National Library of Energy BETA

Sample records for regulatory studies jump

  1. General Renewable Energy-Policy and Regulatory Studies | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    and Regulatory Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: General Renewable Energy-Policy and Regulatory Studies AgencyCompany Organization: World Bank...

  2. Grid Renewable Energy-Policy and Regulatory Studies | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Grid Renewable Energy-Policy and Regulatory Studies AgencyCompany Organization: World Bank Sector: Energy...

  3. Regulatory cost-risk study

    SciTech Connect

    Not Available

    1983-04-01

    This study is intended to provide some quantitative perspective by selecting certain examples of criteria for which estimates of risks and costs can be obtained, and the balance of the various risks, (i.e., internal versus external risks), can be put into perspective. 35 refs., 39 tabs. (JDB)

  4. Stand-alone Renewable Energy-Policy and Regulatory Studies |...

    OpenEI (Open Energy Information) [EERE & EIA]

    icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map References: Stand-alone Renewable Energy-Policy and Regulatory Studies1 Resources PV for Rural Electrification...

  5. Laser-induced temperature jump/time-resolved infrared study of the fast events in protein folding

    SciTech Connect

    Woodruff, W.H.; Dyer, R.B.; Williams, S. [Los Alamos National Laboratory, NM (United States); Callender, H.; Gilmanshin, R. [CUNY, NY (United States)

    1996-10-01

    Laser-induced temperature jump followed by time-resolved infrared probe of reaction dynamics are used to study the temporal evolution of polypeptide structure during protein folding and unfolding. Reactions are initiated in times of 50 ps or longer by T-jumps of 10`s of degrees, obtained by laser excitation of water overtone absorbances. Observation of the Amide I transient absorbances reveal melting lifetimes of helices unconstrained by tertiary structure to be ca. 160 ns in a model 21-peptide and ca. 30 ns in {open_quotes}molten globule{close_quotes} apomyoglobin. No other processes are observed in these systems over the timescale 50 ps to 2 ms. Equilibrium data suggest the corresponding helix formation lifetimes to be ca. 16 and 1 ns, respectively. In {open_quotes}native{close_quotes} apomyoglobin two helix melting lifetimes are observed and we infer that a third occurs on a timescale inaccessible to our experiment (> 1 ms). The shorter observed lifetime, as in the molten globule, is ca. 30 ns. The longer lifetime is ca. 70 {mu}s. We suggest that the slower process is helix melting that is rate-limited by the unfolding of tertiary structure. Equilibrium data suggest a lifetime of ca. 1 {mu}s for the development of these tertiary folds.

  6. Interstate Technology & Regulatory Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance

    Energy.gov [DOE]

    Interstate Technology & Regulatory Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance

  7. Washington Air Quality Notice of Construction Permit Regulatory...

    OpenEI (Open Energy Information) [EERE & EIA]

    Air Quality Notice of Construction Permit Regulatory Handbook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  8. Category:Geothermal Regulatory Roadmap Sections | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Geothermal Regulatory Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal...

  9. Category:Regulatory Roadmap Federal Sections | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Datasets Community Login | Sign Up Search Category Edit History Category:Regulatory Roadmap Federal Sections Jump to: navigation, search GRR-logo.png Looking for the Regulatory...

  10. Effective Regulatory Institutions: The Regulator's Role in the...

    OpenEI (Open Energy Information) [EERE & EIA]

    Regulatory Institutions: The Regulator's Role in the Policy Process, Including Issues of Regulatory Independence Jump to: navigation, search Tool Summary LAUNCH TOOL Name:...

  11. Carbon Capture, Transport and Storage Regulatory Test Exercise...

    OpenEI (Open Energy Information) [EERE & EIA]

    Capture, Transport and Storage Regulatory Test Exercise: Output Report Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Carbon Capture, Transport and Storage Regulatory...

  12. Regulatory effectiveness study for the Armand Bayou Coastal Preserve

    SciTech Connect

    Mitchell, G.; Windsor, D.

    1991-12-01

    The report contains a description and evaluation of essential regulatory activities governing Christmas Bay and its watershed. The report will be used in management planning for the preserve, and will also contribute to the baseline regulatory data for developing the Galveston Bay Comprehensive Conservation and Management Plan. A companion report was prepared for the Armand Bayou Coastal Preserve.

  13. Regulatory effectiveness study for the Christmas Bay Coastal Preserve

    SciTech Connect

    Mitchell, G.; Windsor, D.

    1991-12-01

    The report contains a description and evaluation of essential regulatory activities governing Armand Bayou and its watershed. The report will be used in management planning for the preserve, and will also contribute to the baseline regulatory data for developing the Galveston Bay Comprehensive Conservation and Management Plan. A companion report was prepared for the Christmas Bay Coastal Preserve.

  14. Category:Regulatory Roadmap State Sections | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Regulatory Roadmap State Sections Jump to: navigation, search GRR-logo.png Looking for the Regulatory Roadmap? Click here for a user-friendly list of Regulatory Roadmap pages. This...

  15. 1992 Memorandum of Understanding between the Federal Energy Regulatory...

    OpenEI (Open Energy Information) [EERE & EIA]

    between the Federal Energy Regulatory Commission and the Department of Interior, Bureau of Reclamation Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  16. Army Corps of Engineers - Regulatory Guidance Letters | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Guidance Letters Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Army Corps of Engineers - Regulatory Guidance Letters Abstract This webpage...

  17. Category:Bulk Transmission Regulatory Roadmap Sections | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Login | Sign Up Search Category Edit History Category:Bulk Transmission Regulatory Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the RAPIDRoadmap?...

  18. Category:Hydropower Regulatory Roadmap Sections | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Community Login | Sign Up Search Category Edit History Category:Hydropower Regulatory Roadmap Sections Jump to: navigation, search RAPID Toolkit Add.png Add a Section Pages in...

  19. Category:Solar Regulatory Roadmap Sections | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Community Login | Sign Up Search Category Edit History Category:Solar Regulatory Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the RAPIDRoadmap?...

  20. California Department of Fish and Wildlife: Federal Energy Regulatory...

    OpenEI (Open Energy Information) [EERE & EIA]

    Fish and Wildlife: Federal Energy Regulatory Commission (FERC) Hydroelectric Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California...

  1. Recent regulatory experience of low-Btu coal gasification. Volume III. Supporting case studies

    SciTech Connect

    Ackerman, E.; Hart, D.; Lethi, M.; Park, W.; Rifkin, S.

    1980-02-01

    The MITRE Corporation conducted a five-month study for the Office of Resource Applications in the Department of Energy on the regulatory requirements of low-Btu coal gasification. During this study, MITRE interviewed representatives of five current low-Btu coal gasification projects and regulatory agencies in five states. From these interviews, MITRE has sought the experience of current low-Btu coal gasification users in order to recommend actions to improve the regulatory process. This report is the third of three volumes. It contains the results of interviews conducted for each of the case studies. Volume 1 of the report contains the analysis of the case studies and recommendations to potential industrial users of low-Btu coal gasification. Volume 2 contains recommendations to regulatory agencies.

  2. Category:Regulatory Roadmap Overview Sections | Open Energy Informatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    Category Edit History Category:Regulatory Roadmap Overview Sections Jump to: navigation, search GRR-logo.png Looking for the Regulatory Roadmap? Click here for a user-friendly list...

  3. Jump Steady Resort Space Heating Low Temperature Geothermal Facility...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump Steady Resort Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Jump Steady Resort Space Heating Low Temperature Geothermal Facility Facility...

  4. 1981 Memorandum of Understanding between the Federal Energy Regulatory...

    OpenEI (Open Energy Information) [EERE & EIA]

    81 Memorandum of Understanding between the Federal Energy Regulatory Commission and the Water and Power Resources Service Jump to: navigation, search OpenEI Reference LibraryAdd to...

  5. Geothermal Regulatory Roadmap Workshop at GRC | Open Energy Informatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    Workshop at GRC Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections GRR Project Review and Workshop Register for this...

  6. Category:Regulatory Roadmap Sections | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the RAPIDRoadmap? Click here for a user-friendly list of Regulatory Roadmap pages. Add.png Add a Section...

  7. Interstate Technology & Regulatory Council (ITRC) Remediation...

    Office of Environmental Management (EM)

    Interstate Technology & Regulatory Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance Interstate Technology & Regulatory Council (ITRC) Remediation ...

  8. ORNL Announces New JUMP Partnership with Siemens, Launches Crowdsourci...

    Office of Environmental Management (EM)

    ORNL Announces New JUMP Partnership with Siemens, Launches Crowdsourcing Call on the Internet of Things ORNL Announces New JUMP Partnership with Siemens, Launches Crowdsourcing ...

  9. Technology Innovators are Invited: FEMP JUMP Call for innovation

    Energy.gov [DOE]

    Learn about JUMP, an online community seeking your input for technology innovation. The FEMP JUMP Call for innovation is intended to identify near commercialization or newly commercialized...

  10. Scattering universality classes of side jump in the anomalous...

    Office of Scientific and Technical Information (OSTI)

    Scattering universality classes of side jump in the anomalous Hall effect Citation Details In-Document Search Title: Scattering universality classes of side jump in the anomalous ...

  11. Structural studies of bacterial transcriptional regulatory proteins by multidimensional heteronuclear NMR

    SciTech Connect

    Volkman, B.F.

    1995-02-01

    Nuclear magnetic resonance spectroscopy was used to elucidate detailed structural information for peptide and protein molecules. A small peptide was designed and synthesized, and its three-dimensional structure was calculated using distance information derived from two-dimensional NMR measurements. The peptide was used to induce antibodies in mice, and the cross-reactivity of the antibodies with a related protein was analyzed with enzyme-linked immunosorbent assays. Two proteins which are involved in regulation of transcription in bacteria were also studied. The ferric uptake regulation (Fur) protein is a metal-dependent repressor which controls iron uptake in bacteria. Two- and three-dimensional NMR techniques, coupled with uniform and selective isotope labeling allowed the nearly complete assignment of the resonances of the metal-binding domain of the Fur protein. NTRC is a transcriptional enhancer binding protein whose N-terminal domain is a {open_quote}receiver domain{close_quote} in the family of {open_quote}two-component{close_quote} regulatory systems. Phosphorylation of the N-terminal domain of NTRC activates the initiation of transcription of aeries encoding proteins involved in nitrogen regulation. Three- and four-dimensional NMR spectroscopy methods have been used to complete the resonance assignments and determine the solution structure of the N-terminal receiver domain of the NTRC protein. Comparison of the solution structure of the NTRC receiver domain with the crystal structures of the homologous protein CheY reveals a very similar fold, with the only significant difference being the position of helix 4 relative to the rest of the protein. The determination of the structure of the NTRC receiver domain is the first step toward understanding a mechanism of signal transduction which is common to many bacterial regulatory systems.

  12. NRC (Nuclear Regulatory Commission) staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    SciTech Connect

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved.

  13. Insider Models with Finite Utility in Markets with Jumps

    SciTech Connect

    Kohatsu-Higa, Arturo; Yamazato, Makoto

    2011-10-15

    In this article we consider, under a Levy process model for the stock price, the utility optimization problem for an insider agent whose additional information is the final price of the stock blurred with an additional independent noise which vanishes as the final time approaches. Our main interest is establishing conditions under which the utility of the insider is finite. Mathematically, the problem entails the study of a 'progressive' enlargement of filtration with respect to random measures. We study the jump structure of the process which leads to the conclusion that in most cases the utility of the insider is finite and his optimal portfolio is bounded. This can be explained financially by the high risks involved in models with jumps.

  14. DOE Announces JUMP Initiative Winners, Launches New Crowdsourcing Calls at

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bay Area Maker Faire | Department of Energy JUMP Initiative Winners, Launches New Crowdsourcing Calls at Bay Area Maker Faire DOE Announces JUMP Initiative Winners, Launches New Crowdsourcing Calls at Bay Area Maker Faire May 23, 2016 - 12:10pm Addthis DOE Announces JUMP Initiative Winners, Launches New Crowdsourcing Calls at Bay Area Maker Faire May 23, 2016 - The Department of Energy's Buildings Technologies Office announced the latest winners for its JUMP platform, an online crowdsourcing

  15. AS 42.05.990, Alaska Public Utilities Regulatory Act Definitions...

    OpenEI (Open Energy Information) [EERE & EIA]

    AS 42.05.990, Alaska Public Utilities Regulatory Act Definitions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: AS 42.05.990,...

  16. AS 42.05.711, Alaska Public Utilities Regulatory Act Exemptions...

    OpenEI (Open Energy Information) [EERE & EIA]

    AS 42.05.711, Alaska Public Utilities Regulatory Act Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: AS 42.05.711,...

  17. Thermo-mechanical study of bare 48Y UF6 containers exposed to the regulatory fire environment.

    SciTech Connect

    Ammerman, Douglas James; Lopez, Carlos; Morrow, Charles; Korbmacher, Tim; Charette, Marc-Andre

    2010-11-01

    Most of the regulatory agencies world-wide require that containers used for the transportation of natural UF6 and depleted UF6 must survive a fully-engulfing fire environment for 30 minutes as described in 10CFR71 and in TS-R-1. The primary objective of this project is to examine the thermo-mechanical performance of 48Y transportation cylinders when exposed to the regulatory hypothetical fire environment without the thermal protection that is currently used for shipments in those countries where required. Several studies have been performed in which UF6 cylinders have been analyzed to determine if the thermal protection currently used on UF6 cylinders of type 48Y is necessary for transport. However, none of them could clearly confirm neither the survival nor the failure of the 48Y cylinder when exposed to the regulatory fire environment without the additional thermal protection. A consortium of five companies that move UF6 is interested in determining if 48Y cylinders can be shipped without the thermal protection that is currently used. Sandia National Laboratories has outlined a comprehensive testing and analysis project to determine if these shipping cylinders are capable of withstanding the regulatory thermal environment without additional thermal protection. Sandia-developed coupled physics codes will be used for the analyses that are planned. A series of destructive and non-destructive tests will be performed to acquire the necessary material and behavior information to benchmark the models and to answer the question about the ability of these containers to survive the fire environment. Both the testing and the analysis phases of this project will consider the state of UF6 under thermal and pressure loads as well as the weakening of the steel container due to the thermal load. Experiments with UF6 are also planned to collect temperature- and pressure-dependent thermophysical properties of this material.

  18. Public involvement in the regulatory activities regarding nuclear fuel cycle facilities: A case study

    SciTech Connect

    Austin, D.E.

    1995-12-01

    This paper reviews the involvement of a community-based organization in the activities of the Nuclear Regulatory Commission (NRC) regarding a uranium conversion facility that operated near Gore, Oklahoma from 1970 until 1992. Effective participation requires access to decision making. Access is a complex phenomenon that includes: (1) opportunity, both procedural and physical, (2) a common language, and (3) time and resources. The paper describes how both the community organization and the NRC responded to these requirements for access, the strategies that were most effective in securing meaningful public involvement in the decision making, and the impacts of that involvement on the organization.

  19. Regulatory Tools

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Regulatory Tools Home CRA - 2004 Final Recertification Decision CRA Comments & Responses CCA - 1996 CRA CARDs & TSDs CCA CARDs & TSDs Regulatory Tools Title 40 CFR Part 191 Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Title 40 CFR Part 194 Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations.

  20. Low-rank coal study. Volume 4. Regulatory, environmental, and market analyses

    SciTech Connect

    Not Available

    1980-11-01

    The regulatory, environmental, and market constraints to development of US low-rank coal resources are analyzed. Government-imposed environmental and regulatory requirements are among the most important factors that determine the markets for low-rank coal and the technology used in the extraction, delivery, and utilization systems. Both state and federal controls are examined, in light of available data on impacts and effluents associated with major low-rank coal development efforts. The market analysis examines both the penetration of existing markets by low-rank coal and the evolution of potential markets in the future. The electric utility industry consumes about 99 percent of the total low-rank coal production. This use in utility boilers rose dramatically in the 1970's and is expected to continue to grow rapidly. In the late 1980's and 1990's, industrial direct use of low-rank coal and the production of synthetic fuels are expected to start growing as major new markets.

  1. Engineers, Tinkerers, and Innovators Are Invited to Join the JUMP

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Initiative | Department of Energy Engineers, Tinkerers, and Innovators Are Invited to Join the JUMP Initiative Engineers, Tinkerers, and Innovators Are Invited to Join the JUMP Initiative October 26, 2015 - 3:10pm Addthis JUMP connects innovators to industry to make the most creative ideas a reality. Oak Ridge National Laboratory and industry partners (A.O. Smith, GE, and UTRC) want to collaborate with you to solve some of the most interesting technical challenges facing the buildings

  2. Dismantlements of Nuclear Weapons Jump 50 Percent | National...

    National Nuclear Security Administration (NNSA)

    Dismantlements of Nuclear Weapons Jump 50 Percent June 07, 2007 WASHINGTON, D.C. -- Meeting President Bush's directive to reduce the country's nuclear arsenal, the Department of ...

  3. Delayed Frost Growth on Jumping-Drop Superhydrophobic Surfaces...

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Search Results Journal Article: Delayed Frost Growth on Jumping-Drop Superhydrophobic Surfaces Citation ... Here, we report that subcooled condensate on a chilled ...

  4. Barbara McClintock, Jumping Genes, and Transposition

    Office of Scientific and Technical Information (OSTI)

    ... Transposable Elements and Genetic Instabilities in Crop Plants, DOE Technical Report, April 1981 How Jumping Genes Were Discovered, Nature Structural Biology, Vol. 8, No. 4, April ...

  5. Nuclear Safety Regulatory Framework

    Energy.gov [DOE] (indexed site)

    Department of Energy Nuclear Safety Regulatory Framework DOE's Nuclear Safety Enabling Legislation Regulatory Enforcement & Oversight Regulatory Governance Atomic Energy Act 1946 ...

  6. Revisiting the emission from relativistic blast waves in a density-jump medium

    SciTech Connect

    Geng, J. J.; Huang, Y. F.; Dai, Z. G. [School of Astronomy and Space Science, Nanjing University, Nanjing 210093 (China); Wu, X. F. [Purple Mountain Observatory, Chinese Academy of Sciences, Nanjing 210008 (China); Li, Liang, E-mail: hyf@nju.edu.cn, E-mail: dzg@nju.edu.cn, E-mail: xfwu@pmo.ac.cn [Department of Physics, Stockholm University, AlbaNova, SE-106 91 Stockholm (Sweden)

    2014-09-01

    Re-brightening bumps are frequently observed in gamma-ray burst afterglows. Many scenarios have been proposed to interpret the origin of these bumps, of which a blast wave encountering a density-jump in the circumburst environment has been questioned by recent works. We develop a set of differential equations to calculate the relativistic outflow encountering the density-jump by extending the work of Huang et al. This approach is a semi-analytic method and is very convenient. Our results show that late high-amplitude bumps cannot be produced under common conditions, rather only a short plateau may emerge even when the encounter occurs at an early time (<10{sup 4} s). In general, our results disfavor the density-jump origin for those observed bumps, which is consistent with the conclusion drawn from full hydrodynamics studies. The bumps thus should be caused by other scenarios.

  7. Construction plans jump; operations skid in 1996

    SciTech Connect

    True, W.R.

    1997-08-04

    Federally regulated oil and gas pipelines turned in mixed performances in 1996, a review of annual reports filed with the US Federal Energy Regulatory Commission (FERC) shows. Plans for new pipeline construction, filed with both the FERC and Canadian regulatory bodies, increased during a 12-month period ending June 30, 1997. Natural-gas pipeline operating companies increased their operating revenues but saw their incomes fall; oil pipelines saw both revenues and incomes fall sharply as deliveries were flat. Major natural-gas pipelines slightly increased the amounts of gas they moved for a fee and decreased gas sold out of their systems. In 1996, liquids pipelines moved fewer barrels than a year earlier and reduced in all categories the miles of line operated. Each year in this exclusive report, Oil and Gas Journal tracks revenues and incomes earned from operations along with volumes moved, as submitted to the FERC by US regulated interstate pipeline companies. Data are presented on the following: pipeline revenues, incomes--1996; North American pipeline-construction costs; US pipeline costs--estimated vs. actual; North American compressor construction costs; US compressor costs--estimated vs. actual; Canadian pipeline-construction costs, actual; US interstate mileage; investment in liquids pipelines; 10 years of land-construction costs; top 10 interstate liquids lines; top 10 interstate gas lines; liquids pipeline companies; and gas pipeline companies.

  8. Public Utility Regulatory Policies Act of 1978: Natural Gas Rate Design Study

    SciTech Connect

    1980-05-01

    First, the comments on May 3, 1979 Notice of Inquiry of DOE relating to the Gas Utility Rate Design Study Required by Section 306 of PURPA are presented. Then, comments on the following are included: (1) ICF Gas Utility Model, Gas Utility Model Data Outputs, Scenario Design; (2) Interim Model Development Report with Example Case Illustrations; (3) Interim Report on Simulation of Seven Rate Forms; (4) Methodology for Assessing the Impacts of Alternative Rate Designs on Industrial Energy Use; (5) Simulation of Marginal-Cost-Based Natural Gas Rates; and (6) Preliminary Discussion Draft of the Gas Rate Design Study. Among the most frequent comments expressed were the following: (a) the public should be given the opportunity to review the final report prior to its submission to Congress; (b) results based on a single computer model of only four hypothetical utility situations cannot be used for policy-making purposes for individual companies or the entire gas industry; (c) there has been an unobjective treatment of traditional and economic cost rate structures; the practical difficulties and potential detrimental consequences of economic cost rates are not fully disclosed; and (d) it is erroneous to assume that end users, particularly residential customers, are influenced by price signals in the rate structure, as opposed to the total bill.

  9. U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.

    SciTech Connect

    Kalinich, Donald A.; Sallaberry, Cedric M.; Mattie, Patrick D.

    2010-12-01

    For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

  10. Public Utility Regulatory Policies Act of 1978: Natural Gas Rate Design Study

    SciTech Connect

    None,

    1980-05-01

    The report concludes that, to effectively deal with our national energy problems, gas rate structures should be designed to reflect the costs which the nation avoids if gas is efficiently used and substituted for oil. Current pipeline and distribution company rate structures generally do not meet this test. Although gas is a substitute for oil in many applications, and conserved gas can reduce oil imports, gas rate structures often fail to convey to consumers the fact that, from a national perspective, gas is as valuable as oil. The provisions of the Natural Gas Policy Act of 1978 (NGPA) take a strong first step in correcting these problems. But, as clearly recognized in both NGPA and PURPA, these provisions need to be supplemented by updating pipeline and distribution company rate designs to address the problems of the 1980's - rather than the problems of the 1950's. In this regard, NGPA mandates incremental pricing, which raises the average price of gas to certain industrial users only. The Department of Energy (DOE) study suggests an alternate approach: pipeline and distribution rate structures that reflect in their tailblocks, for all customer classes, the economic costs of gas usage. Such rates would convey to all users the costs incurred by the nation as a consequence of their decisions to use or conserve gas. Such rate structures should promote the three purposes of PURPA - end-use conservation, efficient use of utility resources, and equitable rates - to a greater extent than do traditional accounting cost rate designs, which reflect decisions made in the distant past.

  11. Comparison of Stack Measurement Data from R&D Facilities to Regulatory Criteria. A Case Study from PNNL

    SciTech Connect

    Ballinger, Marcel Y.; Duchsherer, Cheryl J.; Woodruff, Rodger K.; Larson, Timothy V.

    2013-10-30

    Chemical emissions from research and development (R&D) activities are difficult to estimate because of the large number of chemicals used and the potential for continual changes in processes. In this case study, stack measurements taken from R&D facilities at Pacific Northwest National Laboratory (PNNL) were examined, including extreme worst-case emissions estimates and alternate analyses using a Monte Carlo method that takes into account the full distribution of sampling results. The results from these analyses were then compared to emissions estimated from chemical inventories. Results showed that downwind ambient air concentrations calculated from the stack measurement data were below acceptable source impact levels (ASILs) for almost all compounds, even under extreme worst-case analyses. However, for compounds with averaging periods of a year, the unrealistic but simplifying extreme worst-case analysis often resulted in exceedances of lower level regulatory criteria used to determine modeling requirements or to define trivial releases. Compounds with 24-hour averaging periods were nearly all several orders of magnitude below all, including the trivial release, criteria. The alternate analysis supplied a more realistic basis of comparison and an ability to explore effects under different operational modes.

  12. AGS tune jump power supply design and test

    SciTech Connect

    Mi, J.; Glenn, J.W.; Huang, H.; Marneris, I.; Rosas, P.; Sandberg, J.; Tan, Y.; Zhang, W.

    2011-03-28

    A horizontal tune jump system has been installed to overcome the horizontal intrinsic spin resonances, which requires jumping the horizontal tune 0.04 units 82 times, 41 up and 41 down. Two quadruple magnets have been installed in AGS ring to perform this. The pulsed magnet current ranges from about 140A near injection to about 1400A later. The current pulse rise and fall time are around 100uS and flat tops time is around 4mS. These quadruples have separated supplies. This tune jump pulse power supply employees all semiconductor parts as well as the main switches. During dummy load and magnet testing, the test results showed that the power supply could meet the specification. This article will describe some details of power supply simulation, design and testing. Some test waveforms and pictures are presented in this paper.

  13. Winner Announced for FEMP JUMP Call for Innovation

    Energy.gov [DOE]

    At the Energy Exchange 2016 earlier this month, the Department of Energy’s (DOE) Federal Energy Management Program (FEMP) and Building Technologies Office (BTO) announced the winner of the FEMP JUMP technology challenge to identify underutilized new or recently commercialized building technology solutions.

  14. Winner Announced for FEMP JUMP Call for Innovation

    Energy.gov [DOE]

    At the Energy Exchange 2016 earlier this month, the Department of Energy's (DOE) Federal Energy Management Program (FEMP) and Building Technologies Office (BTO) announced the winner of the FEMP JUMP technology challenge to identify underutilized new or recently-commercialized building technology solutions. Retrofit Originality Incorporated was selected for their high efficiency dehumidification system (HEDS) proposal, which outlined a unique, innovative, and potentially impactful technology for both the federal and private sectors.

  15. Nuclear Safety Regulatory Framework

    Energy.gov [DOE]

    Presentation that outlines the rules, policies and orders that comprise the Department of Energy Nuclear Safety Regulatory Framework

  16. Reducing Regulatory Burden

    Energy.gov [DOE]

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’

  17. Nuclear Safety Regulatory Framework

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Nuclear Safety Regulatory Framework DOE's Nuclear Safety Enabling Legislation Regulatory Enforcement & Oversight Regulatory Governance Atomic Energy Act 1946 Atomic Energy Act 1954 Energy Reorganization Act 1974 DOE Act 1977 Authority and responsibility to regulate nuclear safety at DOE facilities 10 CFR 830 10 CFR 835 10 CFR 820 Regulatory Implementation Nuclear Safety Radiological Safety Procedural Rules ISMS-QA; Operating Experience; Metrics and Analysis Cross Cutting

  18. Other Regulatory Efforts

    Energy.gov [DOE]

    In addition to regulating international electricity trade, the Office of Electricity Delivery and Energy Reliability participates in other regulatory activities.

