank samples become available, they will be added to this manual.

  13. Surface water sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This Sampling and Analysis Plan addresses surface water monitoring, sampling, and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Surface water monitoring will be conducted at nine sites within WAG 6. Activities to be conducted will include the installation, inspection, and maintenance of automatic flow-monitoring and sampling equipment and manual collection of various water and sediment samples. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the surface water monitoring, sampling, and analysis will aid in evaluating risk associated with contaminants migrating off-WAG, and will be used in calculations to establish relationships between contaminant concentration (C) and flow (Q). The C-Q relationship will be used in calculating the cumulative risk associated with the off-WAG migration of contaminants.

  14. Construction and installation summary for fiscal year 1992 of the hydraulic head monitoring stations at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Dreier, R.B.; Switek, J.; Couzens, B.A.

    1992-12-01

    During FY 1992, as part of the Hydraulic Head Monitoring Station (HHMS) Project, three multiport wells (HHMS 12, 13, and 14) were constructed along or near the boundaries of Waste Area Grouping (WAG) 2 at Haw Ridge water gap. The purpose of this report is to document well construction and multiport component installation activities. The hydraulic head monitoring stations (HHMS) are well clusters and single multiport wells that provide data required for evaluation of the transition between shallow and deep groundwater systems and of the nature of these systems. This information is used for required characterization of the hydrologic framework as dictated by state and federal regulatory agencies. Groundwater contaminants may move laterally across WAG boundaries or offsite; they may also move in a vertical direction. Because the HHMS Project was designed to address otential contamination problems, the project provides a means for defining the bounds of the uppermost aquifer; identifying potential pathways for offsite contamination for shallow; intermediate, and deep groundwater flow; and evaluating the capacity for contaminant transport in intermediate and deep groundwater flow systems.

  15. DOE - NNSA/NFO -- EM (RWAP) Radioactive Waste Acceptance Program

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Acceptance Program NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Click to subscribe to NNSS News Radioactive Waste Acceptance Program (RWAP) RWAP photo The mission ...

  16. EmPOWER Maryland Clean Energy Communities Grant Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    NOTE: The program has been renewed for FY2016. Applications are due by November 30, 2015. Please visit the program website for more information. ...

  17. Oak Ridge Office of Environmental Management

    Energy.gov [DOE]

    This website highlights activities that support the mission of the Oak Ridge Office of Environmental Management (Oak Ridge Office of EM), which is to remove environmental legacies resulting from more than 60 years of nuclear weapons development and government-sponsored nuclear energy and scientific research.

  18. Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Elvado Environmental LLC

    2009-12-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure A.1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted 'active' status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling (Section 3.0), whereas wells granted 'inactive' status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 3.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 4.0). This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes (Figure A.1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge directly south of Y-12 that is bound on

  19. Calendar Year 2000 Groundwater Monitoring Report for the Groundwater Protection Program, U.S. Department of Energy, Y-12 National Security Complex Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2001-03-01

    This report contains the groundwater and surface water monitoring data that were obtained at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee, during calendar year (CY) 2000. These monitoring data were collected for the specific purposes of DOE Order 5400.1 site surveillance monitoring and exit pathway/perimeter monitoring, as described in the ''Environmental Monitoring Plan for the Oak Ridge Reservation'' (DOE 1996). Site surveillance monitoring provides data regarding the quality of groundwater and surface water in areas that are, or could be, affected by operations at Y-12. Exit pathway/perimeter monitoring provides data regarding the quality of groundwater and surface water where contaminants from Y-12 are most likely to migrate beyond the boundaries of the DOE Oak Ridge Reservation (ORR). The CY 2000 groundwater and surface water monitoring data presented in this report were obtained under the auspices of the Y-12 Groundwater Protection Program (GWPP), managed by Lockheed Martin Energy Systems, Inc. (LMES) (January-October, 2000) and by BWXT Y-12, L.L.C. (November-December, 2000), and the Water Resources Restoration Program (WRRP), which is managed by Bechtel Jacobs Company LLC. Combining the monitoring results obtained under both the Y-12 GWPP and the WRRP enables this report to serve as a consolidated reference for the groundwater and surface water monitoring data obtained at Y-12 during CY 2000.

  20. Quality assurance plan for the design and construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The WAG 6 Closure Quality Assurance Plan establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 Closure project that are subject to the application of the Martin Marietta Energy Systems, Inc. (Energy Systems) QA Program, the Environmental Restoration Division QA Program, and other quality requirements. These activities may be performed by Energy Systems organizations, a subcontractor to Energy Systems, an architect-engineer (A-E) under prime contract to the Department of Energy (DOE), and/or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems Engineering quality requirements for the project. The WAG 6 Closure QA Plan will be supplemented by subproject QA plans that will identify additional requirements pertaining to each subproject.

  1. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 1: Results of Field Sampling Program

    SciTech Connect (OSTI)

    Watkins, D.R.; Ammons, J.T.; Branson, J.L.

    1993-10-01

    This report presents, evaluates, and documents data and results obtained in the Background Soil Characterization Project (BSCP). It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program. The objectives of the BSCP consist of the following: determine background concentrations of organics, metals, and radionuclides in natural soils that are key to environmental restoration projects; provide remediation projects with 100% validated data on background concentrations, which are technically and legally defensible; and quantify baseline risks from background constituents for comparison of risks associated with contaminated sites.

  2. FY 2005 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    SciTech Connect (OSTI)

    Olszewski, M

    2005-11-22

    component research and development activities; (2) Develop and validate individual subsystems and components, including electric motors, emission control devices, battery systems, power electronics, accessories, and devices to reduce parasitic losses; and (3) Determine how well the components and subsystems work together in a vehicle environment or as a complete propulsion system and whether the efficiency and performance targets at the vehicle level have been achieved. The research performed under the Vehicle Systems subprogram will help remove technical and cost barriers to enable technology for use in such advanced vehicles as hybrid and fuel-cell-powered automobiles that meet the goals of the FreedomCAR Program. A key element in making hybrid electric vehicles practical is providing an affordable electric traction drive system. This will require attaining weight, volume, and cost targets for the power electronics and electrical machines subsystems of the traction drive system. Areas of development include: (1) Novel traction motor designs that result in increased power density and lower cost; (2) Inverter technologies involving new topologies to achieve higher efficiency and the ability to accommodate higher-temperature environments; (3) Converter concepts that employ means of reducing the component count and integrating functionality to decrease size, weight, and cost; (4) More effective thermal control and packaging technologies; and (5) Integrated motor/inverter concepts. The Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machinery Research Center conducts fundamental research, evaluates hardware, and assists in the technical direction of the DOE Office of FreedomCAR and Vehicle Technologies Program, Power Electronics and Electric Machinery Program. In this role, ORNL serves on the FreedomCAR Electrical and Electronics Technical Team, evaluates proposals for DOE, and lends its technological expertise to the direction of projects and

  3. EM-54 Technology Development In Situ Remediation Integrated Program. Annual report

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) as an element of Environmental Restoration and Waste Management (EM) in November 1989. EM manages remediation of all DOE sites as well as wastes from current operations. The goal of the EM program is to minimize risks to human health, safety and the environment, and to bring all DOE sites into compliance with Federal, state, and local regulations by 2019. EM-50 is charged with developing new technologies that are safer, more effective and less expensive than current methods. The In Situ Remediation Integrated Program (the subject of this report) is part of EM-541, the Environmental Restoration Research and Development Division of EM-54. The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: Significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces; in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP tends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years.

  4. DOE's EM program continues environmental education grant | Department...

    Energy Savers

    The program is coordinated by biology, math, and science teachers from area schools. In addition, the organization also researches and monitors select species in the area. Addthis ...

  5. High School Students Engage EM Program, Teach Classmates about...

    Office of Environmental Management (EM)

    Classmates about Nuclear Cleanup May 22, 2012 ... the Nevada National Security Site's (NNSS) environmental cleanup program ... and waste management activities at NNSS ...

  6. OAK RIDGE NATIONAL LABORATORY

    Office of Legacy Management (LM)

    POST OFFICE 80X 2008 OAK RIDGE, TENNESSEE 37831 MANAGED BY MARTIN MARlElTA ENERGY SYSTEMS. INC. FOR THE U.S. DEPARTMENT OF ENERGY July 15, 1992 Dr. W. A Williams Department of Energy Trevion II Building EM-421 Washington, D. C. 20585 Dear Dr. Williams: Trip Report of ORNL Health Physics Support at the Uniroyal Chemical Company Painesvik, Ohio, on June 25,1992 As per agreement between DOE-HQ and Uniroyal of Painesville, on June 25, 1992, a member, the undersigned, from the Health and Safety

  7. FY2007 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    SciTech Connect (OSTI)

    Olszewski, Mitchell

    2007-10-01

    the efficiency and performance targets at the vehicle level have been achieved. The research performed under this subprogram will help remove technical and cost barriers to enable the development of technology for use in such advanced vehicles as hybrid and fuel-cell-powered automobiles that meet the goals of the FreedomCAR and Vehicle Technologies Program. A key element in making hybrid electric vehicles (HEVs) practical is providing an affordable electric traction drive system. This will require attaining weight, volume, and cost targets for the power electronics and electrical machines subsystems of the traction drive system. Areas of development include these: (1) novel traction motor designs that result in increased power density and lower cost; (2) inverter technologies involving new topologies to achieve higher efficiency and the ability to accommodate higher-temperature environments; (3) converter concepts that employ means of reducing the component count and integrating functionality to decrease size, weight, and cost; (4) more effective thermal control and packaging technologies; and (5) integrated motor/inverter concepts. The Oak Ridge National Laboratory's (ORNL's) Power Electronics and Electric Machinery Research Center conducts fundamental research, evaluates hardware, and assists in the technical direction of the DOE Office of FreedomCAR and Vehicle Technologies Program, APEEM subprogram. In this role, ORNL serves on the FreedomCAR Electrical and Electronics Technical Team, evaluates proposals for DOE, and lends its technological expertise to the direction of projects and evaluation of developing technologies. ORNL also executes specific projects for DOE. The following report discusses those projects carried out in FY 2007 and conveys highlights of their accomplishments. Numerous project reviews, technical reports, and papers have been published for these efforts, if the reader is interested in pursuing details of the work.

  8. Evaluation of beryllium exposure assessment and control programs at AWE, Cardiff Facility, Rocky Flats Plant, Oak Ridge Y-12 Plant and Lawrence Livermore National Laboratory. Phase 1

    SciTech Connect (OSTI)

    Johnson, J.S.; Foote, K.L.; Slawski, J.W.; Cogbill, G.

    1995-04-28

    Site visits were made to DOE beryllium handling facilities at the Rocky Flats Plant; Oak Ridge Y-12 Plant, LLNL; as well as to the AWE Cardiff Facility. Available historical data from each facility describing its beryllium control program were obtained and summarized in this report. The AWE Cardiff Facility computerized Be personal and area air-sampling database was obtained and a preliminary evaluation was conducted. Further validation and documentation of this database will be very useful in estimating worker Be. exposure as well as in identifying the source potential for a variety of Be fabrication activities. Although all of the Be control programs recognized the toxicity of Be and its compounds, their established control procedures differed significantly. The Cardiff Facility, which was designed for only Be work, implemented a very strict Be control program that has essentially remained unchanged, even to today. LLNL and the Oak Ridge Y-12 Plant also implemented a strict Be control program, but personal sampling was not used until the mid 1980s to evaluate worker exposure. The Rocky Flats plant implemented significantly less controls on beryllium processing than the three previous facilities. In addition, records were less available, management and industrial hygiene staff turned over regularly, and less control was evident from a management perspective.

  9. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  10. FY2010 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Machinery Program

    SciTech Connect (OSTI)

    Olszewski, Mitchell

    2010-10-01

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as FreedomCAR (derived from ''Freedom'' and ''Cooperative Automotive Research''), it represents DOE's commitment to developing public-private partnerships to fund high risk, high payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieve the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Oak Ridge National Laboratory's (ORNL's) Advanced Power Electronics and Electric Machines (APEEM) subprogram within the DOE Vehicle Technologies Program (VTP) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE) and electric motor technologies that will leapfrog current on-the-road technologies. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow's automobiles will function as a unified system to improve fuel efficiency. In supporting the development of advanced vehicle propulsion systems, the APEEM subprogram has enabled the development of technologies that will significantly improve efficiency, costs, and fuel economy. The APEEM subprogram supports the efforts of the FreedomCAR and Fuel Partnership through a three phase approach intended to: (1) identify overall propulsion and vehicle related needs by analyzing programmatic goals and reviewing industry's recommendations and requirements and then develop the appropriate technical targets for systems, subsystems, and component research and development activities; (2

  11. EM Celebrates Successful Completion of Recovery Act Program

    Energy.gov [DOE]

    WASHINGTON, D.C. – DOE officials today marked a historic landmark in EM’s mission as they celebrated the close of the Cold War cleanup program’s $6 billion American Recovery and Reinvestment Act Program.

  12. Oak Ridge - A Center of Innovation & Technology

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    of Energy property at the East Tennessee Technology Park (ETTP) and the Oak Ridge Science & Technology Park. CROET's award-winning program to revitalize former DOE...

  13. Fourth report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect (OSTI)

    Loar, J.M.

    1994-04-01

    In response to a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC) and selected tributaries. BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring, (5) assessment of contaminants in the terrestrial environment, and (6) radioecology of WOC and White Oak Lake. The ecological characterization of the WOC watershed will provide baseline data that can be used to document the ecological effects of the water pollution control program and the remedial action program. The long-term nature of BMAP ensures that the effectiveness of remedial measures will be properly evaluated.

  14. Oak Ridge Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Site Cleanup By the Numbers Oak Ridge Site Cleanup By the Numbers Oak Ridge Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download Oak Ridge Site Cleanup By

  15. EM Official Shares Insight at Women’s Conference

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Earlier this month, EM Associate Principal Deputy Assistant Secretary Monica Regalbuto participated in Oak Ridge’s annual women’s workshop. The conference, themed “All Hands In: Innovate and Collaborate,” was hosted by the Federal Women’s Program and the local chapter of Federally Employed Women.

  16. Site handbook: data acquisition system information, Shelly Ridge Program Center for the Girl Scouts of greater Philadelphia, Miquon, Pennsylvania

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Data were collected at the Shelly Ridge Girl Scout Center using an Aeolian Kinetics PDL-24 data acquisition system. Instantaneous data readings were recorded each 15 seconds by the microprocessor. These channel readings were then averaged to produce hourly values which were then stored on an audio cassette. These hourly data were then transcribed to the AIAF archive. The Girl Scout Center features an 861 square foot unvented Trombe wall, a direct gain sunspace, and two rooftop collectors for heating domestic water.

