  1. FERC hears gas industry concerns, announces Transco settlement. [Federal Energy Regulatory Commission

    SciTech Connect (OSTI)

    Rodgers, L.M.

    1991-07-01

    This article examines the industry comments on the Federal Energy Regulatory Commission's (FERC) notice of proposed rulemaking on natural gas pipeline function and comparability of service and the resolution of a charge of violations of regulations against the Transcontinental Gas Pipe Line Corporation by the FERC's Office of the General Council.

  2. FERC's mega-NOPR. [Federal Energy Regulatory Commission, Notice of Proposed Rulemaking

    SciTech Connect (OSTI)

    Schretter, J. )

    1991-10-01

    This article discusses the changes proposed by US FERC for natural gas regulations and the effect of those changes on the market for natural gas in the US. The topics of the article include the mega-Notice of Proposed Rulemaking, FERC's primary goals in the changes, unbundling of sales and transportation services, pregranted abandonment authority, comparable quality transportation services for all shippers, termination of existing capacity assignment programs and replacement of them with a uniform capacity reallocation system, and changes in the required methodology for firm transportation rates.

  3. FERC's acceptance of market-based pricing: An antitrust analysis. [Federal Energy Regulatory Commission

    SciTech Connect (OSTI)

    Harris, B.C.; Frankena, M.W. )

    1992-06-01

    In large part, FERC's determination of market power is based on an analysis that focuses on the ability of power suppliers to foreclose' other potential power suppliers by withholding transmission access to the buyer. The authors believe that this analysis is flawed because the conditions it considers are neither necessary nor sufficient for the existence of market power. That is, it is possible that market-based rates can be subject to market power even if no transmission supplier has the ability to foreclose some power suppliers; conversely, it is possible that no market power exists despite the ability to foreclose other suppliers. This paper provides a critical analysis of FERC's market-power determinations. The concept of market power is defined and its relationship to competition is discussed in Section 1, while a framework for evaluating the existence of market power is presented in Section 2. In Section 3, FERC's recent order in Terra Comfort is examined using this framework. A brief preview of FERC's order in TECO Power Services comprises Section 4. Overall conclusions are presented in Section 5.

  4. FERC Online eLibrary | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for FERC Online eLibrary Citation Federal Energy Regulatory Commission. FERC...

  5. Nuclear Regulatory Commission information digest

    SciTech Connect (OSTI)

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  6. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 20, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will conduct additional public scoping meetings as part of their preparation of an environmental impact statement (EIS) for the Alaska LNG Project involving construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG, LLC; Conoco Phillips Alaska LNG Company; ExxonMobil Alaska LNG, LLC;

  7. EIS-0510: FERC Notice of Intent to Prepare Environmental Impact...

    Energy.gov (indexed) [DOE]

    Calcasieu Pass Project, Cameron Parish, Louisiana The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS that analyzes the potential environmental...

  8. Nuclear Regulatory Commission | Department of Energy

    Office of Environmental Management (EM)

    Commission Nuclear Regulatory Commission Nuclear Regulatory Commission (25.98 KB) More Documents & Publications What to Expect When Readying to Move Spent Nuclear Fuel from ...

  9. Report to Congress:Impacts of the Federal Energy Regulatory Commission's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Proposal for Standard Market Design | Department of Energy Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design A report on an independent study to assess various potential impacts of the proposed rulemaking by the Federal Energy Regulatory Commission (FERC), "Remedying Undue Discrimination through Open Access Transmission

  10. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  11. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  12. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  13. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  14. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    Not Available

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  15. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  16. FERC`s view of itself: FERC`s authority over the licensing process or why third party contracting rules have been difficult to implement

    SciTech Connect (OSTI)

    Molm, J.

    1995-12-31

    Following the Supreme Court`s decisions in Escondido and Tacoma, it is sometimes difficult to remember FERC`s view of its role in the licensing process and how that view has shaped FERC`s adoption of the NEPA review process. To this day, FERC struggles with reconciling its rules with the NEPA review process. A short historical review of FERC`s efforts in implementing NEPA helps in understanding why FERC does what it does in the environmental context. The first time FERC (then the Federal Power Commission ({open_quotes}FPC{close_quotes})) announced its role in implementing NEPA was in the Commission`s Notice of Proposed Rulemaking issued in response to the Council on Environmental Quality ({open_quotes}CEQ{close_quotes}) regulations in 1979. In the preamble, the commission noted that executive departments were bound by CEQ regulations, but the Commission, as an independent regulatory agency, was not. In its Notice, the Commission stated its concern that under the CEQ referral process, the FPC`s environmental review may be subject to a CEQ review outside of the Commission`s NEPA process.

  17. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  18. Oversight of the Federal Energy Regulatory Commission`s oil pipeline regulatory program. Hearing before the Environment, Energy, and Natural Resources Subcommittee of the Committee on Government Operations, House of Representatives, One Hundred Second Congress, First Session, August 1, 1991

    SciTech Connect (OSTI)

    1992-12-31

    The hearing addresses oversight of The Federal Energy Regulatory Commission`s (FERC) oil pipeline regulatory program which was viewed as deficient. The primary focus is competition and market share among petroleum pipeline segments. Statements of government and industry officials are included along with documents submitted for the record.

  19. EA-1971: FERC Notice of Intent to Prepare an Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of Intent to Prepare an Environmental Assessment Golden Pass LNG Export and Pipeline Project, Texas and Louisiana The Federal Energy Regulatory Commission (FERC)...

  20. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect (OSTI)

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  1. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  2. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  3. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  4. Federal Energy Regulatory Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    FERC, is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil. FERC also reviews proposals to build liquefied natural gas (LNG)...

  5. FERC Presendation: Demand Response as Power System Resources, October 29,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2010 | Department of Energy FERC Presendation: Demand Response as Power System Resources, October 29, 2010 FERC Presendation: Demand Response as Power System Resources, October 29, 2010 Federal Energy Regulatory Commission (FERC) presentation on demand response as power system resources before the Electicity Advisory Committee, October 29, 2010 Demand Response as Power System Resources (247.13 KB) More Documents & Publications A National Forum on Demand Response: Results on What Remains

  6. EIS-0493: FERC Notice of Availability of Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy 3: FERC Notice of Availability of Final Environmental Impact Statement EIS-0493: FERC Notice of Availability of Final Environmental Impact Statement Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory Commission (FERC) announced the availability of a Final EIS that analyzes the potential environmental impacts of a proposal to construct and operate a liquefied natural gas export and import

  7. DOE and FERC Joint Public Statement on Back Stop Siting

    Energy.gov [DOE]

    Washington, D.C. – U.S. Energy Secretary Steven Chu announced today his decision that the Department of Energy will work more closely with the Federal Energy Regulatory Commission (FERC) in...

  8. EVALUATION REPORT The Federal Energy Regulatory Commission's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Energy Regulatory Commission's Unclassified Cybersecurity Program - 2014 OAS-L-15-03 November 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 November 3, 2014 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal

  9. FERC`s {open_quotes}MegaNOPR{close_quotes} - changes ahead for the natural gas industry

    SciTech Connect (OSTI)

    Stosser, M.A.

    1992-12-31

    On July 31, 1991 the Federal Energy Regulatory Commission (FERC) issued a notice of proposed rulemaking (NOPR) that would fundamentally change the current scheme of transportation and sales of natural gas by interstate pipelines. FERC`s proposal will result in disparate impacts on the various segments of the natural gas industry. These impacts and the major policy issues sought for implementation by FERC can be grouped into five major points, discussed in this article: unbundling of service; pregrated abandonment; capacity reallocation; rate design; and transition/implementation costs.

  10. Department of Energy Commends the Nuclear Regulatory Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of ...

  11. Department of Energy and Nuclear Regulatory Commission Increase...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to ...

  12. Energy Praises the Nuclear Regulatory Commission Approval of...

    Office of Environmental Management (EM)

    Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the ...

  13. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Energy Savers

    US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart ...

  14. US Nuclear Regulatory Commission functional organization charts, March 15, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  15. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1989-07-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions and branches are presented.

  16. FERC must fix its electric utility merger policy

    SciTech Connect (OSTI)

    Grankena, M.

    1996-10-01

    In evaluating mergers, FERC should adopt the approach of the federal antitrust agencies to prevent firms from gaining and exercising market power. Doing so will require changes in everything from how FERC defines product and geographic markets, and how market concentration, entry conditions and cost saving are evaluated, to how discovery is conducted - in short, to virtually every aspect of how FERC reaches a merger decision. Reliance on competition to benefit consumers carries with it the necessity to preserve competition that is threatened by mergers or other structural changes. Faced with numerous mergers of large and medium-size electric utilities and the expectation of more to come, in January 1996 the Federal Energy Regulatory Commission requested comments on how it should evaluate mergers. This paper addresses that need. Section I explains how FERC and the federal antitrust agencies have responded to the competitive issues raised by utility mergers during the past decade. Section II introduces the analytical approach used by the antitrust agencies to evaluate mergers. Section III highlights features of the electric power industry that make analysis of market power unusually complex. Section IV evaluates FERC`s past reliance on comparable open access transmission as a sufficient remedy for competitive concerns relating to the availability, reliability and pricing of transmission service. Section V suggests changes to FERC`s merger policy that would make it consistent with antitrust principles and FERC`s public interest responsibilities. The final section draws conclusions.

  17. Nuclear Regulatory Commission | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Nuclear Regulatory Commission NNSA Receives Excellence Award for Radiological Security Enhancements in Hawaii HONOLULU - At an official event this week, the City and County of Honolulu presented the Department of Energy's (DOE) National Nuclear Security Administration (NNSA) with the Homeland Security Excellence Award for DOE/NNSA's Office of Radiological Security's (ORS) efforts

  18. EIS-0508: FERC Notice of Intent to Prepare Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 8: FERC Notice of Intent to Prepare Environmental Impact Statement EIS-0508: FERC Notice of Intent to Prepare Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS that analyzes the potential environmental impacts of proposed liquefied natural gas (LNG) import and export terminal facilities in Washington County, Maine. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to

  19. EIS-0510: FERC Notice of Intent to Prepare Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy FERC Notice of Intent to Prepare Environmental Impact Statement EIS-0510: FERC Notice of Intent to Prepare Environmental Impact Statement Calcasieu Pass Project, Cameron Parish, Louisiana The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS that analyzes the potential environmental impacts of the Calcasieu Pass Project, a proposed liquefied natural gas (LNG) export terminal in Cameron Parish, Louisiana. DOE is a cooperating agency in

  20. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect (OSTI)

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  1. California Department of Fish and Wildlife: Federal Energy Regulatory...

    Open Energy Information (Open El) [EERE & EIA]

    Fish and Wildlife: Federal Energy Regulatory Commission (FERC) Hydroelectric Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California...

  2. EIS-0513: FERC Supplemental Notice of Intent to Prepare Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy Supplemental Notice of Intent to Prepare Environmental Impact Statement EIS-0513: FERC Supplemental Notice of Intent to Prepare Environmental Impact Statement Jacksonville Project, Jacksonville, Florida The Federal Energy Regulatory Commission (FERC) issued a supplemental notice of intent to prepare an EIS that analyzes the potential environmental impacts of a proposal to construct and operate a natural gas liquefaction, storage, and export facility on

  3. EIS-0491: FERC Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy 1: FERC Notice of Availability of Draft Environmental Impact Statement EIS-0491: FERC Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory Commission issued a notice of availability of a Draft EIS that analyzes the potential environmental impacts of a proposal to construct and operate the Lake Charles Liquefaction Project. For more information on this project,

  4. EA-1949: FERC Notice of Availability of an Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy of an Environmental Assessment EA-1949: FERC Notice of Availability of an Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This Notice announces the availability of a Federal Energy Regulatory Commission (FERC) EA, which analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project

  5. US Nuclear Regulatory Commission functional organization charts, January 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  6. DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

  7. Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (4/93) United States Government Department of Energy Memorandum DATE: November 9, 2010 REPLY TO ATTN TO: IG-34 (A10FN002) SUBJECT: Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: Chairman, Federal Energy Regulatory Commission The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) Fiscal Year 2010 balance sheet and the related

  8. ORISE: U.S. Nuclear Regulatory Commission Radiation Exposure...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Information and Reporting System (REIRS) The U.S. Nuclear Regulatory Commission (NRC) is required by federal mandate to maintain and evaluate radiation protection data for...

  9. Regulatory Commission of Alaska | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    includes general information about the RCA and its Commissioners. Commission The Alaska Public Service Commission (APSC) existed from 1960 until 1970. In 1970, the Alaska...

  10. FERC Compliance Handbook | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Compliance HandbookPermittingRegulatory GuidanceGuideHandbook...

  11. FERC Licensing Processes Matrix | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Licensing Processes MatrixPermittingRegulatory GuidanceGuideHandbook...

  12. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1986-11-30

    Functional organization charts for the NRC Commission Offices, Divisions, and Branches are presented.

  13. Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit OAS-FS-15-05 December 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 17, 2014 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Federal Energy Regulatory

  14. EA-2041: FERC Notice of Intent to Prepare an Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy FERC Notice of Intent to Prepare an Environmental Assessment EA-2041: FERC Notice of Intent to Prepare an Environmental Assessment Cameron LNG Expansion Project The Federal Energy Regulatory Commission announced its intent to prepare an environmental assessment that examines the potential environmental impacts of the proposed construction of additional natural gas liquefaction and export facilities at the existing Cameron Liquefied Natural Gas Terminal in Cameron and

  15. EIS-0517: FERC Notice of Intent to Prepare an Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy Statement EIS-0517: FERC Notice of Intent to Prepare an Environmental Impact Statement Port Arthur Liquefaction Project and Port Arthur Pipeline Project; Jefferson and Orange Counties, Texas, and Cameron Parish, Louisiana The Federal Energy Regulatory Commission (FERC) issued a notice of intent to prepare an EIS that analyzes the potential environmental impacts of a proposal to construct and operate a liquefied natural gas marine terminal along the

  16. Energy Praises the Nuclear Regulatory Commission Approval of the First

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    United States Nuclear Plant Site in Over 30 Years | Department of Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years March 8, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today commended the Nuclear Regulatory Commission's decision to approve the first-ever Early Site

  17. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... For further information, contact David Turner by telephone at 202-502-6091 or by email at david.turner@ferc.gov. Kimberly D. Bose, Secretary. 20130115-3035 FERC PDF (Unofficial) ...