  19. Jumping-Droplet-Enhanced Condensation on Scalable Superhydrophobic Nanostructured Surfaces

    SciTech Connect

    Miljkovic, N; Enright, R; Nam, Y; Lopez, K; Dou, N; Sack, J; Wang, E

    2013-01-09

    When droplets coalesce on a superhydrophobic nanostructured surface, the resulting droplet can jump from the surface due to the release of excess surface energy. If designed properly, these superhydrophobic nanostructured surfaces can not only allow for easy droplet removal at micrometric length scales during condensation but also promise to enhance heat transfer performance. However, the rationale for the design of an ideal nanostructured surface as well as heat transfer experiments demonstrating the advantage of this jumping behavior are lacking. Here, we show that silanized copper oxide surfaces created via a simple fabrication method can achieve highly efficient jumping-droplet condensation heat transfer. We experimentally demonstrated a 25% higher overall heat flux and 30% higher condensation heat transfer coefficient compared to state-of-the-art hydrophobic condensing surfaces at low supersaturations (<1.12). This work not only shows significant condensation heat transfer enhancement but also promises a low cost and scalable approach to increase efficiency for applications such as atmospheric water harvesting and dehumidification. Furthermore, the results offer insights and an avenue to achieve high flux superhydrophobic condensation.

  20. CLEAResult and NREL Award Winner of the JUMP Call for Innovation |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy CLEAResult and NREL Award Winner of the JUMP Call for Innovation CLEAResult and NREL Award Winner of the JUMP Call for Innovation The JUMP logo. CLEAResult, a Better Buildings Residential Network member, and the National Renewable Energy Laboratory (NREL) selected Charles Xie's Infrared Street View program as the winner of the JUMP Smartphone Call for Innovation, which seeks to develop new energy-efficient residential building technologies that leverage the smartphone

  1. Jump start: DuPont exports its energy management program

    SciTech Connect

    1994-11-23

    In August 1993, DuPont launched its innovative Jump Start program, which called for managers in its 25 largest plants to carry out a 120-day crash effort to find ways to reduce energy use at their facilities. The effort produced ideas that will result in $21.5 million in energy savings over six years, exceeding DuPont`s target. It also kicked off a longer-term program the company hopes will cut as much as $300 million, or 15% from energy bills through 2000.

  2. Environmental regulatory update table

    SciTech Connect

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  3. FPCC Regulatory Barriers Submittal

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Performance Contracting Coalition (FPCC) appreciates the opportunity to comment on reducing regulatory burdens on the Federal government, specifically as they pertain to federal energy...

  4. Markov Jump Processes Approximating a Non-Symmetric Generalized Diffusion

    SciTech Connect

    Limic, Nedzad

    2011-08-15

    Consider a non-symmetric generalized diffusion X( Dot-Operator ) in Double-Struck-Capital-R {sup d} determined by the differential operator A(x) = -{Sigma}{sub ij} {partial_derivative}{sub i}a{sub ij}(x){partial_derivative}{sub j} + {Sigma}{sub i} b{sub i}(x){partial_derivative}{sub i}. In this paper the diffusion process is approximated by Markov jump processes X{sub n}( Dot-Operator ), in homogeneous and isotropic grids G{sub n} Subset-Of Double-Struck-Capital-R {sup d}, which converge in distribution in the Skorokhod space D([0,{infinity}), Double-Struck-Capital-R {sup d}) to the diffusion X( Dot-Operator ). The generators of X{sub n}( Dot-Operator ) are constructed explicitly. Due to the homogeneity and isotropy of grids, the proposed method for d{>=}3 can be applied to processes for which the diffusion tensor {l_brace}a{sub ij}(x){r_brace}{sub 11}{sup dd} fulfills an additional condition. The proposed construction offers a simple method for simulation of sample paths of non-symmetric generalized diffusion. Simulations are carried out in terms of jump processes X{sub n}( Dot-Operator ). For piece-wise constant functions a{sub ij} on Double-Struck-Capital-R {sup d} and piece-wise continuous functions a{sub ij} on Double-Struck-Capital-R {sup 2} the construction and principal algorithm are described enabling an easy implementation into a computer code.

  5. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  6. Phenylpropanoid related regulatory protein-regulatory region associations

    DOEpatents

    Apuya, Nestor; Bobzin, Steven Craig; Park, Joon-Hyun; Doukhanina, Elena

    2012-01-03

    Materials and methods for identifying lignin regulatory region-regulatory protein associations are disclosed. Materials and methods for modulating lignin accumulation are also disclosed.

  7. Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Request for information on reducing regulatory burden Reducing Regulatory Burden (177.64 KB) More Documents & Publications Reducing Regulatory Burden Reducing Regulatory Burden

  8. .Energy Project Regulatory Considerations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Regulatory Considerations John Clancy Godfrey & Kahn, S.C. jclancy@gklaw.com Telephone: (414) 287-9256 August 31, 2016 Tribal Energy and Economic Development Webinar 1 Regulatory Issues and Opportunities * A number of federal laws and regulations apply to energy development activities on tribal lands * Federal laws, regulations, and Executive Orders apply to energy development activities * State laws and regulations largely do not apply to energy development on tribal lands *

  9. Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Burden Reducing Regulatory Burden Request for information on reducing regulatory burden Reducing Regulatory Burden (289.74 KB) More Documents & Publications Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 SEVENTH RFI COMMENTS ON REDUCING REGULATORY BURDEN

  10. Rationales for regulatory activity

    SciTech Connect

    Perhac, R.M.

    1997-02-01

    The author provides an outline which touches on the types of concerns about risk evaluation which are addressed in the process of establishing regulatory guides. Broadly he says regulatory activity serves three broad constituents: (1) Paternalism (private risk); (2) Promotion of social welfare (public risks); (3) Protection of individual rights (public risks). He then discusses some of the major issues encountered in reaching a decision on what is an acceptable level of risk within each of these areas, and how one establishes such a level.

  11. Portsmouth Site Regulatory Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site Regulatory Agreements Portsmouth Site Regulatory Agreements Portsmouth Administrative Consent Order - 1997 (2.92 MB) Portsmouth Ohio Consent Decree - 1989 (2.69 MB) Portsmouth Removal Action and Remedial Investigation and Feasibility Study and Remedial Design and Remedial Action (D&D Orders) Project Director's Final Findings and Order, Mods. 2011, 2012 (13.24 MB) Portsmouth Integration Director's Final Findings and Order - 2011 (20.16 MB) Portsmouth DUF6 Director's Final Findings and

  12. EPAct Transportation Regulatory Activities

    SciTech Connect

    2011-11-21

    The U.S. Department of Energy's (DOE) Vehicle Technologies Program manages several transportation regulatory activities established by the Energy Policy Act of 1992 (EPAct), as amended by the Energy Conservation Reauthorization Act of 1998, EPAct 2005, and the Energy Independence and Security Act of 2007 (EISA).

  13. Re: Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulatory Burden RFI Re: Regulatory Burden RFI Hearth Patio & Barbecue Association comments on Regulatory Burden RFI Re: Regulatory Burden RFI (74.36 KB) More Documents & Publications Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden RFI Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011

  14. regulatory | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    regulatory Home Graham7781's picture Submitted by Graham7781(2017) Super contributor 5 August, 2013 - 13:18 Geothermal Regulatory Roadmap featured on NREL Now geothermal NREL...

  15. A General Optimality Conditions for Stochastic Control Problems of Jump Diffusions

    SciTech Connect

    Bahlali, Seid; Chala, Adel

    2012-02-15

    We consider a stochastic control problem where the system is governed by a non linear stochastic differential equation with jumps. The control is allowed to enter into both diffusion and jump terms. By only using the first order expansion and the associated adjoint equation, we establish necessary as well as sufficient optimality conditions of controls for relaxed controls, who are a measure-valued processes.

  16. Nuclear Regulatory Commission information digest

    SciTech Connect

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  17. Regulatory Requirements | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Regulatory Requirements Executive Order 13423, Strengthening Federal Environment, Energy, and Transportation Management (January 26, 2007) and Executive Order 13514, Federal...

  18. Washington Coastal Zone Management Regulatory Handbook | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    to library PermittingRegulatory Guidance - GuideHandbook: Washington Coastal Zone Management Regulatory HandbookPermittingRegulatory GuidanceGuideHandbook Author Washington...

  19. Regulatory Burden RFI | Department of Energy

    Energy.gov [DOE] (indexed site)

    and in making its regulatory program more effective and less burdensome. Regulatory Burden RFI More Documents & Publications Regulatory Burden RFI from AHRI Air-Conditioning,...

  20. Spectroscopic studies reveal that the heme regulatory motifs of heme oxygenase-2 are dynamically disordered and exhibit redox-dependent interaction with heme

    SciTech Connect

    Bagai, Ireena; Sarangi, Ritimukta; Fleischhacker, Angela S.; Sharma, Ajay; Hoffman, Brian M.; Zuiderweg, Erik R. P.; Ragsdale, Stephen W.

    2015-05-05

    Heme oxygenase (HO) catalyzes a key step in heme homeostasis: the O₂₋ and NADPH-cytochrome P450 reductase-dependent conversion of heme to biliverdin, Fe, and CO through a process in which the heme participates both as a prosthetic group and as a substrate. Mammals contain two isoforms of this enzyme, HO2 and HO1, which share the same α-helical fold forming the catalytic core and heme binding site, as well as a membrane spanning helix at their C-termini. However, unlike HO1, HO2 has an additional 30-residue N-terminus as well as two cysteine-proline sequences near the C-terminus that reside in heme regulatory motifs (HRMs). While the role of the additional N-terminal residues of HO2 is not yet understood, the HRMs have been proposed to reversibly form a thiol/disulfide redox switch that modulates the affinity of HO2 for ferric heme as a function of cellular redox poise. To further define the roles of the N- and C-terminal regions unique to HO2, we used multiple spectroscopic techniques to characterize these regions of the human HO2. Nuclear magnetic resonance spectroscopic experiments with HO2 demonstrate that, when the HRMs are in the oxidized state (HO2O), both the extra N-terminal and the C-terminal HRM-containing regions are disordered. However, protein NMR experiments illustrate that, under reducing conditions, the C-terminal region gains some structure as the Cys residues in the HRMs undergo reduction (HO2R) and, in experiments employing a diamagnetic protoporphyrin, suggest a redox-dependent interaction between the core and the HRM domains. Further, electron nuclear double resonance and X-ray absorption spectroscopic studies demonstrate that, upon reduction of the HRMs to the sulfhydryl form, a cysteine residue from the HRM region ligates to a ferric heme. Taken together with EPR measurements, which show the appearance of a new low-spin heme signal in reduced HO2, it appears that a cysteine residue(s) in the HRMs directly interacts

  1. Spectroscopic studies reveal that the heme regulatory motifs of heme oxygenase-2 are dynamically disordered and exhibit redox-dependent interaction with heme

    DOE PAGES [OSTI]

    Bagai, Ireena; Sarangi, Ritimukta; Fleischhacker, Angela S.; Sharma, Ajay; Hoffman, Brian M.; Zuiderweg, Erik R. P.; Ragsdale, Stephen W.

    2015-05-05

    Heme oxygenase (HO) catalyzes a key step in heme homeostasis: the O₂₋ and NADPH-cytochrome P450 reductase-dependent conversion of heme to biliverdin, Fe, and CO through a process in which the heme participates both as a prosthetic group and as a substrate. Mammals contain two isoforms of this enzyme, HO2 and HO1, which share the same α-helical fold forming the catalytic core and heme binding site, as well as a membrane spanning helix at their C-termini. However, unlike HO1, HO2 has an additional 30-residue N-terminus as well as two cysteine-proline sequences near the C-terminus that reside in heme regulatory motifs (HRMs).more » While the role of the additional N-terminal residues of HO2 is not yet understood, the HRMs have been proposed to reversibly form a thiol/disulfide redox switch that modulates the affinity of HO2 for ferric heme as a function of cellular redox poise. To further define the roles of the N- and C-terminal regions unique to HO2, we used multiple spectroscopic techniques to characterize these regions of the human HO2. Nuclear magnetic resonance spectroscopic experiments with HO2 demonstrate that, when the HRMs are in the oxidized state (HO2O), both the extra N-terminal and the C-terminal HRM-containing regions are disordered. However, protein NMR experiments illustrate that, under reducing conditions, the C-terminal region gains some structure as the Cys residues in the HRMs undergo reduction (HO2R) and, in experiments employing a diamagnetic protoporphyrin, suggest a redox-dependent interaction between the core and the HRM domains. Further, electron nuclear double resonance and X-ray absorption spectroscopic studies demonstrate that, upon reduction of the HRMs to the sulfhydryl form, a cysteine residue from the HRM region ligates to a ferric heme. Taken together with EPR measurements, which show the appearance of a new low-spin heme signal in reduced HO2, it appears that a cysteine residue(s) in the HRMs directly interacts with a second

  2. REGULATORY PARTNERSHIP STATEMENT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PARTNERSHIP STATEMENT REGULATORY PARTNERSHIP STATEMENT PDF icon RPS PDF.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT

  3. Paducah Regulatory Approach | Department of Energy

    Office of Environmental Management (EM)

    Environmental Remediation Paducah Regulatory Approach Paducah Regulatory Approach Past uranium enrichment operations and support activities generated hazardous, radioactive, ...

  4. Project Regulatory Considerations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulatory Considerations August 31, 2016 11:00 am - 12:30 PM MDT 2 Todays Presenters * Randy Manion, Manion@wapa.gov * Doug Maccourt, douglas.Maccourt@hq.doe.gov * John Clancy, JClancy@gklaw.com * Tamera Dawes, Tamera.dawes@bia.gov * Stan Webb, Stan.webb@bia.gov 3 Link to the Webinar Slides and Audio Everyone will receive a post-webinar e-mail with the link to the page where the slides and recording will be located http://www.energy.gov/indianenergy/webinars#past 4 Questions * To submit

  5. Probing the mechanism of rubredoxin thermal unfolding in the absence of salt bridges by temperature jump experiments

    SciTech Connect

    Henriques, Barbara J. [Instituto Tecnologia Quimica e Biologica, Universidade Nova de Lisboa, Oeiras (Portugal); Saraiva, Ligia M. [Instituto Tecnologia Quimica e Biologica, Universidade Nova de Lisboa, Oeiras (Portugal); Gomes, Claudio M. [Instituto Tecnologia Quimica e Biologica, Universidade Nova de Lisboa, Oeiras (Portugal)]. E-mail: gomes@itqb.unl.pt

    2005-08-05

    Rubredoxins are the simplest type of iron-sulphur proteins and in recent years they have been used as model systems in protein folding and stability studies, especially the proteins from thermophilic sources. Here, we report our studies on the rubredoxin from the hyperthermophile Methanococcus jannaschii (T {sub opt} = 85 deg C), which was investigated in respect to its thermal unfolding kinetics by temperature jump experiments. Different spectroscopic probes were used to monitor distinct structural protein features during the thermal transition: the integrity of the iron-sulphur centre was monitored by visible absorption spectroscopy, whereas tertiary structure was followed by intrinsic tryptophan fluorescence and exposure of protein hydrophobic patches was sensed by 1-anilinonaphthalene-8-sulphonate fluorescence. The studies were performed at acidic pH conditions in which any stabilising contributions from salt bridges are annulled due to protonation of protein side chain groups. In these conditions, M. jannaschii rubredoxin assumes a native-like, albeit more flexible and open conformation, as indicated by a red shift in the tryptophan emission maximum and 1-anilinonaphthalene-8-sulphonate binding. Temperature jumps were monitored by the three distinct techniques and showed that the protein undergoes thermal denaturation via a simple two step mechanism, as loss of tertiary structure, hydrophobic collapse, and disintegration of the iron-sulphur centre are concomitant processes. The proposed mechanism is framed with the multiphasic one proposed for Pyrococcus furiosus rubredoxin, showing that a common thermal unfolding mechanism is not observed between these two closely related thermophilic rubredoxins.

  6. Regulatory Processes | Department of Energy

    Office of Environmental Management (EM)

    Regulatory Processes Beginning with the Energy Policy and Conservation Act of 1975, ... they comply with the applicable energy conservation standards. (42 U.S.C. 6293; 6314) DOE ...

  7. Giant magnetocaloric effect and temperature induced magnetization jump in GdCrO{sub 3} single crystal

    SciTech Connect

    Yin, L. H.; Yang, J.; Kan, X. C.; Song, W. H.; Dai, J. M.; Sun, Y. P.

    2015-04-07

    We report on a systematic study of the single-crystal GdCrO{sub 3}, which shows various novel magnetic features, such as temperature-induced magnetization reversal (TMR), temperature-induced magnetization jump (TMJ), spin reorientation, and giant magnetocaloric effect (MCE). In the field-cooled cooling process with modest magnetic field along the c axis, GdCrO{sub 3} first shows a TMR at T{sub comp}∼120−130 K and then an abrupt TMJ with a sign change of magnetization at T{sub jump}∼52−120 K, and finally a spin reorientation at T{sub SR}∼4−7 K. Interestingly, the remarkable TMJ behavior, which was not reported ever before, persists at higher fields up to 10 kOe even when TMR disappears. In addition, giant MCE with the maximum value of magnetic entropy change reaching ∼31.6 J/kg K for a field change of 44 kOe was also observed in GdCrO{sub 3} single crystal, suggesting it could be a potential material for low-T magnetic refrigeration. A possible mechanism for these peculiar magnetic behaviors is discussed based on the various competing magnetic interactions between the 3d electrons of Cr{sup 3+} ions and 4f electrons of Gd{sup 3+} ions.

  8. Regulatory Streamlining and Improvement

    SciTech Connect

    Mark A. Carl

    2006-07-11

    The Interstate Oil and Gas Compact Commission (IOGCC) engaged in numerous projects outlined under the scope of work discussed in the United States Department of Energy (DOE) grant number DE-FC26-04NT15456 awarded to the IOGCC. Numerous projects were completed that were extremely valuable to state oil and gas agencies as a result of work performed utilizing resources provided by the grant. There are numerous areas in which state agencies still need assistance. This additional assistance will need to be addressed under future scopes of work submitted annually to DOE's Project Officer for this grant. This report discusses the progress of the projects outlined under the grant scope of work for the 2005-2006 areas of interest, which are as follows: Area of Interest No. 1--Regulatory Streamlining and Improvement: This area of interest continues to support IOGCC's regulatory streamlining efforts that include the identification and elimination of unnecessary duplications of efforts between and among state and federal programs dealing with exploration and production on public lands. Area of Interest No. 2--Technology: This area of interest seeks to improve efficiency in states through the identification of technologies that can reduce costs. Area of Interest No. 3--Training and Education: This area of interest is vital to upgrading the skills of regulators and industry alike. Within the National Energy Policy, there are many appropriate training and education opportunities. Education was strongly endorsed by the President's National Energy Policy Development group. Acting through the governors offices, states are very effective conduits for the dissemination of energy education information. While the IOGCC favors the development of a comprehensive, long-term energy education plan, states are also supportive of immediate action on important concerns, such as energy prices, availability and conservation. Area of Interest No. 4--Resource Assessment and Development: This area

  9. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT PDF icon RCC Workplan PDF EN ...

  10. Regulatory Review Comment Section | Department of Energy

    Office of Environmental Management (EM)

    Radiation Protection of the Public and the Environment Regulatory Review Comment Section Regulatory Review Comment Section DOE Comments on Radiation Protection (Atomic Energy ...

  11. EIA - Natural Gas Pipeline Network - Regulatory Authorities

    Gasoline and Diesel Fuel Update

    Regulatory Authorities About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates U.S. Natural Gas Regulatory Authorities ...

  12. Paducah Site Regulatory Documents | Department of Energy

    Office of Environmental Management (EM)

    Regulatory Documents Paducah Site Regulatory Documents Paducah Site Federal Facility Agreement (35.48 MB) Paducah 2015 Site Management Plan (6 MB) Paducah Community Relations Plan ...

  13. Policy and Regulatory Environment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Soft Costs Policy and Regulatory Environment Policy and Regulatory Environment Photo of a man speaking while seated at a table with men and women surrounding him. A favorable ...

  14. General Construction and Environmental Regulatory Support at...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    General Construction and Environmental Regulatory Support at the Los Alamos National Laboratory General Construction and Environmental Regulatory Support at the Los Alamos National ...

  15. Nuclear Regulatory Commission | Department of Energy

    Office of Environmental Management (EM)

    Commission Nuclear Regulatory Commission Nuclear Regulatory Commission (25.98 KB) More Documents & Publications What to Expect When Readying to Move Spent Nuclear Fuel from ...

  16. Regulatory Considerations for Developing Distributed Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, ...

  17. Regulatory Considerations for Developing Distributed Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Document covers the Regulatory ...

  18. OpenEI Community - regulatory

    OpenEI (Open Energy Information) [EERE & EIA]

    Now http:en.openei.orgcommunitybloggeothermal-regulatory-roadmap-featured-nrel-now

    Navigating the complex system of federal and...

  19. Regulatory facility guide for Ohio

    SciTech Connect

    Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O.; Rymer, A.C.

    1994-02-28

    The Regulatory Facility Guide (RFG) has been developed for the DOE and contractor facilities located in the state of Ohio. It provides detailed compilations of international, federal, and state transportation-related regulations applicable to shipments originating at destined to Ohio facilities. This RFG was developed as an additional resource tool for use both by traffic managers who must ensure that transportation operations are in full compliance with all applicable regulatory requirements and by oversight personnel who must verify compliance activities.

  20. Automated high pressure cell for pressure jump x-ray diffraction

    SciTech Connect

    Brooks, Nicholas J.; Gauthe, Beatrice L. L. E.; Templer, Richard H.; Ces, Oscar; Seddon, John M.; Terrill, Nick J.; Rogers, Sarah E.

    2010-06-15

    A high pressure cell for small and wide-angle x-ray diffraction measurements of soft condensed matter samples has been developed, incorporating a fully automated pressure generating network. The system allows both static and pressure jump measurements in the range of 0.1-500 MPa. Pressure jumps can be performed as quickly as 5 ms, both with increasing and decreasing pressures. Pressure is generated by a motorized high pressure pump, and the system is controlled remotely via a graphical user interface to allow operation by a broad user base, many of whom may have little previous experience of high pressure technology. Samples are loaded through a dedicated port allowing the x-ray windows to remain in place throughout an experiment; this facilitates accurate subtraction of background scattering. The system has been designed specifically for use at beamline I22 at the Diamond Light Source, United Kingdom, and has been fully integrated with the I22 beamline control systems.

  1. Dropout dynamics in pulsed quantum dot lasers due to mode jumping

    SciTech Connect

    Sokolovskii, G. S.; Dudelev, V. V.; Deryagin, A. G.; Novikov, I. I.; Maximov, M. V.; Ustinov, V. M.; Kuchinskii, V. I.; Viktorov, E. A.; Abusaa, M.; Danckaert, J.; Kolykhalova, E. D.; Soboleva, K. K.; Zhukov, A. E.; Sibbett, W.; Rafailov, E. U.; Erneux, T.

    2015-06-29

    We examine the response of a pulse pumped quantum dot laser both experimentally and numerically. As the maximum of the pump pulse comes closer to the excited-state threshold, the output pulse shape becomes unstable and leads to dropouts. We conjecture that these instabilities result from an increase of the linewidth enhancement factor α as the pump parameter comes close to the excitated state threshold. In order to analyze the dynamical mechanism of the dropout, we consider two cases for which the laser exhibits either a jump to a different single mode or a jump to fast intensity oscillations. The origin of these two instabilities is clarified by a combined analytical and numerical bifurcation diagram of the steady state intensity modes.

  2. Relationship Between MP and DPP for the Stochastic Optimal Control Problem of Jump Diffusions

    SciTech Connect

    Shi Jingtao Wu, Zhen

    2011-04-15

    This paper is concerned with the stochastic optimal control problem of jump diffusions. The relationship between stochastic maximum principle and dynamic programming principle is discussed. Without involving any derivatives of the value function, relations among the adjoint processes, the generalized Hamiltonian and the value function are investigated by employing the notions of semijets evoked in defining the viscosity solutions. Stochastic verification theorem is also given to verify whether a given admissible control is optimal.

  3. Renewable Energy Case Studies | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Case Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Case Studies AgencyCompany Organization: National Renewable Energy Laboratory Sector:...

  4. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hearth & Home Technologies comments on Regulatory Burden RFI Regulatory Burden RFI (116.35 KB) More Documents & Publications Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Re: Regulatory Burden RFI RegReview_ReplyComments_Lennox_Hearth_Products.PDF

  5. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulatory Burden RFI Regulatory Burden RFI These comments are submitted by the Air-Conditioning, Heating and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the Federal Register on February 3, 2011 requesting information to assist DOE in reviewing existing regulations and in making its regulatory program more effective and less burdensome. Regulatory Burden RFI (50.14 KB) More Documents & Publications Regulatory Burden RFI from AHRI

  6. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in the United States. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    This report is a summary of a series of preliminary reports describing the laws and regulatory programs of the United states and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). A brief summary of public utility regulatory programs, energy facility siting programs, and municipal franchising authority is presented in this report to identify how such programs and authority may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. Subsequent reports will (1) describe public utility rate regulatory procedures and practices as they might affect an ICES, (2) analyze each of the aforementioned regulatory programs to identify impediments to the development of ICES, and (3) recommend potential changes in legislation and regulatory practices and procedures to overcome such impediments.

  7. Powerplant productivity improvements and regulatory incentives

    SciTech Connect

    Hardy, D; Brown, D

    1980-10-27

    The purpose of this study was to examine the benefits to be gained from increased powerplant productivity and to validate and demonstrate the use of incentives within the regulatory process to promote the improvement of powerplant productivity. The system-wide costs savings to be gained from given productivity improvement scenarios are estimated in both the short and long term. Numerous reports and studies exist which indicate that productivity improvements at the powerplant level are feasible and cost effective. The efforts of this study widen this focus and relate system-wide productivity improvements with system-wide cost savings. The initial thrust of the regulatory section of this study is to validate the existence of reasonable incentive procedures which would enable regulatory agencies to better motivate electric utilities to improve productivity on both the powerplant and system levels. The voluntary incentive format developed in this study was designed to facilitate the link between profit and efficiency which is typically not clear in most regulated market environments. It is concluded that at the present time, many electric utilities in this country could significantly increase the productivity of their base load units, and the adoption of an incentive program of the general type recommended in this study would add to rate of return regulation the needed financial incentives to enable utilities to make such improvements without losing long-run profit. In light of the upcoming oil import target levels and mandatory cutbacks of oil and gas as boiler fuels for electric utilities, the use of incentive programs to encourage more efficient utilization of coal and nuclear base load capacity will become far more inviting over the next two decades.

  8. Regulatory/policy-panel A

    SciTech Connect

    Barr, M.R.; Grano, D.; Ruyter, J.C. de; Jernigan, R.; Carney, M.V.; Schulze, R.A.

    1995-08-01

    The status of various bills in Congress is outlined. The bills include those included in the {open_quotes}Contract with America,{close_quotes} limits on federal regulations, the Regulatory Transition Act of 1995, and the Job Creation and Wage Enhancement Act of 1995.

  9. NGNP Project Regulatory Gap Analysis for Modular HTGRs

    SciTech Connect

    Wayne Moe

    2011-09-01

    The Next Generation Nuclear Plant (NGNP) Project Regulatory Gap Analysis (RGA) for High Temperature Gas-Cooled Reactors (HTGR) was conducted to evaluate existing regulatory requirements and guidance against the design characteristics specific to a generic modular HTGR. This final report presents results and identifies regulatory gaps concerning current Nuclear Regulatory Commission (NRC) licensing requirements that apply to the modular HTGR design concept. This report contains appendices that highlight important HTGR licensing issues that were found during the RGA study. The information contained in this report will be used to further efforts in reconciling HTGR-related gaps in the NRC licensing structure, which has to date largely focused on light water reactor technology.