  17. Calendar year 1995 groundwater quality report for the Chestnut Ridge Hydrogeologic Regime Y-12 Plant, Oak Ridge, Tennessee. Part 2: 1995 groundwater quality data interpretations and proposed program modifications

    SciTech Connect (OSTI)

    1996-08-01

    This groundwater quality report (GWQR) contains an evaluation of the groundwater monitoring data obtained during calendar year (CY) 1995 from monitoring wells and springs located at or near several hazardous and non-hazardous waste management facilities associated with the Y-12 Plant. These sites are within the boundaries of the Chestnut Ridge Hydrogeologic Regime, which is one of three hydrogeologic regimes defined for the purposes of the Y-12 Plant Groundwater Protection Program (GWPP). The objectives of the GWPP are to provide the monitoring data necessary for compliance with applicable federal, state, and local regulations, DOE Orders, and Lockheed Martin Energy Systems, Inc. corporate policy. The following evaluation of the data is organized into background regulatory information and site descriptions, an overview of the hydrogeologic framework, a summary of the CY 1995 groundwater monitoring programs and associated sampling and analysis activities, analysis and interpretation of the data for inorganic, organic, and radiological analytes, a summary of conclusions and recommendations, and a list of cited references. Appendix A contains supporting maps, cross sections, diagrams, and graphs; data tables and summaries are in Appendix B. Detailed descriptions of the data screening and evaluation criteria are included in Appendix C.

  18. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P.

    1998-12-31

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  19. Oak Ridge, Tennessee, Warehouses Site Fact Sheet

    Office of Legacy Management (LM)

    Oak Ridge, Tennessee, Warehouses Site. This site is managed by the U.S. Department of Energy Office of Legacy Management under the Formerly Utilized Sites Remedial Action Program. Oak Ridge, Tennessee, Warehouses Site Oak Ridge Warehouses Site Knoxville Oak Ridge 40 75 640 140 75 321 411 70 441 11 129 27 25W M:\LTS\111\0001\10\S03066\S0306600.mxd smithw 09/13/2011 2:35:09 PM 0 10 20 Miles Nashville TENNESSEE Location of the Oak Ridge, Tennessee, Warehouses Site Site Description and History The

  20. Oak Ridge Site Specific Advisory Board 2016 Annual Planning Meeting

    Office of Environmental Management (EM)

    2016 Annual Planning Meeting T r e m o n t L o d g e & R e s o r t 7 7 2 6 E . L a m a r A l e x a n d e r P a r k w a y T o w n s e n d , T e n n e s s e e The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup

  1. Final deactivation project report on the Integrated Process Demonstration Facility, Building 7602 Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-09-01

    The purpose of this report is to document the condition of the Integrated Process Demonstration Facility (Building 7602) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities by the High Ranking Facilities Deactivation Project (HRFDP). This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the U.S. Department of Energy (DOE) Environmental Restoration EM-40 Program. This report provides a history and description of the facility prior to commencing deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S&M) Plan, remaining hazardous and radioactive materials inventory, radiological controls, Safeguards and Security, and supporting documentation provided in the Office of Nuclear Material and Facility Stabilization Program (EM-60) Turnover package are discussed.

  2. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D D) Program is part of the Department of Energy (DOE) Environmental Restoration D D Program and has continued to provide surveillance and maintenance (S M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S M planning, (2) routine S M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  3. Annual summary report on surveillance and maintenance activities of the surplus contaminated facilities program at Oak Ridge National Laboratory for period ending September 30, 1991

    SciTech Connect (OSTI)

    Cannon, T.R.; Ford, M.K.; Holder, L. Jr.

    1991-09-01

    The Surplus Contaminated Facilities Program (SCFP) was established at the Oak Ridge National Laboratory (ORNL) in 1985 to provide support for inactive contaminated facilities that were largely abandoned by the programs which they formerly served. This support provides for routine surveillance and maintenance (S M) and special projects beyond a routine nature when such actions are needed to ensure adequate protection of personnel or the environment. The facilities included in the program had been used for research, technology development, isotope production and processing, and waste management. Support for facilities in the SCFP has previously been provided by the Department of Energy's (DOE's) Office of Energy Research: Multiprogram Energy Laboratories -- Facilities Support (ERKG) because of multiprogram use of the facilities or because of the landlord responsibility of Energy Research. Recently, an integrated Decontamination and Decommissioning (D D) program within the DOE Office of Environmental Restoration and Waste Management has been established to collectively manage the former Surplus Facilities Management Program, Defense D D Program, and the KG-funded, ORNL-originated SCFP. This report gives an overview of the S M planning, routine S M, and special maintenance project activities which have occurred at the SCFP facilities during the 1991 Fiscal Year.

  4. OAK RIDGE

    Office of Legacy Management (LM)

    or _^ *ORNL/RASA-89/1 I : OAK RIDGE _NATIONAL LABORATORY |*H~~~~~ -~~Results of the I'I-------_____ ~ Preliminary Radiological * "~ i, .irri uSurvey at B&T Metals, _" 425 West Town Street, i * !' V Columbus, Ohio (C0001) I i. U Wo. 0aa-. r m ~~~~~~~~~ if? _ ~ W. D. Cottrell J. L Quillen J. W. Crutcher , I OPERATED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOR THE UNITED STATES DEPARTMENT OF ENERGY ORNL/RASA-89/1 3*1~~ ~HEALTH AND SAFETY RESEARCH DIVISION Waste Management Research

  5. Continuing Clean-up at Oak Ridge, Portsmouth and Paducah-Successes and Near-Term Plans

    SciTech Connect (OSTI)

    Fritz, L. L.; Houser, S. M.; Starling, D. A.

    2002-02-26

    This paper describes the complexities and challenges associated with the Oak Ridge Environmental Management (EM) cleanup program and the steps that DOE and Bechtel Jacobs Company LLC (the Oak Ridge EM team) have collaboratively taken to make significant physical progress and get the job done. Maintaining significant environmental cleanup progress is a daunting challenge for the Oak Ridge EM Team. The scale and span of the Oak Ridge Operations (ORO) cleanup is immense-five major half-century-old installations in three states (three installations are complete gaseous diffusion plants), with concurrent cleanup at the fully operational Oak Ridge National Laboratory and Y-12 National Security Complex, and with regulatory oversight from three states and two United States (US) Environmental Protection Agency (EPA) Regions. Potential distractions arising from funding fluctuations and color-of-money constraints, regulatory negotiations, stakeholder issues, or any one of a number of other potential delay phenomena can not reduce the focus on safely achieving project objectives to maintain cleanup momentum.

  6. Independent Oversight Environment, Oak Ridge National Laboratory - June

    Office of Environmental Management (EM)

    2006 | Department of Energy Environment, Oak Ridge National Laboratory - June 2006 Independent Oversight Environment, Oak Ridge National Laboratory - June 2006 June 2006 Inspection of the Environmental Management Program at the Oak Ridge National Laboratory This report documents the results of an inspection of the environment, safety, and health programs for the environmental management program activities at the Department of Energy's (DOE) Oak Ridge National Laboratory. The inspection was

  7. Third report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Bailey, R.D.

    1994-03-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. The BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs at ORNL. These are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring, (5) assessment of contaminants in the terrestrial environment, and (6) radioecology of WOC and White Oak Lake (WOL). The investigation of contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system was originally a task of the BMAP but, in 1988, was incorporated into the Resource Conservation and Recovery Act Facility Investigation for the Clinch River, a separate study to assess offsite contamination from all three Department of Energy facilities in Oak Ridge.

  8. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2003-09-30

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure 1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 which provide the most useful hydrologic and water-quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted ''active'' status are used by the GWPP for hydrologic monitoring and/or groundwater sampling (Section 3.0), whereas well granted ''inactive'' status are not used for either purpose. The status designation also determines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 4.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 5.0). This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within three hydrogeologic regimes (Figure 1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the

  9. Oak Ridge Site Specific Advisory Board Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contacts Oak Ridge Site Specific Advisory Board Contacts Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-942 Oak Ridge, TN 37831 Phone Numbers (865) 241-4583, (865) 241-4584 (800) 382-6938, option 4 DOE Liaisons Jay Mullis, Deputy Designated Federal Officer U.S. DOE-OREM, P.O Box 2001, EM-90, Oak Ridge, TN 37831 Phone: (865) 241-3706 Fax: (865) 241-6932 Email: Jay.Mullis@orem.doe.gov Dave Adler, Alternate Deputy Designated Federal Officer U.S. DOE-OREM, P.O. Box 2001,

  10. Microsoft PowerPoint - EM SSAB Chairs Webinar - (2) Huizenga EM Program Update for SSAB Chairs.042513

    Office of Environmental Management (EM)

    Chairs' Webinar www.energy.gov/EM 1 David Huizenga Senior Advisor for the Office of Environmental Management April 25, 2013 Click to edit Master title style Environmental Cleanup-a Key DOE Strategic Goal EM's mission is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. EM supports DOE Strategic Goal #3: Click to edit Master subtitle style www.energy.gov/EM 2 EM supports DOE

  11. Preliminary Notice of Violation, MK-Ferguson of Oak Ridge Company- EA-98-08

    Office of Energy Efficiency and Renewable Energy (EERE)

    Issued to MK-Ferguson of Oak Ridge Company, related to Bioassay Program Deficiencies at DOE's Oak Ridge Facilities, (EA-98-08)

  12. 2009-12 "Hold a Planned DOE-EM Meeting on LANL Water Quality Programs in a

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Northern New Mexico Location" | Department of Energy 2 "Hold a Planned DOE-EM Meeting on LANL Water Quality Programs in a Northern New Mexico Location" 2009-12 "Hold a Planned DOE-EM Meeting on LANL Water Quality Programs in a Northern New Mexico Location" The NNMCAB recommends that DOE-EM open the special meeting with Mr. Gilkeson to the public and change the location for the meeting to one of the Northern New Mexico communities, such as Los Alamos or Espanola. Rec

  13. Oak Ridge Office

    Office of Environmental Management (EM)

    PO. Box 2001 Oak Ridge, Tennessee 37831 July 21, 2010 Mr. Ron Murphree, Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 1 Oak Ridge, Tennessee 3783 1 Dear Mr....

  14. Second report on the Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Bailey, R.D.; Blaylock, B.G.; Boston, H.L.; Cox, D.K.; Huston, M.A.; Kimmel, B.L.; Loar, J.M.; Olsen, C.R.; Ryon, M.G.; Shugart, L.R.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Talmage, S.S.; Murphy, J.B.; Valentine, C.K.; Appellanis, S.M.; Jimenez, B.D.; Huq, M.V.; Meyers-Schone, L.J.; Mohrbacher, D.A.; Olsen, C.R.; Stout, J.G.

    1992-12-01

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. BMAP consists of seven major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs on-site and the aquatic environs off-site. These tasks are (1) toxicity monitoring; (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota; (3) biological indicator studies; (4) instream ecological monitoring; (5) assessment of contaminants in the terrestrial environment; (6) radioecology of WOC and White Oak Lake (WOL); and (7) contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system. This document, the second of a series of annual reports, described the results of BMAP studies conducted in 1987.

  15. The Oak Ridge Institute for Science and Education Human Subjects...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Human Subjects Research Program PrivacySecurity Statement Contact | Forms PurposeMission ... The Oak Ridge Institute for Science and Education (ORISE) Human Subjects Research Program ...

  16. Oak Ridge Office

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 1, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO....

  17. Oak Ridge Office

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Ms. ... ON FISCAL YEAR 2014 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  18. Oak Ridge Cleanup Vision: Moving to the Future by Cleaning Up the Past - 13291

    SciTech Connect (OSTI)

    Cange, Susan M.; Wieland, Christopher C.; DePaoli, Susan M.

    2013-07-01

    The Oak Ridge Office of Environmental Management (EM) strives to be the leader in the Department of Energy's (DOE's) EM Complex regarding successful and safe project execution and stakeholder interactions that yield positive results. EM's goal has been to become 'Investment Worthy' and, in order to accomplish that important objective, has also had to improve communications both within and outside of the Department. One of our most important missions is to assist the Department in achieving the sustainability goals set forth in Executive Order 13514. In this regard, EM's primary role is to return land to beneficial use and reduce energy impacts and maintenance costs by demolishing unneeded and deteriorating structures and remediating environmental contamination. Recent accomplishments toward meeting these goals include significant progress in the decontamination and demolition of the country's largest facility, the former K-25 Gaseous Diffusion Building, constructed in 1942 to enrich uranium to help end World War II; the disposition of the first phase of Uranium-233 material from the Oak Ridge National Laboratory (ORNL) which involved the transfer of Zero Power Reactor Plates to the National Nuclear Security Administration (NNSA); and a host of other project successes associated with transuranic (TRU) waste processing, hot cell decontamination and demolition, remediation of highly contaminated soils and burial grounds, and removal of mercury from storm sewers and surface waters. With regard to successful stakeholder interactions, recent accomplishments include a new method for collaboration that has renewed EM's working relationship with the regulators, and success in completing an extensive consultation process with over a dozen parties on the historic preservation of the former Oak Ridge Gaseous Diffusion Plant, which is now called the East Tennessee Technology Park (ETTP). Regarding improved communications, EM has successfully revised Program priorities and has

  19. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Oak Ridge Site Specific Advisory Board Recommendation 233: Recommendations on the Proposed Environmental Management Disposal Facility at the U.S. DOE Oak Ridge Reservation Background Much of the Manhattan Project legacy waste for which the Department of Energy (DOE) Oak Ridge Environmental Management (OREM) program is responsible falls under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 (also known as the Superfund Act), which is a federal law

  20. Oak Ridge Cleanup Areas | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Management » Environmental Stewardship » Oak Ridge Cleanup Areas Oak Ridge Cleanup Areas Employees conduct soil and water samples to determine which areas require cleanup. Employees conduct soil and water samples to determine which areas require cleanup. On November 21, 1989, the Environmental Protection Agency placed the Department of Energy's Oak Ridge site on its National Prioritization List (NPL). The list names national priorities where there are known or threatened releases of

  1. Remedial Investigation Report on the Abandoned Nitric Acid Pipeline at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Energy Systems Environmental Restoration Program; Y-12 Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    Upper East Fork Poplar Creek Operable Unit 2 consists of the Abandoned Nitric Acid pipeline (ANAP). This pipeline was installed in 1951 to transport liquid wastes {approximately}4800 ft from Buildings 9212, 9215, and 9206 to the S-3 Ponds. Materials known to have been discharged through the pipeline include nitric acid, depleted and enriched uranium, various metal nitrates, salts, and lead skimmings. During the mid-1980s, sections of the pipeline were removed during various construction projects. A total of 19 locations were chosen to be investigated along the pipeline for the first phase of this Remedial Investigation. Sampling consisted of drilling down to obtain a soil sample at a depth immediately below the pipeline. Additional samples were obtained deeper in the subsurface depending upon the depth of the pipeline, the depth of the water table, and the point of auger refusal. The 19 samples collected below the pipeline were analyzed by the Oak Ridge Y-12 Plant`s laboratory for metals, nitrate/nitrite, and isotopic uranium. Samples collected from three boreholes were also analyzed for volatile organic compounds because these samples produced a response with organic vapor monitoring equipment. Uranium activities in the soil samples ranged from 0.53 to 13.0 pCi/g for {sup 238}U, from 0.075 to 0.75 pCi/g for {sup 235}U, and from 0.71 to 5.0 pCi/g for {sup 238}U. Maximum total values for lead, chromium, and nickel were 75.1 mg/kg, 56.3 mg/kg, and 53.0 mg/kg, respectively. The maximum nitrate/nitrite value detected was 32.0 mg-N/kg. One sample obtained adjacent to a sewer line contained various organic compounds, at least some of which were tentatively identified as fragrance chemicals commonly associated with soaps and cleaning solutions. The results of the baseline human health risk assessment for the ANAP contaminants of potential concern show no unacceptable risks to human health.

