National Library of Energy BETA

Sample records for revised baseline partial

  1. Hanford Site technical baseline database. Revision 1

    SciTech Connect (OSTI)

    Porter, P.E.

    1995-01-27

    This report lists the Hanford specific files (Table 1) that make up the Hanford Site Technical Baseline Database. Table 2 includes the delta files that delineate the differences between this revision and revision 0 of the Hanford Site Technical Baseline Database. This information is being managed and maintained on the Hanford RDD-100 System, which uses the capabilities of RDD-100, a systems engineering software system of Ascent Logic Corporation (ALC). This revision of the Hanford Site Technical Baseline Database uses RDD-100 version 3.0.2.2 (see Table 3). Directories reflect those controlled by the Hanford RDD-100 System Administrator. Table 4 provides information regarding the platform. A cassette tape containing the Hanford Site Technical Baseline Database is available.

  2. Acquisition Career Management Program Handbook, Partial Revision...

    Energy.gov (indexed) [DOE]

    Procurement and Assistance Management SUBJECT: Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative SUMMARY: The...

  3. Revised SRC-I project baseline. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The SRC Process Area Design Baseline consists of six volumes. The first four were submitted to DOE on 9 September 1981. The fifth volume, summarizing the Category A Engineering Change Proposals (ECPs), was not submitted. The sixth volume, containing proprietary information on Kerr-McGee's Critical Solvent Deashing System, was forwarded to BRHG Synthetic Fuels, Inc. for custody, according to past instructions from DOE, and is available for perusal by authorized DOE representatives. DOE formally accepted the Design Baseline under ICRC Release ECP 4-1001, at the Project Configuration Control Board meeting in Oak Ridge, Tennessee on 5 November 1981. The documentation was then revised by Catalytic, Inc. to incorporate the Category B and C and Post-Baseline Engineering Change Proposals. Volumes I through V of the Revised Design Baseline, dated 22 October 1982, are nonproprietary and they were issued to the DOE via Engineering Change Notice (ECN) 4-1 on 23 February 1983. Volume VI again contains proprieary information on Kerr-McGee Critical Solvent Deashing System; it was issued to Burns and Roe Synthetic Fuels, Inc. Subsequently, updated process descriptions, utility summaries, and errata sheets were issued to the DOE and Burns and Roe Synthetic Fuels, Inc. on nonproprietary Engineering Change Notices 4-2 and 4-3 on 24 May 1983.

  4. Revised SRC-I project baseline. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    International Coal Refining Company (ICRC), in cooperation with the Commonwealth of Kentucky has contracted with the United States Department of Energy (DOE) to design, build and operate a first-of-its-kind plant demonstrating the economic, environmental, socioeconomic and technical feasibility of the direct coal liquefaction process known as SRC-I. ICRC has made a massive commitment of time and expertise to design processes, plan and formulate policy, schedules, costs and technical drawings for all plant systems. These fully integrated plans comprise the Project Baseline and are the basis for all future detailed engineering, plant construction, operation, and other work set forth in the contract between ICRC and the DOE. Volumes I and II of the accompanying documents constitute the updated Project Baseline for the SRC-I two-stage liquefaction plant. International Coal Refining Company believes this versatile plant design incorporates the most advanced coal liquefaction system available in the synthetic fuels field. SRC-I two-stage liquefaction, as developed by ICRC, is the way of the future in coal liquefaction because of its product slate flexibility, high process thermal efficiency, and low consumption of hydrogen. The SRC-I Project Baseline design also has made important state-of-the-art advances in areas such as environmental control systems. Because of a lack of funding, the DOE has curtailed the total project effort without specifying a definite renewal date. This precludes the development of revised accurate and meaningful schedules and, hence, escalated project costs. ICRC has revised and updated the original Design Baseline to include in the technical documentation all of the approved but previously non-incorporated Category B and C and new Post-Baseline Engineering Change Proposals.

  5. Notice of Intent to Revise DOE G 413.3-5A, Performance Baseline Guide

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-02-03

    The proposed revision to this Department of Energy Guide focuses on updating the current guide with the latest terminology and references, regarding Performance Baseline Development process. This update also incorporates the latest Secretarial memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  6. The mixed waste management facility. Project baseline revision 1.2

    SciTech Connect (OSTI)

    Streit, R.D.; Throop, A.L.

    1995-04-01

    Revision 1.2 to the Project Baseline (PB) for the Mixed Waste Management Facility (MWMF) is in response to DOE directives and verbal guidance to (1) Collocate the Decontamination and Waste Treatment Facility (DWTF) and MWMF into a single complex, integrate certain and overlapping functions as a cost-saving measure; (2) Meet certain fiscal year (FY) new-BA funding objectives ($15.3M in FY95) with lower and roughly balanced funding for out years; (3) Reduce Total Project Cost (TPC) for the MWMF Project; (4) Include costs for all appropriate permitting activities in the project TPC. This baseline revision also incorporates revisions in the technical baseline design for Molten Salt Oxidation (MSO) and Mediated Electrochemical Oxidation (MEO). Changes in the WBS dictionary that are necessary as a result of this rebaseline, as well as minor title changes, at WBS Level 3 or above (DOE control level) are approved as a separate document. For completeness, the WBS dictionary that reflects these changes is contained in Appendix B. The PB, with revisions as described in this document, were also the basis for the FY97 Validation Process, presented to DOE and their reviewers on March 21-22, 1995. Appendix C lists information related to prior revisions to the PB. Several key changes relate to the integration of functions and sharing of facilities between the portion of the DWTF that will house the MWMF and those portions that are used by the Hazardous Waste Management (HWM) Division at LLNL. This collocation has been directed by DOE as a cost-saving measure and has been implemented in a manner that maintains separate operational elements from a safety and permitting viewpoint. Appendix D provides background information on the decision and implications of collocating the two facilities.

  7. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-06-20

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D&D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities.

  8. Sandia National Laboratories/New Mexico Environmental Baseline update--Revision 1.0

    SciTech Connect (OSTI)

    1996-07-01

    This report provides a baseline update to provide the background information necessary for personnel to prepare clear and consise NEPA documentation. The environment of the Sandia National Laboratories is described in this document, including the ecology, meteorology, climatology, seismology, emissions, cultural resources and land use, visual resources, noise pollution, transportation, and socioeconomics.

  9. Waste Isolation Pilot Plant Transuranic Waste Baseline inventory report. Volume 2. Revision 1

    SciTech Connect (OSTI)

    1995-02-01

    This document is the Baseline Inventory Report for the transuranic (alpha-bearing) wastes stored at the Waste Isolation Pilot Plant (WIPP) in New Mexico. Waste stream profiles including origin, applicable EPA codes, typical isotopic composition, typical waste densities, and typical rates of waste generation for each facility are presented for wastes stored at the WIPP.

  10. Mixed waste focus area integrated technical baseline report. Phase I, Volume 2: Revision 0

    SciTech Connect (OSTI)

    1996-01-16

    This document (Volume 2) contains the Appendices A through J for the Mixed Waste Focus Area Integrated Technical Baseline Report Phase I for the Idaho National Engineering Laboratory. Included are: Waste Type Managers` Resumes, detailed information on wastewater, combustible organics, debris, unique waste, and inorganic homogeneous solids and soils, and waste data information. A detailed list of technology deficiencies and site needs identification is also provided.

  11. Revisions

    U.S. Energy Information Administration (EIA) (indexed site)

    Adjustments Revisions Adjustments Acquisitions Extensions Discoveries in Old Fields ... year + Col. 3 + Col. 4 + Col. 8 - Col. 9. Notes: Old means discovered in a prior year. ...

  12. Revisions

    U.S. Energy Information Administration (EIA) (indexed site)

    proved reserves of natural gas, wet after lease separation, 2001-14 billion cubic feet Revisions a Net of Sales b New Reservoir Proved d Change Net and and New Field Discoveries Total c Estimated Reserves from Adjustments Revisions Adjustments Acquisitions Extensions Discoveries in Old Fields Discoveries Production 12/31 Prior Year Year (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) Total natural gas (billion cubic feet) 2001 1,849 -2,438 -589 2,715 17,183 3,668 2,898 23,749 20,642 191,743 5,233

  13. Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative

    Energy.gov [DOE]

    The purpose of this flash is to provide interim guidance for certifying and appointing Contracting Officer's Representatives. This guidance complies with the Office of Federal Procurement Policy memorandum, Revisions to the Federal Acquisition Certification for Contracting Officer's Representatives (FAC-COR), dated September 6, 2011 with an effective date of January 1, 2012.

  14. Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site`s tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site.

  15. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Shiprock, New Mexico. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This baseline risk assessment at the former uranium mill tailings site near Shiprock, New Mexico, evaluates the potential impact to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an on-site disposal cell in 1986 through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. There are no domestic or drinking water wells in the contaminated ground water of the two distinct ground water units: the contaminated ground water in the San Juan River floodplain alluvium below the site and the contaminated ground water in the terrace alluvium area where the disposal cell is located. Because no one is drinking the affected ground water, there are currently no health or environmental risks directly associated with the contaminated ground water. However, there is a potential for humans, domestic animals, and wildlife to the exposed to surface expressions of ground water in the seeps and pools in the area of the San Juan River floodplain below the site. For these reasons, this risk assessment evaluates potential exposure to contaminated surface water and seeps as well as potential future use of contaminated ground water.

  16. Hanford Site technical baseline database

    SciTech Connect (OSTI)

    Porter, P.E., Westinghouse Hanford

    1996-05-10

    This document includes a cassette tape that contains the Hanford specific files that make up the Hanford Site Technical Baseline Database as of May 10, 1996. The cassette tape also includes the delta files that delineate the differences between this revision and revision 3 (April 10, 1996) of the Hanford Site Technical Baseline Database.

  17. Tank Waste Remediation System (TWRS) Technical Baseline Summary Description

    SciTech Connect (OSTI)

    TEDESCHI, A.R.

    2000-04-21

    This revision notes the supersedure of the subject document by concurrent issuance of HNF-1901 ''Technical Baseline Summary Description for the Tank Farm Contractor'', Revision 2. Safe storage mission technical baseline information was absorbed by the new revision of HNF-1901.

  18. A revised partiality model and post-refinement algorithm for X-ray free-electron laser data

    SciTech Connect (OSTI)

    Ginn, Helen Mary; Brewster, Aaron S.; Hattne, Johan; Evans, Gwyndaf; Wagner, Armin; Grimes, Jonathan M.; Sauter, Nicholas K.; Sutton, Geoff; Stuart, David Ian

    2015-05-23

    An updated partiality model and post-refinement algorithm for XFEL snapshot diffraction data is presented and confirmed by observing anomalous density for S atoms at an X-ray wavelength of 1.3 . Research towards using X-ray free-electron laser (XFEL) data to solve structures using experimental phasing methods such as sulfur single-wavelength anomalous dispersion (SAD) has been hampered by shortcomings in the diffraction models for X-ray diffraction from FELs. Owing to errors in the orientation matrix and overly simple partiality models, researchers have required large numbers of images to converge to reliable estimates for the structure-factor amplitudes, which may not be feasible for all biological systems. Here, data for cytoplasmic polyhedrosis virus type 17 (CPV17) collected at 1.3 wavelength at the Linac Coherent Light Source (LCLS) are revisited. A previously published definition of a partiality model for reflections illuminated by self-amplified spontaneous emission (SASE) pulses is built upon, which defines a fraction between 0 and 1 based on the intersection of a reflection with a spread of Ewald spheres modelled by a super-Gaussian wavelength distribution in the X-ray beam. A method of post-refinement to refine the parameters of this model is suggested. This has generated a merged data set with an overall discrepancy (by calculating the R{sub split} value) of 3.15% to 1.46 resolution from a 7225-image data set. The atomic numbers of C, N and O atoms in the structure are distinguishable in the electron-density map. There are 13 S atoms within the 237 residues of CPV17, excluding the initial disordered methionine. These only possess 0.42 anomalous scattering electrons each at 1.3 wavelength, but the 12 that have single predominant positions are easily detectable in the anomalous difference Fourier map. It is hoped that these improvements will lead towards XFEL experimental phase determination and structure determination by sulfur SAD and will

  19. A revised partiality model and post-refinement algorithm for X-ray free-electron laser data

    DOE PAGES-Beta [OSTI]

    Ginn, Helen Mary; Brewster, Aaron S.; Hattne, Johan; Evans, Gwyndaf; Wagner, Armin; Grimes, Jonathan M.; Sauter, Nicholas K.; Sutton, Geoff; Stuart, David Ian

    2015-05-23

    Research towards using X-ray free-electron laser (XFEL) data to solve structures using experimental phasing methods such as sulfur single-wavelength anomalous dispersion (SAD) has been hampered by shortcomings in the diffraction models for X-ray diffraction from FELs. Owing to errors in the orientation matrix and overly simple partiality models, researchers have required large numbers of images to converge to reliable estimates for the structure-factor amplitudes, which may not be feasible for all biological systems. Here, data for cytoplasmic polyhedrosis virus type 17 (CPV17) collected at 1.3 Å wavelength at the Linac Coherent Light Source (LCLS) are revisited. A previously published definitionmore » of a partiality model for reflections illuminated by self-amplified spontaneous emission (SASE) pulses is built upon, which defines a fraction between 0 and 1 based on the intersection of a reflection with a spread of Ewald spheres modelled by a super-Gaussian wavelength distribution in the X-ray beam. A method of post-refinement to refine the parameters of this model is suggested. This has generated a merged data set with an overall discrepancy (by calculating theRsplitvalue) of 3.15% to 1.46 Å resolution from a 7225-image data set. The atomic numbers of C, N and O atoms in the structure are distinguishable in the electron-density map. There are 13 S atoms within the 237 residues of CPV17, excluding the initial disordered methionine. These only possess 0.42 anomalous scattering electrons each at 1.3 Å wavelength, but the 12 that have single predominant positions are easily detectable in the anomalous difference Fourier map. It is hoped that these improvements will lead towards XFEL experimental phase determination and structure determination by sulfur SAD and will generally increase the utility of the method for difficult cases.« less

  20. A revised partiality model and post-refinement algorithm for X-ray free-electron laser data

    SciTech Connect (OSTI)

    Ginn, Helen Mary; Brewster, Aaron S.; Hattne, Johan; Evans, Gwyndaf; Wagner, Armin; Grimes, Jonathan M.; Sauter, Nicholas K.; Sutton, Geoff; Stuart, David Ian

    2015-05-23

    Research towards using X-ray free-electron laser (XFEL) data to solve structures using experimental phasing methods such as sulfur single-wavelength anomalous dispersion (SAD) has been hampered by shortcomings in the diffraction models for X-ray diffraction from FELs. Owing to errors in the orientation matrix and overly simple partiality models, researchers have required large numbers of images to converge to reliable estimates for the structure-factor amplitudes, which may not be feasible for all biological systems. Here, data for cytoplasmic polyhedrosis virus type 17 (CPV17) collected at 1.3 Å wavelength at the Linac Coherent Light Source (LCLS) are revisited. A previously published definition of a partiality model for reflections illuminated by self-amplified spontaneous emission (SASE) pulses is built upon, which defines a fraction between 0 and 1 based on the intersection of a reflection with a spread of Ewald spheres modelled by a super-Gaussian wavelength distribution in the X-ray beam. A method of post-refinement to refine the parameters of this model is suggested. This has generated a merged data set with an overall discrepancy (by calculating theRsplitvalue) of 3.15% to 1.46 Å resolution from a 7225-image data set. The atomic numbers of C, N and O atoms in the structure are distinguishable in the electron-density map. There are 13 S atoms within the 237 residues of CPV17, excluding the initial disordered methionine. These only possess 0.42 anomalous scattering electrons each at 1.3 Å wavelength, but the 12 that have single predominant positions are easily detectable in the anomalous difference Fourier map. It is hoped that these improvements will lead towards XFEL experimental phase determination and structure determination by sulfur SAD and will generally increase the utility of the method for difficult cases.

  1. Microsoft PowerPoint - Snippet 3.1A IMS Initial Baseline Review...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and risk. This snippet is recommended whenever a schedule baseline is created or revised. 1 The Contract is the prevailing document regarding what Earned Value Management ...

  2. NASA technical baseline

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... Twitter Google + Vimeo GovDelivery SlideShare SunShot Grand Challenge: Regional Test Centers NASA technical baseline HomeTag:NASA technical baseline Curiosity's multi-mission ...

  3. TWRS privatization process technical baseline

    SciTech Connect (OSTI)

    Orme, R.M.

    1996-09-13

    The U.S. Department of Energy (DOE) is planning a two-phased program for the remediation of Hanford tank waste. Phase 1 is a pilot program to demonstrate the procurement of treatment services. The volume of waste treated during the Phase 1 is a small percentage of the tank waste. During Phase 2, DOE intends to procure treatment services for the balance of the waste. The TWRS Privatization Process Technical Baseline (PPTB) provides a summary level flowsheet/mass balance of tank waste treatment operations which is consistent with the tank inventory information, waste feed staging studies, and privatization guidelines currently available. The PPTB will be revised periodically as privatized processing concepts are crystallized.

  4. Common Baseline Implementation Plan...

    Office of Environmental Management (EM)

    Common Baseline Implementation Plan & Self-Assessment 20160517 (v01) U.S. DEPARTMENT OF ... This implementation plan is designed to optimize information resources and improve DOE's ...

  5. Hazard Baseline Documentation

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-12-04

    This standard establishes uniform Office of Environmental Management (EM) guidance on hazard baseline documents that identify and control radiological and non-radiological hazards for all EM facilities.

  6. Revised Manuscript

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Department of Energy Revised Guidance for Recruitment, Retention and Relocation Incentives Revised Guidance for Recruitment, Retention and Relocation Incentives 3Rs Revised Guidance.pdf (66.78 KB) CHCO Memo_3Rs Guidance_Attachment_05-12-2016_FINAL.pdf (181.71 KB) Responsible Contacts Tiffany Wheeler Human Resources Specialist E-mail tiffany.wheeler@hq.doe.gov Phone (202) 586-8481 More Documents & Publications Manager's Desk Reference on Human Capital Management Flexibilities DOE Handbook

  7. Transportation Baseline Report

    SciTech Connect (OSTI)

    Fawcett, Ricky Lee; Kramer, George Leroy Jr.

    1999-12-01

    The National Transportation Program 1999 Transportation Baseline Report presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste and materials transportation. In addition, this Report provides a summary overview of DOEs projected quantities of waste and materials for transportation. Data presented in this report were gathered as a part of the IPABS Spring 1999 update of the EM Corporate Database and are current as of July 30, 1999. These data were input and compiled using the Analysis and Visualization System (AVS) which is used to update all stream-level components of the EM Corporate Database, as well as TSD System and programmatic risk (disposition barrier) information. Project (PBS) and site-level IPABS data are being collected through the Interim Data Management System (IDMS). The data are presented in appendices to this report.

  8. Technical Baseline Summary Description for the Tank Farm Contractor

    SciTech Connect (OSTI)

    TEDESCHI, A.R.

    2000-04-21

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford.

  9. Hanford Site baseline risk assessment methodology. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This methodology has been developed to prepare human health and environmental evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act remedial investigations (RIs) and the Resource Conservation and Recovery Act facility investigations (FIs) performed at the Hanford Site pursuant to the Hanford Federal Facility Agreement and Consent Order referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies Site-specific risk assessment considerations and integrates them with approaches for evaluating human and environmental risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site.

  10. Annual Technology Baseline

    Energy.gov [DOE]

    The National Renewable Energy Laboratory is conducting a study sponsored by the U.S. Department of Energy DOE, Office of Energy Efficiency and Renewable Energy (EERE), that aims to document and implement an annual process designed to identify a realistic and timely set of input assumptions (e.g., technology cost and performance, fuel costs), and a diverse set of potential futures (standard scenarios), initially for electric sector analysis. This primary product of the Annual Technology Baseline (ATB) project component includes detailed cost and performance data (both current and projected) for both renewable and conventional technologies. This data is presented in MS Excel.

  11. TWRS baseline system description

    SciTech Connect (OSTI)

    Lee, A.K.

    1995-03-28

    This document provides a description of the baseline system conceptualized for remediating the tank waste stored within the Hanford Site. Remediation of the tank waste will be performed by the Tank Waste Remediation System (TWRS). This baseline system description (BSD) document has been prepared to describe the current planning basis for the TWRS for accomplishing the tank waste remediation functions. The BSD document is not intended to prescribe firm program management strategies for implementing the TWRS. The scope of the TWRS Program includes managing existing facilities, developing technology for new systems; building, testing and operating new facilities; and maintaining the system. The TWRS Program will manage the system used for receiving, safely storing, maintaining, treating, and disposing onsite, or packaging for offsite disposal, all tank waste. The scope of the TWRS Program encompasses existing facilities such as waste storage tanks, evaporators, pipelines, and low-level radioactive waste treatment and disposal facilities. It includes support facilities that comprise the total TWRS infrastructure, including upgrades to existing facilities or equipment and the addition of new facilities.

  12. Hazard baseline documentation

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This DOE limited technical standard establishes uniform Office of Environmental Management (EM) guidance on hazards baseline documents that identify and control radiological and nonradiological hazards for all EM facilities. It provides a road map to the safety and health hazard identification and control requirements contained in the Department`s orders and provides EM guidance on the applicability and integration of these requirements. This includes a definition of four classes of facilities (nuclear, non-nuclear, radiological, and other industrial); the thresholds for facility hazard classification; and applicable safety and health hazard identification, controls, and documentation. The standard applies to the classification, development, review, and approval of hazard identification and control documentation for EM facilities.

  13. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    SciTech Connect (OSTI)

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-03-13

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also.

  14. Fast Flux Test Facility project plan. Revision 2

    SciTech Connect (OSTI)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  15. Revised Manuscript

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... partial wave (probably l 3) is beginning to contribute strongly to the cross section in a region corresponding to 6 Be* (E x > 18 MeV) (((1965BA2B) and private communication). ...

  16. Revised Manuscript

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... 3 He 1 a F.C. Barker, private communication. function does not show resonance structure. ... to a broad resonance in the l 3 partial wave (1968BA2C) which is reported by (1970BA29) ...

  17. Baseline Control Measures.pdf

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Individual Permit Baseline Control Measures at Los Alamos National Laboratory, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J....

  18. Revised Manuscript

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Revised Manuscript 01 October 2012 Energy Levels of Light Nuclei A = 4 D.R. Tilley 1,2 and H.R. Weller 1,3 1 Traingle Universities Nuclear Laboratory, Durham, NC 27706, USA 2 Department of Physics, North Carolina State University, Raleigh, NC 27695, USA 3 Department of Physics, Duke University, Durham, NC 27706, USA G.M. Hale Los Alamos National Laboratory, Los Alamos, NM 87545, USA Abstract: A compilation of information on A = 4 was published in Nuclear Physics A541 (1992), p. 1. Information

  19. Mixed waste focus area technical baseline report. Volume 1

    SciTech Connect (OSTI)

    1997-04-01

    The Department of Energy (DOE) established the Mixed Waste Characterization, Treatment, and Disposal Focus Area (MWFA) to develop and facilitate implementation of technologies required to meet the Department`s commitments for treatment of mixed low-level and transuranic wastes. The mission of the MWFA is to provide acceptable technologies, developed in partnership with end-users, stakeholders, tribal governments, and regulators, that enable implementation of mixed waste treatment systems. To accomplish this mission, a technical baseline was established in 1996 that forms the basis for determining which technology development activities will be supported by the MWFA. This technical baseline is revised on an annual basis to reflect changes in the DOE Mixed Waste Management strategies, changes in the MWFA technical baseline development process, and MWFA accomplishments. This report presents the first revision to the technical baseline and the resulting prioritized list of deficiencies that the MWFA will address. This report also reflects a higher level of stakeholder involvement in the prioritization of the deficiencies. This document summarizes the data and the assumptions upon which this work was based, as well as information concerning the DOE Office of Environmental Management (EM) mixed waste technology development needs.

  20. 324 Building Baseline Radiological Characterization

    SciTech Connect (OSTI)

    R.J. Reeder, J.C. Cooper

    2010-06-24

    This report documents the analysis of radiological data collected as part of the characterization study performed in 1998. The study was performed to create a baseline of the radiological conditions in the 324 Building.

  1. Heating Oil and Propane Update - Revision report

    Gasoline and Diesel Fuel Update

    Revision reports Revision report 2015-2016 Revision report 2014-2015

  2. Baseline Wind Energy Facility | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Wind Energy Facility Jump to: navigation, search Name Baseline Wind Energy Facility Facility Baseline Wind Energy Facility Sector Wind energy Facility Type Commercial Scale Wind...

  3. Baseline Control Measures.pdf

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Individual Permit Baseline Control Measures at Los Alamos National Laboratory, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J. Intended for: Public Purpose: This poster was prepared for the June 2013 Individual Permit for Storm Water (IP) public meeting. The purpose of the meeting was to update the public on implementation of the permit as required under Part 1.I (7) of the IP (National Pollutant Discharge Elimination System Permit No.

  4. Baseline LAW Glass Formulation Testing

    SciTech Connect (OSTI)

    Kruger, Albert A.; Mooers, Cavin; Bazemore, Gina; Pegg, Ian L.; Hight, Kenneth; Lai, Shan Tao; Buechele, Andrew; Rielley, Elizabeth; Gan, Hao; Muller, Isabelle S.; Cecil, Richard

    2013-06-13

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  5. FED baseline engineering studies report

    SciTech Connect (OSTI)

    Sager, P.H.

    1983-04-01

    Studies were carried out on the FED Baseline to improve design definition, establish feasibility, and reduce cost. Emphasis was placed on cost reduction, but significant feasibility concerns existed in several areas, and better design definition was required to establish feasibility and provide a better basis for cost estimates. Design definition and feasibility studies included the development of a labyrinth shield ring concept to prevent radiation streaming between the torus spool and the TF coil cryostat. The labyrinth shield concept which was developed reduced radiation streaming sufficiently to permit contact maintenance of the inboard EF coils. Various concepts of preventing arcing between adjacent shield sectors were also explored. It was concluded that installation of copper straps with molybdenum thermal radiation shields would provide the most reliable means of preventing arcing. Other design studies included torus spool electrical/structural concepts, test module shielding, torus seismic response, poloidal conditions in the magnets, disruption characteristics, and eddy current effects. These additional studies had no significant impact on cost but did confirm the feasibility of the basic FED Baseline concept.

  6. Baseline Test Specimen Machining Report

    SciTech Connect (OSTI)

    mark Carroll

    2009-08-01

    The Next Generation Nuclear Plant (NGNP) Project is tasked with selecting a high temperature gas reactor technology that will be capable of generating electricity and supplying large amounts of process heat. The NGNP is presently being designed as a helium-cooled high temperature gas reactor (HTGR) with a large graphite core. The graphite baseline characterization project is conducting the research and development (R&D) activities deemed necessary to fully qualify nuclear-grade graphite for use in the NGNP reactor. Establishing nonirradiated thermomechanical and thermophysical properties by characterizing lot-to-lot and billet-to-billet variations (for probabilistic baseline data needs) through extensive data collection and statistical analysis is one of the major fundamental objectives of the project. The reactor core will be made up of stacks of graphite moderator blocks. In order to gain a more comprehensive understanding of the varying characteristics in a wide range of suitable graphites, any of which can be classified as nuclear grade, an experimental program has been initiated to develop an extensive database of the baseline characteristics of numerous candidate graphites. Various factors known to affect the properties of graphite will be investigated, including specimen size, spatial location within a graphite billet, specimen orientation within a billet (either parallel to [P] or transverse to [T] the long axis of the as-produced billet), and billet-to-billet variations within a lot or across different production lots. Because each data point is based on a certain position within a given billet of graphite, particular attention must be paid to the traceability of each specimen and its spatial location and orientation within each billet. The evaluation of these properties is discussed in the Graphite Technology Development Plan (Windes et. al, 2007). One of the key components in the evaluation of these graphite types will be mechanical testing on

  7. Pinellas Plant Environmental Baseline Report

    SciTech Connect (OSTI)

    Not Available

    1997-06-01

    The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

  8. 2008 MERRTT Revision Letter

    Office of Environmental Management (EM)

    Preparedness Program (TEPP) is pleased to announce the release of the 2008 Modular Emergency Response Radiological Transportation Training (MERRTT). This revision replaces...

  9. Partially fluorinated ionic compounds

    DOE Patents [OSTI]

    Han, legal representative, Amy Qi; Yang, Zhen-Yu

    2008-11-25

    Partially fluorinated ionic compounds are prepared. They are useful in the preparation of partially fluorinated dienes, in which the repeat units are cycloaliphatic.

