  1. Ni Clusterbank Replacement Project | Argonne Leadership Computing...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Ni Clusterbank Replacement Project Event Sponsor: Argonne Leadership Computing Facility Seminar Start Date: Oct 20 2015 - 12:00pm BuildingRoom: Building 241Room D173...

  2. Conceptual Design Plan SM-43 Replacement Project

    SciTech Connect

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  3. Replacement of Thermally Produced Calcined Clay; Inventions and Innovation Forest Products Project Fact Sheet

    SciTech Connect

    2000-10-30

    Project fact sheet written for the Inventions and Innovation Program about a new technology that saves energy by replacing calcined clay used in paper manufacturing.

  4. EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

  5. The Radioactive Liquid Waste Treatment Facility Replacement Project...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... These actions, if sustained, should address project management weaknesses discussed in this report. Life Cycle Cost Estimation In a span of more than 7 years, NNSA and Los Alamos ...

  6. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  7. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  8. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    SciTech Connect

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  9. Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

    SciTech Connect

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  10. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    SciTech Connect

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  11. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  12. Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

    SciTech Connect

    Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2013-06-25

    Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  13. Fire hazards analysis for the replacement cross-site transfer system, project W-058

    SciTech Connect

    Sepahpur, J.B.

    1996-02-14

    The fire hazards analysis assess the risk from fire and determines compliance with the applicable criteria of DOE 5480.7A, DOE 6430.1A, and RLID 5480.7. (Project W-058 will provide encased pipelines to connect the SY Tank Farms in 200 West Area with the tank farms in 200 East Area via an interface with the 244-A lift station. Function of the cross-site transfer system will be to transfer radioactive waste from the SY Tank Farm to treatment, storage, and disposal facilities in 200 East Area.)

  14. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    SciTech Connect

    Kinney, Kathryn A

    2009-10-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully

  15. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment

    SciTech Connect

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

  16. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  17. EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico

    Energy.gov [DOE]

    This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

  18. Power Plant Replacement Study

    SciTech Connect

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois Universitys aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  19. Power Plant Replacement Study

    SciTech Connect

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  20. Power Plant Replacement Study

    SciTech Connect

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self‐funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty‐three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  1. Power Plant Replacement Study

    SciTech Connect

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  2. Grand Coulee & Hungry Horse SCADA Replacement

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Gates Replacement This project is part of the Third Powerplant overhaul at Grand Coulee Dam. The full overhaul effort involves a mechanical overhaul of units G19 - G24. The...

  3. Energy Replacement Generation Tax Exemption

    Office of Energy Efficiency and Renewable Energy (EERE)

    Under the Energy Replacement Generation Tax Exemption, the following facilities are exempt from the replacement tax:

  4. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Energy.gov [DOE] (indexed site)

    Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

  5. Ion replacement electrorefining

    SciTech Connect

    Willit, J.L.; Tomczuk, Z.; Miller, W.E.; Laidler, J.J.

    1994-04-01

    We are developing a two-step electrochemical process for purifying and separating metals called ion replacement electrorefining. In each step, metal cations formed by oxidation at an electrode replace other metal cations that are reduced at another elecmae. Using this approach, we have separated or purified uranium, dysprosium, and lanthanum on a laboratory scale. This paper explains the ion replacement concept and presents results of these demonstration experiments.

  6. Line Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  7. Radiation Source Replacement Workshop

    SciTech Connect

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  8. Categorical Exclusion Determinations: Portsmouth Paducah Project Office |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Portsmouth Paducah Project Office Categorical Exclusion Determinations: Portsmouth Paducah Project Office Categorical Exclusion Determinations issued by Portsmouth Paducah Project Office. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2012 CX-009253: Categorical Exclusion Determination Optimization of Electrical Power at the Portsmouth Gaseous Diffusion Facility CX(s) Applied: B4.6, B4.11 Date: 08/09/2012 Location(s): Ohio Offices(s): Portsmouth Paducah Project Office May 9,

  9. WIPP Workers Perform Filter Replacement

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    levels of airborne salt dust, increasing the frequency with which filters are replaced. ... Frequent replacement is necessary because of reduced airflow due to buildup of salt dust. ...

  10. ARRANGEMENT FOR REPLACING FILTERS

    DOEpatents

    Blomgren, R.A.; Bohlin, N.J.C.

    1957-08-27

    An improved filtered air exhaust system which may be continually operated during the replacement of the filters without the escape of unfiltered air is described. This is accomplished by hermetically sealing the box like filter containers in a rectangular tunnel with neoprene covered sponge rubber sealing rings coated with a silicone impregnated pneumatic grease. The tunnel through which the filters are pushed is normal to the exhaust air duct. A number of unused filters are in line behind the filters in use, and are moved by a hydraulic ram so that a fresh filter is positioned in the air duct. The used filter is pushed into a waiting receptacle and is suitably disposed. This device permits a rapid and safe replacement of a radiation contaminated filter without interruption to the normal flow of exhaust air.

  11. Categorical Exclusion Determinations: Advanced Research Projects

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Agency-Energy | Department of Energy Advanced Research Projects Agency-Energy Categorical Exclusion Determinations: Advanced Research Projects Agency-Energy Categorical Exclusion Determinations issued by Advanced Research Projects Agency-Energy. DOCUMENTS AVAILABLE FOR DOWNLOAD December 19, 2013 CX-011762: Categorical Exclusion Determination Arzeda Corp. - Design of Metalloenzymes for Methane Activation CX(s) Applied: B3.6 Date: 12/19/2013 Location(s): Washington Offices(s): Advanced

  12. Replacing Lightbulbs and Ballasts | Department of Energy

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Lighting Replacing Lightbulbs and Ballasts Replacing Lightbulbs and Ballasts Replace frequently used bulbs with more energy efficient options to save money and energy. Replace...

  13. Building America Technology Solutions for New and Existing Homes: Replacing

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Resistance Heating with Mini-Split Heat Pumps | Department of Energy Replacing Resistance Heating with Mini-Split Heat Pumps Building America Technology Solutions for New and Existing Homes: Replacing Resistance Heating with Mini-Split Heat Pumps In this project, the Advanced Residential Integrated Solutions team investigated the suitability of mini-split heat pumps for multifamily retrofits. Replacing Resistance Heating with Mini-Split Heat Pumps (638.84 KB) More Documents &

  14. Git Replacement for the

    Energy Science and Technology Software Center

    2014-09-23

    GRAPE is a tool for managing software project workflows for the Git version control system. It provides a suite of tools to simplify and configure branch based development, integration with a project's testing suite, and integration with the Atlassian Stash repository hosting tool.

  15. Nashville Gas treads carefully to replace pipe

    SciTech Connect

    1997-06-01

    The private gas utility, Nashville Gas, was responsible for replacing damaged or inadequate 2- and 4-inch steel gas lines beneath Music City, USA. The line replacements required either size for size or upsizing. The first choice was directional drilling, which was quickly determined to be unpractical because of rocky soil conditions. The second option was open trenching. Undoubtedly, trenching would mean having to contend with angry residents and tourists, since gas lines ran beneath yards, mature trees, sidewalks, roadways, and railways. In addition to the negative social factors, trenching would require additional funds for substantial landscaping and pavement replacement. It at all possible, a no-dig alternative was desired. Nashville Gas found Grundomat piercing tools which create a bore, then pushes pipe back through it. These same tools can simultaneously pull in pipe. These tools were customized for the Nashville project.

  16. Projecting

    Energy Information Administration (EIA) (indexed site)

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS infrastructure development Matthew Tanner Office of Petroleum, Gas, & Biofuels Analysis U.S. Energy Information Administration October 25, 2010 This paper is released to encourage discussion and critical comment. The analysis and conclusions ex- pressed here are those of the author and not necessarily those of the U.S. Energy Information Administration. Author: Matthew Tanner, matthew.tanner@eia.gov

  17. Atomic Sandblasters Could Replace Silicon

    Energy.gov [DOE]

    Scientists at the National Labs may have found a cheaper, lighter more efficient replacement for silicon in computer chips.

  18. Project Title: X-Ray Machine Replacement Project (4552)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB I.S - Cooling water system...

  19. CX-010155: Categorical Exclusion Determination

    Energy.gov [DOE]

    Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  20. CX-008683: Categorical Exclusion Determination

    Energy.gov [DOE]

    Shaniko Radio Station Replacement Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  1. CX-008691: Categorical Exclusion Determination

    Energy.gov [DOE]

    Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  2. CX-008803: Categorical Exclusion Determination

    Energy.gov [DOE]

    Milling Machine Replacement Projects CX(s) Applied: B1.31 Date: 05/14/2012 Location(s): Tennessee Offices(s): Y-12 Site Office

  3. Categorical Exclusion Determinations: Bonneville Power Administration...

    Office of Environmental Management (EM)

    Coyote Hills Radio Station Electrical Service Replacement Project CX(s) Applied: B4.13 ... November 12, 2015 CX-014377: Categorical Exclusion Determination Olympia Substation ...

  4. Categorical Exclusion Determinations: Southwestern Power Administratio...

    Office of Environmental Management (EM)

    NERC Alert Phase III Transmission Line Structure Replacement Project CX(s) Applied: B4.6 ... May 5, 2014 CX-012212: Categorical Exclusion Determination Doniphan Substation Backup ...

  5. 242T FACP replacement

    SciTech Connect

    Ferry, M.F.

    1994-11-17

    This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Fire Protection system functions as required by project criteria. This ATP will test the Pyrotronic CP-400 fire alarm control panel (FACP), and interfaces with the radio fire alarm reporting box, alarm/supervisory initiating devices, and alarm indicating appliances. This document is to certify the installation and testing of the fire alarm control panel and all attached devices to insure the Hanford Fire Dept. receives the proper signals. This fire alarm control panel is located in Bldg. 242T in the 200 W Area of Hanford.

  6. Replacement Power Facility site selection report

    SciTech Connect

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  7. Replacement Cost of Domestic Crude

    Energy Science and Technology Software Center

    1994-12-01

    The DEEPWATER model forecasts the replacement cost of domestic crude oil for 13 offshore regions in the lower 48 states. The replacement cost of domestic crude oil is the constant or levelized selling price that will recover the full expense of exploration, development, and productions with a reasonable return on capital.

  8. Heavy-Duty Natural Gas Drayage Truck Replacement Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Natural Gas Drayage Truck Replacement Program Heavy-Duty Natural Gas Drayage Truck Replacement Program 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting arravt045_ti_white_2012_o.pdf (517.25 KB) More Documents & Publications Heavy-Duty Natural Gas Drayage Truck Replacement Program Heavy-Duty Natural Gas Drayage Truck Replacement Program UPS Ontario - Las Vegas LNG Corridor Extension Project: Bridging the G

  9. Replacing Lightbulbs and Ballasts | Department of Energy

    Office of Environmental Management (EM)

    Replace frequently used bulbs with more energy efficient options to save money and energy. Replace frequently used bulbs with more energy efficient options to save money and energy. ...

  10. Do You Have Windows That Need Replacing?

    Energy.gov [DOE]

    Do you have windows that need replacing, too? Do you have any plans to replace them with newer, more efficient windows?

  11. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect

    Hernandez, Adriana

    2012-09-21

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  12. Replacement of alloy 800H superheated steam line

    SciTech Connect

    Barbier, R.A.; Bullock, J.W. [Sterling Chemicals, Texas City, TX (United States)

    1996-07-01

    Sterling Chemicals utilizes alloy 800HT (UNS N08811) piping for superheated steam service in its styrene dehydrogenation unit. An engineering project to replace these lines was recently completed. Material acquisition, shop fabrication, inspection requirements, and field erection will be highlighted in this paper.

  13. Modifications to Replacement Costs System

    SciTech Connect

    Godec, M. [ICF Resources, Inc., Fairfax, VA (United States)

    1989-05-18

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985.

  14. KP-Replacement-2-B Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Replacement-2-B Wholesale Power Rate Schedule KP-Replacement-2-B Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to

  15. Replacing The Engine In Your Car While You Are Still Driving It

    SciTech Connect

    Bjorklund, Eric A.

    2015-11-04

    The scope of the project included the following: install new network backbone, replace 201 MHz rf tubes, replace low-level rf system, replace timing system, replace industrial I/O system, replace beam synchronous data acquisition system, replace fast protect reporting system, new wire scanner hardware, and new beam position/phase monitor hardware--all of this to be done while continuing to deliver beam to users. Lessons learned, for anyone contemplating a similarly ambitious upgrade: You can’t replace the whole system at once. Some compatibility must be maintained between the old and new systems. Always have a way to fall back. Have sympathy for the operations staff. You will be surprised.

  16. B Plant process piping replacement feasibility study

    SciTech Connect

    Howden, G.F.

    1996-02-07

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

  17. OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement

    Energy.gov [DOE]

    With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

  18. Duct Chase Sprinkler Replacement Project (4594), 5/31/2012

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner...

  19. Categorical Exclusion 4567, MPLE Test Stand Replacement Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and Guidelines DA 14 - Approval of technical exchange arrangements DA 15 - International umbrella agreements for energy R&D Facility Operations DB 1.2 - Training exercises and...

  20. Acquisition and Project Management Awards Presentations - Ingrid...

    Energy.gov [DOE] (indexed site)

    Secretary's Achievement Award Seismic Life-Safety, Modernization & Replacement (Seismic Ph 2)Secretary's Award for Project Management Improvement Nuclear Materials Safeguards & ...

  1. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    SciTech Connect

    Noel Duckwitz

    2011-05-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the

  2. Retail Replacement Lamps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CALiPER Testing » Application Reports » Retail Replacement Lamps Retail Replacement Lamps Annual CALiPER testing of A19, G25, candelabra, night light, MR16/PAR16, PAR20, and PAR30 replacement lamps - purchased directly from store shelves - offers insights on performance trends from year to year. The report findings offer valuable insights for manufacturers and retailers alike. Retail Lamps Study 3 (48 pages, February 2014) Retail Lamps Study 3.1: Dimming, Flicker, and Power Quality

  3. Economics of chlorofluorocarbon (CFC) machine replacement. Master's thesis

    SciTech Connect

    Rudderow, G.D.

    1994-09-01

    Continued use of chlorofluorocarbon (CFC) refrigerants may have a severe financial as well as operational impact on the users of air-conditioning and other refrigeration equipment as price increases continue and production is phased out. With production of CFC's coming to a halt on 31 December 1995, the two major refrigerants that have been used in commercial and industrial cooling applications will no longer be available. The phase out of production is a result of national and international agreement that these, as well as other CFC's, are a primary cause of the depletion of the stratospheric ozone layer. To help the user reduce this impact, an economic model based on the time value of money and utilizing replacement analysis was developed. The model is designed to require the user to supply information on his own equipment and on the projected costs of non-CFC replacement equipment. After running the model, the point in time when the existing equipment should be replaced is indicated. By way of example, the model is applied to a centrifugal chiller application. The results of this approach indicate that the increase in CFC costs is only a small factor in the cost of chiller operation. Rather than make a replacement to avoid the high price of refrigerant, the controlling factor is the overall cost of power consumption required to provide the cooling effect.

  4. Grand Coulee & Hungry Horse SCADA Replacement

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    extensive maintenance and repairs. The turbine hubs on these units have experienced chronic oil leaks. The history of problems led to a decision to replace the turbine runners...

  5. LED Replacements for Linear Fluorescent Lamps Webcast

    Energy.gov [DOE]

    In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

  6. Replacement solvents for use in chemical synthesis

    DOEpatents

    Molnar, Linda K.; Hatton, T. Alan; Buchwald, Stephen L.

    2001-05-15

    Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

  7. Marin County- Wood Stove Replacement Rebate Program

    Energy.gov [DOE]

    Homes in the San Geronimo Valley (Forest Knolls, Lagunitas, San Geronimo, and Woodacre) can receive a rebate of $1,500 for the removal and replacement of non-certified wood burning appliances with...