  2. Oak Ridge Environmental Information System (ORIES) site workstation information packet for OREIS V1.2. Environmental Restoration Program

    SciTech Connect (OSTI)

    Voorhees, L.D.; McCord, R.A.; Durfee, R.C.; Land, M.L.; Olson, R.J.; Palmer, M.R.; Thomas, J.K.; Tinnel, E.P.; Zygmunt, B.C.

    1993-02-01

    The OREIS site workstation information packet was developed to accompany the OREIS site workstations, which are being delivered to the Environmental Restoration programs at the five DOE-OR sites. The packet is written specifically for the Site ER program staff at each of the five Sites who have been designated the OREIS contact by their ER program manager, and is not intended for general distribution. The packet provides an overview of the components of OREIS, points to more detailed information provided in the accompanying vendor and OREIS developed manuals, and includes information on training opportunities and user support.

  3. FY2014 Oak Ridge National Laboratory Annual Progress Report for the Power Electronics and Electric Motors Program

    SciTech Connect (OSTI)

    Ozpineci, Burak

    2014-11-01

    The US Department of Energy (DOE) announced in May 2011 a new cooperative research effort comprising DOE, the US Council for Automotive Research (composed of automakers Ford Motor Company, General Motors Company, and Chrysler Group), Tesla Motors, and representatives of the electric utility and petroleum industries. Known as U.S. DRIVE (Driving Research and Innovation for Vehicle efficiency and Energy sustainability), it represents DOE’s commitment to developing public–private partnerships to fund high-risk–high-reward research into advanced automotive technologies. The new partnership replaces and builds upon the partnership known as FreedomCAR (derived from “Freedom” and “Cooperative Automotive Research”) that ran from 2002 through 2010 and the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. Oak Ridge National Laboratory’s (ORNL’s) Advanced Power Electronics and Electric Motors (APEEM) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for many cutting-edge automotive technologies now under development. Research is focused on developing revolutionary new power electronics (PE), electric motor, and traction drive system (TDS) technologies that will leapfrog current on-the-road technologies, leading to lower cost and better efficiency in transforming battery energy to useful work. The research and development (R&D) is also aimed at achieving a greater understanding of and improvements in the way the various new components of tomorrow’s automobiles will function as a unified system to improve fuel efficiency through research in more efficient TDSs.

  4. Mr. David Hernelright Chair, Oak Ridge Site Specific Advisory...

    Office of Environmental Management (EM)

    Board P.O. Box 2001 Oak Ridge, Tennessee 3 7831 Dear Mr. ... at DOE EM continues to be aware of the implications of funding constraints stemming from across the board budget ...

  5. Contractor Fee Payments - Oak Ridge Operations | Department of Energy

    Office of Environmental Management (EM)

    Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts. Transuranic Waste Processing - North Wind (33.63 KB) Transuranic Waste Processing - Wastren (36.67 KB) East Tennessee Technology Park (35.79 KB) More Documents & Publications Major Contracts Summary Contractor Fee Payments - Idaho Operations Office Contractor Fee

  6. Data Sharing Report Characterization of Isotope Row Facilities Oak Ridge National Laboratory Oak Ridge TN

    SciTech Connect (OSTI)

    Weaver, Phyllis C

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using funds provided by the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a survey approach, focused on characterizing the Isotope Row Facilities located at the Oak Ridge National Laboratory (ORNL) for future determination of an appropriate disposition pathway for building debris and systems, should the buildings be demolished. The characterization effort was designed to identify and quantify radiological and chemical contamination associated with building structures and process systems. The Isotope Row Facilities discussed in this report include Bldgs. 3030, 3031, 3032, 3033, 3033A, 3034, 3036, 3093, and 3118, and are located in the northeast quadrant of the main ORNL campus area, between Hillside and Central Avenues. Construction of the isotope production facilities was initiated in the late 1940s, with the exception of Bldgs. 3033A and 3118, which were enclosed in the early 1960s. The Isotope Row facilities were intended for the purpose of light industrial use for the processing, assemblage, and storage of radionuclides used for a variety of applications (ORNL 1952 and ORAU 2013). The Isotope Row Facilities provided laboratory and support services as part of the Isotopes Production and Distribution Program until 1989 when DOE mandated their shutdown (ORNL 1990). These facilities performed diverse research and developmental experiments in support of isotopes production. As a result of the many years of operations, various projects, and final cessation of operations, production was followed by inclusion into the surveillance and maintenance (S&M) project for eventual decontamination and decommissioning (D&D). The

  7. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-04-01

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment.

  8. Summary - Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN

    Office of Environmental Management (EM)

    Oak Ridge, TN EM Project: EM Waste Management Facility ETR Report Date: February 2008 ETR-11 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN Why DOE-EM Did This Review The Environmental Management Waste Management Facility (EMWMF) is a land disposal facility for wastes generated by environmental restoration activities being conducted at the US Department of

  9. EM National Cleanup Workshop - Path to EM Success in 2016 and Beyond |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy National Cleanup Workshop - Path to EM Success in 2016 and Beyond EM National Cleanup Workshop - Path to EM Success in 2016 and Beyond Presentation from the 2016 DOE National Cleanup Workshop by Sue Cange, Manager, Oak Ridge Office of Environmental Management and Ken Rueter, President and Project Manager, URS|CH2M Oak Ridge. EM National Cleanup Workshop - Path to EM Success in 2016 and Beyond (4.87 MB) More Documents & Publications ETTP Cleanup and

  10. Compliance with the Clean Air Act Title VI Stratospheric Ozone Protection Program requirements at U.S. DOE Oak Ridge Reservation Facilities

    SciTech Connect (OSTI)

    Humphreys, M.P.; Atkins, E.M.

    1999-07-01

    The Title VI Stratospheric Ozone Protection Program of the Clean Air Act (CAA) requires promulgation of regulations to reduce and prevent damage to the earth's protective ozone layer. Regulations pursuant to Title VI of the CAA are promulgated in the Code of Federal Regulations (CFR) at Title 40 CFR, Part 822. The regulations include ambitious production phaseout schedules for ozone depleting substances (ODS) including chlorofluorocarbons (CFCs), hydrochlorofluorocarbons (HCFCs), halons, carbon tetrachloride, and methyl chloroform under 40 CFR 82, Subpart A. The regulations also include requirements for recycling and emissions reduction during the servicing of refrigeration equipment and technician certification requirements under Subpart F; provisions for servicing of motor vehicle air conditioners under Subpart B; a ban on nonessential products containing Class 1 ODS under Subpart C; restrictions on Federal procurement of ODS under Subpart D; labeling of products using ODS under Subpart E; and the Significant New Alternatives Policy Program under Subpart G. This paper will provide details of initiatives undertaken at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title VI Stratospheric Ozone Protection Program. The Stratospheric Ozone Protection Plans include internal DOE requirements for: (1) maintenance of ODS inventories; (2) ODS procurement practices; (3) servicing of refrigeration and air conditioning equipment; (4) required equipment modifications or replacement; (5) technician certification training; (6) labeling of products containing ODS; (7) substitution of chlorinated solvents; and (8) replacement of halon fire protection systems. The plans also require establishment of administrative control systems which assure that compliance is achieved and maintained as the regulations continue to develop and become effective.

  11. Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    none,

    2013-09-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted "active" status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted "inactive" status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans. This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes.

  12. Follow-up Review, Oak Ridge National Laboratory - December 2001 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Follow-up Review, Oak Ridge National Laboratory - December 2001 Follow-up Review, Oak Ridge National Laboratory - December 2001 December 2001 Follow-up Review of the Oak Ridge National Laboratory Health Services Division This report summarizes the results of a follow-up evaluation to an occupational medicine program review that was performed at the Department of Energy's (DOE) Oak Ridge National Laboratory Health Services Division in September 1998. The follow-up review

  13. Annual summary report on the Decontamination and Decommissioning Program at the Oak Ridge Y-12 Plant for the period ending September 30, 1992. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    The Y-12 Decontamination and Decommissioning (D&D) Program provides for the ultimate disposition of plant process buildings and their supporting facilities. The overall objective is to enable the Y-12 Plant to meet applicable environmental regulations and Department of Energy (DOE) orders to protect human health and the environment from contaminated facilities through decommissioning activities. This objective is met by providing for the surveillance and maintenance (S&M) of accepted standby or shutdown facilities awaiting decommissioning; planning for decommissioning of these facilities; and implementing a program to accomplish the safe, cost-effective, and orderly disposition of contaminated facilities. The Y-12 D&D Program was organized during FY 1992 to encompass the needs of surplus facilities at the Y-12 Plant. The need existed for a program which would include Weapons Program facilities as well as other facilities used by several programs within the Y-12 Plant. Building 9201-4 (Alpha 4) is the only facility that is formally in the D&D Program. Funding for the work completed in FY 1992 was shared by the Environmental Restoration and Waste Management Program (EW-20) and Weapons Operations (GB-92). This report summarizes the FY 1992 D&D activities associated with Building 9201-4. A section is provided for each task; the tasks include surveillance, routine and special maintenance, safety, and D&D planning.

  14. Oak Ridge Office

    Office of Environmental Management (EM)

    Martin , Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 I Oak Ridge, Tennessee 37831 Dear Mr. Martin : May 22, 2013 RESPONSE TO YOUR LETTER DATED MAY 9, 2013, RECOMMENDATION 216: RECOMMENDATIONS ON FISCAL YEAR 2015 DOE OAK RIDGE ENVIRONMENT AL MANAGEMENT BUDGET REQUEST Reference: Letter from David Martin to Mark Whitney, Recommendation 216: Recommendation on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request, dated May 9, 2013. I would like to express my

  15. Oak Ridge Office

    Office of Environmental Management (EM)

    I Oak Ridge, Tennessee 37831 Dear Mr. Martin : September 12, 2013 ru:SPONSE TO YOUR LETTER DATED .JUNE 13, 2013, RECOMMENDATION 217: RECOMMENDATION ON STEWARDSHIP POINT OF CONT ACT FOR THE OAK RIDGE RESERVATION Reference: June 13 , 2013, Letter from David Martin to Susan Cange, Recommendation 217: Recommendation on Stewardship Point of Contact for the Oak Ridge Reservation. We appreciate the recommendation provided by the Oak Ridge Site Specific Advisory Board regard in g having a dedicated

  16. Independent Oversight Review, Oak Ridge Transuranic Waste Processing...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge Transuranic Waste Processing Facility - December 2013 December 2013 Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing...

  17. Y-12 Groundwater Protection Program CY 2009 Triennial Report Of The Monitoring Well Inspection And Maintenance Program, Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2013-06-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspection events conducted on active and inactive wells at Y-12 during calendar years (CY) 2007 through 2009; it documents well maintenance and plugging and abandonment activities completed since the last triennial inspection event (CY 2006); and provides summary tables of well inspection events, well maintenance events, and well plugging and abandonment events during the reference time period.

  18. New EM Technology: Spray Lights up Contamination Hot Spots

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge National Laboratory (ORNL) researchers have developed a new technology to determine the extent of contamination in Cold War facilities that could replace costly and time-consuming traditional survey methods used by EM.

  19. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

  20. Oak Ridge Associated Universities II

    Office of Legacy Management (LM)

    Prepared by Oak Ridge Associated Universities II Prepared for Division of Fuel - Cycle and Material Safety II U.S. Nuclear Regulatory Commission L RADIOLOGICAL SURVEY OF THE W. R. GRACE PROPERTY WAYNE, NEW JERSEY P. W. FRAME Radiological Site Assessment Program Manpower Education, Research, and Training Division FINAL REPORT January 1983 RADIOLOGICAL SURVEY OF THE W.R. GRACE PROPERTY WAYNE, NEW JERSEY Prepared for Division of Fuel Cycle and Material Safety U.S. Nuclear Regulatory Commission P.

  1. Oak Ridge National Laboratory Review

    SciTech Connect (OSTI)

    Krause, C.; Pearce, J.; Zucker, A.

    1992-01-01

    This report presents brief descriptions of the following programs at Oak Ridge National Laboratory: The effects of pollution and climate change on forests; automation to improve the safety and efficiency of rearming battle tanks; new technologies for DNA sequencing; ORNL probes the human genome; ORNL as a supercomputer research center; paving the way to superconcrete made with polystyrene; a new look at supercritical water used in waste treatment; and small mammals as environmental monitors.

  2. Summary - Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN

    Office of Environmental Management (EM)

    & ORNL, Oak Ridge, TN EM Project: Integrated Facility Disposition Project (IFDP) ETR Report Date: August 2008 ETR-15 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN Why DOE-EM Did This Review Approximately two million pounds of mercury are unaccounted for at Y-12 and mercury contamination has been detected in both soils and groundwater. The IFDP will

  3. ORO Energy Employees Occupational Illness Compensation Program...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge...

  4. Oak Ridge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge Oak Ridge Oak Ridge's compliance agreements - which help support the development of effective compliance approaches and strategies - are listed below. Summaries of the agreements also are included. Oak Ridge Reservation Compliance Order, September 26, 1995 (164.23 KB) Oak Ridge Reservation Compliance Order, September 26, 1995 Summary (40.23 KB) Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992 (1.92 MB) Federal Facility Agreement for the Oak Ridge Reservation,

  5. Manager, Oak Ridge Office

    Energy.gov [DOE]

    A successful candidate in this position will provide overall executive leadership to and integration of the Oak Ridge Integrated Support Center, which houses mission critical activities and support...

  6. EM Update Presentation by David Huizenga

    Office of Environmental Management (EM)

    EM Program Update EM Site-Specific Advisory Board Chairs' Meeting October 2, 2012 David Huizenga Senior Advisor for Environmental Management www.em.doe.gov safety performance ...