  10. Baseline Graphite Characterization: First Billet

    SciTech Connect (OSTI)

    Mark C. Carroll; Joe Lords; David Rohrbaugh

    2010-09-01

    The Next Generation Nuclear Plant Project Graphite Research and Development program is currently establishing the safe operating envelope of graphite core components for a very high temperature reactor design. To meet this goal, the program is generating the extensive amount of quantitative data necessary for predicting the behavior and operating performance of the available nuclear graphite grades. In order determine the in-service behavior of the graphite for the latest proposed designs, two main programs are underway. The first, the Advanced Graphite Creep (AGC) program, is a set of experiments that are designed to evaluate the irradiated properties and behavior of nuclear grade graphite over a large spectrum of temperatures, neutron fluences, and compressive loads. Despite the aggressive experimental matrix that comprises the set of AGC test runs, a limited amount of data can be generated based upon the availability of space within the Advanced Test Reactor and the geometric constraints placed on the AGC specimens that will be inserted. In order to supplement the AGC data set, the Baseline Graphite Characterization program will endeavor to provide supplemental data that will characterize the inherent property variability in nuclear-grade graphite without the testing constraints of the AGC program. This variability in properties is a natural artifact of graphite due to the geologic raw materials that are utilized in its production. This variability will be quantified not only within a single billet of as-produced graphite, but also from billets within a single lot, billets from different lots of the same grade, and across different billets of the numerous grades of nuclear graphite that are presently available. The thorough understanding of this variability will provide added detail to the irradiated property data, and provide a more thorough understanding of the behavior of graphite that will be used in reactor design and licensing. This report covers the

  11. Published New Reservoir Proved Revision Revision New Field Discoveries

    U.S. Energy Information Administration (EIA) (indexed site)

    Coalbed methane proved reserves, reserves changes, and production, 2014 billion cubic feet Published New Reservoir Proved Revision Revision New Field Discoveries Estimated Proved ...

  12. Published New Reservoir Proved Revision Revision New Field Discoveries

    Gasoline and Diesel Fuel Update

    Published New Reservoir Proved Revision Revision New Field Discoveries Estimated Proved Reserves Adjustments Increases Decreases Sales Acquisitions Extensions Discoveries in Old ...

  13. Published New Reservoir Proved Revision Revision New Field Discoveries

    Gasoline and Diesel Fuel Update

    wet after lease separation, 2014 billion cubic feet Published New Reservoir Proved Revision Revision New Field Discoveries Estimated Proved Reserves Adjustments Increases ...

  14. Published New Reservoir Proved Revision Revision New Field Discoveries

    Gasoline and Diesel Fuel Update

    Crude oil proved reserves, reserves changes, and production, 2014 million barrels Published New Reservoir Proved Revision Revision New Field Discoveries Estimated Proved Reserves ...

  15. Published New Reservoir Proved Revision Revision New Field Discoveries

    Annual Energy Outlook

    Crude oil and lease condensate proved reserves, reserves changes, and production, 2014 million barrels Published New Reservoir Proved Revision Revision New Field Discoveries ...

  16. Published New Reservoir Proved Revision Revision New Field Discoveries

    Gasoline and Diesel Fuel Update

    Total natural gas proved reserves, reserves changes, and production, wet after lease separation, 2014 billion cubic feet Published New Reservoir Proved Revision Revision New Field ...

  17. Published New Reservoir Proved Revision Revision New Field Discoveries

    Annual Energy Outlook

    Lease condensate proved reserves, reserves changes, and production, 2014 million barrels Published New Reservoir Proved Revision Revision New Field Discoveries Estimated Proved ...

  18. Energy Intensity Baselining and Tracking Guidance

    Energy.gov (indexed) [DOE]

    requirements by describing the steps necessary to develop an energy consumption and energy intensity baseline, as well as to calculate consumption and intensity changes over time. ...

  19. Tank waste remediation systems technical baseline database

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-16

    This document includes a cassette tape that contains Hanford generated data for the Tank Waste Remediation Systems Technical Baseline Database as of October 09, 1996.

  20. Baselines for Greenhouse Gas Reductions: Problems, Precedents...

    Open Energy Information (Open El) [EERE & EIA]

    Baseline projection, GHG inventory, Pathways analysis Resource Type: Publications, Lessons learnedbest practices Website: www.p2pays.orgref2221739.pdf References:...

  1. ARM: Baseline Solar Radiation Network (BSRN): solar irradiances...

    Office of Scientific and Technical Information (OSTI)

    Baseline Solar Radiation Network (BSRN): solar irradiances Title: ARM: Baseline Solar Radiation Network (BSRN): solar irradiances Baseline Solar Radiation Network (BSRN): solar ...

  2. Long-Baseline Neutrino Facility / Deep Underground Neutrino Project...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Long-Baseline Neutrino Facility Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline Neutrino Facility Deep Underground Neutrino Project (LBNF-DUNE) Long-Baseline ...

  3. TWRS technical baseline database manager definition document

    SciTech Connect (OSTI)

    Acree, C.D.

    1997-08-13

    This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager.

  4. Solid Waste Program technical baseline description

    SciTech Connect (OSTI)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  5. Waste management project technical baseline description

    SciTech Connect (OSTI)

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  6. NREL: Energy Analysis - Annual Technology Baseline and Standard...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Annual Technology Baseline and Standard Scenarios - Legacy Versions This section contains earlier versions of NREL's Annual Technology Baseline and Standard Scenarios products. ...

  7. EA-1943: Construction and Operation of the Long Baseline Neutrino...

    Energy Savers

    43: Construction and Operation of the Long Baseline Neutrino Facility and Deep Underground ... EA-1943: Construction and Operation of the Long Baseline Neutrino Facility and Deep ...

  8. UNFCCC-Consolidated baseline and monitoring methodology for landfill...

    Open Energy Information (Open El) [EERE & EIA]

    Consolidated baseline and monitoring methodology for landfill gas project activities Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNFCCC-Consolidated baseline and...

  9. South Africa-Danish Government Baseline Workstream | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Baseline Workstream Jump to: navigation, search Name South Africa-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish Ministry for...

  10. Cost and Performance Comparison Baseline for Fossil Energy Power...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural ... COST AND PERFORMANCE BASELINE FOR FOSSIL ENERGY PLANTS VOLUME 1: BITUMINOUS COAL AND ...

  11. China-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Danish Government Baseline Workstream Jump to: navigation, search Name China-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  12. India-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Danish Government Baseline Workstream Jump to: navigation, search Name India-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  13. Baseline and Target Values for PV Forecasts: Toward Improved...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting ... Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting Jie ...

  14. Mexico-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Danish Government Baseline Workstream Jump to: navigation, search Name Mexico-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  15. Indonesia-Danish Government Baseline Workstream | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Indonesia-Danish Government Baseline Workstream Jump to: navigation, search Name Indonesia-Danish Government Baseline Workstream AgencyCompany Organization Danish Government...

  16. Brazil-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Danish Government Baseline Workstream Jump to: navigation, search Name Brazil-Danish Government Baseline Workstream AgencyCompany Organization Danish Government Partner Danish...

  17. Baseline Microstructural Characterization of Outer 3013 Containers

    SciTech Connect (OSTI)

    Zapp, Phillip E.; Dunn, Kerry A

    2005-07-31

    Three DOE Standard 3013 outer storage containers were examined to characterize the microstructure of the type 316L stainless steel material of construction. Two of the containers were closure-welded yielding production-quality outer 3013 containers; the third examined container was not closed. Optical metallography and Knoop microhardness measurements were performed to establish a baseline characterization that will support future destructive examinations of 3013 outer containers in the storage inventory. Metallography revealed the microstructural features typical of this austenitic stainless steel as it is formed and welded. The grains were equiaxed with evident annealing twins. Flow lines were prominent in the forming directions of the cylindrical body and flat lids and bottom caps. No adverse indications were seen. Microhardness values, although widely varying, were consistent with annealed austenitic stainless steel. The data gathered as part of this characterization will be used as a baseline for the destructive examination of 3013 containers removed from the storage inventory.

  18. Engineering task plan TWRS technical baseline completion

    SciTech Connect (OSTI)

    Moore, T.L

    1996-03-08

    The Tank Waste Remediation System (TWRS) includes many activities required to remediate the radioactive waste stored in underground waste storage tanks. These activities include routine monitoring of the waste, facilities maintenance, upgrades to existing equipment, and installation of new equipment necessary to manage, retrieve, process, and dispose of the waste. In order to ensure that these multiple activities are integrated, cost effective, and necessary, a sound technical baseline is required from which all activities can be traced and measured. The process by which this technical baseline is developed will consist of the identification of functions, requirements, architecture, and test (FRAT) methodology. This process must be completed for TWRS to a level that provides the technical basis for all facility/system/component maintenance, upgrades, or new equipment installation.

  19. Revised Manuscript May

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Revised Manuscript May 29, 2013 Energy Levels of Light Nuclei A = 3 D.R. Tilley a,b , H.R. Weller a,c and H.H. Hasan a,c a Triangle Universities Nuclear Laboratory, Durham, NC 27708-0308 b Department of Physics, North Carolina State University, Raleigh, NC 27695-8202 c Department of Physics, Duke University, Durham, NC 27708-0305 Abstract: An evaluation of A = 3 was published in Nuclear Physics A474 (1987), p. 1. Emphasis is on possible structure of A = 3 systems and final-state interactions in

  20. Revised Manuscript May

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Revised Manuscript May 20, 2014 Energy Levels of Light Nuclei A = 3 J.E. Purcell a,b , J.H. Kelley a,c , E. Kwan a,d , C.G. Sheu a,d and H.R. Weller a,d a Triangle Universities Nuclear Laboratory, Durham, NC 27708-0308 b Department of Physics and Astronomy, Georgia State University, Atlanta, GA 30303 c Department of Physics, North Carolina State University, Raleigh, NC 27695-8202 d Department of Physics, Duke University, Durham, NC 27708-0305 Abstract: A compilation of experimental and

  1. The Fermilab long-baseline neutrino program

    SciTech Connect (OSTI)

    Goodman, M.; MINOS Collaboration

    1997-10-01

    Fermilab is embarking upon a neutrino oscillation program which includes a long-baseline neutrino experiment MINOS. MINOS will be a 10 kiloton detector located 730 km Northwest of Fermilab in the Soudan underground laboratory. It will be sensitive to neutrino oscillations with parameters above {Delta}m{sup 2} {approximately} 3 {times} 10{sup {minus}3} eV{sup 2} and sin{sup 2}(2{theta}) {approximately} 0.02.

  2. Systematic errors in long baseline oscillation experiments

    SciTech Connect (OSTI)

    Harris, Deborah A.; /Fermilab

    2006-02-01

    This article gives a brief overview of long baseline neutrino experiments and their goals, and then describes the different kinds of systematic errors that are encountered in these experiments. Particular attention is paid to the uncertainties that come about because of imperfect knowledge of neutrino cross sections and more generally how neutrinos interact in nuclei. Near detectors are planned for most of these experiments, and the extent to which certain uncertainties can be reduced by the presence of near detectors is also discussed.

  3. Methanol partial oxidation reformer

    DOE Patents [OSTI]

    Ahmed, S.; Kumar, R.; Krumpelt, M.

    1999-08-24

    A partial oxidation reformer is described comprising a longitudinally extending chamber having a methanol, water and an air inlet and an outlet. An igniter mechanism is near the inlets for igniting a mixture of methanol and air, while a partial oxidation catalyst in the chamber is spaced from the inlets and converts methanol and oxygen to carbon dioxide and hydrogen. Controlling the oxygen to methanol mole ratio provides continuous slightly exothermic partial oxidation reactions of methanol and air producing hydrogen gas. The liquid is preferably injected in droplets having diameters less than 100 micrometers. The reformer is useful in a propulsion system for a vehicle which supplies a hydrogen-containing gas to the negative electrode of a fuel cell. 7 figs.

  4. Methanol partial oxidation reformer

    DOE Patents [OSTI]

    Ahmed, Shabbir; Kumar, Romesh; Krumpelt, Michael

    1999-01-01

    A partial oxidation reformer comprising a longitudinally extending chamber having a methanol, water and an air inlet and an outlet. An igniter mechanism is near the inlets for igniting a mixture of methanol and air, while a partial oxidation catalyst in the chamber is spaced from the inlets and converts methanol and oxygen to carbon dioxide and hydrogen. Controlling the oxygen to methanol mole ratio provides continuous slightly exothermic partial oxidation reactions of methanol and air producing hydrogen gas. The liquid is preferably injected in droplets having diameters less than 100 micrometers. The reformer is useful in a propulsion system for a vehicle which supplies a hydrogen-containing gas to the negative electrode of a fuel cell.

  5. Methanol partial oxidation reformer

    DOE Patents [OSTI]

    Ahmed, S.; Kumar, R.; Krumpelt, M.

    1999-08-17

    A partial oxidation reformer is described comprising a longitudinally extending chamber having a methanol, water and an air inlet and an outlet. An igniter mechanism is near the inlets for igniting a mixture of methanol and air, while a partial oxidation catalyst in the chamber is spaced from the inlets and converts methanol and oxygen to carbon dioxide and hydrogen. Controlling the oxygen to methanol mole ratio provides continuous slightly exothermic partial oxidation reactions of methanol and air producing hydrogen gas. The liquid is preferably injected in droplets having diameters less than 100 micrometers. The reformer is useful in a propulsion system for a vehicle which supplies a hydrogen-containing gas to the negative electrode of a fuel cell. 7 figs.

  6. Methanol partial oxidation reformer

    DOE Patents [OSTI]

    Ahmed, Shabbir; Kumar, Romesh; Krumpelt, Michael

    2001-01-01

    A partial oxidation reformer comprising a longitudinally extending chamber having a methanol, water and an air inlet and an outlet. An igniter mechanism is near the inlets for igniting a mixture of methanol and air, while a partial oxidation catalyst in the chamber is spaced from the inlets and converts methanol and oxygen to carbon dioxide and hydrogen. Controlling the oxygen to methanol mole ratio provides continuous slightly exothermic partial oxidation reactions of methanol and air producing hydrogen gas. The liquid is preferably injected in droplets having diameters less than 100 micrometers. The reformer is useful in a propulsion system for a vehicle which supplies a hydrogen-containing gas to the negative electrode of a fuel cell.

  7. Oxygen partial pressure sensor

    DOE Patents [OSTI]

    Dees, D.W.

    1994-09-06

    A method for detecting oxygen partial pressure and an oxygen partial pressure sensor are provided. The method for measuring oxygen partial pressure includes contacting oxygen to a solid oxide electrolyte and measuring the subsequent change in electrical conductivity of the solid oxide electrolyte. A solid oxide electrolyte is utilized that contacts both a porous electrode and a nonporous electrode. The electrical conductivity of the solid oxide electrolyte is affected when oxygen from an exhaust stream permeates through the porous electrode to establish an equilibrium of oxygen anions in the electrolyte, thereby displacing electrons throughout the electrolyte to form an electron gradient. By adapting the two electrodes to sense a voltage potential between them, the change in electrolyte conductivity due to oxygen presence can be measured. 1 fig.

  8. Oxygen partial pressure sensor

    DOE Patents [OSTI]

    Dees, Dennis W.

    1994-01-01

    A method for detecting oxygen partial pressure and an oxygen partial pressure sensor are provided. The method for measuring oxygen partial pressure includes contacting oxygen to a solid oxide electrolyte and measuring the subsequent change in electrical conductivity of the solid oxide electrolyte. A solid oxide electrolyte is utilized that contacts both a porous electrode and a nonporous electrode. The electrical conductivity of the solid oxide electrolyte is affected when oxygen from an exhaust stream permeates through the porous electrode to establish an equilibrium of oxygen anions in the electrolyte, thereby displacing electrons throughout the electrolyte to form an electron gradient. By adapting the two electrodes to sense a voltage potential between them, the change in electrolyte conductivity due to oxygen presence can be measured.

  9. Module 7 - Integrated Baseline Review and Change Control | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 7 - Integrated Baseline Review and Change Control Module 7 - Integrated Baseline Review and Change Control This module focuses on integrated baseline reviews (IBR) and change control. This module outlines the objective and responsibility of an integrated baseline review. Additionally, this module will discuss the change control process required for implementing earned value. Begin Module >> (418.59

  10. Revised Merit Review Guide for Financial Assistance

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached is the revised Merit Review Guide for Financial Assistance. Revisions include reformatting and updating of the information presented in the Guide and Attachments.

  11. Nevada Revised Statutes | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Nevada Revised Statutes Citation Nevada Revised Statutes (2014). Retrieved...

  12. Oregon Revised Statutes | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Oregon Revised Statutes Citation Oregon Revised Statutes (2014). Retrieved...

  13. Partially integrated exhaust manifold

    DOE Patents [OSTI]

    Hayman, Alan W; Baker, Rodney E

    2015-01-20

    A partially integrated manifold assembly is disclosed which improves performance, reduces cost and provides efficient packaging of engine components. The partially integrated manifold assembly includes a first leg extending from a first port and terminating at a mounting flange for an exhaust gas control valve. Multiple additional legs (depending on the total number of cylinders) are integrally formed with the cylinder head assembly and extend from the ports of the associated cylinder and terminate at an exit port flange. These additional legs are longer than the first leg such that the exit port flange is spaced apart from the mounting flange. This configuration provides increased packaging space adjacent the first leg for any valving that may be required to control the direction and destination of exhaust flow in recirculation to an EGR valve or downstream to a catalytic converter.

  14. Global Nuclear Energy Partnership Waste Treatment Baseline

    SciTech Connect (OSTI)

    Dirk Gombert; William Ebert; James Marra; Robert Jubin; John Vienna

    2008-05-01

    The Global Nuclear Energy Partnership program (GNEP) is designed to demonstrate a proliferation-resistant and sustainable integrated nuclear fuel cycle that can be commercialized and used internationally. Alternative stabilization concepts for byproducts and waste streams generated by fuel recycling processes were evaluated and a baseline of waste forms was recommended for the safe disposition of waste streams. Waste forms are recommended based on the demonstrated or expected commercial practicability and technical maturity of the processes needed to make the waste forms, and performance of the waste form materials when disposed. Significant issues remain in developing technologies to process some of the wastes into the recommended waste forms, and a detailed analysis of technology readiness and availability may lead to the choice of a different waste form than what is recommended herein. Evolving regulations could also affect the selection of waste forms.

  15. Grocery 2009 TSD Miami Baseline | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Jump to: navigation, search Model Name Grocery 2009 TSD Miami Baseline Building Type Food Sales Model Type Baseline Model Target Type ASHRAE 90.1 2004 Model Year 2009 IDF file...

  16. Grocery 2009 TSD Chicago Baseline | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Jump to: navigation, search Model Name Grocery 2009 TSD Chicago Baseline Building Type Food Sales Model Type Baseline Model Target Type ASHRAE 90.1 2004 Model Year 2009 IDF file...

  17. Proposed Methodology for LEED Baseline Refrigeration Modeling (Presentation)

    SciTech Connect (OSTI)

    Deru, M.

    2011-02-01

    This PowerPoint presentation summarizes a proposed methodology for LEED baseline refrigeration modeling. The presentation discusses why refrigeration modeling is important, the inputs of energy models, resources, reference building model cases, baseline model highlights, example savings calculations and results.

  18. System Plan Revision 5 + 6

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Plan Revision 7 General Overview DaBrisha Smith (DOEORP) April 10, 2013 System Plan 101 * What is System Planning - A process used by organizations to design, analyze and define ...

  19. Revised Guide for Financial Assistance

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached is a revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was last issued.

  20. GETEM Manuals and Revision Notes

    Energy.gov [DOE]

    Please refer to these manuals and revision notes prior to downloading and running the Geothermal Electricity Technology Evaluation Model (GETEM). Because this is a beta version, you are urged to...

  1. Coal Data Publication Revision Policy

    Annual Energy Outlook

    impact: WHAT happens next to the database and in our coal reports: Respondent provides data that are clearly incorrect or revised data for any period in the current reporting year. ...

  2. Energy Intensity Baselining and Tracking Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technical Assistance » Better Plants » Energy Intensity Baselining and Tracking Guidance Energy Intensity Baselining and Tracking Guidance The Energy Intensity Baselining and Tracking Guidance for the Better Buildings, Better Plants Program helps companies meet the program's reporting requirements by describing the steps necessary to develop an energy consumption and energy intensity baseline and calculating consumption and intensity changes over time. Most of the calculation steps described

  3. Pancreaticoportal Fistula and Disseminated Fat Necrosis After Revision of a Transjugular Intrahepatic Portosystemic Shunt

    SciTech Connect (OSTI)

    Klein, Seth J. Saad, Nael; Korenblat, Kevin; Darcy, Michael D.

    2013-04-15

    A 59-year old man with alcohol related cirrhosis and portal hypertension was referred for transjugular intrahepatic portosystemic shunt (TIPS) to treat his refractory ascites. Ten years later, two sequential TIPS revisions were performed for shunt stenosis and recurrent ascites. After these revisions, he returned with increased serum pancreatic enzyme levels and disseminated superficial fat necrosis; an iatrogenic pancreaticoportal vein fistula caused by disruption of the pancreatic duct was suspected. The bare area of the TIPS was subsequently lined with a covered stent-graft, and serum enzyme levels returned to baseline. In the interval follow-up period, the patient has clinically improved.

  4. LTC vacuum blasting machine (concrete): Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The LTC shot blast technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC 1073 Vacuum Blasting Machine uses a high-capacity, direct-pressure blasting system which incorporates a continuous feed for the blast media. The blast media cleans the surface within the contained brush area of the blast. It incorporates a vacuum system which removes dust and debris from the surface as it is blasted. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure during maintenance activities was minimal, but due to mechanical difficulties dust monitoring could not be conducted during operation. Noise exposure was significant. Further testing for each of these exposures is recommended because of the outdoor environment where the testing demonstration took place. This may cause the results to be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed environment. In addition, other safety and health issues found were ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, and arm-hand vibration.

  5. LTC vacuum blasting machine (metal): Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  6. Pentek metal coating removal system: Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  7. Arc melter demonstration baseline test results

    SciTech Connect (OSTI)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; Oden, L.L.; O`Connor, W.K.; Turner, P.C.

    1994-07-01

    This report describes the test results and evaluation for the Phase 1 (baseline) arc melter vitrification test series conducted for the Buried Waste Integrated Demonstration program (BWID). Phase 1 tests were conducted on surrogate mixtures of as-incinerated wastes and soil. Some buried wastes, soils, and stored wastes at the INEL and other DOE sites, are contaminated with transuranic (TRU) radionuclides and hazardous organics and metals. The high temperature environment in an electric arc furnace may be used to process these wastes to produce materials suitable for final disposal. An electric arc furnace system can treat heterogeneous wastes and contaminated soils by (a) dissolving and retaining TRU elements and selected toxic metals as oxides in the slag phase, (b) destroying organic materials by dissociation, pyrolyzation, and combustion, and (c) capturing separated volatilized metals in the offgas system for further treatment. Structural metals in the waste may be melted and tapped separately for recycle or disposal, or these metals may be oxidized and dissolved into the slag. The molten slag, after cooling, will provide a glass/ceramic final waste form that is homogeneous, highly nonleachable, and extremely durable. These features make this waste form suitable for immobilization of TRU radionuclides and toxic metals for geologic timeframes. Further, the volume of contaminated wastes and soils will be substantially reduced in the process.

  8. Baseline air quality study at Fermilab

    SciTech Connect (OSTI)

    Dave, M.J.; Charboneau, R.

    1980-10-01

    Air quality and meteorological data collected at Fermi National Accelerator Laboratory are presented. The data represent baseline values for the pre-construction phase of a proposed coal-gasification test facility. Air quality data were characterized through continuous monitoring of gaseous pollutants, collection of meteorological data, data acquisition and reduction, and collection and analysis of discrete atmospheric samples. Seven air quality parameters were monitored and recorded on a continuous real-time basis: sulfur dioxide, ozone, total hydrocarbons, nonreactive hydrocarbons, nitric oxide, nitrogen oxides, and carbon monoxide. A 20.9-m tower was erected near Argonne's mobile air monitoring laboratory, which was located immediately downwind of the proposed facility. The tower was instrumented at three levels to collect continuous meteorological data. Wind speed was monitored at three levels; wind direction, horizontal and vertical, at the top level; ambient temperature at the top level; and differential temperature between all three levels. All continuously-monitored parameters were digitized and recorded on magnetic tape. Appropriate software was prepared to reduce the data. Statistical summaries, grphical displays, and correlation studies also are presented.

  9. Gated integrator with signal baseline subtraction

    DOE Patents [OSTI]

    Wang, X.

    1996-12-17

    An ultrafast, high precision gated integrator includes an opamp having differential inputs. A signal to be integrated is applied to one of the differential inputs through a first input network, and a signal indicative of the DC offset component of the signal to be integrated is applied to the other of the differential inputs through a second input network. A pair of electronic switches in the first and second input networks define an integrating period when they are closed. The first and second input networks are substantially symmetrically constructed of matched components so that error components introduced by the electronic switches appear symmetrically in both input circuits and, hence, are nullified by the common mode rejection of the integrating opamp. The signal indicative of the DC offset component is provided by a sample and hold circuit actuated as the integrating period begins. The symmetrical configuration of the integrating circuit improves accuracy and speed by balancing out common mode errors, by permitting the use of high speed switching elements and high speed opamps and by permitting the use of a small integrating time constant. The sample and hold circuit substantially eliminates the error caused by the input signal baseline offset during a single integrating window. 5 figs.

  10. Gated integrator with signal baseline subtraction

    DOE Patents [OSTI]

    Wang, Xucheng

    1996-01-01

    An ultrafast, high precision gated integrator includes an opamp having differential inputs. A signal to be integrated is applied to one of the differential inputs through a first input network, and a signal indicative of the DC offset component of the signal to be integrated is applied to the other of the differential inputs through a second input network. A pair of electronic switches in the first and second input networks define an integrating period when they are closed. The first and second input networks are substantially symmetrically constructed of matched components so that error components introduced by the electronic switches appear symmetrically in both input circuits and, hence, are nullified by the common mode rejection of the integrating opamp. The signal indicative of the DC offset component is provided by a sample and hold circuit actuated as the integrating period begins. The symmetrical configuration of the integrating circuit improves accuracy and speed by balancing out common mode errors, by permitting the use of high speed switching elements and high speed opamps and by permitting the use of a small integrating time constant. The sample and hold circuit substantially eliminates the error caused by the input signal baseline offset during a single integrating window.

  11. Partially segmented deformable mirror

    DOE Patents [OSTI]

    Bliss, E.S.; Smith, J.R.; Salmon, J.T.; Monjes, J.A.

    1991-05-21

    A partially segmented deformable mirror is formed with a mirror plate having a smooth and continuous front surface and a plurality of actuators to its back surface. The back surface is divided into triangular areas which are mutually separated by grooves. The grooves are deep enough to make the plate deformable and the actuators for displacing the mirror plate in the direction normal to its surface are inserted in the grooves at the vertices of the triangular areas. Each actuator includes a transducer supported by a receptacle with outer shells having outer surfaces. The vertices have inner walls which are approximately perpendicular to the mirror surface and make planar contacts with the outer surfaces of the outer shells. The adhesive which is used on these contact surfaces tends to contract when it dries but the outer shells can bend and serve to minimize the tendency of the mirror to warp. 5 figures.

  12. Partially segmented deformable mirror

    DOE Patents [OSTI]

    Bliss, Erlan S.; Smith, James R.; Salmon, J. Thaddeus; Monjes, Julio A.

    1991-01-01

    A partially segmented deformable mirror is formed with a mirror plate having a smooth and continuous front surface and a plurality of actuators to its back surface. The back surface is divided into triangular areas which are mutually separated by grooves. The grooves are deep enough to make the plate deformable and the actuators for displacing the mirror plate in the direction normal to its surface are inserted in the grooves at the vertices of the triangular areas. Each actuator includes a transducer supported by a receptacle with outer shells having outer surfaces. The vertices have inner walls which are approximately perpendicular to the mirror surface and make planar contacts with the outer surfaces of the outer shells. The adhesive which is used on these contact surfaces tends to contract when it dries but the outer shells can bend and serve to minimize the tendency of the mirror to warp.

  13. Partial oxidation catalyst

    DOE Patents [OSTI]

    Krumpelt, Michael; Ahmed, Shabbir; Kumar, Romesh; Doshi, Rajiv

    2000-01-01

    A two-part catalyst comprising a dehydrogenation portion and an oxide-ion conducting portion. The dehydrogenation portion is a group VIII metal and the oxide-ion conducting portion is selected from a ceramic oxide crystallizing in the fluorite or perovskite structure. There is also disclosed a method of forming a hydrogen rich gas from a source of hydrocarbon fuel in which the hydrocarbon fuel contacts a two-part catalyst comprising a dehydrogenation portion and an oxide-ion conducting portion at a temperature not less than about 400.degree. C. for a time sufficient to generate the hydrogen rich gas while maintaining CO content less than about 5 volume percent. There is also disclosed a method of forming partially oxidized hydrocarbons from ethanes in which ethane gas contacts a two-part catalyst comprising a dehydrogenation portion and an oxide-ion conducting portion for a time and at a temperature sufficient to form an oxide.

  14. EIS-0183: Revised Record of Decision | Department of Energy

    Energy Savers

    Revised Record of Decision EIS-0183: Revised Record of Decision Electrical Interconnection ... Revised Record of Decision for the Electrical Interconnection of the SummitWestward ...