  8. CX-010393: Categorical Exclusion Determination

    Energy.gov [DOE]

    Sitewide Domestic Water Service Replacement Project CX(s) Applied: B1.3, B1.15 Date: 09/10/2012 Location(s): Illinois Offices(s): Fermi Site Office

  9. CX-000004: Categorical Exclusion Determination | Department of...

    Energy.gov [DOE] (indexed site)

    Lane-Wendson 1 Structure 105 Access Road Improvement and Pole Replacement Project CX(s) Applied: B1.3 Date: 10082009 Location(s): Lane County, Oregon Office(s): Bonneville ...

  10. CX-011994: Categorical Exclusion Determination

    Energy.gov [DOE]

    Marion-Alvey Marion-Lane Insulator Replacement Project CX(s) Applied: B1.3 Date: 04/07/2014 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  11. CX-010161: Categorical Exclusion Determination

    Energy.gov [DOE]

    Buckley-Marion Overhead Groundwire Replacement Project CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  12. CX-013645: Categorical Exclusion Determination

    Energy.gov [DOE]

    2015 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3Date: 04/09/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  13. CX-008579: Categorical Exclusion Determination

    Energy.gov [DOE]

    Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System CX(s) Applied: B5.1 Date: 07/25/2012 Location(s): Arkansas Offices(s): Golden Field Office

  14. CX-012480: Categorical Exclusion Determination

    Energy.gov [DOE]

    Building 920 AHU-1 Replacement Project CX(s) Applied: B1.15, B1.23, B2.1Date: 41862 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory

  15. CX-014279: Categorical Exclusion Determination

    Energy.gov [DOE]

    Lower Level Guard Post Replacement Project CX(s) Applied: B1.11, B1.15, B2.2Date: 09/25/2015 Location(s): New YorkOffices(s): Naval Nuclear Propulsion Program

  16. CX-008703: Categorical Exclusion Determination

    Energy.gov [DOE]

    Oregon City-Chemawa #2 Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  17. CX-008802: Categorical Exclusion Determination

    Energy.gov [DOE]

    Dry Pipe System Sprinkler Piping Replacement Projects CX(s) Applied: B1.3 Date: 05/14/2012 Location(s): Tennessee Offices(s): Y-12 Site Office

  18. CX-010729: Categorical Exclusion Determination

    Energy.gov [DOE]

    2013 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

  19. CX-010735: Categorical Exclusion Determination

    Energy.gov [DOE]

    Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  20. CX-013878: Categorical Exclusion Determination

    Energy.gov [DOE]

    Naval Reactors Facility (NRF) Storm Sewer West Main Replacement Project CX(s) Applied: B2.5Date: 07/06/2015 Location(s): None ProvidedOffices(s): Naval Nuclear Propulsion Program

  1. CX-014373: Categorical Exclusion Determination

    Energy.gov [DOE]

    Coyote Hills Radio Station Electrical Service Replacement Project CX(s) Applied: B4.13Date: 12/01/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  2. CX-012004: Categorical Exclusion Determination

    Energy.gov [DOE]

    2014 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

  3. CX-008689: Categorical Exclusion Determination

    Energy.gov [DOE]

    2012 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 06/28/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration

  4. CX-008798: Categorical Exclusion Determination

    Energy.gov [DOE]

    Duct Chase Sprinkler Replacement Project CX(s) Applied: B1.3 Date: 06/04/2012 Location(s): Tennessee Offices(s): Y-12 Site Office

  5. CX-010164: Categorical Exclusion Determination

    Energy.gov [DOE]

    2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration

  6. CX-008696: Categorical Exclusion Determination

    Energy.gov [DOE]

    Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration

  7. CX-010427: Categorical Exclusion Determination

    Energy.gov [DOE]

    Hat Rock Switching Station Replacement Project CX(s) Applied: B4.6 Date: 06/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  8. CX-013646: Categorical Exclusion Determination

    Energy.gov [DOE]

    2015 North Bend District Wood Pole Replacement Projects CX(s) Applied: B1.3Date: 04/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  9. CX-010732: Categorical Exclusion Determination

    Energy.gov [DOE]

    2013 Spokane District Wood pole Replacement Projects CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): Washington, Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration

  10. CX-013626: Categorical Exclusion Determination

    Energy.gov [DOE]

    Murray-Custer FY15 Wood Pole Replacement Project CX(s) Applied: B1.3Date: 05/01/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  11. CX-013630: Categorical Exclusion Determination

    Energy.gov [DOE]

    FY15 Snohomish District Danger Pole Replacement Project CX(s) Applied: B1.3Date: 04/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  12. CX-008164: Categorical Exclusion Determination

    Energy.gov [DOE]

    Captain Jack-Olinda RAS LLL/LT Replacement Project CX(s) Applied: B1.31 Date: 03/26/2012 Location(s): California Offices(s): Bonneville Power Administration

  13. CX-008715: Categorical Exclusion Determination

    Energy.gov [DOE]

    2012 Alvey District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  14. CX-007521: Categorical Exclusion Determination

    Energy.gov [DOE]

    MPLE Test Stand Replacement Project CX(s) Applied: B1.3, B1.27, B1.31 Date: 12/15/2011 Location(s): Tennessee Offices(s): Y-12 Site Office

  15. CX-013909: Categorical Exclusion Determination

    Energy.gov [DOE]

    NERC Alert Phase III Transmission Line Structure Replacement Project CX(s) Applied: B4.6Date: 04/16/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration

  16. CX-010428: Categorical Exclusion Determination

    Energy.gov [DOE]

    Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  17. CX-013793: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Shelton-Fairmount No. 1 Switches Replacement Project CX(s) Applied: B1.3Date: 06/18/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  18. CX-008248: Categorical Exclusion Determination

    Energy.gov [DOE]

    Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project CX(s) Applied: B2.2 Date: 04/07/2012 Location(s): Idaho Offices(s): Nuclear Energy

  19. CX-012005: Categorical Exclusion Determination

    Energy.gov [DOE]

    2014 Alvey District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

  20. CX-013644: Categorical Exclusion Determination

    Energy.gov [DOE]

    2015 Alvey District Wood Pole Replacement Projects CX(s) Applied: B1.3Date: 04/09/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  1. CX-012748: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big Spring-Sydney 115 Kilovolt Transmission Line Pole Replacement Project, Deuel County, Nebraska CX(s) Applied: B1.3Date: 41845 Location(s): NebraskaOffices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-008687: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bandon-Rogue Transmission Line Rebuild Project - Fiscal Year 2012 Culvert Replacement and Associated Access Road Reconstruction CX(s) Applied: B1.3 Date: 07/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  3. CX-008162: Categorical Exclusion Determination

    Energy.gov [DOE]

    Redmond-Pilot Butte Number 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 04/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  4. CX-010151: Categorical Exclusion Determination

    Energy.gov [DOE]

    Brasada-Harney No. 1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  5. CX-008891: Categorical Exclusion Determination

    Energy.gov [DOE]

    Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  6. CX-007986: Categorical Exclusion Determination

    Energy.gov [DOE]

    Pearl-Marion #1 Tower 6/2 Replacement Project CX(s) Applied: B4.6 Date: 02/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  7. CX-010726: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big Eddy-Redmond No.1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 08/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  8. CX-008153: Categorical Exclusion Determination

    Energy.gov [DOE]

    Maupin-Tygh Valley Number 1 Pole Replacement Project CX(s) Applied: B1.3 Date: 05/01/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  9. CX-008167: Categorical Exclusion Determination

    Energy.gov [DOE]

    La Pine-Chiloquin Number 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 03/21/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  10. CX-010738: Categorical Exclusion Determination

    Energy.gov [DOE]

    2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

  11. Categorical Exclusion Determinations: B1.27 | Department of Energy

    Office of Environmental Management (EM)

    May 17, 2013 CX-010416: Categorical Exclusion Determination Substation Maintenance and ... Determination MPLE Test Stand Replacement Project CX(s) Applied: B1.3, B1.27, ...

  12. CX-014169: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gila Substation Stage 07 Rebuild Project and Related Communications Equipment Replacement CX(s) Applied: B4.11Date: 07/20/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  13. CX-010546: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Liberty Substation Transformer Replacement Project, Maricopa County, Arizona CX(s) Applied: B4.11 Date: 06/06/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  14. CX-014179: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Snohomish Substation Equipment Replacement and Expansion Project CX(s) Applied: B4.11Date: 09/10/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  15. CX-008702: Categorical Exclusion Determination

    Energy.gov [DOE]

    Forest Grove-McMinnville #1 Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  16. CX-008713: Categorical Exclusion Determination

    Energy.gov [DOE]

    2012 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

  17. Annual report for Ion Replacement Program

    SciTech Connect

    Tomczuk, Z.; Willit, J.L.; Fischer, A.K.

    1993-07-01

    Ion replacement electrorefining is an innovative electrochemical approach to purifying and separating metals. This approach overcomes the shortcomings of conventional electrorefining and has the potential for processing a wider range of metals and metal halide salts. Salt waste is also minimized with this approach. The key element of ion replacement electrorefining is the ion replacement electrode. This electrode allows a decoupling of the electrotransport process into two separate steps, anodic dissolution and cathodic deposition. Three key accomplishments described in this report that demonstrate the feasibility of ion replacement electrorefining are: (1) we have identified a suitable sodium/{beta}{double_prime}-alumina/molten salt electrolyte system that functions reproducibly at 723 K, (2) we have oxidized and deposited dysprosium, lanthanum, uranium, and titanium by using a sodium ion replacement electrode. In several experiments, an actual separation of dysprosium and lanthanum was observed, and (3) we have identified a metal alloy, Li{sub x}Sb, as an alternative ion replacement electrode. The next stage in the program is the design, construction, and testing of a laboratory-scale electrorefiner. Follow-on development with funding from industrial and federal sponsors is being pursued.

  18. Recovery Act Projects Funded for Fuel Cell Market Transformation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    replacement for traditional gasdiesel generators and lead acid battery power sources. ... The project is focused on improving reliability to meet the standards required by the ...

  19. Valve assembly having remotely replaceable bearings

    DOEpatents

    Johnson, Evan R.; Tanner, David E.

    1980-01-01

    A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings.

  20. Replacing the Engine In Your Car While You Are Still Driving It

    SciTech Connect

    Bjorklund, Eric A.

    2015-11-04

    Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with their own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.

  1. Applications of molecular replacement to G protein-coupled receptors...

    Office of Scientific and Technical Information (OSTI)

    Applications of molecular replacement to G protein-coupled receptors Citation Details In-Document Search Title: Applications of molecular replacement to G protein-coupled receptors ...

  2. Replacement-2-A Wholesale Power Rate Schedule | Department of...

    Office of Environmental Management (EM)

    2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public...

  3. Molecular replacement and model-building using distant homology...

    Office of Scientific and Technical Information (OSTI)

    Molecular replacement and model-building using distant homology models as templates Citation Details In-Document Search Title: Molecular replacement and model-building using...

  4. EERE Success Story-Arizona: Solar Panels Replace Inefficient...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems EERE Success Story-Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems May 1, ...

  5. WPN 00-5: Approval of Replacement Refrigerators and Electric...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Provides states with the approval to include refrigerator and electric water heater replacements as an allowable measure. PDF icon WPN 00-5: Approval of Replacement Refrigerators ...

  6. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs A ... program managers decided to drop the web tool, eventually replacing it with a ...

  7. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    SciTech Connect

    Baker, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  8. The Methanol Economy Project

    SciTech Connect

    Olah, George; Prakash, G. K.

    2014-02-01

    The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO2 capture using supported amines, co-electrolysis of CO2 and water to formate and syngas, decomposition of formate to CO2 and H2, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields.

  9. Intensive Observation Period Projects Scheduled

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 Intensive Observation Period Projects Scheduled Several IOP projects have been scheduled for the SGP CART site this spring. These projects either have already begun or will begin shortly. Radiosondes The RS-90 Transition IOP is currently under way. The RS-90 model radiosonde is gradually replacing the older RS-80 model. Radiosondes are instrument packages attached to and launched by weather balloons. The instruments measure atmospheric pressure, temperature, and relative humidity as the

  10. 2013 Awards for Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Awards for Project Management 2013 Awards for Project Management Federal Project Director of the Year for 2013: Everett Trollinger (National Nuclear Security Administration) Secretary's Award of Excellence: Chemistry & Metallurgy Research Building Replacement Project/Radiological Lab Utility Office Building Equipment Installation (National Nuclear Security Administration) Secretary's Achievement Awards: Energy Systems Integration Facility Project (Office of Energy Efficiency and Renewable

  11. A Guide to AC Motor Repair and Replacement

    SciTech Connect

    2004-03-01

    This booklet provides helpful information for making informed repair or replace decisions for electric motors.

  12. Replacing an Oversized and Underloaded Electric Motor | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Replacing an Oversized and Underloaded Electric Motor Replacing an Oversized and Underloaded Electric Motor This fact sheet will assist in decisions regarding replacement of over-sized and under-loaded motors. It includes a discussion of how the MotorMaster+ software can be used to conduct motor replacement analyses. Replacing an Oversized and Underloaded Electric Motor (September 1996) (161.65 KB) More Documents & Publications MotorMaster+ User Manual Buying an Energy-Efficient

  13. Replaces EIA-459E OMB Control No.

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 (04-94) Replaces EIA-459E OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MANAGEMENT SUMMARY REPORT Page of Public reporting burden for this collection of information is estimated to average 3.38 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this

  14. Grand Coulee & Hungry Horse SCADA Replacement

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Spare Transformers for Hub Wind Sites This project includes the installation of a spare, single phase transformer at four existing "hub" facilities. These "hub" facilities, as...

  15. Pacific DC Intertie Upgrade Project Status Update

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    T I O N Pre-Decisional. For Discussion Purposes Only. PDCI Upgrade Project Replace aging Celilo 4 converter terminal with a new 2 converter terminal rated 560kV and 3410A...

  16. Sampling and analysis plan for site assessment during the closure or replacement of nonradioactive underground storage tanks

    SciTech Connect

    Gitt, M.J.

    1990-08-01

    The Tank Management Program is responsible for closure or replacement of nonradioactive underground storage tanks throughout the Idaho National Engineering Laboratory (INEL). A Sampling and Analysis Plan (SAP) has been developed that complies with EPA regulations and with INEL Tank Removal Procedures for sampling activities associated with site assessment during these closure or replacement activities. The SAP will ensure that all data are valid, and it also will function as a Quality Assurance Project Plan. 18 refs., 8 figs., 11 tabs.

  17. NNSA Supplemental Environmental Projects Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NNSA Supplemental Environmental Projects Update NNSA Supplemental Environmental Projects Update In this Presentation: Road Project Triennial Review Project Watershed Enhancement Project Surface Water Sampling Project Potable Water Line Replacement Project SEP Update - June 15, 2016 (2.48 MB) More Documents & Publications 2016-03 "Order on Consent" NNMCAB Board Minutes: July 29, 2015 Taos NNMCAB Committee Minutes: April 2016 Pojoaque

  18. An opposite view data replacement approach for reducing artifacts due to metallic dental objects

    SciTech Connect

    Yazdi, Mehran; Lari, Meghdad Asadi; Bernier, Gaston; Beaulieu, Luc

    2011-04-15

    Purpose: To present a conceptually new method for metal artifact reduction (MAR) that can be used on patients with multiple objects within the scan plane that are also of small sized along the longitudinal (scanning) direction, such as dental fillings. Methods: The proposed algorithm, named opposite view replacement, achieves MAR by first detecting the projection data affected by metal objects and then replacing the affected projections by the corresponding opposite view projections, which are not affected by metal objects. The authors also applied a fading process to avoid producing any discontinuities in the boundary of the affected projection areas in the sinogram. A skull phantom with and without a variety of dental metal inserts was made to extract the performance metric of the algorithm. A head and neck case, typical of IMRT planning, was also tested. Results: The reconstructed CT images based on this new replacement scheme show a significant improvement in image quality for patients with metallic dental objects compared to the MAR algorithms based on the interpolation scheme. For the phantom, the authors showed that the artifact reduction algorithm can efficiently recover the CT numbers in the area next to the metallic objects. Conclusions: The authors presented a new and efficient method for artifact reduction due to multiple small metallic objects. The obtained results from phantoms and clinical cases fully validate the proposed approach.