  7. EM International Program - Moving Forward - Strategic Plan - 2015-2020_Updated.pdf

    Energy Savers

    Energy Second Successful Workshop for Japanese Officials EM Hosts Second Successful Workshop for Japanese Officials March 9, 2012 - 12:00pm Addthis Participants in the EM-led delegation's second workshop gather for a photo at the Hanford site. Participants in the EM-led delegation's second workshop gather for a photo at the Hanford site. RICHLAND, Wash. - An EM-led delegation said its recent workshop for Japanese officials leading the cleanup of the Fukushima Daiichi Nuclear Power Plant site

  8. Oak Ridge Reservation environmental report for 1989

    SciTech Connect (OSTI)

    Jacobs, V.A.; Wilson, A.R.

    1990-10-01

    This two-volume report, the Oak Ridge Reservation Environmental Report for 1989, is the nineteenth in an annual series that began in 1971. It reports the results of a comprehensive, year-round program to monitor the impact of operations at the three major US Department of Energy (DOE) production and research installations in Oak Ridge on the immediate areas' and surrounding region's groundwater and surface waters, soil, air quality, vegetation and wildlife, and through these multiple and varied pathways, the resident human population. Information is presented for the environmental monitoring Quality Assurance (QA) Program, audits and reviews, waste management activities, land special environmental studies. Data are included for the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory (ORNL), and Oak Ridge Gaseous Diffusion Plant (ORGDP). Volume 1 presents narratives, summaries, and conclusions based on environmental monitoring at the three DOE installations and in the surrounding environs during calendar year (CY) 1989. Volume 1 is intended to be a stand-alone'' report about the Oak Ridge Reservation (ORR) for the reader who does not want an in-depth review of 1989 data. Volume 2 presents the detailed data from which these conclusions have been drawn and should be used in conjunction with Volume 1.

  9. Ridge Partners | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Product: Ridge Partners has developed a diversified portfolio of Caribbean and Latin American energy and transportation infrastructure projects. References: Ridge Partners1 This...

  10. Assistant Secretary Regalbuto Lays out Vision, Priorities to Advance Cleanup for EM Program

    Energy.gov [DOE]

    DOE Assistant Secretary for Environmental Management Monica Regalbuto shared her vision for EM, laid out cleanup priorities, and emphasized the need to better leverage technology development to reduce costs in her address at DOE’s first National Cleanup Workshop.

  11. EM-421

    Office of Legacy Management (LM)

    NY-W] ' qc-,p,,4 ,P -pIj i; ,./&+e~--- ,jJs AIJG 0 2 130 EM-421 Addition of Sites to FUSRAP Lester K. Price, Director Technical Services,Division Oak Ridge Operations Office Attached is a memorandum approving transfer of responsibility for the Niagara Falls Storage Site (NFSS) in New York and the New Brunswick Laboratory (NBL) Site in New Jersey to FUSRAP. Please incorporate these sites in the FUSRAP rebaselining effort now underway. As we previously discussed, funding for NBL will provide

  12. Project Quality Assurance Plan for research and development services provided by Oak Ridge National Laboratory in support of the Westinghouse Materials Company of Ohio Operable Unit 1 Stabilization Development and Treatability Studies Program

    SciTech Connect (OSTI)

    Gilliam, T.M.

    1991-05-01

    This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein. The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.

  13. Oak Ridge Reservation Needs Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security Complex production workers.

  14. Oak Ridge Operations YTO

    Office of Legacy Management (LM)

    Mahager . . r Attachment cc wattachment: J. L. King, SAICFUSRAP P. o o l i t t l e ; EM-421, BAH, TREV I 1 R. S. Scott, EM-20, FORS r ' J. W. Wagoner. EM-421.. TREV I1 6. S. ...

  15. 2016 Annual Workforce Analysis and Staffing Plan Report - DOE Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (4193) United States Government Department of Energy Oak Ridge Office of Environmental Management memorandum DATE: January 19, 2016 REPLY TO ATTN OF: EM-90:Cange SUBJECT: 2015 OAK RIDGE OFFICE OF ENVIRONMENTAL MANAGEMENT ANNUAL WORKFORCE ANALYSIS AND STAFFING PLAN TO: Karen L. Boardman, Chairperson, Federal Technical Capability Panel, HS-70 The Oak Ridge Office of Environmental Management (OREM) has produced the required OREM Annual Workforce Analysis and Staffing Plan. The attached report

  16. Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Annual Report | Department of Energy Oak Ridge Transportation Technology Program Annual Report Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology Program Annual Report ornl_ttp_report_fy08.pdf (4.58 MB) More Documents & Publications FY 2008 Progress Report for Lightweighting Materials - 1. Introduction 2011 Annual Progress Report for Lightweighting Materials FY 2009 Progress Report for Lightweighting Materials - 7. Low-Cost Carbon Fiber

  17. Final deactivation project report on the High Radiation Level Analytical Facility, Building 3019B at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-09-01

    The purpose of this report is to document the condition of the High Radiation Level Analytical Facility (Building 3019B) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities. This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the Environmental Restoration EM-40 Program. This document provides a history and description of the facility prior to the commencement of deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S&M) Plan, remaining hazardous materials inventory, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the Nuclear Material and Facility Stabilization (EM-60) Turnover package are discussed. Building 3019B will require access to perform required S&M activities to maintain the building safety envelope. Building 3019B was stabilized during deactivation so that when transferred to the EM-40 Program, only a minimal S&M effort would be required to maintain the building safety envelope. Other than the minimal S&M activities the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S&M until decommissioning activities begin.

  18. Oak Ridge Site Specific Advisory Board Monthly Meeting DOE Information Center

    Office of Environmental Management (EM)

    October 2. November (draft) 3. Work plan schedule of meetings BOARD MINUTES/RECOMMENDATIONS & MOTIONS 1. September 14, 2016, unapproved meeting minutes 2. Recommendations on the proposed EM Disposal Facility REPORTS & MEMOS 1. EM Project Update 2. Travel Opportunities for FY 2017 3. Trip Reports AGENDA Oak Ridge Site Specific Advisory Board Wednesday, October 12, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price)

  19. Source document for waste area groupings at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Osborne, P.L.; Kuhaida, A.J., Jr.

    1996-09-01

    This document serves as a source document for Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and other types of documents developed for and pertaining to Environmental Restoration (ER) Program activities at Oak Ridge National Laboratory (ORNL). It contains descriptions of the (1) regulatory requirements for the ORR ER Program, (2) Oak Ridge Reservation (ORR) ER Program, (3) ORNL site history and characterization, and (4) history and characterization of Waste Area Groupings (WAGS) 1-20. This document was created to save time, effort, and money for persons and organizations drafting documents for the ER Program and to improve consistency in the documents prepared for the program. By eliminating the repetitious use of selected information about the program, this document will help reduce the time and costs associated with producing program documents. By serving as a benchmark for selected information about the ER Program, this reference will help ensure that information presented in future documents is accurate and complete.

  20. An Oak Ridge baseball team | Y-12 National Security Complex

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    An Oak Ridge baseball team An Oak Ridge baseball team An Oak Ridge baseball team

  1. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    14, 2016, 6:00 p.m. Olive Garden Restaurant 7206 Kingston Pike, Knoxville, Tenn. AGENDA I. Welcome and Announcements (E. Trujillo) ........................................................................ 6:00-6:05 A. Next Meeting: Wednesday, October 12 Presentation Topic: State of the Oak Ridge Environmental Management Program II. Comments from the EPA and TDEC Liaisons (C. Jones, K. Czartoryski)

  2. DOE - NNSA/NFO -- EM Low-Level Waste Grant Assistance Program

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Grant Assistance Program NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Click to subscribe to NNSS News Low-Level Waste Grant Assistance Program An Emergency ...

  3. Oak Ridge Associated Universities Procurement Questionnaire Application

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    System Supplier Profile PIA, Oak ridge Operations Office | Department of Energy Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities

  4. Natural and Accelerated Bioremediation Research (NABIR) Field Research Center (FRC), Oak Ridge Tennessee

    SciTech Connect (OSTI)

    Watson, David; Jardine, Philip; Gu, Baohua; Parker, Jack; Brandt, Craig; Holladay, Susan; Wolfe, Amy; Bogle, Mary Anna; Lowe, Kenneth; Hyder, Kirk

    2006-06-01

    The Field Research Center (FRC) in Oak Ridge (Fig. 1), Tennessee supports the U.S. Department of Energy's (DOE's) Environmental Remediation Sciences Program (ERSP) goal of understanding the complex physical, chemical, and biological properties of contaminated sites for new solutions to environmental remediation and long-term stewardship. In particular, the FRC provides the opportunity for researchers to conduct studies that promote the understanding of the processes that influence the transport and fate of subsurface contaminants, the effectiveness and long-term consequences of existing remediation options, and the development of improved remediation strategies. It offers a series of contaminated sites around the former S-3 Waste Disposal Ponds and uncontaminated sites in which investigators and students conduct field research or collect samples for laboratory analysis. FRC research also spurs the development of new and improved characterization and monitoring tools. Site specific knowledge gained from research conducted at the FRC also provides the DOE-Oak Ridge Office of Environmental Management (EM) the critical scientific knowledge needed to make cleanup decisions for the S-3 Ponds and other sites on the Oak Ridge Reservation (ORR).

  5. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    SciTech Connect (OSTI)

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  6. Vansycle Ridge II | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Vansycle Ridge II Jump to: navigation, search Name Vansycle Ridge II Facility Vansycle Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service...

  7. Antelope Ridge Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Antelope Ridge Wind Farm Jump to: navigation, search Name Antelope Ridge Wind Farm Facility Antelope Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility...

  8. Locust Ridge Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Locust Ridge Wind Farm Jump to: navigation, search Name Locust Ridge Wind Farm Facility Locust Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility...

  9. Laredo Ridge Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Laredo Ridge Wind Farm Jump to: navigation, search Name Laredo Ridge Wind Farm Facility Laredo Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility...

  10. Hatchet Ridge Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hatchet Ridge Wind Farm Jump to: navigation, search Name Hatchet Ridge Wind Farm Facility Hatchet Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility...

  11. Allegheny Ridge Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Allegheny Ridge Wind Farm Jump to: navigation, search Name Allegheny Ridge Wind Farm Facility Allegheny Ridge wind farm Sector Wind energy Facility Type Commercial Scale Wind...

  12. EM Shines with Five DOE Sustainability Awards

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, D.C. – EM was selected for five DOE 2013 Sustainability Awards that recognize individual and group efforts at the Oak Ridge, Savannah River and Portsmouth sites.

  13. EM News Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Kopotic and his daughter Lauren pause for a photo after a race that raised money for cancer research and treatment. 'Can Do' Attitude Brings EM Family Together OAK RIDGE, Tenn. -...

  14. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  15. Oak Ridge Office

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    July 30, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R231 00, MODIFICATION A049 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $14,265 ,839.77, resulting in total obligations to this contract of $515,743,782 .56 . If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at

  16. ORNL Weatherization Program Evaluation | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Program Evaluation AgencyCompany Organization: Oak Ridge National Laboratory Sector: Energy Focus Area: Buildings Topics: Policiesdeployment programs Website:...

  17. ORNL Weatherization Program Evaluation | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Weatherization Program Evaluation AgencyCompany Organization: Oak Ridge National Laboratory Sector: Energy Focus Area: Buildings Topics: Policiesdeployment programs Website:...

  18. Oak Ridge Centers for Manufacturing Technology, part 1

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    program of the 1960's through the early 1980's, the Oak Ridge Centers for Manufacturing Technology (ORMCT) in the 1990's was also a most unique and unusual effort. It was...

  19. Oak Ridge completes field work on Recovery Act-projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Ridge completes field work on Recovery Act-projects Oak Ridge completes field work on Recovery Act-projects May 8, 2014 - 12:00pm Addthis The U.S. Department of Energy's Oak Ridge Office of Environmental Management (EM) has finished field work on the last Recovery Act-funded environmental cleanup project. Since 2009, EM has used the $751 million in Recovery Act funds to accomplish 27 projects, many of which included multiple subcomponents and extensive scopes. "This is a landmark

  20. I' I OAK RIDGE NATIONAL LABORATORY OPERATED B Y UNION CARBIDE CORPORATION

    Office of Legacy Management (LM)

    / I' I OAK RIDGE NATIONAL LABORATORY OPERATED B Y UNION CARBIDE CORPORATION NUCLEAR DIVISION POST OFFICE BOK X OAK RIDGE, TENNESSEE 37830 August 21, 1979 Department of Energy, Oak Ridge Operations Attention: E. L. Keller, Director for Technical Services Division Post Office Box E Oak Ridge, Tennessee 37830 Gentlemen: Formerly Utilized Site-Remedial Action Program - Post Decontamination Radiological Survey of a portion of the Former Kellex Laboratory Site, Jersey City, New Jersey Decontamination

  1. Y-12 Groundwater Protection Program Calendar Year 2000 Groundwater Monitoring Data Evaluation Report for the Bear Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2001-09-01

    This report presents an evaluation of the groundwater and surface water monitoring data obtained during calendar year (CY) 2000 in the Bear Creek Hydrogeologic Regime (Bear Creek Regime). The Bear Creek Regime encompasses many confirmed and potential sources of groundwater and surface water contamination associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee (Figure A.1). Prepared by the Y-12 Groundwater Protection Program (GWPP), this report addresses applicable provisions of DOE Order 5400.1 (General Environmental Protection Program) that require: (1) an evaluation of the quantity and quality of groundwater and surface water in areas that are, or could be, affected by Y-12 operations, (2) an evaluation of groundwater and surface water quality in areas where contaminants from Y-12 operations are most likely to migrate beyond the DOE Oak Ridge Reservation (ORR) property line, and (3) an evaluation of long-term trends in groundwater quality at Y-12. The following sections of this report contain relevant background information (Section 2.0); describe the results of the respective data evaluations required under DOE Order 5400.1 (Section 3.0); summarize significant findings of each evaluation (Section 4.0); and list the technical reports and regulatory documents cited for more detailed information (Section 5.0). Illustrations (maps and trend graphs) are presented in Appendix A. Brief data summary tables referenced in each section are contained within the sections. Supplemental information and extensive data tables are provided in Appendix B.

  2. Environmental Management Science Education and Internship Program

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental worker near water Oak Ridge Office of Environmental Management offers students and recent college graduates opportunities to learn about the mission of the DOE-EM...

  3. EM International Strategic Plan 2015-2020 | Department of Energy

    Energy Savers

    Strategic Plan 2015-2020 EM International Strategic Plan 2015-2020 The 2015 - 2020 EM International Strategic Plan outlines the EM International Program's strategic approaches to ...

  4. cityOakRidgeWeb

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Center Children 's Museum OFFICE OF SCIENTIFIC & TECHNICAL INFORMATION Oak Ridge Marina Centennial Golf Course Oak Ridge Memorial Park Swimming Pool 11 10 9 9 8 6 7 5 4 3 2 1...

  5. Oak Ridge Operations

    Office of Legacy Management (LM)

    Ridge. Tennessee 37831- 8723 October 6, 1993 Ms. Susan Zacker State H i s t o r i c Preservation O f f i c e - - Pennsylvania H i s t o r i c a l and Museum Cornmi ssion P.O. Box...