  18. NUCLEAR REGULATORY,.COMMISSION REGION I

    Office of Legacy Management (LM)

    ... & Lab Branch Division of Nuclear Materials Safety Docket No. 040-07964 License No. ... U.S. NUCLEAR REGULATORY COMblISSION REGION I INSPECTION REPORT Report No. 040-0796496-001 ...

  19. Nuclear Regulatory Commission Handling of Beyond Design Basis Events for Nuclear Power Reactors

    Energy.gov [DOE]

    Presenter: Bill Reckley, Chief, Policy and Support Branch, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission US Nuclear Regulatory Commission

  20. Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    110 Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15-69-000] Acciona Wind Energy USA LLC v. Midcontinent Independent System Operator, Inc.; Notice of Complaint Take notice that on May 27, 2015, pursuant to section 206 of the Federal Power Act, U.S.C. 824(e) and Rule 206 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Acciona Wind Energy USA

  1. Commission.

    National Nuclear Security Administration (NNSA)

    July 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Highlights of the NMMSS 2014 Annual Users Training Meeting The Nuclear ...

  2. US Nuclear Regulatory Commission functional organization charts, March 15, 1993. Revision 16

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  3. Department of Energy Commends the Nuclear Regulatory Commission's Approval

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of a Second Early Site Permit in Just One Month | Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the

  4. Research report: Summary of key state issues of FERC orders 888 and 889

    SciTech Connect (OSTI)

    Rose, K.; Burns, R.E.; Graniere, R.J.

    1997-01-01

    The Federal Energy Regulatory Commission`s (FERC) Order 888 is perhaps the most important and far reaching FERC electricity order in decades. The consequences on the structure of the industry and how the industry is regulated are significant departures from past methods and regulatory philosophy. This will undoubtedly have a dramatic impact on the manner in which state public utility commissions, which are also undergoing or considering dramatic change, regulate their jurisdictional electric utilities. This report summarizes and discusses the actions that the FERC is taking and their profound repercussions on the industry and state commissions. The report is not a comprehensive summary of the entire order. Rather, it is intended to highlight the order`s more important features and discuss what this could mean for the states. The report is organized into eight sections; the first seven address Order 888 and the last section (section 8) addresses Order 889. Section 1 through 5 summarize and discuss the main features of Order 888. Section 6 (on jurisdiction) and Section 7 (on property rights) interpret the likely consequences of the order. Section 8, summarizes the FERC`s Open Access Same Time System (OASIS) and discusses some concerns about its real-world application.

  5. FERC responds to requests, fine tunes Order 636

    SciTech Connect (OSTI)

    Not Available

    1992-08-10

    This paper reports that the Federal Regulatory Commission has changed Order 636, its U.S. pipeline rate unbundling rule, to meet major objections raised to it. Order 636 now requires pipelines to continue existing one part volumetric rates, computed at the existing load factor, for unbundled transportation service for small customers. FERC retained the existing eligibility criteria but increased the size of the eligible class to include customers that transport up to 10 MMcfd.

  6. KWOC (Key-Word-Out-of-Context) Index of US Nuclear Regulatory Commission Regulatory Guide Series

    SciTech Connect (OSTI)

    Jennings, S.D.

    1990-04-01

    To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series.

  7. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  8. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect (OSTI)

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  9. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect (OSTI)

    Olive, K

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  10. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    SciTech Connect (OSTI)

    1998-03-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution.

  11. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    SciTech Connect (OSTI)

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

  12. FERC must adopt an efficient transmission pricing system - now

    SciTech Connect (OSTI)

    Pierce, R.J. Jr.

    1997-10-01

    In spite of assumptions to the contrary, this nation will not enjoy competitive power markets until the Federal Energy Regulatory Commission (FERC) uses its bully pulpit to require establishment of--and prescribe minimum authorities for--properly sized ISOs that administer efficient transmission pricing. In 1989, the FERC recognized that getting transmission pricing right is the crucial first step in the process of creating a competitive electricity market. A lot has happened in the ensuing eight years. There is now a competitive wholesale market, and retail competition is beginning in many states. Yet, FERC has not made any progress in taking that crucial first step. Unless FERC abandons the present archaic system of transmission pricing promptly, competition will produce a long list of unintended adverse effects. The short-term effects will include markets too small to support effective competition and misleading price signals that induce buyers and sellers to make decisions that waste resources. The long-term effects will include large investments in capital assets at the wrong locations, and ill-informed antitrust and regulatory decisions. These effects will also create scores of entities with a powerful vested interest in retaining the status quo forever. As the British have discovered, once that happens, it is almost impossible to abandon an inefficient pricing system.

  13. US Nuclear Regulatory Commission functional organization charts, January 31, 1992. Revision 15

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  14. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 19

    SciTech Connect (OSTI)

    NONE

    1996-01-31

    Functional statements and organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  15. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012, OAS-L-13-01

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 OAS-L-13-01 November 2012 Department of Energy Washington, DC 20585 November 7, 2012 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012" BACKGROUND The Federal Energy Regulatory Commission (Commission) is an independent

  16. FERC Handbook for Hydroelectric Filings other than Licenses and...

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Handbook for Hydroelectric Filings other than Licenses and...

  17. A Guide to the FERC Electric Transmission Facilities Permit Process...

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: A Guide to the FERC Electric Transmission Facilities Permit...

  18. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    SciTech Connect (OSTI)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2.

  19. US Nuclear Regulatory Commission Input to DOE Request for Information Smart

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Grid Implementation Input | Department of Energy US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input. Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New

  20. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011, OAS-M-12-01

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Evaluation Report The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011 OAS-M-12-01 November 2011 Department of Energy Washington, DC 20585 November 15, 2011 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011"

  1. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program … 2013

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Evaluation Report The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2013 OAS-M-14-01 October 2013 Department of Energy Washington, DC 20585 October 23, 2013 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program -

  2. Report to Congress:Impacts of the Federal Energy Regulatory Commission...

    Office of Environmental Management (EM)

    Proposal for Standard Market Design Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design A report on an independent ...

  3. Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process

    Energy.gov [DOE]

    Presenter: Undine Shoop, Chief, Health Physics and Human Performance Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission

  4. Department of Energy and Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership

    Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) expanded cooperation for President Bush's Global Nuclear Energy Partnership (GNEP) through a Memorandum...

  5. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1982-02-01

    Functional organization charts for the NRC Commission Offices, Divisions, Staffs and Branches are presented.

  6. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  7. Commission.

    National Nuclear Security Administration (NNSA)

    November 2015 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. NMMSS 2016 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2016 Annual Users Training Meeting will be held May 9-12, 2016, in New Orleans, Louisiana. The NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and

  8. Commission.

    National Nuclear Security Administration (NNSA)

    March 2015 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Register for the NMMSS 2015 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2015 Annual Users Training Meeting will be held May 11-14, 2015, in Las Vegas, Nevada. There is no registration fee to participate in this invaluable learning opportunity. NMMSS is the U.S. Government's official information system containing current and historical accounting

  9. Commission.

    National Nuclear Security Administration (NNSA)

    6 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. NMMSS 2016 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2016 Annual Users Training Meeting will be held May 9-12, 2016, in New Orleans, Louisiana. The NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and commercial

  10. Commission.

    National Nuclear Security Administration (NNSA)

    July 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Highlights of the NMMSS 2014 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) Annual Users Training Meeting was held on May 12-15, 2014, in Denver, Colorado. The NMMSS serves a critical role in the U.S. Government's ability to maintain operational awareness of the inventory, status, and whereabouts of nuclear materials. Accuracy, transparency, and

  11. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  12. Nuclear Regulatory Commission issuances. Volume 38, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  13. Nuclear Regulatory Commission Issuances. Volume 39, No. 2

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director`s Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  14. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy.gov (indexed) [DOE]

    Gulf LNG Liquefaction Company, LLC Docket No. PF13-4-000 Gulf LNG Energy, LLC Gulf LNG Pipelines, LLC NOTICE OF EXTENSION OF TIME (August 27, 2014) On July 31, 2014, the Commission ...

  15. Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  16. Nuclear Regulatory Commission issuances. Volume 42, No. 4

    SciTech Connect (OSTI)

    1995-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  17. Nuclear Regulatory Commission issuances. Volume 47, Number 3

    SciTech Connect (OSTI)

    1998-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director`s Decision to the North Atlantic Energy Service Corporation.

  18. DOE Awards Contract for the Nuclear Regulatory Commission (NRC) Licensed Facilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati – The U.S. Department of Energy (DOE) today announced the award of a contract to Spectra Tech, Inc. for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement.

  19. U.S. Nuclear Regulatory Commission Certifies HalfPACT Transportation...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Container CARLSBAD, N.M., November 20, 2000 - The U.S. Nuclear Regulatory Commission (NRC) issued a Certificate of Compliance November 2 for the HalfPACT transportation...

  20. U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMEN...

    Office of Legacy Management (LM)

    c i. :i; i 4 5 ' I jr 1 ly i *- 1 U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF ... Results: rt was determined tfiat M&C Nuclear, Inc., Attleboro, Massachusetts, which merged ...

  1. AUDIT REPORT Federal Energy Regulatory Commission's Fiscal Year 2015 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fiscal Year 2015 Financial Statement Audit OAI-FS-16-02 November 2015 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 November 18, 2015 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Acting Inspector General SUBJECT: INFORMATION: Audit Report: "Federal Energy Regulatory Commission's Fiscal Year 2015 Financial Statement Audit" The attached report presents the results

  2. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-08-19

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices.

  3. Supreme court agrees: FERC must regulate wholesale markets

    SciTech Connect (OSTI)

    Wolak, Frank A.

    2008-08-15

    The author believes that wholesale markets in the United States would have a greater likelihood of ultimately benefiting consumers if the Federal Energy Regulatory Commission did not have the mandate under the Federal Power Act (FPA) to ensure that wholesale prices are ''just and reasonable.'' However, he continues to believe that the FERC cannot avoid having an ex post criteria for asssessing whether market prices are just and reasonable. Moreover, changes in the design and regulatory oversight of U.S. wholesale electricity markets in recent years, including the recent Supreme Court decision, have caused him to believe even more strongly in the guardrails-for-market-outcomes approach. Finally, several questions are addressed which relate to the pricing of fixed-price, long-term contracts and the impact of these obligations on the behavior of suppliers in short-term wholesale markets that are directly relevant to answering the two major questions that the Supreme Court remanded to FERC in its recent decision.

  4. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    SciTech Connect (OSTI)

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  5. Nuclear Regulatory Commission issuances, Volume 46, No. 4

    SciTech Connect (OSTI)

    1997-10-01

    This report includes the issuances received in October 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Five issuances were received on the following subjects: (1) decontamination and decommissioning funding for Sequoyah Fuels Corporation and General Atomics; (2) involvement in NRC-licensed activities by Aharon Ben-Haim; (3) Barnett Industrial X-Ray, Inc.; (4) spent fuel storage installation at Northern States Power Company; and (5) Vermont Yankee Nuclear Power Station. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  6. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

  7. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    SciTech Connect (OSTI)

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  8. The Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit, OAS-FS-13-03

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit OAS-FS-13-03 November 2012 Department of Energy Washington, DC 20585 November 15, 2012 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit The attached report presents the results of the independent

  9. Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  10. Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a final Request for Proposal (RFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities and licenses under NRC regulations.

  11. Nuclear Regulatory Commission's antitrust review process: an analysis of the impacts

    SciTech Connect (OSTI)

    Not Available

    1981-06-01

    The Nuclear Regulatory Commission's (NRC) antitrust process is reviewed and its impacts to small systems and applicant systems are studied. This process takes the form of a description of the NRC's antitrust review process as implemented, a generic categorization of potential impacts and individual case-by-case studies of four different utilities.

  12. The U.S. Nuclear Regulatory Commission's Strategy for Revising the RIA Acceptance Criteria

    SciTech Connect (OSTI)

    Clifford, Paul M.

    2007-07-01

    The U.S. Nuclear Regulatory Commission (NRC) has issued interim criteria and guidance for the reactivity-initiated accident (RIA) within the latest revision to NUREG-0800, 'Standard Review Plan' (SRP), Section 4.2, 'Fuel System Design', Appendix B (Revision 03, March 2007). The purpose of this paper is as follows: 1. present a change in regulatory staff position regarding the requirements of 10 CFR 50, Appendix A, General Design Criteria 28 (GDC28) and changes in regulatory guidance provided in Regulatory Guide (RG) 1.77, RG 1.195, RG 1.183, and previous versions of NUREG-0800 SRP; 2. describe the implementation strategy and schedule for both new reactors and the existing fleet; and 3. encourage licensees and nuclear fuel vendors to (1) develop improved core physics analytical methods to allow a more deliberate transition to the new fuel cladding failure criteria and (2) develop the technical basis to address the new core coolability criteria. (authors)

  13. Audit of the Federal Energy Regulatory Commission Leased Warehouse Space, CR-B-96-01

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AUDIT OF THE FEDERAL ENERGY REGULATORY COMMISSION LEASED WAREHOUSE SPACE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet 5 to 7 days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vml.hqadmin.doe.gov Department of Energy

  14. Microsoft Word - Buff Report Cover - FERC FISMA

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Evaluation Report The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2010 OAS-M-11-01 October 2010 Department of Energy Washington, DC 20585 October 25, 2010 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2010" BACKGROUND

  15. Property:FERC License | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    FERC License Jump to: navigation, search Property Name FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

  16. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  17. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  18. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  19. Improved cost-benefit techniques in the US Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Cronin, F.J.; Nesse, R.J.; Vaeth, M.; Wusterbarth, A.R.; Currie, J.W.

    1983-06-01

    The major objective of this report is to help the US Nuclear Regulatory Commission (NRC) in its regulatory mission, particularly with respect to improving the use of cost-benefit analysis and the economic evaluation of resources within the NRC. The objectives of this effort are: (1) to identify current and future NRC requirements (e.g., licensing) for valuing nonmarket goods; (2) to identify, highlight, and present the relevant efforts of selected federal agencies, some with over two decades of experience in valuing nonmarket goods, in this area; and (3) to review methods for valuing nonmarket impacts and to provide estimats of their magnitudes. Recently proposed legislation may result in a requirement for not only more sophisticated valuation analyses, but more extensive applications of these techniques to issues of concern to the NRC. This paper is intended to provide the NRC with information to more efficiently meet such requirements.