  19. About Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and ...

  20. Magnesium Replacement of Aluminum Cast Components in a Production...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Magnesium Replacement of Aluminum Cast Components in a Production V6 ...

  1. California: SQAMD Replaces Drayage Trucks with CNG | Department...

    Energy Saver

    California: SQAMD Replaces Drayage Trucks with CNG California: SQAMD Replaces Drayage Trucks with CNG November 6, 2013 - 12:00am Addthis In 2008, the South Coast Air Quality ...

  2. LED T8 Replacement Lamps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    LED T8 Replacement Lamps LED T8 Replacement Lamps This documents provides an overview of LED T8 replacement lamps and helps define a reasonable minimum performance level for the purpose of plant-wide improvement. LED T8 Replacement Lamps (April 2010) (809.84 KB) More Documents & Publications Emerging Lighting Technology Guiding Market Introduction of High-Performance SSL Products DOE Booth Presentations From Grainger Show 2015 Downloads

  3. Trim or Replace Impellers on Oversized Pumps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Trim or Replace Impellers on Oversized Pumps Trim or Replace Impellers on Oversized Pumps This tip sheet discusses the reasoning behind trimming or replacing impellers on oversized pumps and describes how it works to improve pumping system efficiency. PUMPING SYSTEMS TIP SHEET #7 Trim or Replace Impellers on Oversized Pumps (September 2006) (208.93 KB) More Documents & Publications Improving Pumping System Performance: A Sourcebook for Industry - Second Edition Match Pumps to System

  4. Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps |

    Energy Saver

    Department of Energy Replacements for Linear Fluorescent Lamps Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011. Theresa Shoemaker: Welcome, ladies and gentlemen. I'm Terry Shoemaker with the Pacific Northwest National Laboratory, and I'd like to welcome you to today's webcast, "LED Replacements for Linear Fluorescent Lamps,"

  5. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    SciTech Connect

    Noel Duckwtiz

    2011-05-01

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object

  6. Replaces EIA-459F All Other Editions Are Obsolete OMB Control No.

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 (10-94) Replaces EIA-459F All Other Editions Are Obsolete OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE PROGRAM/PROJECT STATUS REPORT Public reporting burden for this collection of information is estimated to average 47.5 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate

  7. 2014 Awards for Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4 Awards for Project Management 2014 Awards for Project Management Federal Project Director of the Year for 2014: Pepin Carolan (Office of Science) Secretary's Award of Excellence: Numi Off-axis electron neutrino (νe) Appearance (NOνA) Project (Office of Science) Secretary's Achievement Awards: Seismic Life-Safety, Modernization, and Replacement of General Purpose Buildings, Phase 2 Project (Office of Science) Security Improvements Project (The National Nuclear Security Administration) Energy

  8. 2014 QA Improvement Project Plan (August 2014).pdf

    Office of Environmental Management (EM)

    4 Awards for Project Management 2014 Awards for Project Management Federal Project Director of the Year for 2014: Pepin Carolan (Office of Science) Secretary's Award of Excellence: Numi Off-axis electron neutrino (νe) Appearance (NOνA) Project (Office of Science) Secretary's Achievement Awards: Seismic Life-Safety, Modernization, and Replacement of General Purpose Buildings, Phase 2 Project (Office of Science) Security Improvements Project (The National Nuclear Security Administration) Energy

  9. Alternatives to proposed replacement production reactors

    SciTech Connect

    Cullingford, H.S.

    1981-06-01

    To insure adequate supplies of plutonium and tritium for defense purposes, an independent evaluation was made by Los Alamos National Laboratory of the numerous alternatives to the proposed replacement production reactors (RPR). This effort concentrated on the defense fuel cycle operation and its technical implications in identifying the principal alternatives for the 1990s. The primary options were identified as (1) existing commercial reactors, (2) existing and planned government-owned facilities (not now used for defense materials production), and (3) other RPRs (not yet proposed) such as CANDU or CANDU-type heavy-water reactors (HWR) for both plutonium and tritium production. The evaluation considered features and differences of various options that could influence choice of RPR alternatives. Barring a change in the US approach to civilian and defense fuel cycles and precluding existing commercial reactors at government-owned sites, the most significant alternatives were identified as a CANDU-type HWR at Savannah River Plant (SRP) site or the Three Mile Island commercial reactor with reprocessing capability at Barnwell Nuclear Fuel Plant and at SRP.

  10. Replace Pressure-Reducing Valves with Backpressure Turbogenerators |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Pressure-Reducing Valves with Backpressure Turbogenerators Replace Pressure-Reducing Valves with Backpressure Turbogenerators This tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies. STEAM TIP SHEET #20 Replace Pressure-Reducing Valves with Backpressure Turbogenerators (January 2012) (451.58 KB) More Documents & Publications Consider Installing High-Pressure

  11. Replacement-1 Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at

  12. Text-Alternative Version: LED Replacement Lamps: Current Performance and

    Energy Saver

    the Latest on ENERGY STAR® | Department of Energy Replacement Lamps: Current Performance and the Latest on ENERGY STAR® Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast. Terry Shoemaker: Welcome, ladies and gentlemen. I'm Terry Shoemaker with the Pacific Northwest National Laboratory, and I'd like to welcome you

  13. Virent is Replacing Crude Oil | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Virent is Replacing Crude Oil Virent is Replacing Crude Oil Breakout Session 2A-Conversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent cortright_biomass_2014.pdf (2.43 MB) More Documents & Publications Bioproducts and Biofuels - Growing Together! NABC Webinar Navigating Roadblocks on the Path to Advanced Biofuels Deployment

  14. Forties oil line replacement overcomes sandwave challenge

    SciTech Connect

    Steel, W.J.M.; Imglis, R. )

    1991-03-06

    A major new 36-in., oil-export pipeline has been installed in the North Sea between the Forties field and Cruden Bay on the U.K. mainland. Designing and installing the line involved solving problems caused by sandwaves in the nearshore segment of the route. The Forties pipeline system covers offshore and land pipelines between the Forties field and the Firth of Forth tanker loading terminal and incorporates oil transportation, stabilization-gas separation, processing, and storage. The pipeline is used as part of an integrated oil and gas liquid gathering system from the central North Sea. Oil and gas liquids from other offshore fields are connected by subsea pipelines and riser to the Forties Charlie platform. Inspection of the existing 32-in. offshore pipeline had indicated signs of corrosion which would prevent the system from operating economically as future demands increased. In addition, when the line was commissioned in 1975, it was not envisioned that it would eventually carry crude from several other fields, which will come onstream this decade. The decision to lay a new 36-in. sealine reflects this need for increased capacity to ensure that the Forties pipeline system continues as a major carrier of oil and gas liquids well into the next century. Corrosion monitoring and inspection of the 32-in. line led to sections of the topside pipework being replaced in 1985 and the top section of the rise in 1987. The corrosion also resulted in the pipeline maximum allowable operating pressure (MAOP) being limited to 115 barg (1,668 psig) from 129 barg (1,871 psig).

  15. Monitoring Galvanic Replacement of Ag Nanoparticles by Pd using...

    Office of Scientific and Technical Information (OSTI)

    Conference: Monitoring Galvanic Replacement of Ag Nanoparticles by Pd using Low Dose In Situ Liquid STEM. Citation Details In-Document Search Title: Monitoring Galvanic ...

  16. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 ... More Documents & Publications Chapter 3 Demand-Side Resources Survey of Emissions Models ...

  17. Replace Fossil Fuels, Final Technical Report Roberts, William...

    Office of Scientific and Technical Information (OSTI)

    Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to Replace Fossil Fuels, Final Technical Report Roberts, William L 09 BIOMASS FUELS biofuels, glycerin, glycerol,...

  18. QUENCHING AND PARTITIONING PROCESS DEVELOPMENT TO REPLACE HOT...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    HOT STAMPING OF HIGH STRENGTH AUTOMOTIVE STEEL QUENCHING AND PARTITIONING PROCESS DEVELOPMENT TO REPLACE HOT STAMPING OF HIGH STRENGTH AUTOMOTIVE STEEL Colorado School of Mines ...

  19. Jordan Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The proposed replacement would help improve fish passage and facilitate continued ... the existing diversion dam to help improve fish passage and facilitate continued ...

  20. Window Replacement, Rehabilitation, & Repair Guides- Building America Top Innovation

    Energy.gov [DOE]

    Building America team Building Science Corporation guides contractors through several options for repairing or replacing old windows to improve air sealing and thermal performance.

  1. "Green" Replacement for Industrial Applications of Polar Organic...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Find More Like This Return to Search "Green" Replacement for Industrial Applications ... The lower volatility can lead to more energy intensive separation of the solvent; however, ...

  2. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving...

    Energy.gov [DOE] (indexed site)

    U.S. Environmental Protection Agency's ENERGY STAR Residential Program, is part of the Case Study Series, highlighting how "Evaluation Prompts ENERGY STAR Program to Replace Web ...

  3. Trim or Replace Impellers on Oversized Pumps

    SciTech Connect

    Not Available

    2006-09-01

    One in a series of tip sheets to help manufacturers optimize their industrial pumping systems. As a result of conservative engineering practices, pumps are often substantially larger than they need to be for an industrial plant's process requirements. Centrifugal pumps can often be oversized because of ''rounding up'', trying to accommodate gradual increases in pipe surface roughness and flow resistance over time, or anticipating future plant capacity expansions. In addition, the plant's pumping requirements might not have been clearly defined during the design phase. Because of this conservative approach, pumps can have operating points completely different from their design points. The pump head is often less than expected, while the flow rate is greater. This can cause cavitation and waste energy as the flow rate typically must be regulated with bypass or throttle control. Oversized and throttled pumps that produce excess pressure are excellent candidates for impeller replacement or ''trimming'', to save energy and reduce costs. Trimming involves machining the impeller to reduce its diameter. Trimming should be limited to about 75% of a pump's maximum impeller diameter, because excessive trimming can result in a mismatched impeller and casing. As the impeller diameter decreases, added clearance between the impeller and the fixed pump casing increases internal flow recirculation, causes head loss, and lowers pumping efficiency. For manufacturing standardization purposes, pump casings and shafts are designed to accommodate impellers in a range of sizes. Many pump manufacturers provide pump performance curves that indicate how various models will perform with different impeller diameters or trims. The impeller should not be trimmed any smaller than the minimum diameter shown on the curve. Net positive suction head requirements (NPSHR) usually decrease at lower flow rates and can increase at the higher end of the pump head curve. The NPSHR at a given flow rate will

  4. Acquisition and Project Management Awards Presentations - Ingrid Kolb,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Director, Office of Management | Department of Energy and Project Management Awards Presentations - Ingrid Kolb, Director, Office of Management Acquisition and Project Management Awards Presentations - Ingrid Kolb, Director, Office of Management Secretary's Achievement Award Seismic Life-Safety, Modernization & Replacement (Seismic Ph 2)Secretary's Award for Project Management Improvement Nuclear Materials Safeguards & Security Upgrades (NMSSUP) Secretary's Achievement Award Security

  5. What is the status of the Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    status of the Project? The frst phase of the project was energized on July 20, 2006. It operated fawlessly as an integral part of National Grid's 35-kilovolt network in Albany, serving the equivalent of 25,000 homes. It was taken offine after nine months to begin phase II of the project: replacing a 30-meter section with 2G cable, which will be the world's frst use of 2G in any utility device. Phase II of the project was energized on January 8, 2008. Project Fact Sheet Albany HTS Power Cable

  6. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  7. CX-009197: Categorical Exclusion Determination

    Energy.gov [DOE]

    2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

  8. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  9. Project Accounts

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:50

  10. Project Financing

    Office of Environmental Management (EM)

    evaluate a Federal Energy Efficiency Project across three broad risk categories: - Contract Risk - Project Risk - Participant Risk * Ultimately, pricing and terms are set by ...

  11. Project Gnome

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961 ...

  12. Sustainable LED Fluorescent Light Replacement Technology

    SciTech Connect

    2011-06-30

    Ilumisys and the National Center for Manufacturing Sciences (NCMS) partnered on a three-year project awarded by the United States (U.S.) Department of Energy (DOE), to quantify the impacts of LED lamps, incandescent lamps and fluorescent benchmark lamps over a product lifecycle – i.e. to develop a sustainable design and manufacturing strategy that addresses product manufacturing, use, recycling and disposal scenarios for LED-based lighting. Based on the knowledge gained from extensive product tear-down studies of fluorescent and screw-in lighting products, lifecycle assessment tools, and accelerated lifecycle testing protocols, an interactive Sustainable LED Design Guide has been developed to aid architectural and lighting designers and engineers in making design decisions that consider three important environmental impacts (greenhouse gas emissions, energy use and mercury emission) across all phases of the life of an LED lighting product. Critical information developed for the lifecycle analysis and product feature comparisons is the useful life of the lighting product as well as its performance. The Design Guide is available at www.ncms.org, and was developed based on operational and durability testing of a variety of lighting products including power consumption, light output, and useful life of a lamp in order to allow a more realistic comparison of lamp designs. This report describes the main project tasks, results and innovative features of the lifecycle assessment (LCA)-based design tools, and the key considerations driving the sustainable design of LED lighting systems. The Design Guide incorporates the following three novel features for efficiently evaluating LED lighting features in value-chains: • Bill-of-Materials (BOM) Builder – Designers may import process data for each component and supply functional data for the product, including power, consumption, lumen output and expected useful life. • Environmental Impact Review – Designs are

  13. Collector main replacement at Indianapolis Coke

    SciTech Connect

    Sickle, R.R. Van

    1997-12-31

    Indianapolis Coke is a merchant coke producer, supplying both foundry and blast furnace coke to the industry. The facility has three coke batteries: two 3 meter batteries, one Wilputte four divided and one Koppers Becker. Both batteries are underjet batteries and are producing 100% foundry coke at a net coking time of 30.6 hours. This paper deals with the No. 1 coke battery, which is a 72 oven, gun fired, 5 meter Still battery. No. 1 battery produces both foundry and blast furnace coke at a net coking rate of 25.4 hours. No. 1 battery was commissioned in 1979. The battery is equipped with a double collector main. Although many renovations have been completed to the battery, oven machinery and heating system, to date no major construction projects have taken place. Deterioration of the collector main was caused in part from elevated levels of chlorides in the flushing liquor, and temperature fluctuations within the collector main. The repair procedures are discussed.

  14. NNSA projects win Secretary's Achievement Awards for cost savings...

    National Nuclear Security Administration (NNSA)

    The project replaced electrical, ventilation, steam, and cooling water systems in two Y-12 production buildings that dated back to the 1940s. "This team's success on the Nuclear ...

  15. 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

    SciTech Connect

    David E. Korns

    2012-05-01

    The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

  16. Nucla CFB Demonstration Project

    SciTech Connect

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  17. Project Controls

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  18. REQUEST FOR LOST/STOLEN BADGE REPLACEMENT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    REQUEST FOR LOST/STOLEN BADGE REPLACEMENT REQUEST FOR LOST/STOLEN BADGE REPLACEMENT Form documents the circumstances surrounding the loss of the security badge, i.e., the date the badge was Iost/stolen, location where the badge may have been Iost/stolen, attempts to find the lost badge, etc. REQUEST FOR LOST/STOLEN BADGE REPLACEMENT (10.68 KB) More Documents & Publications DOE HQ F 473.1 (fillable pdf) DOE F 5634.1 DOE F 5639.2

  19. Replacing 16 mm film cameras with high definition digital cameras

    SciTech Connect

    Balch, K.S.