  6. Oak Ridge reservation land-use plan

    SciTech Connect (OSTI)

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  7. EM Mercury Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technology Plan to Address the EM Mercury Challenge FEBRUARY 2016 Table of Contents SUMMARY 1 1. BACKGROUND 2 1.1 OAK RIDGE RESERVATION'S MERCURY CHALLENGE 2 1.2 SAVANNAH RIVER SITE'S MERCURY CHALLENGE 3 2. APPROACH 4 3. OREM'S 2014 TECHNOLOGY DEVELOPMENT PLAN 5 4. RESEARCH AND TECHNOLOGY DEVELOPMENT AREAS FOR OAK RIDGE 6 4.1 MERCURY DETECTION AND MEASUREMENT 6 4.2 Y-12 SITE CLEANUP 7 4.3 EAST FORK POPLAR CREEK REMEDIATION 9 4.4 MODELING 10 5. RESEARCH AND TECHNOLOGY DEVELOPMENT AREAS FOR THE

  8. EM Highlights Advisory Board Contributions

    Energy.gov [DOE]

    Advisory board contributions to the EM program were the subject of a session at the Waste Management Conference.

  9. EM/Stewardship Commitee meeting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM/Stewardship Commitee meeting EM/Stewardship Commitee meeting November 30, 2016 6:00PM to 7:30PM EST The Oak Ridge Site Specific Advisory Board's EM/Stewardship Committee meeting is open to the public. This month, the committee will have detailed discussion about the "Excess Facilities" presentation that was given to the board on November 9. Location: DOE Information Center Building 1916-T1 1 Science.Gov Way Oak Ridge, TN 37831

  10. Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program

    SciTech Connect (OSTI)

    Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

    1993-07-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

  11. Summary - Mitigation and Remediation of Mercury Contamination at the Y-12 Plant, Oak Ridge, TN

    Office of Environmental Management (EM)

    Oak Ridge, TN EM Project: Mitigation/Remediation of Hg ETR Report Date: April 2008 ETR-13 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Mitigation and Remediation of Mercury Contamination at the Y-12 Plant, Oak Ridge, TN Why DOE-EM Did This Review From 1953 to 1983, ~240,000 pounds of mercury (Hg) were released to the East Fork Popular Creek during the operation of the Y-12 Plant. In 1963, direct systematic releases of mercury

  12. EM Recovery Act Performance

    Energy.gov [DOE]

    The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently achieved 74 percent footprint reduction, exceeding the originally established goal of 40...

  13. OAK RIDGE NATIONAL LABORATORY

    Office of Legacy Management (LM)

    Building EM-421 Washington, D. C. 20585 Dear Dr. Williams: Trip Report of ORNL Health Physics Support at the Uniroyal Chemical Company Painesvik, Ohio, on June 25,1992 As per...

  14. EM International. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    It is the intent of EM International to describe the Office of Environmental Restoration and Waste Management`s (EM`s) various roles and responsibilities within the international community. Cooperative agreements and programs, descriptions of projects and technologies, and synopses of visits to international sites are all highlighted in this semiannual journal. Focus on EM programs in this issue is on international collaboration in vitrification projects. Technology highlights covers: in situ sealing for contaminated sites; and remote sensors for toxic pollutants. Section on profiles of countries includes: Arctic contamination by the former Soviet Union, and EM activities with Germany--cooperative arrangements.

  15. Partnership between DOE programs leads to mutual success

    Energy.gov [DOE]

    NNSA and DOE's Oak Ridge Office of EM, along with their major contractors, Consolidated Nuclear Security and URS|CH2M Oak Ridge, recently collaborated to recycle excavated soil resulting in cost savings for two active projects.

  16. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  17. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.

  18. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 4, Technical memorandums 06-03A, 06-04A, 06-05A, and 06-08A: Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This report presents data and information related to remedial investigation studies for Oak Ridge National Laboratory (ORNL). Information is included on a soil gas survey, surface radiological investigations of waste areas, and well installation for ground water monitoring. (CBS)

  19. Oak Ridge Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Site Oak Ridge Site Demolition progress at Oak Ridge Demolition progress at Oak Ridge Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Demolition progress at Oak Ridge

  20. Program management plan for development, demonstration, testing, and evaluation efforts associated with Oak Ridge Reservation`s Land Disposal Restrictions Federal Facility Compliance Agreement

    SciTech Connect (OSTI)

    Conley, T.B.

    1994-04-01

    This program management plan covers the development, demonstration, testing, and evaluation efforts necessary to identify treatment methods for all the waste listed in Appendix B of the ORR`s LDR/FFCA as well as any new wastes which meet Appendix B criteria. To successfully identify a treatment method, at least a proof-of-principle level of understanding must be obtained: that is, the candidate processes must be demonstrated as effective in treating the wastes to the LDR; however, an optimized process is not required. Where applicable and deemed necessary and where the budgets will support them, pilot-scale demonstrations will be pursued. The overall strategy being adopted in this program will be composed of the following activities: Scoping of the study; characterization; development and screening of alternatives; treatability investigations; and detailed analysis of alternatives.

  1. Program Led by EM's Carlsbad Field Office Joins Emergency Response in National Exercise

    Energy.gov [DOE]

    CARLSBAD, N.M. – For the first time, a program led by EM’s Carlsbad Field Office (CBFO) that coordinates analytical capabilities throughout DOE for response to potential radiological incidents joined an exercise to test national readiness for such an event.

  2. Oak Ridge Site Specific

    Office of Environmental Management (EM)

    Site Specific adviSORy BOaRd fy 2014 annual RepORt OctOBeR 2013 - SeptemBeR 2014 ORSSAB FY 2014 ANNUAL REPORT FY 2014 was my first term as chair of the Oak Ridge Site Specific Advisory Board. I thank the members of the board for putting their confidence in me for the year and again for FY 2015. It is an honor and a privilege to represent this important organization. The board's primary mission is to provide independent advice and recommendations to the Department of Energy on its environmental

  3. DOE Oak Ridge Operations managers

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    weapons production, and basic scientific research. Additional responsibilities have been placed on the federal offices in Oak Ridge during the years. It can be said, if the...

  4. Even more Oak Ridge transitions

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Ridge to personally announce it. Eugene Wigner left to go back to Princeton and Alvin Weinberg was appointed Scientific Director in December 1948. I would suggest that appointment...

  5. Advisory Board Makes Valuable Contributions to EM

    Energy.gov [DOE]

    WASHINGTON, D.C. – The eight local boards of the EM Site-Specific Advisory Board (EM SSAB) provided 56 recommendations collectively in 2011, according to a recent assessment of board input into the EM program.

  6. Oak Ridge ARI Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge ARI Overview Oak Ridge ARI Overview This fact sheet covers the asset revitalization initiative in Oak Ridge, TN. Oakridge_Fact_Sheet.pdf (382.48 KB) More Documents & Publications ARI Quarterly Newsletter Oak Ridge ARI Overview ARI: Creating a 2020 DOE Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets

  7. Gamma radiological surveys of the Oak Ridge Reservation, Paducah Gaseous Diffusion Plant, and Portsmouth Gaseous Diffusion Plant, 1990-1993, and overview of data processing and analysis by the Environmental Restoration Remote Sensing Program, Fiscal Year 1995

    SciTech Connect (OSTI)

    Smyre, J.L.; Moll, B.W.; King, A.L.

    1996-06-01

    Three gamma radiological surveys have been conducted under auspices of the ER Remote Sensing Program: (1) Oak Ridge Reservation (ORR) (1992), (2) Clinch River (1992), and (3) Portsmouth Gaseous Diffusion Plant (PORTS) (1993). In addition, the Remote Sensing Program has acquired the results of earlier surveys at Paducah Gaseous Diffusion Plant (PGDP) (1990) and PORTS (1990). These radiological surveys provide data for characterization and long-term monitoring of U.S. Department of Energy (DOE) contamination areas since many of the radioactive materials processed or handled on the ORR, PGDP, and PORTS are direct gamma radiation emitters or have gamma emitting daughter radionuclides. High resolution airborne gamma radiation surveys require a helicopter outfitted with one or two detector pods, a computer-based data acquisition system, and an accurate navigational positioning system for relating collected data to ground location. Sensors measure the ground-level gamma energy spectrum in the 38 to 3,026 KeV range. Analysis can provide gamma emission strength in counts per second for either gross or total man-made gamma emissions. Gross count gamma radiation includes natural background radiation from terrestrial sources (radionuclides present in small amounts in the earth`s soil and bedrock), from radon gas, and from cosmic rays from outer space as well as radiation from man-made radionuclides. Man-made count gamma data include only the portion of the gross count that can be directly attributed to gamma rays from man-made radionuclides. Interpretation of the gamma energy spectra can make possible the determination of which specific radioisotopes contribute to the observed man-made gamma radiation, either as direct or as indirect (i.e., daughter) gamma energy from specific radionuclides (e.g., cesium-137, cobalt-60, uranium-238).

  8. Oak Ridge Site Specific Advisory Board Monthly Meeting DOE Information Center

    Office of Environmental Management (EM)

    November 2. December (draft) 3. Work plan schedule of meetings BOARD MINUTES/RECOMMENDATIONS & MOTIONS 1. October 12, 2016, unapproved meeting minutes REPORTS & MEMOS 1. EM Project Update 2. Travel Opportunities for FY 2017 3. Waste Definitions Table AGENDA Oak Ridge Site Specific Advisory Board Wednesday, November 9, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. 37831 AGENDA I. Welcome and Announcements (B. Price)

  9. Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Elvado Environmental, LLC

    2009-09-01

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP

  10. State Energy Program National Evaluation

    Energy.gov [DOE]

    The Weatherization and Intergovernmental Programs Office authorized the Oak Ridge National Laboratory to implement a national evaluation of the State Energy Program.

  11. ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Operations Office | Department of Energy Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office (73.78 KB) More Documents &

  12. Flat Ridge Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Flat Ridge Wind Farm Jump to: navigation, search Name Flat Ridge Wind Farm Facility Flat Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  13. OREM Program Plan | Department of Energy

    Energy Savers

    Mission OREM Program Plan OREM Program Plan The Oak Ridge Office of Environmental Management's (OREM) Program Plan discusses the vision, goals, and strategy for 2014-2024. The ...

  14. Groundwater Protection Program Management Plan for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex

    2004-03-31

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.

  15. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

  16. Wildcat Ridge Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Wildcat Ridge Wind Farm Facility Wildcat Ridge Wind Farm Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Midwest Wind Energy Developer Midwest Wind...

  17. Hopkins Ridge Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Wind Farm Jump to: navigation, search Name Hopkins Ridge Wind Farm Facility Hopkins Ridge Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  18. Oak Ridge Office of Environmental Management

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... ON FISCAL YEAR 2016 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  19. Blue Ridge Biofuels LLC | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Biofuels LLC Jump to: navigation, search Name: Blue Ridge Biofuels LLC Place: Asheville, North Carolina Zip: 28801 Sector: Biofuels Product: Blue Ridge Biofuels is a worker...

  20. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Savers

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  1. EM Begins Demolishing K-31 Gaseous Diffusion Building

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM's demolition of the K-31 Building at Oak Ridge’s East Tennessee Technology Park (ETTP) began Wednesday, marking the removal of the fourth of five gaseous diffusion buildings at the former uranium enrichment site.

  2. Recommendation on Continued Funding Levels for the EM SSAB (7/26/2012)

    Office of Environmental Management (EM)

    Disposal Facility at the U.S. DOE Oak Ridge Reservation | Department of Energy 3: Recommendations on the Proposed Environmental Managment Disposal Facility at the U.S. DOE Oak Ridge Reservation Recommendation 233: Recommendations on the Proposed Environmental Managment Disposal Facility at the U.S. DOE Oak Ridge Reservation ORSSAB supports onsite disposal of Oak Ridge EM CERCLA wastes that meet the onsite waste acceptance criteria. The board affirms its commitment to the recommendations

  3. SUMMARY OF 2010 DOE EM INTERNATIONAL PROGRAM STUDIES OF WASTE GLASS MELT RATE ENHANCEMENT

    SciTech Connect (OSTI)

    Fox, K.; Marra, J.

    2011-01-19

    A collaborative study has been established under the U.S. Department of Energy (DOE) Office of Environmental Management International Program between the Savannah River National Laboratory (SRNL) and the V. G. Khlopin Radium Institute (KRI) in St. Petersburg, Russia, to investigate potential improvements in melt rate via chemical additions to the glass frit. Researchers at KRI suggested a methodology for selecting frit additives based on empirical coefficients for optimization of glass melting available in the Russian literature. Using these coefficients, KRI identified B{sub 2}O{sub 3}, CuO, and MnO as frit additives that were likely to improve melt rate without having adverse effects on crystallization of the glass or its chemical durability. The results of the melt rate testing in the SMK melter showed that the slurry feed rate (used as a gauge of melt rate) could be significantly increased when MnO or CuO were added to Frit 550 with the SMR-2 sludge. The feed rates increased by about 27% when MnO was added to the frit and by about 26% when CuO was added to the frit, as compared to earlier results for Frit 550 alone. The impact of adding additional B{sub 2}O{sub 3} to the frit was minor when added with CuO. The additional B{sub 2}O{sub 3} showed a more significant, 39% improvement in melt rate when added with MnO. The additional B{sub 2}O{sub 3} also reduced the viscosity of the glasses during pouring. Samples of the glasses from the melt rate testing characterized at SRNL showed that there were no significant impacts on crystallization of the glasses. All of the glasses had very good chemical durability. Chemical composition measurements showed that the frit additives were present in concentrations below the targeted values in some of the glasses. Therefore, it is possible that higher concentrations of these additives may further improve melt rate, although the impacts of higher concentrations of these components on crystallization and durability would need to

  4. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.

  5. Oak Ridge shoppers | Y-12 National Security Complex

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    shoppers Oak Ridge shoppers Oak Ridge shoppers in a crowded grocery store

  6. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Office | Department of Energy Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office (78.91 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA,

  7. OAK RIDGE NATIONAL LABORATORY

    Office of Legacy Management (LM)

    ... HEALTH SCIENCES RESEARCH DMSION Environmental Restoration and Waste Management Non-Defense Programs (Activity No. EX 20 20 010) Results of the Independent Radiological Verification ...

  8. Oak Ridge National Laboratory

    Office of Scientific and Technical Information (OSTI)

    SIMNON and MATLABSIMULWK. for power electronics system simulation. A complete power ... System simulation based SIblNON and MATLABSIMULINK program examples will be demonstrated. ...