  15. Published New Reservoir Proved Revision Revision New Field Discoveries

    U.S. Energy Information Administration (EIA) (indexed site)

    Shale natural gas proved reserves, reserves changes, and production, wet after lease separation, 2014 billion cubic feet Published New Reservoir Proved Revision Revision New Field Discoveries Estimated Proved Reserves Adjustments Increases Decreases Sales Acquisitions Extensions Discoveries in Old Fields Production Reserves State and Subdivision 12/31/13 (+,-) (+) (-) (-) (+) (+) (+) (+) (-) 12/31/14 Alaska 0 0 0 0 0 0 0 0 0 0 0 Lower 48 States 159,115 12,113 27,643 26,199 5,029 7,657 35,401

  16. NREL: Climate Neutral Research Campuses - Determine Baseline Energy

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Consumption Determine Baseline Energy Consumption To create a climate action plan for your research campus, begin by determining current energy consumption and the resulting greenhouse gas emissions. You can then break down emissions by sector. It important to understand the following at the beginning: The Importance of a Baseline "The baseline inventory also provides a common data set for establishing benchmarks and priorities during the strategic planning stage and a means for

  17. Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template Template for briefing Baseline Change Proposals to the ESAAB and/or PMRC July 2015 Template (579 KB) Key Resources Internal DOE Tools PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications Critical Decision 2 (CD-2) ESAAB and PMRC Brief Template DOE Project Management Risk Committee (PMRC) SOP ESAAB Standard

  18. Mid-Atlantic Baseline Studies Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mid-Atlantic Baseline Studies Project Mid-Atlantic Baseline Studies Project Funded by the Department of Energy, along with a number of partners, the collaborative Mid-Atlantic Baseline Studies Project, led by the Biodiversity Research Institute (BRI), helps improve understanding of species composition and use of the Mid-Atlantic marine environment in order to promote more sustainable offshore wind development. This first-of-its-kind study along the Eastern Seaboard of the United States delivers

  19. ARM: Baseline Solar Radiation Network (BSRN): solar irradiances (Dataset) |

    Office of Scientific and Technical Information (OSTI)

    Data Explorer Baseline Solar Radiation Network (BSRN): solar irradiances Title: ARM: Baseline Solar Radiation Network (BSRN): solar irradiances Baseline Solar Radiation Network (BSRN): solar irradiances Authors: Mary Anderberg ; Ibrahim Reda ; Afshin Andreas ; Mark Kutchenreiter ; Aron Habte ; Mike Dooraghi Publication Date: 1993-07-01 OSTI Identifier: 1025163 DOE Contract Number: DE-AC05-00OR22725 Resource Type: Dataset Data Type: Numeric Data Research Org: Atmospheric Radiation Measurement

  20. Annual Technology Baseline (Including Supporting Data); NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Blair, Nate; Cory, Karlynn; Hand, Maureen; Parkhill, Linda; Speer, Bethany; Stehly, Tyler; Feldman, David; Lantz, Eric; Augusting, Chad; Turchi, Craig; O'Connor, Patrick

    2015-07-08

    Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), National Renewable Energy Laboratory provides an organized and centralized dataset that was reviewed by internal and external experts. It uses the best information from the Department of Energy laboratory's renewable energy analysts and Energy Information Administration information for conventional technologies. The ATB will be updated annually in order to provide an up-to-date repository of current and future cost and performance data. Going forward, we plan to revise and refine the values using best available information. The ATB includes both a presentation with notes (PDF) and an associated Excel Workbook. The ATB includes the following electricity generation technologies: land-based wind; offshore wind; utility-scale solar PV; concentrating solar power; geothermal power; hydropower plants (upgrades to existing facilities, powering non-powered dams, and new stream-reach development); conventional coal; coal with carbon capture and sequestration; integrated gasification combined cycle coal; natural gas combustion turbines; natural gas combined cycle; conventional biopower. Nuclear laboratory's renewable energy analysts and Energy Information Administration information for conventional technologies. The ATB will be updated annually in order to provide an up-to-date repository of current and future cost and performance data. Going forward, we plan to revise and refine the values using best available information.

  1. Cost and Performance Comparison Baseline for Fossil Energy Power...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    blocks together into a new, revolutionary concept for future coal-based power and energy production. Objective To establish baseline performance and cost estimates for today's...

  2. ENERGY STAR PortfolioManager Baseline Year Instructions

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Baseline Year" Time frame Select "Multiple Properties" Using filters, choose properties to include in report Check box to Select all filtered properties Select these reporting ...

  3. Chile-Danish Government Baseline Workstream | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Kenya, Mexico, South Africa, Thailand and Vietnam), to share practices on setting national greenhouse gas emissions baseline scenarios. The aim of the workstream is to...

  4. Ethiopia-National Greenhouse Gas Emissions Baseline Scenarios...

    Open Energy Information (Open El) [EERE & EIA]

    National Greenhouse Gas Emissions Baseline Scenarios: Learning from Experiences in Developing Countries Jump to: navigation, search Name Ethiopia-National Greenhouse Gas Emissions...

  5. NETL - Bituminous Baseline Performance and Cost Interactive Tool...

    Open Energy Information (Open El) [EERE & EIA]

    from the Cost and Performance Baseline for Fossil Energy Plants - Bituminous Coal and Natural Gas to Electricity report. The tool provides an interactive summary of the full...

  6. Sandia Energy - Scaled Wind Farm Technology Facility Baselining...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Project Accelerates Work Home Renewable Energy Energy SWIFT Facilities Partnership News Wind Energy News & Events Systems Analysis Scaled Wind Farm Technology Facility Baselining...

  7. U.S. Department of Energy Performance Baseline Guide

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12

    The guide supports DOE O 413.3A and identifies key performance baseline development processes and practices. Does not cancel other directives.

  8. 2008 CHP Baseline Assessment and Action Plan for the California...

    Energy.gov (indexed) [DOE]

    report provides an updated baseline assessment and action plan for combined heat and power (CHP) in California and identifies hurdles that prevent the expanded use of CHP systems. ...

  9. EA-1943: Long Baseline Neutrino Facility/Deep Underground Neutrino...

    Energy.gov (indexed) [DOE]

    May 27, 2015 EA-1943: Draft Environmental Assessment Long Baseline Neutrino FacilityDeep Underground Neutrino Experiment (LBNFDUNE) at Fermilab, Batavia, Illinois and the...

  10. Updates to the International Linear Collider Damping Rings Baseline...

    Office of Scientific and Technical Information (OSTI)

    Updates to the International Linear Collider Damping Rings Baseline Design Citation Details In-Document Search Title: Updates to the International Linear Collider Damping Rings...

  11. South Africa - Greenhouse Gas Emission Baselines and Reduction...

    Open Energy Information (Open El) [EERE & EIA]

    from Buildings AgencyCompany Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis,...

  12. Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials...

    Open Energy Information (Open El) [EERE & EIA]

    from Buildings AgencyCompany Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis,...

  13. River Corridor Baseline Risk Assessment (RCBRA) Human Health...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    12, 2011 River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2) * RCBRA Human Health Risk Assessment is final - Response provided to HAB ...

  14. NMED Presentation on Revised Consent Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Presentation on Revised Consent Order NMED Presentation on Revised Consent Order NMED Secretary Ryan Flynn provided a presentation on the Revisions to the 2005 Order on Consent. NMED Revised CO - November 12, 2015 (334.24

  15. EIS-0218: Revised Record of Decision

    Office of Energy Efficiency and Renewable Energy (EERE)

    Revision of the Record of Decision for a Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel

  16. Acquisition Career Management Handbook Change - Revised Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Officer's Representative Certification (COR) | Department of Energy Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) A recent review of the January 2009 issue of the Department of Energy (DOE) Acquisition Career Management Program (ACMP) Handbook identified many areas that require an update. Although the ACMP Handbook revisions

  17. Revised OMB Circular A-76 (Revised November 14, 2002) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy OMB Circular A-76 (Revised November 14, 2002) Revised OMB Circular A-76 (Revised November 14, 2002) Revised OMB Circular A-76 (Revised November 14, 2002) (246.94 KB) More Documents & Publications Operating Guidelines Appendix A B.DOC� DOE HR Guidebook 12_15_05.DOC� Operating Guidelines Appendix C D.DOC�

  18. Tank waste remediation system technical baseline summary description

    SciTech Connect (OSTI)

    Raymond, R.E.

    1998-01-08

    This document is one of the tools used to develop and control the mission work as depicted in the included figure. This Technical Baseline Summary Description document is the top-level tool for management of the Technical Baseline for waste storage operations.

  19. Clean Air Act. Revision 5

    SciTech Connect (OSTI)

    Not Available

    1994-02-15

    This Reference Book contains a current copy of the Clean Air Act, as amended, and those regulations that implement the statute and appear to be most relevant to DOE activities. The document is provided to DOE and contractor staff for informational purposes only and should not be interpreted as legal guidance. This Reference Book has been completely revised and is current through February 15, 1994.

  20. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    1995-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project, and the Ground Water Project. For the UMTRA Project site located near Naturita, Colorado, phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado. The surface cleanup will reduce radon and other radiation emissions from the former uranium processing site and prevent further site-related contamination of ground water. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health and the environment, and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water or surface water that has mixed with contaminated ground water. Therefore, a risk assessment was conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  1. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Rifle, Colorado. Revision 2

    SciTech Connect (OSTI)

    1996-02-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment. Human health risk may result from exposure to ground water contaminated from uranium ore processing. Exposure could occur from drinking water obtained from a well placed in the areas of contamination. Furthermore, environmental risk may result from plant or animal exposure to surface water and sediment that have received contaminated ground water.

  2. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Lakeview, Oregon. Revision 1

    SciTech Connect (OSTI)

    1995-12-01

    Surface cleanup at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Lakeview, Oregon was completed in 1989. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Ecological risks to plants or animals may result from exposure to surface water and sediment that have received contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the ecological environment.

  3. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Rifle, Colorado. Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase 1) and the Ground Water Project (Phase 2). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment.

  4. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Lakeview, Oregon. Revision 2

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the UMTRA Project site near Lakeview, Oregon, was completed in 1989. The mill operated from February 1958 to November 1960. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Ecological risks to plants or animals may result from exposure to surface water and sediment that have received contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the ecological environment.

  5. CD-2, Approve Performance Baseline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2, Approve Performance Baseline CD-2, Approve Performance Baseline CD-2, Approve Performance Baseline << Resource Center | CD-3 >> Description Completion of preliminary design is the first major milestone in the project Execution Phase. The design must be sufficiently mature (refer to DOE O 413.3B, Appendix C, Paragraph 4) at the time of CD-2 approval to provide reasonable assurance that the design will be implementable within the approved PB. The document signed by the CE or PME

  6. Baseline design/economics for advanced Fischer-Tropsch technology

    SciTech Connect (OSTI)

    Not Available

    1992-04-27

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis, and the computer model will be the major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide, and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal.

  7. OSTIblog Articles in the Long Baseline Neutrino Experiment Topic...

    Office of Scientific and Technical Information (OSTI)

    Long Baseline Neutrino Experiment Topic Mining for Gold, Neutrinos and the Neutrinoless ... The site of the former Homestake Mine was once one of the largest and deepest gold mines ...

  8. EVMS Training Snippet: 4.6 Baseline Control Methods | Department...

    Energy.gov (indexed) [DOE]

    More Documents & Publications EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and The Over Target Schedule (OTS) Implementations EVMS Training Snippet: 4.9 High-level EVM ...

  9. Cost and Performance Baseline for Fossil Energy Plants Volume...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    www.netl.doe.gov This page intentionally left blank Cost and Performance Baseline for Coal-to-SNG and Ammonia (Volume 2) i Table of Contents LIST OF EXHIBITS......

  10. Biodiversity Research Institute Mid-Atlantic Baseline Study Webinar

    Energy.gov [DOE]

    Carried out by the Biodiversity Research Institute (BRI) and funded by the U.S. Department of Energy Wind and Water Power Technology Office and other partners, the goal of the Mid-Atlantic Baseline...

  11. U.S Department of Energy Performance Baseline Guide

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-23

    This guide identifies key Performance Baseline (PB) elements, development processes, and practices; describes the context in which DOE PB development occurs; and suggests ways of addressing the critical elements in PB development.

  12. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 6

    SciTech Connect (OSTI)

    Cushing, C.E.; Baker, D.A.; Chamness, M.A.

    1994-08-01

    This sixth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors; Chapter 5.0 has been significantly updated from the fifth revision. It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions; The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be utilized directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

  13. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 8

    SciTech Connect (OSTI)

    Neitzel, D.A.; Bjornstad, B.N.; Fosmire, C.J.; Fowler, R.A.

    1996-08-01

    This eighth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, historical, archaeological and cultural resources, socioeconomics, and noise. Chapter 6 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. The following sections were updated in this revision: climate and meteorology; ecology (threatened and endangered species section only); historical; archaeological and cultural resources; and all of chapter 6. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the hanford Site and its past activities by which to evaluate projected activities and their impacts.

  14. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 7

    SciTech Connect (OSTI)

    Cushing, C.E.; Baker, D.A.; Chamness, M.A.

    1995-09-01

    This seventh revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Chapter 4.0 summarizes up-to-date information on climate and meteorology, geology, hydrology, environmental monitoring, ecology, history and archaeology, socioeconomics, land use, and noise levels prepared by Pacific Northwest Laboratory (PNL) staff. More detailed data are available from reference sources cited or from the authors. Chapter 5.0 was not updated from the sixth revision (1994). It describes models, including their principal underlying assumptions, that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. The updated Chapter 6.0 provides the preparer with the federal and state regulations, DOE Orders and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site, following the structure of Chapter 4.0. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the Hanford Site and its past activities by which to evaluate projected activities and their impacts.

  15. Apparatus for generating partially coherent radiation

    DOE Patents [OSTI]

    Naulleau, Patrick P.

    2005-02-22

    Techniques for generating partially coherent radiation and particularly for converting effectively coherent radiation from a synchrotron to partially coherent EUV radiation suitable for projection lithography.

  16. Hot Plasma Partial to Bootstrap Current

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hot Plasma Partial to Bootstrap Current Hot Plasma Partial to Bootstrap Current New calculations shed light on self-generated current, which could help reduce fusion reactor costs ...

  17. Multiproject baselines for evaluation of electric power projects

    SciTech Connect (OSTI)

    Sathaye, Jayant; Murtishaw, Scott; Price, Lynn; Lefranc, Maurice; Roy, Joyashree; Winkler, Harald; Spalding-Fecher, Randall

    2003-03-12

    Calculating greenhouse gas emissions reductions from climate change mitigation projects requires construction of a baseline that sets emissions levels that would have occurred without the project. This paper describes a standardized multiproject methodology for setting baselines, represented by the emissions rate (kg C/kWh), for electric power projects. A standardized methodology would reduce the transaction costs of projects. The most challenging aspect of setting multiproject emissions rates is determining the vintage and types of plants to include in the baseline and the stringency of the emissions rates to be considered, in order to balance the desire to encourage no- or low-carbon projects while maintaining environmental integrity. The criteria for selecting power plants to include in the baseline depend on characteristics of both the project and the electricity grid it serves. Two case studies illustrate the application of these concepts to the electric power grids in eastern India and South Africa. We use hypothetical, but realistic, climate change projects in each country to illustrate the use of the multiproject methodology, and note the further research required to fully understand the implications of the various choices in constructing and using these baselines.

  18. EIS-0286: Notice of Revised Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of Revised Scope EIS-0286: Notice of Revised Scope Hanford Site Solid (Radioactive and Hazardous) Waste Program The U.S. Department of Energy (DOE) has decided to revise the...

  19. Etalon-induced baseline drift and correction in atom flux sensors based on atomic absorption spectroscopy

    SciTech Connect (OSTI)

    Du, Yingge; Chambers, Scott A.

    2014-10-20

    Atom flux sensors based on atomic absorption (AA) spectroscopy are of significant interest in thin film growth as they can provide unobtrusive, element specific real-time flux sensing and control. The ultimate sensitivity and performance of these sensors are strongly affected by baseline drift. Here we demonstrate that an etalon effect resulting from temperature changes in optical viewport housings is a major source of signal instability, which has not been previously considered, and cannot be corrected using existing methods. We show that small temperature variations in the fused silica viewports can introduce intensity modulations of up to 1.5% which in turn significantly deteriorate AA sensor performance. This undesirable effect can be at least partially eliminated by reducing the size of the beam and tilting the incident light beam off the viewport normal.

  20. Etalon-induced Baseline Drift And Correction In Atom Flux Sensors Based On Atomic Absorption Spectroscopy

    SciTech Connect (OSTI)

    Du, Yingge; Chambers, Scott A.

    2014-10-20

    Atom flux sensors based on atomic absorption (AA) spectroscopy are of significant interest in thin film growth as they can provide unobtrusive, element specific, real-time flux sensing and control. The ultimate sensitivity and performance of the sensors are strongly affected by the long-term and short term baseline drift. Here we demonstrate that an etalon effect resulting from temperature changes in optical viewport housings is a major source of signal instability which has not been previously considered or corrected by existing methods. We show that small temperature variations in the fused silica viewports can introduce intensity modulations of up to 1.5%, which in turn significantly deteriorate AA sensor performance. This undesirable effect can be at least partially eliminated by reducing the size of the beam and tilting the incident light beam off the viewport normal.

  1. Dual baseline search for muon antineutrino disappearance at 0.1 eV²

    DOE PAGES-Beta [OSTI]

    Cheng, G.; Huelsnitz, W.; Aguilar-Arevalo, A. A.; Alcaraz-Aunion, J. L.; Brice, S. J.; Brown, B. C.; Bugel, L.; Catala-Perez, J.; Church, E. D.; Conrad, J. M.; et al

    2012-09-25

    The MiniBooNE and SciBooNE collaborations report the results of a joint search for short baseline disappearance of ν¯μ at Fermilab’s Booster Neutrino Beamline. The MiniBooNE Cherenkov detector and the SciBooNE tracking detector observe antineutrinos from the same beam, therefore the combined analysis of their data sets serves to partially constrain some of the flux and cross section uncertainties. Uncertainties in the νμ background were constrained by neutrino flux and cross section measurements performed in both detectors. A likelihood ratio method was used to set a 90% confidence level upper limit on ν¯μ disappearance that dramatically improves upon prior limits inmore »the Δm²=0.1–100 eV² region.« less

  2. Functional Testing Protocols for Commercial Building Efficiency Baseline Modeling Software

    SciTech Connect (OSTI)

    Jump, David; Price, Phillip N.; Granderson, Jessica; Sohn, Michael

    2013-09-06

    This document describes procedures for testing and validating proprietary baseline energy modeling software accuracy in predicting energy use over the period of interest, such as a month or a year. The procedures are designed according to the methodology used for public domain baselining software in another LBNL report that was (like the present report) prepared for Pacific Gas and Electric Company: ?Commercial Building Energy Baseline Modeling Software: Performance Metrics and Method Testing with Open Source Models and Implications for Proprietary Software Testing Protocols? (referred to here as the ?Model Analysis Report?). The test procedure focuses on the quality of the software?s predictions rather than on the specific algorithms used to predict energy use. In this way the software vendor is not required to divulge or share proprietary information about how their software works, while enabling stakeholders to assess its performance.

  3. Precision Measurements of Long-Baseline Neutrino Oscillation at LBNF

    DOE PAGES-Beta [OSTI]

    Worcester, Elizabeth

    2015-08-06

    In a long-baseline neutrino oscillation experiment, the primary physics objectives are to determine the neutrino mass hierarchy, to determine the octant of the neutrino mixing angle θ23, to search for CP violation in neutrino oscillation, and to precisely measure the size of any CP-violating effect that is discovered. This presentation provides a brief introduction to these measurements and reports on efforts to optimize the design of a long-baseline neutrino oscillation experiment, the status of LBNE, and the transition to an international collaboration at LBNF.

  4. Precision Measurements of Long-Baseline Neutrino Oscillation at LBNF

    SciTech Connect (OSTI)

    Worcester, Elizabeth

    2015-08-06

    In a long-baseline neutrino oscillation experiment, the primary physics objectives are to determine the neutrino mass hierarchy, to determine the octant of the neutrino mixing angle θ23, to search for CP violation in neutrino oscillation, and to precisely measure the size of any CP-violating effect that is discovered. This presentation provides a brief introduction to these measurements and reports on efforts to optimize the design of a long-baseline neutrino oscillation experiment, the status of LBNE, and the transition to an international collaboration at LBNF.

  5. DOE Requests Information on Potential New or Revised Categorical...

    Energy Savers

    DOE Requests Information on Potential New or Revised Categorical Exclusions DOE Requests Information on Potential New or Revised Categorical Exclusions December 22, 2009 - 10:33am...

  6. CEQ Issues Revised Draft Guidance on Consideration of Greenhouse...

    Office of Environmental Management (EM)

    Issues Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Issues Revised Draft Guidance on Consideration of ...

  7. Florida Dry Natural Gas Reserves Revision Decreases (Billion...

    Annual Energy Outlook

    Decreases (Billion Cubic Feet) Florida Dry Natural Gas Reserves Revision Decreases ... Dry Natural Gas Reserves Revision Decreases Florida Dry Natural Gas Proved Reserves Dry ...

  8. Florida Dry Natural Gas Reserves Revision Increases (Billion...

    Annual Energy Outlook

    Increases (Billion Cubic Feet) Florida Dry Natural Gas Reserves Revision Increases ... Dry Natural Gas Reserves Revision Increases Florida Dry Natural Gas Proved Reserves Dry ...

  9. ,"Florida Dry Natural Gas Reserves Revision Decreases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Data for" ,"Data 1","Florida Dry Natural Gas Reserves Revision ... 10:36:48 AM" "Back to Contents","Data 1: Florida Dry Natural Gas Reserves Revision ...

  10. ,"Florida Dry Natural Gas Reserves Revision Increases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Data for" ,"Data 1","Florida Dry Natural Gas Reserves Revision ... 10:36:46 AM" "Back to Contents","Data 1: Florida Dry Natural Gas Reserves Revision ...

  11. Virginia Dry Natural Gas Reserves Revision Increases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Revision Increases ... Dry Natural Gas Reserves Revision Increases Virginia Dry Natural Gas Proved Reserves Dry ...

  12. Virginia Dry Natural Gas Reserves Revision Decreases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Revision Decreases ... Dry Natural Gas Reserves Revision Decreases Virginia Dry Natural Gas Proved Reserves Dry ...

  13. West Virginia Dry Natural Gas Reserves Revision Increases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) West Virginia Dry Natural Gas Reserves Revision Increases ... Dry Natural Gas Reserves Revision Increases West Virginia Dry Natural Gas Proved Reserves ...

  14. Eastern Wind Integration and Transmission Study (EWITS) (Revised...

    Energy.gov (indexed) [DOE]

    PREPARED BY: EnerNex Corporation REVISED FEBRUARY 2011 EASTERN WIND INTEGRATION AND TRANSMISSION STUDY PIX 16204 2 3 EASTERN WIND INTEGRATION AND TRANSMISSION STUDY Revised ...

  15. Attachment 2: Solicitation for Offers with New and Revised Green...

    Energy Savers

    Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Attachment 2: Solicitation for Offers with New and Revised Green Lease Text PDF icon Solicitation for...

  16. Microsoft Word - CCP-PO-012-Revision 15

    Office of Environmental Management (EM)

    of Revision 0 10212003 Initial Issue. 1 12162003 Revised the Scope of the document. ... updated to reflect changes in work scope and joint organizational responsibilities. ...

  17. Solar Position Algorithm for Solar Radiation Applications (Revised...

    Office of Scientific and Technical Information (OSTI)

    Solar Position Algorithm for Solar Radiation Applications (Revised) Citation Details In-Document Search Title: Solar Position Algorithm for Solar Radiation Applications (Revised) ...

  18. SUMMARY OF REVISED TORNADO, HURRICANE AND EXTREME STRAIGHT WIND...

    Office of Environmental Management (EM)

    Summary of Revised Tornado, Hurricane and Extreme Straight Wind Characteristics at Nuclear Facility Sites BY: John D. Stevenson Consulting Engineer PDF icon Summary of Revised ...

  19. Kansas Dry Natural Gas Reserves Revision Increases (Billion Cubic...

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Kansas Dry Natural Gas Reserves Revision Increases (Billion ... Dry Natural Gas Reserves Revision Increases Kansas Dry Natural Gas Proved Reserves Dry ...

  20. Kansas Dry Natural Gas Reserves Revision Decreases (Billion Cubic...

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Kansas Dry Natural Gas Reserves Revision Decreases (Billion ... Dry Natural Gas Reserves Revision Decreases Kansas Dry Natural Gas Proved Reserves Dry ...

  1. New York Dry Natural Gas Reserves Revision Decreases (Billion...

    Annual Energy Outlook

    Decreases (Billion Cubic Feet) New York Dry Natural Gas Reserves Revision Decreases ... Dry Natural Gas Reserves Revision Decreases New York Dry Natural Gas Proved Reserves Dry ...

  2. New Mexico Dry Natural Gas Reserves Revision Increases (Billion...

    Annual Energy Outlook

    Increases (Billion Cubic Feet) New Mexico Dry Natural Gas Reserves Revision Increases ... Dry Natural Gas Reserves Revision Increases New Mexico Dry Natural Gas Proved Reserves Dry ...

  3. New York Dry Natural Gas Reserves Revision Increases (Billion...

    Gasoline and Diesel Fuel Update

    Increases (Billion Cubic Feet) New York Dry Natural Gas Reserves Revision Increases ... Dry Natural Gas Reserves Revision Increases New York Dry Natural Gas Proved Reserves Dry ...

  4. New Mexico Dry Natural Gas Reserves Revision Decreases (Billion...

    Annual Energy Outlook

    Decreases (Billion Cubic Feet) New Mexico Dry Natural Gas Reserves Revision Decreases ... Dry Natural Gas Reserves Revision Decreases New Mexico Dry Natural Gas Proved Reserves Dry ...

  5. EA-1947: Draft Revised Finding of No Significant Impact | Department...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    1947: Draft Revised Finding of No Significant Impact EA-1947: Draft Revised Finding of No Significant Impact Transfer of the Kansas City Plant, Kansas City, Missouri The National ...

  6. North Dakota Dry Natural Gas Reserves Revision Increases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) North Dakota Dry Natural Gas Reserves Revision Increases ... Dry Natural Gas Reserves Revision Increases North Dakota Dry Natural Gas Proved Reserves ...

  7. North Dakota Dry Natural Gas Reserves Revision Decreases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) North Dakota Dry Natural Gas Reserves Revision Decreases ... Dry Natural Gas Reserves Revision Decreases North Dakota Dry Natural Gas Proved Reserves ...

  8. Commercial Grade Dedication Record (ANL-746 Revised) | Department...

    Energy Savers

    Record (ANL-746 Revised) Commercial Grade Dedication Record (ANL-746 Revised) A sample of a process to recorddocument CGD activities. Forms are included. Commercial Grade...

  9. Forrestal Garage Parking Guidelines, Revised August 12, 2010...

    Office of Environmental Management (EM)

    Forrestal Garage Parking Guidelines, Revised August 12, 2010 Forrestal Garage Parking Guidelines, Revised August 12, 2010 Forrestal Garage Parking Guidelines PDF icon Forrestal...

  10. Attachment 2: Solicitation for Offers with New and Revised Green...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    2: Solicitation for Offers with New and Revised Green Lease Text Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Solicitation for Offers Paragraphs with ...

  11. Radiological control manual. Revision 1

    SciTech Connect (OSTI)

    Kloepping, R.

    1996-05-01

    This Lawrence Berkeley National Laboratory Radiological Control Manual (LBNL RCM) has been prepared to provide guidance for site-specific additions, supplements and interpretation of the DOE Radiological Control Manual. The guidance provided in this manual is one methodology to implement the requirements given in Title 10 Code of Federal Regulations Part 835 (10 CFR 835) and the DOE Radiological Control Manual. Information given in this manual is also intended to provide demonstration of compliance to specific requirements in 10 CFR 835. The LBNL RCM (Publication 3113) and LBNL Health and Safety Manual Publication-3000 form the technical basis for the LBNL RPP and will be revised as necessary to ensure that current requirements from Rules and Orders are represented. The LBNL RCM will form the standard for excellence in the implementation of the LBNL RPP.

  12. Wettability of partially suspended graphene

    DOE PAGES-Beta [OSTI]

    Ondarçuhu, Thierry; Thomas, Vincent; Nuñez, Marc; Dujardin, Erik; Rahman, Atikur; Black, Charles T.; Checco, Antonio

    2016-04-13

    Dependence on the wettability of graphene on the nature of the underlying substrate remains only partially understood. We systematically investigate the role of liquid-substrate interactions on the wettability of graphene by varying the area fraction of suspended graphene from 0 to 95% by means of nanotextured substrates. We find that completely suspended graphene exhibits the highest water contact angle (85° ± 5°) compared to partially suspended or supported graphene, regardless of the hydrophobicity (hydrophilicity) of the substrate. Moreover, 80% of the long-range water-substrate interactions are screened by the graphene monolayer, the wettability of which is primarily determined by short-range graphene-liquidmore » interactions. By its well-defined chemical and geometrical properties, supported graphene therefore provides a model system to elucidate the relative contribution of short and long range interactions to the macroscopic contact angle.« less

  13. THE FIRST VERY LONG BASELINE INTERFEROMETRIC SETI EXPERIMENT

    SciTech Connect (OSTI)

    Rampadarath, H.; Morgan, J. S.; Tingay, S. J.; Trott, C. M.