  10. An Experimental Study Of Hydromagmatic Fragmentation Through...

    OpenEI (Open Energy Information) [EERE & EIA]

    Experimental Study Of Hydromagmatic Fragmentation Through Energetic, Non-Explosive Magma-Water Mixing Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal...

  11. Regulatory applications of sediment criteria. Final report

    SciTech Connect

    Not Available

    1987-06-23

    The report briefly describes the development of sediment criteria, discusses their utility and appropriate regulatory applications, and recommends steps to enhance the acceptance of sediment criteria by the regulatory and regulated communities.

  12. 5.0 INTERFACE OF REGULATORY AUTHORITIES

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5-1 5.0 INTERFACE OF REGULATORY AUTHORITIES 5.1 REGULATORY PROGRAMS The RCRA, CERCLA, and State Dangerous Waste Program overlap in many areas. In general, CERCLA was created by...

  13. Tribal Renewable Energy Webinar: Project Regulatory Considerations...

    Office of Environmental Management (EM)

    Regulatory Considerations Tribal Renewable Energy Webinar: Project Regulatory Considerations August 31, 2016 11:00AM to 12:30PM MDT Learn about the many permitting and project ...

  14. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  15. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  16. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  17. Introducing a New Fuel: A Regulatory Perspective

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Introducing a New Fuel: A Regulatory Perspective Sustainable Transportation Summit July 12, 2016 Overview * Background * Market Driven - New fuel for existing vehicles and engines - New fuel for new vehicles and engines * Regulation Driven * Past Regulatory Experience * Conclusions 2 EPA Fuels Regulatory Authority * Congress has given EPA regulatory authority for motor vehicle and nonroad fuels - Contained in Title 2 (Mobile Sources) of the CAA, Section 211 * Major revisions in 1990 * Several

  18. Developing a Regulatory Framework for Extended Storage and Transportat...

    Office of Environmental Management (EM)

    Developing a Regulatory Framework for Extended Storage and Transportation Outline: Current Regulatory Framework Future Regulatory Needs Technical Basis (with some examples) Path ...

  19. Republic of Macedonia-Low Carbon Growth Country Studies Program...

    OpenEI (Open Energy Information) [EERE & EIA]

    Low Carbon Growth Country Studies Program Jump to: navigation, search Name Republic of Macedonia-Low Carbon Growth Country Studies Program AgencyCompany Organization Energy...

  20. General Renewable Energy-Market Development Studies | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: General Renewable Energy-Market Development Studies AgencyCompany Organization: World Bank Sector: Energy...

  1. Stand Alone Renewable Energy Systems Case Studies | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Alone Renewable Energy Systems Case Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Stand Alone Renewable Energy Systems Case Studies AgencyCompany...

  2. Mini-Grid Renewable Energy Systems Case Studies | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Mini-Grid Renewable Energy Systems Case Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Mini-Grid Renewable Energy Systems Case Studies AgencyCompany...

  3. Asia Least-Cost Greenhouse Gas Abatement Study | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Gas Abatement Study Jump to: navigation, search Name Asia Least-Cost Greenhouse Gas Abatement Study (ALGAS) AgencyCompany Organization Global Environment Facility,...

  4. Making Car Sharing and Car Clubs Work: Case Study Summaries ...

    OpenEI (Open Energy Information) [EERE & EIA]

    Case Study Summaries Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Making Car Sharing and Car Clubs Work: Case Study Summaries AgencyCompany Organization: United...

  5. Geothermal Exploration Techniques a Case Study. Final Report...

    OpenEI (Open Energy Information) [EERE & EIA]

    Techniques a Case Study. Final Report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Geothermal Exploration Techniques a Case Study. Final Report...

  6. National Strategy Study on the Clean Development Mechanism in...

    OpenEI (Open Energy Information) [EERE & EIA]

    Strategy Study on the Clean Development Mechanism in Indonesia Jump to: navigation, search Name National Strategy Study on the Clean Development Mechanism in Indonesia Agency...

  7. LBNL-Climate Change and International Studies | Open Energy Informatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    Climate Change and International Studies Jump to: navigation, search Name LBNL-Climate Change and International Studies AgencyCompany Organization Lawrence Berkeley National...

  8. Renewable Energy Workshops and Study Tours | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Workshops and Study Tours Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Workshops and Study Tours AgencyCompany Organization: World Bank Sector:...

  9. North Florida Global Warming Study Group | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Global Warming Study Group Jump to: navigation, search Name: North Florida Global Warming Study Group Address: 8342 Compass Rose Dr S Place: Jacksonville, Florida Zip: 32216 Year...

  10. UNF Energy Efficiency Case Studies | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    UNF Energy Efficiency Case Studies Jump to: navigation, search Tool Summary Name: UNF Energy Efficiency Case Studies AgencyCompany Organization: United Nations Foundation Sector:...

  11. Low Carbon Growth Country Studies Program | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Studies Program Jump to: navigation, search Name Low Carbon Growth Country Studies Program AgencyCompany Organization Energy Sector Management Assistance Program of the...

  12. Poland-Low Carbon Growth Country Studies Program | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Low Carbon Growth Country Studies Program Jump to: navigation, search Name Poland-Low Carbon Growth Country Studies Program AgencyCompany Organization Energy Sector Management...

  13. Indonesia-Low Carbon Development Options Study | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Indonesia-Low Carbon Development Options Study Jump to: navigation, search Name Indonesia-ESMAP Low Carbon Country Studies Program AgencyCompany Organization Energy Sector...

  14. Indonesia-Low Carbon Development Options Study | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Indonesia-Low Carbon Development Options Study (Redirected from ESMAP-Indonesia-Low Carbon Development Options Study) Jump to: navigation, search Name Indonesia-ESMAP Low Carbon...

  15. Geothermal Regulatory Roadmap | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulatory Roadmap Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap presentation at the April 2013 peer review meeting held in Denver, Colorado. grr_peer2013.pdf (1.04 MB) More Documents & Publications track 1: systems analysis | geothermal 2015 peer review Geothermal Technologies Program Annual Peer Review Presentation By Doug Hollett Validation of Innovation Exploration Technologies for Newberry Volcano

  16. Improving Regulation and Regulatory Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alton Strategic Environmental Group New Port Richey, FL charles.alton@earthlink.net April 4, 2011 Daniel Cohen, Assistant General Counsel Legislation, Regulation, and Energy Efficiency Office of the General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Dear Mr. Cohen: I have reviewed the Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). In the

  17. Environmental regulatory update table, April 1990

    SciTech Connect

    Houlberg, L.M.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1990-05-01

    This report contains a monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and projection of further action.

  18. Environmental regulatory update table, May 1990

    SciTech Connect

    Houlberg, L.M.; Nikbakht, A.; Salk, M.S.

    1990-06-01

    This report contains a monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  19. Environmental regulatory update table, March 1990

    SciTech Connect

    Houlberg, L.M.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1990-04-01

    This report contains a monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  20. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Texas. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Texas is generally vested in the Public Utilities Commission. The Commission is comprised of three members appointed by the governor, with the advice of at least two-thirds of the senate, for a six-year term. Prior to the passage of the Texas Public Utility Regulatory Act (PURA) in 1975, the power to regulate public utilities was vested almost exclusively in municipalities. Under PURA, municipalities retain exclusive original jurisdiction over all electric, water, and sewer utilities within the municipality. PURA provides that all regulations pertaining to public utilities promulgated by local regulatory agencies remain in effect unless they are superceded by Commission rules. The municipality's governing body is required to exercise its regulatory authority under rules and standards consistent with those promulgated by the Commission. The Commission has exclusive appellate jurisdiction to review orders and ordinances of regulatory municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  1. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    SciTech Connect

    Moe, Wayne Leland

    2015-05-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  2. Robustness of Quadratic Hedging Strategies in Finance via Backward Stochastic Differential Equations with Jumps

    SciTech Connect

    Di Nunno, Giulia; Khedher, Asma; Vanmaele, Michèle

    2015-12-15

    We consider a backward stochastic differential equation with jumps (BSDEJ) which is driven by a Brownian motion and a Poisson random measure. We present two candidate-approximations to this BSDEJ and we prove that the solution of each candidate-approximation converges to the solution of the original BSDEJ in a space which we specify. We use this result to investigate in further detail the consequences of the choice of the model to (partial) hedging in incomplete markets in finance. As an application, we consider models in which the small variations in the price dynamics are modeled with a Poisson random measure with infinite activity and models in which these small variations are modeled with a Brownian motion or are cut off. Using the convergence results on BSDEJs, we show that quadratic hedging strategies are robust towards the approximation of the market prices and we derive an estimation of the model risk.

  3. Energy Department Issues Request For Proposal for Nuclear Regulatory...

    Energy Saver

    Nuclear Regulatory Commission Licensed Facilities Procurement Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement March ...

  4. Report to Congress:Impacts of the Federal Energy Regulatory Commission's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Proposal for Standard Market Design | Department of Energy Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design A report on an independent study to assess various potential impacts of the proposed rulemaking by the Federal Energy Regulatory Commission (FERC), "Remedying Undue Discrimination through Open Access Transmission

  5. Regulatory analyses for severe accident issues: an example

    SciTech Connect

    Burke, R.P.

    1985-01-01

    A study has been performed as part of a program to establish methods for incorporation of information from a broad range of research programs, particularly those which generate probabilistic risk information, and to develop suitable presentation formats for providing guidance to decisionmakers on issues related to severe accidents. The study addresses issues related to information availability, content, and presentation formats for use in the regulatory decisionmaking process. The approach employed to address these issues was to perform an example regulatory analysis on representative topics of interest using available technical information. The issue examined in the example analysis is the implementation of either a vented containment system or an alternative decay heat removal system at the Peach Bottom No. 2 plant. The example demonstrates many of the problems which will be encountered as probabilistic information from ongoing programs is incorporated into the regulatory decisionmaking process.

  6. Regulatory cross-cutting topics for fuel cycle facilities.

    SciTech Connect

    Denman, Matthew R.; Brown, Jason; Goldmann, Andrew Scott; Louie, David

    2013-10-01

    This report overviews crosscutting regulatory topics for nuclear fuel cycle facilities for use in the Fuel Cycle Research & Development Nuclear Fuel Cycle Evaluation and Screening study. In particular, the regulatory infrastructure and analysis capability is assessed for the following topical areas: Fire Regulations (i.e., how applicable are current Nuclear Regulatory Commission (NRC) and/or International Atomic Energy Agency (IAEA) fire regulations to advance fuel cycle facilities) Consequence Assessment (i.e., how applicable are current radionuclide transportation tools to support risk-informed regulations and Level 2 and/or 3 PRA) While not addressed in detail, the following regulatory topic is also discussed: Integrated Security, Safeguard and Safety Requirement (i.e., how applicable are current Nuclear Regulatory Commission (NRC) regulations to future fuel cycle facilities which will likely be required to balance the sometimes conflicting Material Accountability, Security, and Safety requirements.)

  7. Grid-Connected Renewable Energy Systems Case Studies | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Grid-Connected Renewable Energy Systems Case Studies AgencyCompany Organization: World Bank Sector: Energy Topics:...

  8. A Broadband Tensorial Magnetotelluric Study In The Travale Geothermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    Broadband Tensorial Magnetotelluric Study In The Travale Geothermal Field Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: A Broadband Tensorial...

  9. Category:Completed Case Study | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Apps Datasets Community Login | Sign Up Search Category Edit History Category:Completed Case Study Jump to: navigation, search List of geothermal areas that have a completed...

  10. EWIS European wind integration study (Smart Grid Project) (Spain...

    OpenEI (Open Energy Information) [EERE & EIA]

    Spain) Jump to: navigation, search Project Name EWIS European wind integration study Country Spain Coordinates 40.522152, -4.163818 Loading map... "minzoom":false,"mappingserv...

  11. EWIS European wind integration study (Smart Grid Project) (United...

    OpenEI (Open Energy Information) [EERE & EIA]

    United Kingdom) Jump to: navigation, search Project Name EWIS European wind integration study Country United Kingdom Coordinates 55.378052, -3.435973 Loading map......

  12. Progress Report on Electrical Resistivity Studies Coso Geothermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    Report on Electrical Resistivity Studies Coso Geothermal Area Inyo County California Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Progress Report on...

  13. Progress report on electrical resistivity studies, COSO Geothermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    report on electrical resistivity studies, COSO Geothermal Area, Inyo County, California Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Progress report...

  14. Water geochemistry study of Indian Wells Valley, Inyo and Kern...

    OpenEI (Open Energy Information) [EERE & EIA]

    Final report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Water geochemistry study of Indian Wells Valley, Inyo and Kern Counties, California....

  15. Applications of the VLF Induction Method For Studying Some Volcanic...

    OpenEI (Open Energy Information) [EERE & EIA]

    the VLF Induction Method For Studying Some Volcanic Processes of Kilauea Volcano, Hawaii Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article:...

  16. EWIS European wind integration study (Smart Grid Project) (France...

    OpenEI (Open Energy Information) [EERE & EIA]

    France) Jump to: navigation, search Project Name EWIS European wind integration study Country France Coordinates 45.897655, 2.021484 Loading map... "minzoom":false,"mappingser...

  17. Volatiles in hydrothermal fluids- A mass spectrometric study...

    OpenEI (Open Energy Information) [EERE & EIA]

    Volatiles in hydrothermal fluids- A mass spectrometric study of fluid inclusions from active geothermal systems Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  18. Reconnaissance geophysical studies of the geothermal system in...

    OpenEI (Open Energy Information) [EERE & EIA]

    Reconnaissance geophysical studies of the geothermal system in southern Raft River Valley, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article:...

  19. EWIS European wind integration study (Smart Grid Project) (Germany...

    OpenEI (Open Energy Information) [EERE & EIA]

    Germany) Jump to: navigation, search Project Name EWIS European wind integration study Country Germany Coordinates 51.165691, 10.451526 Loading map... "minzoom":false,"mapping...

  20. FERC Order No. 2003 Appendix 5 - Optional Interconnection Study...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 - Optional Interconnection Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 5 - Optional Interconnection...

  1. A Successful Case Study of Small Business Energy Efficiency and...

    OpenEI (Open Energy Information) [EERE & EIA]

    Successful Case Study of Small Business Energy Efficiency and Demand Response with Communicating Thermostats Jump to: navigation, search Tool Summary LAUNCH TOOL Name: A Successful...

  2. EWIS European wind integration study (Smart Grid Project) (Czech...

    OpenEI (Open Energy Information) [EERE & EIA]

    Czech Republic) Jump to: navigation, search Project Name EWIS European wind integration study Country Czech Republic Coordinates 49.817493, 15.472962 Loading map......

  3. Center for Study of Science, Technology and Policy of India ...

    OpenEI (Open Energy Information) [EERE & EIA]

    Science, Technology and Policy of India Jump to: navigation, search Name: Center for Study of Science, Technology and Policy (CSTEP) Address: Raj Bhavan Circle, High Grounds,...

  4. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Kentucky. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Until April 1, 1979, the Public Service Commission had been vested with exclusive jurisdiction over the regulation of rates and service of utilities. As of that date two new agencies, the Energy Regulatory Commission (ERC) and the Utility Regulatory Commission (URC), have replaced the Public Service Commission. The ERC consists of three full-time members appointed by the governor for four year terms and is responsible for enforcing the provisions of the Kentucky statutes relating to electric and gas utilities. The three-member URC is responsible for enforcing the provisions relating to non-energy utilities such as telephone, sewer, and water utilities. The statutes vest all regulatory authority over public utilities in either the ERC or the URC. Local governments retain only the power to grant local franchises. However, it should be noted, that any utility owned or operated by a political subdivision of the state is exempt from regulation. Thus, local government has complete authority over utilities which are self-owned. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  5. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Idaho. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Idaho state legislature has created the Idaho Public Utilities Commission and has given the Commission the power and jurisdiction to supervise and regulate every public utility in the state. The Commission is comprised of three members appointed by the governor with the approval of the senate. Commissioners serve full time and are appointed for six year terms. No more than two of the members may be from the same political party. Title 61 of the Idaho Code, which establishes the Commission and delineates its powers, vests all regulatory responsibility in the Commission to the exclusion of local government. However, as an incident to their franchising power, municipalities may impose reasonable regulations on the use of their streets. The Idaho Supreme Court holds that the transfer of regulatory power over public utilities to the Commission did not diminish the powers and duties of municipalities to control and maintain their streets and alleys. Limited statutory authority also exists giving municipalities the power to regulate the fares, rates, rentals, or charges made for the service rendered under any franchise granted in such city, except such as are subject to regulation by the Public Utilities Commission. With the exception of this limited power, the Commission is the sole agency having regulatory power over Idaho public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  6. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Louisiana. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Louisiana Public Service Commission, composed of five members elected by the general electorate and elected for six-year terms. The Commission is charged with regulating all public utilities and has such other regulatory authority as provided by law. The Commission, however, has no power to regulate a public utility owned, operated, or regulated on the effective data of this constitution (1921) by the governing authority of one or more political subdivisions unless the Commission is authorized to regulate these utilities by the electorate of the political subdivision involved. An additional statutory provision excludes all municipally-owned public utilities from Commission regulation. New Orleans has retained the regulatory authority which it held as of the effective date of the Louisiana Constitution. Therefore, the Commission exercises no regulatory powers over investor or municipally-owned utilities in New Orleans. A municipality is empowered to own and operate a revenue-producing public utility within or without its boundaries and it may sell and distribute the commodity or service of the public utility within or without its corporate limits and may establish rates, rules, and regulations with respect to the sale and distribution. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  7. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Illinois. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Illinois Commerce Commission, comprised of five members appointed by the governor with the advice and consent of the senate and appointed for five year terms. They must be free from any employment or pecuniary interests in any business subject to regulation by the Commission. Local governments may exercise a large degree of regulatory authority over public utilities providing services within a municipality. The question of whether a municipality will exercise regulatory control over local public utilities must be put to the voters of the city. If the proposition is approved by a majority of the voters, the municipality may regulate services and rates and exercise most of the regulatory functions otherwise assigned to the Commission. If any public utility is dissatisfied with any action of a municipality, the utility is entitled to apply to the Commission for review of the action. On review, the Commission may take any determination which it deems just and reasonable. In addition, municipally-owned utilities are excluded specifically from the definition of public utility. These utilities are not within the jurisdiction of the Commission and are regulated locally. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  8. Environmental Regulatory Update Table, July 1990

    SciTech Connect

    Houlberg, L.M.; Nikbakht, A.; Salk, M.S.

    1990-08-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  9. Environmental Regulatory Update Table, November 1991

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-12-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  10. Environmental Regulatory Update Table, October 1991

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  11. Environmental regulatory update table, January 1988

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-02-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  12. Environmental Regulatory Update Table, January 1991

    SciTech Connect

    Hawkins, G.T.; Houlberg, L.M.; Salk, M.S.

    1991-02-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  13. Environmental regulatory update table, July 1991

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-08-01

    This Environmental Regulatory Update Table (July 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  14. Environmental Regulatory Update Table, June 1991

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-07-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  15. Environmental Sciences Division environmental regulatory update table

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiative so interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  16. Environmental Regulatory Update Table, October 1990

    SciTech Connect

    Houlberg, L.M.; Noghrei-Nikbakht, P.A.; Salk, M.S.

    1990-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  17. Environmental Regulatory Update Table, December 1991

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1992-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  18. Environmental Regulatory Update Table, November 1990

    SciTech Connect

    Hawkins, G.T.; Houlberg, L.M.; Noghrei-Nikbakht, P.A.; Salk, M.S.

    1990-12-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  19. Environmental regulatory update table, February 1988

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-02-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for taht initiative with an abstract and a projection of further action.

  20. Environmental regulatory update table, February 1990

    SciTech Connect

    Houlberg, L.M.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1990-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to Department of Energy (DOE) operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  1. Environmental Regulatory Update Table, May 1991

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-06-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  2. Environmental Regulatory Update Table, December 1990

    SciTech Connect

    Hawkins, G.T.; Houlberg, L.M.; Noghrei-Nikbakht, P.A.; Salk, M.S.

    1991-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  3. Environmental regulatory update table, June 1988

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-07-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  4. Environmental regulatory update table, January 1990

    SciTech Connect

    Houlberg, L.M.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1990-02-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  5. Environmental Regulatory Update Table, March 1991

    SciTech Connect

    Hawkins, G.T.; Houlberg, L.M.; Salk, M.S.

    1991-04-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  6. Environmental regulatory update table, December 1987

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  7. Environmental Regulatory Update Table, December 1988

    SciTech Connect

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  8. Environmental Regulatory Update Table, February 1991

    SciTech Connect

    Hawkins, G.T.; Houlberg, L.M.; Salk, M.S.

    1991-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  9. Environmental Regulatory Update Table, September 1991

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  10. Environmental regulatory update table, September 1988

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the /ital Federal Register/ and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  11. Environmental Regulatory Update Table, November 1988

    SciTech Connect

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-12-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  12. Environmental regulatory update table, June 1990

    SciTech Connect

    Houlberg, L.M.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1990-07-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  13. Environmental Regulatory Update Table, September 1990

    SciTech Connect

    Houlberg, L.M.; Nikbakht, A.; Salk, M.S.

    1990-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  14. Environmental Regulatory Update Table, April 1991

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  15. Environmental Regulatory Update Table, August 1990

    SciTech Connect

    Houlberg, L.M.; Nikbakht, A.; Salk, M.S.

    1990-09-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  16. Environmental Regulatory Update Table, August 1991

    SciTech Connect

    Houlberg, L.M., Hawkins, G.T.; Salk, M.S.

    1991-09-01

    This Environmental Regulatory Update Table (August 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  17. Environmental Sciences Division: Environmental regulatory update table

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-09-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  18. Environmental regulatory update table, May 1988

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-06-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  19. Environmental regulatory update table, March 1989

    SciTech Connect

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-04-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  20. Environmental Regulatory Update Table, April 1989

    SciTech Connect

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  1. Environmental Regulatory Update Table, December 1989

    SciTech Connect

    Houlbert, L.M.; Langston, M.E. ); Nikbakht, A.; Salk, M.S. )

    1990-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  2. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cheniere Energy, Inc. ("Cheniere") submits the following comments in response to the Department of Energy's ("DOE" or "Department") request for information and comments concerning "Reducing Regulatory Burden" published in the Federal Register on February 3, 2011. Regulatory Burden RFI (206.63 KB) More Documents & Publications Regulatory Burden RFI [76 FR 75798] SEMI-ANNUAL REPORTS FOR CHENIERE MARKETING, LLC and CORPUS CHRISTIC LIQUEFACTION, LLC -FE

  3. History of Regulatory Oversight at LANL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    History of Regulatory Oversight History of Regulatory Oversight at LANL History of Regulatory Oversight at LANL 1943-1950: Manhattan Project Era Few environmental regulations Best available protection technologies employed, though rudimentary 1950s-1970s: Cold War Era Laboratory moved from townsite to current location Advent of national environmental protection laws Clean Air Act Clean Water Act Resource Conservation and Recovery Act (RCRA) 1980s-1990s: Non-proliferation/Stockpile Reduction LANL

  4. Understanding the Energy Policy and Regulatory Environment

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Understanding the Energy Policy and Regulatory Environment Douglas MacCourt Senior Policy Advisor Department of Energy, Office of Indian Energy Policy and Programs 2 Presentation Agenda * Regulatory and Policy Considerations o Legal Issues, Interconnection, permitting considerations, Clean Power Plan * Federal, State, & Utility Incentives o Net metering, Renewable Portfolio Standards, ITC * Tools 3 REGULATORY AND POLICY CONSIDERATIONS 4 Legal Issues Legal issues to consider in exploring your

  5. Regulatory Policy Guide/Game Concept Paper

    SciTech Connect

    Driving Ratepayer-Funded Efficiency through Regulatory Policies Working Group

    2011-09-01

    Proposes a new resource for utility regulators to plot a course through regulatory options available to surmount barriers to aggressive and sustained utility investment in energy efficiency programs.

  6. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  7. EAC Recommendations Regarding Emerging and Alternative Regulatory...

    Energy.gov [DOE] (indexed site)

    tools, and the use of DOE's convening authority and financial sponsorship. EAC Recommendations Regarding Emerging and Alternative Regulatory Models and Modeling Tools to ...

  8. Restrospective Regulatory Review | Department of Energy

    Energy.gov [DOE] (indexed site)

    On January 18, 2011, President Obama issued Executive Order 13563, Improving Regulation and Regulatory Review, which directs federal agencies, among other things, to review ...

  9. Federal / State Legislative & Regulatory Changes Required for...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ethanol blends Federal State Legislative & Regulatory Changes Required for Introduction of E15 (2.81 MB) More Documents & Publications Vehicle Certification Test Fuel and Ethanol ...

  10. Reducing Regulatory Burden - EO 13563 Retrospective Review |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Plan for Retrospective Analysis of Existing Rules Regulatory and Financial Reform of Federal Research Policy: Recommendations to the NRC Committee on Research Universities

  11. Regulatory Analysis of Reactivity Transients

    SciTech Connect

    Beyer, Carl E.; Clifford, Paul M.; Geelhood, Kenneth J.; Voglewede, John C.

    2009-08-01

    This paper will describe modifications made to the FRAPCON-3 and FRAPTRAN fuel performance codes and models that impact reactivity initiated accident (RIA) analyses. The modified models include an upper bound empirical and best estimate release models for fast transients, and a revised fuel failure model that accounts for ductile and brittle failure. Because experimental data exists for discrete test conditions, the codes and models are used to interpolate and to some extent, to extrapolate these test conditions. An upper bound empirical model for release is used to establish new recommended release fractions for long-lived and short lived (radioactive) isotopes for RIA events in Regulatory Guide 1.183. A best estimate release model is used in FRAPTRAN 1.4 based on grain boundary gas concentrations from FRAPCON-3.4 to predict release for RIA events. Code and model predictions will be compared to failure and release data from RIA tests to demonstrate accuracy.

  12. Steam generators regulatory practices and issues in Spain

    SciTech Connect

    Mendoza, C.; Castelao, C.; Ruiz-Colino, J.; Figueras, J.M.

    1997-02-01

    This paper presents the actual status of Spanish Steam Generator tubes, actions developed by PWR plant owners and submitted to CSN, and regulatory activities related to tube degradation mechanisms analysis; NDT tube inspection techniques; tube, tubesheet and TSPs integrity studies; tube plugging/repair criteria; preventive and corrective measures including whole SGs replacement; tube leak measurement methods and other operational aspects.

  13. Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory Watchdog

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Memorandum serves as an Executive Summary of Center for Regulatory Effectiveness’ (CRE’s) attached comments highlighting four issues:

  14. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Indiana. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Public Service Commission of Indiana. The Commission is comprised of three members appointed by the governor. Commissioners are appointed for four-year terms. They must be free from any employment or pecuniary interest in any public utility. Indiana courts have stated that the Commission was created and vested with regulatory authority over public utilities in order to relieve these utilities from local regulation. Local governments do, however, have specific statutory authority to determine, by contract or ordinance, the quality and character of service to be provided by public utilities within the municipality. Local governments may also regulate the use of streets and other public property by public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  15. Environmental Sciences Division environmental regulatory update table

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action. This report contains a monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. Any proposed regulation that raises significant issues for any DOE operation should be reported to the Office of Environmental Guidance and Compliance.