  20. Regulatory Considerations for Developing Generation Projects on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mason Emnett Office of Energy Policy and Innovation Jonathan First Office of the General Counsel February 6, 2013 NOTE: Comments herein do not represent the views of the Federal Energy Regulatory Commission or its Commissioners Regulatory Considerations for Developing Generation Projects on Federal Lands 2 Purpose of this Presentation * Describe the types of transactions that fall under FERC jurisdiction * Describe pertinent federal laws and how they apply - What does it mean to be a

  1. Regulatory Policy and Markets for Energy Storage in North America

    SciTech Connect (OSTI)

    Kintner-Meyer, Michael CW

    2014-05-14

    The last 5 years have been one of the most exciting times for the energy storage industry. We have seen significant advancements in the regulatory process to make accommodations for valuing and monetizing energy storage for what it provides to the grid. The most impactful regulatory decision for the energy storage industry has come from California, where the California Public Utilities Commission issued a decision that mandates procurement requirements of 1.325 GW for energy storage to 3 investor-own utilities in 4 stages: in 2014, 2016, 2018, and 2020. Furthermore, at the Federal level, FERCs Order 755, requires the transmission operators to develop pay for performance tariffs for ancillary services. This has had direct impact on the market design of US competitive wholesale markets and the monetization of fast responding grid assets. While this order is technology neutral, it clearly plays into the fast-responding capability of energy storage technologies. Today PJM, CAISO, MISO, NYISO, and NE-ISO have implemented Order 755 and offer new tariff for regulation services based on pay-for-performance principles. Furthermore, FERC Order 784, issued in July 2013 requires transmission providers to consider speed and accuracy in determining the requirements for ancillary services. In November 2013, FERC issued Order 972, which revises the small generator interconnection agreement which declares energy storage as a power source. This order puts energy storage on par with existing generators. This paper will discuss the implementation of FERCs Pay for Performance Regulation order at all ISOs in the U.S. under FERC regulatory authority (this excludes ERCOT). Also discussed will be the market impacts and overall impacts on the NERC regulation performance indexes. The paper will end with a discussion on the California and Ontario, Canada procurement mandates and the opportunity that it may present to the energy storage industry.

  2. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1986

    SciTech Connect (OSTI)

    1987-05-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during calendar year 1986. Comments and observations are provided on operating experience at nuclear power plants and other NRC licensees, including results from selected AEOD studies; summaries of abnormal occurrences involving US nuclear plants; reviews of licensee event reports and their quality, reactor scram experience from 1984 to 1986, engineered safety features actuations, and the trends and patterns analysis program; and assessments of nonreactor and medical misadministration events. In addition, the report provides the year-end status of all recommendations included in AEOD studies, and listings of all AEOD reports issued from 1980 through 1986.

  3. Nuclear Regulatory Commission (NRC) Staff Confirmatory Calculations for the Hanford Probabilistic Seismic Hazard and the Columbia Generating Station Site Response Analyses

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nuclear Regulatory Commission (NRC) Staff Confirmatory Calculations for the Hanford Probabilistic Seismic Hazard and the Columbia Generating Station Site Response Analyses

  4. BPA seeks clarification and rehearing on FERC order on Environmental...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    and rehearing of the Federal Energy Regulatory Commission's order on BPA's Interim Environmental Redispatch policy. "While BPA is meeting a regulatory deadline to respond to...

  5. Commissions as educating organizations: How to educate the public regarding the mission of the public utilities commission in the new regulatory environment

    SciTech Connect (OSTI)

    Sevel, F.

    1996-12-31

    Numerous authors have discussed the massive changes in the new regulatory environment and the necessary impact of these changes on the roles, responsibilities, structure, function, and mission of the public utility commission. In fact, when public utility commissioners gathered in Denver for the NRRI/NARUC Commissioners Summit in April 1995, {open_quotes}they made it clear that they embraced change as necessary to effective commission functioning in new regulatory environments and made it clear that they were prepared to direct that change.{close_quotes} The Commissioners identified the following trends of change: (1) Dichotomy of customers in core and noncore groupings. (2) Unbundling and new service offerings. (3) Deregulation of certain services and markets. (4) Increased use of market-based pricing and incentive ratemaking. (5) Large users seeking lowest-cost service providers. (6) Shift from old regulatory compact [of] territorial exclusivity and assured recovery. (7) Changing obligation to serve. (8) Utility diversification into other businesses and use of holding company structures. (9) Increased business risk for utilities. (10) Uncertainty as to continued attention to social goals. In response to these changes, they identified five clusters of core missions for public utility commissions: (1) Protection of those customers who would not reap the full benefits of competition. (2) Support of competition balanced with an interest in fair and effective competition. (3) The provision of timely and clear decisions to utility managers and allowing utilities the flexibility to adapt to new conditions. (4) Preserving the commitment to social goals compatible with the competitive market. (5) Addressing the impact of new corporate structures, jurisdictional changes, necessary change in regulatory methods, and customer protection in the new environment.

  6. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  7. Restructuring the natural gas industry: Order No. 436 and other regulatory initiatives

    SciTech Connect (OSTI)

    Griggs, J.W.

    1986-01-01

    Federal Energy Regulatory Commission (FERC) Order No. 436 is the latest in a series of major regulatory initiatives that have impacted gas pricing, pipeline contracting provisions, spot market sales, and transportation. The policy followed by FERC reflects a faith in the free market to efficiently allocate resource at reasonable cost to consumers. In responding to deregulation mandates while retaining regulation of the price of old gas and of interstate transportation and sales for resale, FERC is unbundling gas costs from the fixed costs of providing service in hopes of improving price signals. It is also pushing pipelines to provide open access to inject competition. The long-term commitments needed by producers may be incompatible with the oscillations caused by market restructuring, but there is a possibility that the new approach will work.

  8. FERC approves Northwest pipeline expansion

    SciTech Connect (OSTI)

    Not Available

    1992-06-15

    Northwest Pipeline Co., Salt Lake City, Utah, received a final permit from the Federal Energy Regulatory Commission for a $373.4 million main gas line expansion. This paper reports that it plans to begin construction of the 443 MMcfd expansion in mid-July after obtaining further federal, state, and local permits. The expanded system is to be fully operational by second quarter 1993. When the expansion is complete, total Northwest system mileage will be 3,936 miles and system capacity about 2.49 bcfd.

  9. NRC (Nuclear Regulatory Commission) staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    SciTech Connect (OSTI)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved.

  10. Report to the Nuclear Regulatory Commission from the staff panel on the Commission's determination of an Extraordinary Nuclear Occurrence (ENO)

    SciTech Connect (OSTI)

    1980-01-01

    The Panel finds that the first criterion, pertaining to whether the accident caused a discharge of radioactive material or levels of radiation offsite as defined in 10 CFR 140.84, has not been met. It further finds that there is presently insufficient information to support any definitive finding as to whether or not the second criterion, relating to damage to persons or property offsite as defined in 10 CFR 140.85, has been met. Since the Panel has not found that both criteria have been met, it recommends that the Commission determine that the accident at Three Mile Island did not constitute an extraordinary nuclear occurrence.

  11. Nuclear Regulatory Commission Authorization Act for fiscal years 1994 and 1995. Introduced in the Senate of the United States, One Hundred Third Congress, Second Session, July 25, 1994

    SciTech Connect (OSTI)

    1994-12-31

    The report addresses S. 2313 a bill to authorize appropriations for the Nuclear Regulatory Commission (NRC) for fiscal years 1994 and 1995. Congressional oversight of the Federal independent regulatory agencies is a fundamental aspect of the Federal regulatory process to ensure that their responsibilities are properly implemented. The bill amends the Atomic Energy Act of 1954 to strengthen and clarify NRC;s authority.

  12. Implementing 'Continuous Improvement' in the U.S. Nuclear Regulatory Commission's Decommissioning Program

    SciTech Connect (OSTI)

    Orlando, D. A.; Buckley, J. T.; Johnson, R. L.; Gillen, D. M.

    2006-07-01

    The United States Nuclear Regulatory Commission's (US NRC's) comprehensive decommissioning program encompasses the decommissioning of all US NRC licensed facilities, ranging from the termination of routine licenses for sealed sources, to the closure of complex materials sites and nuclear power reactor facilities. Of the approximately 200 materials licenses that are terminated each year, most are routine and require little, if any, remediation to meet the US NRC unrestricted release criteria. However, some present technical and policy challenges that require large expenditures of resources, including a few complex materials sites that have requested license termination under the restricted-use provisions of 10 CFR 20.1403. Fiscal constraints to reduce budgeted resources in the decommissioning program, as well as concerns over the time to complete the decommissioning process have led to actions to improve the program and use resources more efficiently. In addition, the US NRC's Strategic Plan requires efforts to identify and implement improvements to US NRC programs in order to improve efficiency, effectiveness, timeliness, and openness, of the US NRC's activities, while maintaining the necessary focus on safety. Decommissioning regulations, and more recently the analysis of several issues associated with implementing those regulations, also have been significant catalysts for improvements in the decommissioning program. Actions in response to these catalysts have resulted in a program focused on the management of complex sites in a comprehensive, consistent, and risk-informed manner, as opposed to the past practice of focusing on sites deemed to be problematic. This paper describes the current status of the decommissioning of US NRC-licensed nuclear facilities, including an overview of recent decommissioning project completion efforts. It provides a detailed summary of past, current, and future improvements in the US NRC decommissioning program including the

  13. Considerations for State Regulators and Policy Makers in a Post-FERC Order 745 World

    Office of Energy Efficiency and Renewable Energy (EERE)

    By vacating the Federal Energy Commission's (FERC) Order 745 in Electric Power Supply Association vs. FERC (EPSA, 2014) the U.S. Court of Appeals for the D.C Circuit injected uncertainty into the future of demand response (DR) resources in U.S. wholesale markets. Many possible future scenarios in which DR continues to be available to provide capacity for resource adequacy would need to rely on a potential checkerboard of policies promulgated by state utility commissions. However, the states that will be most directly impacted by the potential implications from the EPSA ruling are precisely those that have the fewest policies currently in place to promote retail program development.

  14. Nuclear Regulatory Commission Issuances. Volume 42, No. 1, Pages 1--45

    SciTech Connect (OSTI)

    1995-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  15. Fed`s new regulatory role in emerging power markets

    SciTech Connect (OSTI)

    Moler, E.A.

    1997-10-01

    Efforts to deregulate the electric utility industry are not exactly operating at the frontier of reform. The natural gas industry has scouted out the territory, and the same regulatory agency that oversaw that transition will be establishing a few boundaries for the electric utility industry as well. The agency in charge is the Federal Energy Regulatory Commission (FERC), says Elizabeth A. Moler, chair of the FERC in Washington, D.C. The electric power industry, she adds, already is responding positively to the new competitive environment. For example, {open_quotes}state regulators are taking advantage of the opportunities afforded by FERC`s new regulations to provide choice to customers at the retail level,{close_quotes} Moler says. However, potential abuses on the new open market include price fixing and other unfair practices. {open_quotes}A utility that controls all of the generation within a large geographic area may yet control prices. Regulators at the federal and state levels must guard against these problems,{close_quotes} Moler says. In the new world of deregulation, old anti-trust laws may be invoked to ensure that monopolies do not unfarily limit competition.

  16. FERC Presendation: Demand Response as Power System Resources...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FERC Presendation: Demand Response as Power System Resources, October 29, 2010 FERC Presendation: Demand Response as Power System Resources, October 29, 2010 Federal Energy ...

  17. Title 50 CFR Part 221 Prescriptions in FERC Hydropower Licenses...

    Open Energy Information (Open El) [EERE & EIA]

    in FERC Hydropower LicensesLegal Abstract Regulations governing Department of Commerce review of FERC hydropower license conditions under Federal Power Act. Published NA...

  18. Property:FERC License Application Date | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    FERC License Application Date Jump to: navigation, search Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgw...

  19. FERC Order No. 792 - Interconnection Agreement | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    FERC Order No. 792 - Interconnection Agreement Abstract FERC Order No. 792, Small Generator Interconnection Agreement, current through June 3, 2013. Form Type Other Form Topic...

  20. EIS-0513: FERC Notice of Intent to Prepare Environmental Impact...

    Energy Savers

    Jacksonville Project, Jacksonville, Florida The Federal Energy Regulatory Commission ... Johns River in Jacksonville, Florida. DOE is a cooperating agency. A later supplemental ...

  1. EIS-0513: FERC Supplemental Notice of Intent to Prepare Environmental...

    Office of Environmental Management (EM)

    Jacksonville Project, Jacksonville, Florida The Federal Energy Regulatory Commission ... Johns River in Jacksonville, Florida. This supplemental notice announces an extension of ...

  2. EIS-0491: FERC Notice of Availability of Draft Environmental...

    Energy.gov (indexed) [DOE]

    Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory Commission issued a notice of availability of a Draft EIS that analyzes the potential...

  3. The use of information systems to transform utilities and regulatory commissions: The application of geographic information systems

    SciTech Connect (OSTI)

    Wirick, D.W.; Montgomery, G.E.; Wagman, D.C.; Spiers, J.

    1995-09-01

    One technology that can assist utilities remain financially viable in competitive markets and help utilities and regulators to better serve the public is information technology. Because geography is an important part of an electric, natural gas, telecommunications, or water utility, computer-based Geographic Information Systems (GIS) and related Automated Mapping/Facilities Management systems are emerging as core technologies for managing an ever-expanding variety of formerly manual or paper-based tasks. This report focuses on GIS as an example of the types of information systems that can be used by utilities and regulatory commissions. Chapter 2 provides general information about information systems and effects of information on organizations; Chapter 3 explores the conversion of an organization to an information-based one; Chapters 4 and 5 set out GIS as an example of the use of information technologies to transform the operations of utilities and commissions; Chapter 6 describes the use of GIS and other information systems for organizational reengineering efforts; and Chapter 7 examines the regulatory treatment of information systems.