    2012-08-15

    The first Search for Extra-Terrestrial Intelligence (SETI) conducted with very long baseline interferometry (VLBI) is presented. By consideration of the basic principles of interferometry, we show that VLBI is efficient at discriminating between SETI signals and human generated radio frequency interference (RFI). The target for this study was the star Gliese 581, thought to have two planets within its habitable zone. On 2007 June 19, Gliese 581 was observed for 8 hr at 1230-1544 MHz with the Australian Long Baseline Array. The data set was searched for signals appearing on all interferometer baselines above five times the noise limit. A total of 222 potential SETI signals were detected and by using automated data analysis techniques were ruled out as originating from the Gliese 581 system. From our results we place an upper limit of 7 MW Hz{sup -1} on the power output of any isotropic emitter located in the Gliese 581 system within this frequency range. This study shows that VLBI is ideal for targeted SETI including follow-up observations. The techniques presented are equally applicable to next-generation interferometers, such as the long baselines of the Square Kilometre Array.

  14. BASELINE DESIGN/ECONOMICS FOR ADVANCED FISCHER-TROPSCH TECHNOLOGY

    SciTech Connect (OSTI)

    1998-04-01

    Bechtel, along with Amoco as the main subcontractor, developed a Baseline design, two alternative designs, and computer process simulation models for indirect coal liquefaction based on advanced Fischer-Tropsch (F-T) technology for the U. S. Department of Energy's (DOE's) Federal Energy Technology Center (FETC).

  15. 241-AZ Farm Annulus Extent of Condition Baseline Inspection

    SciTech Connect (OSTI)

    Engeman, Jason K.; Girardot, Crystal L.; Vazquez, Brandon J.

    2013-05-15

    This report provides the results of the comprehensive annulus visual inspection for tanks 241- AZ-101 and 241-AZ-102 performed in fiscal year 2013. The inspection established a baseline covering about 95 percent of the annulus floor for comparison with future inspections. Any changes in the condition are also included in this document.

  16. ABB SCADA/EMS System INEEL Baseline Summary Test Report (November...

    Office of Environmental Management (EM)

    SCADAEMS System INEEL Baseline Summary Test Report (November 2004) ABB SCADAEMS System INEEL Baseline Summary Test Report (November 2004) This document covers the security ...

  17. EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process...

    Energy Savers

    2 Integrated Baseline Review (IBR) Process EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process This EVMS Training Snippet sponsored by the Office of Project ...

  18. Microsoft PowerPoint - Snippet 4.6 Baseline Control Methods 20140723...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    to an approved performance baseline, including impacts on the project scope, schedule, design, methods, and cost baselines. The BCP represents a change to one or more of the...

  19. Microsoft Word - DOE 2016 SSPP Revision 09022016

    Energy Savers

    ... Target FY 2015 Performance (vs. baseline) Scope 1 & 2 ... (WAPA) and the solar developer was finalized in ... Fleet Management Fleet Petroleum Use Reduction Goal E.O. ...

  20. Nevada Test Site Radiological Control Manual. Revision 1

    SciTech Connect (OSTI)

    None, None

    2010-02-09

    This document supersedes DOE/NV/25946--801, “Nevada Test Site Radiological Control Manual,” Revision 0 issued in October 2009. Brief Description of Revision: A minor revision to correct oversights made during revision to incorporate the 10 CFR 835 Update; and for use as a reference document for Tenant Organization Radiological Protection Programs.

  1. High Level Waste System Plan Revision 9

    SciTech Connect (OSTI)

    Davis, N.R.; Wells, M.N.; Choi, A.S.; Paul, P.; Wise, F.E.

    1998-04-01

    Revision 9 of the High Level Waste System Plan documents the current operating strategy of the HLW System at SRS to receive, store, treat, and dispose of high-level waste.

  2. Fig 9-revised Flowchart.xls

    Office of Legacy Management (LM)

    Figure 9 Soil Nature and Extent AOI Identification Process d The PRG value for lead is not a calculated PRG, but rather is taken from the EPA guidance document Revised Interim Soil ...

  3. Notice of Intent to Revise Personnel Security

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-08-02

    The order is being revised to clarify the responsibilities for adjudicating dual citizens and make consultation with the Office of Intelligence and Counterintelligence (IN) mandatory in dual citizen cases.

  4. Section 311 Revised Template August 2012

    Energy.gov [DOE]

    Attached are 3 revised templates for sending the Section 311 notices to Congress as prescribed in Acquisition Letter (AL) 2012-07 and Financial Assistance Letter (FAL) 2012-01.

  5. Section 311 Revised Template January 4 2013

    Energy.gov [DOE]

    Attached are 3 revised templates for sending the Section 311 notices to Congress as prescribed in Acquisition Letter (AL) 2012-07 and Financial Assistance Letter (FAL) 2012-01.

  6. Section 311 Revised Template January 24 2013

    Energy.gov [DOE]

    Attached are 3 revised templates for sending the Section 311 notices to Congress as prescribed in Acquisition Letter (AL) 2012-07 and Financial Assistance Letter (FAL) 2012-01.

  7. Baseline ecological risk assessment Salmon Site, Lamar County, Mississippi

    SciTech Connect (OSTI)

    1995-04-01

    The Salmon Site (SS), formerly the Tatum Dome Test Site, located in Mississippi was the site of two nuclear and two gas explosion tests conducted between 1964 and 1970. A consequence of these testing activities is that radionuclides were released into the salt dome, where they are presently contained. During reentry drilling and other site activities, incidental liquid and solid wastes that contained radioactivity were generated, resulting in some soil, ground water and equipment contamination. As part of the remedial investigation effort, a Baseline Ecological Risk Assessment was conducted at the SS. The purpose is to gauge ecological and other environmental impacts attributable to past activities at the former test facility. The results of this facility-specific baseline risk assessment are presented in this document.

  8. Implementing wide baseline matching algorithms on a graphics processing unit.

    SciTech Connect (OSTI)

    Rothganger, Fredrick H.; Larson, Kurt W.; Gonzales, Antonio Ignacio; Myers, Daniel S.

    2007-10-01

    Wide baseline matching is the state of the art for object recognition and image registration problems in computer vision. Though effective, the computational expense of these algorithms limits their application to many real-world problems. The performance of wide baseline matching algorithms may be improved by using a graphical processing unit as a fast multithreaded co-processor. In this paper, we present an implementation of the difference of Gaussian feature extractor, based on the CUDA system of GPU programming developed by NVIDIA, and implemented on their hardware. For a 2000x2000 pixel image, the GPU-based method executes nearly thirteen times faster than a comparable CPU-based method, with no significant loss of accuracy.

  9. Standards Development and Revision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Standards Development and Revision Standards Development and Revision Beginning in the 1970s, Congress enacted a series of laws that established or directed the Department of Energy (DOE) to establish energy efficiency standards for certain appliances and commercial equipment. In addition, DOE is required to review existing standards for covered products at least once every six years and to set standards at levels that achieve the maximum improvement in energy efficiency that is

  10. NREL: Energy Analysis - Annual Technology Baseline and Standard Scenarios

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Annual Technology Baseline and Standard Scenarios NREL annually documents a realistic and timely set of input assumptions (e.g., technology cost, fuel costs), and a diverse set of potential futures (Standard Scenarios) to support and inform electric sector analysis in the United States. The products of this work, including assessments of current and projected technology cost and performance for both renewable and conventional electricity generation technologies, as well as market projections of

  11. Baseline measurements of terrestrial gamma radioactivity at the CEBAF site

    SciTech Connect (OSTI)

    Wollenberg, H.A.; Smith, A.R.

    1991-10-01

    A survey of the gamma radiation background from terrestrial sources was conducted at the CEBAF site, Newport News, Virginia, on November 12--16, 1990, to provide a gamma radiation baseline for the site prior to the startup of the accelerator. The concentrations and distributions of the natural radioelements in exposed soil were measured, and the results of the measurements were converted into gamma-ray exposure rates. Concurrently, samples were collected for laboratory gamma spectral analyses.

  12. Hybrid Electric Vehicle Fleet and Baseline Performance Testing

    SciTech Connect (OSTI)

    J. Francfort; D. Karner

    2006-04-01

    The U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA) conducts baseline performance and fleet testing of hybrid electric vehicles (HEV). To date, the AVTA has completed baseline performance testing on seven HEV models and accumulated 1.4 million fleet testing miles on 26 HEVs. The HEV models tested or in testing include: Toyota Gen I and Gen II Prius, and Highlander; Honda Insight, Civic and Accord; Chevrolet Silverado; Ford Escape; and Lexus RX 400h. The baseline performance testing includes dynamometer and closed track testing to document the HEV’s fuel economy (SAE J1634) and performance in a controlled environment. During fleet testing, two of each HEV model are driven to 160,000 miles per vehicle within 36 months, during which maintenance and repair events, and fuel use is recorded and used to compile life-cycle costs. At the conclusion of the 160,000 miles of fleet testing, the SAE J1634 tests are rerun and each HEV battery pack is tested. These AVTA testing activities are conducted by the Idaho National Laboratory, Electric Transportation Applications, and Exponent Failure Analysis Associates. This paper discusses the testing methods and results.

  13. Revision of the DELFIC Particle Activity Module

    SciTech Connect (OSTI)

    Hooper, David A; Jodoin, Vincent J

    2010-09-01

    The Defense Land Fallout Interpretive Code (DELFIC) was originally released in 1968 as a tool for modeling fallout patterns and for predicting exposure rates. Despite the continual advancement of knowledge of fission yields, decay behavior of fission products, and biological dosimetry, the decay data and logic of DELFIC have remained mostly unchanged since inception. Additionally, previous code revisions caused a loss of conservation of radioactive nuclides. In this report, a new revision of the decay database and the Particle Activity Module is introduced and explained. The database upgrades discussed are replacement of the fission yields with ENDF/B-VII data as formatted in the Oak Ridge Isotope Generation (ORIGEN) code, revised decay constants, revised exposure rate multipliers, revised decay modes and branching ratios, and revised boiling point data. Included decay logic upgrades represent a correction of a flaw in the treatment of the fission yields, extension of the logic to include more complex decay modes, conservation of nuclides (including stable nuclides) at all times, and conversion of key variables to double precision for nuclide conservation. Finally, recommended future work is discussed with an emphasis on completion of the overall radiation physics upgrade, particularly for dosimetry, induced activity, decay of the actinides, and fractionation.

  14. DOE-EM-STD-5502-94; DOE Limited Standard Hazard Baseline Documentation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... . . . . . . . . . . . . . . 14 5.1 Hazard Baseline Documentation Criteria for EM Nuclear Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  15. NREL: MIDC/SRRL Baseline Measurement System (39.74 N, 105.18 W, 1829 m,

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    GMT-7) Solar Radiation Research Laboratory Baseline Measurement System

  16. Lawrence Livermore National Laboratory Emergency Response Capability Baseline Needs Assessment Requirement Document

    SciTech Connect (OSTI)

    Sharry, J A

    2009-12-30

    This revision of the LLNL Fire Protection Baseline Needs Assessment (BNA) was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by Martin Gresho, Sandia/CA Fire Marshal. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only address emergency response. The original LLNL BNA was created on April 23, 1997 as a means of collecting all requirements concerning emergency response capabilities at LLNL (including response to emergencies at Sandia/CA) into one BNA document. The original BNA documented the basis for emergency response, emergency personnel staffing, and emergency response equipment over the years. The BNA has been updated and reissued five times since in 1998, 1999, 2000, 2002, and 2004. A significant format change was performed in the 2004 update of the BNA in that it was 'zero based.' Starting with the requirement documents, the 2004 BNA evaluated the requirements, and determined minimum needs without regard to previous evaluations. This 2010 update maintains the same basic format and requirements as the 2004 BNA. In this 2010 BNA, as in the previous BNA, the document has been intentionally divided into two separate documents - the needs assessment (1) and the compliance assessment (2). The needs assessment will be referred to as the BNA and the compliance assessment will be referred to as the BNA Compliance Assessment. The primary driver for separation is that the needs assessment identifies the detailed applicable regulations (primarily NFPA Standards) for emergency response capabilities based on the hazards present at LLNL and Sandia/CA and the geographical location of the facilities. The needs assessment also identifies areas where the modification of the requirements in the applicable NFPA standards is appropriate, due to the improved fire protection provided, the

  17. Verification of warhead dismantelment and the importance of baseline validation

    SciTech Connect (OSTI)

    Buonpane, L.M.; Strait, R.S. )

    1991-01-01

    This paper presents an approach for evaluating verification regimes for nuclear warhead dismantlement. The approach is an adaptation of the traditional nuclear materials management model. As such the approach integrates the difficulties of verifying both stockpile estimates and numbers of warheads dismantled. Both random uncertainties and systematic uncertainties are considered in this approach. By making some basic assumptions about the relative uncertainties surrounding the stockpile estimates and the numbers of warheads dismantled, the authors illustrate their relative impacts on overall verification ability. The results highlight the need for increased attention on the problem of validating baseline declarations of stockpile size.

  18. Integrated Baseline System (IBS) Version 2.0: Models guide

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Models Guide summarizes the IBS use of several computer models for predicting the results of emergency situations. These include models for predicting dispersion/doses of airborne contaminants, traffic evacuation, explosion effects, heat radiation from a fire, and siren sound transmission. The guide references additional technical documentation on the models when such documentation is available from other sources. The audience for this manual is chiefly emergency management planners and analysts, but also data managers and system managers.

  19. Baseline review of the U.S. LHC Accelerator project

    SciTech Connect (OSTI)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O`Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  20. TWRS phase I privatization site environmental baseline and characterization plan

    SciTech Connect (OSTI)

    Shade, J.W.

    1997-09-01

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan.

  1. Emergency Response Capability Baseline Needs Assessment Compliance Assessment

    SciTech Connect (OSTI)

    Sharry, John A.

    2013-09-16

    This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2013 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2009 BNA, the 2012 BNA document, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures.

  2. Integrated Baseline System (IBS) Version 1.03: Utilities guide

    SciTech Connect (OSTI)

    Burford, M.J.; Downing, T.R.; Pottier, M.C.; Schrank, E.E.; Williams, J.R.

    1993-01-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This Utilities Guide explains how to operate utility programs that are supplied as a part of the IBS. These utility programs are chiefly for managing and manipulating various kinds of IBS data and system administration files. Many of the utilities are for creating, editing, converting, or displaying map data and other data that are related to geographic location.

  3. Integrated Baseline System (IBS) Version 2.0: Utilities Guide

    SciTech Connect (OSTI)

    Burford, M.J.; Downing, T.R.; Williams, J.R.; Bower, J.C.

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Utilities Guide explains how you can use the IBS utility programs to manage and manipulate various kinds of IBS data. These programs include utilities for creating, editing, and displaying maps and other data that are referenced to geographic location. The intended audience for this document are chiefly data managers but also system managers and some emergency management planners and analysts.

  4. Baseline Glass Development for Combined Fission Products Waste Streams

    SciTech Connect (OSTI)

    Crum, Jarrod V.; Billings, Amanda Y.; Lang, Jesse B.; Marra, James C.; Rodriguez, Carmen P.; Ryan, Joseph V.; Vienna, John D.

    2009-06-29

    Borosilicate glass was selected as the baseline technology for immobilization of the Cs/Sr/Ba/Rb (Cs), lanthanide (Ln) and transition metal fission product (TM) waste steams as part of a cost benefit analysis study.[1] Vitrification of the combined waste streams have several advantages, minimization of the number of waste forms, a proven technology, and similarity to waste forms currently accepted for repository disposal. A joint study was undertaken by Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) to develop acceptable glasses for the combined Cs + Ln + TM waste streams (Option 1) and Cs + Ln combined waste streams (Option 2) generated by the AFCI UREX+ set of processes. This study is aimed to develop baseline glasses for both combined waste stream options and identify key waste components and their impact on waste loading. The elemental compositions of the four-corners study were used along with the available separations data to determine the effect of burnup, decay, and separations variability on estimated waste stream compositions.[2-5] Two different components/scenarios were identified that could limit waste loading of the combined Cs + LN + TM waste streams, where as the combined Cs + LN waste stream has no single component that is perceived to limit waste loading. Combined Cs + LN waste stream in a glass waste form will most likely be limited by heat due to the high activity of Cs and Sr isotopes.

  5. Moving baseline for evaluation of advanced coal-extraction systems

    SciTech Connect (OSTI)

    Bickerton, C.R.; Westerfield, M.D.

    1981-04-15

    This document reports results from the initial effort to establish baseline economic performance comparators for a program whose intent is to define, develop, and demonstrate advanced systems suitable for coal resource extraction beyond the year 2000. Systems used in this study were selected from contemporary coal mining technology and from conservative conjectures of year 2000 technology. The analysis was also based on a seam thickness of 6 ft. Therefore, the results are specific to the study systems and the selected seam thickness. To be more beneficial to the program, the effort should be extended to other seam thicknesses. This document is one of a series which describe systems level requirements for advanced underground coal mining equipment. Five areas of performance are discussed: production cost, miner safety, miner health, environmental impact, and recovery efficiency. The projections for cost and production capability comprise a so-called moving baseline which will be used to assess compliance with the systems requirement for production cost. Separate projections were prepared for room and pillar, longwall, and shortwall technology all operating under comparable sets of mining conditions. This work is part of an effort to define and develop innovative coal extraction systems suitable for the significant resources remaining in the year 2000.

  6. Recent Title V operating permit program revisions

    SciTech Connect (OSTI)

    Nicewander, M.

    1995-12-31

    The purpose of this paper is to discuss recent EPA proposed regulations regarding required procedures to be incorporated into the state operating permit programs to accommodate permit revisions. The development and implementation of an operating permits program must balance air pollution control requirements with the ability of a source to meet changing market demands. This has been the major item of concern during the operating permits program development. Before discussing the specific procedures for revising operating permits, it is necessary to include some generic background information for familiarization with the operating permits program.

  7. Property:NEPA RevisedApplicationDate | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    RevisedApplicationDate Jump to: navigation, search Property Name NEPA RevisedApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA...

  8. POLICY FLASH 2013-58 Revised Guide for Financial Assistance ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    POLICY FLASH 2013-58 Revised Guide for Financial Assistance POLICY FLASH 2013-58 Revised Guide for Financial Assistance Questions concerning this policy flash should be directed to...

  9. Hawaii Revised Statute 182-6 Exploration | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hawaii Revised Statute 182-6 Exploration Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Hawaii Revised Statute 182-6...

  10. Appendix A: Comments and Responses on the Draft Revised FONSI

    National Nuclear Security Administration (NNSA)

    Can you provide recent water quality results? The Draft Revised FONSI was drafted to ... The Draft Revised FONSI did not impact the plan for water quality testing at the site. ...

  11. EM Quality Assurance Program (EM-QA-001 Revision 0)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Previous revision of the Environmental Management Quality Assurance Program. The program is the EM management system to ensure we "do work correctly." This document has been superseded by Revision...

  12. Public Comment Received on Proposed Revisions to DOE's NEPA Rule...

    Energy Savers

    Public Comment Received on Proposed Revisions to DOE's NEPA Rule: 10 CFR Part 1021 Public Comment Received on Proposed Revisions to DOE's NEPA Rule: 10 CFR Part 1021 Public Comment...

  13. Acquisition Letter 09 - Revision of Department of Energy (DOE...

    Office of Environmental Management (EM)

    9 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause The ...

  14. Partially fluorinated cyclic ionic polymers and membranes

    DOE Patents [OSTI]

    Yang, Zhen-Yu

    2013-04-09

    Ionic polymers are made from selected partially fluorinated dienes, in which the repeat units are cycloaliphatic. The polymers are formed into membranes.

  15. Inexpensive, Nonfluorinated (or Partially Fluorinated) Anions...

    Energy.gov (indexed) [DOE]

    Liquids for Lithium Battery Electrolytes Inexpensive, Nonfluorinated (or Partially Fluorinated) Anions for Lithium Salts and Ionic Liquids for Lithium Battery Electrolytes Linking ...

  16. Inexpensive, Nonfluorinated (or Partially Fluorinated) Anions...

    Energy.gov (indexed) [DOE]

    Liquids for Lithium Battery Electrolytes Inexpensive, Nonfluorinated (or Partially Fluorinated) Anions for Lithium Salts and Ionic Liquids for Lithium Battery Electrolytes ...

  17. Integrated Baseline Bystem (IBS) Version 1.03: Models guide

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Integrated Baseline System)(IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planning and analysis. This document is the models guide for the IBS and explains how to use the emergency related computer models. This document provides information for the experienced system user, and is the primary reference for the computer modeling software supplied with the system. It is designed for emergency managers and planners, and others familiar with the concepts of computer modeling. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other IBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary.

  18. Sandia National Laboratories, California proposed CREATE facility environmental baseline survey.

    SciTech Connect (OSTI)

    Catechis, Christopher Spyros

    2013-10-01

    Sandia National Laboratories, Environmental Programs completed an environmental baseline survey (EBS) of 12.6 acres located at Sandia National Laboratories/California (SNL/CA) in support of the proposed Collaboration in Research and Engineering for Advanced Technology and Education (CREATE) Facility. The survey area is comprised of several parcels of land within SNL/CA, County of Alameda, California. The survey area is located within T 3S, R 2E, Section 13. The purpose of this EBS is to document the nature, magnitude, and extent of any environmental contamination of the property; identify potential environmental contamination liabilities associated with the property; develop sufficient information to assess the health and safety risks; and ensure adequate protection for human health and the environment related to a specific property.

  19. Waste Assessment Baseline for the IPOC Second Floor, West Wing

    SciTech Connect (OSTI)

    McCord, Samuel A

    2015-04-01

    Following a building-wide waste assessment in September, 2014, and subsequent presentation to Sandia leadership regarding the goal of Zero Waste by 2025, the occupants of the IPOC Second Floor, West Wing contacted the Materials Sustainability and Pollution Prevention (MSP2) team to guide them to Zero Waste in advance of the rest of the site. The occupants are from Center 3600, Public Relations and Communications , and Center 800, Independent Audit, Ethics and Business Conduct . To accomplish this, MSP2 conducted a new limited waste assessment from March 2-6, 2015 to compare the second floor, west wing to the building as a whole. The assessment also serves as a baseline with which to mark improvements in diversion in approximately 6 months.

  20. Direct coal liquefaction baseline design and system analysis

    SciTech Connect (OSTI)

    Not Available

    1991-04-01

    The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based on two stage direct coupled catalytic reactors. This primary objective is to be accomplished by completing the following: a base line design based on previous DOE/PETC results from Wilsonville pilot plant and other engineering evaluations; a cost estimate and economic analysis; a computer model incorporating the above two steps over a wide range of capacities and selected process alternatives; a comprehensive training program for DOE/PETC Staff to understand and use the computer model; a thorough documentation of all underlying assumptions for baseline economics; and a user manual and training material which will facilitate updating of the model in the future.

  1. C-018H Pre-Operational Baseline Sampling Plan

    SciTech Connect (OSTI)

    Guzek, S.J.

    1993-08-20

    The objective of this task is to field characterize and sample the soil at selected locations along the proposed effluent line routes for Project C-018H. The overall purpose of this effort is to meet the proposed plan to discontinue the disposal of contaminated liquids into the Hanford soil column as described by DOE (1987). Detailed information describing proposed transport pipeline route and associated Kaiser Engineers Hanford Company (KEH) preliminary drawings (H288746...755) all inclusive, have been prepared by KEH (1992). The information developed from field monitoring and sampling will be utilized to characterize surface and subsurface soil along the proposed C-018H effluent pipeline and it`s associated facilities. Potentially existing contaminant levels may be encountered therefore, soil characterization will provide a construction preoperational baseline reference, develop personnel safety requirements, and determine the need for any changes in the proposed routes prior to construction of the pipeline.

  2. Direct coal liquefaction baseline design and system analysis

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    The primary objective of the study is to develop a computer model for a base line direct coal liquefaction design based on two stage direct coupled catalytic reactors. This primary objective is to be accomplished by completing the following: a base line design based on previous DOE/PETC results from Wilsonville pilot plant and other engineering evaluations; a cost estimate and economic analysis; a computer model incorporating the above two steps over a wide range of capacities and selected process alternatives; a comprehensive training program for DOE/PETC Staff to understand and use the computer model; a thorough documentation of all underlying assumptions for baseline economics; and a user manual and training material which will facilitate updating of the model in the future.

  3. Automated baseline change detection -- Phases 1 and 2. Final report

    SciTech Connect (OSTI)

    Byler, E.

    1997-10-31

    The primary objective of this project is to apply robotic and optical sensor technology to the operational inspection of mixed toxic and radioactive waste stored in barrels, using Automated Baseline Change Detection (ABCD), based on image subtraction. Absolute change detection is based on detecting any visible physical changes, regardless of cause, between a current inspection image of a barrel and an archived baseline image of the same barrel. Thus, in addition to rust, the ABCD system can also detect corrosion, leaks, dents, and bulges. The ABCD approach and method rely on precise camera positioning and repositioning relative to the barrel and on feature recognition in images. The ABCD image processing software was installed on a robotic vehicle developed under a related DOE/FETC contract DE-AC21-92MC29112 Intelligent Mobile Sensor System (IMSS) and integrated with the electronics and software. This vehicle was designed especially to navigate in DOE Waste Storage Facilities. Initial system testing was performed at Fernald in June 1996. After some further development and more extensive integration the prototype integrated system was installed and tested at the Radioactive Waste Management Facility (RWMC) at INEEL beginning in April 1997 through the present (November 1997). The integrated system, composed of ABCD imaging software and IMSS mobility base, is called MISS EVE (Mobile Intelligent Sensor System--Environmental Validation Expert). Evaluation of the integrated system in RWMC Building 628, containing approximately 10,000 drums, demonstrated an easy to use system with the ability to properly navigate through the facility, image all the defined drums, and process the results into a report delivered to the operator on a GUI interface and on hard copy. Further work is needed to make the brassboard system more operationally robust.

  4. Probing Neutrino Properties with Long-Baseline Neutrino Beams

    SciTech Connect (OSTI)

    Marino, Alysia

    2015-06-29

    This is nal report on an Early Career Award grant began in April 15, 2010 and concluded on April 14, 2015. Alysia Marino's research is fo- cussed on making precise measurements of neutrino properties using in- tense accelerator-generated neutrino beams. As a part of this grant, she is collaborating on the Tokai-to-Kamioka (T2K) long-baseline neutrino exper- iment [6], currently taking data in Japan, and on the Deep Underground Neutrino Experiment (DUNE) design e ort for a future Long-Baseline Neu- trino Facility (LBNF) in the US.1 She is also a member of the NA61/SHINE particle production experiment at CERN, but as that e ort is supported by other funds, it will not be discussed further here. T2K was designed to search for the disappearance of muon neutrinos ( ) and the appearance of electron neutrinos ( e), using a beam of muon neu- trino beam that travels 295 km across Japan towards the Super-Kamiokande detector. In 2011 T2K rst reported indications of e appearance [2], a pre- viously unobserved mode of neutrino oscillations. In the past year, T2K has published a combined analysis of disappearance and e appearance [1], and began collecting taking data with a beam of anti-neutrinos, instead of neutrinos, to search for hints of violation of the CP symmetry of the uni- verse. The proposed DUNE experiment has similar physics goals to T2K, but will be much more sensitive due to its more massive detectors and new higher-intensity neutrino beam. This e ort will be very high-priority particle physics project in the US over the next decade.

  5. Notice, Revised Classified Information Nondisclosure Agreement- July 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Notice to all cleared individuals, the "Classified Information Nondisclosure Agreement, Standard Form 312" (SF 312) was revised in July 2013.

  6. ETA-HTP11 - Vehicle Verification - Revision 1

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 Revision 1 Effective October 1, 2005 Vehicle Verification Prepared by Electric Transportation Applications Prepared by: ... Date:... Garrett ...

  7. Revision Policy for EIA Weekly Underground Natural Gas Storage Estimates

    Weekly Natural Gas Storage Report

    Revision Policy for EIA Weekly Underground Natural Gas Storage Estimates Latest Update: November 16, 2015 This report consists of the following sections: General EIA Weekly Natural Gas Storage Report Revisions Policy - a description of how revisions to the Weekly Natural Gas Storage Report estimates may occur EIA Weekly Natural Gas Storage Report Policy to Allow Unscheduled Release of Revisions - a description of the policy that will be implemented in the event of an out-of-cycle release

  8. System maintenance verification and validation plan for the TWRS controlled baseline database system

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    TWRS Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the verification and validation approach for system documentation changes within the database system.

  9. EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review EVMS Training Snippet: 4.6 Baseline Control Methods EVMS Training Snippet: 4.9 High-level EVM...

  10. Anomalies of Nuclear Criticality, Revision 6

    SciTech Connect (OSTI)

    Clayton, E. D.; Prichard, Andrew W.; Durst, Bonita E.; Erickson, David; Puigh, Raymond J.