  9. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement; Volume 1, Appendix F, Nevada Test Site and Oak Ridge Reservation Spent Nuclear Fuel Management Programs

    SciTech Connect (OSTI)

    1994-06-01

    This volume addresses the interim storage of spent nuclear fuel (SNF) at two US Department of Energy sites, the Nevada Test Site (NTS) and the Oak Ridge Reservation (ORR). These sites are being considered to provide a reasonable range of alternative settings at which future SNF management activities could be conducted. These locations are not currently involved in management of large quantities of SNF; NTS has none, and ORR has only small quantities. But NTS and ORR do offer experience and infrastructure for the handling, processing and storage of radioactive materials, and they do exemplify a broad spectrum of environmental parameters. This broad spectrum of environmental parameters will provide, a perspective on whether and how such location attributes may relate to potential environmental impacts. Consideration of these two sites will permit a programmatic decision to be based upon an assessment of the feasible options without bias, to the current storage sites. This volume is divided into four parts. Part One is the volume introduction. Part Two contains chapters one through five for the NTS, as well as references contained in chapter six. Part Three contains chapters one through five for the ORR, as well as references contained in chapter six. Part Four is summary information including the list of preparers, organizations contacted, acronyms, and abbreviations for both the NTS and the ORR. A Table of Contents, List of Figures, and List of Tables are included in parts Two, Three, and Four. This approach permitted the inclusion of both sites in one volume while maintaining consistent chapter numbering.

  10. Oak Ridge Opw~tlon~

    Office of Legacy Management (LM)

    634 eo.7to Department of Energy Oak Ridge Opwtlon P.O. Box ... (MED) for short-term storage of approximately 219,000 ... in the near future in areas found to be contaminated. ...

  11. Deputy Secretary visits Oak Ridge

    Energy.gov [DOE]

    As Deputy Secretary Sherwood-Randall traveled across the Oak Ridge Reservation, she stopped at the East Tennessee Technology Park for a first-hand perspective of the environmental cleanup happening there.

  12. Growth of a tectonic ridge

    SciTech Connect (OSTI)

    Fleming, R.W.; Messerich, J.A.; Johnson, A.M.

    1997-12-31

    The 28 June 1992 Landers, California, earthquake of M 7.6 created an impressive record of surface rupture and ground deformation. Fractures extend over a length of more than 80 km including zones of right-lateral shift, steps in the fault zones, fault intersections and vertical changes. Among the vertical changes was the growth of a tectonic ridge described here. In this paper the authors describe the Emerson fault zone and the Tortoise Hill ridge including the relations between the fault zone and the ridge. They present data on the horizontal deformation at several scales associated with activity within the ridge and belt of shear zones and show the differential vertical uplifts. And, they conclude with a discussion of potential models for the observed deformation.

  13. Blue Ridge EMC- Net Metering

    Energy.gov [DOE]

    The Blue Ridge Electric Membership Corporation offers net metering to its residential customers with solar photovoltaic, wind, or micro-hydro generators up to 25 kilowatts. There is no aggregate...

  14. Oak Ridge Field O%ce

    Office of Legacy Management (LM)

    DOC F ' ;fz; , NiJlo-2- - ' U ' ted St tes Go e e t kh&~~durn Der>artment of Energy rm jl# Oak Ridge Field O%ce DATE: June 21, 1993 REPLY TO ATTW Of: EW-93:Hartman SUBJECT: WAYNE INTERIM STORAGE SITE - TERMINATION OF SITE ENVIRONMENTAL REPORT TO: Peter 3. Gross, Director, Environmental Protection Division, SE-31 The Wayne Interim Storage Site (WISS) is part of the Formerly Utilized Sites Remedial Action Program. Based upon our surveillance efforts at WISS since 1984, the data for all

  15. Quality Assurance Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Formal EM policy on the use of the corporate Quality Assurance Program (EM-QA-001 Rev. 1) to ensure all EM projects utilize a consistent quality assurance approach.

  16. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  17. Contaminated scrap metal management on the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Hayden, H.W.; Stephenson, M.J.; Bailey, J.K.; Weir, J.R.; Gilbert, W.C.

    1993-09-01

    Large quantities of scrap metal are accumulating at the various Department of Energy (DOE) installations across the country as a result of ongoing DOE programs and missions in concert with present day waste management practices. DOE Oak Ridge alone is presently storing around 500,000 tons of scrap metal. The local generation rate, currently estimated at 1,400 tons/yr, is expected to increase sharply over the next couple of years as numerous environmental restoration and decommissioning programs gain momentum. Projections show that 775,000 tons of scrap metal could be generated at the K-25 Site over the next ten years. The Y-12 Plant and Oak Ridge National Laboratory (ORNL) have similar potentials. The history of scrap metal management at Oak Ridge and future challenges and opportunities are discussed.

  18. Worker Safety and Health Training at Oak Ridge Operations Office on October

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    31 - November 3, 2016 | Department of Energy Oak Ridge Operations Office on October 31 - November 3, 2016 Worker Safety and Health Training at Oak Ridge Operations Office on October 31 - November 3, 2016 September 29, 2016 - 11:58am Addthis Worker Safety and Health Training at Oak Ridge Operations Office on October 31 – November 3, 2016 Worker Safety and Health Program Implementation Assistance - Worker Safety and Health Training at the Oak Ridge Operations Office: On October 31 -

  19. Worker Safety and Health Training at Oak Ridge Operations Office on

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    December 5 - 8 | Department of Energy Worker Safety and Health Training at Oak Ridge Operations Office on December 5 - 8 Worker Safety and Health Training at Oak Ridge Operations Office on December 5 - 8 November 7, 2016 - 4:26pm Addthis Worker Safety and Health Training at Oak Ridge Operations Office on December 5 - 8 Worker Safety and Health Program Implementation Assistance - Worker Safety and Health Training at the Oak Ridge Operations Office: On December 5 - 8, the Office of Worker

  20. Calendar Year 2011 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Elvado Environmental LLC,

    2012-12-01

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2011 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. This report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and known extent of groundwater contamination. The CY 2011 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by the DOE Environmental Management (EM) contractor responsible for environmental cleanup on the ORR. In August 2011, URS | CH2M Oak Ridge LLC (UCOR) replaced Bechtel Jacobs Company LLC (BJC) as the DOE EM contractor. For this report, BJC/UCOR will be referenced as the managing contractor for CY 2011. Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC/UCOR (i.e., coordinating sample collection and sharing data) ensures

  1. Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge National Laboratory Oak Ridge National Laboratory Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory (ORNL) conducts research and development to create scientific knowledge and solutions that strengthen the nation's leadership in key areas of science; increase the availability of clean, abundant energy; restore and protect the environment; and contribute to national security. ORNL also performs

  2. CRAD, Training- Oak Ridge National Laboratory High Flux Isotope Reactor

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Training Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  3. CRAD, Training- Oak Ridge National Laboratory TRU ALPHA LLWT Project

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Training Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

  4. CRAD, Management- Oak Ridge National Laboratory TRU ALPHA LLWT Project

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

  5. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  6. Oak Ridge Reservation Annual Site environmental report for 1994

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1995-10-01

    This report presents the details of the environmental monitoring and management plan for the Oak Ridge Reservation. Topics include: site and operations overview; environmental compliance strategies; environmental management program; effluent monitoring; environmental surveillance; radiation doses; chemical doses; ground water; and quality assurance.

  7. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  8. CRAD, Engineering- Oak Ridge National Laboratory High Flux Isotope Reactor

    Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Engineering Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  9. Oak Ridge National Laboratory Technology Logic Diagram. Volume 1, Technology Evaluation: Part B, Remedial Action

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Oak Ridge National Laboratory Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) and waste management (WM) problems at Oak Ridge National Laboratory (ORNL) to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to decontamination and decommissioning (D&D), remedial action (RA), and WM activities. The TLD consists of three fundamentally separate volumes: Vol. 1 (Technology Evaluation), Vol. 2 (Technology Logic Diagram), and Vol. 3 (Technology Evaluation Data Sheets). Part A of Vols. 1 and 2 focuses on D&D. Part B of Vols. 1 and 2 focuses on RA of contaminated facilities. Part C of Vols. 1 and 2 focuses on WM. Each part of Vol. 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the ranking os remedial technologies. Volume 2 (Pts. A, B, and C) contains the logic linkages among EM goals, environmental problems, and the various technologies that have the potential to solve these problems. Volume 3 (Pts. A, B, and C) contains the TLD data sheets. The focus of Vol. 1, Pt. B, is RA, and it has been divided into six chapters. The first chapter is an introduction, which defines problems specific to the ER Program for ORNL. Chapter 2 provides a general overview of the TLD. Chapters 3 through 5 are organized into necessary subelement categories: RA, characterization, and robotics and automation. The final chapter contains regulatory compliance information concerning RA.

  10. Oak Ridge Construction | Y-12 National Security Complex

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    System Supplier Profile PIA, Oak ridge Operations Office | Department of Energy Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities

  11. Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-07-01

    The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant`s QA programs that are necessary for this project.

  12. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Management Quality Assurance EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010 EM Quality Assurance Centralized Training Platform Project...

  13. Diverse Array of Career Resources Help EM Contractor Employees...

    Office of Environmental Management (EM)

    with EM, Professional Services of America, Inc. (PSA) oper- ates the Contractor Transition Service Program. Its services are available to contractor employees across the EM...

  14. Bluegrass Ridge Wind Energy Project | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Bluegrass Ridge Wind Energy Project Jump to: navigation, search Name Bluegrass Ridge Wind Energy Project Facility Bluegrass Ridge Wind Energy Project Sector Wind energy Facility...

  15. Beech Ridge Energy Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Beech Ridge Energy Wind Farm Jump to: navigation, search Name Beech Ridge Energy Wind Farm Facility Beech Ridge Energy Sector Wind energy Facility Type Commercial Scale Wind...

  16. Oak Ridge Operations Office of Environmental Management Overview...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview PDF icon Oak Ridge Operations Office of...

  17. Recommendation 208 : Use White Paper on Oak Ridge Reservation...

    Office of Environmental Management (EM)

    8 : Use White Paper on Oak Ridge Reservation Recommendation 208 : Use White Paper on Oak Ridge Reservation The ORSSAB approved the enclosed recommendation suggesting DOE Oak Ridge...

  18. Oak Ridge National Laboratory Launches New Accelerator for Energy Tech Entrepreneurs

    Energy.gov [DOE]

    The nation’s top innovators will soon have the opportunity to advance their promising energy technology ideas at the Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) in a new program called Innovation Crossroads.

  19. Directory of Small Business Program Managers (SBPMs)

    Energy Savers

    ... Ridge Operations Office (SC) 200 Administration Road Oak Ridge, TN 37381-8501 Abbey Campbell Small Business Program Manager W: (865) 576-9430 campbella@oro.doe.gov Natasha White ...

  20. Directory of Small Business Program Managers (SBPMs)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Ridge Operations Office (SC) 200 Administration Road Oak Ridge, TN 37381-8501 Abbey Campbell Small Business Program Manager W: (865) 576-9430 campbella@oro.doe.gov Portsmouth ...

  1. Building 9201-4 at the Oak Ridge Y-12 Site annual surveillance and maintenance report 1994

    SciTech Connect (OSTI)

    Sollenberger, M.L.; Sparkman, D.E.; Reynolds, R.M.

    1995-01-01

    The Oak Ridge Y-12 Plant Decontamination and Decommissioning (D&D) Program is part of the Waste Management/D&D Organization and is funded by the Office of Environmental Restoration (EM-40). Strategic goals are to protect human health and environment and to reduce the number of hazardous material-contaminated facilities by properly managing and dispositioning facilities when they are no longer required to fulfill a site mission. The D&D Program objectives include (1) providing surveillance and maintenance (S&M) activities in support of facilities in standby and awaiting D&D; (2) developing specific methods, schedules, and funding plans for the D&D of shutdown facilities; and (3) implementing plans to provide for facility disposition in a safe, compliant, and cost effective manner. Presently Building 9201-4 (Alpha-4) is the only facility at the complex that is in the Y-12 D&D Program. This report provides a status of the program plans and specific S&M requirements for Building 9201-4 as part of the Y-12 D&D Program.

  2. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  3. The Oak Ridge Institute for Science and Education (ORISE) was established by the

    Office of Legacy Management (LM)

    The Oak Ridge Institute for Science and Education (ORISE) was established by the U.S. Department of Energy to undertake national and international programs in science and engineering education, training and management systems, energy and environment systems, and medical sciences. ORISE and its programs are operated by Oak Ridge Associated Universities (ORAU) through a management and operating contract with the U.S. Department of Energy. Established in 1946, ORAU is a consortium of 65 colleges

  4. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    3: Recommendations on Additional Waste Disposal Capacity on the Oak Ridge Reservation At our May 14, 2014, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations on additional waste disposal capacity on the Oak Ridge Reservation. These recommendations are based on the Remedial Investigation/Feasibility Study for CERCLA Oak Ridge Reservation Waste Disposal (DOE/OR/01-2535&D2). The recommendations encourage DOE to continue planning for an additional on-site

  5. Oak Ridge Site Specific Advisory Board Meetings

    Energy.gov [DOE]

    Lists links to the Oak Ridge Site Specific Advisory Board Meetings. The links provide meeting documents available for download.

  6. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject.

  7. Archived EM SSAB Correspondence & Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Communication & Engagement » EM SSAB » Archived EM SSAB Correspondence & Briefings Archived EM SSAB Correspondence & Briefings 2006 June 21, 2006 Letter: Congratulating Oak Ridge SSAB and its Stewardship Committee for Receiving the EPA's 2006 Citizen's Excellence in Community Involvement Award From: Assistant Secretary for Environmental Management, James A. Rispoli To: Mr. Kerry Trammell, Chair Site Specific Advisory Board 2004 March 9, 2004 Letter: Transition of Closure Sites from

  8. Early Oak Ridge Trailer Home | Y-12 National Security Complex

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Home Early Oak Ridge Trailer Home A typical trailer home

  9. US DOE Office of Technology Innovation and Development - Integration of the EM R and D Program in 2012 and Beyond - 12537

    SciTech Connect (OSTI)

    Collazo, Yvette T.; DeLeon, Gary; Schneider, Steve; Gerdes, Kurt; Szilagyi, Andy; Wellman, Dawn; Bredt, Paul; Pierce, Eric; Marra, Jim

    2012-07-01

    Applied research and technology development has the potential to accelerate environmental cleanup and reduce the cost for cleanup and closure of U.S. Department of Energy (DOE) legacy waste sites throughout the United States. Providing the scientific understanding, knowledge, and technologies to enable successful completion of the DOE Office of Environmental Management (EM) mission, the Technology Innovation and Development program is transforming science and innovation into practical solutions for environmental cleanup. Through integration, collaboration, and communication with DOE partner organization, DOE site managers and contractors, these technologies will reduce human health and environmental risk, cost, and time associated with cleanup and closure. The Office of Technology Innovation and Development (OTID) focused efforts in fiscal year 2011 (FY 2011) to a proactive, visionary program balance with integrated, cross-disciplinary applied research and technology development activities. This transition provides the necessary scientific and technical advancements to address near-term needs. In addition, it fills the critical role in providing scientific approaches and advanced technologies that look beyond today's known needs and requirements to provide innovative technologies to make the necessary long-term changes required to facilitate cleanup and bring sites to closure. The outcomes and impacts of this strategy are summarized in the Impact Plan, which describes potential reduction in life-cycle costs through the development and deployment of advanced technologies supporting EM needs associated with waste processing, groundwater and soil remediation, deactivation and decommissioning, and spent nuclear fuel and materials disposition. Additionally, the OTID International Program Strategic Plan 2010-2015 outlines cooperation and collaboration with the international community that has similar nuclear legacy management experience and expertise to foster transfer

  10. Oak Ridge Environmental Management: 30 years in 30 minutes |...

    Office of Environmental Management (EM)

    Oak Ridge Environmental Management: 30 years in 30 minutes Oak Ridge Environmental Management: 30 years in 30 minutes Addthis

  11. Oak Ridge Facilities Construction | Y-12 National Security Complex

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Facilities ... Oak Ridge Facilities Construction Work in wet and mud was common during the construction of Oak Ridge facilities

  12. DATA SHARING REPORT CHARACTERIZATION OF POPULATION 7: PERSONAL PROTECTIVE EQUIPMENT, DRY ACTIVE WASTE, AND MISCELLANEOUS DEBRIS, SURVEILLANCE AND MAINTENANCE PROJECT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Harpenau, Evan M

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

  13. EM's Budget Outlook by Terry Tyborowski

    Office of Environmental Management (EM)

    Assistant Secretary for Program Planning and Budget April 18, 2012 www.em.doe.gov safety performance cleanup closure E M Environmental Management 2 EM's Budget Outlook: FY 2013, FY ...