  16. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New York. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the New York Public Service Commission. The Commission is composed of five members appointed by the governor with the advice and consent of the senate. Commissioners are appointed for six-year terms. Commissioners may not have any pecuniary or financial interest in any public utility. Local governing bodies are authorized to exercise such power, jurisdiction and authority in enforcing the laws of the state and the orders, rules, and regulations of the commission as may be prescribed by statute or by the commission with respect to public utilities. A Commission spokesman confirmed that no statutes have been passed pursuant to this provision and the Commission has not ceded any of its regulatory powers to local governments. With the exception of the granting of franchises and permits to use public ways, local governments exercise no regulatory powers over public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  17. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in California. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Constitution of the State of California grants to the Legislature control over persons and private corporations that own or operate a line, plant, or system for the production, generation, or transmission of heat, light, water, or power to be furnished either directly or indirectly to or for the public. The Constitution establishes the Public Utilities Commission and grants certain specific powers to the PUC, including the power to fix rates, establish rules and prescribe a uniform system of accounts. The Constitution also recognizes that the Legislature has plenary power to confer additional authority and jurisdiction upon the PUC. The Constitution prohibits regulation by a city, county, or other municipal body of matters over which the Legislature has granted regulatory power to the PUC. This provision does not, however, impair the right of any city to grant franchises for public utilities. The California legislature has enacted the California Public Utilities Code and has designated the PUC as the agency to implement the regulatory provisions of the Code. The Public Utilities Commission consists of five members appointed by the governor and approved by the senate, a majority of the membership concurring, for staggered 6-year terms. Certain limited powers over the conduct of public utilities may still be exercised by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  18. Steel characteristics measurement system using Barkhausen jump sum rate and magnetic field intensity and method of using same

    DOEpatents

    Kohn, Gabriel; Hicho, George; Swartzendruber, Lydon

    1997-01-01

    A steel hardness measurement system and method of using same are provided for measuring at least one mechanical or magnetic characteristic of a ferromagnetic sample as a function of at least one magnetic characteristic of the sample. A magnetic field generator subjects the sample to a variable external magnetic field. The magnetic field intensity of the magnetic field generated by the magnetic field generating means is measured and a signal sensor is provided for measuring Barkhausen signals from the sample when the sample is subjected to the external magnetic field. A signal processing unit calculates a jump sum rate first moment as a function of the Barkhausen signals measured by the signal sensor and the magnetic field intensity, and for determining the at least one mechanical or magnetic characteristic as a function of the jump sum rate first moment.

  19. Steel characteristics measurement system using Barkhausen jump sum rate and magnetic field intensity and method of using same

    DOEpatents

    Kohn, G.; Hicho, G.; Swartzendruber, L.

    1997-04-08

    A steel hardness measurement system and method of using same are provided for measuring at least one mechanical or magnetic characteristic of a ferromagnetic sample as a function of at least one magnetic characteristic of the sample. A magnetic field generator subjects the sample to a variable external magnetic field. The magnetic field intensity of the magnetic field generated by the magnetic field generating means is measured and a signal sensor is provided for measuring Barkhausen signals from the sample when the sample is subjected to the external magnetic field. A signal processing unit calculates a jump sum rate first moment as a function of the Barkhausen signals measured by the signal sensor and the magnetic field intensity, and for determining the at least one mechanical or magnetic characteristic as a function of the jump sum rate first moment. 7 figs.

  20. Regulatory analysis technical evaluation handbook. Final report

    SciTech Connect

    1997-01-01

    The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC`s Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available.

  1. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Alabama. Preliminary background report

    SciTech Connect

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Alabama legislature has created the Public Service Commission which has general supervisory powers over utilities. The PSC consists of a president and two associates, who are elected to four-year terms. The PSC has no jurisdiction over municipal utilities and, as a result, local governments retain the power to regulate the operation of their municipally-owned utilities. Municipalities also retain their police power over streets and highways within their territory. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  2. Sandia Energy - Policy and Regulatory, Codes and Standards

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Policy and Regulatory, Codes and Standards Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Policy and Regulatory, Codes...

  3. NEMA Comments on DOE Reducing Regulatory Burden RFI | Department...

    Office of Environmental Management (EM)

    DOE Reducing Regulatory Burden RFI NEMA Comments on DOE Reducing Regulatory Burden RFI The National Electrical Manufacturers Association (NEMA) thanks you for the opportunity to ...

  4. NEMA Comments on Reducing Regulatory Burden | Department of Energy

    Energy Saver

    Reducing Regulatory Burden NEMA Comments on Reducing Regulatory Burden The National Electrical Manufacturers Association (NEMA) thanks you for the opportunity to provide comments ...

  5. Maryland-National Capital Building Industry Association Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Maryland-National Capital Building Industry Association Regulatory Burden RFI (Federal Register August 8, 2012) Maryland-National Capital Building Industry Association Regulatory ...

  6. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) -List of Covered Electric Utilities - 2006 Public Utility Regulatory ...

  7. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Public Utility Regulatory ...

  8. Comments from The National Association of Regulatory Utility...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI Comments from The National Association of Regulatory Utility Commissioners (NARUC) ...

  9. 7/24/2014 DOE Natural Gas Regulatory...

    Energy.gov [DOE] (indexed site)

    42014 DOE Natural Gas Regulatory E-filing Application https:app.fossil.energy.govappfergasApplicationAction.go 12 Basic Information Natural Gas Regulatory E-filing...

  10. April Tribal Webinar on Energy Policy and Regulatory Environment...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    April Tribal Webinar on Energy Policy and Regulatory Environment Rescheduled for May 4 April Tribal Webinar on Energy Policy and Regulatory Environment Rescheduled for May 4 April ...

  11. Department of Energy Commends the Nuclear Regulatory Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of ...

  12. Department of Energy and Nuclear Regulatory Commission Increase...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to ...

  13. Energy Praises the Nuclear Regulatory Commission Approval of...

    Office of Environmental Management (EM)

    Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the ...

  14. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Energy Saver

    US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart ...

  15. Canada-United States Regulatory Cooperation Council Webinar:...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards Canada-United States Regulatory Cooperation Council Webinar: Proposed ...

  16. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar:...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 201617; April 12, 2016 CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan ...

  17. Department of Energy Request for Information: Reducing Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Request for Information: Reducing Regulatory Burden (Reply Comments) Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Comments on RFI on ...

  18. .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Association's Comments on DOE's Regulatory Burden RFI .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden RFI Comments from Hearth, Patio & Barbecue ...

  19. Microsoft Word - AGA Comments on 2011 Regulatory Burden RFI ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AGA Comments on 2011 Regulatory Burden RFI Microsoft Word - AGA Comments on 2011 ... 76, No. 23, February 3, 2011 PDF icon Microsoft Word - AGA Comments on 2011 Regulatory ...

  20. Re: Request for Information on Regulatory Burden of DOE Regulations...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon Re: Request for Information on Regulatory Burden of DOE Regulations More Documents & Publications Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Fed. ...

  1. Category:Regulatory Roadmap Flowcharts | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    flowcharts Subcategories This category has the following 2 subcategories, out of 2 total. G Geothermal Regulatory Roadmap Flowcharts S Solar Regulatory Roadmap...

  2. Energy Department Develops Regulatory Roadmap to Spur Geothermal Energy Development

    Energy.gov [DOE]

    The Energy Department today issued a Geothermal Regulatory Roadmap that will help developers navigate regulatory requirements at every level of government to deploy geothermal energy projects.

  3. SEVENTH RFI COMMENTS ON REDUCING REGULATORY BURDEN

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’ issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is...

  4. Sixth RFI Comment On Reducing Regulatory Burden

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’ issued by the President on January 18, 2011, the Department of Energy(Department or DOE) is...

  5. Fourth RFI Comment on Regulatory Review

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’ issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is...

  6. Small Business Regulatory Enforcement Fairness Act Information

    Energy.gov [DOE]

    Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA) OSDBU is a resource for small businesses seeking information concerning the rules and regulations regarding all federal agencies and their relationships with the small business community.

  7. AHAM Comments_Regulatory Burden RFI

    Energy.gov [DOE]

    The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 81 Fed. Reg. 28736 (May 10, 2016).

  8. Reducing Regulatory Burden EO 13563 Third RFI

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’ issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is...

  9. Reducing Regulatory Burden EO 13563 Fifth RFI

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’ issued by the President on January 18, 2011, the Department of Energy(Department or DOE) is...

  10. NUCLEAR REGULATORY,.COMMISSION REGION I

    Office of Legacy Management (LM)

    ... & Lab Branch Division of Nuclear Materials Safety Docket No. 040-07964 License No. ... U.S. NUCLEAR REGULATORY COMblISSION REGION I INSPECTION REPORT Report No. 040-0796496-001 ...

  11. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Request for Information on reducing regulatory burden, 76 Fed. Reg. 6123 (Feb. 3, 2011). Regulatory Burden RFI (340.84 KB) More Documents & Publications WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters as Allowable Weatherization Measures TEE-0012 - In the Matter of Electrolux Home Products, Inc. TEE-0022 - In the Matter of

  12. EVALUATION REPORT The Federal Energy Regulatory Commission's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Energy Regulatory Commission's Unclassified Cybersecurity Program - 2014 OAS-L-15-03 November 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 November 3, 2014 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal

  13. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Ohio. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Public Utilities Commission (PUCO) is a body created by the Ohio State legislature to administer the provisions of the Ohio Public Utilities Act. It is composed of three commissioners appointed by the governor with the advice and consent of the senate. Once appointed, a commissioner serves for a six-year period. The PUCO is vested with the power and jurisdiction to supervise and regulate public utilities and railroads... . The term public utility includes every corporation, company, co-partnership, person or association, their lessees, trustees, or receivers, as defined in the Ohio Code. Among the various services enumerated in the Code under the definition of public utility are an electric light company; a gas company; a pipeline company transporting gas, oil or coal; a waterworks company; a heating or cooling company. The power to regulate public utilities is shared by the PUCO and municipal governments. The municipal regulatory authority is derived from the Ohio Constitution, statutory provisions, and municipal franchising authority. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  14. Water and energy studies | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Water and energy studies Jump to: navigation, search This page tracks studies, reports and analyses of the Energy-Water Nexus. When adding a study, report or publication to this...

  15. KWOC (Key-Word-Out-of-Context) Index of US Nuclear Regulatory Commission Regulatory Guide Series

    SciTech Connect

    Jennings, S.D.

    1990-04-01

    To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series.

  16. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Missouri. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Missouri is vested in the Public Service Commission. The Commission is composed of five members who are appointed by the governor with the advice and consent of the senate. Commissioners are appointed for a term of six years. Commissioners must be free from any employment or pecuniary interests incompatible with the duties of the Commission. The Commission is charged with the general supervision of public utilities. The Public Service Commission Law passed in 1913, makes no provision for the regulation of public utilities by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  17. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Virginia. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilties is vested generally in the State Corporation Commission. The Commission is comprised of three members elected by a joint vote of the two houses of the general assembly. Commissioners serve six-year terms. They must be free from any employment or pecuniary interests in any company subject to the supervision and regulation of the Commission. The Commission is charged with the primary responsibility of supervising and regulating public utilities. However, local governments retain the power to grant franchises and otherwise regulate the use of streets and other public property. In addition, municipally-owned utilities are not within the jurisdiction of the Commission to the extent that they operate within corporate limits. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  18. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Tennessee. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Tennessee Public Service Commission has been designated by the legislature as the agency primarily responsible for the regulation of public utilities and carriers. The Commission is comprised of three members elected by the voters of the state. Each member of the Commission serves a six-year term. The Commission is given broad supervisory control over public utilities in the public utilities statute. Included under its authority is the power to determine whether a privilege or franchise granted to a public utility by a municipality is necessary and proper for the public convenience. No privilege or franchise is valid until it has been approved by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  19. Regulatory Burden Request for Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Request for Information Regulatory Burden Request for Information Response to Regulatory Burden RFI Regulatory Burden Request for Information (46.48 KB) More Documents & Publications DOE Preliminary Plan for Retrospective Analysis of Existing Rules DOE_05_18_2011.pdf Regulatory Burden RFI - Docket No. DOE-HQ-2011-0014-0001

  20. Regulatory Considerations for Developing Generation Projects on Federal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lands | Department of Energy Regulatory Considerations for Developing Generation Projects on Federal Lands Regulatory Considerations for Developing Generation Projects on Federal Lands Presentation covers regulatory considerations for developing generation projects on federal lands. Download the presentation on regulatory considerations for developing generation projects on federal lands. (309.17 KB) More Documents & Publications Coordinating Interstate ElectricTransmission Siting: An

  1. US Nuclear Regulatory Commission functional organization charts, March 15, 1993

    SciTech Connect

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  2. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect

    Not Available

    1989-07-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions and branches are presented.

  3. Effects on NRC regulations and regulatory guides of considering degraded core accidents

    SciTech Connect

    Elliott, J.M.; Immerman, W.H.; Kolaczkowski, A.M.; Quinn, J.A.

    1981-01-01

    A review was performed for the Office of Standards Development, NRC, of Title 10 of the Code of Federal Regulations (CFR) and NRC Regulatory Guides. This review was to determine to what extent these portions of the NRC regulatory base would have to be changed to include degraded core accidents in the licensing process. The review focused on 10 CFR Parts 50, 55, and 100, and the Division 1 Regulatory Guides, although other sections of these documents also were examined. This study identifies those changes that could be mandated due to the direct conflict of existing regulations with the concept of a degraded core rule or with its basis.

  4. Evaluation of regulatory guides potentially useful to geologic repository development

    SciTech Connect

    Chang, W.Y.

    1986-01-01

    The US Regulatory Commission Regulatory Guide series provides a set of regulatory and technical guidelines for achieving and demonstrating regulatory compliance for various segments of the nuclear fuel cycle. Of these regulatory guides only few specifically pertain to high-level waste repository activities. The overwhelming majority pertain to other, more mature aspects of the nuclear cycle. It is believed that conscientious, reasoned application of the fundamental regulatory bases underlying the positions in these other regulatory guides could provide a solid regulatory starting point for repository development activities. This information report provides a summary screening of regulatory guides published as of September 1983 and provides an initial assessment of the potential usefulness of these regulatory guides to repository design and operation activities.

  5. A performance-based regulatory approach to increase the efficiency of the regulatory process

    SciTech Connect

    Dey, M. )

    1993-01-01

    The US Nuclear Regulatory Commission (NRC) has adopted as a fundamental principle that all regulatory burdens must be justified and that its regulatory process must be efficient. The reasons for seeking to remove marginal-to-safety regulations are to eliminate or modify regulations where burdens are not commensurate with their safety significance and thus free up resources and improve the focus and effectiveness of the body of regulations. As a result, the NRC has for some time been pursuing programs consistent with this philosophy. It now plans to institutionalize a continuing effort of regulatory burden reduction to ensure such efforts are permanently integrated into its regulatory process. The NRC believes such efforts are important to its mission and the industry it regulates.

  6. CRE_Response-DOE_Regulatory_Review_Request_for_Comments.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Center for Regulatory Effectiveness 1601 Connecticut Avenue, N.W. Washington, DC, 20009 Tel: (202) 265-2383 Fax: (202) 939-6969 secretary1@mbsdc.com www.TheCRE.com 1 REGULATORY REVIEW MEMORANDUM To: Department of Energy From: Jim Tozzi Subject: Regulatory Burden Request for Information Date: September 4, 2012 CC: Boris Bershteyn/Office of Information and Regulatory Affairs This Memorandum serves as an Executive Summary of Center for Regulatory Effectiveness' (CRE's) attached comments

  7. Department of Energy Request for Information: Reducing Regulatory Burden

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (Reply Comments) | Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Comments on RFI on reducing regulatory burden Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) (89.49 KB) More Documents & Publications Re: Regulatory Burden RFI RegReview_ReplyComments_Lennox_Hearth_Products.PDF .Hearth, Patio & Barbecue

  8. Comments on reducing regulatory burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    reducing regulatory burden Comments on reducing regulatory burden Comments on reducing regulatory burden from Ingersoll Rand, Residential Solutions, manufacturer of Trane and American Standard residential air conditioners, heat pumps, furnaces, and accessories Comments on reducing regulatory burden (115.32 KB) More Documents & Publications Regulatory Burden RFI [76 FR 75798] Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules 2014-09-18 Issuance: Energy

  9. DOE Ex Parte Memorandum - Center for Regulatory Effectiveness | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Memorandum - Center for Regulatory Effectiveness DOE Ex Parte Memorandum - Center for Regulatory Effectiveness The Center for Regulatory Effectiveness (CRE) is submitting this memorandum pursuant to the Department of Energy's (DOE) Guidance on Ex Parte Communications. Center_for_Reg_Effectiveness.pdf (169.94 KB) More Documents & Publications DOE Review of Regulations - Center for Regulatory Effectiveness Comments Regulatory Burden RFI: Revitalization of DOE's Role as a

  10. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  11. Solar Project Regulatory Considerations and NEPA Compliance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bureau of Indian Affairs Solar Project Regulatory Considerations and NEPA Compliance DOE Tribal Webinar Project Regulatory Considerations August 31, 2016 NEPA Compliance  Statute, Executive Orders, DOI Memos, Policy, DOI Handbooks  Process  Coordination National Environmental Policy Act (NEPA)  NEPA-Public Law 91- 190 42 U.S.C. 4321-4347 January 1, 1970  CEQ Regulations 40 CFR 1500-1508 November 29, 1978  DOI Implementing Procedures 516 DM 1-6 (April 23, 1980)  DOI Final

  12. Probabilistic risk assessment (PRA): status report and guidance for regulatory application. Draft report for comment

    SciTech Connect

    none,

    1984-02-01

    This document describes the current status of the methodologies used in probabilistic risk assessment (PRA) and provides guidance for the application of the results of PRAs to the nuclear reactor regulatory process. The PRA studies that have been completed or are underway are reviewed. The levels of maturity of the methodologies used in a PRA are discussed. Insights derived from PRAs are listed. The potential uses of PRA results for regulatory purposes are discussed.

  13. Airflow-terrain interactions through a mountain gap, with an example of eolian activity beneath an atmospheric hydraulic jump

    SciTech Connect

    Gaylord, D.R.; Dawson, P.J.

    1987-09-01

    The integration of atmospheric soundings from a fully instrumented aircraft with detailed sedimentary and geomorphic analyses of eolian features in the Ferris dune field of south-central Wyoming lends insight into the manner in which topography interacts with airflow to modify eolian activity. Topographically modified airflow results in zones of airflow deceleration, acceleration, and enhanced atmospheric turbulence, all of which influence the surface morphology and sedimentology. Extreme lateral confluence of prevailing airflow produces accelerated, unidirectional winds. These winds correlate with unusually continuous and elongate parabolic dunes that extend into a mountain gap (Windy Gap). Persistently heightened winds produced at the entrance to Windy Gap have resulted in a concentration of active sand dunes that lack slipfaces. Common development of a strongly amplified atmospheric wave analogous to a hydraulic jump in the gap contributes to the formation of a variety of eolian features that mantle the surface of Windy Gap and the Ferris dune field tail. Heightened, unidirectional winds in this zone promote grain-size segregation, the formation of elongated and aligned sand drifts, climbing and falling dunes, elongate scour streaks, and parabolic dunes that have low-angle (< 20/sup 0/) cross-stratification. Deflation of bedrock and loose sediment has been enhanced in the zone of maximum turbulence beneath the hydraulic jump.

  14. Confidential data in a competitive environment: Setting a regulatory agenda

    SciTech Connect

    Vine, E.

    1997-04-01

    Utilities will be reluctant to share data that gives them a competitive advantage over competitors. For exactly that reason, regulators should be more proactive in reviewing and revising, if need be, their policies with respect to the confidentiality of that data. Historically, the electric utility industry has been regarded as one of the most open industries in the United States in terms of inter-company sharing of information and conducting joint research and development activities. But as the prospect of competition among electricity power providers has increased in recent years, investor-owned utilities have become concerned that their competitors will desire access to energy-related data that they may regard as proprietary or confidential. As a result, many utilities are now requesting that the data they submit to their utility regulatory commissions remain confidential. As noted in the discussion below, withholding utility information from the public is likely to have significant policy implications with respect to such matters as: (1) consumer education, the pursuit of truth, mutual respect among parties, and social cooperation; (2) creation of a fair market for competitive energy services; (3) the regulatory balance; (4) regional and national assessments of energy-savings opportunities; (5) research and development; and (6) evaluations of utility programs, plans, and policies. In response to these concerns, in late 1995 and early 1996 the author conducted a survey of state public utility commissions in the U.S. to assess: (1) the relative importance of the issue of confidential data in the regulatory arena; (2) the regulatory response to utility requests for confidentiality (e.g., formal policies, guidelines, rules and procedures, and decisions); and (3) the type of data filed as confidential with PUCs. In this article, the author focus on only the first two objectives of this study.

  15. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Massachusetts. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Department of Public Utilities. The Department is under the supervision and control of a commission consisting of three members appointed by the governor for terms of four years. No more than two of the commissioners may be members of the same political party. Commissioners must be freee from any employment or financial interests which are incompatible with the duties of the Department. The Department is responsible for regulating public utilities. The Department is specifically granted general supervisory authority over all gas and electric companies. Specific provisions for the appeal of local decisions exist only in the case of a municipality's approval or disapproval of new operaions by an electric or gas company in a municipality already being served by another such utility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  16. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Washington. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Washinton State Constitution grants authority to the legislature to regulate railroads and other common carriers as well as telegraph and telephone companies in the state. No section of the constitution expressly provides for the regulation of electric, gas, water, or heating utilities. The authority to regulate public utilities is vested generally in the Utilities and Transportation Commission, formerly designated at the Public Service Commission. The Commission is composed of three members appointed by the governor, with the consent of the senate. The term of office for commissioners is six years. Recently enacted legislation provides for the implementation of tax incentives to encourage the development of cogeneration facilities in the state. This plan is to be administered by the Department of Revenue in conjunction with the Energy Office. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  17. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Nevada. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate the operatons of public utilities in Nevada is vested generally in the Public Service Commission. The Commission is comprised of three members appointed by the governor to four year terms. One of the members is designated by the governor to act as chairman and serves in that capacity at the pleasure of the governor. Commissioners must be free from employment or pecuniary interests which are incompatible with the duties of the Commission. Within the purview of its powers, the authority of the Commission supercedes that of local governments. Local governments play a role in regulating public utilities only through the exercise of their zoning and franchising powers. In addition, municipally-owned utilities are totally exempt from Commission control. No specific procedure is provided by which the decisions of local governments regarding utilities may be reviewed by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  18. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Mississippi. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Mississippi is vested generally in the Public Service Commission, composed of three members elected for four year terms from separate districts of the state. Within the purview of its powers, the authority of the Commission supersedes that of local governments. It is empowered to amend municipal franchises that contain provisions conflicting with its exclusive jurisdiction over the rates and standards of service of public utilities. Local governments play a role in regulating public utilities only through the exercise of their zoning and franchising powers. They may also operate their own utilities which are totally exempt from Commission control, unless they provide services more than one mile beyond their corporate boundaries. Other than a procedure in which certain provisions in municipal franchises may be subject to modification by the Commission, there is no process by which the decisions of local government respecting utilities are reviewed by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  19. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in North Carolina. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Under the Public Utilities Act of 1965, utilities in North Carolina are regulated by the State's Utility Commission. The Commission consists of seven members who are appointed by the governor, subject to confirmation by the General Assembly sitting in joint session. The Commissioners serve eight year terms and the governor designates one of the commissioners as chairman. The Commission has an office of the executive director, who is appointed to a six year term by the governor subject to confirmaion by the General Assembly. The executive director heads the Commission's public staff. The public staff's duties include reviewing, investigating, and making recommendations on utility rates and services and intervention on behalf of the public in proceedings affecting consumer rates and generating plant certification. The Commission has the same power to regulate the operation of privately-owned public utilities within municipalities as it has to control those ouside. The only power over privately-owned utilities reserved to the municipalities is the power to grant franchises. A municipality may maintain its own utility systems, and such systems are not subject to the control and jurisdiction of the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  20. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New Jersey. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate the operations of public utilities in New Jersey is generally vested in the Board of Public Utilities. The Board is subsumed within the Department of Energy for administrative purposes, but functions largely independently of supervision or control by that agency. The Board is composed of three members who serve for six-year terms. They are appointed by the governor with the advice and consent of the senate. Within the purview of its powers, the authority of the Board supersedes that of local governments. The Board, for example, may grant exemptions from local zoning provisions, and has approving authority over privileges or franchises granted by municipalities to public utilities. The Board, however, cannot override the refusal of a municipality to grant consent to the initiation of operations by a public utility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  1. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in South Dakota. Preliminary background report

    SciTech Connect

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The South Dakota Public Utilities Commission is authorized by statute to regulate gas and electric utilities. The Commission consists of three elected commissioners each of whom serves for a six year term. The Commissioners are elected by district and each must, at the time of election, be a resident of the district from which he has been elected. Each Commissioner must reside in the state capital and devote his entire time to the duties of his office. The Commission is part of the Department of Commerce and Consumer Protection. Municipal power to regulate privately owned electric and gas public utilities was terminated in 1975. A municipally-owned electric utility has the authority to regulate the sale, use, and rates of electric power and energy which it provides. The Commission has no authority to regulate steam, heat, and refrigeration systems; that power resides in cities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  2. Regulatory Promotion of Emergent CCS Technology

    SciTech Connect

    Davies, Lincoln; Uchitel, Kirsten; Johnson, David

    2014-01-01

    Despite the growing inevitability of climate change and the attendant need for mitigation strategies, carbon capture and sequestration (CCS) has yet to gain much traction in the United States. Recent regulatory proposals by the U.S. Environmental Protection Agency (EPA), limited in scope to new-build power plants, represent the only significant policy initiative intended to mandate diffusion of CCS technology. Phase I of this Project assessed barriers to CCS deployment as prioritized by the CCS community. That research concluded that there were four primary barriers: (1) cost, (2) lack of a carbon price, (3) liability, and (4) lack of a comprehensive regulatory regime. Phase II of this Project, as presented in this Report, assesses potential regulatory models for CCS and examines where those models address the hurdles to diffusing CCS technology identified in Phase I. It concludes (1) that a CCS-specific but flexible standard, such as a technology performance standard or a very particular type of market-based regulation, likely will promote CCS diffusion, and (2) that these policies cannot work alone, but rather, should be combined with other measures, such as liability limits and a comprehensive CCS regulatory regime.

  3. The regulatory battleground: A briefing for commanders

    SciTech Connect

    Wirick, D.