    2010-02-19

    This report is revision 6 of the Anomalies of Nuclear Criticality. This report is required reading for the training of criticality professionals in many organizations both nationally and internationally. This report describes many different classes of nuclear criticality anomalies that are different than expected.

  11. FTCP Corrective Action Plan- Revision 2

    Energy.gov [DOE]

    March 2009 FTCP Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations

  12. FTCP Corrective Action Plan- Revision 1

    Energy.gov [DOE]

    January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

  13. Mixed waste focus area technical baseline report. Volume 2

    SciTech Connect (OSTI)

    1997-04-01

    As part of its overall program, the MWFA uses a national mixed waste data set to develop approaches for treating mixed waste that cannot be treated using existing capabilities at DOE or commercial facilities. The current data set was originally compiled under the auspices of the 1995 Mixed Waste Inventory Report. The data set has been updated over the past two years based on Site Treatment Plan revisions and clarifications provided by individual sites. The current data set is maintained by the MWFA staff and is known as MWFA97. In 1996, the MWFA developed waste groupings, process flow diagrams, and treatment train diagrams to systematically model the treatment of all mixed waste in the DOE complex. The purpose of the modeling process was to identify treatment gaps and corresponding technology development needs for the DOE complex. Each diagram provides the general steps needed to treat a specific type of waste. The NWFA categorized each MWFA97 waste stream by waste group, treatment train, and process flow. Appendices B through F provide the complete listing of waste streams by waste group, treatment train, and process flow. The MWFA97 waste strewn information provided in the appendices is defined in Table A-1.

  14. ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) (46.89 KB) More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS

  15. Using compressive sensing to recover images from PET scanners with partial detector rings

    SciTech Connect (OSTI)

    Valiollahzadeh, SeyyedMajid; Clark, John W.; Mawlawi, Osama

    2015-01-15

    Purpose: Most positron emission tomography/computed tomography (PET/CT) scanners consist of tightly packed discrete detector rings to improve scanner efficiency. The authors’ aim was to use compressive sensing (CS) techniques in PET imaging to investigate the possibility of decreasing the number of detector elements per ring (introducing gaps) while maintaining image quality. Methods: A CS model based on a combination of gradient magnitude and wavelet domains (wavelet-TV) was developed to recover missing observations in PET data acquisition. The model was designed to minimize the total variation (TV) and L1-norm of wavelet coefficients while constrained by the partially observed data. The CS model also incorporated a Poisson noise term that modeled the observed noise while suppressing its contribution by penalizing the Poisson log likelihood function. Three experiments were performed to evaluate the proposed CS recovery algorithm: a simulation study, a phantom study, and six patient studies. The simulation dataset comprised six disks of various sizes in a uniform background with an activity concentration of 5:1. The simulated image was multiplied by the system matrix to obtain the corresponding sinogram and then Poisson noise was added. The resultant sinogram was masked to create the effect of partial detector removal and then the proposed CS algorithm was applied to recover the missing PET data. In addition, different levels of noise were simulated to assess the performance of the proposed algorithm. For the phantom study, an IEC phantom with six internal spheres each filled with F-18 at an activity-to-background ratio of 10:1 was used. The phantom was imaged twice on a RX PET/CT scanner: once with all detectors operational (baseline) and once with four detector blocks (11%) turned off at each of 0 °, 90 °, 180 °, and 270° (partially sampled). The partially acquired sinograms were then recovered using the proposed algorithm. For the third test, PET images

  16. NREL Releases Updated Baseline of Cost and Performance Data for Electricity

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Generation Technologies | Grid Modernization | NREL Updated Baseline of Cost and Performance Data for Electricity Generation Technologies Webinar to be held on September 13 September 1, 2016 Graph-showing-NREL-2016-Annual-Technology-Baseline From NREL's 2016 Annual Technology Baseline, the projected Capital Expenditure (CAPEX) for electricity generating technologies in 2030. The Energy Department's National Renewable Energy Laboratory (NREL) has released the 2016 Annual Technology Baseline.

  17. Idaho National Laboratory’s Greenhouse Gas FY08 Baseline

    SciTech Connect (OSTI)

    Jennifer D. Morton

    2011-06-01

    A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13514 requires that federal agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INL's FY08 GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL's organizational boundaries but are a consequence of INL's activities). This inventory found that INL generated a total of 113,049 MT of CO2-equivalent emissions during FY08. The following conclusions were made from looking at the results of the individual contributors to INL's baseline GHG inventory: (1) Electricity (including the associated transmission and distribution losses) is the

  18. Idaho National Laboratory’s Greenhouse Gas FY08 Baseline

    SciTech Connect (OSTI)

    Jennifer D. Morton

    2010-09-01

    A greenhouse gas (GHG) inventory is a systematic attempt to account for the production and release of certain gasses generated by an institution from various emission sources. The gasses of interest are those which have become identified by climate science as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2008 by Idaho National Laboratory (INL), a Department of Energy (DOE)-sponsored entity, located in southeastern Idaho. Concern about the environmental impact of GHGs has grown in recent years. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of a baseline estimate of total GHGs generated at the INL. Additionally, the INL has a desire to see how its emissions compare with similar institutions, including other DOE-sponsored national laboratories. Executive Order 13514 requires that federally-sponsored agencies and institutions document reductions in GHG emissions in the future, and such documentation will require knowledge of a baseline against which reductions can be measured. INL’s FY08 GHG inventory was calculated according to methodologies identified in Federal recommendations and an as-yet-unpublished Technical and Support Document (TSD) using operational control boundary. It measures emissions generated in three Scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occur outside INL’s organizational boundaries but are a consequence of INL’s activities). This inventory found that INL generated a total of 114,256 MT of CO2-equivalent emissions during fiscal year 2008 (FY08). The following conclusions were made from looking at the results of the individual contributors to INL

  19. EM Quality Assurance Policy, Revision 0 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Policy, Revision 0 EM Quality Assurance Policy, Revision 0 Previous EM policy on the use of the corporate Quality Assurance Program (EM-QA-001 Rev. 0). This document has been superseded by Revision 1 of the policy, but is still in use at some EM sites. EM Quality Assurance Policy, Revision 0 (259.04 KB) More Documents & Publications Line Management Understanding of QA and Oversight EM Quality Assurance Program (EM-QA-001 Revision 0) QA Corporate Board Meeting - February 2010 (Teleconference)

  20. T-606: Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data

    Energy.gov [DOE]

    Sun Java System Access Manager Lets Remote Users Partially Modify Data and Remote Authenticated Users Partially Access Data.

  1. Pentek metal coating removal system: Baseline report; Greenbook (chapter)

    SciTech Connect (OSTI)

    1997-07-31

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  2. Ultra-high pressure water jet: Baseline report

    SciTech Connect (OSTI)

    1997-07-31

    The ultra-high pressure waterjet technology was being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The ultra-high pressure waterjet technology acts as a cutting tool for the removal of surface substrates. The Husky{trademark} pump feeds water to a lance that directs the high pressure water at the surface to be removed. The safety and health evaluation during the testing demonstration focused on two main areas of exposure. These were dust and noise. The dust exposure was found to be minimal, which would be expected due to the wet environment inherent in the technology, but noise exposure was at a significant level. Further testing for noise is recommended because of the outdoor environment where the testing demonstration took place. In addition, other areas of concern found were arm-hand vibration, ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, fall hazards, slipping hazards, hazards associated with the high pressure water, and hazards associated with air pressure systems.

  3. Pentek concrete scabbling system: Baseline report; Greenbook (chapter)

    SciTech Connect (OSTI)

    1997-07-31

    The Pentek scabbling technology was tested at Florida International University (FIU) and is being evaluated as a baseline technology. This report evaluates it for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek concrete scabbling system consisted of the MOOSE, SQUIRREL-I, and SQUIRREL-III scabblers. The scabblers are designed to scarify concrete floors and slabs using cross-section, tungsten carbide tipped bits. The bits are designed to remove concrete in 318 inch increments. The bits are either 9-tooth or demolition type. The scabblers are used with a vacuum system designed to collect and filter the concrete dust and contamination that is removed from the surface. The safety and health evaluation conducted during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure was minimal, but noise exposure was significant. Further testing for each of these exposures is recommended. Because of the outdoor environment where the testing demonstration took place, results may be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed operating environment. Other areas of concern were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  4. LTC vacuum blasting machine (metal) baseline report: Greenbook (chapter)

    SciTech Connect (OSTI)

    1997-07-31

    The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  5. LTC vacuum blasting maching (concrete): Baseline report: Greenbook (Chapter)

    SciTech Connect (OSTI)

    1997-07-31

    The LTC shot blast technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjuction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC 1073 Vacuum Blasting Machine uses a high-capacity, direct-pressure blasting system which incorporates a continuous feed for the blast media. The blast media cleans the surface within the contained brush area of the blast. It incorporates a vacuum system which removes dust and debris from the surface as it is blasted. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure during maintenance activities was minimal, but due to mechanical difficulties dust monitoring could not be conducted during operation. Noise exposure was significant. Further testing for each of these exposures is recommended because of the outdoor environment where the testing demonstration took place. This may cause the results to be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed environment. In addition, other safety and health issues found were ergonomics, heat stress, tripping hazards, electrical hazards, lockout/tagout, and arm-hand vibration.

  6. A SURVEY OF ASTRONOMICAL RESEARCH: A BASELINE FOR ASTRONOMICAL DEVELOPMENT

    SciTech Connect (OSTI)

    Ribeiro, V. A. R. M.; Russo, P.; Crdenas-Avendao, A. E-mail: russo@strw.leidenuniv.nl

    2013-12-01

    Measuring scientific development is a difficult task. Different metrics have been put forward to evaluate scientific development; in this paper we explore a metric that uses the number of peer-reviewed, and when available non-peer-reviewed, research articles as an indicator of development in the field of astronomy. We analyzed the available publication record, using the Smithsonian Astrophysical Observatory/NASA Astrophysics Database System, by country affiliation in the time span between 1950 and 2011 for countries with a gross national income of less than 14,365 USD in 2010. This represents 149 countries. We propose that this metric identifies countries in ''astronomical development'' with a culture of research publishing. We also propose that for a country to develop in astronomy, it should invest in outside expert visits, send its staff abroad to study, and establish a culture of scientific publishing. Furthermore, we propose that this paper may be used as a baseline to measure the success of major international projects, such as the International Year of Astronomy 2009.

  7. Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

    1994-01-01

    This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

  8. Fort Stewart integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Keller, J.M.; Sullivan, G.P.; Wahlstrom, R.R.; Larson, L.L.

    1993-08-01

    This report documents the assessment of baseline energy use at Fort Stewart, a US Army Forces Command facility located near Savannah, Georgia. This is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. PNL, in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP), has designed a model program applicable to the federal sector for this purpose. The model program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Stewart. The analysis examines the characteristics of electric, natural gas, oil, propane, and wood chip use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Fort Stewart by building type, fuel type, and energy end use. A complete energy consumption reconciliation is presented that accounts for the distribution of all major energy uses and losses among buildings, utilities, and central systems.

  9. Conceptual baseline document for the nuclear materials safeguards system

    SciTech Connect (OSTI)

    Nelson, R.A.

    1995-08-01

    This document defines the baseline scope, schedule, and cost requirements of the Nuclear Materials Safeguards System (NMSS) replacement for the Plutonium Finishing Plant. The Nuclear Material Safeguards System (NMSS), operating in PFP, comprises data from several site safeguards systems that have been merged since 1987. NMSS was designed and implemented to the state of computer technology for the mid 1970`s. Since implementation, the hardware vendor has stopped producing computer systems and the availability of personnel trained and willing to work with the technology has diminished. Maintenance has become expensive and `reliability is a serious concern. -This effort provides a replacement in kind of the NMSS, using modern, scalable, upgradable hardware and software to the same standards used for the Hanford Local Area Network (HLAN) system. The NMSS Replacement is a Client/Server architecture designed on a Personal Computer based local area network (LAN) platform. The LAN is provided through an ethernet interface running the Transmission Control Protocol/Internet Protocol (TCP/IP). This architecture conforms to the HLAN standard, including the End System Operating Environment (ESOE). The Server runs the Microsoft Windows NT` Server operating system, Microsoft SQL Server2 database management system, and application tools. Clients run Microsoft Windows` and application software provided as part of the system. The interface between the clients and the database is through Microsoft ODBC4.

  10. Fort Lewis electric energy baseline and efficiency resource assessment

    SciTech Connect (OSTI)

    Secrest, T.J.; Currie, J.W.; DeSteese, J.G.; Dirks, J.A.; Marseille, T.J.; Parker, G.B.; Richman, E.E.; Shankle, S.A.

    1991-10-01

    In support of the US DOE Federal Energy Management Program, the Pacific Northwest Laboratory is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations. Fort Lewis, a US Army installation near Tacoma, Washington, was selected as the pilot site for developing this approach. This site was chosen in conjunction with the interests of the Bonneville Power Administration to develop programs for its federal sector customers and the Army Forces Command to develop an in-house program to upgrade the energy efficiency of its installations. This report documents the electricity assessment portion of the approach, providing an estimate of the electricity use baseline and efficiency improvement potential for major sectors and end uses at the Fort. Although the assessment did not identify all possible efficiency improvement opportunities, it is estimated that electricity use can be reduced by at least 20% cost-effectively at the $0.045/kWh marginal cost of electricity in the Pacific Northwest. 12 refs., 3 figs., 7 tabs.

  11. ATIC as a testbed for the ACCESS baseline calorimeter

    SciTech Connect (OSTI)

    Isbert, J.; Authement, J.; Coleman, J.; Guzik, T. G.; Granger, D.; Lockwood, R.; McMorris, A.; Mock, L.; Oubre, C.; Panasyuk, M.; Peck, J.; Wefel, J. P.; Adams, J. H. Jr.; Boberg, P. R.; Dion-Schwarz, C.; Kroeger, R.; Bashindzhagyan, G. B.; Khein, L.; Samsonov, G. A.; Zatsepin, V. I.

    1999-01-22

    The Advanced Thin Ionization Calorimeter (ATIC) balloon experiment is designed to measure the spectrum of individual elements from H through Fe up to a total energy >10{sup 14} eV. To accomplish this goal, ATIC incorporates a Silicon matrix detector composed of more than 4,000 pixels to measure the incident particle charge in the presence of backscatter background, three plastic scintillator hodoscopes to provide an event trigger as well as a backup measurement of the particle charge and trajectory, a 3/4 interaction length carbon target and a fully active ionization calorimeter composed of 22 radiation lengths of Bismuth Germanate (BGO) crystals. This detector complement is very similar to the baseline calorimeter for the Advanced Cosmic Ray Composition Experiment for the Space Station, ACCESS. The ATIC flights can be used to evaluate such a calorimeter in the cosmic ray 'beam.' ATIC integration is currently underway with a first flight expected during 1999. This talk will discuss ATIC as it applies to ACCESS.

  12. Neutrino Oscillation Parameter Sensitivity in Future Long-Baseline Experiments

    SciTech Connect (OSTI)

    Bass, Matthew

    2014-01-01

    The study of neutrino interactions and propagation has produced evidence for physics beyond the standard model and promises to continue to shed light on rare phenomena. Since the discovery of neutrino oscillations in the late 1990s there have been rapid advances in establishing the three flavor paradigm of neutrino oscillations. The 2012 discovery of a large value for the last unmeasured missing angle has opened the way for future experiments to search for charge-parity symmetry violation in the lepton sector. This thesis presents an analysis of the future sensitivity to neutrino oscillations in the three flavor paradigm for the T2K, NO A, LBNE, and T2HK experiments. The theory of the three flavor paradigm is explained and the methods to use these theoretical predictions to design long baseline neutrino experiments are described. The sensitivity to the oscillation parameters for each experiment is presented with a particular focus on the search for CP violation and the measurement of the neutrino mass hierarchy. The variations of these sensitivities with statistical considerations and experimental design optimizations taken into account are explored. The effects of systematic uncertainties in the neutrino flux, interaction, and detection predictions are also considered by incorporating more advanced simulations inputs from the LBNE experiment.

  13. Scientific Opportunities with the Long-Baseline Neutrino Experiment

    SciTech Connect (OSTI)

    Adams, C.; et al.,

    2013-07-28

    In this document, we describe the wealth of science opportunities and capabilities of LBNE, the Long-Baseline Neutrino Experiment. LBNE has been developed to provide a unique and compelling program for the exploration of key questions at the forefront of particle physics. Chief among the discovery opportunities are observation of CP symmetry violation in neutrino mixing, resolution of the neutrino mass hierarchy, determination of maximal or near-maximal mixing in neutrinos, searches for nucleon decay signatures, and detailed studies of neutrino bursts from galactic supernovae. To fulfill these and other goals as a world-class facility, LBNE is conceived around four central components: (1) a new, intense wide-band neutrino source at Fermilab, (2) a fine-grained `near' neutrino detector just downstream of the source, (3) the Sanford Underground Research Facility (SURF) in Lead, South Dakota at an optimal distance (~1300 km) from the neutrino source, and (4) a massive liquid argon time-projection chamber (LArTPC) deployed there as a 'far' detector. The facilities envisioned are expected to enable many other science opportunities due to the high event rates and excellent detector resolution from beam neutrinos in the near detector and atmospheric neutrinos in the far detector. This is a mature, well developed, world class experiment whose relevance, importance, and probability of unearthing critical and exciting physics has increased with time.

  14. Future Long-Baseline Neutrino Oscillations: View from North America

    SciTech Connect (OSTI)

    Wilson, R. J.

    2015-06-01

    In late 2012 the US Department of Energy gave approval for the first phase of the Long-Baseline Neutrino Experiment (LBNE), that will conduct a broad scientific program including neutrino oscillations, neutrino scattering physics, search for baryon violation, supernova burst neutrinos and other related astrophysical phenomena. The project is now being reformulated as an international facility hosted by the United States. The facility will consist of an intense neutrino beam produced at Fermi National Accelerator Laboratory (Fermilab), a highly capable set of neutrino detectors on the Fermilab campus, and a large underground liquid argon time projection chamber at Sanford Underground Research Facility (SURF) in South Dakota 1300 km from Fermilab. With an intense beam and massive far detector, the experimental program at the facility will make detailed studies of neutrino oscillations, including measurements of the neutrino mass hierarchy and Charge-Parity symmetry violation, by measuring neutrino and anti-neutrino mixing separately. At the near site, the high-statistics neutrino scattering data will allow for many cross section measurements and precision tests of the Standard Model. This presentation will describe the configuration developed by the LBNE collaboration, the broad physics program, and the status of the formation of the international facility.

  15. Development Of Regional Climate Mitigation Baseline For A DominantAgro-Ecological Zone Of Karnataka, India

    SciTech Connect (OSTI)

    Sudha, P.; Shubhashree, D.; Khan, H.; Hedge, G.T.; Murthy, I.K.; Shreedhara, V.; Ravindranath, N.H.

    2007-06-01

    Setting a baseline for carbon stock changes in forest andland use sector mitigation projects is an essential step for assessingadditionality of the project. There are two approaches for settingbaselines namely, project-specific and regional baseline. This paperpresents the methodology adopted for estimating the land available formitigation, for developing a regional baseline, transaction cost involvedand a comparison of project-specific and regional baseline. The studyshowed that it is possible to estimate the potential land and itssuitability for afforestation and reforestation mitigation projects,using existing maps and data, in the dry zone of Karnataka, southernIndia. The study adopted a three-step approach for developing a regionalbaseline, namely: i) identification of likely baseline options for landuse, ii) estimation of baseline rates of land-use change, and iii)quantification of baseline carbon profile over time. The analysis showedthat carbon stock estimates made for wastelands and fallow lands forproject-specific as well as the regional baseline are comparable. Theratio of wasteland Carbon stocks of a project to regional baseline is1.02, and that of fallow lands in the project to regional baseline is0.97. The cost of conducting field studies for determination of regionalbaseline is about a quarter of the cost of developing a project-specificbaseline on a per hectare basis. The study has shown the reliability,feasibility and cost-effectiveness of adopting regional baseline forforestry sectormitigation projects.

  16. Guidance document for revision of DOE Order 5820.2A, Radioactive Waste Technical Support Program. Revision 1

    SciTech Connect (OSTI)

    Kudera, D.E.; McMurtrey, C.D.; Meagher, B.G.

    1993-04-01

    This document provides guidance for the revision of DOE Order 5820.2A, ``Radioactive Waste Management.`` Technical Working Groups have been established and are responsible for writing the revised order. The Technical Working Groups will use this document as a reference for polices and procedures that have been established for the revision process. The overall intent of this guidance is to outline how the order will be revised and how the revision process will be managed. In addition, this document outlines technical issues considered for inclusion by a Department of Energy Steering Committee.

  17. Supplier Information Form Date: New Revision

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Supplier Information Form Date: New Revision Interested suppliers may complete and submit a Supplier Information Form to be included into LANS' vendor database. Suppliers are advised that there is no guarantee any solicitations or awards will be sent to Supplier by submitting a Supplier Information Form; however, in the event a solicitation is sent to the Supplier from an LANS Procurement Official, then a more formal quotation/offer may be required. Legal Business Name: D/B/A: (if applicable)

  18. Coal within a revised energy perspective

    SciTech Connect (OSTI)

    Darmstadter, J.

    2006-07-15

    The author considers the use of coal within a revised energy perspective, focusing on the factors that will drive which fuels are used to generate electricity going forward. He looks at the world markets for fossil fuels and the difficulties of predicting oil and natural gas supply and prices, as demonstrated by the variability in projections from one year to another in the EIA's Annual Energy Outlook. 4 refs., 1 tab.

  19. India's baseline plan for nuclear energy self-sufficiency.

    SciTech Connect (OSTI)

    Bucher, R .G.; Nuclear Engineering Division

    2009-01-01

    India's nuclear energy strategy has traditionally strived for energy self-sufficiency, driven largely by necessity following trade restrictions imposed by the Nuclear Suppliers Group (NSG) following India's 'peaceful nuclear explosion' of 1974. On September 6, 2008, the NSG agreed to create an exception opening nuclear trade with India, which may create opportunities for India to modify its baseline strategy. The purpose of this document is to describe India's 'baseline plan,' which was developed under constrained trade conditions, as a basis for understanding changes in India's path as a result of the opening of nuclear commerce. Note that this treatise is based upon publicly available information. No attempt is made to judge whether India can meet specified goals either in scope or schedule. In fact, the reader is warned a priori that India's delivery of stated goals has often fallen short or taken a significantly longer period to accomplish. It has been evident since the early days of nuclear power that India's natural resources would determine the direction of its civil nuclear power program. It's modest uranium but vast thorium reserves dictated that the country's primary objective would be thorium utilization. Estimates of India's natural deposits vary appreciably, but its uranium reserves are known to be extremely limited, totaling approximately 80,000 tons, on the order of 1% of the world's deposits; and nominally one-third of this ore is of very low uranium concentration. However, India's roughly 300,000 tons of thorium reserves account for approximately 30% of the world's total. Confronted with this reality, the future of India's nuclear power industry is strongly dependent on the development of a thorium-based nuclear fuel cycle as the only way to insure a stable, sustainable, and autonomous program. The path to India's nuclear energy self-sufficiency was first outlined in a seminal paper by Drs. H. J. Bhabha and N. B. Prasad presented at the Second

  20. Long-Term Stewardship Baseline Report and Transition Guidance

    SciTech Connect (OSTI)

    Kristofferson, Keith

    2001-11-01

    Long-term stewardship consists of those actions necessary to maintain and demonstrate continued protection of human health and the environment after facility cleanup is complete. As the Department of Energys (DOE) lead laboratory for environmental management programs, the Idaho National Engineering and Environmental Laboratory (INEEL) administers DOEs long-term stewardship science and technology efforts. The INEEL provides DOE with technical, and scientific expertise needed to oversee its long-term environmental management obligations complexwide. Long-term stewardship is administered and overseen by the Environmental Management Office of Science and Technology. The INEEL Long-Term Stewardship Program is currently developing the management structures and plans to complete INEEL-specific, long-term stewardship obligations. This guidance document (1) assists in ensuring that the program leads transition planning for the INEEL with respect to facility and site areas and (2) describes the classes and types of criteria and data required to initiate transition for areas and sites where the facility mission has ended and cleanup is complete. Additionally, this document summarizes current information on INEEL facilities, structures, and release sites likely to enter long-term stewardship at the completion of DOEs cleanup mission. This document is not intended to function as a discrete checklist or local procedure to determine readiness to transition. It is an overarching document meant as guidance in implementing specific transition procedures. Several documents formed the foundation upon which this guidance was developed. Principal among these documents was the Long-Term Stewardship Draft Technical Baseline; A Report to Congress on Long-Term Stewardship, Volumes I and II; Infrastructure Long-Range Plan; Comprehensive Facility Land Use Plan; INEEL End-State Plan; and INEEL Institutional Plan.

  1. Fort Drum integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  2. Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

    1993-02-01

    The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

  3. Partial ASL extensions for stochastic programming.

    Energy Science and Technology Software Center (OSTI)

    2010-03-31

    partially completed extensions for stochastic programming to the AMPL/solver interface library (ASL).modeling and experimenting with stochastic recourse problems. This software is not primarily for military applications

  4. Hot Plasma Partial to Bootstrap Current

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hot Plasma Partial to Bootstrap Current Hot Plasma Partial to Bootstrap Current New calculations shed light on self-generated current, which could help reduce fusion reactor costs July 9, 2014 Kathy Kincade, +1 510 495 2124, kkincade@lbl.gov Supercomputers at NERSC are helping plasma physicists "bootstrap" a potentially more affordable and sustainable fusion reaction. If successful, fusion reactors could provide almost limitless clean energy. In a fusion reaction, energy is released

  5. Fast Flux Test Facility transition project resource loaded schedule. Revision 1

    SciTech Connect (OSTI)

    Hulvey, R.K.

    1994-10-31

    Revision 1 of the Fast Flux Test Facility (FFTF) Transition Project Resource Loaded Schedule (RLS) provides detail to manage the major elements, project baseline and cost estimate for the FFF Transition Project within the Advanced Reactors Transition Program, comprised of Activity Data Sheets (ADS) 6640, 6641, and 6642. The scope includes all work in the Budget and Reporting categories of Program Integration (PI), Surveillance and Maintenance (S and M), and Deactivation/Compliance (D/C). The transition activities are necessary to bring the FFTF and related facilities to a safe deactivation state, while maintaining worker health and safety. The scope of ADS 6640 and 6642 is the FFTF Transition Project while the scope of ADS 6641 is the Hanford Site Nuclear Energy Legacies.

  6. NREL Releases Updated Baseline of Cost and Performance Data for Electricity

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Generation Technologies | Energy Systems Integration | NREL Releases Updated Baseline of Cost and Performance Data for Electricity Generation Technologies Webinar to be held on September 13 September 1, 2016 Graph-showing-NREL-2016-Annual-Technology-Baseline From NREL's 2016 Annual Technology Baseline, the projected Capital Expenditure (CAPEX) for electricity generating technologies in 2030. The Energy Department's National Renewable Energy Laboratory (NREL) has released the 2016 Annual

  7. NREL Releases Updated Baseline of Cost and Performance Data for Electricity

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Generation Technologies - News Releases | NREL Releases Updated Baseline of Cost and Performance Data for Electricity Generation Technologies Webinar to be held on September 13 September 1, 2016 Graph-showing-NREL-2016-Annual-Technology-Baseline From NREL's 2016 Annual Technology Baseline, the projected Capital Expenditure (CAPEX) for electricity generating technologies in 2030. The Energy Department's National Renewable Energy Laboratory (NREL) has released the 2016 Annual Technology

  8. EVMS Training Snippet: 4.2 Integrated Baseline Review (IBR) Process

    Energy.gov [DOE]

    This EVMS Training Snippet sponsored by the Office of Project Management (PM) covers the Integrated Baseline Review (IBR) process. 

  9. Spent nuclear fuel technical baseline description, Fiscal Year 1996: Volume II, supporting data

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-11-01

    The Technical Baseline Description documents the Project-Level functions and requirements, along with associated enabling assumptions, issues, trade studies, interfaces, and products. It is a snapshot in time of the baseline at the beginning of September 1995. It supports the individual subprojects in the development of lower-tier functions, requirements, and specifications in FY 1996. It also supports the need for Hanford site planning to be based on an integrated Hanford site systems engineering technical baseline; and is traceable to that baseline. This document replaces and supercedes WHC-SD-SNF-SD-003.

  10. LEDSGP/Transportation Toolkit/Key Actions/Create a Baseline ...

    Open Energy Information (Open El) [EERE & EIA]

    a Baseline) Jump to: navigation, search LEDSGP Logo.png Transportation Toolkit Home Tools Training Request Assistance Key Actions for Low-Emission Development in Transportation...

  11. U.S. Department of Energy Performance Baseline Guide - DOE Directives...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    5A, U.S. Department of Energy Performance Baseline Guide by Brian Kong Functional areas: Program Management, Project Management, Work Processes This guide identifies key PB...

  12. EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and...

    Office of Environmental Management (EM)

    EVMS Training Snippet: 4.1 The Over Target Baseline (OTB) and The Over Target Schedule (OTS) Implementations This EVMS Training Snippet, sponsored by the Office of Project ...