  4. Federal Energy Regulatory Commission Interconnection Queue Practices Technical Conference December 11, 2007

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    National Electric Transmission Congestion Study Workshop December 8, 2011 Hilton St. Louis Airport, 10330 Natural Bridge Road, St. Louis, Missouri 63134 Presented by: Jerry Lein Public Utility Analyst North Dakota Public Service Commission Phone: 701 328-1035 Fax: 701 328-2410 jlein@nd.gov Overview * ND Electric Energy Resources * Need for New Transmission - Interconnection Difficulties - Transmission Constraints * Regional Transmission Projects Update * Capacity Deliverability between RTOs ND

  5. EMI/RFI and Power Surge Withstand Guidance for the U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Ewing, PD

    2001-09-07

    This paper discusses the regulatory guidance implemented by U.S. NRC for minimizing malfunctions and upsets in safety-related instrumentation and control (I and C) systems in nuclear power plants caused by electromagnetic interference (EMI), radio-frequency interference (RFI), and power surges. The engineering design, installation, and testing practices deemed acceptable to U.S. NRC are described in Regulatory Guide (RG) 1.180, ''Guidelines for Evaluating Electromagnetic and Radio-Frequency in Safety-Related Instrumentation and Control Systems'' (January 2000) and in a Safety Evaluation Report (SER) endorsing EPRI TR-102323, ''Guidelines for Electromagnetic Interference Testing in Power Plants,'' (April 1996). These engineering practices provide a well-established, systematic approach for ensuring electromagnetic compatibility (EMC) and surge withstand capability (SWC).

  6. FERC Small, Low-Impact Hydropower Projects Webpage | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    cited 20150827. Available from: https:www.ferc.govindustrieshydropowergen-infolicensingsmall-low-impactget-startedexemp-licensproject-comparison.asp...

  7. What`s new about the FERC`s new utility merger policy?

    SciTech Connect (OSTI)

    Griff, M.T.

    1997-02-01

    Order No. 592 of the US Federal Energy Regulatory commission regarding utility mergers is analyzed. Highlighted topics include effects on competition, relevant product markets, geographic markets, market concentration, remedial measures, effects on rates, and effects on regulations. The Order is generally depicted as an assembly of the commissions operative doctrines into one document, with little new regulations. However, increased litigation and the same or lengthier review times are predicted to result from the guidelines.

  8. FERC Proposal for Delegation of DOE Authority

    Energy.gov [DOE]

    The Department of Energy is considering whether to delegate to FERC its authorities related to the conduct of congestion studies and the designation of National Interest Electric Transmission Corridors.

  9. Report to the US Nuclear Regulatory Commission on analysis and evaluation of operational data - 1987: Power reactors

    SciTech Connect (OSTI)

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactors events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD Reports issued for 1980-1987.

  10. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  11. S. 1165: A Bill to provide for judicial review of Nuclear Regulatory Commission decisions on petitions for enforcement actions, and for other purposes. Introduced in the Senate of the United States, One Hundred Third Congress, Second Session, August 11, 1994

    SciTech Connect (OSTI)

    1994-12-31

    The report S. 1165 is a bill to provide for judicial review of Nuclear Regulatory Commission decisions on petitions for enforcement actions. The proposed legislative text is included.

  12. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    SciTech Connect (OSTI)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  13. FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement...

    Open Energy Information (Open El) [EERE & EIA]

    2 - Feasibility Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement Abstract FERC...

  14. FERC Order No. 2003 Appendix 4 - Facilities Study Agreement ...

    Open Energy Information (Open El) [EERE & EIA]

    4 - Facilities Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 4 - Facilities Study Agreement Abstract FERC...

  15. FERC Order No. 2003 Appendix 6 - Large Generator Interconnection...

    Open Energy Information (Open El) [EERE & EIA]

    FERC Order No. 2003 Appendix 6 - Large Generator Interconnection Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 6 -...

  16. U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.

    SciTech Connect (OSTI)

    Kalinich, Donald A.; Sallaberry, Cedric M.; Mattie, Patrick D.

    2010-12-01

    For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

  17. Vital area identification for U.S. Nuclear Regulatory Commission nuclear power reactor licensees and new reactor applicants.

    SciTech Connect (OSTI)

    Whitehead, Donnie Wayne; Varnado, G. Bruce

    2008-09-01

    U.S. Nuclear Regulatory Commission nuclear power plant licensees and new reactor applicants are required to provide protection of their plants against radiological sabotage, including the placement of vital equipment in vital areas. This document describes a systematic process for the identification of the minimum set of areas that must be designated as vital areas in order to ensure that all radiological sabotage scenarios are prevented. Vital area identification involves the use of logic models to systematically identify all of the malicious acts or combinations of malicious acts that could lead to radiological sabotage. The models available in the plant probabilistic risk assessment and other safety analyses provide a great deal of the information and basic model structure needed for the sabotage logic model. Once the sabotage logic model is developed, the events (or malicious acts) in the model are replaced with the areas in which the events can be accomplished. This sabotage area logic model is then analyzed to identify the target sets (combinations of areas the adversary must visit to cause radiological sabotage) and the candidate vital area sets (combinations of areas that must be protected against adversary access to prevent radiological sabotage). Any one of the candidate vital area sets can be selected for protection. Appropriate selection criteria will allow the licensee or new reactor applicant to minimize the impacts of vital area protection measures on plant safety, cost, operations, or other factors of concern.

  18. FERC sees huge potential for demand response

    SciTech Connect (OSTI)

    2010-04-15

    The FERC study concludes that U.S. peak demand can be reduced by as much as 188 GW -- roughly 20 percent -- under the most aggressive scenario. More moderate -- and realistic -- scenarios produce smaller but still significant reductions in peak demand. The FERC report is quick to point out that these are estimates of the potential, not projections of what could actually be achieved. The main varieties of demand response programs include interruptible tariffs, direct load control (DLC), and a number of pricing schemes.

  19. Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Name of Applicant: Cameron LNG, LLC (Cameron) Date Filed: September 28, 2015 Docket No: CP15-560-000 Type: Section 3(a) Cost: N/A Facilities: Cameron would construct two liquefaction trains (Trains 4 and 5) each with a maximum LNG production capacity of 4.985 million metric tonnes per year and a new 160,000 cubic meter full containment LNG storage tank (Tank 5) at its existing LNG liquefaction facility in Cameron and Calcasieu Parishes, Louisiana. Additionally, Cameron would install a low

  20. NUCLEAR REGULATORY COMMISSION

    Office of Environmental Management (EM)

    NUCLEAR ENERGY RESEARCH AND DEVELOPMENT ROADMAP Table of Contents List of Acronyms ................................................................................................... iii Executive Summary ............................................................................................... v 1. Introduction ...................................................................................................... 1 2. Background

  1. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  2. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991. Digest 6, Revision 4

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  3. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  4. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1971: Revision 2

    SciTech Connect (OSTI)

    Not Available

    1992-05-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  5. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--March 1991: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This revision of the sixth edition of the NRC Practice and Procedure Digest contains a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  6. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1992: Digest No. 6, Revision No. 7

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This 7th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  7. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1992: Digest 6, Revision 6

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This 6th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  8. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992. Digest 6, Revision 5

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  9. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1991: Digest 6, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1991, interpreting the NRC`s Rules of Pratice in 10 CFR Part 2.

  10. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    SciTech Connect (OSTI)

    1996-11-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

  11. OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP

    SciTech Connect (OSTI)

    Langton, C.; Burns, H.

    2009-05-29

    a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4

  12. United States Nuclear Regulatory Commission staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972-September 1985. Digest No. 4, Revision No. 1

    SciTech Connect (OSTI)

    Not Available

    1986-04-01

    This Revision 1 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1985 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 1 replaces earlier editions and supplements and includes appropriate changes reflecting the admendments to the Rules of Practice effective through September 20, 1985.

  13. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972--December 1990

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    This sixth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1990 interpreting the NRC`s Rules of Practice in 10 CFR Part 2. This sixth edition replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1990.

  14. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, appeal board and licensing board decisions, July 1972--June 1996. Digest Number 8

    SciTech Connect (OSTI)

    1997-07-01

    This is the eighth edition of the NRC Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1996 interpreting the NRC`s Rules of Practice in 10 CFR Part 2. Although the Appeal Board was abolished in 1991, Appeal Board precedent, to the extent it is consistent with more recent case law and rule changes, may still be cited. This eighth edition of the Digest replaces earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through June 1996. The Practice and Procedure Digest was originally prepared by NRC attorneys as an internal research tool. Because of its proven usefulness to those attorneys, it was decided that it might also prove useful to members of the public and practitioners before the NRC. Accordingly, the decision was made to publish the digest and subsequent editions thereof. This current edition of the Digest was prepared by staff members of the Office of General Counsel and the Office of Commission Appellate Adjudication.

  15. Nuclear Regulatory Commission Issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders. Progress report, January 1, 1996--June 30, 1996. Volume 43, pages 1-358

    SciTech Connect (OSTI)

    1997-05-01

    The hardbound edition of the Nuclear Regulatory Issuances is a final compilation of the monthly issuances. It includes all legal precedents for the agency within a six month period. This is the forty-third volume of issuances.

  16. EIS-0501: FERC Project Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FERC Project Update EIS-0501: FERC Project Update Golden Pass LNG Export and Pipeline Project, Texas and Louisiana After conducting scoping for an EA for the proposed Golden Pass LNG terminal and pipeline project, FERC issued a project update that announced that, due to changes in the project location and scope, it would prepare an EIS instead. DOE, Office of Fossil Energy - a cooperating agency in preparing the EIS - has an obligation under Section 3 of the Natural Gas Act to authorize the

  17. United States Nuclear Regulatory Commission Staff practice and procedure digest: Commission, Appeal Board and Licensing Board Decisions, July 1972--December 1988

    SciTech Connect (OSTI)

    Not Available

    1989-10-01

    This Revision 2 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1988, interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 2 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice Effective through December 31, 1988. The Practice and Procedure Digest was originally prepared by attorneys in the NRC's Office of the Executive Legal Director (now, Office of the General Counsel) as an internal research tool. Because of its proven usefulness to those attorneys, it was decided that it might also prove useful to members of the public. Accordingly, the decision was made to publish the Digest and subsequent editions thereof. This edition of the Digest was prepared by attorneys from Aspen Systems Corporation pursuant to Contract number 18-89-346.

  18. EIS-0511: FERC Notice of Availability of FInal Environmental...

    Energy.gov (indexed) [DOE]

    Project. For more information on this project, see the project page: http:energy.govnode1021761. Download Document EIS-0511: FERC Notice of Availability of FInal Environmental...

  19. EIS-0492: FERC Notice of Availability of Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0492: FERC Notice of Availability of Draft Environmental Impact Statement Oregon LNG ... the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. ...

  20. FERC Order No. 2003 Appendix 5 - Optional Interconnection Study...

    Open Energy Information (Open El) [EERE & EIA]

    5 - Optional Interconnection Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 5 - Optional Interconnection...

  1. FERC Small/Low Impact Hydropower Program Website | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    2015. cited 20150916. Available from: http:www.ferc.govindustrieshydropowergen-infolicensingsmall-low-impact.asp Retrieved from "http:en.openei.orgw...

  2. FERC Hydropower Licensing Guidelines webpage | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Guidelines webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: FERC Hydropower Licensing Guidelines webpage Abstract This webpage provides...

  3. FERC Hydropower Licensing and Endangered Species - A Guide for...

    Open Energy Information (Open El) [EERE & EIA]

    FERC Hydropower Licensing and Endangered Species - A Guide for Applicants, Contractors, and Staff Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  4. FERC Division of Hydropower Administration and Compliance | Open...

    Open Energy Information (Open El) [EERE & EIA]

    Division of Hydropower Administration and Compliance Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: FERC Division of Hydropower Administration and...

  5. Property:FERC License Issuance Date | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

  6. Assistant Secretary Patricia Hoffman's Remarks at the 2011 FERC...

    Energy Savers

    ... Energy Department Assistant Secretary Patricia Hoffman Addresses 2011 FERC Reliability Technical Conference First Annual GridWeek Conference Photo via iStock by Getty Images. ...

  7. FERC Order No. 792 - Interconnection Request | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    792 - Interconnection RequestLegal Abstract FERC Order No. 792, Attachment 2, Small Generator Interconnection Request Form, current through June 3, 2014. Published NA Year...

  8. A compilation of reports of the Advisory Committee on Reactor Safeguards, 1997 annual, U.S. Nuclear Regulatory Commission. Volume 19

    SciTech Connect (OSTI)

    1998-04-01

    This compilation contains 67 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1997. It also includes a report to the Congress on the NRC Safety Research Program. Specific topics include: (1) advanced reactor designs, (2) emergency core cooling systems, (3) fire protection, (4) generic letters and issues, (5) human factors, (6) instrumentation, control and protection systems, (7) materials engineering, (8) probabilistic risk assessment, (9) regulatory guides and procedures, rules, regulations, and (10) safety research, philosophy, technology and criteria.

  9. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  10. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  11. How Regulatory Risk Has Moved Front and Center in the Tug-of-War between State Commissions and Public Utilities

    SciTech Connect (OSTI)

    Keglevic, Paul; McConomy, John; Koppin, John

    2006-11-15

    Deregulation of generation, volatile commodity markets and an increase in proposed utility mergers have heightened the stakes in the historic struggle of public service commissions to balance the interests of ratepayers and shareholders. The authors review this struggle and its impact on recent requests for rate increases and the pending approval of several mergers announced in the past few years. (author)

  12. Symbiotics, LLC, 110 FERC 61,235 (2005) | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    (2005)Legal Abstract FERC Order denying Symbiotic, LLC's request for a rehearing, stemming from FERC's decision to dismiss Symbiotic's application for an original license for a...

  13. Solar Energy to Benefit from New FERC Interconnection Procedures

    Energy.gov [DOE]

    As a major win for solar and testament to the impact of Department of Energys SunShot Initiative funded research at the national labs, this past month Federal Energy Regulatory Commission announced the adoption of new fast track rules to make the interconnection process dramatically cheaper and faster for small wholesale energy projects, representing a major improvement with nationwide impacts.

  14. Energy Department Issues Request For Proposal for Nuclear Regulatory...

    Energy Savers

    Nuclear Regulatory Commission Licensed Facilities Procurement Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement March ...