    1995-12-31

    For many years 16 mm film cameras have been used in severe environments. These film cameras are used on Hy-G automotive sleds, airborne gun cameras, range tracking and other hazardous environments. The companies and government agencies using these cameras are in need of replacing them with a more cost effective solution. Film-based cameras still produce the best resolving capability, however, film development time, chemical disposal, recurring media cost, and faster digital analysis are factors influencing the desire for a 16 mm film camera replacement. This paper will describe a new camera from Kodak that has been designed to replace 16 mm high speed film cameras.

  20. Project Information

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-RIC REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory FE0027167 High Yield and Economical

  1. 10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

    SciTech Connect

    Noel Duckwitz

    2011-05-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs

  2. Forrest County, MS Geothermal Project--Final Report

    SciTech Connect

    Proctor, Corey

    2014-03-13

    The Forrest County Geothermal Energy Project consists of replacing the existing air cooled chiller with geothermal water to water chillers for energy savings at the Forrest County Multi-Purpose Center. The project will also replace DX/gas rooftop and DX split system heat pump equipment with geothermal units for the Forrest County Jail. Each of the aforementioned projects consists of approximately 400 tons of cooling. The project also includes between 600 and 800 geothermal closed-loop wells. Building controls will be updated as well on both sites.

  3. Replace Pressure-Reducing Valves with Backpressure Turbogenerators

    SciTech Connect

    Not Available

    2006-01-01

    This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  4. Reminder: Y-12 Public Warning Siren System being replaced, tested...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    located around the Oak Ridge area is being replaced this month with a test of the new system on Sept. 26. The vendor, American Signal, will be testing the sirens Sept. 26...

  5. Washington State Department of Ecology: Replacement Wells Requiring...

    OpenEI (Open Energy Information) [EERE & EIA]

    Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

  6. Laboratory Evaluation of LED T8 Replacement Lamp Products

    SciTech Connect

    Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

    2011-05-23

    A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

  7. Ultrasound image guided acetabular implant orientation during total hip replacement

    DOEpatents

    Chang, John; Haddad, Waleed; Kluiwstra, Jan-Ulco; Matthews, Dennis; Trauner, Kenneth

    2003-08-19

    A system for assisting in precise location of the acetabular implant during total hip replacement. The system uses ultrasound imaging for guiding the placement and orientation of the implant.

  8. Measure Guideline: Replacing Single-Speed Pool Pumps with Variable...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... initiating flow to a solar panel and pumping water to waterfalls and other water features. ... Installing a new pump and working at the equipment pad by replacing hard angle ...

  9. Cobalt discovery replaces precious metals as industrial catalyst

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the

  10. Cobalt discovery replaces precious metals as industrial catalyst

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the

  11. Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

    SciTech Connect

    David Brien

    2012-06-21

    The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

  12. Southwest Alaska Regional Geothermal Energy Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Southwest Alaska Regional Geothermal Energy Project Southwest Alaska Regional Geothermal Energy Project Engineered Geothermal Systems Demonstration Projects. Project objectives: Develop a renewable energy resource to offset diesel-fired electricity and heating in a region with few alternatives. Stabilize electric rates in Naknek and 25 rural communities by replacing >5.4 mm gals of diesel used for electricity and heating, avoiding >$15,000,000/yr in fuel costs.

  13. Project Benefits

    Energy.gov [DOE]

    Benefits of the Guidelines for Home Energy Professionals project including reducing energy upgrade costs for consumers, employers, and program administrators.

  14. Hydropower Projects

    Energy.gov [DOE]

    This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

  15. Dry Pipe Sprinkler Piping Replacement Project (4588), 4/30/2012

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner...

  16. Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Replacement of Variable-Speed Motors for Furnaces Syracuse, New York PROJECT INFORMATION Project Name: Evaluation of Concept 3 BPM motors Location: Syracuse, NY Partners: New York State Energy Research and Development Authority (NYSERDA) www.nyserda.org Proctor Engineering Group (PEG) www.proctoreng.com Tag Mechanical www.taghomeperformance.com/ Consortium for Advanced Residential Buildings www.carb-swa.com Building Component: HVAC Application: Retrofit, homes with forced air distribution Year

  17. Project Tour

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Tour Project Tour See NMSSUP from the ground NMSSUP Phase II Construction Project Tour Transportation Transportation to the tour will be provided from Hilton Santa Fe Buffalo Thunder to Los Alamos National Laboratory, Technical Area 55. After the tour, transportation will be provided back to Hilton Santa Fe Buffalo Thunder. What to wear Wear comfortable pants and leather shoes (flat, comfortable, closed-toe; no tennis shoes or high heels). Schedule There will be a one-hour, no-host lunch

  18. PROJECT INFORMATION

    Office of Scientific and Technical Information (OSTI)

    PROJECT INFORMATION DOE award number: DE EE0000621 Name of recipient: San Francisco Public Utilities Commission Project title: San Francisco Biofuel Program Name of project: Brown Grease to Biodiesel Demonstration Director/principal investigator: Domenec Jolis Consortium/teaming members: Environmental Protection Agency (EPA) California Energy Commission (CEC) URS Corporation EXECUTIVE SUMMARY Municipal wastewater treatment facilities have typically been limited to the role of accepting

  19. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    structure whose behavior is fundamentally nonlinear. Thus, the students assigned to this project will develop control techniques that will allow an electrodynamic shake table to...

  20. Custom Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  1. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  2. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  3. Project Complete

    Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  4. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San ...

  5. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  6. Replacing the whole barrel of oil with plants and microbes

    ScienceCinema

    Simmons, Blake

    2016-07-12

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  7. CALiPER Special Summary Report: Retail Replacement Lamp Testing

    SciTech Connect

    2011-04-01

    CALiPER testing has evaluated many products for commercial lighting markets and found some excellent performers. However, many of these are not available on the retail market. This special testing was undertaken to identify and test solid-state lighting (SSL) replacement lamp products that are available to the general public through retail stores and websites.

  8. Replacing the whole barrel of oil with plants and microbes

    SciTech Connect

    Simmons, Blake

    2013-05-29

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  9. CALiPER Exploratory Study Retail Replacement Lamps – 2011

    SciTech Connect

    2012-04-02

    In 2010, CALiPER conducted a study on LED replacement lamps found in retail stores. The results were less than satisfactory, and many products were classified as being unlikely to meet consumer expectations. In November 2011, CALiPER purchased a new sample of products for a follow-up study, with the intent of characterizing the progress of this essential market segment.

  10. Selection and Implementation of a Replacement Cutting Tool Selection Application

    SciTech Connect

    Rice, Gordon

    2008-10-06

    A new commercial cutting tool software package replaced an internally created legacy system. This report describes the issues that surfaced during the migration and installation of the commercial package and the solutions employed. The primary issues discussed are restructuring the data between two drastically different database schemas and the creation of individual component graphics.

  11. Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-08-01

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  12. Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999

    SciTech Connect

    Not Available

    1990-08-01

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  13. Measure Guideline. Wood Window Repair, Rehabilitation, and Replacement

    SciTech Connect

    Baker, P.; Eng, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  14. ARP/wARP and molecular replacement: the next generation

    SciTech Connect

    Cohen, Serge X. Ben Jelloul, Marouane; Long, Fei; Vagin, Alexei; Knipscheer, Puck; Lebbink, Joyce; Sixma, Titia K.; Lamzin, Victor S.; Murshudov, Garib N.; Perrakis, Anastassis

    2008-01-01

    A systematic test shows how ARP/wARP deals with automated model building for structures that have been solved by molecular replacement. A description of protocols in the flex-wARP control system and studies of two specific cases are also presented. Automatic iterative model (re-)building, as implemented in ARP/wARP and its new control system flex-wARP, is particularly well suited to follow structure solution by molecular replacement. More than 100 molecular-replacement solutions automatically solved by the BALBES software were submitted to three standard protocols in flex-wARP and the results were compared with final models from the PDB. Standard metrics were gathered in a systematic way and enabled the drawing of statistical conclusions on the advantages of each protocol. Based on this analysis, an empirical estimator was proposed that predicts how good the final model produced by flex-wARP is likely to be based on the experimental data and the quality of the molecular-replacement solution. To introduce the differences between the three flex-wARP protocols (keeping the complete search model, converting it to atomic coordinates but ignoring atom identities or using the electron-density map calculated from the molecular-replacement solution), two examples are also discussed in detail, focusing on the evolution of the models during iterative rebuilding. This highlights the diversity of paths that the flex-wARP control system can employ to reach a nearly complete and accurate model while actually starting from the same initial information.

  15. Awarded projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    projects Awarded projects 2016 Allocation Awards This page lists the allocation awards for NERSC for the 2016 allocation year (Jan 12, 2016 through Jan 09, 2017). Read More » Previous Year Awards Last edited: 2016-04-29 11:35:1

  16. CX-010725: Categorical Exclusion Determination | Department of Energy

    Energy Saver

    25: Categorical Exclusion Determination CX-010725: Categorical Exclusion Determination 2013 Ross Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Washington, Washington, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission lines. Replacement

  17. NNSA Receives Secretary's Award for Project Management Excellence |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Receives Secretary's Award for Project Management Excellence April 02, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) was recently presented with the Secretary's Award for Project Management Excellence for delivering the Chemistry and Metallurgy Research Building Replacement (CMRR) Radiological Laboratory/Utility/Office Building (RLUOB) Equipment Installation (REI) Project $2 million under budget and ahead of

  18. Brooklyn Union develops tool for replacing steel, cast iron mains

    SciTech Connect

    Marazzo, J.J. )

    1994-12-01

    Over the last 10 years, Brooklyn Union Gas Co. has undergone significant changes in the methods it has used to install gas service and gas main systems. Recently, Brooklyn Union engineers developed a user friendly method of replacing steel and cast iron gas mains and service lines with same size or larger polyethylene pipe without using conventional trench excavation. The system, known as the ''Bullet'' pipe replacement system, involves splitting steel and cast iron pipe using a series of rolling cutter wheels. After consecutive cutting wheels completely penetrate both pipe and fittings, both pipe and soil are spread with an expander and new polyethylene pipe is inserted. The ''Bullet'' pipe splitting system for 1[1/4] in. (32 mm) through 6 in. (150 mm) diameter has been developed.

  19. Magnetic Nanoparticle Capilary Flow as a Replacement for Lateral Flow

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Chromatography - Energy Innovation Portal Magnetic Nanoparticle Capilary Flow as a Replacement for Lateral Flow Chromatography Colorado School of Mines Contact CSM About This Technology Technology Marketing SummaryThis invention looks at method to detect targeted analytes. DescriptionThe method most often used now is Lateral Flow Chromatography (LFC) which has many drawbacks including: the need for extensive optimization, sensitivity, specificity, lack of quantitative data and extensive

  20. Polypeptide having an amino acid replaced with N-benzylglycine

    DOEpatents

    Mitchell, Alexander R.; Young, Janis D.

    1996-01-01

    The present invention relates to one or more polypeptides having useful biological activity in a mammal, which comprise: a polypeptide related to bradykinin of four to ten amino acid residues wherein one or more specific amino acids in the polypeptide chain are replaced with achiral N-benzylglycine. These polypeptide analogues have useful potent agonist or antagonist pharmacological properties depending upon the structure. A preferred polypeptide is (N-benzylglycine.sup.7)-bradykinin.

  1. Measure Guideline. Air Conditioner Diagnostics, Maintenance, and Replacement

    SciTech Connect

    Springer, David; Dakin, Bill

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  2. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    SciTech Connect

    Springer, D.; Dakin, B.

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  3. COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    with Fungi | Princeton Plasma Physics Lab March 20, 2013, 4:15pm to 6:30pm Colloquia MBG Auditorium COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements with Fungi Mr. Gavin McIntyre Ecovative Design LLC Colloquium Committee: The Princeton Plasma Physics Laboratory 2016-2017 Colloquium Committee is comprised of the following people. Please feel free to contact them by e-mail regarding any possible speakers or topics for future colloquia. Carol Ann Austin,

  4. Replace V-Belts with Notched or Synchronous Belt Drives

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Replace V-Belts with Notched or Synchronous Belt Drives Approximately one-third of the electric motors in the industrial and commercial sectors use belt drives. 1 Belt drives provide fexibility in the positioning of the motor relative to the load. Pulleys (sheaves) of varying diameters allow the speed of the driven equipment to be increased or decreased relative to the motor speed. A properly designed belt power-transmission system offers high effciency and low noise, requires no lubrication,

  5. Project 1027697

    Office of Scientific and Technical Information (OSTI)

    William Apel and Frank Roberto at) the Biotechnology Department at the INEEL. Each part of this project is funded under a different contract with the Science Division of the US ...

  6. RENOTER Project

    Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  7. EGS Projects

    Energy.gov [DOE]

    EGS projects span research, development, and demonstration. Unlike traditional hydrothermal systems, EGS capture heat from areas that traditional geothermal energy cannot—where fluid and/or...

  8. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Projects » Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate

  9. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Projects Joint Los Alamos National Laboratory/UCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email "Since 2003, LANL has funded numerous collaborative

  10. Project Plan Remote Target Fabrication Refurbishment Project

    SciTech Connect

    Bell, Gary L; Taylor, Robin D

    2009-08-01

    In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of {sup 252}Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The {sup 252}Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of {sup 252}Cf; the average irradiation period is {approx}10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of {sup 252}Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and

  11. DOE Project Scorecards

    Energy.gov [DOE]

    DOE Project Scorecards DOE project scorecards summarize capital asset project performance compared to the current approved baseline. 

  12. DOE Project Scorecards

    Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  13. CX-013916: Categorical Exclusion Determination

    Energy.gov [DOE]

    Amended Boysen-Thermopolis 115 Kilovolt Transmission Line Structure Replacement Project Hot Springs Fremont Counties WY CX(s) Applied: B1.3Date: 06/12/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-011294: Categorical Exclusion Determination

    Energy.gov [DOE]

    Replace Potable Water Supply Line: Phase Two (Project Modification) CX(s) Applied: B1.3, B1.16, B1.32 Date: 10/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

  15. CX-012214: Categorical Exclusion Determination

    Energy.gov [DOE]

    Copper Mountain-Pilot Butte 34.5 Kilovolt Transmission Line Structure Pole Replacement Project, Fremont County, Wyoming CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  16. CX-013926: Categorical Exclusion Determination

    Energy.gov [DOE]

    Copper Mountain-Pilot Butte 34.5 Kilovolt Transmission Line Structure Pole Replacement Project Fremont County WY CX(s) Applied: B1.3Date: 03/19/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  17. CX-009235: Categorical Exclusion Determination

    Energy.gov [DOE]

    Willow Creek - Granby Tap 2.4 Kilovolt Distribution Line Structure 0/3A Pole Replacement Project CX(s) Applied: B4.6 Date: 09/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  18. CX-012356: Categorical Exclusion Determination

    Energy.gov [DOE]

    Lovell-Yellowtail No. 1 115-kilovolt Transmission Line Culvert Replacement Project, Big Horn County, Wyoming CX(s) Applied: B1.3 Date: 07/01/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-012747: Categorical Exclusion Determination

    Energy.gov [DOE]

    Alcova-Miracle Mile East 115 Kilovolt Transmission Line Fiber Optic Ground Wire and Structure Replacement Project Natrona and Carbon Counties, Wyoming CX(s) Applied: B1.3, B4.7Date: 41855 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-012213: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Boysen-Thermopolis 115 Kilovolt Transmission Line Structure Replacement Project, Hot Springs and Fremont Counties, Wyoming CX(s) Applied: B1.3 Date: 05/16/2014 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  1. CX-013990: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big Eddy-Troutdale No. 1 230 Kilovolt Transmission Line Mile 38 and 39 Priority Conductor Replacement Project CX(s) Applied: B1.3Date: 07/17/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  2. CX-013920: Categorical Exclusion Determination

    Energy.gov [DOE]

    Box Butte-Chadron 115 Kilovolt Transmission Line Structure Replacement Project, Dawes County, CO CX(s) Applied: B1.3Date: 06/02/2015 Location(s): NebraskaOffices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-013799: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Fiscal Year 2015 Snohomish District Danger Pole Replacement Project (Update to previous CX issued 4/23/15) CX(s) Applied: B4.6Date: 06/10/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  4. CX-008777: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Boysen-Thermopolis 115 Kilowolt Transmission Line Structure 15/6 Pole Replacement Project Fremont County, Wyoming CX(s) Applied: B4.6 Date: 07/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. Cloudnet Project

    SciTech Connect

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  6. Cloudnet Project

    DOE Data Explorer

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  7. Electronic-type vacuum gauges with replaceable elements

    DOEpatents

    Edwards, D. Jr.