    1995-12-31

    This imperfect analogy likens the history and current status of public utility regulation to a military campaign. Clearly, the relationship between regulators and utilities has not always been combative, but intermittent conflict has necessarily characterized the relationship. Nonetheless, this military analogy describes some of the elements of the history of regulation and may have implications for regulatory policy in the near term. The scene is a battlefield headquarters not far from the heat of the conflict. The commanders of regulatory units are gathered. In the distance, the low rumble of troop movements can be heard. Ladies and gentlemen, please take your seats. As you are aware, recent developments have placed regulatory forces in extreme jeopardy. Our forces are under stress, and though they continue to fight, the confusion of the current situation is beginning to take its toll. In most cases, reinforcements have been denied and our lines of logistical support have been weakened. Without effective and rapid action on our part, the regulatory battle will be lost and we will be driven from the field. Until consumers are well-enough armed to protect themselves, a process that is certainly suspect and potentially time-consuming, they will be powerless and undoubtedly victimized.

  4. Tribal Renewable Energy Webinar: Project Regulatory Considerations

    Energy.gov [DOE]

    Learn about the many permitting and project regulatory issues that need to be addressed when developing energy projects. Considerations include the Helping Expedite and Advance Responsible Tribal Home Ownership (HEARTH) Act, land use, noise, birds, and other biological resources; visual impact; soil erosion and water quality; public health and safety; cultural and paleontological resources; solid and hazardous wastes; air quality; and climate.

  5. Obtain regulatory support services and technical expertise

    Energy.gov [DOE]

    The purpose of this task order (TO) is to obtain regulatory support services and technical expertise required to comply with the March 2005 Compliance Order on Consent (Consent Order), the Individual Permit for Stormwater (IP), Resource Conservation and Recovery Act (RCRA) Hazardous Waste Facility Permit (RCRA Permit, and other applicable compliance areas for Fiscal Year 2016.

  6. Nuclear Regulatory Commission | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Nuclear Regulatory Commission NNSA Receives Excellence Award for Radiological Security Enhancements in Hawaii HONOLULU - At an official event this week, the City and County of Honolulu presented the Department of Energy's (DOE) National Nuclear Security Administration (NNSA) with the Homeland Security Excellence Award for DOE/NNSA's Office of Radiological Security's (ORS) efforts

  7. Multi-jump magnetic switching in ion-beam sputtered amorphous Co{sub 20}Fe{sub 60}B{sub 20} thin films

    SciTech Connect

    Raju, M.; Chaudhary, Sujeet; Pandya, D. K.

    2013-08-07

    Unconventional multi-jump magnetization reversal and significant in-plane uniaxial magnetic anisotropy (UMA) in the ion-beam sputtered amorphous Co{sub 20}Fe{sub 60}B{sub 20}(5–75 nm) thin films grown on Si/amorphous SiO{sub 2} are reported. While such multi-jump behavior is observed in CoFeB(10 nm) film when the magnetic field is applied at 10°–20° away from the easy-axis, the same is observed in CoFeB(12.5 nm) film when the magnetic field is 45°–55° away from easy-axis. Unlike the previous reports of multi-jump switching in epitaxial films, their observance in the present case of amorphous CoFeB is remarkable. This multi-jump switching is found to disappear when the films are crystallized by annealing at 420 °C. The deposition geometry and the energy of the sputtered species appear to intrinsically induce a kind of bond orientation anisotropy in the films, which leads to the UMA in the as-grown amorphous CoFeB films. Exploitation of such multi-jump switching in amorphous CoFeB thin films could be of technological significance because of their applications in spintronic devices.

  8. Regulatory Impact Analysis and Regulatory Flexibility Act screening for operating permits regulations

    SciTech Connect

    Rodriguez, R.M.

    1992-06-01

    The report presents the economic impact analysis performed to comply with the requirements of the Regulatory Flexibility Act and Executive Order 12291 for the Title V Operating permits Rule.

  9. DOE Seeks Comments on its Preliminary Plan to Reduce Regulatory...

    Energy Saver

    Comments on its Preliminary Plan to Reduce Regulatory Burden DOE Seeks Comments on its Preliminary Plan to Reduce Regulatory Burden July 13, 2011 - 2:02pm Addthis The Department of ...

  10. DOE Review of Regulations - Center for Regulatory Effectiveness Comments |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Review of Regulations - Center for Regulatory Effectiveness Comments DOE Review of Regulations - Center for Regulatory Effectiveness Comments The Center for Regulatory Effectiveness (CRE) is pleased to submit these comments to the Department of Energy (DOE) on how DOE can best review its existing regulations and to identify whether any of its existing regulations should be modified, streamlined, expanded or repealed. Center_for_Regulatory_Effectiveness_Comments.pdf

  11. US Nuclear Regulatory Commission functional organization charts, January 31, 1992

    SciTech Connect

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  12. AHAM Comments Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Comments Regulatory Burden RFI AHAM Comments Regulatory Burden RFI The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 77 Fed. Reg. 47328 (Aug. 8, 2012). AHAM Comments_DOE Reg Review Sept 2012_FINAL.pdf (64.14 KB) More Documents & Publications Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012) Association of Home Appliance Manufacturers Comment AHAM Retrospective Preliminary

  13. Fact Sheet: DOE/National Association of Regulatory Utility Commissione...

    Energy Saver

    National Association of Regulatory Utility Commissioners (NARUC) to encourage investments in infrastructure modernization to enhance pipeline safety, efficiency and deliverability. ...

  14. .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    RFI | Department of Energy .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden RFI .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden RFI Comments from Hearth, Patio & Barbecue Association on DOE's Regulatory Burden RFI .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden RFI (604.37 KB) More Documents & Publications HPBA Comments NOPR on Energy Conservation Standards for Direct Heating Equipment

  15. DOE Comments Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Comments Regulatory Burden RFI DOE Comments Regulatory Burden RFI These comments are submitted by Rheem Manufacturing Company in response to the U.S. Department of Energy's (DOE) notice appearing in the December 5, 2011 Federal Register requesting information on existing regulations that should be modified, streamlined, expanded, or repealed. Reg_Review_DOE_comts_RFI.pdf (55.91 KB) More Documents & Publications Rheem Comments Fourth RFI Comment on Regulatory Review Reducing Regulatory Burden

  16. Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Burden; Retrospective Review Under E.O. 13563 Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 Request for information on reducing regulatory burden, E.O. 13563 Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 (140.78 KB) More Documents & Publications Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Reducing Regulatory Burden

  17. Microsoft Word - Cover Letter Regulatory Burden RFI 4-15-11 ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cover Letter Regulatory Burden RFI 4-15-11 Microsoft Word - Cover Letter Regulatory Burden ... on Wednesday, Feb. 3, 2011. PDF icon Microsoft Word - Cover Letter Regulatory Burden ...

  18. Papers on the nuclear regulatory dilemma

    SciTech Connect

    Barkenbus, J.N.; Freeman, S.D.; Weinberg, A.M.

    1985-10-01

    The four papers contained in this report are titled: (1) From Prescriptive to Performance-Based Regulation of Nuclear Power; (2) Nuclear Regulatory Reform: A Technology-Forcing Approach; (3) Improving the Regulation of Nuclear Power; and (4) Science and Its Limits: The Regulators' Dilemma. These four papers investigate issues relating to the long-term regulation of nuclear energy. They were prepared as part of the Institute for Energy Analysis' project on Nuclear Regulation funded by a grant from the Mellon Foundation and a smaller grant by the MacArthur Foundation. Originally this work was to be supplemented by contributions from the Nuclear Regulatory Commission and from the Department of Energy. These contributions were not forthcoming, and as a result the scope of our investigations was more restricted than we had originally planned.

  19. Environmental Regulatory Update Table, January/February 1995

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Mayer, S.J.; Salk, M.S.

    1995-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives impacting environmental, health, and safety management responsibilities. the table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  20. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Proposed Approach for Energy Efficiency Standards January 12, 2015 Natural Resources Ressources naturelles Canada Canada Key Contacts in U.S. and Canada NRCan * Debbie Scharf, Director of Equipment Division * Katherine Delves, Chief of Standards Development * Jamie Hulan, Team leader for Standards Development * Andrés Drew, RCC lead DOE * John Cymbalsky, Program Manager for Appliance Standards * Ashley Armstrong, Supervisory

  1. Plant nitrogen regulatory P-PII genes

    DOEpatents

    Coruzzi, Gloria M.; Lam, Hon-Ming; Hsieh, Ming-Hsiun

    2001-01-01

    The present invention generally relates to plant nitrogen regulatory PII gene (hereinafter P-PII gene), a gene involved in regulating plant nitrogen metabolism. The invention provides P-PII nucleotide sequences, expression constructs comprising said nucleotide sequences, and host cells and plants having said constructs and, optionally expressing the P-PII gene from said constructs. The invention also provides substantially pure P-PII proteins. The P-PII nucleotide sequences and constructs of the

  2. Regulatory Burden RFI - Hussmann Corporation Response

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulatory Burden RFI - Hussmann Corporation Response January 3, 2012 Below are the list of questions with answers from the December 5 RFI: (1) How can the Department best promote meaningful periodic reviews of its existing rules and how can it best identify those rules that might be modified, streamlined, expanded, or repealed? DOE should maintain a list of all manufacturers impacted by legislation/rules and make sure these manufacturers are notified of all rule changes. A full review cycle

  3. Responding to the changing regulatory scene

    SciTech Connect

    Wise, P.

    1995-12-31

    The regulatory approach of the Illinois Environmental Protection Agency (EPA) is discussed in this paper. Three areas receive emphasis: (1) the changing relations between the US EPA and the states, (2) the new emphasis on pollution prevention techniques, and (3) a new environmental amnesty project. Budgetary considerations, performance partnerships, and nonregulatory compliance assistance are briefly outlined in relation to these topics. Results of the environmental amnesty program for small business, called Clean Break, are briefly reported.

  4. Implementation of subsidence control regulatory requirements

    SciTech Connect

    Barkley, D.

    1999-07-01

    Underground coal mining in Illinois has shown an increasing percentage of total coal mined relative to surface mining. In the past 20 years, the percentage of underground to surface mine production has steadily increased. Underground mining is expected to continue to dominate Illinois coal production into the 21st century. The drive for higher production and lower operating costs should increase the number of longwall and high extraction retreat mines. This will be achieved through conversion of existing room and pillar mines or initiation of new underground mining operations. The environmental regulations that govern the mitigation of surface impacts have evolved at both the state and federal level. Federal regulations passed in 1995 modifying the Surface Mining Control and Reclamation Act mandated additional restrictions and regulatory requirements beyond those adopted in 1977. State regulatory bodies that implement the regulations are now working to bring their regulations and procedures into compliance with the oversight federal counterpart. many states have raised concerns over the practical application of certain aspects of the new permitting requirements. This paper describes past and present subsidence regulations in Illinois, their impact on the coal industry and on the landowners above underground coal mining. Potential problems in implementation of the new regulatory requirements as well as additional burdens placed on coal companies to comply with the regulations are explored.

  5. Plant nitrogen regulatory P-PII polypeptides

    DOEpatents

    Coruzzi, Gloria M.; Lam, Hon-Ming; Hsieh, Ming-Hsiun

    2004-11-23

    The present invention generally relates to plant nitrogen regulatory PII gene (hereinafter P-PII gene), a gene involved in regulating plant nitrogen metabolism. The invention provides P-PII nucleotide sequences, expression constructs comprising said nucleotide sequences, and host cells and plants having said constructs and, optionally expressing the P-PII gene from said constructs. The invention also provides substantially pure P-PII proteins. The P-PII nucleotide sequences and constructs of the invention may be used to engineer organisms to overexpress wild-type or mutant P-PII regulatory protein. Engineered plants that overexpress or underexpress P-PII regulatory protein may have increased nitrogen assimilation capacity. Engineered organisms may be used to produce P-PII proteins which, in turn, can be used for a variety of purposes including in vitro screening of herbicides. P-PII nucleotide sequences have additional uses as probes for isolating additional genomic clones having the promoters of P-PII gene. P-PII promoters are light- and/or sucrose-inducible and may be advantageously used in genetic engineering of plants.

  6. Regulatory issues for deep borehole plutonium disposition

    SciTech Connect

    Halsey, W.G.

    1995-03-01

    As a result of recent changes throughout the world, a substantial inventory of excess separated plutonium is expected to result from dismantlement of US nuclear weapons. The safe and secure management and eventual disposition of this plutonium, and of a similar inventory in Russia, is a high priority. A variety of options (both interim and permanent) are under consideration to manage this material. The permanent solutions can be categorized into two broad groups: direct disposal and utilization. The deep borehole disposition concept involves placing excess plutonium deep into old stable rock formations with little free water present. Issues of concern include the regulatory, statutory and policy status of such a facility, the availability of sites with desirable characteristics and the technologies required for drilling deep holes, characterizing them, emplacing excess plutonium and sealing the holes. This white paper discusses the regulatory issues. Regulatory issues concerning construction, operation and decommissioning of the surface facility do not appear to be controversial, with existing regulations providing adequate coverage. It is in the areas of siting, licensing and long term environmental protection that current regulations may be inappropriate. This is because many current regulations are by intent or by default specific to waste forms, facilities or missions significantly different from deep borehole disposition of excess weapons usable fissile material. It is expected that custom regulations can be evolved in the context of this mission.

  7. Success of Geothermal Wells: A Global Study | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    of Geothermal Wells: A Global Study Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Success of Geothermal Wells: A Global Study Abstract This report...

  8. FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement...

    OpenEI (Open Energy Information) [EERE & EIA]

    2 - Feasibility Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement Abstract FERC...

  9. An Integrated Geophysical Study Of The Northern Kenya Rift |...

    OpenEI (Open Energy Information) [EERE & EIA]

    Geophysical Study Of The Northern Kenya Rift Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: An Integrated Geophysical Study Of The Northern...

  10. Widget:CaseStudyAssist | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    History Widget:CaseStudyAssist Jump to: navigation, search Description Widget to assist case study pages and forms: CSC & CSA Usage This widget must be used with the...

  11. Seismic refraction study of the Raft River geothermal area, Idaho...

    OpenEI (Open Energy Information) [EERE & EIA]

    refraction study of the Raft River geothermal area, Idaho Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Seismic refraction study of the Raft...

  12. FERC Order No. 2003 Appendix 4 - Facilities Study Agreement ...

    OpenEI (Open Energy Information) [EERE & EIA]

    4 - Facilities Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 4 - Facilities Study Agreement Abstract FERC...

  13. Geothermal Studies in Southwest New Mexico | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Studies in Southwest New Mexico Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Geothermal Studies in Southwest New Mexico Author Swanberg Published New...

  14. Large Scale Comparative Visualisation of Regulatory Networks with TRNDiff

    SciTech Connect

    Chua, Xin-Yi; Buckingham, Lawrence; Hogan, James M.; Novichkov, Pavel

    2015-06-01

    The advent of Next Generation Sequencing (NGS) technologies has seen explosive growth in genomic datasets, and dense coverage of related organisms, supporting study of subtle, strain-specific variations as a determinant of function. Such data collections present fresh and complex challenges for bioinformatics, those of comparing models of complex relationships across hundreds and even thousands of sequences. Transcriptional Regulatory Network (TRN) structures document the influence of regulatory proteins called Transcription Factors (TFs) on associated Target Genes (TGs). TRNs are routinely inferred from model systems or iterative search, and analysis at these scales requires simultaneous displays of multiple networks well beyond those of existing network visualisation tools [1]. In this paper we describe TRNDiff, an open source system supporting the comparative analysis and visualization of TRNs (and similarly structured data) from many genomes, allowing rapid identification of functional variations within species. The approach is demonstrated through a small scale multiple TRN analysis of the Fur iron-uptake system of Yersinia, suggesting a number of candidate virulence factors; and through a larger study exploiting integration with the RegPrecise database (http://regprecise.lbl.gov; [2]) - a collection of hundreds of manually curated and predicted transcription factor regulons drawn from across the entire spectrum of prokaryotic organisms.

  15. Large Scale Comparative Visualisation of Regulatory Networks with TRNDiff

    DOE PAGES [OSTI]

    Chua, Xin-Yi; Buckingham, Lawrence; Hogan, James M.; Novichkov, Pavel

    2015-06-01

    The advent of Next Generation Sequencing (NGS) technologies has seen explosive growth in genomic datasets, and dense coverage of related organisms, supporting study of subtle, strain-specific variations as a determinant of function. Such data collections present fresh and complex challenges for bioinformatics, those of comparing models of complex relationships across hundreds and even thousands of sequences. Transcriptional Regulatory Network (TRN) structures document the influence of regulatory proteins called Transcription Factors (TFs) on associated Target Genes (TGs). TRNs are routinely inferred from model systems or iterative search, and analysis at these scales requires simultaneous displays of multiple networks well beyond thosemore » of existing network visualisation tools [1]. In this paper we describe TRNDiff, an open source system supporting the comparative analysis and visualization of TRNs (and similarly structured data) from many genomes, allowing rapid identification of functional variations within species. The approach is demonstrated through a small scale multiple TRN analysis of the Fur iron-uptake system of Yersinia, suggesting a number of candidate virulence factors; and through a larger study exploiting integration with the RegPrecise database (http://regprecise.lbl.gov; [2]) - a collection of hundreds of manually curated and predicted transcription factor regulons drawn from across the entire spectrum of prokaryotic organisms.« less

  16. Regulatory elements of the floral homeotic gene AGAMOUS identified by phylogenetic footprinting and shadowing.

    SciTech Connect

    Hong, R. L., Hamaguchi, L., Busch, M. A., and Weigel, D.

    2003-06-01

    OAK-B135 In Arabidopsis thaliana, cis-regulatory sequences of the floral homeotic gene AGAMOUS (AG) are located in the second intron. This 3 kb intron contains binding sites for two direct activators of AG, LEAFY (LFY) and WUSCHEL (WUS), along with other putative regulatory elements. We have used phylogenetic footprinting and the related technique of phylogenetic shadowing to identify putative cis-regulatory elements in this intron. Among 29 Brassicaceae, several other motifs, but not the LFY and WUS binding sites previously identified, are largely invariant. Using reporter gene analyses, we tested six of these motifs and found that they are all functionally important for activity of AG regulatory sequences in A. thaliana. Although there is little obvious sequence similarity outside the Brassicaceae, the intron from cucumber AG has at least partial activity in A. thaliana. Our studies underscore the value of the comparative approach as a tool that complements gene-by-gene promoter dissection, but also highlight that sequence-based studies alone are insufficient for a complete identification of cis-regulatory sites.

  17. DOE regulatory reform initiative vitrified mixed waste

    SciTech Connect

    Carroll, S.J.; Holtzscheiter, E.W.; Flaherty, J.E.

    1997-12-31

    The US Department of Energy (DOE) is charged with responsibly managing the largest volume of mixed waste in the United States. This responsibility includes managing waste in compliance with all applicable Federal and State laws and regulations, and in a cost-effective, environmentally responsible manner. Managing certain treated mixed wastes in Resource Conservation and Recovery Act (RCRA) permitted storage and disposal units (specifically those mixed wastes that pose low risks from the hazardous component) is unlikely to provide additional protection to human health and the environment beyond that afforded by managing these wastes in storage and disposal units subject to requirements for radiological control. In October, 1995, the DOE submitted a regulatory reform proposal to the Environmental Protection Agency (EPA) relating to vitrified mixed waste forms. The technical proposal supports a regulatory strategy that would allow vitrified mixed waste forms treated through a permit or other environmental compliance mechanism to be granted an exemption from RCRA hazardous waste regulation, after treatment, based upon the inherent destruction and immobilization capabilities of vitrification technology. The vitrified waste form will meet, or exceed the performance criteria of the Environmental Assessment (EA) glass that has been accepted as an international standard for immobilizing radioactive waste components and the LDR treatment standards for inorganics and metals for controlling hazardous constituents. The proposal further provides that vitrified mixed waste would be responsibly managed under the Atomic Energy Act (AEA) while reducing overall costs. Full regulatory authority by the EPA or a State would be maintained until an acceptable vitrified mixed waste form, protective of human health and the environment, is produced.

  18. Nuclear Regulatory Commission's antitrust review process: an analysis of the impacts

    SciTech Connect

    Not Available

    1981-06-01

    The Nuclear Regulatory Commission's (NRC) antitrust process is reviewed and its impacts to small systems and applicant systems are studied. This process takes the form of a description of the NRC's antitrust review process as implemented, a generic categorization of potential impacts and individual case-by-case studies of four different utilities.

  19. Understanding the Energy Policy and Regulatory Environment

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Understanding the Energy Policy & Regulatory Environment May 4, 2016 11:00 am - 12:30 PM MDT Tribal Energy Development Operation and Management Best Practices 2 Todays Presenters * Randy Manion Manion@wapa.gov * Doug MacCourt Douglas.Maccourt@hq.doe.gov * Sarai Geary, Sarai.geary@hq.doe.gov * Jana Ganion, jana.ganion@bluelakerancheria- nsn.gov * Theresa Cole, tcole@aha-nsn.gov 3 Questions * Answers to all questions submitted electronically during today's webinar will be posted on DOE's OIE

  20. Regulatory Approaches for Solid Radioactive Waste Storage in Russia

    SciTech Connect

    Griffith, A.; Testov, S.; Diaschev, A.; Nazarian, A.; Ustyuzhanin, A.

    2003-02-26

    The Russian Navy under the Arctic Military Environmental Cooperation (AMEC) Program has designated the Polyarninsky Shipyard as the regional recipient for solid radioactive waste (SRW) pretreatment and storage facilities. Waste storage technologies include containers and lightweight modular storage buildings. The prime focus of this paper is solid radioactive waste storage options based on the AMEC mission and Russian regulatory standards. The storage capability at the Polyarninsky Shipyard in support of Mobile Pretreatment Facility (MPF) operations under the AMEC Program will allow the Russian Navy to accumulate/stage the SRW after treatment at the MPF. It is anticipated that the MPF will operate for 20 years. This paper presents the results of a regulatory analysis performed to support an AMEC program decision on the type of facility to be used for storage of SRW. The objectives the study were to: analyze whether a modular storage building (MSB), referred in the standards as a lightweight building, would comply with the Russian SRW storage building standard, OST 95 10517-95; analyze the Russian SRW storage pad standard OST 95 10516-95; and compare the two standards, OST 95 10517-95 for storage buildings and OST 95 10516-95 for storage pads.

  1. Identifying Synonymous Regulatory Elements in Vertebrate Genomes

    SciTech Connect

    Ovcharenko, I; Nobrega, M A

    2005-02-07

    Synonymous gene regulation, defined as driving shared temporal and/or spatial expression of groups of genes, is likely predicated on genomic elements that contain similar modules of certain transcription factor binding sites (TFBS). We have developed a method to scan vertebrate genomes for evolutionary conserved modules of TFBS in a predefined configuration, and created a tool, named SynoR that identify synonymous regulatory elements (SREs) in vertebrate genomes. SynoR performs de novo identification of SREs utilizing known patterns of TFBS in active regulatory elements (REs) as seeds for genome scans. Layers of multiple-species conservation allow the use of differential phylogenetic sequence conservation filters in the search of SREs and the results are displayed as to provide an extensive annotation of genes containing detected REs. Gene Ontology categories are utilized to further functionally classify the identified genes, and integrated GNF Expression Atlas 2 data allow the cataloging of tissue-specificities of the predicted SREs. We illustrate how this new tool can be used to establish a linkage between human diseases and noncoding genomic content. SynoR is publicly available at http://synor.dcode.org.

  2. MHI Comments to DOE-Regulatory Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    MHI Comments to DOE-Regulatory Review MHI Comments to DOE-Regulatory Review On behalf of the Manufactured Housing Institute (MHI) I am pleased to respond to the Department of Energy's (DOE's) May 15, 2012 request for comments and information regarding regulations that should be modified, streamlined, expanded, or repealed as a part of its implementation of Executive Order 13563, "Improving Regulation and Regulatory Review," issued by the President on January 18, 2011.

  3. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Development - 2016/17; April 12, 2016 | Department of Energy CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 Work Plan and Development 2016-04-12 (207.15 KB) More Documents & Publications Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards North America Energy

  4. Environmental sciences division: Environmental regulatory update table July 1988

    SciTech Connect

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-08-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  5. Environmental Regulatory Update Table, March/April 1993. Revision 1

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bimonthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  6. Environmental Regulatory Update Table, January--February 1993

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  7. Environmental regulatory update table, September--October 1992

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  8. Environmental Regulatory Update Table, March/April 1993

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bimonthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  9. Environmental Regulatory Update Table, May/June 1993

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-07-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bimonthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  10. Environmental Regulatory Update Table July/August 1993

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-09-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  11. Environmental Regulatory Update Table, July--August 1992

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-09-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  12. Environmental Regulatory Update Table, January/February 1992

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1992-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action. This table is for January/February 1992.

  13. Environmental Regulatory Update Table, November--December 1992

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1993-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly wit information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  14. Environmental Regulatory Update Table, September/October 1993

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operation and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  15. Environmental Regulatory Update Table, November--December 1993

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1994-01-01

    The Environmental Regulatory Update Table provides information on regulatory of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  16. Environmental Regulatory Update Table, May--June 1994

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Salk, M.S.

    1994-07-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bimonthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  17. Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (4/93) United States Government Department of Energy Memorandum DATE: November 9, 2010 REPLY TO ATTN TO: IG-34 (A10FN002) SUBJECT: Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: Chairman, Federal Energy Regulatory Commission The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) Fiscal Year 2010 balance sheet and the related

  18. Federal / State Legislative & Regulatory Changes Required for Introduction

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of E15 | Department of Energy / State Legislative & Regulatory Changes Required for Introduction of E15 Federal / State Legislative & Regulatory Changes Required for Introduction of E15 Overview EPA Waiver Decision E15 Implementation Issues Federal and State Blending Restrictions Action by ASTM / NCWM to address higher ethanol blends Federal / State Legislative & Regulatory Changes Required for Introduction of E15 (2.81 MB) More Documents & Publications Vehicle Certification

  19. Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit OAS-FS-15-05 December 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 17, 2014 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Federal Energy Regulatory

  20. Environmental regulatory update table: September/October 1994

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Salk, M.S.

    1994-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  1. Environmental regulatory update table, March--April 1994

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Salk, M.S.

    1994-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  2. Environmental Regulatory Update Table, January--February 1994

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1994-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations ad contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  3. Environmental Regulatory Update Table, March/April 1992

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1992-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  4. Information resources in state regulatory agencies-a California perspective

    SciTech Connect

    DiZio, S.M.

    1990-12-31

    Various state regulatory agencies have expressed a need for networking with information gatherers/researchers to produce a concise compilation of primary information so that the basis for regulatory standards can be scientifically referenced. California has instituted several programs to retrieve primary information, generate primary information through research, and generate unique regulatory standards by integrating the primary literature and the products of research. This paper describes these programs.

  5. Environmental regulatory update table, July/August 1994

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Salk, M.S.

    1994-09-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  6. Environmental regulatory update table November--December 1994

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Mayer, S.J.; Salk, M.S.

    1995-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  7. Comments from The National Association of Regulatory Utility Commissioners

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (NARUC) on the Smart Grid RFI | Department of Energy from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI Comments from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI The National Association of Regulatory Utility Commissioners (NARUC) appreciates the opportunity to provide comments to the Department of Energy (DOE) on this Request for Information (RFI) regarding the policy and logistical challenges of the

  8. Canada-United States Regulatory Cooperation Council Webinar: Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Approach for Energy Efficiency Standards | Department of Energy Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards This is a presentation from the January 12, 2015 Canada-United States Regulatory Cooperation Council webinar for Natural Resources Canada and the US Department of Energy regarding a proposed approach for energy

  9. Summary Report on Industrial and Regulatory Engagement Activities |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Report on Industrial and Regulatory Engagement Activities Summary Report on Industrial and Regulatory Engagement Activities The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and

  10. A Mineralogical Petrographic And Geochemical Study Of Samples...

    OpenEI (Open Energy Information) [EERE & EIA]

    Mineralogical Petrographic And Geochemical Study Of Samples From Wells In The Geothermal Field Of Milos Island (Greece) Jump to: navigation, search OpenEI Reference LibraryAdd to...