  15. Neshaps rulemaking on Nuclear Regulatory Commission and agreement state licensees other than nuclear power reactors. Background information document

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    Contents: introduction and summary; description of regulatory programs; results of designated survey of NRC-licensed facilities (uranium fuel cycle facilities, test and research reactors, radiopharmaceutical and radiolabeled compound manufacturers, hospitals and medical research facilities, manufacturers of sealed sources, testing of depleted uranium munitions, rare earth and thorium processors (source material), commercial low-level radioactive waste disposal and incineration, and summary of results); results of random survey of licensees; and quality control.

  16. Requiring an Office of Investigations within the Nuclear Regulatory Commission. Introduced in the House of Representatives, One Hundredth Congress, Second Session, September 29, 1988

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    This bill amends the Energy Reorganization Act of 1974 to add a new section 205A that establishes within the Nuclear Regulatory Commission (NRC) a statutory Office of Investigation (OI) and establishes a director of this office who reports directly to the five NRC Commissioners. The new section also sets out the responsibility of the office for initiating and conducting investigations into violations of laws the NRC implements that relate to violations involving wrongdoing. The OI is charged with reporting violations of federal criminal law to the Department of Justice. The Committee on Energy and Commerce considered the bill, report favorably on it without amendment, and recommend its passage by the whole House of Representatives.

  17. Natural Gas Weekly Update, Printer-Friendly Version

    Annual Energy Outlook

    recorded last year. Other Market Trends: FERC Releases Report on Underground Natural Gas Storage: The Federal Energy Regulatory Commission (FERC) issued a report last week that...

  18. Natural Gas Weekly Update

    Annual Energy Outlook

    recorded last year. Other Market Trends: FERC Releases Report on Underground Natural Gas Storage: The Federal Energy Regulatory Commission (FERC) issued a report last week that...

  19. U.S. Energy Information Administration (EIA)

    Annual Energy Outlook

    ... FERC Expands Eligibility of Blanket Certificates: The Federal Energy Regulatory Commission (FERC) issued a final rule on October 19, 2006, that expanded the scope of blanket ...

  20. FERC Order No. 2003 - Final Rule | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    through June 2, 2014. Published NA Year Signed or Took Effect 2003 Legal Citation 68 FR 49846 DOI Not Provided Check for DOI availability: http:crossref.org Citation FERC...

  1. Title 43 CFR 45 Conditions and Prescriptions in FERC Hydropower...

    Open Energy Information (Open El) [EERE & EIA]

    5 Conditions and Prescriptions in FERC Hydropower Licenses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 43 CFR 45...

  2. Alaska Planning Commission Handbook | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Alaska Planning Commission HandbookPermittingRegulatory GuidanceGuide...

  3. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 4. Evaluation of other loads and load combinations

    SciTech Connect (OSTI)

    Not Available

    1984-12-01

    Six topical areas were covered by the Task Group on Other Dynamic Loads and Load Combinations as described below: Event Combinations - dealing with the potential simultaneous occurrence of earthquakes, pipe ruptures, and water hammer events in the piping design basis; Response Combinations - dealing with multiply supported piping with independent inputs, the sequence of combinations between spacial and modal components of response, and the treatment of high frequency modes in combination with low frequency modal responses; Stress Limits/Dynamic Allowables - dealing with inelastic allowables for piping and strain rate effects; Water Hammer Loadings - dealing with code and design specifications for these loadings and procedures for identifying potential water hammer that could affect safety; Relief Valve Opening and Closing Loads - dealing with the adequacy of analytical tools for predicting the effects of these events and, in addition, with estimating effective cycles for fatigue evaluations; and Piping Vibration Loads - dealing with evaluation procedures for estimating other than seismic vibratory loads, the need to consider reciprocating and rotary equipment vibratory loads, and high frequency vibratory loads. NRC staff recommendations or regulatory changes and additional study appear in this report.

  4. Why applicants should use computer simulation models to comply with the FERC`s new merger policy

    SciTech Connect (OSTI)

    Frankena, M.W.; Morris, J.R.

    1997-02-01

    Computer models for electric utility use in complying with the US Federal Energy Regulatory Commission policy on mergers are described. Four types of simulation models that are widely used in the electric power industry are considered as tools for analyzing market power issues: dispatch/transportation models, dispatch/unit-commitment models, load-flow models, and load-flow/dispatch models. Basic model capabilities and limitations are described. Uses of the models for other purposes are also noted, including regulatory filings, antitrust litigation, and evaluation of pricing strategies.

  5. Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2010, Prepared for the Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, May 2012

    SciTech Connect (OSTI)

    D. E. Lewis D. A. Hagemeyer Y. U. McCormick

    2012-07-07

    This report summarizes the occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commission’s (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 2010 annual reports submitted by five of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Because there are no geologic repositories for high-level waste currently licensed and no NRC-licensed low-level waste disposal facilities currently in operation, only five categories will be considered in this report. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in this report in terms of collective dose and the distribution of dose among the monitored individuals. Annual reports for 2010 were received from a total of 190 NRC licensees. The summation of reports submitted by the 190 licensees indicated that 192,424 individuals were monitored, 81,961 of whom received a measurable dose. When adjusted for transient workers who worked at more than one licensee during the year, there were actually 142,471 monitored individuals and 62,782 who received a measurable dose. The collective dose incurred by these individuals was 10,617 person-rem, which represents a 12% decrease from the 2009 value. This decrease was primarily due to the decrease in collective dose at commercial nuclear power reactors, as well as a decrease in the collective dose for most of the other categories of NRC licensees. The number of individuals receiving a measurable dose also decreased, resulting in an average measurable dose of 0.13 rem for 2010. The average measurable dose is defined as the total effective dose equivalent (TEDE) divided by the number of individuals receiving a measurable dose. In calendar year 2010, the average annual collective dose per reactor for light water reactor

  6. 18 CFR 4.104 FERC Amendment of Exemption | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    4.104 FERC Amendment of Exemption Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 18 CFR 4.104 FERC Amendment of...

  7. * Milepost Federal Energy Regulatory Commission

    Energy Savers

    using the eLibrary link. Click on the eLibrary link, click on "General Search," and enter the docket number excluding the last three digits in the Docket Number field (i.e.,...

  8. * Milepost Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... L.P. CEQ Council on Environmental Quality CFR Code of Federal Regulations CGT Columbia Gulf ... the late 1970s at the Naval Weapons Center in China Lake, California. ...

  9. UNITED STATES NUCLEAR REGULATORY COMMISSION

    Office of Legacy Management (LM)

    FCAF:Wi3 )I 70-364 : i: SNM-414,jAmendment No. 3 --A Babcock and Wilcox Company Nuclear ... the experience requirements for the function of Licensing and Nuclear Safety Specialist. ...

  10. FERC How to Surrender a License or Exemption | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    cited 20150507. Available from: http:www.ferc.govindustrieshydropowergen-infocomp-adminsurrender.asp Retrieved from "http:en.openei.orgw...

  11. EA-1949: FERC Notice of Availability Errata Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Errata Sheet EA-1949: FERC Notice of Availability Errata Sheet Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This notice corrects the Notice of Availability issued on August 9, 2013, announcing the availability of the FERC Admiralty Inlet Pilot Tidal Project, Puget Sound, WA Final Environmental Assessment. Please note that FERC is not requesting comments on the Final EA. EA-1949-FEA-ErrataNoticeofAvailabilty-2013.pdf (6.26 KB) More Documents & Publications EA-1949: FERC Notice of

  12. Microsoft Word - A15TG042 RPT 2015-10-29 FERC FISMA

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Unclassified Cybersecurity Program - 2015 OAI-L-16-02 October 2015 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 October 30, 2015 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Audit Report: "Federal Energy Regulatory Commission's Unclassified

  13. Commissioning Specifications

    Office of Energy Efficiency and Renewable Energy (EERE)

    Commissioning specifications outline basic requirements of the commissioning process and detail the roles and responsibilities of each party involved. System checklists, startup requirements, and...

  14. Inventory of U.S. Greenhouse Gas Emissions and Sinks: 1990-2009...

    National Nuclear Security Administration (NNSA)

    ... October 2006. . EPA (2004) Green ... FERC (2010). North American LNG Terminals . Federal Energy Regulatory Commission, ...

  15. EA-1949: FERC Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within

  16. EA-1949: FERC Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Final Environmental Assessment EA-1949: FERC Final Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA On September 16, 2010, Snohomish PUD was selected for potential receipt of financial assistance from the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy to support the design, construction, deployment and monitoring phases of their project. To satisfy DOE's requirements under the National Environmental Policy Act (NEPA) for this

  17. Utah Labor Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    The Utah Labor Commission is the regulatory agency responsible for preserving the balance established by the legislature for protecting the health, safety, and economic...

  18. H. R. 3532: This act may be cited as the Nuclear Regulatory Commission Authorization Act for Fiscal Year 1999. Introduced in the House of Representatives, One Hundred Fifth Congress, Second Session, March 24, 1998

    SciTech Connect (OSTI)

    Not Available

    1998-03-24

    This bill authorizes appropriations for the Nuclear Regulatory Commission for fiscal year 1999. It is divided into the following sections: Section 1. Short title; Section 102. Allocation of amounts authorized; Section 103. Retention of funds; Section 104. Transfer of certain funds; Section 105. Limitation; Section 106. License fee exemption; Section 107. NRC user fees and actual charges. Section 201. Office location; Section 202. Period of a combined license; Section 203. Gift acceptance authority; Section 204. Carrying of firearms by licensee employees; Section 205. Sabotage of production, utilization or waste storage facilities under construction; Section 206. Unauthorized introduction of dangerous weapons; and Section 207. Continuation of Commissioner service.

  19. H. R. 1711: a Bill to authorize appropriations for the Nuclear Regulatory Commission for fiscal year 1986 and fiscal year 1987. Introduced in the House of Representatives, Ninety-Ninth Congress, First Session

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Nuclear Regulatory Commission (NRC) appropriations for fiscal years 1986 and 1987 are $429 million and $460 million, respectively. The Bill allocates sums for each year for reactor regulation, inspection and enforcement, nuclear material safety and safeguards, reactor research, program technical support, and program administration. The Bill cites conditions for spending the funds and for entering into grants and cooperative agreements. The NRC is authorized to issue reactor operating licenses in the absence of a state or local emergency preparedness plan if it determines that public safety is assured.

  20. Authority of states of use section 401 water quality certification to deny or condition Federal Energy Regulatory Commission licenses. Master's thesis

    SciTech Connect (OSTI)

    Hart, E.O.

    1994-09-01

    This thesis discusses a recent United States Supreme Court case that will have a profound influence on the licensure of hydroelectric projects and the related ability of States to protect the quality of their waters. On October 4, 1993, the Supreme Court granted a Writ of Certiorari to resolve a conflict among the state courts of last resort. This case involves two fundamental and competing national interests: the nation's thirst for cheap, dependable power versus its equally strong desire to improve the quality of its water resources. It also involves two underlying regulatory regimes that overlap and conflict with each other in some ways. This case illustrates how those two national interests and their underlying regulatory regimes cannot always be reconciled. It also demonstrates how Congress, with its muddled ways of passing legislation, can create conflicts between federal and state regulatory agencies.

  1. Beyond Commissioning

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2004-08-31

    The emerging practice of building commissioning generally provides energy savings of 10% to, in some cases, more than 60% of a building's energy consumption. Moreover, commissioning ensures that equipment and systems are installed and operate properly, providing occupants with the conditions expected. Without commissioning, new buildings can have incorrect equipment installed, devices like fans installed backwards, and unimplemented control algorithms to mention a few deficiencies sometimes found. Existing buildings can have faulty and failed equipment such as clogged filters and coils, stuck dampers, leaky valves, and imbalanced air distribution, as well as overridden controls, improper set points, and incorrect schedules. Commissioning of new and existing buildings helps prevent and alleviate such problems. Yet only a small fraction of commercial buildings has ever been commissioned, and many buildings that have been commissioned have only a fraction of the recommended actions implemented. Time may change this situation or maybe other changes can accelerate the progress of commissioning. Will commissioning continue in the future as it is performed today or must it change? The authors share a vision for how the functions provided by commissioning could change in the future. The paper delves into the roles of automation technology for functional testing, diagnostics, prognostics, data management, asset tracking, and project management in building commissioning. Methods of delivery explored for these capabilities include laptop-, desktop-, and pda-based tools, web-based services, and ubiquitous embedded networked processing. The authors present a vision for how these technologies could change the practice of commissioning and the impacts this could bring for commercial buildings in the U.S. and throughout the world. Potential impacts on building performance, energy consumption, peak power, and occupant satisfaction are examined.

  2. Analysis of FERC's Final EIS for Electricity Open Access & Recovery of Stranded Costs

    Reports and Publications

    1996-01-01

    Reviews the Final Environmental Impact Statement (FEIS) prepared by the Federal Energy Regulatory Commission for its electricity transmission system open access prepared in April 1996 and uses the National Energy Modeling System (NEMS) to analyze the open access rule (Orders 888 and 889).

  3. Energy Department Assistant Secretary Patricia Hoffman Addresses 2011 FERC Reliability Technical Conference

    Energy.gov [DOE]

    Department of Energy Assistant Secretary for Electricity Delivery and Energy Reliability Patricia Hoffman today addressed the 2011 Federal Energy Regulatory Commission technical conference in Washington, D.C. In remarks prepared for delivery, Assistant Secretary Hoffman discussed recent evaluations of proposed Environmental Protection Agency (EPA) rules and the impact those rules could be expected to have on our nation’s electrical grid.

  4. EA-1916: DOE Notice of Availability of a Draft Environmental...

    Energy.gov (indexed) [DOE]

    and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean...

  5. EA-1650: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The staff of the Federal Energy Regulatory Commission (FERC or Commission) and the Department of Energy (DOE), Office of Fossil Fuels, have prepared an environmental assessment ...

  6. Economic and regulatory aspects of cogeneration: the implementation of Section 210 of the Public Utility Regulatory Policies Act of 1978

    SciTech Connect (OSTI)

    Vincent, J.W.