    1984-09-18

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge. 5 figs.

  8. Electronic-type vacuum gauges with replaceable elements

    DOEpatents

    Edwards, Jr., David

    1984-01-01

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge.

  9. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  10. Project Narrative

    SciTech Connect

    Driscoll, Mary C.

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  11. Safeguards and Security Program and Project Management

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2013-04-18

    The proposed revision to this Department of Energy Guide focuses on alignment of guidance for implementing key safeguard and security components to the DOE capital asset acquisition process with the revised DOE O 413.3B, Program and Project Management for Acquisition of Capital Assets, the revised DOE O 470.4B, Safeguard and Security Program, and the new series of DOE Orders replacing the DOE M 470.4 series of manuals.

  12. Nuclear criticality safety assessment of the proposed CFC replacement coolants

    SciTech Connect

    Jordan, W.C.; Dyer, H.R.

    1993-12-01

    The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

  13. Operational Readiness Review: Savannah River Replacement Tritium Facility

    SciTech Connect

    Not Available

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

  14. Webinar: The L Prize-Winning LED A19 Replacement-What Commercial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The L Prize-Winning LED A19 Replacement-What Commercial Building OwnersOperators Can Expect in 2012 Webinar: The L Prize-Winning LED A19 Replacement-What Commercial Building ...

  15. CALiPER Benchmark Report: Performance of Halogen Incandescent MR16 Lamps and LED Replacement

    SciTech Connect

    Paget, M. L.; Lingard, R. D.; Myer, M. A.

    2008-11-01

    This benchmark report addresses the halogen MR16 lamp and its commercially available light-emitting diode (LED) replacements.

  16. WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    as Allowable Weatherization Measures | Department of Energy 0-5: Approval of Replacement Refrigerators and Electric Water Heaters as Allowable Weatherization Measures WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters as Allowable Weatherization Measures Effective: Oct. 6, 2000 Provides states with the approval to include refrigerator and electric water heater replacements as an allowable measure. WPN 00-5: Approval of Replacement Refrigerators and Electric Water

  17. MHK Projects/Manchac Point Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  18. MHK Projects/Claiborne Island Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  19. MHK Projects/Point Pleasant Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  20. MHK Projects/College Point Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    bel":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St James, LA Project StateProvince Louisiana Project Country United States Project Resource...

  1. Hydropower Projects

    SciTech Connect

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  2. PROJECT SUMMARY

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PROJECT SUMMARY 1 TITLE Advancing Synchrophasor Applications and Training through Academic-Industry Collaborations 2 PRINCIPLE INVESTIGATORS University of Wyoming: Dongliang Duan (PI), John Pierre, Suresh Muknahallipatna (co-PIs) Colorado State University: Liuqing Yang, Louis L. Scharf (co-PIs) Montana Tech of the University of Montana: Daniel Trudnowski, Matthew Donnelly (co-PIs) 3 CONTACT INFORMATION Dongliang Duan Dept. 3295, 1000 E. University Ave. Laramie, WY 82070 Tel: (307)766-6541; Fax:

  3. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    FFA Quarterly Report: April 1-June 30, 2009 July 2009 Doc. No. S05572 Page 1 Monticello National Priorities List Sites Federal Facilities Agreement (FFA) Quarterly Report: April 1-June 30, 2009 This report summarizes project status and activities implemented April through June 2009, and provides a schedule of near-term activities for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) sites. This report also includes disposal cell and Pond 4 leachate collection

  4. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    09 January 2010 Doc. No. S06172 Page 1 1.3 Peripheral Properties (Private and City-Owned) * No land use or supplemental standards compliance issues were observed or reported by LTSM on-site staff. Monticello National Priorities List Sites Federal Facilities Agreement (FFA) Quarterly Report: October 1-December 31, 2009 This report summarizes project status and activities implemented October through December 2009, and provides a schedule of near-term activities for the Monticello Mill Tailings

  5. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    1 July 2011 Doc. No. S07978 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: April 1-June 30, 2011 This report summarizes project status and activities implemented April through June 2011 and provides a schedule for near-term activities at the Monticello Vicinity Properties (MVP) site and the Monticello Mill Tailings Site (MMTS) located in and near Monticello, Utah. The MMTS and MVP were placed on the U.S. Environmental Protection Agency

  6. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    31, 2011 April 2011 Doc. No. S07666 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: January 1-March 31, 2011 This report summarizes project status and activities implemented January through March 2011 and provides a schedule for near-term activities at the Monticello Vicinity Properties (MVP) site and the Monticello Mill Tailings Site (MMTS) located in and near Monticello, Utah. The MMTS and MVP were placed on the U.S. Environmental

  7. Hallmark Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hallmark Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message

  8. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

    SciTech Connect

    Krementz, D.; Coughlin, Jeffrey

    2009-05-05

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and

  9. Solar Thermal Demonstration Project

    SciTech Connect

    Biesinger, K; Cuppett, D; Dyer, D

    2012-01-30

    HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with Kalwall building panels. An added feature of the Kalwall system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

  10. Capital assets management process (CAMP) prioritization exercise for FY 1994 and FY 1995 projects at Field Office, Albuquerque

    SciTech Connect

    1992-01-16

    This report presents figures derived from a rating process to determine budget needs for projects for 1994 and 1995 at the Albuquerque Field Office. Projects for 1994 include plant life safety code upgrades, roads and parking lot upgrades, and emergency system notification replacement. Projects for 1995 include reconfiguration of inert operations, steam and condensate system upgrades, and site drainage control.

  11. Security Improvements Project Completed Ahead of Schedule, $20 Million

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration | (NNSA) Security Improvements Project Completed Ahead of Schedule, $20 Million Under Budget April 07, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Security Improvements Project (SIP) was recently completed ahead of schedule and approximately $20 million under its original budget of $72 million. SIP upgraded security at Y-12 by replacing existing alarm stations and access control systems with Argus, a

  12. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Current Baseline (FY99 MYWP) Revised Project Baseline Project Scope: Maintain Safe and ... Material Transition PFP Project Scope: Same as Current Baseline, Except ...

  13. Capital Project Prioritization

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Capital-Project-Prioritization Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  14. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    Action Plan (CAP) Performance Metrics 1 ContractProject Management Performance Metric FY ... TPC is Total Project Cost. ContractProject Management Performance Metrics FY 2013 Target ...

  15. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Action Plan (CAP) Performance Metrics 1 ContractProject Management Performance Metric FY ... to FY13). TPC is Total Project Cost. ContractProject Management Performance Metrics ...

  16. PORTNUS Project

    SciTech Connect

    Loyal, Rebecca E.

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  17. PROJECT MANGEMENT PLAN EXAMPLES Project Organization Examples

    Office of Environmental Management (EM)

    ... are as follows: Develop an integrated plan to accomplish the project objectives in a ... The 324327 Projects manager has the overall responsibility to establish, plan, and ...

  18. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  19. CAPITAL PROJECT PROPOSAL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Non-Discretionary, please provide explanation: 07 Approval for: Ongoing Program 08 Investment Type: Capital Replacement 09 Emergency? YES NO 09A If "YES", please provide...

  20. Project Grandmaster

    SciTech Connect

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves in the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren?t already aware of or different groups of interest they might want to follow.

  1. Project Grandmaster

    Energy Science and Technology Software Center

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves inmore » the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren’t already aware of or different groups of interest they might want to follow.« less

  2. Research Project Description

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Project Description No job description found Current

  3. Project Management Lessons Learned

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2008-08-05

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  4. Replacing precious metals with carbide catalysts for hydrogenation reactions

    SciTech Connect

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo₂C and Ni/Mo₂C) catalysts were compared with Pd/SiO₂ for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO₂, Mo₂C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo₂C could be completely regenerated by H₂ treatment at 723 K for the three molecules. The Ni modified Mo₂C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo₂C catalysts, 8.6%Ni/Mo₂C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO₂. Compared to Pd/SiO₂, both Mo₂C and Ni/Mo₂C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  5. Replacing precious metals with carbide catalysts for hydrogenation reactions

    SciTech Connect

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  6. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE PAGES [OSTI]

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo₂C and Ni/Mo₂C) catalysts were compared with Pd/SiO₂ for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO₂, Mo₂C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo₂C could be completely regenerated by H₂ treatment at 723 K for the three molecules. The Ni modified Mo₂C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Nimore » modified Mo₂C catalysts, 8.6%Ni/Mo₂C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO₂. Compared to Pd/SiO₂, both Mo₂C and Ni/Mo₂C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.« less

  7. Goode Gym Energy Renovation Project

    SciTech Connect

    Coleman, Andrena

    2014-12-11

    The Ida H. Goode Gymnasium was constructed in 1964 to serve as a focal point for academics, student recreation, and health and wellness activities. This 38,000 SF building contains a gymnasium with a stage, swimming pool, eight classrooms, a weight room, six offices and auxiliary spaces for the athletic programs. The gym is located on a 4-acre greenfield, which is slated for improvement and enhancement to future athletics program at Bennett College. The available funding for this project was used to weatherize the envelope of the gymnasium, installation of a new energy-efficient mechanical system, and a retrofit of the existing lighting systems in the building’s interior. The envelope weatherization was completed without disturbing the building’s historic preservation eligibility. The existing heating system was replaced with a new high efficiency condensing system. The new heating system also includes a new Building Automation System which provides additional monitoring. Proper usage of this system will provide additional energy savings. Most of the existing interior lighting fixtures and bulbs were replaced with new LED and high efficiency T-8 bulbs and fixtures. Occupancy sensors were installed in applicable areas. The Ida Goode Gymnasium should experience high electricity and natural gas savings as well as operational/maintenance efficiency increases. The aesthetics of the building was maintained and the overall safety was improved.

  8. Demonstration project Smart Charging (Smart Grid Project) | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Smart Grid Projects Smart Grid Projects in Europe Smart Grid Projects - Grid Automation Distribution Smart Grid Projects - Integrated System Smart Grid Projects - Home...

  9. MHK Projects/Admirality Inlet Tidal Energy Project | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    eLabel":"","visitedicon":"" Project Profile Project Start Date 112006 Project City Port Townsend, WA Project StateProvince Washington Project Country United States...

  10. 2016 DOE Project Management Workshop - "Enhancing Project Management...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 DOE Project Management Workshop - "Enhancing Project Management" 2016 DOE Project Management Workshop - "Enhancing Project Management" 20160407-doe-project-management-workshop-AD...

  11. Western Interconnection Synchrophasor Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Demonstration Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies Synchrophasor measurements are a...

  12. Geothermal Energy Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy ...

  13. Fact #944: September 26, 2016 Public Opinion of Fuels Which Could Replace

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Gasoline - Dataset | Department of Energy 4: September 26, 2016 Public Opinion of Fuels Which Could Replace Gasoline - Dataset Fact #944: September 26, 2016 Public Opinion of Fuels Which Could Replace Gasoline - Dataset Excel file and dataset for Public Opinion of Fuels Which Could Replace Gasoline fotw#944_web.xlsx (17.54 KB) More Documents & Publications Fact #943: September 19, 2016 Fuel Economy Being Chosen as the Most Important Vehicle Attribute is Related to the Price of Gasoline -

  14. Brigham City Hydro Generation Project

    SciTech Connect

    Ammons, Tom B.

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  15. Is it Cost-Effective to Replace Old Eddy-Current Drives? - Motor Tip Sheet #12

    SciTech Connect

    2008-07-01

    New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may be cost-effective replacements for aging or maintenance-intensive eddy-current drives.

  16. CALiPER Benchmark Report: Performance of Incandescent A Type and Decorative Lamps and LED Replacements

    SciTech Connect

    Lingard, R. D.; Myer, M. A.; Paget, M. L.

    2008-11-01

    This benchmark report addresses common omnidirectional incandescent lamps - A-type and small decorative, candelabra-type lamps - and their commercially available light-emitting diode (LED) replacements.

  17. Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)

    SciTech Connect

    McBride, K.C.; Russell, V.K.

    1994-10-04

    This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

  18. Building America Top Innovations 2013 Profile – Window Replacement, Rehabilitation, & Repair Guide

    SciTech Connect

    none,

    2013-09-01

    In this Top Innovation profile, Building Science Corporation guides contractors through several options for repairing or replacing old windows to improve air sealing and thermal performance.

  19. Y-12 Public Warning Siren System being replaced, tested this month | Y-12

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    National Security Complex Public Warning Siren ... Y-12 Public Warning Siren System being replaced, tested this month Posted: September 4, 2012 - 1:08pm The Y-12 Public Warning Siren System (PWSS) located around the Oak Ridge area is being replaced this month with a test of the new system to follow. A private contractor will begin replacement of the electronic sirens today with anticipated completion of the replacement Sept. 14. During this time, workers will be removing old sirens and

  20. Steam Plant Replaces Outdated Coal-Fired System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Steam Plant Replaces Outdated Coal-Fired System Steam Plant Replaces Outdated Coal-Fired System September 1, 2012 - 12:00pm Addthis A new natural gas-fired steam plant will replace an older coal-fired steam plant shown here. The new plant has the capacity to heat buildings at the Portsmouth site much more efficiently than the old coal-fired steam plant. A new natural gas-fired steam plant will replace an older coal-fired steam plant shown here. The new plant has the capacity to heat buildings at

  1. How do I know if my RTUs are Efficient? When do I Replace or Retrofit them?

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy How do I know if my RTUs are Efficient? When do I Replace or Retrofit them? How do I know if my RTUs are Efficient? When do I Replace or Retrofit them? December 2, 2015 - 3:05pm Addthis Advanced RTU Campaign: Decision Tree for RTU Replacements or Retrofits Advanced RTU Campaign: Decision Tree for RTU Replacements or Retrofits By Marta Schantz This is the second in a blog series on DOE's Advanced Rooftop Unit Campaign. Because roof top unit (RTU) air

  2. Wind Energy Projects | Department of Energy

    Energy.gov [DOE] (indexed site)

    Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy Projects Wind Energy ...

  3. Radkowsky Thorium Fuel Project

    SciTech Connect

    Todosow, Michael

    2006-12-31

    In the early/mid 1990’s Prof. Alvin Radkowsky, former chief scientist of the U.S. Naval Reactors program, proposed an alternate fuel concept employing thorium-based fuel for use in existing/next generation pressurized water reactors (PWRs). The concept was based on the use of a 'seed-blanket-unit' (SBU) that was a one-for-one replacement for a standard PWR assembly with a uranium-based central 'driver' zone, surrounded by a 'blanket' zone containing uranium and thorium. Therefore, the SBU could be retrofit without significant modifications into existing/next generation PWRs. The objective was to improve the proliferation and waste characteristics of the current once-through fuel cycle. The objective of a series of projects funded by the Initiatives for Proliferation Prevention program of the U.S. Department of Energy (DOE-IPP) - BNL-T2-0074,a,b-RU 'Radkowsky Thorium Fuel (RTF) Concept' - was to explore the characteristics and potential of this concept. The work was performed under several BNL CRADAs (BNL-C-96-02 and BNL-C-98-15) with the Radkowsky Thorium Power Corp./Thorium Power Inc. and utilized the technical and experimental capabilities in the Former Soviet Union (FSU) to explore the potential of this concept for implementation in Russian pressurized water reactors (VVERs), and where possible, also generate data that could be used for design and licensing of the concept for Western PWRs. The Project in Russia was managed by the Russian Research Center-'Kurchatov Institute'(RRC-KI), and included several institutes (e.g., PJSC 'Electrostal', NPO 'LUCH' (Podolsk), RIINM (Bochvar Institute), GAN RF (Gosatomnadzor), Kalininskaja NPP (VVER-1000)), and consisted of the following phases: Phase-1 ($550K/$275K to Russia): The objective was to perform an initial review of all aspects of the concept (design, performance, safety, implementation issues, cost, etc.) to confirm feasibility/viability and identify any “show-stoppers”; Phase-2 ($600K/$300K to Russia

  4. Step 3: Project Refinement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Project Refinement 2 1 Potential 3 Refinement 4 Implementation 5 Operations & Maintenance 2 Options 3 Refinement 1/28/2016 2 3 FUNDING AND FINANCING OPTIONS Project Ownership Financing structure is highly dependent on size of the project and the capital available for a given project: * Tribe owns the project (cash purchase or debt) * Tribe hosts the project and buys the electricity (power purchase agreement) * Tribe partners with private sector and co-owns the project (uncertainties about

  5. Replacement energy costs for nuclear electricity-generating units in the United States: 1997--2001. Volume 4

    SciTech Connect

    VanKuiken, J.C.; Guziel, K.A.; Tompkins, M.M.; Buehring, W.A.