  13. HNF-53665 Revision 0 Steelhead Redd Monitoring Report for

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    665 Revision 0 Steelhead Redd Monitoring Report for Calendar Year 2012 Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Contractor for the U.S. Department of Energy under Contract DE-AC06-09RL14728 P.O. Box 650 Richland, Washington 99352 Approved for Public Release; Further Dissemination Unlimited HNF-53665 Revision 0 This page intentionally left blank. HNF-53665 Revision 0 Steelhead Redd Monitoring Report for Calendar Year 2012 Document Type: RPT

  14. Audit/Investigative Records Schedule (Revision 2) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Audit/Investigative Records Schedule (Revision 2) Audit/Investigative Records Schedule (Revision 2) This schedule covers both records associated with investigations other than those performed by the Office of the Inspector General (OIG) as well as records created by the Department's OIG investigations. Audit/Investigative Records Schedule (Revision 2) (21.38 KB) More Documents & Publications Audit/Investigation Records ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING, AND

  15. ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and personal property surplus to the needs of the Government. ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) (13.24 KB) More Documents & Publications PROPERTY DISPOSAL RECORDS ADMINISTRATIVE RECORDS: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3:

  16. DOE Requests Information on Potential New or Revised Categorical Exclusions

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy on Potential New or Revised Categorical Exclusions DOE Requests Information on Potential New or Revised Categorical Exclusions December 22, 2009 - 10:33am Addthis The U.S. Department of Energy intends to update its National Environmental Policy Act (NEPA) categorical exclusions, and has posted a request for information on the NEPA website to seek input from interested individuals and organizations regarding new or revised categorical exclusions. Addthis Related

  17. Ohio Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Revision Decreases (Billion Cubic Feet) Ohio Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 1 2010's 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Decreases

  18. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy DOE Acquisition Guide Chapter 7.1 Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Acquisition Guide Chapter 7.1 is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. Revisions to the guide chapter add to

  19. EIS-0486: Mitigation Action Plan Revision 1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6: Mitigation Action Plan Revision 1 EIS-0486: Mitigation Action Plan Revision 1 Plains & Eastern Clean Line Transmission Project DOE issued a Mitigation Action Plan that explains how mitigation measures, which have been designed to mitigate adverse environmental impacts associated with the course of action directed by the Record of Decision, will be planned and implemented. DOE issued Revision 1 of the Mitigation Action Plan in October 2016. For more information visit the project page:

  20. Classification Bulletin GEN-16 Revision 2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bulletin GEN-16 Revision 2 Classification Bulletin GEN-16 Revision 2 Provides guidance to DOE Federal and contractor employees with access to classified information on appropriate actions when classified information (i.e., Restricted Data (RD), Formerly Restricted Data (FRD), Transclassified Foreign Nuclear Information (IFNI), National Security Information (NSI)) appears in the open literature and to clarify the circumstances that constitute comment. Classification Bulletin GEN-16 Revision 2

  1. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Environmental Management (EM)

    Department of Energy is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. Revisions to the guide chapter add to references FAR 17.5 and related guide chapter 17.1. Also, two revisions in the chapter are identified by vertical lines in the

  2. Management plan for revision for DOE Order 5820. 2A

    SciTech Connect (OSTI)

    Kudera, D.E.; McMurtrey, C.D.

    1993-02-01

    This document discusses how the US Department of Energy (DOE) will manage the revision of DOE Order 5820.2A, Radioactive Waste Management,'' and describes personnel involved in the effort, estimated cost and schedule, and administrative and reporting requirements. The organizational structure and responsibilities and approval authorities for the revision are discussed. A planning package is included that provides details on the schedule, budget, and justification and assumptions used in developing the plan for revision.

  3. Revised Acquisition Guide Chapter 42.5, Contract Management Planning

    Energy.gov (indexed) [DOE]

    policyguidancepolicyflashes.htm. Questions concerning the revised Acquisition Guide chapter may be addressed to Mike Larson at (202) 287-1426 or Michael.Larson@hq.doe.gov....

  4. Microsoft Word - Transmittal Revised B6 Checlist and Additional...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    the Idaho National LaboratoryCentral Characterization Project Remote-Handled Waste Visual Examination Process, Audit A-10-03 Dear Mr. Zappe: This letter transmits the revised...

  5. Recently Added or Revised "Slice" Information (contracts/slice...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Product Recently Added or Revised Information (updated November 2, 2011) Applicable Interest Rates for Slice Product (updated November 2, 2011) Slice Product Review Meeting...

  6. Microsoft Word - Revision 2 06-16-2014.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Sheet - Revision 2 - June 2014 A. Waste Generator or Classified Matter Originator Information 1. Company name: 2. Address: 3. GeneratorOriginator Facility: 4. Primary Technical ...

  7. EIS-0463: Revision to EPA Notice Of Availability Draft Environmental...

    Energy.gov (indexed) [DOE]

    Download Document EIS-0463: Revision to EPA Notice Of Availability Draft Environmental Impact Statement (195.62 KB) More Documents & Publications EIS-0515: EPA Notice of ...

  8. CEQ Extends Comment Period on Revised Draft Guidance on Consideration...

    Energy Savers

    Extends Comment Period on Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Extends Comment Period on ...

  9. SUMMARY OF REVISED TORNADO, HURRICANE AND EXTREME STRAIGHT WIND...

    Office of Environmental Management (EM)

    N E T SUMMARY OF REVISED TORNADO, HURRICANE AND EXTREME STRAIGHT WIND CHARACTERISTICS AT ... (1) natural hazard phenomenon (earthquake, wind, flooding and precipitation) and ...

  10. Microsoft Word - CCP-TP-030-Revision 33 (Obsolete)

    Office of Environmental Management (EM)

    Project Corrective Active Report CAR 08-025, deleted Characterization Data ... 31 11192012 Revised to address CAR-CCP-0003-12 and various editorial changes. ...

  11. WPN 98-3- Revised Weatherization Assistance Program Application Package

    Energy.gov [DOE]

    To issue the revised application package and reporting requirements for the low-income Weatherization Assistance Program for use by the states.

  12. Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    71.1 Headquarters Business Clearance Process Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process There was mention in the National Academy of Public ...

  13. Hawaii Revised Statute 523A-2, Definition of Mineral Resources...

    Open Energy Information (Open El) [EERE & EIA]

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Hawaii Revised Statute 523A-2, Definition of Mineral Resources Citation...

  14. EIS-0183: Revised Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (FCRTS) of, the 846-megawatt (MW) Shepherds. PDF icon DOEEIS-0183, Revised Record of Decision for Offer of Conditional Commitment for a Loan Guarantee for, and Electrical...

  15. Draft Revised Guidelines for Implementing Executive Order 11988, "Floodplain Management"

    Energy.gov [DOE]

    The Federal Emergency Management Agency published the draft Revised Guidelines for Implementing Executive Order 11988, Floodplain Management for public review and comment on January 30, 2015.

  16. EIS-0200: Revision to the Record of Decision | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (DOE) is revising the Record of Decision (ROD) for its Waste Management Program: Treatment and Storage of Transuranic Waste prepared pursuant to the Waste Management...

  17. U.S. Coalbed Methane Proved Reserves Revision Increases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Revision Increases ... Release Date: 11192015 Next Release Date: 12312016 Referring Pages: Coalbed Methane ...

  18. U.S. Coalbed Methane Proved Reserves Revision Decreases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Revision Decreases ... Release Date: 11192015 Next Release Date: 12312016 Referring Pages: Coalbed Methane ...

  19. Revised Merit Review Guide for Financial Assistance, JULY 2013

    Energy.gov [DOE]

    The Merit Review Guide for Financial Assistance along with Attachments 2 and 3 of the Guide have been revised. Revisions include correcting references to attachments and updating of the information presented in the Guide and Attachments to reflect the new requirements of the Whistleblower Protection Enhancement Act of 2012. The revised documents can be found at http://energy.gov/management/downloads/policy-flash-2013-38-revised-meri... and are labeled: Merit Review Guide FINAL JULY 2013, ATTACHMENT 2 Sample COI ADDED WB LANGUAGE JULY 2013.docx and ATTACHMENT 3 - Sample Evaluation and Selection Plan JULY 2013.docx.

  20. Major Process Revision of WP&C - Lessons Learned | Department...

    Energy.gov (indexed) [DOE]

    Hazard AnalysisControl Subject Matter Expert Involvement Expectations for Workers Lessons Learned Major Process Revision of WP&C - Lessons Learned More Documents &...

  1. Revisions to FAR Part 17 Special Contracting Methods and Part...

    Energy.gov (indexed) [DOE]

    and Assistance Management SUBJECT: Revisions to FAR Part 17 Special Contracting Methods and Part 35 Research and Development Contracting SUMMARY: The Federal Register (77 FR...

  2. Revised DRAFT NEPA Guidance on Consideration of the Effects of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Climate Change and Greenhouse Gas Emissions (DOE, 2014) Revised DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions (DOE, ...

  3. Microsoft Word - CCP-PO-001-Revision 21

    Office of Environmental Management (EM)

    Effective Date: Nuclear Waste Partnership Carlsbad, NM CCP-PO-001 Revision 21 CCP Transuranic Waste Characterization Quality Assurance Project Plan INFORMATION ONLY CCP-PO-001, ...

  4. Microsoft Word - CCP-PO-002-Revision 27

    Office of Environmental Management (EM)

    Effective Date: CCP-PO-002 Revision 27 CCP Transuranic Waste Certification Plan INFORMATION ONLY CCP-PO-002, Rev. 27 Effective Date: 05312013 CCP Transuranic Waste Certification ...

  5. IAEA Information Circular 225 Revision 5: Fact Sheet | National...

    National Nuclear Security Administration (NNSA)

    ... Finally, INFCIRC225Revision 5 provides clearer physical protection guidance for states that may be developing peaceful nuclear energy for the first time. US Efforts to Implement ...

  6. Section 20320 of the Revised Continuing Appropriations Resolution...

    Energy.gov (indexed) [DOE]

    20320 of the Revised Continuing Appropriations Resolution More Documents & Publications ENERGY POLICY ACT OF 2005 Energy Policy Act of 2005 Section 129 of the Consolidated...

  7. On partially massless theory in 3 dimensions

    SciTech Connect (OSTI)

    Alexandrov, Sergei; Deffayet, Cédric

    2015-03-24

    We analyze the first-order formulation of the ghost-free bigravity model in three-dimensions known as zwei-dreibein gravity. For a special choice of parameters, it was argued to have an additional gauge symmetry and give rise to a partially massless theory. We provide a thorough canonical analysis and identify that whether the theory becomes partially massless depends on the form of the stability condition of the secondary constraint responsible for the absence of the ghost. Generically, it is found to be an equation for a Lagrange multiplier implying that partially massless zwei-dreibein gravity does not exist. However, for special backgrounds this condition is identically satisfied leading to the presence of additional symmetries, which however disappear at quadratic order in perturbations.

  8. Partial discharge and the measurement in GIS

    SciTech Connect (OSTI)

    Han Xiaolian; Feng Yunping; Qiu Yuchang; Zheng Xiaoguang; Chen Jinqing

    1996-12-31

    The focal point of this paper is to study on the partial discharge on-line diagnostic measurement system in GIS from the aspect of electrical measurement assuming that there were not any measurement devices before the GIS being put to use. A length of coaxial cable was wound on a magnetic ring. Also by the use of an impedance alternator, a higher sensitivity was realized. The coil sensor and antenna sensor are the important parts of the perfect partial discharge measurement system in GIS. The sensitivities of the sensors were determined by comparing to the charge quantity measured by 50{Omega} resistance. The characteristics of the partial discharge that was produced by the fixed protrusion, free particles and the surface contamination on spacer was studied in the GIS simulating system.

  9. Test documentation for converting TWRS baseline data from RDD-100 V3.0.2.2 to V4.0.3. Revision 1

    SciTech Connect (OSTI)

    Gneiting, B.C.; Johnston, M.E.

    1996-05-03

    This document describes the test documentation required for converting between two versions of the RDD-100 software application, specifically version 3.0.2.2 and version 4.0.3. The area of focus in the successful conversion of the master data set between two versions of the database tool and their corresponding data structures.

  10. DEVICE FOR CONTROL OF OXYGEN PARTIAL PRESSURE

    DOE Patents [OSTI]

    Bradner, H.; Gordon, H.S.

    1957-12-24

    A device is described that can sense changes in oxygen partial pressure and cause a corresponding mechanical displacement sufficient to actuate meters, valves and similar devices. A piston and cylinder arrangement contains a charge of crystalline metal chelate pellets which have the peculiar property of responding to variations in the oxygen content of the ambient atmosphere by undergoing a change in dimension. A lever system amplifies the relative displacement of the piston in the cylinder, and actuates the controlled valving device. This partial pressure oxygen sensing device is useful in controlled chemical reactions or in respiratory devices such as the oxygen demand meters for high altitude aircraft.

  11. Partial Shading in Monolithic Thin Film PV Modules: Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Partial Shading in Monolithic Thin Film PV Modules: Analysis and Design Partial Shading in Monolithic Thin Film PV Modules: Analysis and Design Presented at the PV Module ...

  12. Partial Defect Testing of Pressurized Water Reactor Spent Fuel...

    Office of Scientific and Technical Information (OSTI)

    Partial Defect Testing of Pressurized Water Reactor Spent Fuel Assemblies Citation Details In-Document Search Title: Partial Defect Testing of Pressurized Water Reactor Spent Fuel ...

  13. Partial Shade Stress Test for Thin-Film Photovoltaic Modules...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Partial Shade Stress Test for Thin-Film Photovoltaic Modules Preprint Timothy J. ... Partial shade stress test for thin-film photovoltaic modules Timothy J Silverman , ...

  14. Partial Collapse and Reswelling of a Polymer in the Critical...

    Office of Scientific and Technical Information (OSTI)

    Publisher's Accepted Manuscript: Partial Collapse and Reswelling of a Polymer in the Critical Demixing Region of Good Solvents Prev Next Title: Partial Collapse and ...

  15. System maintenance test plan for the TWRS controlled baseline database system

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    TWRS [Tank Waste Remediation System] Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the maintenance testing approach for software testing of the TCBD system once SCR/PRs are implemented.

  16. Methods for producing partially digested restriction DNA fragments and for producing a partially modified PCR product

    DOE Patents [OSTI]

    Wong, Kwong-Kwok

    2000-01-01

    The present invention is an improved method of making a partially modified PCR product from a DNA fragment with a polymerase chain reaction (PCR). In a standard PCR process, the DNA fragment is combined with starting deoxynucleoside triphosphates, a primer, a buffer and a DNA polymerase in a PCR mixture. The PCR mixture is then reacted in the PCR producing copies of the DNA fragment. The improvement of the present invention is adding an amount of a modifier at any step prior to completion of the PCR process thereby randomly and partially modifying the copies of the DNA fragment as a partially modified PCR product. The partially modified PCR product may then be digested with an enzyme that cuts the partially modified PCR product at unmodified sites thereby producing an array of DNA restriction fragments.

  17. Policy Flash 2013-38 Revised Merit Review Guide For Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8 Revised Merit Review Guide For Financial Assistance Policy Flash 2013-38 Revised Merit Review Guide For Financial Assistance Attached is Policy Flash 2013-38 Revised Merit Review ...

  18. Microsoft Word - AL2005-05Revised.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AL2005-05Revised.doc Microsoft Word - AL2005-05Revised.doc PDF icon Microsoft Word - AL2005-05Revised.doc More Documents & Publications AL2007-03.doc&0; 2011-31 Attachment...

  19. Instructions for the Supporting Statement - Revision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Instructions for the Supporting Statement - Revision Instructions for the Supporting Statement - Revision Instructions for the Supporting Statementrev-includes BH table.pdf (38 KB) More Documents & Publications Paperwork Reduction Act Forms Draft Funding Opportunity Announcement for Research and Development of Polymer Electrolyte Membrane (PEM) Fuel Cells for the Hydrogen Economy

  20. EA-1947: Revised Finding of No Significant Impact | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Revised Finding of No Significant Impact EA-1947: Revised Finding of No Significant Impact Transfer of the Kansas City Plant, Kansas City, Missouri The National Nuclear Security Administration issued this Revised FONSI on its proposed action to transfer the Kansas City Plant. The Revised FONSI includes comments, and responses, on the Draft Revised FONSI (June 2016) in Appendix A. For more information on this project, see www.energy.gov/node/579721. Download Document EA-1947: Draft Revised

  1. EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental...

    Office of Environmental Management (EM)

    Revision to EPA Notice of Availability Draft Supplemental Environmental Impact Statement EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact ...

  2. CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate...

    Energy.gov (indexed) [DOE]

    CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate Change What are the key facts? CEQ issued revised draft guidance in December to "provide Federal agencies ...

  3. Acquisition Letter No. Al 2015-06 - Revised 9/9/2015 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Al 2015-06 - Revised 992015 Acquisition Letter No. Al 2015-06 - Revised 992015 DATE: September 9, 2015 TO: Procurement DirectorsContracting Officers FROM: Director Contract...

  4. POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process ...

  5. Notice of Intent to Revise DOE O 457.1, Nuclear Counterterrorism

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-02-07

    Intent is to revise DOE O 457.1 and include the content of DOE M 457.1-1 as appendices to the revised order.

  6. 2013 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 22)

    SciTech Connect (OSTI)

    Mike Lewis

    2014-06-01

    This 2013 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 22) provides water use information for production and potable water wells at the Idaho National Laboratory for Calendar Year 2013. It also provides detailed information for new, modified, and decommissioned wells and holes. Two new wells were drilled and completed in Calendar Year 2013. No modifications were performed on any wells. Seven wells were decommissioned in Calendar Year 2013. Detailed construction information for the new and decommissioned wells is provided. Location maps are included, provided survey information was available. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990) and the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003.

  7. 2014 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 23)

    SciTech Connect (OSTI)

    Lewis, Mike

    2015-06-01

    This 2014 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 23) provides water use information for production and potable water wells at the Idaho National Laboratory for Calendar Year 2014. It also provides detailed information for new, modified, and decommissioned wells and holes. One new well was drilled and completed in Calendar Year 2014. No modifications were performed on any wells. No wells were decommissioned in Calendar Year 2014. Detailed construction information and a location map for the new well is provided. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990), the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003, and the Final Unified Decree issued August 26, 2014.

  8. 2010 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 19)

    SciTech Connect (OSTI)

    Mike Lewis

    2011-06-01

    This 2010 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 19) provides water use information (monthly annual average and total annual volume) for production and potable water wells at the Idaho National Laboratory for Calendar Year 2010. It also provides detailed information for new, modified, and abandoned (decommissioned) wells and holes. Five new wells were drilled and completed in the latter part of Calendar Years 2009 and 2010. Two wells were modified in Calendar Year 2010 and 66 wells and boreholes reported as abandoned (decommissioned). Detailed construction information for the new and modified wells, along with abandonment information for older wells, is provided. Location maps are provided if survey information was available. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990) and the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003.

  9. 2011 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 20)

    SciTech Connect (OSTI)

    Renee Bowser

    2012-06-01

    This 2011 Idaho National Laboratory Water Use Report and Comprehensive Well Inventory (Revision 20) provides water use information (monthly annual average and total annual volume) for production and potable water wells at the Idaho National Laboratory for Calendar Year 2011. It also provides detailed information for new, modified, and abandoned (decommissioned) wells and holes. One new well was drilled and completed and one well was modified in Calendar Year 2011. A total of 14 wells and boreholes were reported as decommissioned. Detailed construction information for the new and modified wells is provided. Details are provided for the wells and boreholes that have been decommissioned, and if available, construction diagrams. Location maps are included, provided survey information was available. This report is being submitted in accordance with the Water Rights Agreement between the State of Idaho and the United States, for the United States Department of Energy (dated 1990) and the subsequent Partial Decree for Water Right 34-10901 issued June 20, 2003.

  10. Standard technical specifications: Combustion engineering plants. Volume 1, Revision 1: Specifications

    SciTech Connect (OSTI)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry to produce improved Standard Technical Specifications (STS), Revision 1 for Combustion Engineering Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved STS or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.9 of the improved STS.

  11. Local public document room directory. Revision 7

    SciTech Connect (OSTI)

    1998-04-01

    This directory (NUREG/BR-0088, Revision 7) lists local public document rooms (LPDRs) for commercial nuclear power plants with operating or possession-only licenses or under construction, plus the LPDRs for potential high-level radioactive waste repository sites, gaseous diffusion plants, certain fuel cycle facilities, certain low-level waste disposal facilities, and any temporary LPDRs established for the duration of licensing proceedings. In some instances, the LPDR libraries maintain document collections for more than one licensed facility. The library staff members listed are the persons most familiar with the LPDR collections. Reference librarians in the NRC Headquarters Public Document Room (PDR) are also available to assist the public in locating NRC documents.

  12. Revised energy tax called less harsh

    SciTech Connect (OSTI)

    Begley, R.

    1993-06-23

    Following the Senate`s refusal to consider a Btu tax, manufacturing interests are greeting the revised transportation fuels tax proposal with notably less rancor than they did its more sweeping predecessor. Far from the fierce opposition expressed to the broadbased Btu tax, industry groups are staking out a position of {open_quotes}no position{close_quotes} on the fuels tax. The Chemical Manufacturers Association (CMA; Washington) sent a letter to all 100 senators calling the proposed fuels tax-still being negotiated at CW`s press time-the least harmful of the energy tax ideas that have been discussed but stopping short of an endorsement, says CMA`s Bob Hill, assistant director/taxation.

  13. A Review of Criticality Accidents 2000 Revision

    SciTech Connect (OSTI)

    Thomas P. McLaughlin; Shean P. Monahan; Norman L. Pruvost; Vladimir V. Frolov; Boris G. Ryazanov; Victor I. Sviridov

    2000-05-01

    Criticality accidents and the characteristics of prompt power excursions are discussed. Sixty accidental power excursions are reviewed. Sufficient detail is provided to enable the reader to understand the physical situation, the chemistry and material flow, and when available the administrative setting leading up to the time of the accident. Information on the power history, energy release, consequences, and causes are also included when available. For those accidents that occurred in process plants, two new sections have been included in this revision. The first is an analysis and summary of the physical and neutronic features of the chain reacting systems. The second is a compilation of observations and lessons learned. Excursions associated with large power reactors are not included in this report.

  14. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, October--December 1991

    SciTech Connect (OSTI)

    Not Available

    1992-04-27

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis, and the computer model will be the major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide, and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal.

  15. Initial Comparisons between the Advanced Technology Development Gen 2 Baseline Cells and Variant C Cells

    SciTech Connect (OSTI)

    Christophersen, Jon Petter; Motloch, Chester George; Wright, Randy Ben; Murphy, Timothy Collins; Belt, Jeffrey R; Ho, Chinh Dac; Bloom, Ira D.; Jones, S. A.; Battaglia, Vincent S.; Jungst, Rudy G.; Case, Herb L.; Sutula, Raymond A.; Barnes, James A.; Duong, Tien Q.

    2002-06-01

    The Advanced Technology Development Program is testing a second generation of lithium-ion cells, consisting of a baseline and three variant chemistries. The cathode composition of the Variant C chemistry was altered with an increase to the aluminum dopant and a decrease to the cobalt dopant to explore the impact on performance. However, it resulted in a 20% drop in rated capacity. Also, the Variant C average power fade is higher, but capacity fade is higher for the Baseline cell chemistry. Initial results indicate that the Variant C chemistry will reach end of life sooner than the Baseline chemistry.

  16. Anderson localization of partially incoherent light

    SciTech Connect (OSTI)

    Capeta, D.; Radic, J.; Buljan, H.; Szameit, A.; Segev, M.

    2011-07-15

    We study Anderson localization and propagation of partially spatially incoherent wavepackets in linear disordered potentials, motivated by the insight that interference phenomena resulting from multiple scattering are affected by the coherence of the waves. We find that localization is delayed by incoherence: the more incoherent the waves are, the longer they diffusively spread while propagating in the medium. However, if all the eigenmodes of the system are exponentially localized (as in one- and two-dimensional disordered systems), any partially incoherent wavepacket eventually exhibits localization with exponentially decaying tails, after sufficiently long propagation distances. Interestingly, we find that the asymptotic behavior of the incoherent beam is similar to that of a single instantaneous coherent realization of the beam.

  17. Apparatus for generating partially coherent radiation

    DOE Patents [OSTI]

    Naulleau, Patrick P.

    2004-09-28

    The effective coherence of an undulator beamline can be tailored to projection lithography requirements by using a simple single moving element and a simple stationary low-cost spherical mirror. The invention is particularly suited for use in an illuminator device for an optical image processing system requiring partially coherent illumination. The illuminator includes: (i) source of coherent or partially coherent radiation which has an intrinsic coherence that is higher than the desired coherence; (ii) a reflective surface that receives incident radiation from said source; (iii) means for moving the reflective surface through a desired range of angles in two dimensions wherein the rate of the motion is fast relative to integration time of said image processing system; and (iv) a condenser optic that re-images the moving reflective surface to the entrance plane of said image processing system, thereby, making the illumination spot in said entrance plane essentially stationary.

  18. An evaluation of baseline conditions at lease tract C-a, Rio Blanco County, Colorado

    SciTech Connect (OSTI)

    Barteaux, W.L.; Biezugbe, G.

    1987-09-01

    An analysis was made of baseline groundwater quality data from oil shale lease tract C-a, managed by Rio Blanco Oil Shale Company. The data are limited in several respects. All conclusions drawn from the data must be qualified with these limitations. Baseline conditions were determined by analyzing data from wells in the upper bedrock and lower bedrock aquifers and from the alluvial wells. Baseline data were considered all data collected before mining operations began. The water quality was then evaluated using the 1987 Colorado State Basic Standards for Ground Water as a basis. The maximum baseline values for several parameters in each aquifer exceed the standard values. The quality of the upper lower bedrock aquifers varies from region to region within the site. Data on the lower bedrock aquifer are insufficient for speculation on the cause of the variations. Variations in the upper bedrock aquifer are possibly caused by leakage of the lower bedrock aquifer. 16 refs., 9 figs., 9 tabs.

  19. 2008 CHP Baseline Assessment and Action Plan for the Hawaii Market...

    Energy.gov (indexed) [DOE]

    is to provide an updated baseline assessment and action plan for combined heat and power (CHP) in Hawaii and to identify the hurdles that prevent the expanded use of CHP systems. ...

  20. TWRS privatization phase I - site characterization and environmental baseline work plan

    SciTech Connect (OSTI)

    Reidel, S.P.; Hodges, F.N., Westinghouse Hanford

    1996-08-27

    This work plan defines the steps necessary to develop a Site Characterization Plan and Environmental Baseline for the TWRS Privatization Phase I area. The Data Quality Objectives Process will be the primary tool used to develop these plans.

  1. Appendix A: Comments and Responses on the Draft Revised FONSI

    National Nuclear Security Administration (NNSA)

    Appendix A: Comments and Responses on the Draft Revised FONSI Comments and Responses on the Draft Revised FONSI Comment Number EA Section Commenter Comment Response 1 General J Moore Curious if the streams in the area of the bannister complex have been examined for pollutants and if any clean up of those are included in these plans? I have a particular interest in Dyke Branch as my property backs up to it. Can you provide recent water quality results? The Draft Revised FONSI was drafted to

  2. Alabama (with State Offshore) Shale Proved Reserves Revision Decreases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Billion Cubic Feet) Revision Decreases (Billion Cubic Feet) Alabama (with State Offshore) Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 2 2010's 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  3. Appendix A: Comments and Responses on the Draft Revised FONSI

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Appendix A: Comments and Responses on the Draft Revised FONSI Comments and Responses on the Draft Revised FONSI Comment Number EA Section Commenter Comment Response 1 General J Moore Curious if the streams in the area of the bannister complex have been examined for pollutants and if any clean up of those are included in these plans? I have a particular interest in Dyke Branch as my property backs up to it. Can you provide recent water quality results? The Draft Revised FONSI was drafted to

  4. Revised Guidance for Recruitment, Retention and Relocation Incentives |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Revised Guidance for Recruitment, Retention and Relocation Incentives Revised Guidance for Recruitment, Retention and Relocation Incentives 3Rs Revised Guidance.pdf (66.78 KB) CHCO Memo_3Rs Guidance_Attachment_05-12-2016_FINAL.pdf (181.71 KB) Responsible Contacts Tiffany Wheeler Human Resources Specialist E-mail tiffany.wheeler@hq.doe.gov Phone (202) 586-8481 More Documents & Publications Manager's Desk Reference on Human Capital Management Flexibilities DOE Handbook

  5. Kentucky Coalbed Methane Proved Reserves Revision Increases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Revision Increases (Billion Cubic Feet) Kentucky Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 0 0 1 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Increases

  6. The Science and Strategy for Phasing of the Long-Baseline Neutrino Experiment

    SciTech Connect (OSTI)

    Diwan, Milind V.

    2012-05-22

    This note is about the principles behind a phased plan for realizing a Long-Baseline Neutrino Experiment(LBNE) in the U.S.. The most important issue that must be resolved is the direction of the first phase of the experiment. Based on both scientific and programmatic considerations, the U.S. should pursue the best option for accelerator neutrino physics, which is the longer baseline towards Homestake with an optimizedbroadband intense beam.