    1982-01-01

    In February of 1980 the Federal Energy Regulatory Commission (FERC) promulgated a set of rules that were to commence the implementation process of Section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). Of particular interest to economists are the pricing provisions in the rules that pertain to integrating dispersed sources of electric power generation into conventional electric utility systems. The full avoided cost pricing provision couples a utility mandate to purchase power from qualified dispersed facilities (cogenerators, wind power, small hydro facilities, etc., hereafter denoted QFs) with the requirement that the price the utility pays for such purchases be equal to the full extent of the cost it avoids by not generating the power itself. The simultaneous purchase and sale billing scheme requires a utility to purchase the gross power output of a QF at the full avoided cost rate and simultaneously sell back to the QF its power requirement on the applicable retail tariff. Theoretical investigation of these two provisions reveals that, properly defined, they are consistent with improving economic signals with respect to electricity generation.

  7. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of seismic designs: a review of seismic design requirements for Nuclear Power Plant Piping

    SciTech Connect (OSTI)

    Not Available

    1985-04-01

    This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

  8. Student Trainee (Electrical Engineering)

    Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) is an independent regulatory agency that regulates and oversees various aspects of the energy markets within the United States. We value independence...

  9. Student Trainee (Administrative and Office Support)

    Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) is an independent regulatory agency that regulates and oversees various aspects of the energy markets within the United States. We value independence...

  10. Natural Gas Weekly Update

    Annual Energy Outlook

    passed milestones in the regulatory approval processes in the United States and Mexico. The U.S. Federal Energy Regulatory Commission (FERC) issued a favorable final...

  11. Natural Gas Weekly Update, Printer-Friendly Version

    Annual Energy Outlook

    passed milestones in the regulatory approval processes in the United States and Mexico. The U.S. Federal Energy Regulatory Commission (FERC) issued a favorable final...

  12. Student Trainee (Operations Research Analysis)

    Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) is an independent regulatory agency that regulates and oversees various aspects of the energy markets within the United States. We value independence...

  13. BPA-2012-01870-FOIA Response

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Regulatory Commission (FERC) matters relating to the operations of BPA. Regulatory intelligence related to BPA will include research, analysis, briefings, andor reports as...

  14. BPA-2011-00675-FOIA Response

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    services and products to obtain strategic advice and electric utility regulatory intelligence for Federal Energy Regulatory Commission (FERC) matters relating to the operations...

  15. Student Trainee (Energy Industry)

    Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) is an independent regulatory agency that regulates and oversees various aspects of the energy markets within the United States. We value independence...

  16. Title 7 CFR 1.601 et seq. Conditions in FERC Hydropower Licenses...

    Open Energy Information (Open El) [EERE & EIA]

    7 CFR 1.601 et seq. Conditions in FERC Hydropower Licenses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 7 CFR...

  17. Title 43 CFR Part 45 Conditions and Prescriptions in FERC Hydropower...

    Open Energy Information (Open El) [EERE & EIA]

    Part 45 Conditions and Prescriptions in FERC Hydropower Licenses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 43...

  18. EIS-0517: FERC Notice of Intent to Prepare an Environmental Impact...

    Energy.gov (indexed) [DOE]

    Federal Register) (217.21 KB) More Documents & Publications EIS-0517: FERC Notice of Intent to Prepare an Environmental Impact Statement EIS-0520: Notice of Intent EIS-0519: Notice ...

  19. California Trout, Inc. v. FERC, 313 F.3d 1131,1134, 1136 (9th...

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Legal CaseHearing: California Trout, Inc. v. FERC, 313 F.3d 1131,1134, 1136 (9th Cir. 2002)Legal Abstract Ninth Circuit case that...

  20. California Trout, Inc. v. FERC, 313 F.3d 1131,1134,1136 (9th...

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Legal CaseHearing: California Trout, Inc. v. FERC, 313 F.3d 1131,1134,1136 (9th Cir. 2002)Legal Hearing California Trout, Inc. v....

  1. EERE Success Story—Solar Energy to Benefit from New FERC Interconnection Procedures

    Energy.gov [DOE]

    As a major win for solar and testament to the impact of Department of Energy’s SunShot Initiative funded research at the national labs, this past month Federal Energy Regulatory Commission announced the adoption of new “fast track” rules to make the interconnection process dramatically cheaper and faster for small wholesale energy projects, representing a major improvement with nationwide impacts.

  2. FERC Hydroelectric Project Handbook for Filings other than Licenses...

    Open Energy Information (Open El) [EERE & EIA]

    Hydroelectric Project Handbook for Filings other than Licenses and Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  3. FERC Handbook for Hydroelectric Project Licensing and 5 MW Exemptions...

    Open Energy Information (Open El) [EERE & EIA]

    Handbook for Hydroelectric Project Licensing and 5 MW Exemptions from Licensing Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  4. Commission to Review the Effectiveness of the National Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Richard A. Meserve President Emeritus, Carnegie Institution for Science and Former Chairman of the US Nuclear Regulatory Commission Read Bio Cherry A. Murray Dean, Harvard ...

  5. Oregon Public Utility Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oregon Public Utility Commission Oregon Public Utility Commission Offer comments on the United States Department of Energy Smart Grid Request for Information (RFI). Oregon Public Utility Commission (330.3 KB) More Documents & Publications Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy- Request for Information Edison Electric Institute (EEI) Regulatory Burden RFI, 77 Fed. Reg. 47328 Comments of the American Public

  6. NRC (Nuclear Regulatory Commission) editorial style guide

    SciTech Connect (OSTI)

    Beeson, J.F.; Calure, B.A.; Gable, D.; Lesar, M.T.; Mejac, M.F.; Sanders, R.F.

    1989-10-01

    Editorial style refers to the choices that writers, editors, and secretaries make to eliminate inconsistencies in their documents. These choices apply to the recurrent features of a document such as abbreviations, capitalization, compound words, numbers, symbols, and punctuation, as well as to references and footnotes. Making these choices is sometimes difficult because usage changes as the language evolves. Consider the use of hyphens, for example. Do we write non-power reactor or nonpower reactor Is it on-site incident or onsite incident Although usage is moving away from the use of hyphens with prefixes, the authorities who compile style guides do not always agree about which choice to use at a given time. Moreover, each discipline -- law, physics, mathematics -- has specific standards that apply to the publications for that discipline. Even in an area as seemingly certain as spelling, overlapping usage exists. Reputable dictionaries show both align'' and aline'' as correct spellings. Likewise, disc, disk, and diskette'' currently coexist as equally valid choices.

  7. Sandia Energy - Federal Electric Regulatory Commission Revised...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    rules that govern the interconnection of all distributed generators, including solar PV. "In particular, the solar energy sector is expected to benefit significantly from the...

  8. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    This document provides functional organization charts for all NRC Offices and Regions, and their components.

  9. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I

    Office of Legacy Management (LM)

    and Lab Branch Division of Nuclear Materials Safety Docket No. 040-07123 License No. ... SUB-748 file cc wencl: State of New York NATIONAL LEAD COMPANY ?La;R Pile cOpt NUCLEAR ...

  10. NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

    Office of Legacy Management (LM)

    ... Location Kerr-McGee Nuclear Corporation Cimarron Uranium Fuel Fabrication Facility - 2. ... for possession.of source and special nuclear material. 3. Contamination, Demography ...

  11. 2010 Assessment of Demand Response and Advanced Metering - Staff...

    Energy.gov (indexed) [DOE]

    2010 Assessment of Demand Response and Advanced Metering - Staff Report. The Federal Energy Regulatory Commission's 2010 Demand Response and Advanced Metering Survey (2010 FERC ...

  12. Implementation Proposal for the National Action Plan on Demand Response- July 2011

    Energy.gov [DOE]

    Report to Congress prepared by the staff of the Federal Energy Regulatory Commission (FERC) and the Department of Energy.

  13. Microsoft Word - NAP Coalition Response to DOE RFI DRAFT 10.11...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    consumer decision-making be incorporated into federal-state collaborative efforts such as the Federal Energy Regulatory Commission's (FERC) National Action Plan on Demand Response? ...

  14. Contract No. DE-AC02-07CH11358 Contract Modification No. 0200

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... Energy, "FERC" means the Federal Energy Regulatory Commission, and "NNSA" means the ... Standards and related documents, and Guides, including for purposes of this contract ...

  15. Microsoft Word - DE-RW0000005.rtf

    Energy Savers

    ... Energy, "FERC" means the Federal Energy Regulatory Commission, and "NNSA" means the ... Standards and related documents, and Guides, including for purposes of this contract ...

  16. Microsoft Word - DOE_PPPL_M233_Sect_H.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... Energy, "FERC" means the Federal Energy Regulatory Commission, and "NNSA" means the ... Standards and related documents, and Guides, including for purposes of this contract ...

  17. EIS-0513: Jacksonville Project, Jacksonville, Florida | Department...

    Office of Environmental Management (EM)

    3: Jacksonville Project, Jacksonville, Florida EIS-0513: Jacksonville Project, Jacksonville, Florida SUMMARY The Federal Energy Regulatory Commission (FERC) announced its intent to ...

  18. United States

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... FERC Federal Energy Regulatory Commission GW Gigawatt (one billion watts) HVDC ... ownership of high- voltage direct current (HVDC) transmission facilities running ...

  19. U.S. Energy Information Administration (EIA)

    Annual Energy Outlook

    ... In a rule issued on Tuesday, November 25, the Federal Energy Regulatory Commission (FERC) significantly broadened the scope of energy affiliates that must conform to the standards ...

  20. National Action Plan on Demand Response, June 2010 | Department...

    Energy.gov (indexed) [DOE]

    Federal Energy Regulatory Commission (FERC) is required to develop the National Action Plan on Demand Response (National Action Plan) as outlined in section 529 of the Energy ...

  1. EA-1983: Finding of No Significant Impact | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulatory Commission (FERC), with DOE as a cooperating agency, for a proposal to expand the Sabine Pass Liquefied Natural Gas Terminal and extend an associated pipeline system. ...

  2. EIS-0520: Texas LNG Project; Cameron County, Texas | Department...

    Office of Environmental Management (EM)

    20: Texas LNG Project; Cameron County, Texas EIS-0520: Texas LNG Project; Cameron County, Texas Summary The Federal Energy Regulatory Commission (FERC) announced its intent to ...

  3. EIS-0518: Annova LNG Brownsville Project; Cameron County, Texas...

    Office of Environmental Management (EM)

    18: Annova LNG Brownsville Project; Cameron County, Texas EIS-0518: Annova LNG Brownsville Project; Cameron County, Texas Summary The Federal Energy Regulatory Commission (FERC) ...

  4. EA-2041: Cameron LNG Expansion Project | Department of Energy

    Office of Environmental Management (EM)

    41: Cameron LNG Expansion Project EA-2041: Cameron LNG Expansion Project Summary The Federal Energy Regulatory Commission (FERC) prepared an environmental assessment (EA) that ...

  5. EIS-0501: Notice of Intent | Department of Energy

    Energy.gov (indexed) [DOE]

    Golden Pass LNG Export Project; Texas and Louisiana In October 2013, Federal Energy Regulatory Commission (FERC) announced its intent to prepare, with DOE as a cooperating agency, ...

  6. EIS-0508: Downeast LNG Import-Export Project, Robbinston, Maine...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8: Downeast LNG Import-Export Project, Robbinston, Maine EIS-0508: Downeast LNG Import-Export Project, Robbinston, Maine SUMMARY The Federal Energy Regulatory Commission (FERC) is ...

  7. EIS-0494: Notice of Intent to Prepare an Environmental Impact...

    Office of Environmental Management (EM)

    Excelerate Liquefaction Solutions Lavaca Bay LNG Project, Calhoun and Jackson Counties, Texas The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a ...

  8. DOE Designates Southwest Area and Mid-Atlantic Area National...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... The Energy Policy Act of 2005 authorizes the Federal Energy Regulatory Commission (FERC) to issue, under certain circumstances, permits for new transmission facilities within a ...

  9. U.S. Energy Information Administration (EIA)

    Gasoline and Diesel Fuel Update

    DemandSupply | Storage In the News: FERC approves New England's 2014-15 winter reliability program, but challenges remain Last week, the Federal Energy Regulatory Commission...

  10. RAPID/Roadmap/2 | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Regulatory Commission (FERC),Bureau of Reclamation (BOR), U.S. Forest Service (USFS), Fish and Wildlife Service (FWS), and Bureau of Land Management (BLM) provide guidance on...

  11. EIS-0491: Notice of Intent to Prepare an Environmental Impact...

    Office of Environmental Management (EM)

    Notice of Intent to Prepare an Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, LA The Federal Energy Regulatory Commission (FERC) is...

  12. EA-1963: Notice of Intent to Prepare an Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Assessment EA-1963: Notice of Intent to Prepare an Environmental Assessment Elba Liquefaction Project, Savannah, Georgia The Federal Energy Regulatory Commission (FERC) is...

  13. Analysis of Firm Transportation Contracts: Results and Methodology

    Reports and Publications

    1996-01-01

    Summary of Federal Energy Regulatory Commission (FERC) Index of Customers Data - Firm Transportation Capacity Under Contract as of April 1, 1996.

  14. Office of Chief Financial Officer

    Energy Savers

    ... Department of Energy Budget by Appropriation Energy and Water Development, and Related ... Federal Energy Regulatory Commission (FERC) 0 0 0 0 0 NA Subtotal, Energy and Water ...

  15. Narragansett update: from Washington Gas Light to Nantahala

    SciTech Connect (OSTI)

    Ercolano, A.J.; Lesch, P.C.

    1986-01-01

    In recent contests over regulatory jurisdiction between the Federal Energy Regulatory Commission (FERC) and local utility commissions, the courts have defended the FERC's exclusive regulatory authority over interstate rates against state commission encroachment. Moreover, in Nantahala, the Court applied an expansive interpretation of what constitutes an impermissible interference with the FERC's jurisdiction. By not limiting the holding to rates per se the Court drove home the message that local public utility commissions have a duty not to interfere, in any manner, in the area of the FERC's exclusive domain - regulation of interstate wholesale rates.

  16. Role of the environmental management commission in North Carolina

    SciTech Connect (OSTI)

    Watkins, R.V. )

    1993-01-01

    The state of North Carolina's 17-member Environmental Management Commission is the principal regulatory and environmental policy-making body in the state for issues affecting water, air, and land resources. The author traces the evolution of environmental programs in the state, and the history of the Environmental Management Commission from its origin in 1927, and reviews the Commission's role, mission, structure, organization, function, and regulatory/public participation process. The state's environmental regulatory rulemaking process and established provisions against conflict of interest are also reviewed.