    1997-09-01

    This report updates previous estimates of replacement energy costs for potential short-term shutdowns of 109 US nuclear electricity-generating units. This information was developed to assist the US Nuclear Regulatory Commission (NRC) in its regulatory impact analyses, specifically those that examine the impacts of proposed regulations requiring retrofitting of or safety modifications to nuclear reactors. Such actions might necessitate shutdowns of nuclear power plants while these changes are being implemented. The change in energy cost represents one factor that the NRC must consider when deciding to require a particular modification. Cost estimates were derived from probabilistic production cost simulations of pooled utility system operations. Factors affecting replacement energy costs, such as random unit failures, maintenance and refueling requirements, and load variations, are treated in the analysis. This report describes an abbreviated analytical approach as it was adopted to update the cost estimates published in NUREG/CR-4012, Vol. 3. The updates were made to extend the time frame of cost estimates and to account for recent changes in utility system conditions, such as change in fuel prices, construction and retirement schedules, and system demand projects.

  6. New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report

    SciTech Connect

    Kinney, L.F.; Lewis, G.; Pratt, R.G.; Miller, J.

    1997-08-01

    Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

  7. Step 4: Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Process Step 4: Project Implementation Presentation Agenda * Step 4: Project Implementation - Pre-construction - Contract execution - Interconnection - Project construction - Commissioning * Project Example 2 1/28/2016 2 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation 4 Implementation 3 Potential Options Refinement Implementation Operations & Maintenance Step 4: Implementation 4 Purpose: Contract and begin physical construction of project Tasks: * Finalize

  8. Test report for K Basin MK I lid removal and replacement system

    SciTech Connect

    Omberg, R.P.; Roe, N.R.

    1996-08-21

    This report provides the results of acceptance testing of sampling equipment for use in the Hanford K Basin. The equipment, MK I Lid Removal/Replacement Tools, were designed to remove/replace MK I Spent Fuel Canister lids so that other equipment may be used to sample the canister contents. The tools were determined to be acceptable for their intended use.

  9. Project Reports for Haida Corporation- 2010 Project

    Energy.gov [DOE]

    The Reynolds Creek Hydroelectric Project ("Reynolds Creek" or the "Project") is a 5 MW hydroelectric resource to be constructed on Prince of Wales Island, Alaska, approximately 10 miles east of Hydaburg.

  10. Project Reports for Chickasaw Nation- 2010 Project

    Energy.gov [DOE]

    Under this project, the Chickasaw Nation, Division of Commerce (CNDC) will upgrade old, inefficient lighting systems throughout CNDC to new, energy saving systems. Learn more about this project or...

  11. Fairbanks Geothermal Energy Project Final Report

    SciTech Connect

    Karl, Bernie

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  12. CX-001319: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    319: Categorical Exclusion Determination CX-001319: Categorical Exclusion Determination Grants for State-Sponsored Renewable Energy and Energy Efficiency Projects - New Jersey Institute of Technology CX(s) Applied: B5.1 Date: 03/17/2010 Location(s): Newark, New Jersey Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory Oak Hall project including new demand-based building controls (variable-frequency drives), boiler replacement, solar water heating, rooftop

  13. Leveraging the LEDA high voltage power supply systems for the LANSCE refurbishment project

    SciTech Connect

    Bradley Iii, Joseph Thomas; Rees, Daniel E; Roybal, William T; Young, Karen A

    2008-01-01

    The LANSCE Refurbishment Project (LANSCE-R) will revitalize the LANSCE accelerator infrastructure. Much of the equipment has been in use for over 39 years and is approaching the end of its design lifetime. As obsolescence issues make like-for-like replacements increasingly more expensive, modern systems with lower costs become a reasonable alternative. As part of the LANSCE-R project, four of the seven HV power supplies for the 805 MHz RF klystrons will be replaced. The present and future requirements for these power supplies influence the selection of replacement options. Details of the HV power supply replacement requirements and the different replacement options will be discussed. One option is to use four 95 kV, 21 A DC power supplies originally installed nearby as part of the Low Energy Demonstration Accelerator (LEDA) project. Significant material and labor cost savings can be achieved by leaving these supplies installed where they are and building a HV transport system to bring high voltage power from the existing LEDA facility to the LANSCE facility. The different replacement options will be compared based on material and labor costs as offset by long-term energy savings.

  14. Project File System

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    with each project directory. This user must have a NIM role of PI, PI Proxy, or Project Manager. Access control for project directories is based on Unix groups. The...

  15. Improving Project Management

    Office of Energy Efficiency and Renewable Energy (EERE)

    On December 19, 2014, the Energy Department released its "Improving Project Management" report, a roadmap to transformation in funding, culture, project ownership, independent oversight and front-end planning from experienced project management leaders.

  16. Project Charter Template

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EERE WebDigital Project Charter |Project Name|| |Project Lead|| |Supporting EERE Office... How do you plan to address Section 508 requirements? Do you need a separate Web statistics ...

  17. Categorical Exclusion Determinations: Idaho Operations Office...

    Energy.gov [DOE] (indexed site)

    Stack Modifications for Sample Probe Replacement CX(s) Applied: B2.2 Date: 05112015 ... Determination Test Reactor Area-774 Substation Equipment Upgrades CX(s) Applied: B2.5 ...

  18. Bradys EGS Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bradys EGS Project DOE: DE-FG36-08GO18200 Kyle Snyder Ezra Zemach Ormat Nevada Inc. Project Officer: Bill Vandermeer Total Project Funding: $6.6M April 22nd, 2013 This presentation does not contain any proprietary confidential, or otherwise restricted information. Insert photo of your choice 2 | US DOE Geothermal Program eere.energy.gov - Timeline * Project start date: September 2008, contract singed on June 2009 * Project end date: December 2013 * percent complete: ~50% - Budget * Total project

  19. Completed Deepwater Technology Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Deepwater Technology Projects Active Projects | Completed Projects Completed Offshore Deepwater Technology Projects Project Number Project Name Primary Performer 12121-6503-01 Development of Best Practices and Risk Mitigation Measures for Deepwater Cementing in SBM and OBM CSI Technologies 11121-5101-01 Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Incidents, and Literature Review Pacific Science & Engineering Group 11121-5503-01 Intelligent BOP RAM Actuation

  20. Completed Methane Hydrate Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Completed Methane Hydrate Projects Active Projects | Completed Projects Completed Methane Hydrate Projects Project Number Project Name Primary Performer DE-FE0002911 Natural Gas Hydrates in Permafrost and Marine Settings: Resources, Properties, and Environmental Issues U.S. Geological Survey at Woods Hole DE-FE0013565 Hydrate Evolution in Response to Ongoing Environmental Shifts University of Oregon DE-FE0013889 THCM Coupled Model for Hydrate-bearing Sediments: Data Analysis and Design of New

  1. Buckman Direct Diversion Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Buckman Direct Diversion Project Buckman Direct Diversion Project This project takes surface water from the Rio Grande, and then treats and distributes these waters to the city and county of Santa Fe through their drinking water distribution systems. August 1, 2013 Water flumes at Buckman Direct Diversion Project Water flumes at Buckman Direct Diversion Project The City of Santa Fe and Santa Fe County completed the construction of the Buckman Direct Diversion (BDD) Project in December 2010. The

  2. Y-12 Steam Plant Project Received National Recognition for Project...

    National Nuclear Security Administration (NNSA)

    Steam Plant Project Received National Recognition for Project Management Excellence March 23, 2011 Y-12 steam plant project receives national recognition for project management ...

  3. MHK Projects/Clarence Strait Tidal Energy Project | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Project Country Australia Project Resource Click here Current Tidal Project Nearest Body of Water Clarence Strait Coordinates -12.083533792616, 131.04972839355 Project...

  4. MHK Projects/Twelve Mile Point Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Province Louisiana Project Country United States Project Resource Click here Current Tidal Coordinates 29.9177, -89.9307 Project Phase Phase 1 Project Installed Capacity...

  5. GTO Project Portfolio

    Energy.gov [DOE]

    The Office funds 154 research and development projects leveraging nearly $500 million in total combined investment. Each project represents a growing technology sector in conventional hydrothermal,...

  6. Step 4: Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... expected * Technology O&M Assumed low, mitigable or allocatable Sources: Adapted from Holland & Hart, RE Project Development & Finance & Infocast, Advanced RE Project Finance & ...

  7. Project Finance and Investments

    Energy.gov [DOE]

    Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  8. 2016 Technology Innovation Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Projects FY 2016 Technology Innovation Project Briefs Demand Response TIP 292: Advanced Heat Pump Water Heater Research TIP 336: Scaled Deployment and Demonstration of Demand...

  9. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY ...

  10. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & ...

  11. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & ...

  12. Evaluation Project 4492

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Organization area to allow the movement and radio-graphing of component for evaluation to determine the proper Project Execution Plan for dismantlement. Evaluation Project...

  13. Camp Lejeune Solar Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Communication Base Coordination Regulatory Requirements Lease Project Management Environmental NSA Crane 13 Overview of Project * Leased Area: 140 acres on base * DC Capacity: ...

  14. The Manhattan Project

    Office of Scientific and Technical Information (OSTI)

    ... Center for Oak Ridge Oral History, including stories about the Manhattan Project The Manhattan Project: A New and Secret World of Human Experimentation Top Related Information: ...

  15. Transmission Commercial Project Integration

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K Commercial Business Process Improvement (CBPI) Customer...

  16. Falls Creek Hydroelectric Project

    SciTech Connect

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  17. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  18. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  19. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  20. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    3 First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2013 Target FY 2013 Final FY ...

  1. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  2. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY ...

  3. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY ...

  5. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  6. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY ...

  7. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  8. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual ...

  9. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2008 Target FY 2008 Actual ...

  10. Manhattan Project: Maps

    Office of Scientific and Technical Information (OSTI)

    Scroll down to view thumbnails of each map. Leslie Groves looks at a map of Japan. Manhattan Project: General Manhattan Project Facilities Places map "Signature Facilities of the ...

  11. DHS Flat Stanley Project

    Energy.gov [DOE]

    To provide information on the DHS Flat Stanley Project. The goal of the project is to help kids learn about the importance of cybersecurity.

  12. ARRA Electrification Projects

    Alternative Fuels and Advanced Vehicles Data Center

    U.S. Department of Energy funded multiple electrification projects through the American ... The U.S. Department of Energy funded multiple electrification projects through the ...

  13. Photovoltaic Solar Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects Photovoltaic Solar Projects LPO_Utility-Scale_PV_Solar_Report_Thumbnail_180.png

  14. Projects - Summer 2017 Cyclotron Institute REU Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2017 Student Projects

  15. Project Management Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance ...

  16. EERE Success Story-California: SQAMD Replaces Drayage Trucks with CNG |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy SQAMD Replaces Drayage Trucks with CNG EERE Success Story-California: SQAMD Replaces Drayage Trucks with CNG November 6, 2013 - 12:00am Addthis In 2008, the South Coast Air Quality Management District (AQMD) Heavy-Duty Natural Gas Drayage Truck Replacement Program started to address a significant need to reduce diesel emissions and associated public health risks from goods movement at the Ports of Los Angeles and Long Beach. In 2010, the two ports processed goods worth

  17. Agents for replacement of NAD+/NADH system in enzymatic reactions

    DOEpatents

    Fish, Richard H.; Kerr, John B.; Lo, Christine H.

    2004-04-06

    Novel agents acting as co-factors for replacement of NAD(P).sup.+ /NAD(P)H co-enzyme systems in enzymatic oxido-reductive reactions. Agents mimicking the action of NAD(P).sup.+ /NAD(P)H system in enzymatic oxidation/reduction of substrates into reduced or oxidized products. A method for selection and preparation of the mimicking agents for replacement of NAD(P).sup.+ /NAD(P)H system and a device comprising co-factors for replacement of NAD(P).sup.+ /NAD(P)H system.

  18. Text-Alternative Version: The L Prize-Winning LED A19 Replacement-What

    Energy Saver

    Commercial Building Owners/Operators Can Expect in 2012 | Department of Energy The L Prize-Winning LED A19 Replacement-What Commercial Building Owners/Operators Can Expect in 2012 Text-Alternative Version: The L Prize-Winning LED A19 Replacement-What Commercial Building Owners/Operators Can Expect in 2012 Below is the text-alternative version of the "The L Prize-Winning LED A19 Replacement-What Commercial Building Owners/Operators Can Expect in 2012" webcast, held January 18, 2012.

  19. Desert Peak EGS Project

    Energy.gov [DOE]

    Desert Peak EGS Project presentation at the April 2013 peer review meeting held in Denver, Colorado.

  20. EM Projects Perspective

    Energy.gov [DOE]

    Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management March 22, 2016

  1. Statement of Project Objectives

    Office of Energy Efficiency and Renewable Energy (EERE)

    Statement of Project Objectives, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  2. eProject Builder

    Energy Science and Technology Software Center

    2014-06-01

    eProject Builder enables Energy Services Companies (ESCOs) and their contracting agencies to: 1. upload and track project-level Information 2. generate basic project reports required by local, state, and/or federal agencies 3. benchmark new Energy Savings Performance Contract (ESPC) projects against historical data

  3. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects

  4. January 2016 Project Dashboard

    Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOEs portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 32 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  5. April 2016 Project Dashboard

    Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOE’s portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 34 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  6. December 2015 Project Dashboard

    Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOEs portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 32 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  7. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  8. PROJECT MANGEMENT PLAN EXAMPLES Project Execution Example

    Office of Environmental Management (EM)

    Project Execution Example Example 73 6.3 Project Approach The overall schedule strategy for the PFP project includes ongoing minimum safe activities, combined with stabilization of materials followed by materials disposition, and subsequent transition of the PFP complex to a decommissioned state. The PFP material stabilization baseline was developed using a functionally-based work WBS. The WBS defines all activities required to take each material stream from their current location/conditions

  9. Reynolds Creek Hydroelectric Project, Project Status

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hydroelectric Project Project Status November 17, 2009 By : Alvin Edenshaw, President Haida Corporation and Haida Energy, Inc. Mike Stimac, P.E. Vice President, HDR Engineering, Inc. Project Manager November 17, 2009 2 Haida Corporation  Located in Hydaburg on Prince of Wales Island in SE Alaska  Hydaburg population = 350 people (called Kaigani Haida)  Hydaburg is largest Haida Village in Alaska  Subsistence and Commercial Fishing Lifestyle  Substantial Timber Holdings 

  10. Project Reports for Winnebago Tribe- 2014 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Following through with the Winnebago Tribe's commitment to reduce energy usage and consumption, the Winnebago Tribe Solar Project will focus on renewable energy production and energy cost savings...

  11. Project Information Form for Usability Projects | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    it to the Web Governance Team facilitator. File Project Information Form - Usability More Documents & Publications EERE's Usability and Analysis Techniques Guidebook Web Content ...