  11. Active System For Monitoring Volcanic Activity- A Case Study...

    OpenEI (Open Energy Information) [EERE & EIA]

    For Monitoring Volcanic Activity- A Case Study Of The Izu-Oshima Volcano, Central Japan Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article:...

  12. Geophysical Studies in the Vicinity of Blue Mountain and Pumpernickel...

    OpenEI (Open Energy Information) [EERE & EIA]

    Studies in the Vicinity of Blue Mountain and Pumpernickel Valley near Winnemucca, North-Central Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Report:...

  13. An Oxygen Isotope Study Of Silicates In The Larderello Geothermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    Silicates In The Larderello Geothermal Field, Italy Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: An Oxygen Isotope Study Of Silicates In The...

  14. A Geological and Geophysical Study of Chena Hot Springs, Alaksa...

    OpenEI (Open Energy Information) [EERE & EIA]

    Alaksa Jump to: navigation, search OpenEI Reference LibraryAdd to library M.Sc. Thesis: A Geological and Geophysical Study of Chena Hot Springs, AlaksaThesisDissertation...

  15. Daniel Cohen Assistant General Counsel for Legislation and Regulatory...

    Energy Saver

    Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law Office of the General Counsel Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0121 ...

  16. Daniel Cohen Assistant General Counsel for Legislation and Regulatory...

    Energy Saver

    2, 2014 Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law Office of the General Counsel Department of Energy 1000 Independence Avenue, SW Washington, DC ...

  17. Federal Bulk Transmission Regulatory Roadmapping | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Federal Bulk Transmission Regulatory Roadmapping Home > Features > Groups Content Group Activity By term Q & A Feeds Content type Blog entry Discussion Document Event Poll...

  18. Codes and standards and other guidance cited in regulatory documents

    SciTech Connect

    Nickolaus, J.R.; Vinther, R.W.; Maguire-Moffitt, N.E.; Hammer, J.A.; Sherfey, L.L.; Warner, R.D. )

    1993-01-01

    As part of the US Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program, Pacific Northwest Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. This listing identifies the version of the code or standard cited in the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and NRC's Bulletins, Information Notices, Circulars, Generic Letters, Policy Statements, Regulatory Guides, and Standard Review Plan (NUREG-08000).

  19. Codes and standards and other guidance cited in regulatory documents

    SciTech Connect

    Nickolaus, J.R.; Vinther, R.W.; Maguire-Moffitt, N.E.; Hammer, J.A.; Sherfey, L.L.; Warner, R.D.

    1993-01-01

    As part of the US Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program, Pacific Northwest Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. This listing identifies the version of the code or standard cited in the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and NRC`s Bulletins, Information Notices, Circulars, Generic Letters, Policy Statements, Regulatory Guides, and Standard Review Plan (NUREG-08000).

  20. ORISE: U.S. Nuclear Regulatory Commission Radiation Exposure...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Information and Reporting System (REIRS) The U.S. Nuclear Regulatory Commission (NRC) is required by federal mandate to maintain and evaluate radiation protection data for...

  1. Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)

    SciTech Connect

    Young, K.

    2014-04-01

    Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.

  2. Hydropower Regulatory Efficiency Act of 2013 | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- BillBill: Hydropower Regulatory Efficiency Act of 2013Legal Abstract Amends statutory provisions related...

  3. Regulatory Roadmap Workshop for Federal Bulk Transmission Regulations...

    OpenEI (Open Energy Information) [EERE & EIA]

    for bulk transmission. Date: Tuesday, 29 July, 2014 - 09:30 - 15:30 Location: NREL Education Center Auditorium Golden, Colorado Groups: Federal Bulk Transmission Regulatory...

  4. Safety and Regulatory Structure for CNG, CNG-Hydrogen, Hydrogen...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hydrogen, Hydrogen Vehicles and Fuels in China Safety and Regulatory Structure for CNG, CNG-Hydrogen, Hydrogen Vehicles and Fuels in China Presentation given by Jinyang Zheng of ...

  5. Gregory H. Friedman: Before the Subcommittee on Regulatory Affairs...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    U.S. House of Representatives Gregory H. Friedman: Before the Subcommittee on Regulatory ... Representatives Statement of Gregory H. Friedman, Inspector General, U.S. Department of ...

  6. Regulatory and Financial Reform of Federal Research Policy: Recommenda...

    Office of Environmental Management (EM)

    for regulatory reform that would improve research universities' ability to carry out their missions without requiring a significant financial investment by the Federal government. ...

  7. Nevada Meeting #2 - Regulatory Issues | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Nevada Meeting 2 - Regulatory Issues Home > Blogs > Kyoung's blog Kyoung's picture Submitted by Kyoung(150) Contributor 2 August, 2012 - 18:43 water + monitoring + Nevada +...

  8. Thoughts after the Geothermal Regulatory Roadmap Advisory Meeting...

    OpenEI (Open Energy Information) [EERE & EIA]

    Thoughts after the Geothermal Regulatory Roadmap Advisory Meeting Home > Blogs > Twnrel's blog Twnrel's picture Submitted by Twnrel(12) Member 23 July, 2012 - 11:51 meetings +...

  9. Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory...

    Office of Legacy Management (LM)

    111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W ...

  10. Comments on Request For Information regarding Reducing Regulatory...

    Office of Environmental Management (EM)

    In the Department of Energy"s (DOE) attempt to meet its obligation to implement Executive Order 13563, ""Improving Regulation and Regulatory Review,"" issued by the President on ...

  11. Edison Electric Institute (EEI) Reducing Regulatory Burden RFI...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    request for information (RFI) issued by the Department of Energy (DOE). ... 5-29-12.pdf More Documents & Publications Edison Electric Institute (EEI) Regulatory Burden RFI, 77 ...

  12. 33 CFR 320: General Regulatory Policies | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Retrieved from "http:en.openei.orgwindex.php?title33CFR320:GeneralRegulatoryPolicies&oldid890296" Feedback Contact needs updating Image needs updating Reference...

  13. Texas - PUC - Public Utility Regulatory Act | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Act (2011). Retrieved from "http:en.openei.orgwindex.php?titleTexas-PUC-PublicUtilityRegulatoryAct&oldid800942" Feedback Contact needs updating Image needs...

  14. Public Utility Regulatory Act - Texas | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    http:crossref.org Citation Retrieved from "http:en.openei.orgwindex.php?titlePublicUtilityRegulatoryAct-Texas&oldid792167" Feedback Contact needs updating...

  15. NAESCO Comments on Reducing Regulatory Burden RFI Final

    Office of Energy Efficiency and Renewable Energy (EERE)

    The National Association of Energy Service Companies (NAESCO) appreciates the opportunity to submit these comments in response to the Request for Information (RFI) entitled, “Reducing Regulatory...

  16. JUMP | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in September 2015, ORNL's new crowdsourcing initiative ... and ORNL to provide in-kind technical support and cash ... Lab-Corps, which builds on the National Science Foundation's ...

  17. Regulatory Review of Early Site Permit Applications

    SciTech Connect

    Scott, Michael L.

    2004-07-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  18. Approach of Czech regulatory body to LBB

    SciTech Connect

    Tendera, P.

    1997-04-01

    At present there are two NPPs equipped with PWR units in Czech Republic. The Dukovany, NPP is about ten years in operation (four units 440 MW - WWBFL model 213) and Tomelin NPP is under construction (two units 1000 MW - WWER model 320). Both NPPs were built to Soviet design and according to Soviet regulations and standards but most of equipment for primary circuits was supplied by home manufacturers. The objective of the Czech LBB program is to prove the LBB status of the primary piping systems of there NPPs and the LBB concept is a part of strategy to meet western style safety standards. The reason for the Czech LBB project is a lack of some standard safety Facilities too. For both Dukovany and Tomelin NPPs a full LBB analysis should be carried out. The application of LBB to the piping system should be also a cost effective means to avoid installations of pipe whip restraints and jet shields. The Czech regulatory body issued non-mandatory requirement, {open_quotes}Leak Before Break{close_quotes} which is in compliance with national legal documents and which is based on the US NRC Regulatory Procedures and US standards (ASMF CODE, ANSI). The requirement has been published in the document {open_quotes}Safety of Nuclear Facilities{close_quotes} No 1/1991 as {open_quotes}Requirements on the Content and Format of Safety Reports and their Supplements{close_quote} and consist of two parts (1) procedure for obtaining proof of evidence {open_quotes}Leak Before Break{close_quotes} (2) leak detection systems for the pressurized reactor primary circuit. At present some changes concerning both parts of the above document will be introduced. The reasons for this modifications will be presented.

  19. Approach for Czech regulatory body to LBB

    SciTech Connect

    Tendera, P.

    1997-04-01

    At present there are two NPPs equipped with PWR units in Czech Republic. The Dukovany NPP is about ten years in operation (four units 440 MW - WWER model 213) and Temelin NPP is under construction (two units 1000 MW-WWER model 320). Both NPPs were built to Soviet design and according to Soviet regulations and standards but most of equipment for primary circuits was supplied by home manufactures. The objective for the Czech LBB programme is to prove the LBB status of the primary piping systems of these NPPs and the LBB concept is a part of strategy to meet western style safety standards. The reason for the Czech LBB project is a lack of some standard safety facilities, too. For both Dukovany and Temolin NPPs a full LBB analysis should be carried out. The application of LBB to the piping system should be also a cost effective means to avoid installations of pipe whip restraints and jet shields. The Czech regulatory body issued non-mandatory requirement {open_quotes}Leak Before Break{close_quotes} which is in compliance with national legal documents and which is based on the US NRC Regulatory Procedures and US standards (ASME, CODE, ANSI). The requirement has been published in the document {open_quotes}Safety of Nuclear Facilities{close_quotes} No. 1/1991 as {open_quotes}Requirements on the Content and Format of Safety Reports and their Supplements{close_quotes} and consists of two parts (1) procedure for obtaining proof of evidence {open_quotes}Leak Before Break{close_quotes} (2) leak detection systems for the pressurized reactor primary circuit. At present some changes concerning both parts of the above document will be introduced. The reasons for this modifications will be presented.

  20. Regulatory Burden RFI from Bodine Electric Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bodine Electric Company Regulatory Burden RFI from Bodine Electric Company The following is a response from Bodine Electric Company on unnecessarily burdensome regulations involving Energy Conservation Standards for Small Electric Vehicles. Bodine Electric Company Comment.PDF (33.6 KB) More Documents & Publications Consumer Electronics Association Comments Consumer Electronics Association Comment Regulatory Burden RFI from AHRI

  1. World Bank-Morocco Study on the Impact of Climate Change on the...

    OpenEI (Open Energy Information) [EERE & EIA]

    Morocco Study on the Impact of Climate Change on the Agricultural Sector Jump to: navigation, search Name World Bank-Morocco Study on the Impact of Climate Change on the...

  2. Codes and standards and other guidance cited in regulatory documents

    SciTech Connect

    Nickolaus, J.R.; Bohlander, K.L.

    1996-08-01

    As part of the U.S. Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program (SRP-UDP), Pacific Northwest National Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. The SRP-UDP has been completed and the SRP-Maintenance Program (SRP-MP) is now maintaining this listing. Besides updating previous information, Revision 3 adds approximately 80 citations. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Enforcement Manual, Generic Letters, Inspection Manual, Policy Statements, Regulatory Guides, Standard Technical Specifications and the Standard Review Plan (NUREG-0800).

  3. Smart Grid Legislative and Regulatory Policies and Case Studies

    Reports and Publications

    2011-01-01

    In recent years, a number of U.S. states have adopted or are considering smart grid related laws, regulations, and voluntary or mandatory requirements. At the same time, the number of smart grid pilot projects has been increasing rapidly. The Energy Information Administration (EIA) commissioned SAIC to research the development of smart grid in the United States and abroad. The research produced several documents that will help guide EIA as it considers how best to track smart grid developments.

  4. Mini Grid Renewable Energy-Policy and Regulatory Studies | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Alex Sundakov, Castalia Strategic Advisors "The Marginalization of "Small is Beautiful": Micro-hydroelectricity, Common Property, and the Polities of Rural Electricity Provision...

  5. Future trends and issues in regulatory takings

    SciTech Connect

    Allbright, M.P.

    1995-12-01

    This paper will complement that delivered by Thomas root by following his historical analysis of the Fifth Amendment through recent case law with an analysis of regulatory taking through environmental statutes. The discussion will center on takings of water rights through application of the Clean Water Act and the Threatened and Endangered Species Act. Although the examples used will be hypothetical, they will be based upon factual situations. Some of the issues presented for consideration will be an examination of standing of municipalities and corporations under the Fifth Amendment, federal and state legislation impacting the judicial trend toward reviving the Fifth Amendment, budgetary considerations, and convergence from focus on real property to other types of property. The author will also discuss the judicial trend in the Fifth Amendment cases from reliance on federal power to regulate to financial impact on real property resulting from regulation, and the potential for a return to the analysis of the power to regulate through a resurrection of the Tenth Amendment limitation of powers.

  6. Alternative multimedia regulatory programs for next-generation refineries

    SciTech Connect

    Elcock, D.; Gasper, J.; Arguerro, R.; Emerson, D.

    2000-06-22

    The 25-year-old command-and-control environmental regulatory structure in the US has resulted in significant environmental improvements. Recently, however, its limitations (e.g., rigid application regardless of site-specific conditions, disregard of cross-media and multimedia impacts, limited incentives for new technology development and use) have become increasingly apparent. New regulatory approaches that recognize current and anticipated economic constraints, new knowledge of environmental processes and impacts, and the benefits of new technologies are needed. Such approaches could be especially important for the US petroleum refining industry. This industry operates under thin profit margins, releases chemicals that can produce adverse health and environmental impacts, and must meet the technological challenges of producing more highly refined fuels from poorer quality feedstocks. Under a grant from the Environmental Technology Initiative (ETI), Argonne National Laboratory and its subcontractor, Analytical Services, Inc. developed two alternative environmental regulatory programs for next-generation petroleum refineries. (In this report, next-generation refineries refers to the refineries of today as they operate in the next 20 or more years rather than to fully reengineered future refineries.) The objective of the ETI refinery project was to develop future-oriented regulatory programs for next-generation refineries that will expand the use of innovative technologies, encourage pollution prevention, demonstrate environmental responsibility, and maintain refinery economic performance. Rather than suggesting targeted, short-term modifications to existing media-specific command-and-control regulations, the ETI project suggests the use of new approaches that are broader and more flexible. It recognizes that giving refineries flexibility in meeting environmental protection goals can stimulate new technology development and use. Unlike most US Environmental

  7. Techniques for analyzing the impacts of certain electric-utility ratemaking and regulatory-policy concepts. Regulatory laws and policies. [State by state

    SciTech Connect

    1980-08-01

    This report is a legal study prepared to provide a review of the substantive and procedural laws of each regulatory jurisdiction that may affect implementation of the PURPA standards, and to summarize the current state of consideration and implementation of policies and rate designs similar or identical to the PURPA standards by state regulatory agencies and nonregulated utilities. This report is divided into three sections. The first section, the Introduction, summarizes the standards promulgated by PURPA and the results of the legal study. The second section, State Regulatory Law and Procedure, summarizes for each state or other ratemaking jurisdiction: (1) general constitutional and statutory provisions affecting utility rates and conditions of service; (2) specific laws or decisions affecting policy or rate design issues covered by PURPA standards; and (3) statutes and decisions governing administrative procedures, including judicial review. A chart showing actions taken on the policy and rate design issues addressed by PURPA is also included for each jurisdiction, and citations to relevant authorities are presented for each standard. State statutes or decisions that specifically define a state standard similar or identical to a PURPA standard, or that refer to one of the three PURPA objectives, are noted. The third section, Nonregulated Electric Utilities, summarizes information available on nonregulated utilities, i.e., publicly or cooperatively owned utilities which are specifically exempted from state regulation by state law.

  8. Single nucleotide polymorphism in transcriptional regulatory regions and expression of environmentally responsive genes

    SciTech Connect

    Wang, Xuting; Tomso, Daniel J.; Liu Xuemei; Bell, Douglas A. . E-mail: BELL1@niehs.nih.gov

    2005-09-01

    Single nucleotide polymorphisms (SNPs) in the human genome are DNA sequence variations that can alter an individual's response to environmental exposure. SNPs in gene coding regions can lead to changes in the biological properties of the encoded protein. In contrast, SNPs in non-coding gene regulatory regions may affect gene expression levels in an allele-specific manner, and these functional polymorphisms represent an important but relatively unexplored class of genetic variation. The main challenge in analyzing these SNPs is a lack of robust computational and experimental methods. Here, we first outline mechanisms by which genetic variation can impact gene regulation, and review recent findings in this area; then, we describe a methodology for bioinformatic discovery and functional analysis of regulatory SNPs in cis-regulatory regions using the assembled human genome sequence and databases on sequence polymorphism and gene expression. Our method integrates SNP and gene databases and uses a set of computer programs that allow us to: (1) select SNPs, from among the >9 million human SNPs in the NCBI dbSNP database, that are similar to cis-regulatory element (RE) consensus sequences; (2) map the selected dbSNP entries to the human genome assembly in order to identify polymorphic REs near gene start sites; (3) prioritize the candidate polymorphic RE containing genes by searching the existing genotype and gene expression data sets. The applicability of this system has been demonstrated through studies on p53 responsive elements and is being extended to additional pathways and environmentally responsive genes.

  9. Development of Bioinformatic and Experimental Technologies for Identification of Prokaryotic Regulatory Networks

    SciTech Connect

    Lawrence, Charles E; McCue, Lee Ann

    2008-07-31

    The transcription regulatory network is arguably the most important foundation of cellular function, since it exerts the most fundamental control over the abundance of virtually all of a cell’s functional macromolecules. The two major components of a prokaryotic cell’s transcription regulation network are the transcription factors (TFs) and the transcription factor binding sites (TFBS); these components are connected by the binding of TFs to their cognate TFBS under appropriate environmental conditions. Comparative genomics has proven to be a powerful bioinformatics method with which to study transcription regulation on a genome-wide level. We have further extended comparative genomics technologies that we introduced over the last several years. Specifically, we developed and applied statistical approaches to analysis of correlated sequence data (i.e., sequences from closely related species). We also combined these technologies with functional genomic, proteomic and sequence data from multiple species, and developed computational technologies that provide inferences on the regulatory network connections, identifying the cognate transcription factor for predicted regulatory sites. Arguably the most important contribution of this work emerged in the course of the project. Specifically, the development of novel procedures of estimation and prediction in discrete high-D settings has broad implications for biology, genomics and well beyond. We showed that these procedures enjoy advantages over existing technologies in the identification of TBFS. These efforts are aimed toward identifying a cell’s complete transcription regulatory network and underlying molecular mechanisms.

  10. Aug. 31 Webinar to Focus on Project Regulatory Considerations | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Aug. 31 Webinar to Focus on Project Regulatory Considerations Aug. 31 Webinar to Focus on Project Regulatory Considerations August 23, 2016 - 11:43am Addthis The U.S. Department of Energy Office of Indian Energy, in partnership with Western Area Power Administration, is hosting a free webinar on "Project Regulatory Considerations" Wednesday, Aug. 31, from 11 a.m. to 12:30 p.m. Mountain Daylight Time. Attendees will get an overview of the many permitting and project

  11. Energy Praises the Nuclear Regulatory Commission Approval of the First

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    United States Nuclear Plant Site in Over 30 Years | Department of Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years March 8, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today commended the Nuclear Regulatory Commission's decision to approve the first-ever Early Site

  12. Environmental Regulatory Update Table, May/June 1992

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-07-01

    This report contains a bi-monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. Any proposed regulation that raises significant issues for any DOE operation should be reported to the Office of Environmental Guidance (EH-23) as soon as possible so that the Department can make its concerns known to the appropriate regulatory agency. Items of particular interest to EH-23 are indicated by a shading of the RU{number sign}.

  13. Environmental Regulatory Update Table, May/June 1992

    SciTech Connect

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-07-01

    This report contains a bi-monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. Any proposed regulation that raises significant issues for any DOE operation should be reported to the Office of Environmental Guidance (EH-23) as soon as possible so that the Department can make its concerns known to the appropriate regulatory agency. Items of particular interest to EH-23 are indicated by a shading of the RU{number_sign}.

  14. TRUPACT-II, a regulatory perspective

    SciTech Connect

    Gregory, P.C.; Spooner, O.R.

    1995-12-31

    The Transuranic Package Transporter II (TRUPACT-II) is a US Nuclear Regulatory Commission (NRC) certified Type B packaging for the shipment of contact-handled transuranic (CH-TRU) material by the US Department of Energy (DOE). The NRC approved the TRUPACT-II design as meeting the requirements of Title 10, Code of Federal Regulations, Part 71 (10 CFR 71) and issued Certificate of Compliance (CofC) Number 9218 to the DOE. There are currently 15 certified TRUPACT-IIs. Additional TRUPACT-IIs will be required to make more than 15,000 shipments of CH-TRU waste to the Waste Isolation Pilot Plant (WIPP) site near Carlsbad, New Mexico. The TRUPACT-II may also be used for the DOE inter-site and intra-site shipments of CH-TRU waste. The Land Withdrawal Act (Public Law 102-579), enacted by the US Congress, October 30, 1992, and an agreement between the DOE and the State of New Mexico, signed August 4, 1987, both stipulate that only NRC approved packaging may be used for shipments of TRU waste to the WIPP. Early in the TRUPACT-II development phase it was decided that the transportation system (tractor, trailer, and TRUPACT-II) should be highway legal on all routes without the need for oversize and/or overweight permits. In large measure, public acceptance of the DOE`s efforts to safely transport CH-TRU waste depends on the public`s perception that the TRUPACT-II is in compliance with all applicable regulations, standards, and quality assurance requirements. This paper addresses some of the numerous regulations applicable to Type B packaging, and it describes how the TRUPACT-II complies with these regulations.

  15. Regulatory and extra-regulatory testing to demonstrate radioactive material packaging safety

    SciTech Connect

    Ammerman, D.J.

    1997-06-01

    Packages for the transportation of radioactive material must meet performance criteria to assure safety and environmental protection. The stringency of the performance criteria is based on the degree of hazard of the material being transported. Type B packages are used for transporting large quantities of radioisotopes (in terms of A{sub 2} quantities). These packages have the most stringent performance criteria. Material with less than an A{sub 2} quantity are transported in Type A packages. These packages have less stringent performance criteria. Transportation of LSA and SCO materials must be in {open_quotes}strong-tight{close_quotes} packages. The performance requirements for the latter packages are even less stringent. All of these package types provide a high level of safety for the material being transported. In this paper, regulatory tests that are used to demonstrate this safety will be described. The responses of various packages to these tests will be shown. In addition, the response of packages to extra-regulatory tests will be discussed. The results of these tests will be used to demonstrate the high level of safety provided to workers, the public, and the environment by packages used for the transportation of radioactive material.

  16. Nuclear Regulatory Commission Handling of Beyond Design Basis Events for Nuclear Power Reactors

    Energy.gov [DOE]

    Presenter: Bill Reckley, Chief, Policy and Support Branch, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission US Nuclear Regulatory Commission

  17. Comment On: DOE-HQ-2011-0014-0001 Reducing Regulatory Burden | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Comments on reducing regulatory burden. Comment On: DOE-HQ-2011-0014-0001 Reducing Regulatory Burden (114.8

  18. Regulatory Burden RFI Executive Order 13563 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The situation we described last year (see below) has not improved. We are waiting for additional rules from DOE but don't believe they'll provide the needed relief from regulatory ...

  19. Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012)

    Energy.gov [DOE]

    The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012).

  20. The Office of Fossil Energy Natural Gas Regulatory Activities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3, 2015 The Office of Fossil Energy Natural Gas Regulatory Activities U.S. Department of Energy Attention: Larine Moore, Docket Room Manager Docket Room FE-34 P.0. Box 44375 ...

  1. The Office of Fossil Energy Natural Gas Regulatory Activities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    September 25, 2014 The Office of Fossil Energy Natural Gas Regulatory Activities U.S. Department of Energy Attention: Larine Moore, Docket Room Manager Docket Room FE-34 P.O. Box ...

  2. The Office of Fossil Energy Natural Gas Regulatory Activities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 The Office of Fossil Energy Natural Gas Regulatory Activities U.S. Department of Energy Attention: Larine Moore, Docket Room Manager Docket Room FE-34 P.O. Box 44375 Washington, ...

  3. Public Utility Regulatory Policies Act of 1978 (PURPA) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TVA is deemed to be the State regulatory authority for those electric utilities over which ... The reader may thus wish to consult two non-DOE guides that explain and interpret PURPA as ...

  4. NEMA Comments on DOE Reducing Regulatory Burden RFI

    Office of Energy Efficiency and Renewable Energy (EERE)

    The National Electrical Manufacturers Association (NEMA) thanks you for the opportunity to provide comments on the Department of Energy’s efforts to make its regulatory program more effective and...

  5. Regulatory guidance for lightning protection in nuclear power plants

    SciTech Connect

    Kisner, R. A.; Wilgen, J. B.; Ewing, P. D.; Korsah, K.; Antonescu, C. E.

    2006-07-01

    Oak Ridge National Laboratory (ORNL) was engaged by the U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) to develop the technical basis for regulatory guidance to address design and implementation practices for lightning protection systems in nuclear power plants (NPPs). Lightning protection is becoming increasingly important with the advent of digital and low-voltage analog systems in NPPs. These systems have the potential to be more vulnerable than older analog systems to the resulting power surges and electromagnetic interference (EMI) when lightning strikes facilities or power lines. This paper discusses the technical basis for guidance to licensees and applicants covered in Regulatory Guide (RG) 1.204, Guidelines for Lightning Protection of Nuclear Power Plants, issued August 2005. RG 1.204 describes guidance for practices that are acceptable to the NRC staff for protecting nuclear power structures and systems from direct lightning strikes and the resulting secondary effects. (authors)

  6. Developing consensus in response to regulatory change: a survival strategy

    SciTech Connect

    McAllister, J.E.

    1985-11-01

    For several years now, the nuclear industry has implemented basic regulatory guides and pursued evolving incremental changes by de facto execution of US Nuclear Regulatory Commission codes or in anticipation of them. The purpose of this paper is to describe a consensus-building process recently employed by industry representatives to respond to changes to 10CFR55, Operator's Licenses and Conforming Amendment. This process resulted from the necessity for industry stakeholders to evaluate the impact of pending regulatory change. It also highlighted the need for more dialogue in the industry and the potential of expanding links with academic representatives. In addition, the paper reports participants; documentation of unnecessary regulatory constraint and vagueness of new terminology and requirements.