  17. EA-1963: Elba Liquefaction Project; Chatham, Hart, Jefferson, and Effingham Counties, Georgia, and Jasper County, South Carolina

    Energy.gov [DOE]

    Federal Energy Regulatory Commission (FERC) prepared an EA that assesses the potential environmental impacts of a proposal to add natural gas liquefaction and export capabilities at the existing Elba Liquefied Natural Gas Terminal near Savannah, Georgia. Information about this project is available on the FERC website (www.ferc.gov).

  18. Alaska - AS 42.05.431 - Power of Commission to Fix Rates | Open...

    Open Energy Information (Open El) [EERE & EIA]

    - AS 42.05.431 - Power of Commission to Fix RatesLegal Abstract This section sets forth the authority of the Regulatory Commission to fix rates for service by utilities....

  19. SPEAR3 | Commissioning

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    elog elog demo setting printer queue for elog Matlab installation Middle layer Quick Reference Middle layer software Accelerator Toolbox Parameter list (updated 06/06/05) Power supply list Linear Optics from Closed Orbits (LOCO) Commissioning Schedule Commissioning Program(.ppt) Commissioning Schedule(.mpp) Run Schedule Shift Schedule SSRL | SLAC | Stanford University | SSRL Computing | SLAC Computing last updated: DEC 09, 2005

  20. Audit Report: IG-0750 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    50 Audit Report: IG-0750 December 18, 2006 The Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams Pursuant to the Federal Power Act, the Federal Energy Regulatory Commission (FERC) regulates certain aspects of non-Federal hydroelectric dams. FERC is required to ensure the safety, stability. and integrity of these dams with the goal of protecting life, health, and property from, among other things, instances of sabotage and vandalism. To meet these requirements, FERC

  1. Commission Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Commission Meetings Meetings of the Commission to Review the Effectiveness of the National Energy Laboratories October 23, 2015 Commission to Review the Effectiveness of the ...

  2. Speakers: Howard K. Gruenspecht, EIA Shahid Chaudhry, California Energy Commission

    Gasoline and Diesel Fuel Update

    10: "The Energy-Water Nexus: Availability and Impacts" Speakers: Howard K. Gruenspecht, EIA Shahid Chaudhry, California Energy Commission M. Michael Hightower, Sandia National Laboratories James Richenderfer, Susquehanna River Basin Commission Jeff C. Wright, Federal Energy Regulatory Commission [Note: Recorders did not pick up introduction of panel (see biographies for details on the panelists) or introduction of session.] Howard Gruenspecht: Okay, we're going to try to get underway

  3. EA-1963: Elba Liquefaction Project, Savannah, Georgia

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Regulatory Commission (FERC) is preparing, with DOE as a cooperating agency, an EA to analyze the potential environmental impacts of a proposal to add natural gas liquefaction and export capabilities at the existing Elba Liquefied Natural Gas Terminal near Savannah, Georgia. Additional information is available at FERCs eLibrary website, elibrary.ferc.gov/idmws/docket_search.asp; search for docket number PF13-3.

  4. Commissioning guidance for ESPCs

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Guidance for facility managers describing the commissioning process in Super ESPC contracts and how these contracts can achieve the objective of meeting facility performance requirements.

  5. California Energy Commission

    Energy.gov (indexed) [DOE]

    California Energy Commission Quadrennial Water Review Comments - June 19, 2014 Water-Energy Nexus Water and energy systems are inextricably linked -- producing energy uses large ...

  6. 1992 Memorandum of Understanding between the Federal Energy Regulatory...

    Open Energy Information (Open El) [EERE & EIA]

    between the Federal Energy Regulatory Commission and the Department of Interior, Bureau of Reclamation Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  7. Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory...

    Office of Legacy Management (LM)

    111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W ...

  8. Guidelines for residential commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  9. FERC Review

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Skip navigation links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings...

  10. FERC Filing

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K Commercial Business Process Improvement (CBPI) Customer...

  11. FERC Filing

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer Involvement Reports & Tools Expand Reports & Tools Operations &...

  12. Commissioning the LCLS Injector

    SciTech Connect (OSTI)

    Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Gilevich, S.; Hays, G.; Hering, Ph.; Iverson, R.; Limborg-Deprey, C.; Loos, H.; Miahnahri, A.; Schmerge, J.; Turner, J.; Welch, J.; White, W.; Wu, J.; /SLAC

    2007-11-28

    The Linac Coherent Light Source (LCLS) is a SASE x-ray Free-Electron Laser (FEL) project presently under construction at SLAC. The injector section, from drive laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam was completed in August 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch clearly demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photo-cathode drive laser, RF gun, photocathode, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

  13. Retro-Commissioning Program

    Energy.gov [DOE]

    To obtain incentives, interested applicants must work with a Retro-Commissioning Service Provider adviser to complete the initial study. Please note that customer eligibility for Focus on Energy ...

  14. Commissioning and Retro-Commissioning Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Commissioning and Retro-Commissioning Resources Commissioning and Retro-Commissioning Resources To ensure a new building's systems are correctly installed and are operating properly, a commissioning program may be incorporated into all building phases, including design, construction, and operations. Likewise, a retro-commissioning process is used for identifying and improving less-than-optimal energy performance in an existing building's equipment and control systems. State and local governments

  15. European Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    European Commission Name: European Commission Place: Brussels, Belgium Website: ec.europa.euindexen.htm Coordinates: 50.8503396, 4.3517103 Show Map Loading map......

  16. EIS-0493: FERC Notice of Intent to Prepare an Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Intent to Prepare an Environmental Assessment Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory...

  17. UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C...

    Office of Scientific and Technical Information (OSTI)

    ... FIGURE 3-4 S c h e m a t i c of BWR R e a c t o r C o o l a n t System - 3 5 - . ' . . . 4 i ..> . . . . . ---... , I Vent Piping' ( 8 pipes) Dryvell -37- Q c - - CONTAINMENT ...

  18. Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel Management

    Office of Environmental Management (EM)

    of NEAC Mujid Kazimi (Chair), Ashok Bhatnagar, Doug Chapin, Tom Cochran, Mike Corradini, Regis Matzie, Harold Ray, Joy Rempe. Briefing to Nuclear Energy Advisory Committee to Department of Energy December 10, 2014 1 NRT Subcommittee Meetings * Subcommittee met on September 29, 2014. * Briefed on the March 2014 DOE "Big Idea Summit", where Idaho National Laboratory (INL) led a break-out group that discussed more rapid advanced technology deployment in nuclear power plants and more rapid

  19. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 8, 2015) The ... impact statement (EIS) for the Alaska LNG Project involving construction and ...

  20. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October ... impact statement (EIS) for the Alaska LNG Project involving construction and ...

  1. US Nuclear Regulatory Commission functional organization charts. Revision 6

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The report consists entirely of organizational charts of the US NRC, with functional notes for each office. (GHT)

  2. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New Technologies" and "Reliability and Cyber-Security," US...

  3. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... If the turbine must be removed, the process could take up to ... in pH, spill of oil, and use of anti-bio-fouling paints. ... would alter other water quality conditions in the ...

  4. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    under section 211A of the Federal Power Act (FPA) to propose a cost allocation methodology under the Oversupply Management Protocol (OMP) to allocate displacement costs in a...

  5. DOE Awards Contract for the Nuclear Regulatory Commission (NRC...

    Office of Environmental Management (EM)

    The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities ... protection, waste management, safeguards and security, information management, ...

  6. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Corpus Christi Liquefaction, LLC Docket Nos. CP12-507-000 Cheniere Corpus Christi Pipeline... Corpus Christ Pipeline, LP (collectively Cheniere) in the above-referenced docket. ...

  7. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Golden Pass Products, LLC and Docket Nos. CP14-517-000 Golden Pass Pipeline, LLC ... Pass Products, LLC and Golden Pass Pipeline, LLC (collectively referred to as Golden ...

  8. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy.gov (indexed) [DOE]

    Arthur Pipeline, LLC PF15-19-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED PORT ARTHUR LIQUEFACTION PROJECT AND PORT ARTHUR PIPELINE PROJECT, ...

  9. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Environmental Management (EM)

    Cameron Interstate Pipeline, LLC (collectively Cameron) in the above-referenced docket. ... CP13-25-000, et al. - 2 - Cameron Interstate Pipeline. Operation of the Project would not ...

  10. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and interested agencies on additional pipeline, compression, and metering facilities ... newly affected landowners along the pipeline routes or near the aboveground facilities. ...

  11. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy Savers

    ... The planned Alaska LNG Project would start at the GTP and generally follow the existing Trans-Alaska Pipeline System crude oil pipeline (TAPS) and adjacent highways south to ...

  12. UNITED STATES NUCLEAR REGULATORY COMMISSION WAWINQTON, 0. C....

    Office of Legacy Management (LM)

    WAWINQTON, 0. C. ZOSSS Hr. Ray Cooperstein Nuclear Environmental Department ,of Energy ... for uee in the construction of ".?.- nuclear reactab:ifot the 0.8. Navy under an ...

  13. UNITED STATES NUCLEAR REGULATORY COMMISSION WAWINGTON. D. C....

    Office of Legacy Management (LM)

    WAWINGTON. D. C. 20555 kpartmnt of Energy Al7N: Dr. W illiam E. Mott. Director Environmental and Safety Engineering Division (EP-32) Washington, D.C. 20545 Dear Dr. kbtt: Enclosed ...

  14. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    (WA), Sen. Maria Cantwell (OR), Rep. Norman Dicks (WA), Rep. Rick Larsen (WA), Rep. Adam Smith (WA), Rep. Greg Walden (OR), Rep. Mike Simpson (ID), Rep. David Reichert (WA),...

  15. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Jordan Cove Energy Project LP Docket No. CP13-483-000 Pacific Connector Gas Pipeline LP ... NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED JORDAN ...

  16. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy.gov (indexed) [DOE]

    ... Plains and Eastern also plan for the Project to include an intermediate converter station ... will safely and reliably interconnect to the 2 Application at 10. 3 Id. at 6-8. Docket No. ...

  17. The Federal Energy Regulatory Commission's Fiscal Year 2011 Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    November 4, 2011 Page 2 of 3 The information in the Management's Discussion and Analysis is not a required part of the financial statements, but is supplementary...

  18. Management Letter on the Federal Energy Regulatory Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    with the appropriate members of management, are intended to improve internal ... and communicated this in writing to management and those charged with governance on ...

  19. Nuclear Regulatory Commission issuances, July 1996: Volume 44, No. 1

    SciTech Connect (OSTI)

    1996-07-01

    This report includes the issuances received during this period from NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking.

  20. Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel Management

    Energy.gov [DOE]

    • 20+ years of preparation for the licensing review• DOE application received in June 2008 and accepted for review in September 2008• President Obama pursues alternatives to Yucca Mountain• DOE...

  1. File:Federal Hydropower - Federal Energy Regulatory Commission...

    Open Energy Information (Open El) [EERE & EIA]

    2013 File change date and time 11:28, 1 February 2013 Software used Adobe InDesign CS6 (Windows) Unique ID of original document xmp.did:487FE6522507E2119FC0B002DF1AC338...

  2. Nuclear Regulatory Commission issuances, January 1995. Volume 41, Number 1

    SciTech Connect (OSTI)

    1995-01-01

    This book contains issuances of the Atomic Safety and Licensing Boards for January 1995. The issuances include Babcock and Wilcox Company materials license; Hydro Resources, Inc. application for uranium mining; low-level waste storage in Utah; communication of emerging and existing generic, technical issues with PWR owners groups; and radioactive waste management by Sierra Nuclear Corporation.

  3. A Guide to Building Commissioning

    SciTech Connect (OSTI)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  4. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    SciTech Connect (OSTI)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  5. Regulatory Tools

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Regulatory Tools Home CRA - 2004 Final Recertification Decision CRA Comments & Responses CCA - 1996 CRA CARDs & TSDs CCA CARDs & TSDs Regulatory Tools Title 40 CFR Part 191 Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Title 40 CFR Part 194 Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations.

  6. EA-1981: Bonneville-Hood River Transmission Line Rebuild; Multnomah and

    Energy Savers

    Department of Energy FERC Notice of Availability for Final Environmental Assessment EA-1963: FERC Notice of Availability for Final Environmental Assessment Elba Liquefaction Project; Chatham, Hart, Jefferson, and Effingham Counties, Georgia, and Jasper County, South Carolina Federal Energy Regulatory Commission (FERC) issued a notice of availability of an EA that analyzes the potential environmental impacts of a proposal to add natural gas liquefaction and export capabilities at the existing

  7. EAC Recommendations for DOE Action on the Development of the...

    Energy Savers

    ... to include the development of planning guides for designing bulk electric systems to ... In the late 1980s and 1990s, the Federal Energy Regulatory Commission (FERC) passed a ...

  8. A National Forum on Demand Response: Results on What Remains to Be Done to Achieve Its Potential- Cost-Effectiveness Working Group

    Energy.gov [DOE]

    In July 2011, the Federal Energy Regulatory Commission's (FERC) staff and the Department of Energy (DOE) jointly submitted to Congress a required “Implementation Proposal for the National Action...

  9. Frequency Instability Problems in North American Interconnections

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... FERC Federal Energy Regulatory Commission HVDC High voltage direct current Hz Hertz ISO ... achieved by using high voltage direct current (HVDC) lines and back-to-back HVDC links. ...

  10. Potomac Electric Power Company's Motion to Intervene and Comment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Docket No. EO-05-01. Docket No. EL05-145-000: Pursuant to Rules 211 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the ...

  11. A Review of Variable Generation Forecasting in the West: July...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... of Texas FERC Federal Energy Regulatory Commission kW Kilowatt kWh Kilowatt-hour LIDAR Light Detection and Ranging LMP Locational Marginal Pricing MAE Mean Absolute Error ...

  12. A National Forum on Demand Response: Results on What Remains to Be Done to Achieve Its Potential- Program Design and Implementation Working Group

    Office of Energy Efficiency and Renewable Energy (EERE)

    In July 2011, the Federal Energy Regulatory Commission's (FERC) staff and the Department of Energy (DOE) jointly submitted to Congress a required “Implementation Proposal for the National Action...