  7. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, April--June 1993

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of this study are to: (1) Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. (2) Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. (3) Develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that PETC will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks: Task 1: Establish the baseline design and alternatives. Task 2: Evaluate baseline and alternative economics. Task 3: Develop engineering design criteria. Task 4: Develop a process flowsheet simulation (PFS) model. Task 5: Perform sensitivity studies using the PFS model. Task 6: Document the PFS model and develop a DOE training session on its use. Task 7: Perform project management, technical coordination and other miscellaneous support functions. During the reporting period, work progressed on Tasks 1, 4 and 7. This report covers work done during the period and consists of four sections: Introduction and Summary. Task 1--Baseline Design and Alternatives. Task 4--Process Flowsheet Simulation (PFS) Model, and Project Management and Staffing Report.

  8. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1993

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM- 5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case, and develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks: Task 1, establish the baseline design and alternatives; Task 2, evaluate baseline and alternative economics; Task 3, develop engineering design criteria; Task 4, develop a process flowsheet simulation (PFS) model; Task 5, perform sensitivity studies using the PFS model; Task 6, document the PFS model and develop a DOE training session on its use; and Task 7, perform project management, technical coordination and other miscellaneous support functions. This report covers work done during the period and consists of four sections: Introduction and summary; Task 1, baseline design and alternatives; Task 4, process flowsheet simulation (PFS) model; and project management and staffing report.

  9. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, October--December 1994

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of the study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that PETC will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks. Task 1: Establish the baseline design and alternatives. Task 2: Evaluate baseline and alternative economics. Task 3: Develop engineering design criteria. Task 4: Develop a process flowsheet simulation model. Task 5: Perform sensitivity studies using the PFS model. Task 6: Document the PFS model and develop a DOE training session on its use, and Task 7: Perform project management, technical coordination and other miscellaneous support functions. During the reporting period, work progressed on Tasks 1, 4 and 7. This report covers work done during the period and consists of four sections: Introduction and Summary. Task 1--Baseline Design and Alternatives. Task 4--Process Flowsheet Simulation Model. Project Management and Staffing Report.

  10. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, July--September 1993

    SciTech Connect (OSTI)

    1993-12-31

    The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation (PFS) model. During the period of this report, a Topical Report summarizing the Baseline Case design was drafted and issued to DOE/PETC for review and release approval. Major effort was spent on the Alternate Upgrading and Refining Case. Its design specifications were finalized, and material and utility balances completed. Initial capital cost estimates were developed. A Topical Report, summarizing the Alternative (ZSM-5) Upgrading and Refining Case design, is being drafted. Under Task 4, some of the individual plant models were expanded and enhanced. An overall ASPEN/SP process simulation model was developed for the Baseline Design Case by combining the individual models of Areas 100, 200 and 300. In addition, a separate model for the simplified product refining area, Area 300, of the Alternate Upgrading and Refining case was developed. Under Task 7, cost and schedule control was the primary activity. A technical paper entitled ``Baseline Design/Economics for Advanced Fischer-Tropsch Technology`` was presented in the DOE/PETC`s Annual Contractors Review Conference, held at Pittsburgh, Pennsylvania, on September 27-29, 1993. A contract amendment was submitted to include the Kerr McGee ROSE unit in the Baseline design case and to convert the PFS models from the ASPEN/SP to ASPEN/Plus software code.

  11. Statistical Analysis of Baseline Load Models for Non-Residential Buildings

    SciTech Connect (OSTI)

    Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

    2008-11-10

    Policymakers are encouraging the development of standardized and consistent methods to quantify the electric load impacts of demand response programs. For load impacts, an essential part of the analysis is the estimation of the baseline load profile. In this paper, we present a statistical evaluation of the performance of several different models used to calculate baselines for commercial buildings participating in a demand response program in California. In our approach, we use the model to estimate baseline loads for a large set of proxy event days for which the actual load data are also available. Measures of the accuracy and bias of different models, the importance of weather effects, and the effect of applying morning adjustment factors (which use data from the day of the event to adjust the estimated baseline) are presented. Our results suggest that (1) the accuracy of baseline load models can be improved substantially by applying a morning adjustment, (2) the characterization of building loads by variability and weather sensitivity is a useful indicator of which types of baseline models will perform well, and (3) models that incorporate temperature either improve the accuracy of the model fit or do not change it.

  12. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, April--June 1994

    SciTech Connect (OSTI)

    1994-01-01

    The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor steam from the flurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case, develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis and computer model will be major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. During the reporting period, work progressed on Tasks 1, 4, 5, 6 and 7. This report covers work done during the period and consists of six sections: introduction and summary; Task 1, baseline design and alternatives; Task 4, process flowsheet simulation (PFS) model; Task 5, perform sensitivity studies using the PFS model; Task 6, document the PFS model and develop a DOE training session on its use, and project management and staffing report.

  13. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, October--December 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    Bechtel, with Amoco as the main subcontractor, initiated a study on September 26, 1991, for the US Department of Energy`s (DOE`s) Pittsburgh Energy Technology Center (PETC) to develop a computer model and baseline design for advanced Fischer-Tropsch (F-T) technology. This 24-month study, with an approved budget of $2.3 million, is being performed under DOE Contract Number AC22-91PC90027. (1) Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. (2) Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. (3) Develop a process flowsheet simulation (PFS) model. The baseline design, the economic analysis and computer model will be major research planning tools that PETC will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal.

  14. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1994

    SciTech Connect (OSTI)

    1994-12-31

    The objectives of the study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western, coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation (PFS) model. During the reporting period, work progressed on Tasks 1, 2, 4, 6 and 7. This report covers work done during the period and consists of four sections: Introduction and Summary. Task 1: Baseline Design and Alternatives. Task 2: Evaluate baseline and alternative economics. Task 4: Process Flowsheet Simulation (PFS) model. Task 6: Document the PFS model and develop a DOE training session on its use and Project Management and Staffing Report.

  15. N Reactor Deactivation Program Plan. Revision 4

    SciTech Connect (OSTI)

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

  16. Notice of Intent to Revise DOE O 475.2A, Identifying Classified Information

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-06

    The revision will incorporate changes that were identified during the 1-year review after initial issuance

  17. Microsoft Word - CHAP02ESH _REVISED1_3.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CHAP02ESH _REVISED1_3.doc Microsoft Word - CHAP02ESH _REVISED1_3.doc Microsoft Word - CHAP02ESH _REVISED1_3.doc (183.77 KB) More Documents & Publications Regulatory Aspects of ISM COMMENTS&#0; A:\CHAP05PERFASSM(REVISED).PDF&#0;

  18. Revising 10 CFR Part 1022 “Compliance with Floodplain and Wetland Environmental Review Requirements”

    Energy.gov [DOE]

    Revising 10 CFR Part 1022 “Compliance with Floodplain and Wetland Environmental Review Requirements”

  19. PartialDeletion for web.cdr

    Office of Legacy Management (LM)

    States Department of Energy Grand Junction Office F A C T S H E E T Partial Deletion of Monticello Mill Tailings Site From the National Priorities List July 2003 The U.S. Department of Energy has completed the cleanup of the Non-Surface and Ground-Water Impacted Peripheral Properties that are part of Operable Unit II of the Monticello (Utah) Mill Tailings Site. These properties can now be removed from the U.S. Environmental Protection Agency's National Priorities List. This fact sheet provides a

  20. POLICY FLASH 2013-58 Revised Guide for Financial Assistance ...

    Energy.gov (indexed) [DOE]

    Ellen Colligan at (202) 287-1776 or Ellen.colligan@hq.doe.gov. Policy Flash 2013-58 Revised Guide for Finanacial Assistance.pdf THE DOE GUIDE TO FINANCIAL ASSISTANCE More Documents...

  1. WPN 04-4: Revised Weatherization Assistance Program Application...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    To issue the revised application package and planned reporting format for the Weatherization Assistance Program for low-income persons for use by the states. PDF icon WPN 04-4: ...

  2. Microsoft Word - CCP-QP-002-Revision 39

    Office of Environmental Management (EM)

    Separated electronically fillable forms and updated references in procedure. 14 12022003 Revision initiated to address CAR 04-002 identified during CBFO audit A-04-03 and CAR ...

  3. Revised Propane Stock Levels for 6/7/13

    Gasoline and Diesel Fuel Update

    Revised Propane Stock Levels for 6713 Release Date: June 19, 2013 Following the release of the Weekly Petroleum Status Report (WPSR) for the week ended June 7, 2013, EIA...

  4. Microsoft Word - FINAL Class 1 Revise TRUPACT-III Management...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... A.1 A-4 A-3 Item 1 Description: Revise the language in Attachment A1, "Container Storage," Section A1-1c(1) "TRUPACT-III Management" to address manual bolt removal from the ...

  5. Gasoline and Diesel Fuel Update Data Revision Notice

    Annual Energy Outlook

    for some stations in the West Coast less California region. EIA has corrected this error and provides a revision to the affected areas for December 28, 2015 in this...

  6. Revision to the Procurement Strategy Panel (PSP) Briefing Process

    Office of Energy Efficiency and Renewable Energy (EERE)

    This flash and the attached Acquisition Guide 7.1 revises the PSP process, which is an alternate to a written acquisition plan for procurements expected to exceed $100M.

  7. Wyoming Dry Natural Gas Reserves Revision Increases (Billion...

    U.S. Energy Information Administration (EIA) (indexed site)

    Wyoming Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1970's 226 220 637 1980's 760 ...

  8. EA-1605: Revised Finding of No Significant Impact | Department...

    Office of Environmental Management (EM)

    located at the Savannah River Site (SRS). A FONSI was issued in August 2008. In this revised FONSI, DOE proposes to design an construct a new heating plant to be located ...

  9. Questions and answers based on revised 10 CFR Part 20

    SciTech Connect (OSTI)

    Borges, T.; Stafford, R.S.; Lu, P.Y.; Carter, D.

    1994-05-01

    NUREG/CR-6204 is a collection of questions and answers that were originally issued in seven sets and which pertain to revised 10 CFR Part 20. The questions came from both outside and within the NRC. The answers were compiled and provided by NRC staff within the offices of Nuclear Reactor Regulation, Nuclear Material Safety and Safeguards, Nuclear Regulatory Research, the Office of State Programs, and the five regional offices. Although all of the questions and answers have been reviewed by attorneys in the NRC Office of the General Counsel, they do not constitute official legal interpretations relevant to revised 10 CFR Part 20. The questions and answers do, however, reflect NRC staff decisions and technical options on aspects of the revised 10 CFR Part 20 regulatory requirements. This NUREG is being made available to encourage communication among the public, industry, and NRC staff concerning the major revisions of the NRC`s standards for protection against radiation.

  10. Workplace Charging Challenge Partner: ReVision Energy | Department...

    Office of Environmental Management (EM)

    To that end, ReVision Energy has installed two Level 2 charging stations at their Portland, ME facility, two Level 2 charging stations at their Exeter, NH facility and one Level 2 ...

  11. SUSTAINABILITY NEWS CEQ Issues Revised Guiding Principles for Sustainable

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CEQ Issues Revised Guiding Principles for Sustainable Federal Buildings The White House Council on Environmental Quality (CEQ) has issued revisions to the Guiding Principles for Sustainable Federal Buildings (Guiding Principles) per Executive Order (E.O.) 13693, Planning for Federal Sustainability for the Next Decade. The new Guiding Principles updates and replaces the High Performance and Sustainable Buildings Guidance issued by CEQ in December 2008. These guidelines outline the new

  12. NREL Job Task Analysis: Retrofit Installer Technician (Revised) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Retrofit Installer Technician (Revised) NREL Job Task Analysis: Retrofit Installer Technician (Revised) A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence. retrofit_installer_jta_04112012.pdf (518.38 KB) More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician NREL Job Task Analysis: Energy Auditor Training Self-Assessment

  13. Michigan Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Michigan Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 276 2010's 325 151 916 103 57 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  14. Michigan Shale Proved Reserves Revision Increases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Michigan Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 149 2010's 165 140 520 351 209 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  15. Montana Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Montana Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 34 2010's 16 14 2 28 51 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  16. Montana Shale Proved Reserves Revision Increases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Montana Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 42 2010's 14 14 18 31 64 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  17. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1

    Energy.gov [DOE]

    Acquisition Guide Chapter 7.1 is revised to update references to DOE orders from 413.3A to 413.3B and 430.2A to 436.1 and DOE manual 413.3-1 to DOE Guide 413.3-13. Revisions to references for the DOE orders and DOE Guide are identified by vertical lines in the left margin.

  18. Alabama (with State Offshore) Shale Proved Reserves Revision Increases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Billion Cubic Feet) Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  19. New Mexico Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) New Mexico Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 2 2010's 11 190 56 45 100 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  20. New Mexico Shale Proved Reserves Revision Increases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) New Mexico Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 2 2010's 1 83 18 58 105 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  1. North Dakota Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) North Dakota Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 17 2010's 343 290 199 554 823 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  2. Ohio Coalbed Methane Proved Reserves Revision Increases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Increases

  3. Ohio Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Ohio Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 98 1,446 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  4. Ohio Shale Proved Reserves Revision Increases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Ohio Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 272 1,468 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  5. Comments on the Revised Consent Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Comments on the Revised Consent Order Comments on the Revised Consent Order Presentation by NMED Secretary Ryan Flynn "Comments Received on LANL Order on Consent." Comments RCO - May 18, 2016 (1.81 MB) More Documents & Publications Los Alamos Legacy Cleanup Contract Draft Request for Proposal Memorandums of Understanding Between the Department of Energy and the Buckman Direct Diversion Board Regarding Water Quality Monitoring and Surface Water Protection NNSA Supplemental

  6. Revised Acquisition Guide Chapter 42.5, Contract Management Planning

    Energy.gov [DOE]

    The Department of Energy (DOE) has been on GAO's High Risk List for the past several years as a result of inadequate contract and project management. Accordingly, the improvement of contract administration is a critical issue for DOE. The Acquisition Guide chapter on Contract Management Planning has been completely revised to address this matter. The revised chapter 42.5, entitled Contract Management Planning is attached.

  7. Virginia Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Virginia Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 12 76 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  8. Virginia Shale Proved Reserves Revision Increases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Virginia Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 3 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  9. Eastern Wind Integration and Transmission Study (EWITS) (Revised)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    EnerNex Corporation REVISED FEBRUARY 2011 EASTERN WIND INTEGRATION AND TRANSMISSION STUDY PIX #16204 2 3 EASTERN WIND INTEGRATION AND TRANSMISSION STUDY Revised February 2011 Prepared for NREL by: EnerNex Corporation Knoxville, Tennessee NREL Technical Monitor: David Corbus Prepared under Subcontract No. AAM-8-88513-01 Subcontract Report NREL/SR-5500-47078 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401 303-275-3000 * www.nrel.gov NREL is a national laboratory of

  10. Test Procedure Development and Revision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure Development and Revision Test Procedure Development and Revision Most energy conservation standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail the protocols that manufacturers must follow when testing their products for compliance with Department of Energy (DOE) standards. DOE also uses the test procedures to determine compliance with the applicable standards in any verification or enforcement testing. The procedures specify how

  11. Kansas Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Kansas Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 0 6 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  12. Kansas Shale Proved Reserves Revision Increases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Kansas Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 0 3 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  13. Kentucky Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Decreases

  14. Kentucky Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Kentucky Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 3 2010's 43 11 4 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  15. Kentucky Shale Proved Reserves Revision Increases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Kentucky Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 44 2010's 3 44 1 16 4 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  16. Wyoming Shale Proved Reserves Revision Decreases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Billion Cubic Feet) Wyoming Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 1 2010's 2 1 0 536 98 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  17. Wyoming Shale Proved Reserves Revision Increases (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Billion Cubic Feet) Wyoming Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 4 0 3 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  18. Waste Isolation Pilot Plant Technical Assessment Team Report Revision 0 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Technical Assessment Team Report Revision 0 Waste Isolation Pilot Plant Technical Assessment Team Report Revision 0 This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia

  19. DWPF waste form compliance plan (Draft Revision)

    SciTech Connect (OSTI)

    Plodinec, M.J.; Marra, S.L.

    1991-01-01

    The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970's, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

  20. DWPF waste form compliance plan (Draft Revision)

    SciTech Connect (OSTI)

    Plodinec, M.J.; Marra, S.L.

    1991-12-31

    The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970`s, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan.

  1. Parallel programming with PCN. Revision 2

    SciTech Connect (OSTI)

    Foster, I.; Tuecke, S.

    1993-01-01

    PCN is a system for developing and executing parallel programs. It comprises a high-level programming language, tools for developing and debugging programs in this language, and interfaces to Fortran and Cthat allow the reuse of existing code in multilingual parallel programs. Programs developed using PCN are portable across many different workstations, networks, and parallel computers. This document provides all the information required to develop parallel programs with the PCN programming system. It includes both tutorial and reference material. It also presents the basic concepts that underlie PCN, particularly where these are likely to be unfamiliar to the reader, and provides pointers to other documentation on the PCN language, programming techniques, and tools. PCN is in the public domain. The latest version of both the software and this manual can be obtained by anonymous ftp from Argonne National Laboratory in the directory pub/pcn at info.mcs. ani.gov (cf. Appendix A). This version of this document describes PCN version 2.0, a major revision of the PCN programming system. It supersedes earlier versions of this report.

  2. NRC comprehensive records disposition schedule. Revision 3

    SciTech Connect (OSTI)

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  3. Baseline Library

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Skip navigation links Marketing Resources Reports, Publications, and Research Agricultural Commercial Consumer Products Industrial Institutional Multi-Sector Residential...

  4. Partial oxidation power plant with reheating and method thereof

    DOE Patents [OSTI]

    Newby, Richard A.; Yang, Wen-Ching; Bannister, Ronald L.

    1999-01-01

    A system and method for generating power having an air compression/partial oxidation system, a turbine, and a primary combustion system. The air compression/partial oxidation system receives a first air stream and a fuel stream and produces a first partially oxidized fuel stream and a first compressed air stream therefrom. The turbine expands the first partially oxidized fuel stream while being cooled by the first compressed air stream to produce a heated air stream. The heated air stream is injected into the expanding first partially oxidized fuel stream, thereby reheating it in the turbine. A second partially oxidized fuel stream is emitted from the turbine. The primary combustion system receives said second partially oxidized fuel stream and a second air stream, combusts said second partially oxidized fuel stream, and produces rotating shaft power and an emission stream therefrom.

  5. Partial oxidation power plant with reheating and method thereof

    DOE Patents [OSTI]

    Newby, R.A.; Yang, W.C.; Bannister, R.L.

    1999-08-10

    A system and method are disclosed for generating power having an air compression/partial oxidation system, a turbine, and a primary combustion system. The air compression/partial oxidation system receives a first air stream and a fuel stream and produces a first partially oxidized fuel stream and a first compressed air stream therefrom. The turbine expands the first partially oxidized fuel stream while being cooled by the first compressed air stream to produce a heated air stream. The heated air stream is injected into the expanding first partially oxidized fuel stream, thereby reheating it in the turbine. A second partially oxidized fuel stream is emitted from the turbine. The primary combustion system receives said second partially oxidized fuel stream and a second air stream, combusts said second partially oxidized fuel stream, and produces rotating shaft power and an emission stream therefrom. 2 figs.

  6. Characterizing Shading Losses on Partially Shaded PV Systems (Presentation)

    SciTech Connect (OSTI)

    Deline, C.

    2010-09-23

    Presentation on shaded PV power loss, practical issues with modeling shaded PV, and methods of implementing partially shaded PV modeling.

  7. Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

    SciTech Connect (OSTI)

    Boring, Ronald L.; Joe, Jeffrey C.

    2015-02-01

    For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

  8. Report of the DOE Review Committee on the baseline validation of the Superconducting Super Collider

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The Secretary of Energy directed that an independent review of the current cost and schedule baseline for the SSC be conducted. The purpose of this independent review was to validate the current cost and schedule baseline and to ensure that the project status is accurate as currently reported. Through May 1993, approximately $1.5 billion of the baseline cost of $8.249 billion had been expended, with project completion forecasted on the baseline schedule as of September 1999. This report documents the findings of the SSC Baseline Validation Review Committee (the Committee). The report is organized into five parts. The first section is the Executive Summary. This introduction is followed by a discussion of the project progress/status as determined by the Committee. The next section describes the Committee`s estimate of the cost at completion for the SSC project, followed by an assessment of the adequacy of the business management systems currently being used to manage the project. The final section presents the Committee`s conclusions and recommendations. The main body of the report is followed by the subcommittee reports and appendices.

  9. Baseline design/economics for advanced Fischer-Tropsch technology. Auarterly report, July--September 1992

    SciTech Connect (OSTI)

    1992-12-31

    The objectives of this study are to: Develop a baseline design for indirect liquefaction using advanced F-T technology; prepare the capital and operating costs for the baseline design; and develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that Pittsburgh Energy Technology Center will use to plan, guide and evaluate its ongoing and future research and commercialisation programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks: Task 1, establish the baseline design and alternatives; Task 2, evaluate baseline economics; Task 3: Develop engineering design criteria; Task 4, develop a process flowsheet simulation (PFS) model; Task 5, perform sensitivity studies using the PFS model; Task 6, document the PFS model and develop a DOE training session on its use; Task 7, perform project management, technical coordination and other miscellaneous support functions. During the reporting period work progressed on Tasks 1, 4 and 7. This report covers work done during the period and consists of five sections: Introduction and summary; preliminary design for syngas production; Task 1, preliminary F-T reaction loop design; Task 1, development of a process simulation model; Task 4, key personnel staffing report, Task 7.

  10. Examining Uncertainty in Demand Response Baseline Models and Variability in Automated Response to Dynamic Pricing

    SciTech Connect (OSTI)

    Mathieu, Johanna L.; Callaway, Duncan S.; Kiliccote, Sila

    2011-08-15

    Controlling electric loads to deliver power system services presents a number of interesting challenges. For example, changes in electricity consumption of Commercial and Industrial (C&I) facilities are usually estimated using counterfactual baseline models, and model uncertainty makes it difficult to precisely quantify control responsiveness. Moreover, C&I facilities exhibit variability in their response. This paper seeks to understand baseline model error and demand-side variability in responses to open-loop control signals (i.e. dynamic prices). Using a regression-based baseline model, we define several Demand Response (DR) parameters, which characterize changes in electricity use on DR days, and then present a method for computing the error associated with DR parameter estimates. In addition to analyzing the magnitude of DR parameter error, we develop a metric to determine how much observed DR parameter variability is attributable to real event-to-event variability versus simply baseline model error. Using data from 38 C&I facilities that participated in an automated DR program in California, we find that DR parameter errors are large. For most facilities, observed DR parameter variability is likely explained by baseline model error, not real DR parameter variability; however, a number of facilities exhibit real DR parameter variability. In some cases, the aggregate population of C&I facilities exhibits real DR parameter variability, resulting in implications for the system operator with respect to both resource planning and system stability.

  11. National Nuclear Security Administration Service Center Environmental Programs Long-Term Environmental Stewardship Baseline Handbook

    SciTech Connect (OSTI)

    Griswold, D. D.; Rohde, K.

    2003-02-26

    As environmental restoration (ER) projects move toward completion, the planning, integration, and documentation of long-term environmental stewardship (LTES) activities is increasingly important for ensuring smooth transition to LTES. The Long-Term Environmental Stewardship Baseline Handbook (Handbook) prepared by the National Nuclear Security Administration (NNSA) Service Center Environmental Programs Department (EPD) outlines approaches for integrating site-specific LTES planning and implementation into site ER baseline documentation. Since LTES will vary greatly from site to site, the Handbook also provides for flexibility in addressing LTES in ER Project life-cycle baselines, while clearly identifying Environmental Management (EM) requirements. It provides suggestions for enacting LTES principles and objectives through operational activities described in site-specific LTES plans and life cycle ER Project baseline scope, cost, and schedule documentation and tools for more thorough planning, better quantification, broader understanding of risk and risk management factors, and more comprehensive documentation. LTES planning applied to baselines in a phased approach will facilitate seamlessly integrating LTES into site operational activities, thereby minimizing the use of resources.

  12. Apparatus for the concurrent inspection of partially completed welds

    DOE Patents [OSTI]

    Smartt, Herschel B.; Johnson, John A.; Larsen, Eric D.; Bitsoi, Rodney J.; Perrenoud, Ben C.; Miller, Karen S.; Pace, David P.

    2002-01-01

    An apparatus for the concurrent inspection of partially completed welds is described in which is utilized in combination with a moveable welder for forming a partially completed weld, and an ultrasonic generator mounted on a moveable welder in which is reciprocally moveable along a path of travel which is laterally disposed relative to the partially completed weld.

  13. Dual baseline search for muon antineutrino disappearance at 0.1 eV²<Δm²<100 eV²

    DOE PAGES-Beta [OSTI]

    Cheng, G.; Huelsnitz, W.; Aguilar-Arevalo, A. A.; Alcaraz-Aunion, J. L.; Brice, S. J.; Brown, B. C.; Bugel, L.; Catala-Perez, J.; Church, E. D.; Conrad, J. M.; et al

    2012-09-25

    The MiniBooNE and SciBooNE collaborations report the results of a joint search for short baseline disappearance of ν¯μ at Fermilab’s Booster Neutrino Beamline. The MiniBooNE Cherenkov detector and the SciBooNE tracking detector observe antineutrinos from the same beam, therefore the combined analysis of their data sets serves to partially constrain some of the flux and cross section uncertainties. Uncertainties in the νμ background were constrained by neutrino flux and cross section measurements performed in both detectors. A likelihood ratio method was used to set a 90% confidence level upper limit on ν¯μ disappearance that dramatically improves upon prior limits inmore » the Δm²=0.1–100 eV² region.« less

  14. Partial Differential Algebraic Sensitivity Analysis Code

    Energy Science and Technology Software Center (OSTI)

    1995-05-15

    PDASAC solves stiff, nonlinear initial-boundary-value in a timelike dimension t and a space dimension x. Plane, circular cylindrical or spherical boundaries can be handled. Mixed-order systems of partial differential and algebraic equations can be analyzed with members of order or 0 or 1 in t, 0,1 or 2 in x. Parametric sensitivities of the calculated states are compted simultaneously on request, via the Jacobian of the state equations. Initial and boundary conditions are efficiently reconciled.more » Local error control (in the max-norm or the 2-norm) is provided for the state vector and can include the parametric sensitivites if desired.« less

  15. Testing of concurrent programs and partial specifications

    SciTech Connect (OSTI)

    Hamlet, D.

    1982-12-01

    The testing problems of concurrent systems include those of sequential programs, but there are two additional difficulties: the scheduling of tasks may alter the behavior, making tests misleading; testing may be conducted at an early stage of development, by users who are not software experts. Concurrent process systems can be modeled by a collection of finite-state transducers, in a way that displays their unique problems. The specification languages PAISLey and Gist approach the definition of concurrent systems differently, but both permit users to execute partially defined systems. The declarative language PROLOG, although not explicitly designed for concurrent programming, exhibits similar characteristics. Prototype execution has some unexpected implications for testing, and for final implementation.

  16. PARTIAL SLINGSHOT RECONNECTION BETWEEN TWO FILAMENTS

    SciTech Connect (OSTI)

    Jiang, Yunchun; Hong, Junchao; Yang, Jiayan; Bi, Yi; Zheng, Ruisheng; Yang, Bo; Li, Haidong; Yang, Dan

    2013-02-10

    We present a rare observation of an interaction between two filaments around AR 11358 and AR 11361 on 2011 December 3 that is strongly suggestive of the occurrence of slingshot reconnection. A small elbow-shaped active-region filament (F12) underwent a failed eruption that brought it into contact with a nearby larger, thicker filament (F34). Accompanied by the appearance of complicated internal structures below the erupting F12, its two legs separated away from each other and then connected into F34. This process led the filaments to change their connectivity to form two newly linked filaments, and one of them showed a clear inverse {gamma}-shape. However, the alteration in the filament connectivity was imperfect since F34 is discernible after the eruption. These observations can be interpreted as a partial slingshot reconnection between two filaments that had unequal axial magnetic flux.

  17. Understanding the Effect of Baseline Modeling Implementation Choices on Analysis of Demand Response Performance

    SciTech Connect (OSTI)

    University of California, Berkeley; Addy, Nathan; Kiliccote, Sila; Mathieu, Johanna; Callaway, Duncan S.

    2012-06-13

    Accurate evaluation of the performance of buildings participating in Demand Response (DR) programs is critical to the adoption and improvement of these programs. Typically, we calculate load sheds during DR events by comparing observed electric demand against counterfactual predictions made using statistical baseline models. Many baseline models exist and these models can produce different shed calculations. Moreover, modelers implementing the same baseline model can make different modeling implementation choices, which may affect shed estimates. In this work, using real data, we analyze the effect of different modeling implementation choices on shed predictions. We focused on five issues: weather data source, resolution of data, methods for determining when buildings are occupied, methods for aligning building data with temperature data, and methods for power outage filtering. Results indicate sensitivity to the weather data source and data filtration methods as well as an immediate potential for automation of methods to choose building occupied modes.