  14. Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition September 13, 2016 - 12:10pm Addthis A 3-D rendering of the ETTP end-state goal by 2020. A 3-D rendering of the ETTP end-state goal by 2020. The Toxic Substances Control Act Incinerator is scheduled for demolition before EM transfers the site in 2020. During its years of operations, it incinerated 35 million pounds of waste. The Toxic Substances Control Act Incinerator

  15. Il,R!:i'iT[ WORKING GROUP Final Report of the Oak Ridge Reservation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Il,R!:i'iT[ WORKING GROUP Final Report of the Oak Ridge Reservation End Use Working Group July, 1998 This report was written and edited by the members of the End Use Working Group with the assistance of Phoenix Environmental Corporation of Alexandria, Virginia. Additional copies and information can be found on the DOE Oak Ridge Operations site on the world wide web: ornl.gov/doe~oro/em/emhome.html or by calling the Information Resource Center at 423-241-4582. Final Report of the End Use Working

  16. Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans

    Energy.gov [DOE]

    Review protocol and lines of inquiry that are used as basis for technical review and approval of site-specific quality assurance programs.

  17. Evaluation, Measurement, and Verification (EM&V) of Residential Behavior-Based Energy Efficiency Programs: Issues and Recommendations

    SciTech Connect (OSTI)

    none,

    2012-05-16

    Offers technically valid methods for state and local policymakers to estimate the energy savings from residential behavior-based energy efficiency programs.

  18. Oak Ridge Presentation - VOLTTRON 2016

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ORNL is managed by UT-Battelle for the US Department of Energy Utilizing VOLTTRON(tm) Platform for Enabling Energy Efficiency and Grid-Responsiveness of Building Loads Teja Kuruganti, David Fugate, James Nutaro, Jibonananda Sanyal, Brian Fricke Oak Ridge National Laboratory John Wallace Emerson Climate Technologies Presented at: Technical Meeting on Software Framework for Transactive Energy: VOLTTRON 4 th - 5 th August, 2016 Goals - The Transactive Letter * From the Grid Perspective - Increase

  19. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    SciTech Connect (OSTI)

    Thompson, Sharon D.

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  20. HA' R$,kAW CH EM I CAL CO,M i=ANY A

    Office of Legacy Management (LM)

    TH Ii ' HA' R,kAW CH EM I CAL CO,M iANY A December 30, 1955 U. S. Atomic Energy Commission Oak Ridge OperationwOfflce Post Office Box "E" Oak Ridge, Tennessee Attention: Mr. T. ...

  1. Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001

    SciTech Connect (OSTI)

    1995-12-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

  2. Oak Ridge National Laboratory Review. Volume 25, No. 1, 1992

    SciTech Connect (OSTI)

    Krause, C.; Pearce, J.; Zucker, A.

    1992-10-01

    This report presents brief descriptions of the following programs at Oak Ridge National Laboratory: The effects of pollution and climate change on forests; automation to improve the safety and efficiency of rearming battle tanks; new technologies for DNA sequencing; ORNL probes the human genome; ORNL as a supercomputer research center; paving the way to superconcrete made with polystyrene; a new look at supercritical water used in waste treatment; and small mammals as environmental monitors.

  3. OakRidge-cert-OPEIU 1981.pdf

    Energy Savers

    September 2013 ORSSAB Meeting - September 2013 Oak Ridge Site Specific Advisory Board meeting minutes and materials. A Review of Long-term Stewardship for the Contaminated Areas on the Oak Ridge Reservation, Lorene Sigal Meeting Minutes - Sept. 2013 (64.85 KB) A Review of Long-term Stewardship for the Contaminated Areas on the Oak Ridge Reservation, Lorene Sigal (780.35 KB) Meeting Materials - Sept. 2013 (319.63 KB) More Documents & Publications ORSSAB Meeting - November 2013 ORSSAB Meeting

  4. Pantex and Y-12 teams receive NNSA Defense Programs awards |...

    National Nuclear Security Administration (NNSA)

    Pantex and Y-12 teams receive NNSA Defense Programs awards January 13, 2016 OAK RIDGE, ... Nuclear Security Administration (NNSA) Defense Programs Awards of Excellence at an ...

  5. EA-1044: Melton Valley Storage Tanks Capacity Increase Project- Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to construct and maintain additional storage capacity at the U.S. Department of Energy's Oak Ridge National Laboratory, Oak Ridge,...

  6. Oak Ridge National Laboratory | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Tool 4 References 4.1 References Overview "Oak Ridge National Laboratory (ORNL) is a science and technology laboratory managed for the United States Department of Energy by...

  7. Independent Oversight Inspection, Oak Ridge National Laboratory...

    Energy.gov (indexed) [DOE]

    8 Inspection of Nuclear Safety at the Oak Ridge National Laboratory Radiochemical Engineering Development Center, Building 7920 This report provides the results of an inspection of...

  8. Wheat Ridge Solar | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    4550 Teller St Place: Wheat Ridge, Colorado Zip: 80033 Region: Rockies Area Sector: Solar Product: Design and installation of solar systems for residential and small business...

  9. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    4 Annual Meeting Oak Ridge Site Specific Advisory Board Saturday, August 16, 2014, 8 a.m. to noon DOE Information Center, 1 Science.gov Way Oak Ridge, Tenn. The Oak Ridge Site Specific Advisory Board (ORSSAB) met for its annual planning meeting beginning at 8 a.m., on Saturday, August 16, 2014, at the Department of Energy (DOE) Information Center, 1 Science.gov Way, Oak Ridge, Tenn. The objectives of the meeting were to: * Develop an increased understanding of and commitment to the goals of the

  10. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    February 12, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright) ......

  11. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Ridge Reservation Please see the enclosed recommendation for complete details. We look forward to receiving your response to this recommendation by January 12, 2012. Sincerely,...

  12. Oak Ridge OPEIU 2001 | Department of Energy

    Office of Environmental Management (EM)

    Oak Ridge National Laboratory (ORNL), Y-12 National Security Complex (Y-12), and East Tennessee Technology Park (ETTP) evolved and conducted different missions for the Department. ...

  13. Oak Ridge National Laboratory Technology Marketing Summaries...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... and Minerals Extraction Researchers at ORNL are ... brackish water into fresh water.... read more Oak Ridge ... wave of detection devices based on ion mobility ...

  14. Oak Ridge Site Specific Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Expedite Milestones C. Recommendation on DOE Oak Ridge GIS Fact Sheets (C. Staley) D. Election of FY 2015 Board Officers (B. Price) VII. Responses to Recommendations & Comments (D. ...

  15. Tectonic origin of Crowley's Ridge, northeastern Arkansas

    SciTech Connect (OSTI)

    VanArsdale, R.B. (Univ. of Arkansas, Fayetteville, AR (United States). Geology Dept.); Williams, R.A.; Shedlock, K.M.; King, K.W.; Odum, J.K. (Geological survey, Denver, CO (United States). Denver Federal Center); Schweig, E.S. III; Kanter, L.R. (Memphis State Univ., TN (United States))

    1992-01-01

    Crowley's Ridge is a 320 km long topographic ridge that extends from Thebes, Illinois to Helena, Arkansas. The ridge has been interpreted as an erosional remnant formed during Quaternary incision of the ancestral Mississippi and Ohio rivers; however, the Reelfoot Rift COCORP line identified a down-to-the-west fault bounding the western margin of Crowley's Ridge south of Jonesboro, Arkansas. Subsequent Mini-Sosie seismic reflection profiles confirmed the COCORP data and identified additional faults beneath other margins of the ridge. In each case the faults lie beneath the base of the ridge scarp. The Mini-Sosie data did not resolve the uppermost 150 m and so it was not possible to determine if the faults displace the near-surface Claiborne Group (middle Eocene). A shotgun source seismic reflection survey was subsequently conducted to image the uppermost 250 m across the faulted margins. The shotgun survey across the western margin of the ridge south of Jonesboro reveals displaced reflectors as shallow as 30 m depth. Claiborne Group strata are displaced approximately 6 m and it appears that some of the topographic relief of Crowley's Ridge at this location is due to post middle Eocene fault displacement. Based on the reflection data, the authors suggest that Crowley's Ridge is tectonic in origin.

  16. Oak Ridge Centers for Manufacturing Technology - Partnership...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Impact on the Semiconductor Industry, part 2 The Oak Ridge Centers for Manufacturing Technology in partnership with SEMATECH (Semiconductor Manufacturing TECHnology) had...

  17. Oak Ridge Centers for Manufacturing Technology - Partnership...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    with some of the people who experienced the Oak Ridge Centers for Manufacturing Technology firsthand. Here is his introduction followed by the first of three letters...

  18. Oak Ridge Centers for Manufacturing Technology ? testimonials

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    testimonials The first testimonial for the successful Oak Ridge Centers for Manufacturing Technology came from Mitchell Burnett. Mitch was among the first hourly paid employees, an...

  19. Oak Ridge National Laboratory Environmental Management Portfolio...

    Office of Environmental Management (EM)

    Ridge Office of Environmental Management (OREM) East Tennessee Technology Park Portfolio Plan Jim Kopotic Portfolio Federal Project Director East Tennessee Technology Park...

  20. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    January 13, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price) ......

  1. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    January 14, 2015, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright) ......

  2. Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-09-01

    The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.

  3. Oak Ridge Reservation environmental report for 1990

    SciTech Connect (OSTI)

    Wilson, A.R.

    1991-09-01

    The purpose of this report is to provide information to the public about the impact of the US Department of Energy's (DOE's) facilities located on the Oak Ridge Reservation (ORR) on the public and the environment. It describes the environmental surveillance and monitoring activities conducted at and around the DOE facilities operated by Martin Marietta Energy Systems, Inc. Preparation and publication of this report is in accordance with DOE Order 5400.1. The order specifies a publication deadline of June of the following year for each calendar year of data. The primary objective of this report is to summarize all information collected for the previous calendar year regarding effluent monitoring, environmental surveillance, and estimates of radiation and chemical dose to the surrounding population. When multiple years of information are available for a program, trends are also evaluated. The first seven sections of Volume 1 of this report address this objective. The last three sections of Volume 1 provide information on solid waste management, special environmental studies, and quality assurance programs.

  4. EM SSAB Conference Calls - January 15, 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    15, 2014 EM SSAB Conference Calls - January 15, 2014 Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program, Chairs' Meeting, and Around the Complex updates and Closing Remarks. EM SSAB Conference Calls - January 15, 2014 (139.29 KB) More Documents & Publications EM SSAB Conference Calls - August 27, 2013 EM SSAB Conference Calls - June 6, 2012 EM

  5. Oak%20Ridge.jpg | OSTI, US Dept of Energy Office of Scientific and

    Office of Scientific and Technical Information (OSTI)

    Technical Information Oak%20Ridge

  6. EM SSAB Conference Calls- May 11, 2006

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  7. EM SSAB Conference Calls- June 8, 2005

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  8. EM SSAB Conference Calls- January 22, 2009

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  9. EM SSAB Conference Calls- May 10, 2007

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  10. EM SSAB Conference Calls- January 11, 2007

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  11. EM SSAB Conference Calls- November 20, 2008

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  12. EM SSAB Conference Calls- July 13, 2006

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  13. EM SSAB Conference Calls- December 15, 2005

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  14. EM SSAB Conference Calls- August 25, 2004

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  15. EM SSAB Conference Calls- May 7, 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  16. EM SSAB Conference Calls- November 19, 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  17. EM SSAB Conference Calls- January 31, 2008

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  18. EM SSAB Conference Calls- February 19, 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  19. EM SSAB Conference Calls- March 18, 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  20. EM SSAB Conference Calls- January 21, 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  1. EM SSAB Conference Calls- November 9, 2006

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  2. EM SSAB Conference Calls- November 29, 2007

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  3. EM SSAB Conference Calls- July 9, 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  4. EM SSAB Conference Calls- December 2, 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  5. EM SSAB Conference Calls- June 19, 2008

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  6. EM SSAB Conference Calls- June 18, 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  7. EM SSAB Conference Calls- August 11, 2005

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  8. EM SSAB Conference Calls- August 7, 2008

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  9. EM SSAB Conference Calls- July 26, 2007

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  10. EM SSAB Conference Calls- March 27, 2008

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  11. EM SSAB Conference Calls- May 19, 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  12. EM SSAB Conference Calls- February 23, 2012

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  13. EM SSAB Conference Calls- June 6, 2012

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  14. EM SSAB Conference Calls- September 19, 2011

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  15. EM SSAB Conference Calls- August 27, 2013

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  16. EM SSAB Conference Calls- June 29, 2004

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  17. EM SSAB Conference Calls- October 20, 2005

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  18. EM International Strategic Plan 2010-2015

    Energy.gov [DOE]

    The International Program assists the DOE Office of Environmental Management (EM) in identifying technologies and strategies for waste processing, groundwater and soil remediation, spent nuclear...

  19. EM SSAB Conference Calls- December 18, 2012

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  20. EM SSAB Conference Calls- January 30, 2004

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  1. EM SSAB Conference Calls- December 7, 2011

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  2. EM Issues 2015 Year-in Review

    Energy.gov [DOE]

    WASHINGTON, D.C. – Today EM released its 2015 Year-in-Review highlighting the wide array of work performed in the cleanup program this year.