  12. Replace Pressure-Reducing Valves with Backpressure Turbogenerators - Steam Tip Sheet #20

    SciTech Connect

    2012-01-01

    This revised AMO steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  13. Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (07-95) Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE 6. DATE NEXT REGULAR STEP INCREASE IS DUE: 7. LIST ANY AWARDS OR QUALITY INCREASES RECEIVED IN LAST 5 YEARS...

  14. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs

    Energy.gov [DOE]

    This document, from the U.S. Environmental Protection Agency's ENERGY STAR Residential Program, is part of the Case Study Series, highlighting how "Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs."

  15. Is it Cost-Effective to Replace Old Eddy-Current Drives?

    Energy.gov [DOE]

    New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may be cost-effective replacements for aging or maintenance-intensive eddy-current drives. This tip sheet provides suggested actions and example energy savings calculations.

  16. Microsoft Word - SERIG Project Fact Sheet_29APR16.docx

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Remote Indonesian Grids (SERIG) The United States Department of Energy (DOE) is funding the US $1.2 million SERIG project to support Indonesia's efforts to develop clean energy and increase access to electricity in remote locations across the country. SERIG has two components: pilots and nationwide deployment. * Pilots: SERIG conducted technical and economic analyses for high-penetration renewable energy technologies to replace high-cost diesel generation on selected islands and remote

  17. Building America Top Innovations 2013 Profile … Window Replacement, Rehabilitation, & Repair Guide

    Energy Saver

    Window Replacement, Rehabilitation, & Repair Guide TOP INNOVATOR: BSC Old single-glazed windows have such low thermal resistance that their effect on the overall thermal resistance of the walls can be staggering. Building America recommends several ways to improve the performance of existing windows at varying price points. Owners of older homes who want to improve their homes' efficiency often conclude that window replacement is a necessary first step. They are right that windows can be a

  18. Design Review Report for Concrete Cover Block Replaced by Steel Plate

    SciTech Connect

    JAKA, O.M.

    2000-07-27

    The design for the steel cover plates to replace concrete cover blocks for U-109 was reviewed and approved in a design review meeting. The design for steel plates to replace concrete blocks were reviewed and approved by comparison and similarity with U-109 for the following additional pits: 241-U-105. 241-I-103, 241-Ax-101. 241-A-101, 241-SX-105, 241-S-A, 241-S-C, 241-SX-A.

  19. CU-Replacement-3 Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Replacement-3 Wholesale Power Rate Schedule CU-Replacement-3 Wholesale Power Rate Schedule Area: Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky, southern Illinois System: CU This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the

  20. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    August 2011 | Department of Energy Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This paper discusses the so-called "coal train wreck" which may afford an opportunity to modernize our electric utility regulations to reflect a new century of different economic and energy markets, creating opportunities for the utility industry to define a new path to

  1. 2014 DOE Project Management Workshop

    Energy.gov [DOE]

    What:  2014 DOE Project Management Workshop (Meeting the Challenge—Integrated Acquisition & Project Management)

  2. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect

    Not Available

    2014-09-01

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  3. Concentrating Solar Power Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects

  4. Advanced Engineering Environment FY09/10 pilot project.

    SciTech Connect

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.; Dutra, Edward G.; Sego, Abraham L.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

  5. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete

  6. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  7. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  8. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10).

  9. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10).

  10. Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

    SciTech Connect

    Richman, Eric E.

    2012-10-31

    This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

  11. Alternatives to Diesel Fuel in California - Fuel Cycle Energy and Emission Effects of Possible Replacements Due to the TAC Diesel Particulate Decision

    SciTech Connect

    Christopher L. Saraicks; Donald M. Rote; Frank Stodolsky; James J. Eberhardt

    2000-05-01

    Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel, per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible ''mid-course'' strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression ignition by spark ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21 percent above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7 percent above projected (total) consumption level. In the second case, ressionignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case we estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOx emissions, though all scenarios bring about PM10 reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

  12. Alternatives to diesel fuel in California - fuel cycle energy and emission effects of possible replacements due to the TAC diesel particulate decision.

    SciTech Connect

    Saricks, C. L.; Rote, D. M.; Stodolsky, F.; Eberhardt, J. J.

    1999-12-03

    Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible mid-course strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression-ignition by spark-ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21% above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7% above projected (total) consumption level. In the second case, compression-ignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case the authors estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOX emissions, though all scenarios bring about PM{sub 10} reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

  13. MHK Projects/Tensas | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ","visitedicon":"" Project Profile Project Start Date 112009 Project City Butte la Rose, LA Project StateProvince Louisiana Project Country United States Project Resource...

  14. Acquisition and Project Management

    National Nuclear Security Administration (NNSA)

    4%2A en Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise http:nnsa.energy.govblogacquisition-and-project-mana...

  15. Project Execution Plan RM

    Office of Environmental Management (EM)

    Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module ...

  16. A=HTML Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    HTML Documents for Nuclides, A 3 - 20 The HTML for Nuclides Project is an ongoing project. HTML documents for A 3 - 20 nuclides provide HTML documents for each individual ...

  17. Information Technology Project Management

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2012-12-03

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  18. Integrated Project Team RM

    Energy.gov [DOE]

    The Integrated Project Team (IPT) is an essential element of the Department’s acquisition process and will be utilized during all phases of a project life cycle. The IPT is a team of professionals...

  19. Information Technology Project Management

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2012-12-03

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Admin Chg 1, dated 1-16-2013, supersedes DOE O 415.1.

  20. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and ...

  1. Contract/Project Management

    Energy.gov [DOE] (indexed site)

    Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and ...

  2. Sample Project Execution Plan

    Energy.gov [DOE]

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  3. Haida Corporation- 2010 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Reynolds Creek Hydroelectric Project ("Reynolds Creek" or the "Project") is a 5 MW hydroelectric resource to be constructed on Prince of Wales Island, Alaska, approximately 10 miles east of Hydaburg.

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual ...

  5. Sandia National Laboratories: Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Projects Threat and Intelligence Insight Game-changing projects with a high degree of technical risk realized and produced in support of the warfighter Threat and Intelligence Insight Various Project Highlights IMS spearheads work supporting a number of prominent projects. Supporting the Department of Defense's core mission and ever-evolving needs, IMS leverages its robust background in weapons development to understand and actively engage with a number of weapons technologies, defense

  6. Completed Environmental Solutions Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Solutions Projects Produced Water | Federal Lands Access | Regulatory Streamlining | Oil Refining Completed Produced Water Management Projects Project Number Project Name Primary Performer DE-NT0005227 Membrane Technology for Produced Water at Lea County, NM Lea County Government, Lovington, NM DE-FE0000833 An Integrated Water Treatment Technology Solution for Sustainable Water Resource Management in the Marcellus Shale Altela, Inc. Argonne National Laboratory DE-FE0000784

  7. Mentors and Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Mentors, Projects Mentors and Projects Bringing together top space science students with internationally recognized researchers at Los Alamos in an educational, collaborative atmosphere Contacts Director Misa Cowee Email Administrative Assistant Lynea Koshar Email Request more information Email Students work closely with their mentors, who are Laboratory scientists, on challenging research projects in the Space Weather Summer School. Projects are related to current research topics in space

  8. WIPP Projects Interative Map

    Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  9. GHPsRUS Project

    DOE Data Explorer

    Battocletti, Liz

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  10. PROJECT TASK STATEMENT

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Arizona State University 4 (PVRD) PROJECT PROFILE: Arizona State University 4 (PVRD) Project Name: Plant and Module Designs for Uniform and Reduced Operating Temperature Funding Opportunity: PVRD SunShot Subprogram: Photovoltaics Location: Tempe, AZ SunShot Award Amount: $899,316 Awardee Cost Share: $100,000 Project Investigator: Govindasamy Tamizhmani This project intends to identify and evaluate thermally conductive and radiative but electrically insulating backsheets, which can be used by the

  11. GHPsRUS Project

    DOE Data Explorer

    Battocletti, Liz

    2013-07-09

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  12. Red Lake Weatherization Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    REVIEW RED LAKE WEATHERIZATION PROJECT BERT VAN WERT ENERGY ACTIVITIES COORDINATOR Project Overview To develop the capacity to conduct energy audits Implement energy efficiency measures into Tribal homes Develop a Tribally administered Energy Efficiency Program and business PROJECT LOCATION Our project is located at Red Lake Housing Authority Red Lake Band of Chippewa Indians Red Lake , MN Red Lake Band of Chippewas Area overview Reservation (Diminished Lands) and Surroundings Red Lake Band of

  13. Step 2: Project Options

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2: Project Options 2 2 Design 1 Potential 3 Refinement 4 Implementation 2 Options 5 Operations & Maintenance 1/28/2016 2 Presentation Agenda * Step 2: Project Options * Project members and roles * Activity * Project ownership options - Interconnection, net metering, permitting, and considerations * Tools * Case in Point 3 Potential Options Refinement Implementation Operations & Maintenance 4 Step 2: Roles, Business Structures, & Regulatory Considerations Purpose: Determine ownership

  14. All Selected Projects

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Selected Projects Oct 23, 2009 (rev. Dec. 14, 2010) 99 Projects SMART GRID INVESTMENT GRANTS Type Advanced Metering Infrastructure Customer Systems Electric Systems Distribution Electric Transmission Systems Equipment Manufacturing Integrated and/or Crosscutting Systems Circle indicates project where specific utility/area is not known.

  15. Concentrating Solar Power Projects - Rice Solar Energy Project...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Rice Solar Energy Project This page provides information on Rice Solar Energy Project, a concentrating solar power (CSP) project, with data organized by background, participants, ...

  16. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    SciTech Connect

    DiCello, D.C.; Odell, A.D.; Jackson, T.J.

    1995-03-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific ({mu}Ci/cm{sup 2}) of Co-60 and Zn-65 were analyzed.

  17. River Protection Project (RPP) Immobilized Low Activity Waste (ILAW) Disposal Plan

    SciTech Connect

    BRIGGS, M.G.

    2000-09-22

    This document replaces HNF-1517, Rev 2 which is deleted. It incorporates updates to reflect changes in programmatic direction associated with the vitrification plant contract change and associated DOE/ORP guidance. In addition it incorporates the cancellation of Project W-465, Grout Facility, and the associated modifications to Project W-520, Immobilized High-Level Waste Disposal Facility. It also includes document format changes and section number modifications consistent with CH2M HILL Hanford Group, Inc. procedures.

  18. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    SciTech Connect

    Hsu, R.H.; Oji, L.N.

    1997-11-14

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  19. Project Reports for Pawnee Nation- 2006 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The primary goal of this project is to move the energy vision of the Pawnee Nation forward by conducting specific data collection and analysis tasks to assess the viable options available to Pawnee to meet future energy needs sustainable.

  20. Project Reports for Hualapai Tribe- 2010 Project

    Energy.gov [DOE]

    The project will build on the potential for renewable energy development on the Hualapai Reservation that was identified during the Phase l renewable energy resource assessment conducted by the Hualapai Tribe since 2005.

  1. Manhattan Project app released

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    » Manhattan Project app released At the Bradbury Latest Issue:November 2016 all issues All Issues » submit Manhattan Project app available NOW! Downloadable through iTunes June 1, 2016 The opening graphic of the Los Alamos: Secret City of the Manhattan Project app Los Alamos: Secret City of the Manhattan Project is available through iTunes for free! We let you know about it. We provided a short video so you could get a feel for what the Los Alamos: Secret City of the Manhattan Project app is

  2. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total

  3. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC

  5. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is

  6. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is

  7. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  8. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  9. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  10. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  11. EM Capital Asset Project List

    Energy.gov [DOE]

    Read the EM Capital Asset Project List, which includes the project's name, site, current critical decision and current total project cost.

  12. Replacement of outboard main steam isolation valves in a boiling water reactor plant

    SciTech Connect

    Schlereth, J.R.; Pennington, D.

    1996-12-01

    Most Boiling Water Reactor plants utilize wye pattern globe valves for main steam isolation valves for both inboard and outboard isolation. These valves have required a high degree of maintenance attention in order to pass the plant local leakage rate testing (LLRT) requirements at each outage. Northern States Power made a decision in 1993 to replace the outboard valves at it`s Monticello plant with double disc gate valves. The replacement of the outboard valves was completed during the fall outage in 1994. During the spring outage in April of 1996 the first LLRT testing was performed with excellent results. This presentation will address the decision process, time requirements and planning necessary to accomplish the task as well as the performance results and cost effectiveness of replacing these components.

  13. Categorical Exclusion Determinations: Naval Nuclear Propulsion Program |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Naval Nuclear Propulsion Program Categorical Exclusion Determinations: Naval Nuclear Propulsion Program Categorical Exclusion Determinations issued by Naval Nuclear Propulsion Program. DOCUMENTS AVAILABLE FOR DOWNLOAD September 25, 2015 CX-014279: Categorical Exclusion Determination Lower Level Guard Post Replacement Project CX(s) Applied: B1.11, B1.15, B2.2 Date: 09/25/2015 Location(s): New York Offices(s): Naval Nuclear Propulsion Program July 6, 2015 CX-013878:

  14. MHK Projects/UEK Yukon River Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    StateProvince Alaska Project Country United States Project Resource Click here Current Tidal Coordinates 64.7881, -141.2 Project Phase Phase 1 Project Details UEK is has...

  15. Solid Oxide Fuel Cells (SOFC) as Military APU Replacements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Cells (SOFC) as Military APU Replacements Solid Oxide Fuel Cells (SOFC) as Military APU Replacements Presentation by Thomas Reitz, Air Force Research Laboratory, at the DOD-DOE Aircraft Petroleum Use Reduction Workshop, September 30, 2010, in Washington, DC. aircraft_7_reitz.pdf (406.74 KB) More Documents & Publications Report of the DOE-DOE Workshop on Fuel Cells in Aviation: Workshop Summary and Action Plan Manufacturing Cost Analysis of 1 kW and 5 kW Solid Oxide Fuel Cell

  16. Fact #944: September 26, 2016 Public Opinion of Fuels Which Could Replace

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Gasoline | Department of Energy 4: September 26, 2016 Public Opinion of Fuels Which Could Replace Gasoline Fact #944: September 26, 2016 Public Opinion of Fuels Which Could Replace Gasoline SUBSCRIBE to the Fact of the Week A public opinion survey from June 2016 posed this question: Consider a future date when gasoline is no longer available. Which of the following do you think would be the BEST fuel for use in personal vehicles? Would you say natural gas, electricity, ethanol, or hydrogen?

  17. Reminder: Y-12 Public Warning Siren System being replaced, tested | Y-12

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    National Security Complex Reminder: Y-12 Public ... Reminder: Y-12 Public Warning Siren System being replaced, tested Posted: September 25, 2012 - 12:55pm The Y-12 Public Warning Siren System (PWSS) located around the Oak Ridge area is being replaced this month with a test of the new system on Sept. 26. The vendor, American Signal, will be testing the sirens Sept. 26 between 10 a.m. and 2 p.m. They may sound sirens multiple times during this window, and they probably will sound each siren

  18. Study: Algae Could Replace 17% of U.S. Oil Imports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Study: Algae Could Replace 17% of U.S. Oil Imports Study: Algae Could Replace 17% of U.S. Oil Imports April 13, 2011 - 6:30pm Addthis Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL Staff Photographer Dennis Schroeder. Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL

  19. Webinar: The L Prize-Winning LED A19 Replacement-What Commercial Building

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Owners/Operators Can Expect in 2012 | Department of Energy The L Prize-Winning LED A19 Replacement-What Commercial Building Owners/Operators Can Expect in 2012 Webinar: The L Prize-Winning LED A19 Replacement-What Commercial Building Owners/Operators Can Expect in 2012 This January 18, 2012 webinar presented an update on the status of LED A19 lamp options for commercial businesses, with an overview of DOE's L Prize competition and the rigorous lab, lifetime, and field testing that went into

  20. Baltazor Springs Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Baltazor Springs Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Baltazor Springs Geothermal Project Project Location...

  1. Silver State Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    State Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Silver State Geothermal Project Project Location Information Coordinates...