  18. Relative astrometry of compact flaring structures in Sgr A* with polarimetric very long baseline interferometry

    SciTech Connect (OSTI)

    Johnson, Michael D.; Doeleman, Sheperd S.; Fish, Vincent L.; Broderick, Avery E.; Wardle, John F. C.; Marrone, Daniel P.

    2014-10-20

    We demonstrate that polarimetric interferometry can be used to extract precise spatial information about compact polarized flares of Sgr A*. We show that, for a faint dynamical component, a single interferometric baseline suffices to determine both its polarization and projected displacement from the quiescent intensity centroid. A second baseline enables two-dimensional reconstruction of the displacement, and additional baselines can self-calibrate using the flare, enhancing synthesis imaging of the quiescent emission. We apply this technique to simulated 1.3 mm wavelength observations of a 'hot spot' embedded in a radiatively inefficient accretion disk around Sgr A*. Our results indicate that, even with current sensitivities, polarimetric interferometry with the Event Horizon Telescope can achieve ∼5 μas relative astrometry of compact flaring structures near Sgr A* on timescales of minutes.

  19. Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting

    SciTech Connect (OSTI)

    Zhang, Jie; Hodge, Bri-Mathias; Lu, Siyuan; Hamann, Hendrik F.; Lehman, Brad; Simmons, Joseph; Campos, Edwin; Banunarayanan, Venkat

    2015-10-05

    Accurate solar power forecasting allows utilities to get the most out of the solar resources on their systems. To truly measure the improvements that any new solar forecasting methods can provide, it is important to first develop (or determine) baseline and target solar forecasting at different spatial and temporal scales. This paper aims to develop baseline and target values for solar forecasting metrics. These were informed by close collaboration with utility and independent system operator partners. The baseline values are established based on state-of-the-art numerical weather prediction models and persistence models. The target values are determined based on the reduction in the amount of reserves that must be held to accommodate the uncertainty of solar power output.

  20. Borehole temperatures and a baseline for 20th-century global warming estimates

    SciTech Connect (OSTI)

    Harris, R.N.; Chapman, D.S.

    1997-03-14

    Lack of a 19th-century baseline temperature against which 20th-century warming can be referenced constitutes a deficiency in understanding recent climate change. Combination of borehole temperature profiles, which contain a memory of surface temperature changes in previous centuries, with the meteorologicl archive of surface air temperatures can provide a 19th-century baseline temperature tied to the current observational record. A test case in Utah, where boreholes are interspersed with meteorological stations belonging to the Historical Climatological network, Yields a noise reduction in estimates of 20th-century warming and a baseline temperature that is 0.6{degrees} {+-} 0.1{degrees}C below the 1951 to 1970 mean temperature for the region. 22 refs., 3 figs., 1 tab.

  1. Heat exchanger restart evaluation. Revision 1

    SciTech Connect (OSTI)

    Morrison, J.M.; Hirst, C.W.; Lentz, T.F.

    1992-03-18

    On December 24, 1991, the K-Reactor was in the shutdown mode with full AC process water flow and full cooling water flow. Safety rod testing was being performed as part of the power ascension testing program. The results of cooling water samples indicated tritium concentrations higher than allowable. Further sampling and testing confirmed a Process Water System to Cooling Water System leak in heat exchanger 4A (HX 4A). The heat exchanger was isolated and the plant shutdown. Heat exchanger 4A was removed from the plant and moved to C-Area prior to performing examinations and diagnostic testing. This included locating and identifying the leaking tube or tubes, eddy current examination of the leaking tube and a number of adjacent tubes, visually inspecting the leaking tube from both the inside as well as the area surrounding the identified tube. The leaking tube was removed and examined metallurgically to determine the failure mechanism. In addition ten other tubes that either exhibited eddy current indications or would represent a baseline condition were removed from heat exchanger 4A for metallurgical examination. Additional analysis and review of heat exchanger leakage history was performed to determine if there are any patterns which can be used for predictive purposes. Compensatory actions have been taken to improve the sensitivity and response time to any future events of this type. The results of these actions are summary herein.

  2. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, July--September 1994

    SciTech Connect (OSTI)

    1994-12-31

    This report is Bechtel`s twelfth quarterly technical progress report and covers the period of July through September, 1994. All major tasks associated with the contract study have essentially been completed. Effort is under way in preparing various topical reports for publication. The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases win be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation (PFS) model; establish the baseline design and alternatives; evaluate baseline and alternative economics; develop engineering design criteria; develop a process flowsheet simulation (PFS) model; perform sensitivity studies using the PFS model; document the PFS model and develop a DOE training session on its use; and perform project management, technical coordination and other miscellaneous support functions. Tasks 1, 2, 3 and 5 have essentially been completed. Effort is under way in preparing topical reports for publication. During the current reporting period, work progressed on Tasks 4, 6 and 7. This report covers work done during this period and consists of four sections: Introduction and Summary; Task 4 - Process Flowsheet Simulation (PFS) Model and Conversion to ASPEN PLUS; Task 6 - Document the PFS model and develop a DOE training session on its use; and Project Management and Staffing Report.

  3. Budget FY 1996 Site Support Program Plan: WBS 6.10.1. Revision 1

    SciTech Connect (OSTI)

    Wemhoff, G.M.

    1995-09-01

    This is the budget site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance baseline schedule, cost baseline by month, and the program funding required.

  4. 2010-06 "Budget Priorities for FY'12 and Baseline Change Proposal with

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Future Budgets at LANL" | Department of Energy 6 "Budget Priorities for FY'12 and Baseline Change Proposal with Future Budgets at LANL" 2010-06 "Budget Priorities for FY'12 and Baseline Change Proposal with Future Budgets at LANL" The intent of this recommendation is to provide LASO with the priorities, which the NNMCAB believes are important to the citizens of Northern New Mexico in the large program to clean up the legacy waste at LANL. Rec 2010-06 - March 31, 2010

  5. 2008 CHP Baseline Assessment and Action Plan for the Nevada Market |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 08 CHP Baseline Assessment and Action Plan for the Nevada Market 2008 CHP Baseline Assessment and Action Plan for the Nevada Market The purpose of this report is to assess the current status of combined heat and power (CHP) in Nevada and to identify the hurdles that prevent the expanded use of CHP systems. The report summarizes the CHP "landscape" in Nevada, including the current installed base of CHP systems, the potential future CHP market, and the status of

  6. Baselines For Land-Use Change In The Tropics: Application ToAvoided Deforestation Projects

    SciTech Connect (OSTI)

    Brown, Sandra; Hall, Myrna; Andrasko, Ken; Ruiz, Fernando; Marzoli, Walter; Guerrero, Gabriela; Masera, Omar; Dushku, Aaron; Dejong,Ben; Cornell, Joseph

    2007-06-01

    Although forest conservation activities particularly in thetropics offer significant potential for mitigating carbon emissions,these types of activities have faced obstacles in the policy arena causedby the difficulty in determining key elements of the project cycle,particularly the baseline. A baseline for forest conservation has twomain components: the projected land-use change and the correspondingcarbon stocks in the applicable pools such as vegetation, detritus,products and soil, with land-use change being the most difficult toaddress analytically. In this paper we focus on developing and comparingthree models, ranging from relatively simple extrapolations of pasttrends in land use based on simple drivers such as population growth tomore complex extrapolations of past trends using spatially explicitmodels of land-use change driven by biophysical and socioeconomicfactors. The three models of the latter category used in the analysis atregional scale are The Forest Area Change (FAC) model, the Land Use andCarbon Sequestration (LUCS) model, and the Geographical Modeling (GEOMOD)model. The models were used to project deforestation in six tropicalregions that featured different ecological and socioeconomic conditions,population dynamics, and uses of the land: (1) northern Belize; (2) SantaCruz State, Bolivia; (3) Parana State in Brazil; (4) Campeche, Mexico;(5) Chiapas, Mexico; and (6) Michoacan, Mexico. A comparison of all modeloutputs across all six regions shows that each model produced quitedifferent deforestation baseline. In general, the simplest FAC model,applied at the national administrative-unit scale, projected the highestamount of forest loss (four out of six) and the LUCS model the leastamount of loss (four out of five). Based on simulations of GEOMOD, wefound that readily observable physical and biological factors as well asdistance to areas of past disturbance were each about twice as importantas either sociological/demographic or economic

  7. Planned revision to DOE Order 5820.2A, Radioactive Waste Management

    SciTech Connect (OSTI)

    Duggan, G.J.; Williams, R.E.; Kudera, D.E.; Bailey, D.E.

    1993-03-01

    US Department of Energy Headquarters initiated efforts to revise DOE Order 5820.2A, ``Radioactive Waste Management``. The purpose of the revision is to enhance DOE waste management requirements, reflect new DOE organizational responsibilities, and consolidate requirements for management of all waste, under the responsibility of Environmental Restoration and Waste Management, into a single order. This paper discusses the revision philosophy, objectives of the revision, and strategy for the revision. Issues being considered for inclusion in the revision and recommended methods of resolving each issue are also discussed.

  8. Spent Nuclear Fuel Project technical baseline document. Volumes 1--4, FY 1994

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-04-03

    The Technical Baseline document presents the results of the SNFP systems engineering analyses to date. These analyses establish the baseline functions, requirements, and interfaces to a level necessary to complete the SNFP mission as defined in the SNFP Mission Analysis Report (Volume II). It is a summary-level description of the activities necessary to successfully complete the SNFP mission. The time relationship of these activities is depicted in a two page Activities Logic Diagram (Figure 1.0-1). This document lacks detail in some areas because a clear programmatic and technical path forward is currently under development, and several key trade studies are yet to be completed. A narrative baseline description has been provided as a basis for a point of departure for individual trade studies and further ANFP definition and development. This document is composed of four volumes. Volume I presents the SNFP baseline description. Volume II presents an updated version of the Mission Analysis Report. Volume III presents the results of the functions and requirements analyses, which is an update of the draft of the SNFP Functions and Requirements Document. The initial alternatives analyses are also included in this volume. Volume IV presents the supporting data for the first three volumes.

  9. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Iovenitti, Joe

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

  10. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, April--June 1992

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    Effective September 26, 1991, Bechtel, with Amoco as the main subcontractor, initiated a study to develop a computer model and baseline design for advanced Fischer-Tropsch (F-T) technology for the US Department of Energy`s Pittsburgh Energy Technology Center (PETC). The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced F-T technology; prepare the capital and operating costs for the baseline design; and develop a process flow sheet simulation (PI-S) model. The baseline design, the economic analysis, and the computer model win be the major research planning tools that PETC will use to plan, guide, and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction. for the manufacture of synthetic liquid fuels from coal. This report is Bechtel`s third quarterly technical progress report covering the period from March 16, 1992 through June 21, 1992. This report consists of seven sections: Section 1 - introduction; Section 2 - summary; Section 3 - carbon dioxide removal tradeoff study; Section 4 - preliminary plant designs for coal preparation; Section 5 - preliminary design for syngas production; Section 6 - Task 3 - engineering design criteria; and Section 7 - project management.

  11. Baseline Risk Assessment for the F-Area Burning/Rubble Pits and Rubble Pit

    SciTech Connect (OSTI)

    Palmer, E.

    1996-03-01

    This document provides an overview of the Savannah River Site (SRS) and a description of the F-Area Burning/Rubble Pits (BRPs) and Rubble Pit (RP) unit. It also describes the objectives and scope of the baseline risk assessment (BRA).

  12. Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, January--March 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The objectives of the study are to: Develop a baseline design for indirect liquefaction using advanced Fischer-Tropsch (F-T) technology. Prepare the capital and operating costs for the baseline design. Develop a process flow sheet simulation (PFS) model. This report summarizes the activities completed during the period December 23, 1992 through March 15, 1992. In Task 1, Baseline Design and Alternates, the following activities related to the tradeoff studies were completed: approach and basis; oxygen purity; F-T reactor pressure; wax yield; autothermal reformer; hydrocarbons (C{sub 3}/C{sub 4}s) recovery; and hydrogenrecovery. In Task 3, Engineering Design Criteria, activities were initiated to support the process tradeoff studies in Task I and to develop the environmental strategy for the Illinois site. The work completed to date consists of the development of the F-T reactor yield correlation from the Mobil dam and a brief review of the environmental strategy prepared for the same site in the direct liquefaction baseline study.Some work has also been done in establishing site-related criteria, in establishing the maximum vessel diameter for train sizing and in coping with the low H{sub 2}/CO ratio from the Shell gasifier. In Task 7, Project Management and Administration, the following activities were completed: the subcontract agreement between Amoco and Bechtel was negotiated; a first technical progress meeting was held at the Bechtel office in February; and the final Project Management Plan was approved by PETC and issued in March 1992.

  13. Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report

    SciTech Connect (OSTI)

    Iovenitti, Joe

    2013-05-15

    The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

  14. Baseline and Target Values for PV Forecasts: Toward Improved Solar Power Forecasting: Preprint

    SciTech Connect (OSTI)

    Zhang, Jie; Hodge, Bri-Mathias; Lu, Siyuan; Hamann, Hendrik F.; Lehman, Brad; Simmons, Joseph; Campos, Edwin; Banunarayanan, Venkat

    2015-08-05

    Accurate solar power forecasting allows utilities to get the most out of the solar resources on their systems. To truly measure the improvements that any new solar forecasting methods can provide, it is important to first develop (or determine) baseline and target solar forecasting at different spatial and temporal scales. This paper aims to develop baseline and target values for solar forecasting metrics. These were informed by close collaboration with utility and independent system operator partners. The baseline values are established based on state-of-the-art numerical weather prediction models and persistence models. The target values are determined based on the reduction in the amount of reserves that must be held to accommodate the uncertainty of solar power output. forecasting metrics. These were informed by close collaboration with utility and independent system operator partners. The baseline values are established based on state-of-the-art numerical weather prediction models and persistence models. The target values are determined based on the reduction in the amount of reserves that must be held to accommodate the uncertainty of solar power output.

  15. Baseline and target values for regional and point PV power forecasts: Toward improved solar forecasting

    SciTech Connect (OSTI)

    Zhang, Jie; Hodge, Bri -Mathias; Lu, Siyuan; Hamann, Hendrik F.; Lehman, Brad; Simmons, Joseph; Campos, Edwin; Banunarayanan, Venkat; Black, Jon; Tedesco, John

    2015-11-10

    Accurate solar photovoltaic (PV) power forecasting allows utilities to reliably utilize solar resources on their systems. However, to truly measure the improvements that any new solar forecasting methods provide, it is important to develop a methodology for determining baseline and target values for the accuracy of solar forecasting at different spatial and temporal scales. This paper aims at developing a framework to derive baseline and target values for a suite of generally applicable, value-based, and custom-designed solar forecasting metrics. The work was informed by close collaboration with utility and independent system operator partners. The baseline values are established based on state-of-the-art numerical weather prediction models and persistence models in combination with a radiative transfer model. The target values are determined based on the reduction in the amount of reserves that must be held to accommodate the uncertainty of PV power output. The proposed reserve-based methodology is a reasonable and practical approach that can be used to assess the economic benefits gained from improvements in accuracy of solar forecasting. Lastly, the financial baseline and targets can be translated back to forecasting accuracy metrics and requirements, which will guide research on solar forecasting improvements toward the areas that are most beneficial to power systems operations.

  16. Baseline and target values for regional and point PV power forecasts: Toward improved solar forecasting

    DOE PAGES-Beta [OSTI]

    Zhang, Jie; Hodge, Bri -Mathias; Lu, Siyuan; Hamann, Hendrik F.; Lehman, Brad; Simmons, Joseph; Campos, Edwin; Banunarayanan, Venkat; Black, Jon; Tedesco, John

    2015-11-10

    Accurate solar photovoltaic (PV) power forecasting allows utilities to reliably utilize solar resources on their systems. However, to truly measure the improvements that any new solar forecasting methods provide, it is important to develop a methodology for determining baseline and target values for the accuracy of solar forecasting at different spatial and temporal scales. This paper aims at developing a framework to derive baseline and target values for a suite of generally applicable, value-based, and custom-designed solar forecasting metrics. The work was informed by close collaboration with utility and independent system operator partners. The baseline values are established based onmore » state-of-the-art numerical weather prediction models and persistence models in combination with a radiative transfer model. The target values are determined based on the reduction in the amount of reserves that must be held to accommodate the uncertainty of PV power output. The proposed reserve-based methodology is a reasonable and practical approach that can be used to assess the economic benefits gained from improvements in accuracy of solar forecasting. Lastly, the financial baseline and targets can be translated back to forecasting accuracy metrics and requirements, which will guide research on solar forecasting improvements toward the areas that are most beneficial to power systems operations.« less

  17. Baseline geochemistry of soil and bedrock Tshirege Member of the Bandelier Tuff at MDA-P

    SciTech Connect (OSTI)

    Warren, R.G.; McDonald, E.V.; Ryti, R.T.

    1997-08-01

    This report provides baseline geochemistry for soils (including fill), and for bedrock within three specific areas that are planned for use in the remediation of Material Disposal Area P (MDA-P) at Technical Area 16 (TA-16). The baseline chemistry includes leachable element concentrations for both soils and bedrock and total element concentrations for all soil samples and for two selected bedrock samples. MDA-P operated from the early 1950s to 1984 as a landfill for rubble and debris generated by the burning of high explosives (HE) at the TA-16 Burning Ground, HE-contaminated equipment and material, barium nitrate sand, building materials, and trash. The aim of this report is to establish causes for recognizable chemical differences between the background and baseline data sets. In many cases, the authors conclude that recognizable differences represent natural enrichments. In other cases, differences are best attributed to analytical problems. But most importantly, the comparison of background and baseline geochemistry demonstrates significant contamination for several elements not only at the two remedial sites near the TA-16 Burning Ground, but also within the entire region of the background study. This contamination is highly localized very near to the surface in soil and fill, and probably also in bedrock; consequently, upper tolerance limits (UTLs) calculated as upper 95% confidence limits of the 95th percentile are of little value and thus are not provided. This report instead provides basic statistical summaries and graphical comparisons for background and baseline samples to guide strategies for remediation of the three sites to be used in the restoration of MDA-P.

  18. Revised accident source terms for light-water reactors

    SciTech Connect (OSTI)

    Soffer, L.

    1995-02-01

    This paper presents revised accident source terms for light-water reactors incorporating the severe accident research insights gained in this area over the last 15 years. Current LWR reactor accident source terms used for licensing date from 1962 and are contained in Regulatory Guides 1.3 and 1.4. These specify that 100% of the core inventory of noble gases and 25% of the iodine fission products are assumed to be instantaneously available for release from the containment. The chemical form of the iodine fission products is also assumed to be predominantly elemental iodine. These assumptions have strongly affected present nuclear air cleaning requirements by emphasizing rapid actuation of spray systems and filtration systems optimized to retain elemental iodine. A proposed revision of reactor accident source terms and some im implications for nuclear air cleaning requirements was presented at the 22nd DOE/NRC Nuclear Air Cleaning Conference. A draft report was issued by the NRC for comment in July 1992. Extensive comments were received, with the most significant comments involving (a) release fractions for both volatile and non-volatile species in the early in-vessel release phase, (b) gap release fractions of the noble gases, iodine and cesium, and (c) the timing and duration for the release phases. The final source term report is expected to be issued in late 1994. Although the revised source terms are intended primarily for future plants, current nuclear power plants may request use of revised accident source term insights as well in licensing. This paper emphasizes additional information obtained since the 22nd Conference, including studies on fission product removal mechanisms, results obtained from improved severe accident code calculations and resolution of major comments, and their impact upon the revised accident source terms. Revised accident source terms for both BWRS and PWRS are presented.

  19. Louisiana Crude Oil + Lease Condensate Reserves Revision Decreases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Decreases (Million Barrels) Louisiana Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 69 2010's 93 43 67 65 75 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet After Lease

  20. Louisiana Crude Oil + Lease Condensate Reserves Revision Increases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Increases (Million Barrels) Louisiana Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 100 2010's 139 100 98 91 71 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases

  1. Louisiana State Offshore Crude Oil + Lease Condensate Reserves Revision

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Million Barrels) Decreases (Million Barrels) Louisiana State Offshore Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 6 2010's 9 5 13 6 6 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision

  2. Louisiana--North Shale Proved Reserves Revision Decreases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Decreases (Billion Cubic Feet) Louisiana--North Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 826 2010's 1,878 3,882 10,558 2,731 2,558 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  3. Louisiana--North Shale Proved Reserves Revision Increases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Increases (Billion Cubic Feet) Louisiana--North Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 636 2010's 1,856 2,002 1,422 1,606 1,631 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  4. Louisiana--South Onshore Shale Proved Reserves Revision Decreases (Billion

    U.S. Energy Information Administration (EIA) (indexed site)

    Cubic Feet) Decreases (Billion Cubic Feet) Louisiana--South Onshore Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 0 6 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  5. Louisiana--South Onshore Shale Proved Reserves Revision Increases (Billion

    U.S. Energy Information Administration (EIA) (indexed site)

    Cubic Feet) Increases (Billion Cubic Feet) Louisiana--South Onshore Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 0 22 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  6. Lower 48 States Coalbed Methane Proved Reserves Revision Decreases (Billion

    U.S. Energy Information Administration (EIA) (indexed site)

    Cubic Feet) Decreases (Billion Cubic Feet) Lower 48 States Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 2,486 2010's 2,914 1,668 3,871 1,998 1,020 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision

  7. Lower 48 States Coalbed Methane Proved Reserves Revision Increases (Billion

    U.S. Energy Information Administration (EIA) (indexed site)

    Cubic Feet) Increases (Billion Cubic Feet) Lower 48 States Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 1,563 2010's 2,589 2,071 971 3,123 3,299 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision I

  8. Michigan Crude Oil + Lease Condensate Reserves Revision Decreases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Decreases (Million Barrels) Michigan Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 17 2010's 5 4 3 2 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet After Lease

  9. Michigan Crude Oil + Lease Condensate Reserves Revision Increases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Increases (Million Barrels) Michigan Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 21 2010's 4 5 19 4 3 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases

  10. Miscellaneous States Coalbed Methane Proved Reserves Revision Decreases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Billion Cubic Feet) Decreases (Billion Cubic Feet) Miscellaneous States Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 24 2010's 2 0 1 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Decreases

  11. Miscellaneous States Coalbed Methane Proved Reserves Revision Increases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Billion Cubic Feet) Increases (Billion Cubic Feet) Miscellaneous States Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 0 0 1 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Increases

  12. Miscellaneous States Crude Oil + Lease Condensate Reserves Revision

    U.S. Energy Information Administration (EIA) (indexed site)

    Decreases (Million Barrels) Decreases (Million Barrels) Miscellaneous States Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 2 2010's 1 2 7 5 8 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision

  13. Miscellaneous States Crude Oil + Lease Condensate Reserves Revision

    U.S. Energy Information Administration (EIA) (indexed site)

    Increases (Million Barrels) Increases (Million Barrels) Miscellaneous States Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 5 2010's 3 3 3 3 1 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision

  14. Miscellaneous States Shale Gas Proved Reserves Revision Decreases (Billion

    U.S. Energy Information Administration (EIA) (indexed site)

    Cubic Feet) Decreases (Billion Cubic Feet) Miscellaneous States Shale Gas Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 22 2010's 77 27 9 29 17 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  15. Miscellaneous States Shale Gas Proved Reserves Revision Increases (Billion

    U.S. Energy Information Administration (EIA) (indexed site)

    Cubic Feet) Increases (Billion Cubic Feet) Miscellaneous States Shale Gas Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 4 2010's 17 19 76 3 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  16. Mississippi (with State off) Shale Proved Reserves Revision Decreases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Billion Cubic Feet) Decreases (Billion Cubic Feet) Mississippi (with State off) Shale Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 0 3 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Decreases

  17. Mississippi (with State off) Shale Proved Reserves Revision Increases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Billion Cubic Feet) Increases (Billion Cubic Feet) Mississippi (with State off) Shale Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 0 4 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Revision Increases

  18. Mississippi Crude Oil + Lease Condensate Reserves Revision Decreases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Million Barrels) Decreases (Million Barrels) Mississippi Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 8 2010's 9 13 28 15 17 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet

  19. Mississippi Crude Oil + Lease Condensate Reserves Revision Increases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Million Barrels) Increases (Million Barrels) Mississippi Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 30 2010's 17 14 37 8 14 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases

  20. Montana Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Decreases (Billion Cubic Feet) Montana Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 29 2010's 0 3 28 4 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Decreases

  1. Montana Coalbed Methane Proved Reserves Revision Increases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Increases (Billion Cubic Feet) Montana Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 23 0 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Increases

  2. Montana Crude Oil + Lease Condensate Reserves Revision Decreases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Decreases (Million Barrels) Montana Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 47 2010's 44 51 38 59 44 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet After Lease

  3. Montana Crude Oil + Lease Condensate Reserves Revision Increases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Increases (Million Barrels) Montana Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 72 2010's 54 54 19 75 19 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases

  4. Nebraska Crude Oil + Lease Condensate Reserves Revision Decreases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Decreases (Million Barrels) Nebraska Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 0 0 1 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet After Lease

  5. Nebraska Crude Oil + Lease Condensate Reserves Revision Increases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Increases (Million Barrels) Nebraska Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 1 2010's 1 6 1 4 7 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases

  6. New Mexico - East Crude Oil + Lease Condensate Reserves Revision Decreases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Million Barrels) Decreases (Million Barrels) New Mexico - East Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 74 2010's 65 88 148 179 189 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision

  7. New Mexico - East Crude Oil + Lease Condensate Reserves Revision Increases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Million Barrels) Increases (Million Barrels) New Mexico - East Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 95 2010's 85 97 193 182 284 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision

  8. New Mexico - West Crude Oil + Lease Condensate Reserves Revision Decreases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Million Barrels) Decreases (Million Barrels) New Mexico - West Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 3 2010's 2 4 3 9 14 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet

  9. New Mexico - West Crude Oil + Lease Condensate Reserves Revision Increases

    U.S. Energy Information Administration (EIA) (indexed site)

    (Million Barrels) Increases (Million Barrels) New Mexico - West Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 7 2010's 5 14 7 29 10 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases

  10. New Mexico Coalbed Methane Proved Reserves Revision Decreases (Billion

    U.S. Energy Information Administration (EIA) (indexed site)

    Cubic Feet) Decreases (Billion Cubic Feet) New Mexico Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 353 2010's 565 279 602 587 532 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Decreases

  11. U. S. Btu tax plan revised; industry wary of results

    SciTech Connect (OSTI)

    Crow, P.

    1993-04-12

    The Clinton administration has changed its U.S. energy tax proposal to remove some objection voiced by industry and consumers. The Treasury Department's revised plan will still tax oil products at double the rate of other types of energy except for home heating oil, which now is to be taxed at the lower rate for natural gas. Of major importance to California producers, the revision will not tax natural gas used in enhanced recovery for heavy oil. This paper describes exemptions; effects on natural gas; the credibility gap; inhibition of gas market recovery; tax on NGL; and forecasting the future.

  12. Revision to DOE Order 435.1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Management » Compliance » Revision to DOE Order 435.1 Revision to DOE Order 435.1 The Office of Environmental Management has primary responsibility, within DOE, for DOE Order 435.1, the self-regulation of radioactive waste management. As part of this responsibility, EM has decided to update the Order to incorporate several changes to the regulatory process that have taken place over the last decade as well as streamline the Order to improve management of the waste. A comprehensive

  13. Alabama Crude Oil + Lease Condensate Reserves Revision Decreases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Decreases (Million Barrels) Alabama Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 2 2010's 5 1 2 2 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet After Lease

  14. Alabama Crude Oil + Lease Condensate Reserves Revision Increases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Increases (Million Barrels) Alabama Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 9 2010's 9 2 10 13 16 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases

  15. Alaska Crude Oil + Lease Condensate Reserves Revision Decreases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Decreases (Million Barrels) Alaska Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 152 2010's 76 129 451 392 196 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet After Lease

  16. Alaska Crude Oil + Lease Condensate Reserves Revision Increases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Increases (Million Barrels) Alaska Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 394 2010's 397 362 84 87 239 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases

  17. Arkansas Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Decreases (Billion Cubic Feet) Arkansas Coalbed Methane Proved Reserves Revision Decreases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 1 3 10 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Decreases

  18. Arkansas Coalbed Methane Proved Reserves Revision Increases (Billion Cubic

    U.S. Energy Information Administration (EIA) (indexed site)

    Feet) Increases (Billion Cubic Feet) Arkansas Coalbed Methane Proved Reserves Revision Increases (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 3 2010's 9 0 1 5 3 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Revision Increases

  19. Arkansas Crude Oil + Lease Condensate Reserves Revision Decreases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Decreases (Million Barrels) Arkansas Crude Oil + Lease Condensate Reserves Revision Decreases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 3 3 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Decreases, Wet After Lease

  20. Arkansas Crude Oil + Lease Condensate Reserves Revision Increases (Million

    U.S. Energy Information Administration (EIA) (indexed site)

    Barrels) Increases (Million Barrels) Arkansas Crude Oil + Lease Condensate Reserves Revision Increases (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 5 2010's 12 31 4 15 2 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Revision Increases