  7. Regulatory Guidance for Lightning Protection in Nuclear Power Plants

    SciTech Connect

    Kisner, Roger A; Wilgen, John B; Ewing, Paul D; Korsah, Kofi; Antonescu, Christina E

    2006-01-01

    Abstract - Oak Ridge National Laboratory (ORNL) was engaged by the U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) to develop the technical basis for regulatory guidance to address design and implementation practices for lightning protection systems in nuclear power plants (NPPs). Lightning protection is becoming increasingly important with the advent of digital and low-voltage analog systems in NPPs. These systems have the potential to be more vulnerable than older analog systems to the resulting power surges and electromagnetic interference (EMI) when lightning strikes facilities or power lines. This paper discusses the technical basis for guidance to licensees and applicants covered in Regulatory Guide (RG) 1.204, Guidelines for Lightning Protection of Nuclear Power Plants, issued August 2005. RG 1.204 describes guidance for practices that are acceptable to the NRC staff for protecting nuclear power structures and systems from direct lightning strikes and the resulting secondary effects.

  8. Alternative future environmental regulatory approaches for petroleum refineries.

    SciTech Connect

    Elcock, D.; Gasper, J.; Moses, D. O.; Emerson, D.; Arguerro, R.; Environmental Assessment; DOE; Analytical Services, Inc.

    2000-01-01

    Recently, many industrial, regulatory, and community leaders have expressed concern that the current environmental regulatory structure disregards multimedia environmental impacts, provides few incentives to develop and use new technologies, and fails to consider site-specific conditions. For the US petroleum refining industry, faced with the need to produce higher-quality fuels from poorer-quality feedstocks, such criticisms are expected to increase. This article offers two alternative environmental regulatory approaches for existing petroleum refineries to use in the future. These alternative approaches are multimedia in scope, provide for new technology development and use, and allow flexibility in the means for meeting environmental goals. They have been reviewed and critiqued by various stakeholders, including industry representatives, regulators, and local and national community and environmental organizations. The integration of stakeholder comments and findings of ongoing national and international regulatory reinvention efforts in the development of these approaches positions them for potential use by other industries in addition to petroleum refineries.

  9. The Office of Fossil Energy Natural Gas Regulatory Activities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    March 24, 2014 The Office of Fossil Energy Natural Gas Regulatory Activities U.S. Department ... Other than as required under the securities laws, Cheniere does not assume a duty to ...

  10. Engineered Nanoparticles- The Department of Energy’s Regulatory Approach

    Energy.gov [DOE]

    On October 14 & 15, Dr. McArthur presented the lecture entitled "Engineered Nanoparticles - The Department of Energy’s Regulatory Approach” at both the Northwest Occupational Health Conference in Bremerton, Washington and the University of Washington in Seattle.

  11. Portsmouth Site Achieves Regulatory Milestone after Successful Controlled Burn

    Energy.gov [DOE]

    PIKETON, Ohio – Portsmouth Gaseous Diffusion Plant firefighters recently completed a prescribed fire, or controlled burn, of an 18-acre prairie at the site, two weeks ahead of a regulatory deadline.

  12. Regulatory analysis of Regulatory Guide 1. 35 (Revision 3, Draft 2): In-service inspection of ungrouted tendons in prestressed concrete containments

    SciTech Connect

    Naus, D.J.

    1987-02-01

    The objectives of this study were to review all the changes in the latest version (Rev. 3, Draft 2) of Regulatory Guide 1.35 and to provide a regulatory analysis for all positions in the guide to determine if it is cost-effective to backfit the guide to the containments of existing plants. To meet these objectives, three tasks were undertaken. The first task outlined containment design criteria, traced the evolution of prestressed concrete containment configurations and prestressing systems, reviewed the history of the development of the guide, and summarized the applicability of the particular versions of the regulatory guide to the 43 nuclear plants that utilize a prestressed concrete containment. Under the second task a comparative regulatory analysis of Rev. 3 (Draft 2) of the guide was developed in which major decision factors affected by the proposed change were identified, and differential risk and cost factors were addressed in relation to the current version of the guide which is in effect (Rev. 2). Finally, under the third task a backfit analysis was conducted in accordance with the requirements of the ''Backfitting'' Rule, Section 50.109 for each of the revised or added positions contained in Rev. 3 (Draft 2). Application of the revision to operating plants will provide consistency in review and a uniform standard for assessing the in-service condition of the ungrouted tendons in prestressed concrete containments. It is concluded that the revisions will have a positive impact on safety and thus lower public risk. Backfitting of the revised guide is possible for most plants licensed since 1974.

  13. Small Business Regulatory Enforcement Fairness Act Download | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Regulatory Enforcement Fairness Act Download Small Business Regulatory Enforcement Fairness Act Download Attachment-1-1-Non-Retaliation-Policy-Internal.pdf (227.36 KB) ONO-SBA-Report-to-Congress-2014.pdf (4.63 MB) More Documents & Publications Federal Acquisition Circular (FAC) 2005-91 The Role of Ombudsmen in Dispute Resolution Human Capital: The Role of Ombudsmen in Dispute Resolution

  14. Computerized fire risk assessment models: A regulatory effectiveness analysis

    SciTech Connect

    Brannigan, V.; Meeks, C.

    1994-10-01

    Computerized fire risk assessment models have been proposed for regulatory use. Regulatory Effectiveness Analysis is a tool which can be used to determine whether the model satisfies the regulator`s legal requirements, and whether it is properly responsive to public judgments of fire safety. Model builders should expect detailed examination of the specifications and data used in the model, and be prepared to show competent verification and validation of the model results.

  15. DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents

    Office of Legacy Management (LM)

    Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011)

  16. Fourth RFI_Comment on Regulatory Review.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    47328 Vol. 77, No. 153 Wednesday, August 8, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties

  17. General Construction and Environmental Regulatory Support at the Los Alamos

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    National Laboratory | Department of Energy General Construction and Environmental Regulatory Support at the Los Alamos National Laboratory General Construction and Environmental Regulatory Support at the Los Alamos National Laboratory The Los Alamos National Laboratory (LANL or the Laboratory) is a multidisciplinary research facility owned by the U.S. Department of Energy (DOE) and managed by Los Alamos National Security, LLC. The Laboratory site covers approximately 40 mi2 of the Pajarito

  18. Reducing Regulatory Burden EO 13563 Third RFI Comment Extension |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy RFI Comment Extension Reducing Regulatory Burden EO 13563 Third RFI Comment Extension This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' is extended to June 19, 2012. ReducRegBurden_EO_13563_Third_RFI_Comt_ Ext.pdf (175.56 KB) More Documents & Publications Fourth RFI Comment on

  19. Regulatory Burden RFI [76 FR 75798] | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    RFI [76 FR 75798] Regulatory Burden RFI [76 FR 75798] The following comments are provided on behalf of Ingersoll Rand [IRCO], Residential Solutions, manufacturer of Trane and American Standard residential air conditioners, heat pumps, furnaces and accessories therefore. --- Ingersoll Rand appreciates the opportunity to comment on the Department of Energy's request for information on "Reducing Regulatory Burden" in the spirit of Executive Order 13563. Reg_Review_RFI_76_FR_75798.pdf

  20. Regulatory Burden RFI from HPBA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    HPBA Regulatory Burden RFI from HPBA The Hearth, Patio & Barbecue Association (HPBA) is pleased to submit for your consideration the following comments in response to the U.S. Department of Energy's (DOE's) Request for Information (RFI) published at 76 Fed. Reg. 75798 (December 5, 2011). The December RFI is an effort by DOE to better implement President Obama's Executive Order 13563 (January 18, 2011). DOE Reducing Regulatory Burden RFI January 4.pdf (2.8 MB) More Documents &

  1. Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Burden RFI | Department of Energy Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the August 8, 2012 Federal Register requesting information to assist DOE in reviewing existing regulations and in making its

  2. Fact Sheet: DOE/National Association of Regulatory Utility Commissioners

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Natural Gas Infrastructure Modernization Partnership | Department of Energy DOE/National Association of Regulatory Utility Commissioners Natural Gas Infrastructure Modernization Partnership Fact Sheet: DOE/National Association of Regulatory Utility Commissioners Natural Gas Infrastructure Modernization Partnership The following fact sheet outlines one of the Department of Energy's series of actions, partnerships, and stakeholder commitments to help modernize the nation¹s natural gas

  3. Gregory H. Friedman: Before the Subcommittee on Regulatory Affairs,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Stimulus Oversight, and Government Spending Committee on Oversight and Government Reform U.S. House of Representatives | Department of Energy Regulatory Affairs, Stimulus Oversight, and Government Spending Committee on Oversight and Government Reform U.S. House of Representatives Gregory H. Friedman: Before the Subcommittee on Regulatory Affairs, Stimulus Oversight, and Government Spending Committee on Oversight and Government Reform U.S. House of Representatives November 2, 2011 Before the

  4. Comments on Request For Information regarding Reducing Regulatory Reform

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). | Department of Energy Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). Comments on Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). I have reviewed the Request For Information

  5. A Systems Biology Platform for Characterizing Regulatory and Metabolic

    Office of Scientific and Technical Information (OSTI)

    Pathways that Influence and Control Microbial Hydrogen Production (Technical Report) | SciTech Connect A Systems Biology Platform for Characterizing Regulatory and Metabolic Pathways that Influence and Control Microbial Hydrogen Production Citation Details In-Document Search Title: A Systems Biology Platform for Characterizing Regulatory and Metabolic Pathways that Influence and Control Microbial Hydrogen Production Authors: Collins, James J [1] + Show Author Affiliations Boston University

  6. Regulatory Considerations for Developing Generation Projects on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mason Emnett Office of Energy Policy and Innovation Jonathan First Office of the General Counsel February 6, 2013 NOTE: Comments herein do not represent the views of the Federal Energy Regulatory Commission or its Commissioners Regulatory Considerations for Developing Generation Projects on Federal Lands 2 Purpose of this Presentation * Describe the types of transactions that fall under FERC jurisdiction * Describe pertinent federal laws and how they apply - What does it mean to be a

  7. Regulatory and Commercial Barriers to Introduction of Renewable Super

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Premium | Department of Energy Regulatory and Commercial Barriers to Introduction of Renewable Super Premium Regulatory and Commercial Barriers to Introduction of Renewable Super Premium Breakout Session 2: Frontiers and Horizons Session 2-B: End Use and Fuel Certification Robert McCormick, Principal Engineer in Fuels Performance, National Renewable Energy Laboratory b13_mccormick_2-b.pdf (974.85 KB) More Documents & Publications The Impact of Low Octane Hydrocarbon Blending Streams on

  8. Regulatory and Financial Reform of Federal Research Policy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulatory and Financial Reform of Federal Research Policy Recommendations to the NRC Committee on Research Universities January 21, 2011 Introduction At the request of the National Research Council (NRC) Committee on Research Universities, the Council on Governmental Relations (COGR), the Association of American Universities (AAU), and the Association of Public and Land-grant Universities (APLU) have assembled a set of ten recommendations for regulatory reform that would improve research

  9. Safety and Health Regulatory and Policy Response Line | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Safety and Health Regulatory and Policy Response Line Safety and Health Regulatory and Policy Response Line The Response Line is a service maintained by the Office of Worker Safety and Health Policy, AU-11, within the Office of Health and Safety, AU-10. It provides responses to questions from DOE and DOE contractor personnel regarding worker safety and health requirements and guidance. The information contained in responses are technical clarifications to a DOE Rule or Directive and

  10. Before the Subcommittee on Economic Growth, Job Creation and Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Affairs - House Committee on Oversight and Governmant Reform | Department of Energy Economic Growth, Job Creation and Regulatory Affairs - House Committee on Oversight and Governmant Reform Before the Subcommittee on Economic Growth, Job Creation and Regulatory Affairs - House Committee on Oversight and Governmant Reform Written statement of Nicholas Whitcombe, Former Acting Director, Advanced Technology Vehicles Manufacturing Loan Program Submitted to the Subcommittee on Economic Growth,

  11. EERE Success Story-Collaborating on Regulatory Processes for Hydropower |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Collaborating on Regulatory Processes for Hydropower EERE Success Story-Collaborating on Regulatory Processes for Hydropower September 7, 2016 - 11:02am Addthis The Hydropower RAPID Toolkit uses an OpenEI wiki-based platform that makes permitting information easily accessible from one location. (Photo by Sarah Wagoner / NREL 38642) The Hydropower RAPID Toolkit uses an OpenEI wiki-based platform that makes permitting information easily accessible from one location. (Photo

  12. Two regional regulatory meetings on distributed resources. Final technical report

    SciTech Connect

    2001-02-01

    An overview and discussion of Eastern Regional and Western Regional State Utility Regulators Workshops on Distributed Resources (DR) is given. The purpose of the workshops was for state regulators to learn about DR and the regulatory issues surrounding their greater use. The following issues were addressed: introduction to DR technologies and their potential benefits, interconnection and market barriers, regulatory incentives, rate design issues, and environmental issues.

  13. Carbon Capture and Sequestration: A Regulatory Gap Assessment

    SciTech Connect

    Lincoln Davies; Kirsten Uchitel; John Ruple; Heather Tanana

    2012-04-30

    Though a potentially significant climate change mitigation strategy, carbon capture and sequestration (CCS) remains mired in demonstration and development rather than proceeding to full-scale commercialization. Prior studies have suggested numerous reasons for this stagnation. This Report seeks to empirically assess those claims. Using an anonymous opinion survey completed by over 200 individuals involved in CCS, it concludes that there are four primary barriers to CCS commercialization: (1) cost, (2) lack of a carbon price, (3) liability risks, and (4) lack of a comprehensive regulatory regime. These results largely confirm previous work. They also, however, expose a key barrier that prior studies have overlooked: the need for comprehensive, rather than piecemeal, CCS regulation. The survey data clearly show that the CCS community sees this as one of the most needed incentives for CCS deployment. The community also has a relatively clear idea of what that regulation should entail: a cooperative federalism approach that directly addresses liability concerns and that generally does not upset traditional lines of federal-state authority.

  14. A Study Of Scale Deposition- An Analogue Of Meso- To Epithermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    Study Of Scale Deposition- An Analogue Of Meso- To Epithermal Ore Formation In The Volcano Of Milos, Aegean Arc, Greece Jump to: navigation, search OpenEI Reference LibraryAdd to...

  15. A Closely-Spaced Magnetotelluric Study Of The Ahuachapan-Chipilapa...

    OpenEI (Open Energy Information) [EERE & EIA]

    Closely-Spaced Magnetotelluric Study Of The Ahuachapan-Chipilapa Geothermal Field, El Salvador Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: A...

  16. A Geological and Hydro-Geochemical Study of the Animas Geothermal...

    OpenEI (Open Energy Information) [EERE & EIA]

    Hydro-Geochemical Study of the Animas Geothermal Area, Hidalgo County, New Mexico Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: A Geological...

  17. IEA Wind Task 26 - Multi-national Case Study of the Financial...

    OpenEI (Open Energy Information) [EERE & EIA]

    Wind Task 26 - Multi-national Case Study of the Financial Cost of Wind Energy, Work Package 1, Final Report Jump to: navigation, search Tool Summary LAUNCH TOOL Name: IEA Wind Task...

  18. Lithology and well log study of Campbell E-2 geothermal test...

    OpenEI (Open Energy Information) [EERE & EIA]

    well log study of Campbell E-2 geothermal test well, Humboldt House geothermal prospect, Pershing County, Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  19. Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)

    SciTech Connect

    Young, K. R.; Levine, A.

    2014-09-01

    The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

  20. Bioengineering and Coordination of Regulatory Networks and Intracellular Complexes to Maximize Hydrogen Production by Phototrophic Microorganisms

    SciTech Connect

    Tabita, F. Robert [The Ohio State University] [The Ohio State University

    2013-07-30

    In this study, the Principal Investigator, F.R. Tabita has teemed up with J. C. Liao from UCLA. This project's main goal is to manipulate regulatory networks in phototrophic bacteria to affect and maximize the production of large amounts of hydrogen gas under conditions where wild-type organisms are constrained by inherent regulatory mechanisms from allowing this to occur. Unrestrained production of hydrogen has been achieved and this will allow for the potential utilization of waste materials as a feed stock to support hydrogen production. By further understanding the means by which regulatory networks interact, this study will seek to maximize the ability of currently available unrestrained organisms to produce hydrogen. The organisms to be utilized in this study, phototrophic microorganisms, in particular nonsulfur purple (NSP) bacteria, catalyze many significant processes including the assimilation of carbon dioxide into organic carbon, nitrogen fixation, sulfur oxidation, aromatic acid degradation, and hydrogen oxidation/evolution. Moreover, due to their great metabolic versatility, such organisms highly regulate these processes in the cell and since virtually all such capabilities are dispensable, excellent experimental systems to study aspects of molecular control and biochemistry/physiology are available.

  1. US Nuclear Regulatory Commission functional organization charts, March 15, 1993. Revision 16

    SciTech Connect

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  2. Evolutionary conservation of regulatory elements in vertebrate HOX gene clusters

    SciTech Connect

    Santini, Simona; Boore, Jeffrey L.; Meyer, Axel

    2003-12-31

    Due to their high degree of conservation, comparisons of DNA sequences among evolutionarily distantly-related genomes permit to identify functional regions in noncoding DNA. Hox genes are optimal candidate sequences for comparative genome analyses, because they are extremely conserved in vertebrates and occur in clusters. We aligned (Pipmaker) the nucleotide sequences of HoxA clusters of tilapia, pufferfish, striped bass, zebrafish, horn shark, human and mouse (over 500 million years of evolutionary distance). We identified several highly conserved intergenic sequences, likely to be important in gene regulation. Only a few of these putative regulatory elements have been previously described as being involved in the regulation of Hox genes, while several others are new elements that might have regulatory functions. The majority of these newly identified putative regulatory elements contain short fragments that are almost completely conserved and are identical to known binding sites for regulatory proteins (Transfac). The conserved intergenic regions located between the most rostrally expressed genes in the developing embryo are longer and better retained through evolution. We document that presumed regulatory sequences are retained differentially in either A or A clusters resulting from a genome duplication in the fish lineage. This observation supports both the hypothesis that the conserved elements are involved in gene regulation and the Duplication-Deletion-Complementation model.

  3. Integrating hazardous waste management into a multimedia pollution prevention paradigm. A protoype regulatory program for petroleum refinesments

    SciTech Connect

    Elcock, D.; Gasper, J.

    1996-12-31

    An emerging trend in environmental regulatory management promises enhanced environmental protection and more flexibility for regulated entities. This trend reflects three concepts. First, regulations designed to reduce one type of environmental pollution (e.g., air pollution) should not increase other types of pollution (e.g. hazardous waste). Second, pollution prevention is an important alternative to end-of-pipe control requirements. Third, offering polluting entities the flexibility of meeting certain performance criteria may produce better environmental results than prescribing specific technologies or approaches. A significant body of literature supports the need to develop regulatory programs that incorporate these concepts. However, there is little evidence that these concepts have been integrated into actual multimedia regulatory programs. Argonne National Laboratory and the U.S. Department of Energy are developing a prototype regulatory program for petroleum refineries that embraces these concepts. The development approach in this case study comprises several steps: (1) identifying and evaluating existing regulations governing petroleum refineries (if any); (2) characterizing expected future operating conditions of refineries; (3) setting goals for the regulatory program; (4) identifying and evaluating options for the program; (5) developing a prototype based on selected options; (6) identifying and addressing implementation issues; and (7) testing the prototype on a pilot basis. The approach being used in the U.S. effort is flexible and can be used in environmental management efforts throughout the Pacific Basin--in both developing and developed countries.

  4. Poster — Thur Eve — 50: Common Regulatory Non-Compliances and How to Avoid Them

    SciTech Connect

    Heimann, M.

    2014-08-15

    The Accelerators and Class II Facilities Division (ACFD) of the Canadian Nuclear Safety Commission (CNSC), is responsible for the oversight of radiotherapy facilities containing Class II prescribed equipment in Canada. Over the past several years, ACFD has been performing compliance inspections of Class II nuclear facilities across the country (medical and otherwise), and in that time, has issued several hundred corrective actions to licensees due to non-compliance with regulatory requirements. Recently, a study was done to determine the most common regulatory non-compliances. The purpose of this poster presentation is to disseminate information to the licensee community about the nature of these non-compliances, and how they can be avoided by licensees in the future.

  5. Development of Technical Basis for Burnup Credit Regulatory Guidance in the United States

    SciTech Connect

    Parks, Cecil V; Wagner, John C; Mueller, Don; Gauld, Ian C

    2011-01-01

    In the United States (U.S.) there has been and continues to be considerable interest in the increased use of burnup credit as part of the safety basis for SNF systems and this interest has motivated numerous technical studies related to the application of burnup credit for maintaining subcriticality. Responding to industry requests and needs, the U.S. Nuclear Regulatory Commission initiated a burnup credit research program, with support from the Oak Ridge National Laboratory, to develop regulatory guidance and the supporting technical basis for allowing and expanding the use of burnup credit in pressurized-water reactor SNF storage and transport applications. The objective of this paper is to summarize the work and significant accomplishments, with references to the technical reports and publications for complete details.

  6. Accelerating population balance-Monte Carlo simulation for coagulation dynamics from the Markov jump model, stochastic algorithm and GPU parallel computing

    SciTech Connect

    Xu, Zuwei; Zhao, Haibo Zheng, Chuguang

    2015-01-15

    This paper proposes a comprehensive framework for accelerating population balance-Monte Carlo (PBMC) simulation of particle coagulation dynamics. By combining Markov jump model, weighted majorant kernel and GPU (graphics processing unit) parallel computing, a significant gain in computational efficiency is achieved. The Markov jump model constructs a coagulation-rule matrix of differentially-weighted simulation particles, so as to capture the time evolution of particle size distribution with low statistical noise over the full size range and as far as possible to reduce the number of time loopings. Here three coagulation rules are highlighted and it is found that constructing appropriate coagulation rule provides a route to attain the compromise between accuracy and cost of PBMC methods. Further, in order to avoid double looping over all simulation particles when considering the two-particle events (typically, particle coagulation), the weighted majorant kernel is introduced to estimate the maximum coagulation rates being used for acceptance–rejection processes by single-looping over all particles, and meanwhile the mean time-step of coagulation event is estimated by summing the coagulation kernels of rejected and accepted particle pairs. The computational load of these fast differentially-weighted PBMC simulations (based on the Markov jump model) is reduced greatly to be proportional to the number of simulation particles in a zero-dimensional system (single cell). Finally, for a spatially inhomogeneous multi-dimensional (multi-cell) simulation, the proposed fast PBMC is performed in each cell, and multiple cells are parallel processed by multi-cores on a GPU that can implement the massively threaded data-parallel tasks to obtain remarkable speedup ratio (comparing with CPU computation, the speedup ratio of GPU parallel computing is as high as 200 in a case of 100 cells with 10 000 simulation particles per cell). These accelerating approaches of PBMC are

  7. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  8. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect

    Olive, K

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  9. Legal and regulatory issues affecting aquifer thermal energy storage

    SciTech Connect

    Hendrickson, P.L.

    1981-10-01

    This document updates and expands the report with a similar title issued in October 1980. This document examines a number of legal and regulatory issues that potentially can affect implementation of the aquifer thermal energy storage (ATES) concept. This concept involves the storage of thermal energy in an underground aquifer until a later date when it can be effectively utilized. Either heat energy or chill can be stored. Potential end uses of the energy include district space heating and cooling, industrial process applications, and use in agriculture or aquaculture. Issues are examined in four categories: regulatory requirements, property rights, potential liability, and issues related to heat or chill delivery.

  10. Regulatory impact analysis for the petroleum refineries neshap. Draft report

    SciTech Connect

    Not Available

    1994-07-01

    The report analyzes the regulatory impacts of the Petroleum Refinery National Emission Standard for Hazardous Air Pollutants (NESHAP), which is being promulgated under Section 112 of the Clean Air Act Amendments of 1990 (CCA). This emission standard would regulate the emissions of certain hazardous air pollutants (HAPs) from petroleum refineries. The petroleum refineries industry group includes any facility engaged in the production of motor gasoline, naphthas, kerosene, jet fuels, distillate fuel oils, residual fuel oils, lubricants, or other products made from crude oil or unfinished petroleum derivatives. The report analyzes the impact that regulatory action is likely to have on the petroleum refining industry.

  11. Guide to the Regulatory Flexibility Act. Final report

    SciTech Connect

    1996-05-01

    On March 29, 1996, the Small Business Regulatory Enforcement Fairness Act (P.L. 104-121) was signed into law. Among other things, the new law amended the Regulatory Flexibility Act of 1980 (5 U.S.C. 601-12) to allow judicial review of a federal agency`s compliance with the provisions of this law when promulgating new regulations. This publication contains an overview and legislative history of the act, as well as a clear description of the oversight process designed to implement it.

  12. Regulatory practices in India for establishing nuclear power stations

    SciTech Connect

    De, A.K.; Singh, S.P.

    1991-07-01

    The Atomic Energy Regulatory Board (AERB) of India was established as an independent regulatory authority charged with regulating radiation protection and nuclear safety. This article reviews the current state of India`s nuclear power reactor program and discusses the makeup of functions of the AERB, including the preparation of issuance of safety codes, guides, and other standards, with special recent emphasis on pressurized-heavy-water reactors (PHWRs). The AERB`s relationship to nuclear plant owners is discussed, as are the inspection and control functions the AERB performs, both for the construction and operation of nuclear plants and the licensing of operating personnel. 8 refs., 2 figs.

  13. A proposed Regulatory Guide basis for spent fuel decay heat

    SciTech Connect

    Hermann, O.W.; Parks, C.V.; Renier, J.P.

    1991-01-01

    A proposed revision to Regulatory Guide 3.54, Spent Fuel Heat Generation in an Independent Spent Fuel Storage Installation'' has been developed for the US Nuclear Regulatory Commission. The proposed revision includes a data base of decay heat rates calculated as a function of burnup, specific power, cooling time, initial fuel {sup 235}U enrichment and assembly type (i.e., PWR or BWR). Validation of the calculational method was done by comparison with existing measured decay heat rates. Procedures for proper use of the data base, adjustment formulae accounting for effects due to differences in operating history and initial enrichment, and a defensible safety factor were derived. 15 refs., 6 tabs.

  14. Nuclear regulatory legislation, 104th Congress, Volume 1, No. 4

    SciTech Connect

    1997-12-01

    This document is the first of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Atomic Energy Act, Energy Reorganization Act, Low-Level Radioactive Waste Policy Amendments Act, and Nuclear Waste Policy Act. Other information included in this volume pertains to NRC user fees, NRC authorizations, the Inspector General Act, and the Administrative Procedure Act.

  15. Department of Energy Commends the Nuclear Regulatory Commission's Approval

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of a Second Early Site Permit in Just One Month | Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the

  16. Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    110 Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15-69-000] Acciona Wind Energy USA LLC v. Midcontinent Independent System Operator, Inc.; Notice of Complaint Take notice that on May 27, 2015, pursuant to section 206 of the Federal Power Act, U.S.C. 824(e) and Rule 206 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Acciona Wind Energy USA

  17. Natural Gas: Major Legislative and Regulatory Actions (1935 - 2008)

    Reports and Publications

    2009-01-01

    This special report Web-based product presents a chronology of some of the key federal legislative and regulatory actions that have helped shape the natural gas market, with particular emphasis on policy directives from 1978 to October 2008. Separate reports provide brief descriptions of specific legislation, regulations, or policies, and their impacts on the natural gas market.

  18. Model uncertainty from a regulatory point of view

    SciTech Connect

    Abramson, L.R.