  2. Panther Canyon Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Canyon Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Panther Canyon Geothermal Project Project Location Information...

  3. Kelsey North Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    North Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Kelsey North Geothermal Project Project Location Information...

  4. Devil's Canyon Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Canyon Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Devil's Canyon Geothermal Project Project Location Information...

  5. Dead Horse Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Horse Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Dead Horse Geothermal Project Project Location Information...

  6. Delcer Butte Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Butte Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Delcer Butte Geothermal Project Project Location Information...

  7. Drum Mountain Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Mountain Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Drum Mountain Geothermal Project Project Location Information...

  8. Puna Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Puna Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Puna Geothermal Project Project Location Information Coordinates...

  9. Reese River Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    River Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Reese River Geothermal Project Project Location Information...

  10. Orita 3 Geothermal Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    3 Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Orita 3 Geothermal Project Project Location Information Coordinates...

  11. Y-12 Steam Plant Project Received National Recognition for Project

    National Nuclear Security Administration (NNSA)

    Management Excellence | National Nuclear Security Administration | (NNSA) Steam Plant Project Received National Recognition for Project Management Excellence March 23, 2011 Y-12 steam plant project receives national recognition for project management excellence. Y-12's Steam Plant Life Extension Project (SPLE) has received the Secretary of Energy's Project Management Improvement Award. Microsoft Office document icon NR-03-28

  12. Fuel Cell Forklift Project Final Report

    SciTech Connect

    Cummings, Clifton C

    2013-10-23

    This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

  13. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  14. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  15. Structuring small projects

    SciTech Connect

    Pistole, C.O.

    1995-11-01

    One of the most difficult hurdles facing small project developers is obtaining financing. Many major banks and institutional investors are unwilling to become involved in projects valued at less than $25 million. To gain the interest of small project investors, developers will want to present a well-considered plan and an attractive rate of return. Waste-to-energy projects are one type that can offer diversified revenue sources that assure maximum profitability. The Ripe Touch Greenhouse project, a $14.5 million waste tire-to-energy facility in Colorado, provides a case study of how combining the strengths of the project partners can help gain community and regulatory acceptance and maximize profit opportunities.

  16. Battleground Energy Recovery Project

    SciTech Connect

    Daniel Bullock

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ? Create a Showcase Waste Heat Recovery Demonstration Project.

  17. Project Reports for Hualapai Tribe- 2005 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Hualapai Tribe is located on the end of their existing utility grid which has subjected them to high costs and poor reliability of electric service. The first phase of the project will establish a tribally operated utility to provide service to tribal customers at Grand Canyon West, which has been operating without grid power for the past seven years. The second phase of the project will examine the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation.

  18. Campo Net Meter Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Campo Net Meter Project Michael Connolly Miskwish, MA Economist/Engineer Campo Kumeyaay Nation Location map Tribal Energy Planning  Current 50 MW project  Proposed 160 MW project  DOE energy grant  Land use planning, renewable energy zones overlay  Economic analysis  Transmission, queue, PPA  Energy Resource Agreement analysis  Tribal Net meter turbine planning California SGIP program  Self Generation Incentive Program  Requires utilities to allow net metering 

  19. Microwave solidification project overview

    SciTech Connect

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  20. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Safety Integration - Implementation of Controls Examples Example 24 5 Health & Safety This section describes the work controls associated with the 771/774 Closure Project. As prescribed in DOE Order 440.1, Worker Protection Management for DOE Federal and Contractor Employees, the project must comply with the OSHA construction standards for Hazardous Waste Operations and Emergency Response, 29 CFR 1910.120 and 1926. Under these standards, a Building 771/774 Closure Project-Specific HASP has

  1. Funding for CSES Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Funding for CSES Projects Funding for CSES Projects High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email CSES Student and Postdoctoral Fellow Program Funding intervals are based on the federal fiscal year spanning the year from October 1 through September 30 of the following year. For all projects

  2. NREL: Geothermal Technologies - Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Projects The NREL geothermal team is involved in various projects to help accelerate the development and deployment of clean, renewable geothermal technologies, including low-temperature resources; enhanced geothermal systems; strategic planning, analysis, and modeling; and project assessment. Low-Temperature Geothermal Resources NREL supports the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) through various collaborations that evaluate the levelized cost of electricity

  3. NREL: Transportation Research - Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Projects Illustration of aerodynamic light-, medium, and heavy-duty vehicles. NREL research helps optimize the energy efficiency of a wide range of vehicle technologies and applications. NREL's innovative transportation research, development, and deployment projects accelerate widespread adoption of high-performance, low-emission, energy-efficient passenger and freight vehicles, as well as alternative fuels and related infrastructure. The following NREL transportation projects are propelling

  4. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  5. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  6. Conformationally constrained farnesoid X receptor (FXR) agonists: Heteroaryl replacements of the naphthalene

    SciTech Connect

    Bass, Jonathan Y.; Caravella, Justin A.; Chen, Lihong; Creech, Katrina L.; Deaton, David N.; Madauss, Kevin P.; Marr, Harry B.; McFadyen, Robert B.; Miller, Aaron B.; Mills, Wendy Y.; Navas, III, Frank; Parks, Derek J.; Smalley, Jr., Terrence L.; Spearing, Paul K.; Todd, Dan; Williams, Shawn P.; Wisely, G. Bruce

    2014-08-13

    To improve on the drug properties of GSK8062 1b, a series of heteroaryl bicyclic naphthalene replacements were prepared. The quinoline 1c was an equipotent FXR agonist with improved drug developability parameters relative to 1b. In addition, analog 1c lowered body weight gain and serum glucose in a DIO mouse model of diabetes.

  7. Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect

    Hunt, A.; Easley, S.

    2012-05-01

    The report evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provide a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  8. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  9. Measure Guideline. Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect

    Hunt, A.; Easley, S.

    2012-05-01

    This measure guideline evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provides a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  10. Advanced Blade Manufacturing Project - Final Report

    SciTech Connect

    POORE, ROBERT Z.

    1999-08-01

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  11. Envision Charlotte Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the period of the project * Utilize smart city initiatives to create a scalable, ... Problem Statement: Envision Charlotte was very successful during the Smart Energy Now ...

  12. The MAJORANA Project

    SciTech Connect

    Aalseth, Craig E.; Amman, M.; Amsbaugh, John F.; Avignone, F. T.; Back, Henning O.; Barabash, Alexander; Barbeau, P. S.; Beene, Jim; Bergevin, M.; Bertrand, F.; Boswell, M.; Brudanin, V.; Bugg, William; Burritt, Tom H.; Busch, Matthew; Capps, Greg L.; Chan, Yuen-Dat; Collar, J. I.; Cooper, R. J.; Creswick, R.; Detwiler, Jason A.; Doe, P. J.; Efremenko, Yuri; Egorov, Viatcheslav; Ejiri, H.; Elliott, S. R.; Ely, James H.; Esterline, James H.; Farach, H. A.; Fast, James E.; Fields, N.; Finnerty, P.; Fujikawa, Brian; Fuller, Erin S.; Gehman, Victor M.; Giovanetti, G. K.; Guiseppe, Vincente; Gusey, K.; Hallin, A. L.; Hazama, R.; Henning, Reyco; Hime, Andrew; Hoppe, Eric W.; Hossbach, Todd W.; Howe, M. A.; Johnson, R. A.; Keeter, K.; Keillor, Martin E.; Keller, C.; Kephart, Jeremy; Kidd, M. F.; Kochetov, Oleg; Konovalov, S.; Kouzes, Richard T.; Leviner, L.; Loach, J. C.; Luke, P.; MacMullin, S.; Marino, Michael G.; Martin, R. D.; Mei, Dong-Ming; Miley, Harry S.; Miller, M. L.; Mizouni, Leila; Montoya, A.; Myers, Allan W.; Nomachi, Masaharu; Orrell, John L.; Phillips, D.; Poon, Alan; Prior, Gersende; Qian, J.; Radford, D. C.; Rielage, Keith; Robertson, R. G. H.; Rodriguez, Larry; Rykaczewski, Krzysztof P.; Schubert, Alexis G.; Shima, T.; Shirchenko, M.; Steele, David; Strain, J.; Swift, Gary; Thomas, K.; Thompson, Rachel B.; Timkin, V.; Tornow, W.; Van Wechel, T. D.; Vanyushin, I.; Vetter, Kai; Warner, Ray A.; Wilkerson, J. F.; Wouters, Jan; Yakushev, E.; Young, A.; Yu, Chang-Hong; Yumatov, Vladimir; Zhang, C.; Zimmerman, S.

    2010-10-01

    The MAJORANA project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  13. IS&T Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hybrid Quantum-Classical Computing POC: Rolando Somma Description: The main goal of this project is to investigate and exploit the performance potential of physically realizable ...

  14. Desert Peak EGS Project

    Energy.gov [DOE] (indexed site)

    Ethan Chabora GeothermEx, a Schlumberger Company Ezra Zemach Ormat Nevada Inc. ... Collaborations * Project Leader: Ormat Nevada, Inc. - Co-Management: GeothermEx, Inc. - ...

  15. Final Project Report

    SciTech Connect

    Wang, Qiang; Dandy, David S.

    2015-05-15

    This is the final technical report of the DOE project DE-FG02-07ER46448 awarded to Colorado State University.

  16. AVEC's Village Wind Projects

    Office of Environmental Management (EM)

    Village Wind Projects By Meera Kohler Alaska Village Electric Cooperative Tribal Energy Conference Denver, Colorado October 28, 2010 New turbines in Hooper Bay AVEC is a ...

  17. Tribal Energy Projects

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Feasibility Projects (Selected in FY2002) * Bristol Bay Native Corporation (AK) * Cherokee Nation (OK) * Lower Brule Sioux Tribe (SD) * Shoshone Paiute Tribes (NV) * St. Croix ...

  18. NREL: Biomass Research - Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Spectrometer analyzes vapors during the gasification and pyrolysis processes. NREL's biomass projects are designed to advance the production of liquid transportation fuels from...

  19. Evaluation Project 4492

    National Nuclear Security Administration (NNSA)

    The BOTE project would involve multiple releases of a biological simulant, characterization sampling, decontamination, and clearance sampling, at the Idaho National Laboratory ...

  20. Funding for IGPPS Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    which may, in certain circumstances, require several months to implement after the start of the fiscal year. For all projects supported with Los Alamos National Laboratory...

  1. Custom Renewable Energy Projects

    Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  2. Major Capital Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    BPA on 242015 and does not contain Agency-approved Financial Information. 1 Includes capital projects authorized at the agency level since August 2007 2 Direct capital costs...

  3. Major Capital Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    BPA on 622014 and does not contain Agency-approved Financial Information. 1 Includes capital projects authorized at the agency level since August 2007 2 Direct capital costs...

  4. Major Capital Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    on 1142014 and does not contain Agency-approved Financial Information. 1 Includes capital projects authorized at the agency level since August 2007 2 Direct capital costs...

  5. Major Capital Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    on 2112014 and does not contain Agency-approved Financial Information. 1 Includes capital projects authorized at the agency level since August 2007 2 Direct capital costs...

  6. Penobscot Tribe- 2012 Project

    Energy.gov [DOE]

    With this award, the Penobscot Indian Nation will advance the preconstruction activities required to secure funding for the proposed 227-megawatt (MW) Alder Stream wind project.

  7. Project Submission Template

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cooperation Project Title: CountryOrganizations: Foreign: Foreign POC: U.S: U.S. POC: Technology Area: Scope of Collaborative Research and Development: Justification of Approach: ...

  8. Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Projects Projects Between 2010 and 2016, the Office of Indian Energy co-funded the deployment of 43 tribal energy project valued at more than $70 million. For more highlights of DOE’s investment in tribal communities, check out this infographic. Between 2010 and 2016, the Office of Indian Energy co-funded the deployment of 43 tribal energy project valued at more than $70 million. For more highlights of DOE's investment in tribal communities, check out this infographic. The U.S. Department

  9. Evaluation Project 4492

    National Nuclear Security Administration (NNSA)

    project, to be managed through the U.S. Air Force (USAF) Operationally Responsive Space (ORS) Office. Sandia Site Office Missile System LEONIDAS Component Development ...

  10. Mascoma: Frontier Biorefinery Project

    Energy.gov [DOE]

    This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

  11. PNM Prosperity Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    PNM Prosperity Project - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power ...

  12. Evaluation Project 4492

    National Nuclear Security Administration (NNSA)

    This project would involve verifying the contents of 25 containers through a review of ... Each container would then be opened, and the contents would be inventoried. Sandia ...

  13. System Analysis Projects

    Energy.gov [DOE]

    Geothermal Technologies Office Systems Analysis projects include environmental, regulatory, financial initiatives and efforts that solve non-technical barriers to geothermal deployment.

  14. structured innovation project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    innovation project - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us ... Center for Infrastructure Research and Innovation Combustion Research Facility Joint ...

  15. The MAJORANA project

    SciTech Connect

    Elliott, Steven R [Los Alamos National Laboratory

    2009-01-01

    The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  16. Mentors and Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    coupling Suggested Project Topics Theory andor data analysis of solar-windmagnetosphere coupling Email the summer school Director for this mentor's contact information. ...

  17. Next Generation Luminaire (NGL) Downlight Demonstration Project: St. Anthony's Hospital

    Energy.gov [DOE]

    The U.S. DOE conducts demonstration projects documenting the performance of LED luminaires relative to conventional technologies to increase market adoption of energy-efficient LED systems and to stimulate ongoing product development. These demonstration projects evaluate various aspects of lighting design, purchase, installation, and operation, and they assess the impacts LED technology might have on building owners and users.The prior reports featured NGL-recognized LED downlight luminaires in projects that were either new construction (Hilton Columbus Downtown) or a major renovation (Alston & Bird, LLC). But purchasing and installing new luminaires is not always feasible for existing buildings. For this report, the DOE evaluated the use of LED replacement lamps in the existing CFL downlights at St. Anthony Hospital in Gig Harbor, WA.

  18. Promoting plumbing fixture and fitting replacement: Recommendations and review for state and local water resource authorities

    SciTech Connect

    Dunham, C.; Lutz, J.D.; Pickle, S.J.

    1995-06-01

    Lawrence Berkeley National Laboratory (LBNL) has prepared this report to facilitate compliance with the requirements of Section 123 of the Energy Policy Act of 1992 (EPACT). Section 123 requires the Department of Energy to issue recommendations for establishing state and local incentive programs to encourage acceleration of voluntary consumer replacement of existing water closets, urinals, showerheads and faucets with water-saving products meeting EPACT standards. The authors recommend that state and local authorities working together and also with utilities: (A) investigate the cost-effectiveness of voluntary replacement of plumbing fixtures and fittings as an effective component of a water efficiency incentive program; (B) allow utilities to distribute the costs of water saving products by billing at pre-installation rates until devices have been paid for; (C) encourage decreased water usage by establishing rate structures such as increasing block rates or seasonal pricing; (D) add additional incentive to rebate programs by making the rebates untaxable income. (E) require municipalities or utilities to exhaust every reasonable method of water conservation before applying for permits to construct water supply or water treatment systems; (F) require high-efficiency toilets, urinals, showerheads, and faucets in new construction and changing plumbing codes to incorporate different pipe sizing needs; and (G) and mandate installation of meters to correctly measure water consumption. Following the introduction, a general overview of these recommendations is presented. Each recommendation is discussed briefly. After determining the cost-effectiveness of a plumbing replacement program (or plumbing replacement aspect of a larger program) states can encourage replacement of toilets, urinals, showerheads, and faucets in a number of ways. This report lists both legislative and economic measures that can be implemented on the state level that impact local programs.

  19. GAD (Smart Grid Project) | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Projects in Europe Smart Grid Projects - Smart Meter and AMI Smart Grid Projects - Integrated System Smart Grid Projects - Home application Smart Grid Projects - Customer Behavior...

  20. Address (Smart Grid Project) | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Categories: Smart Grid Projects Smart Grid Projects in Europe Smart Grid Projects - Integrated System Smart Grid Projects - Home application Smart Grid Projects - Customer Behavior...