  3. EM SSAB Conference Calls- August 15, 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  4. EM SSAB Conference Calls- February 16, 2006

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  5. EM SSAB Conference Calls- March 24, 2004

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  6. EM Launches Forum on Business Opportunities

    Energy.gov [DOE]

    WASHINGTON, D.C. – EM will host its first quarterly public forum to discuss upcoming business opportunities in the legacy nuclear cleanup program with contractors.

  7. EM SSAB Conference Calls- July 29, 2010

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  8. Oak Ridge Reservation annual site environmental report for 1995

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1996-09-01

    This report presents the details of the environmental monitoring and management program for the Oak Ridge Reservation. Topics discussed include: site background, climate, and operations; environmental compliance strategies; effluent monitoring; environmental management program including environmental restoration, decontamination and decommissioning, technology development, and public involvement; effluent monitoring of airborne discharges, liquid discharges, toxicity control and monitoring, biological monitoring and abatement; environmental surveillance which encompasses meteorological monitoring, ambient air monitoring, surface water monitoring, soils monitoring, sediment monitoring, and contamination of food stuffs monitoring; radiation doses; chemical exposures; ground water monitoring; and quality assurance.

  9. Contact EM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    About Us » Contact EM Contact EM For information about the Office of Environmental Management and its programs; for assistance in information on this website; or for general information purposes: By E-Mail: EM.WebContentManager@em.doe.gov By Mail: U.S. Department of Energy ATTENTION: Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 By Phone: 202-586-5000 (Main DOE Switchboard) 202-586-7709 (Office of Environmental Management) National DOE Phone Directory For

  10. Long-Term Assessment of Isotopic Exchange of Carbon Dioxide in a Subalpine Forest (Niwot Ridge AmeriFlux Site)

    SciTech Connect (OSTI)

    Bowling, David

    2014-12-31

    In 2005 we began a long-term measurement program of CO{sub 2} and its stable isotopes at the Niwot Ridge AmeriFlux site. Measurements are ongoing.

  11. Native Grass Community Management Plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Ryon, Michael G; Parr, Patricia Dreyer; Cohen, Kari

    2007-06-01

    Land managers at the Department of Energy's Oak Ridge National Laboratory in East Tennessee are restoring native warm-season grasses and wildflowers to various sites across the Oak Ridge Reservation (ORR). Some of the numerous benefits to planting native grasses and forbs include improved habitat quality for wildlife, improved aesthetic values, lower long-term maintenance costs, and compliance with Executive Order 13112 (Clinton 1999). Challenges to restoring native plants on the ORR include the need to gain experience in establishing and maintaining these communities and the potentially greater up-front costs of getting native grasses established. The goals of the native grass program are generally outlined on a fiscal-year basis. An overview of some of the issues associated with the successful and cost-effective establishment and maintenance of native grass and wildflower stands on the ORR is presented in this report.

  12. EM-PDRI Team Concurrence

    Office of Environmental Management (EM)

    Revision 1, January, 2001, reflects the requirements in DOE Order 413.3 and the Draft Manual for Program and Project Management, October, 2000. As such, the EM*PDRI provides a...

  13. Albert Einstein Distinguished Educator Fellowship Program accepting...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Albert Einstein Distinguished Educator Fellowship Program accepting applications for ... FOR IMMEDIATE RELEASE Oct. 7, 2015 FY16-02 OAK RIDGE, Tenn.-The Albert Einstein ...

  14. Nuclear Engineering Science Laboratory Synthesis program accepting...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Nuclear Engineering Science Laboratory Synthesis program accepting applications for ... FOR IMMEDIATE RELEASE Nov. 11, 2015 FY16-06 OAK RIDGE, Tenn.-The Nuclear Engineering ...

  15. Surveillance and maintenance report on the Alpha-4 Building at the Oak Ridge Y-12 Plant for fiscal year 1995

    SciTech Connect (OSTI)

    Sollenberger, M.L.; Sparkman, D.E.; Reynolds, R.M.

    1995-12-01

    Part of the Environmental Restoration Division and funded by the Office of Environmental Management (EM-40) Program, the Oak Ridge Y-l2 Plant Decontamination and Decommissioning Program strives to protect human health and the environment and reduce the number of hazardous-material-contaminated facilities by properly managing and dispositioning facilities when they are no longer required to fulfill a site mission. Building 9201-4, known as Alpha-4, is the only facility at the Y-12 Plant under the D and D Program, and it is the D and D Program that provides surveillance and maintenance (S and M) of the facility. Alpha-4 housed uranium enrichment operations from 1945--47. In 1955 a process known as Colex, for column exchange, that involved electrochemical and solvent extraction processes began. These processes required substantial quantities of mercury as a solvent to separate lithium-6 from lithium-7 (in the form of lithium hydroxide). The Colex process was discontinued in 1962, leaving a legacy of process equipment and lines contaminated with mercury and lithium hydroxide. Now in the inactive-shutdown phase, Alpha-4 requires an S and M program that provides for risk mitigation, hazard abatement, and site preparation for subsequent D and D and/or long-term maintenance of the shutdown status of the building. Daily surveillance activities emphasizes structural integrity, leak detection, safeguards, health of personnel, environmental issues, safety conditions, equipment, hazardous materials, mercury monitoring, and cleanup. This report communicates the status of the program plans and specific surveillance and maintenance requirements for Alpha-4.

  16. SOPP-43, EM-23 Quality Assurance Oversight

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    POLICY: The Office of Environmental Management (EM) Quality Assurance program requirements and expectations are documented in the EM Quality Assurance Program (QAP), EM-QA-001, dated October 2008. The QAP is the EM management system to ensure that all EM organizations "do work correctly." The QAP meets the requirements of DOE O 414.1C, Quality Assurance, and 10 CFR 830 Subpart A "Quality Assurance Requirements." The QAP demonstrates how QA and the Integrated Safety

  17. Implementation plan for liquid low-level radioactive waste systems under the FFA for fiscal years 1996 and 1997 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-06-01

    This document is the fourth annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in 1992 as ES/ER-17&D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). In addition, this document lists FFA activities planned for FY 1997. Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service.

  18. Level 3 Baseline Risk Assessment for Building 3515 at Oak Ridge National Lab., Oak Ridge, TN

    SciTech Connect (OSTI)

    Wollert, D.A.; Cretella, F.M.; Golden, K.M.

    1995-08-01

    The baseline risk assessment for the Fission Product Pilot Plant (Building 3515) at the Oak Ridge National laboratory (ORNL) provides the Decontamination and Decommissioning (D&D) Program at ORNL and Building 3515 project managers with information concerning the results of the Level 3 baseline risk assessment performed for this building. The document was prepared under Work Breakdown Structure 1.4.12.6.2.01 (Activity Data Sheet 3701, Facilities D&D) and includes information on the potential long-term impacts to human health and the environment if no action is taken to remediate Building 3515. Information provided in this document forms the basis for the development of remedial alternatives and the no-action risk portion of the Engineering Evaluation/Cost Analysis report.

  19. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  20. Oak Ridge Operations Office of Environmental Management Overview

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge Reservation * High levels of rainfall coupled with shallow groundwater carry contaminants to local waterways Oak Ridge is not an isolated or arid site Oak Ridge has a Unique...

  1. EM's Jack Surash Reflects on Growing Participation in Business...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... - and DOE's small business program. There's also an opportunity for people to provide feedback on how EM can improve its procurement process. As a result, the program has ...

  2. Federal Facility Agreement Annual Progress Report for Fiscal Year 1999 Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs Company LLC

    2000-01-01

    The U.S. Department of Energy-Oak Ridge Operations (DOE-ORO) EM Program adopted a watershed approach for performing Remedial Investigations (RIs) and characterizations for ORR because it is an effective system for determining the best methods for protecting and restoring aquatic ecosystems and protecting human health. The basic concept is that water quality and ecosystem problems are best solved at the watershed level rather than at the individual water-body or discharger level. The watershed approach requires consideration of all environmental concerns, including needs to protect public health, critical habitats such as wetlands, biological integrity, and surface and ground waters. The watershed approach provides an improved basis for management decisions concerning contaminant sources and containment. It allows more direct focus by stakeholders on achieving ecological goals and water quality standards rather than a measurement of program activities based on numbers of permits or samples. The watershed approach allows better management strategies for investigations, therefore maximizing the utilization of scarce resources. Feasibility studies (FSs) evaluate various alternatives in terms of environmental standards, the protection of human health and the environment, and the costs of implementation to find the optimum solution among them. Society has to decide how much it is willing to spend to meet the standards and to be protective. Conducting FSs is the process of trading off those criteria to pick that optimum point that society wants to achieve. Performing this analysis at the watershed scale allows those trade-offs to be made meaningfully. In addition, a Land Use Control Assurance Plan for the ORR was prepared to identify the strategy for assuring the long-term effectiveness of land use controls. These land use controls will be relied upon to protect human health and the environment at areas of the ORR undergoing remediation pursuant to the Comprehensive

  3. Environmental Monitoring Report - United States Department of Energy, Oak Ridge Facilities, Calendar Year 1984

    SciTech Connect (OSTI)

    Jordan, R.G.

    1999-01-01

    Each year since 1972, a report has been prepared on the environmental monitoring activities for the DOE facilities in oak Ridge, Tennessee, for the previous calendar year. previously, the individual facilities published quarterly and annual progress reports that contained some environmental monitoring data. The environmental monitoring program for 1984 includes sampling and analysis of air, water from surface streams, groundwater, creek sediment, biota, and soil for both radioactive and nonradioactive (including hazardous) materials. Special environmental studies that have been conducted in the Oak Ridge area are included in this report, primarily as abstracts or brief summaries. The annual report for 1984 on environmental monitoring and surveillance of the Oak Ridge community by Oak Ridge Associated Universities (ORAU) is included as an appendix. A brief description of the topography and climate of the Oak Ridge area and a short description of the three DOE facilities are provided below to enhance the reader's understanding of the direction and contents of the environmental monitoring program for Oak Ridge.

  4. Personal Property Management Program Brochure

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    INVENTORY Physical inventory expectations (methods, frequency, and targeted results) are clarified in the chart below. DOE/NNSA ORGANIZATIONAL PROPERTY MANAGEMENT OFFICIALS (OPMOs) SC-Oak Ridge-Rebecca Whitehead (Acting) WhiteheadRN@oro.doe.gov SC-Chicago-Bonnie Anderson Bonnie.Anderson@ch.doe.gov EM-Savannah River-Tim Armstrong Timothy.armstrong@srs.gov EM-CBC-David Lojek dave.lojek@emcbc.doe.gov EM-Richland-Renato Mercado Renato_s_mercado@rl.gov EM-ORP-Richard McNulty Richard_r_mcnulty@rl.gov

  5. EM Quality Assurance Policy, Revision 0 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Policy, Revision 0 EM Quality Assurance Policy, Revision 0 Previous EM policy on the use of the corporate Quality Assurance Program (EM-QA-001 Rev. 0). This document has been superseded by Revision 1 of the policy, but is still in use at some EM sites. EM Quality Assurance Policy, Revision 0 (259.04 KB) More Documents & Publications Line Management Understanding of QA and Oversight EM Quality Assurance Program (EM-QA-001 Revision 0) QA Corporate Board Meeting - February 2010 (Teleconference)

  6. OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE

    Energy.gov [DOE]

    Oak Ridge, TN - The Environmental Management Waste Management Facility (EMWMF) provides the onsite disposal capability for the majority of cleanup-generated wastes on the Oak Ridge Reservation....

  7. Letter: Congratulating Oak Ridge SSAB and its Stewardship Committee...

    Office of Environmental Management (EM)

    Congratulating Oak Ridge SSAB and its Stewardship Committee for Receiving the EPA's 2006 Citizen's Excellence in Community Involvement Award Letter: Congratulating Oak Ridge SSAB ...

  8. Other: Advancing Materials Science using Neutrons at Oak Ridge National

    Office of Scientific and Technical Information (OSTI)

    Laboratory | ScienceCinema Advancing Materials Science using Neutrons at Oak Ridge National Laboratory Citation Details Title: Advancing Materials Science using Neutrons at Oak Ridge National Laboratory

  9. Buffalo Ridge II Wind Power Project | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    II Wind Power Project Jump to: navigation, search Name Buffalo Ridge II Wind Power Project Facility Buffalo Ridge II Wind Power Project Sector Wind energy Facility Type Commercial...

  10. Blue Ridge Renewable Energy LLC | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Renewable Energy LLC Jump to: navigation, search Name: Blue Ridge Renewable Energy LLC Place: Arlington, Virginia Zip: 22209 Product: Developer and operator of the Blue Ridge...

  11. DOE - Office of Legacy Management -- Oak Ridge Gaseous Diffusion...

    Office of Legacy Management (LM)

    Oak Ridge Gaseous Diffusion Plant - TN 02 FUSRAP Considered Sites Site: Oak Ridge Gaseous Diffusion Plant (TN.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site ...

  12. Former Oak Ridge Bechtel Jacobs Employee Charged with Violating...

    Office of Environmental Management (EM)

    Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Department of ...

  13. Energy Department, Oak Ridge National Lab Officials to Celebrate...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge National Laboratory Director Thom Mason, Governor Bill Haslam and ... Dr. Thom Mason, Oak Ridge National Laboratory Director Industry representatives, including ...

  14. Oak Ridge Site Specific Advisory Board Committees | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Committees Oak Ridge Site Specific Advisory Board Committees Oak Ridge's Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its...

  15. John Hsu, Oak Ridge National Laboratory, Flux Coupling Machines...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    John Hsu, Oak Ridge National Laboratory, Flux Coupling Machines and Switched Reluctance Motors to Replace Permanent Magnets in Electric Vehicles John Hsu, Oak Ridge National...

  16. Green Ridge Power Wind Farm II | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    II Jump to: navigation, search Name Green Ridge Power Wind Farm II Facility Green Ridge Power Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service...

  17. ITER movie created by Oak Ridge National Laboratory, National...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ITER movie created by Oak Ridge National Laboratory, National Center for Computational Sciences American Fusion News Category: U.S. ITER Link: ITER movie created by Oak Ridge ...

  18. Evaluation of Side Stream Filtration Technology at Oak Ridge...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Document provides ...

  19. Human Resources at Oak Ridge National Laboratory | Critical Materials...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Oak Ridge National Laboratory Contact Information The main contact for human resources for CMI at Oak Ridge National Laboratory: David Lett Phone: 865-576-5675 Email: ...

  20. Instructions for EM Corporate Performance Metrics | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Instructions for EM Corporate Performance Metrics Instructions for EM Corporate Performance Metrics Quality Program Criteria Instructions for EM Corporate Performance Metrics (128.47 KB) More Documents & Publications EM Corporate QA Performance Metrics CPMS Tables QA Corporate Board Meeting - July 2008