    1994-10-01

    This paper discusses model uncertainty in the larger context of knowledge and random uncertainty. It explores some regulatory implications of model uncertainty and argues that, from a regulator`s perspective, a conservative approach must be taken. As a consequence of this perspective, averaging over model results is ruled out.

  19. Public Utility Regulatory Policies Act of 1978 (PURPA)

    Energy.gov [DOE]

    The Energy Policy Act of 2005 (EPACT 2005) Subtitle E contains three sections (secs. 1251, 1252, and 1254) that add additional “States-must-consider” standards to the Public Utility Regulatory Policies Act of 1978 (PURPA). Specifically, EPACT 2005 adds five new Federal standards to PURPA Section 111(d).

  20. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  1. Multi-Year Program Plan - Building Regulatory Programs

    SciTech Connect

    2010-10-01

    This document presents DOEs multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOEs 5-year plan for moving forward.

  2. Regulatory process for decommissioning nuclear power reactors. Final report

    SciTech Connect

    1998-03-01

    This report provides regulatory guidance for utilities consistent with the changes in the decommissioning rule, 10 CFR50.82 as revised in July 1996. The purpose of this report is to explain the new rule in the context of related industry experience and to provide practical guidance to licensees contemplating or implementing a shutdown. Because the regulatory process is still rapidly evolving, this report reflects only a current status of the acceptable methods and practices derived from a review of the current regulations, guidance documents and industry experience for decommissioning a nuclear power reactor. EPRI anticipates periodic updates of this document to incorporate various utility experiences with decommissioning, and also to reflect any regulatory changes. The report provides a summary of ongoing federal agency and industry activities and the regulatory requirements that are currently applicable, or no longer applicable, to nuclear power plants at the time of permanent shutdown through the early decommissioning stage. The report describes the major components of a typical decommissioning action plan, providing industry experience and guidance for licensees considering or implementing permanent shutdown.

  3. Multi-Year Program Plan - Building Regulatory Programs

    SciTech Connect

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  4. Regulatory assessment: Final rule on structural measures for existing single-hull tankers. Final report

    SciTech Connect

    1996-11-01

    This Final Regulatory Assessment examines certain alternative pollution prevention measures on a selected range of existing single-hull tank vessel categories. The final rule assessment studies the cost and benefit variations if certain existing tank vessels were required to fit protectively located spaces or hydrostatically load cargo to standards equivalent to those in Regulation 13G of Annex I of the International Convention for the Prevention of Pollution from Ships, 1973, as modified by the Protocol of 1978 (MARPOL). The cost and benefit study was broken down by vessel type (international or domestic), gross tonnage, and type of cargo carried.

  5. Regulatory perspective on incomplete control rod insertions

    SciTech Connect

    Chatterton, M.

    1997-01-01

    The incomplete control rod insertions experienced at South Texas Unit 1 and Wolf Creek are of safety concern to the NRC staff because they represent potential precursors to loss of shutdown margin. Even before it was determined if these events were caused by the control rods or by the fuel there was an apparent correlation of the problem with high burnup fuel. It was determined that there was also a correlation between high burnup and high drag forces as well as with rod drop time histories and lack of rod recoil. The NRC staff initial actions were aimed at getting a perspective on the magnitude of the problem as far as the number of plants and the amount of fuel that could be involved, as well as the safety significance in terms of shutdown margin. As tests have been performed and data has been analyzed the focus has shifted more toward understanding the problem and the ways to eliminate it. At this time the staff`s understanding of the phenomena is that it was a combination of factors including burnup, power history and temperature. The problem appears to be very sensitive to these factors, the interaction of which is not clearly understood. The model developed by Westinghouse provides a possible explanation but there is not sufficient data to establish confidence levels and sensitivity studies involving the key parameters have not been done. While several fixes to the problem have been discussed, no definitive fixes have been proposed. Without complete understanding of the phenomena, or fixes that clearly eliminate the problem the safety concern remains. The safety significance depends on the amount of shutdown margin lost due to incomplete insertion of the control rods. Were the control rods to stick high in the core, the reactor could not be shutdown by the control rods and other means such as emergency boration would be required.

  6. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    SciTech Connect

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  7. Review of light water reactor regulatory requirements: Assessment of selected regulatory requirements that may have marginal importance to risk: Postaccident sampling system, Turbine missiles, Combustible gas control, Charcoal filters

    SciTech Connect

    Scott, W.B.; Jamison, J.D.; Stoetzel, G.A.; Tabatabai, A.S.; Vo, T.V.

    1987-05-01

    In a study commissioned by the Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory (PNL) evaluated the costs and benefits of modifying regulatory requirements in the areas of the postaccident sampling system, turbine rotor design reviews and inspections, combustible gas control for inerted Boiling Water Reactor (BWR) containments, and impregnated charcoal filters in certain plant ventilation systems. The basic framework for the analyses was that presented in the Regulatory Analysis Guidelines (NUREG/BR-0058) and in the Handbook for Value-Impact Assessment (NUREG/CR-3568). The effects of selected modifications to regulations were evaluated in terms of such factors as public risk and costs to industry and NRC. The results indicate that potential modifications of the regulatory requirements in three of the four areas would have little impact on public risk. In the fourth area, impregnated charcoal filters in building ventilation systems do appear to limit risks to the public and plant staff. Revisions in the severe accident source term assumptions, however, may reduce the theoretical value of charcoal filters. The cost analysis indicated that substantial savings in operating costs may be realized by changing the interval of turbine rotor inspections. Small to moderate operating cost savings may be realized through postulated modifications to the postaccident sampling system requirements and to the requirements for combustible gas control in inerted BWR containments. Finally, the use of impregnated charcoal filters in ventilation systems appears to be the most cost-effective method of reducing radioiodine concentrations.

  8. Transcript of Tribal Energy and Economic Development August Webinar: Project Regulatory Considerations

    Energy.gov [DOE]

    Transcript of the Tribal Energy and Economic Development webinar, "Project Regulatory Considerations," held on Aug. 31, 2016.

  9. US Nuclear Regulatory Commission functional organization charts, January 31, 1992. Revision 15

    SciTech Connect

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  10. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 19

    SciTech Connect

    NONE

    1996-01-31

    Functional statements and organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  11. Multi-Year Program Plan, Building Regulatory Programs: 2010-2015 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Multi-Year Program Plan, Building Regulatory Programs: 2010-2015 Multi-Year Program Plan, Building Regulatory Programs: 2010-2015 This Multi-Year Program Plan covers Building Regulatory Programs under the Office of Energy Efficiency and Renewable Energy, Building Technologies Program, and was published in October, 2010. regulatory_programs_mypp.pdf (2.54 MB) More Documents & Publications Building Energy Codes Rulemaking How Building Energy Codes Can Support State

  12. Nuclear regulatory legislation, 104th Congress. Volume 2, No. 4

    SciTech Connect

    1997-12-01

    This document is the second of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Paperwork Reduction Act, various acts pertaining to low-level radioactive waste, the Clean Air Act, the Federal Water Pollution Control Act, the National Environmental Policy Act, the Hazardous Materials Transportation Act, the West Valley Demonstration Project Act, Nuclear Non-Proliferation and Export Licensing Statutes, and selected treaties, agreements, and executive orders. Other information provided pertains to Commissioner tenure, NRC appropriations, the Chief Financial Officers Act, information technology management reform, and Federal civil penalties.

  13. Format and content of the NRC Regulatory documents

    SciTech Connect

    Klasky, M.L.

    1996-12-31

    This paper describes the methodology that is currently utilized by the U.S. Nuclear Regulatory Commission (NRC) to review nuclear criticality safety (NCS) for special nuclear material licensees. Included in this paper is a discussion of the various supporting documents that NRC staff use to perform overall NCS license reviews. The basis for regulating NCS at the NRC is founded in the Code of Federal Regulations, Title 10, Part 70 (10 CFR 71), which addresses the regulation of special nuclear material. To provide guidance to the staff and licensees on implementing the pertinent elements of an acceptable NCS program, the NRC utilizes both regulatory guides and a draft standard review plan (SRP). Specific elements of both the regulation and methodology by which the staff reviews NCS are discussed in this paper.

  14. Review of regulatory requirements governing control room habitability systems

    SciTech Connect

    Jacobus, M.J.

    1984-08-01

    This report reviews applicable guides, standards, and codes which govern the design, manufacture, selection, installation, and surveillance practices for components and systems important to control room habitability. It covers the fundamental guidance contained in General Design Criteria, Regulatory Guides, and applicable sections of the Standard Review Plan, as well as numerous documents referenced by this guidance. Instances are cited where the present guidance is misleading, contradictory, or vague. In some cases, the problems in the guidance result from inadequate technical bases; in other cases, the problems result from several documents which are not completely consistent. To independently assess the suitability of the regulatory guide which covers accidental chlorine releases, a computer program was developed to calculate chlorine concentrations in the control room following chlorine release. Although problems with the assumptions used to develop the guide were found, the conservative nature of the chlorine calculations appears to adequately compensate for these problems.

  15. Environmental protection and regulatory compliance at the Elk Hills Field

    SciTech Connect

    Chappelle, H.H.; Donahoe, R.L.; Kato, T.T.; Ordway, H.E.

    1991-12-31

    Environmental protection has played an integral role in the development and operation of the Elk Hills field since production at the maximum efficient rate was authorized in 1976. The field is located in a non-attainment area for California and National Ambient Air Quality Standards for two criteria pollutants and their associated precursors, is home to four endangered species, and operates within the California regulatory framework. Environmental protection and regulatory compliance is a multi-faceted program carried out through a substantial commitment of resources and workforce involvement. This paper describes the actions taken and resources employed to protect the environment, specific technologies and projects implement, and the ongoing nature of these efforts at Elk Hills.

  16. Environmental protection and regulatory compliance at the Elk Hills Field

    SciTech Connect

    Chappelle, H.H. ); Donahoe, R.L. ); Kato, T.T. ); Ordway, H.E. )

    1991-01-01

    Environmental protection has played an integral role in the development and operation of the Elk Hills field since production at the maximum efficient rate was authorized in 1976. The field is located in a non-attainment area for California and National Ambient Air Quality Standards for two criteria pollutants and their associated precursors, is home to four endangered species, and operates within the California regulatory framework. Environmental protection and regulatory compliance is a multi-faceted program carried out through a substantial commitment of resources and workforce involvement. This paper describes the actions taken and resources employed to protect the environment, specific technologies and projects implement, and the ongoing nature of these efforts at Elk Hills.

  17. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    SciTech Connect

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-02-01

    The long economic lifetime and development lead-time of many electric infrastructure investments requires that utility resource planning consider potential costs and risks over a lengthy time horizon. One long-term -- and potentially far-reaching -- risk currently facing the electricity industry is the uncertain cost of future carbon dioxide (CO2) regulations. Recognizing the importance of this issue, many utilities (sometimes spurred by state regulatory requirements) are beginning to actively assess carbon regulatory risk within their resource planning processes, and to evaluate options for mitigating that risk. However, given the relatively recent emergence of this issue and the rapidly changing political landscape, methods and assumptions used to analyze carbon regulatory risk, and the impact of this analysis on the selection of a preferred resource portfolio, vary considerably across utilities. In this study, we examine the treatment of carbon regulatory risk in utility resource planning, through a comparison of the most-recent resource plans filed by fifteen investor-owned and publicly-owned utilities in the Western U.S. Together, these utilities account for approximately 60percent of retail electricity sales in the West, and cover nine of eleven Western states. This report has two related elements. First, we compare and assess utilities' approaches to addressing key analytical issues that arise when considering the risk of future carbon regulations. Second, we summarize the composition and carbon intensity of the preferred resource portfolios selected by these fifteen utilities and compare them to potential CO2 emission benchmark levels.

  18. Conformance to Regulatory Guide 1. 97, Arkansas Nuclear One, Unit No. 1

    SciTech Connect

    Stoffel, J.W.

    1985-08-01

    This EG and G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97 for Unit No. 1 of Arkansas Nuclear One and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified.

  19. Regulatory decision with EPA/NRC/DOE/State Session (Panel)

    SciTech Connect

    O`Donnell, E.

    1995-12-31

    This panel will cover the Nuclear Regulatory Commission`s (NRC) proposed radiation limits in the Branch Technical Position on Low-Level Radioactive Waste Performance Assessment and the Environmental Protection Agency`s (EPA) draft regulation in Part 193. Representatives from NRC and EPA will discuss the inconsistencies in these two regulations. DOE and state representatives will discuss their perspective on how these regulations will affect low-level radioactive waste performance assessments.

  20. Regulatory approaches for addressing dissolved oxygen concerns at hydropower facilities

    SciTech Connect

    Peterson, Mark J.; Cada, Glenn F.; Sale, Michael J.; Eddlemon, Gerald K.

    2003-03-01

    Low dissolved oxygen (DO) concentrations are a common water quality problem downstream of hydropower facilities. At some facilities, structural improvements (e.g. installation of weir dams or aerating turbines) or operational changes (e.g., spilling water over the dam) can be made to improve DO levels. In other cases, structural and operational approaches are too costly for the project to implement or are likely to be of limited effectiveness. Despite improvements in overall water quality below dams in recent years, many hydropower projects are unable to meet state water quality standards for DO. Regulatory agencies in the U.S. are considering or implementing dramatic changes in their approach to protecting the quality of the Nations waters. New policies and initiatives have emphasized flexibility, increased collaboration and shared responsibility among all parties, and market-based, economic incentives. The use of new regulatory approaches may now be a viable option for addressing the DO problem at some hydropower facilities. This report summarizes some of the regulatory-related options available to hydropower projects, including negotiation of site-specific water quality criteria, use of biological monitoring, watershed-based strategies for the management of water quality, and watershed-based trading. Key decision points center on the health of the local biological communities and whether there are contributing impacts (i.e., other sources of low DO effluents) in the watershed. If the biological communities downstream of the hydropower project are healthy, negotiation for site-specific water quality standards or biocriteria (discharge performance criteria based on characteristics of the aquatic biota) might be pursued. If there are other effluent dischargers in the watershed that contribute to low DO problems, watershed-scale strategies and effluent trading may be effective. This report examines the value of regulatory approaches by reviewing their use in other

  1. Fact Sheet: DOE/National Association of Regulatory Utility Commissioners

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fact Sheet: DOE/National Association of Regulatory Utility Commissioners Natural Gas Infrastructure Modernization Partnership Summary: Building on many years of productive collaboration, the U.S. Department of Energy will work with NARUC to encourage investments in infrastructure modernization to enhance pipeline safety, efficiency and deliverability. State Public Utility Commissions serve a leading role in ensuring continued investments are made to secure safe, reliable, affordable and robust

  2. Regulatory and Financial Reform of Federal Research Policy: Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    to the NRC Committee on Research Universities | Department of Energy and Financial Reform of Federal Research Policy: Recommendations to the NRC Committee on Research Universities Regulatory and Financial Reform of Federal Research Policy: Recommendations to the NRC Committee on Research Universities At the request of the National Research Council (NRC) Committee on Research Universities, the Council on Governmental Relations (COGR), the Association of American Universities (AAU), and the

  3. Variable Renewable Energy: a Regulatory Roadmap (Fact Sheet)

    SciTech Connect

    Not Available

    2014-10-01

    There is not a one-size-fits-all approach to the regulation of variable renewable energy (VRE), but international experience reveals many approaches that are proving successful. Drawing upon research and experiences from various international contexts, the 21st Century Power Partnership in conjunction with the Clean Energy Solutions Center and Clean Energy Regulators Initiative identified key issues and ideas that have emerged as variable deployment has grown. The Power Partnership research, published in 2014, identified four broad categories of regulatory issues.

  4. Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2, 2014 Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law Office of the General Counsel Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0121 Re: Ex Parte Communication following meeting between DOE and the National Marine Manufacturers Association At 2 p.m. ET on Wednesday, May 7 2014 the National Marine Manufacturers Association (NMMA) along with representatives from three of its member organizations met with Jeremy Dommu of the Department of

  5. Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law Office of the General Counsel Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0121 Re: Ex Parte Memorandum Dear Mr. Cohen: On Tuesday, May 4, 2010, Kit Kennedy and Kate Houren of the Natural Resources Defense Council (NRDC) initiated a telephone call with Daniel Cohen and Bryan Miller of the Department of Energy's Office of the General Council. During the call, NRDC advocated for the adoption of the

  6. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 20, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will conduct additional public scoping meetings as part of their preparation of an environmental impact statement (EIS) for the Alaska LNG Project involving construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG, LLC; Conoco Phillips Alaska LNG Company; ExxonMobil Alaska LNG, LLC;

  7. Legal & regulatory issues affecting participation in distributed resource markets

    SciTech Connect

    Nimmons, J.T.

    1996-12-31

    This paper describes recent research co-sponsored by the National Renewable Energy Laboratory and four investor-owned utilities. Its purpose was to investigate how legal and regulatory factors will shape strategic decisions on the roles of utilities and others in the development of distributed resources. The work was performed during 1995 and early 1996 by John Nimmons & Associates, with support from Thomas J. Starts, Energy & Environmental Economics, and Awad & Singer.

  8. Competitive behavior of photons contributing to junction voltage jump in narrow band-gap semiconductor multi-quantum-well laser diodes at lasing threshold

    SciTech Connect

    Feng, Liefeng E-mail: lihongru@nankai.edu.cn; Yang, Xiufang; Wang, Cunda; Yao, Dongsheng; Li, Yang; Li, Ding; Hu, Xiaodong; Li, Hongru E-mail: lihongru@nankai.edu.cn

    2015-04-15

    The junction behavior of different narrow band-gap multi-quantum-well (MQW) laser diodes (LDs) confirmed that the jump in the junction voltage in the threshold region is a general characteristic of narrow band-gap LDs. The relative change in the 1310 nm LD is the most obvious. To analyze this sudden voltage change, the threshold region is divided into three stages by I{sub th}{sup l} and I{sub th}{sup u}, as shown in Fig. 2; I{sub th}{sup l} is the conventional threshold, and as long as the current is higher than this threshold, lasing exists and the IdV/dI-I plot drops suddenly; I{sub th}{sup u} is the steady lasing point, at which the separation of the quasi-Fermi levels of electron and holes across the active region (V{sub j}) is suddenly pinned. Based on the evolutionary model of dissipative structure theory, the rate equations of the photons in a single-mode LD were deduced in detail at I{sub th}{sup l} and I{sub th}{sup u}. The results proved that the observed behavior of stimulated emission suddenly substituting for spontaneous emission, in a manner similar to biological evolution, must lead to a sudden increase in the injection carriers in the threshold region, which then causes the sudden increase in the junction voltage in this region.

  9. Regulatory Oversight Program, July 1, 1993--March 3, 1997. Volume 2: Appendices

    SciTech Connect

    1997-12-31

    On July, 1993, a Regulatory Oversight (RO) organization was established within the US DOE, Oak Ridge Operations to provide regulatory oversight of the DOE uranium enrichment facilities leased to the United States Enrichment Corporation (USEC). The purpose of the OR program was to ensure continued plant safety, safeguards and security while the plants were transitioned to regulatory oversight by the Nuclear Regulatory Commission (NRC). Volume 2 contains copies of the documents which established the relationship between NRC, DOE, USEC, and DOL (Dept of Labor) required to facilitate regulatory oversight transition.

  10. Regulatory Burden RFI - Docket No. DOE-HQ-2011-0014-0001 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy - Docket No. DOE-HQ-2011-0014-0001 Regulatory Burden RFI - Docket No. DOE-HQ-2011-0014-0001 Response to Request for Information on "Reducing Regulatory Burden," 76 Fed. Reg. 6123 (Feb. 3, 2011) Regulatory Burden RFI - Docket No. DOE-HQ-2011-0014-0001 (453.78 KB) More Documents & Publications Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory Watchdog DOE Preliminary Plan for Retrospective Analysis of Existing Rules DOE_05_18_2011.pdf

  11. Synthetic Biology and the U.S. Biotechnology Regulatory System: Challenges and Options

    SciTech Connect

    Carter, Sarah R.; Rodemeyer, Michael; Garfinkel, Michele S.; Friedman, Robert M

    2014-05-01

    Synthetic Biology and the U.S. Biotechnology Regulatory System: Challenges and Options Sarah R. Carter, Ph.D., J. Craig Venter Institute; Michael Rodemeyer, J.D., University of Virginia; Michele S. Garfinkel, Ph.D., EMBO; Robert M. Friedman, Ph.D., J. Craig Venter Institute In recent years, a range of genetic engineering techniques referred to as “synthetic biology” has significantly expanded the tool kit available to scientists and engineers, providing them with far greater capabilities to engineer organisms than previous techniques allowed. The field of synthetic biology includes the relatively new ability to synthesize long pieces of DNA from chemicals, as well as improved methods for genetic manipulation and design of genetic pathways to achieve more precise control of biological systems. These advances will help usher in a new generation of genetically engineered microbes, plants, and animals. The JCVI Policy Center team, along with researchers at the University of Virginia and EMBO, examined how well the current U.S. regulatory system for genetically engineered products will handle the near-term introduction of organisms engineered using synthetic biology. In particular, the focus was on those organisms intended to be used or grown directly in the environment, outside of a contained facility. The study concludes that the U.S. regulatory agencies have adequate legal authority to address most, but not all, potential environmental, health and safety concerns posed by these organisms. Such near-term products are likely to represent incremental changes rather than a marked departure from previous genetically engineered organisms. However, the study also identified two key challenges for the regulatory system, which are detailed in the report. First, USDA’s authority over genetically engineered plants depends on the use of an older engineering technique that is no longer necessary for many applications. The shift to synthetic biology and other newer genetic

  12. Artificial leaf jumps developmental hurdle

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    developmental hurdle 18 Feb 2014 by Jenny Green: In a recent early online edition of Nature Chemistry, ASU scientists, along with colleagues at Argonne National Laboratory, have...

  13. Regulatory Policy and Markets for Energy Storage in North America

    SciTech Connect

    Kintner-Meyer, Michael CW

    2014-05-14

    The last 5 years have been one of the most exciting times for the energy storage industry. We have seen significant advancements in the regulatory process to make accommodations for valuing and monetizing energy storage for what it provides to the grid. The most impactful regulatory decision for the energy storage industry has come from California, where the California Public Utilities Commission issued a decision that mandates procurement requirements of 1.325 GW for energy storage to 3 investor-own utilities in 4 stages: in 2014, 2016, 2018, and 2020. Furthermore, at the Federal level, FERCs Order 755, requires the transmission operators to develop pay for performance tariffs for ancillary services. This has had direct impact on the market design of US competitive wholesale markets and the monetization of fast responding grid assets. While this order is technology neutral, it clearly plays into the fast-responding capability of energy storage technologies. Today PJM, CAISO, MISO, NYISO, and NE-ISO have implemented Order 755 and offer new tariff for regulation services based on pay-for-performance principles. Furthermore, FERC Order 784, issued in July 2013 requires transmission providers to consider speed and accuracy in determining the requirements for ancillary services. In November 2013, FERC issued Order 972, which revises the small generator interconnection agreement which declares energy storage as a power source. This order puts energy storage on par with existing generators. This paper will discuss the implementation of FERCs Pay for Performance Regulation order at all ISOs in the U.S. under FERC regulatory authority (this excludes ERCOT). Also discussed will be the market impacts and overall impacts on the NERC regulation performance indexes. The paper will end with a discussion on the California and Ontario, Canada procurement mandates and the opportunity that it may present to the energy storage industry.

  14. Nuclear Regulatory legislation: 103d Congress. Volume 2, No. 3

    SciTech Connect

    1995-08-01

    This document is a compilation of nuclear regulatory legislation and other relevant material through the 103d Congress, 2d Session. This compilation has been prepared for use as a resource document, which the NRC intends to update at the end of every Congress. The contents of NUREG-0980 include the Atomic Energy Act of 1954, as amended; Energy Reorganization Act of 1974, as amended, Uranium Mill Tailings Radiation Control Act of 1978; Low-Level Radioactive Waste Policy Act; Nuclear Waste Policy Act of 1982; and NRC Authorization and Appropriations Acts. Other materials included are statutes and treaties on export licensing, nuclear non-proliferation, and environmental protection.

  15. Regulatory impact analysis for the petroleum refineries NESHAP. Final report

    SciTech Connect

    1995-08-01

    A regulatory impact analysis (RIA) of the industries affected by the Petroleum Refineries National Emissions Standard for Hazardous Air Pollutants (NESHAP) was completed in support of this regulation. This (RIA) was required because the proposal is economically significant according to Executive Order 12866. The industry for which these impacts was computed was the petroleum refinery industry. Several different impact analyses were included in total or summarized in different chapters in the document. Those analyses were: the compliance cost analysis, the economic impact analysis, and the benefits analysis. Benefits and costs were then compared and discussed in the document`s last chapter.

  16. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    SciTech Connect

    1998-03-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution.

  17. Supporting documentation and control over Economic Regulatory Administration cases

    SciTech Connect

    Not Available

    1985-11-19

    This report discusses the adequacy of the Economic Regulatory Administration's (ERA) documentation of and control over cases involving alleged petroleum pricing violations. In response to the oil embargo and price increase, Congress passed the Emergency Petroleum Allocation Act of 1973 (15 USC 751). The Government assured compliance by investigating petroleum pricing violations, recovering overcharges, and making restitution to injured parties. Between August 1973 and January 1981, when oil prices were decontrolled, ERA and predecessor federal agencies established and enforced regulations controlling the allocation and pricing of crude oil and refined petroleum products.

  18. Legal, regulatory & institutional issues facing distributed resources development

    SciTech Connect

    1996-10-01

    This report describes legal, regulatory, and institutional considerations likely to shape the development and deployment of distributed resources. It is based on research co-sponsored by the National Renewable Energy Laboratory (NREL) and four investor-owned utilities (Central & South West Services, Cinergy Corp., Florida Power Corporation, and San Diego Gas & Electric Company). The research was performed between August 1995 and March 1996 by a team of four consulting firms experienced in energy and utility law, regulation, and economics. It is the survey phase of a project known as the Distributed Resources Institutional Analysis Project.

  19. Nuclear Regulatory legislation: 103d Congress. Volume 1, No. 3

    SciTech Connect

    1995-08-01

    This document is a compilation of nuclear regulatory legislation and other relevant material through the 103d Congress, 2d Session. This compilation has been prepared for use as a resource document, which the NRC intends to update at the end of every Congress. The contents of NUREG-0980 include the Atomic Energy Act of 1954, as amended; Energy Reorganization Act of 1974, as amended, Uranium Mill Tailings Radiation Control Act of 1978; Low-Level Radioactive Waste Policy Act; Nuclear Waste Policy Act of 1982; and NRC Authorization and Appropriations Acts. Other materials included are statutes and treaties on export licensing, nuclear non-proliferation, and environmental protection.

  20. Solar Energy Leases on Tribal Land - Project Regulatory Considerations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SOLAR ENERGY LEASES ON TRIBAL LAND - PROJECT REGULATORY CONSIDERATIONS BUREAU OF INDIAN AFFAIRS WESTERN REGIONAL OFFICE AUGUST 2016 Long-Term Leasing - The New Legal Framework * The HEARTH Act was signed into law on July 30, 2012, potentially streamlining the process for tribes wishing to enter into long-term surface leases of tribal land, for all types of community and economic development purposes. * The HEARTH Act amends the Long-Term Leasing Act (at 25 U.S.C. § 415(h)) to allow tribes to