  13. A National Forum on Demand Response: Results on What Remains to Be Done to Achieve Its Potential- Tools and Methods Working Group

    Office of Energy Efficiency and Renewable Energy (EERE)

    In July 2011, the Federal Energy Regulatory Commission's (FERC) staff and the Department of Energy (DOE) jointly submitted to Congress a required “Implementation Proposal for the National Action...

  14. Transmission Pricing Issues for Electricity Generation From Renewable Resources

    Reports and Publications

    1999-01-01

    This article discusses how the resolution of transmission pricing issues which have arisen under the Federal Energy Regulatory Commission's (FERC) open access environment may affect the prospects for renewable-based electricity.

  15. California State Lands Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Lands Commission Jump to: navigation, search Logo: California State Lands Commission Name: California State Lands Commission Abbreviation: CSLC Address: 100 Howe Ave., Suite 100...

  16. California Coastal Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission Jump to: navigation, search Logo: California Coastal Commission Name: California Coastal Commission Address: 45 Fremont Street, Suite 2000 Place: San Francisco,...

  17. National Energy Commission (China) | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission (China) Jump to: navigation, search Name: National Energy Commission (China) Place: Beijing References: National Energy Commission (China)1 This article is a stub. You...

  18. July 18, 2014 Commission Meeting Minutes

    Energy.gov [DOE]

    This meeting was the inaugural meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). The Commission members heard opening remarks by Secretary...

  19. Evaluation of regulatory guides potentially useful to geologic repository development

    SciTech Connect (OSTI)

    Chang, W.Y.

    1986-01-01

    The US Regulatory Commission Regulatory Guide series provides a set of regulatory and technical guidelines for achieving and demonstrating regulatory compliance for various segments of the nuclear fuel cycle. Of these regulatory guides only few specifically pertain to high-level waste repository activities. The overwhelming majority pertain to other, more mature aspects of the nuclear cycle. It is believed that conscientious, reasoned application of the fundamental regulatory bases underlying the positions in these other regulatory guides could provide a solid regulatory starting point for repository development activities. This information report provides a summary screening of regulatory guides published as of September 1983 and provides an initial assessment of the potential usefulness of these regulatory guides to repository design and operation activities.

  20. 1981 Memorandum of Understanding between the Federal Energy Regulatory...

    Open Energy Information (Open El) [EERE & EIA]

    81 Memorandum of Understanding between the Federal Energy Regulatory Commission and the Water and Power Resources Service Jump to: navigation, search OpenEI Reference LibraryAdd to...

  1. Special Report: DOE/IG-0947 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7 Special Report: DOE/IG-0947 September 29, 2015 Enforcement Activities Conducted by the Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) is an independent agency that regulates the Nation's natural gas industry, hydroelectric projects, oil pipelines, and wholesale rates for electricity. Within FERC, the Office of Enforcement (OE) is tasked with protecting customers by conducting oversight of energy markets, identifying and remedying market problems in a

  2. October 2016

    U.S. Energy Information Administration (EIA) (indexed site)

    105 Appendix B Data Sources Note 1. Production Monthly Data The data in this publication are taken from survey reports collected by the Energy Information Administration (EIA), the Federal Energy Regulatory Commission (FERC), and the Office of Fossil Energy of the U.S. Department of Energy (DOE). The EIA is the independent statistical and analytical agency within the DOE. The FERC is an independent regulatory commission within the DOE that has jurisdiction primarily in the regulation of

  3. Other facts

    Gasoline and Diesel Fuel Update

    105 Appendix B Data Sources Note 1. Production Monthly Data The data in this publication are taken from survey reports collected by the Energy Information Administration (EIA), the Federal Energy Regulatory Commission (FERC), and the Office of Fossil Energy of the U.S. Department of Energy (DOE). The EIA is the independent statistical and analytical agency within the DOE. The FERC is an independent regulatory commission within the DOE that has jurisdiction primarily in the regulation of

  4. Commissioning a materials research laboratory

    SciTech Connect (OSTI)

    SAVAGE,GERALD A.

    2000-03-28

    This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented in a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.

  5. Model Commissioning Plan and Guide Specifications

    SciTech Connect (OSTI)

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  6. A Review of Recent RTO Benefit-Cost Studies: Toward MoreComprehensive Assessments of FERC Electricity RestructuringPolicies

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard C.

    2005-12-01

    During the past three years, government and private organizations have issued more than a dozen studies of the benefits and costs of Regional Transmission Organizations (RTOs). Most of these studies have focused on benefits that can be readily estimated using traditional production-cost simulation techniques, which compare the cost of centralized dispatch under an RTO to dispatch in the absence of an RTO, and on costs associated with RTO start-up and operation. Taken as a whole, it is difficult to draw definitive conclusions from these studies because they have not examined potentially much larger benefits (and costs) resulting from the impacts of RTOs on reliability management, generation and transmission investment and operation, and wholesale electricity market operation. This report: (1) Describes the history of benefit-cost analysis of FERC electricity restructuring policies; (2)Reviews current practice by analyzing 11 RTO benefit-cost studies that were published between 2002 and 2004 and makes recommendations to improve the documentation of data and methods and the presentation of findings in future studies that focus primarily on estimating short-run economic impacts; and (3) Reviews important impacts of FERC policies that have been overlooked or incompletely treated by recent RTO benefit-cost studies and the challenges to crafting more comprehensive assessments of these impacts based on actual performance, including impacts on reliability management, generation and transmission investment and operation, and wholesale electricity market operation.

  7. Commissioning of NSLS-II

    SciTech Connect (OSTI)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  8. PRELIMINARY Run Shutdown BL Commissioning

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

  9. Ozone transport commission developments

    SciTech Connect (OSTI)

    Joyce, K.M.

    1995-08-01

    On September 27, 1994, the states of the Ozone Transport Commission (OTC) signed an important memorandum of understanding (MOU) agreeing to develop a regional strategy for controlling stationary sources of nitrogen oxide emissions. Specifically, the states of the Ozone Transport Region, OTR, agreed to propose regulations for the control of NOx emissions from boilers and other indirect heat exchangers with a maximum gross heat input rate of at least 250 million BTU per hour. The Ozone Transport Region was divided into Inner, Outer and Northern Zones. States in the Outer Zone agreed to reduce NOx emissions by 55%. States in the Inner Zone agreed to reduce NOx emissions 65%. Facilities in both zones have the option to emit NOx at a rate no greater than 0.2 pounds per million Btu by May 1, 1999. This option provides fairness for the gas-fired plants which already have relatively low NOx emissions. Additionally, States in the Inner and Outer Zones agreed to reduce their NOx emissions by 75% or to emit NOx at a rate no greater than 0.15 pounds per million BTU by May 1, 2003. The Northern Zone States agree to reduce their rate of NOx emissions by 55% from base year levels by May 1, 2003, or to emit NOx at a rate no greater than 0.2 pounds per million BTU. As part of this MOU, States also agreed to develop a regionwide trading mechanism to provide a cost-effective mechanism for implementing the reductions.

  10. NRC regulatory agenda: Semiannual report, July--December 1996. Volume 15, Number 2

    SciTech Connect (OSTI)

    1997-03-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued semiannually.

  11. Nuclear Safety Regulatory Framework

    Energy.gov (indexed) [DOE]

    Department of Energy Nuclear Safety Regulatory Framework DOE's Nuclear Safety Enabling Legislation Regulatory Enforcement & Oversight Regulatory Governance Atomic Energy Act 1946 ...

  12. Summary Report on Industrial and Regulatory Engagement Activities |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Report on Industrial and Regulatory Engagement Activities Summary Report on Industrial and Regulatory Engagement Activities The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and

  13. Commission Meeting- November 4, 2014

    Energy.gov [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories AgendaArgonne National LaboratoryTCS Conference Center9700 S. Cass AveArgonne, IL 60436November 4, 2014

  14. Orlando Utilities Commission- Solar Programs

    Energy.gov [DOE]

    The Orlando Utilities Commission (OUC) also offers incentive for solar hot water heating systems. Commercial solar hot water heating systems receive a $0.03 per kWh equivalent. Residential...

  15. u. S. Atomic Energy Commission

    Office of Legacy Management (LM)

    S. Atomic Energy Commission R. 0. Box 30, Ansonia Station New York ES, N. Y. MATERIALS 5+k& hJf Reference: SK:BL Attention: Mr. R. J. Smith Jr. Director Special Materials Division ...

  16. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect (OSTI)

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  17. Management Alert: DOE/IG-0939 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE/IG-0939 Management Alert: DOE/IG-0939 June 4, 2015 Review of Allegations of Improper Disclosure of Confidential, Nonpublic Federal Energy Regulatory Commission Information The Federal Energy Regulatory Commission (Commission or FERC), an independent regulatory agency officially organized as part of the Department of Energy, is composed of five Commissioners (including a Chairman). The Commission's Office of Enforcement (OE) seeks to encourage compliance with energy-related statutes, rules,

  18. September 15, 2014 Lab Commission Meeting Minutes

    Office of Energy Efficiency and Renewable Energy (EERE)

    This meeting was the second meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). The Commission members heard opening remarks by Co-Chairs TJ...

  19. Commissioning for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. Download the Commissioning for Federal Facilities guide. (2.77 MB) More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  20. Oregon Water Resources Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Water Resources Commission Jump to: navigation, search Name: Oregon Water Resources Commission Abbreviation: OWRC Address: 725 Summer Street NE, Suite A Place: Salem, Oregon Zip:...

  1. Colorado Ground Water Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  2. State Historical Resources Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Resources Commission Jump to: navigation, search Name: State Historical Resources Commission Address: 1725 23rd Street, Suite 100 Place: Sacramento, CA Zip: 95816 ParentHolding...

  3. Brazil Interministerial Commission on Global Climate Change ...

    Open Energy Information (Open El) [EERE & EIA]

    Interministerial Commission on Global Climate Change Jump to: navigation, search Name: Brazil Interministerial Commission on Global Climate Change Place: Distrito Federal...

  4. California Energy Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission Jump to: navigation, search Name: California Energy Commission Address: 1516 Ninth Street, MS-29 Place: Sacramento, CA Zip: 95814-5512 Website: www.energy.ca.gov...

  5. State Land Commission FAQ | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Land Commission FAQ Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: State Land Commission FAQ Abstract Frequently Asked Questions, California State...

  6. Sandia Energy - Molten Salt Test Loop Commissioning

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Energy Energy News EC News & Events Concentrating Solar Power Solar Molten Salt Test Loop Commissioning Previous Next Molten Salt Test Loop Commissioning The Molten Salt...

  7. Arizona Corporation Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission Jump to: navigation, search Name: Arizona Corporation Commission Abbreviation: ACC Service Territory: Arizona Website: www.azcc.gov EIA Form 861 Data This article is a...

  8. Idaho Public Utilities Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission Jump to: navigation, search Name: Idaho Public Utilities Commission Address: P.O. Box 83720 Place: Boise, ID Zip: 83720 Website: www.puc.idaho.gov Coordinates:...

  9. Regulatory Streamlining and Improvement

    SciTech Connect (OSTI)

    Mark A. Carl

    2006-07-11

    The Interstate Oil and Gas Compact Commission (IOGCC) engaged in numerous projects outlined under the scope of work discussed in the United States Department of Energy (DOE) grant number DE-FC26-04NT15456 awarded to the IOGCC. Numerous projects were completed that were extremely valuable to state oil and gas agencies as a result of work performed utilizing resources provided by the grant. There are numerous areas in which state agencies still need assistance. This additional assistance will need to be addressed under future scopes of work submitted annually to DOE's Project Officer for this grant. This report discusses the progress of the projects outlined under the grant scope of work for the 2005-2006 areas of interest, which are as follows: Area of Interest No. 1--Regulatory Streamlining and Improvement: This area of interest continues to support IOGCC's regulatory streamlining efforts that include the identification and elimination of unnecessary duplications of efforts between and among state and federal programs dealing with exploration and production on public lands. Area of Interest No. 2--Technology: This area of interest seeks to improve efficiency in states through the identification of technologies that can reduce costs. Area of Interest No. 3--Training and Education: This area of interest is vital to upgrading the skills of regulators and industry alike. Within the National Energy Policy, there are many appropriate training and education opportunities. Education was strongly endorsed by the President's National Energy Policy Development group. Acting through the governors offices, states are very effective conduits for the dissemination of energy education information. While the IOGCC favors the development of a comprehensive, long-term energy education plan, states are also supportive of immediate action on important concerns, such as energy prices, availability and conservation. Area of Interest No. 4--Resource Assessment and Development: This area

  10. A performance-based regulatory approach to increase the efficiency of the regulatory process

    SciTech Connect (OSTI)

    Dey, M. )

    1993-01-01

    The US Nuclear Regulatory Commission (NRC) has adopted as a fundamental principle that all regulatory burdens must be justified and that its regulatory process must be efficient. The reasons for seeking to remove marginal-to-safety regulations are to eliminate or modify regulations where burdens are not commensurate with their safety significance and thus free up resources and improve the focus and effectiveness of the body of regulations. As a result, the NRC has for some time been pursuing programs consistent with this philosophy. It now plans to institutionalize a continuing effort of regulatory burden reduction to ensure such efforts are permanently integrated into its regulatory process. The NRC believes such efforts are important to its mission and the industry it regulates.

  11. OCTOBER 23, 2015 LAB COMMISSION MEETING MINUTES

    Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its final meeting at 1:00 PM on October 23, 2015. Commission Co-Chair TJ Glauthier led the meeting. The meeting included a summary of public comments received to date, an opportunity for additional public comment, and Commission discussion and vote to approve the Final Report.

  12. Commissioning

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Data for the graph courtesy Karl Stum; Summit Engineering Verification and Prestart Checks Functional Testing Opposite Season Testing Trend Analysis Responsibility Shifting from ...

  13. Commission.

    National Nuclear Security Administration (NNSA)

    ... Requests (301) 903-2180 Len.Myers@nnsa.doe.gov Patricia Smith NRC Reconciliation (301) 903-6860 PatriciaR.Smith@nnsa.doe.gov Homepage: http:nnsa.energy.govnmmss Email: ...

  14. Commission.

    National Nuclear Security Administration (NNSA)

    November 2015 NMMSS News is sponsored by the Department of Energy and the Nuclear ... (NRC) licensees, the Department of Energy (DOE)National Nuclear Security ...

  15. Codes and standards and other guidance cited in regulatory documents

    SciTech Connect (OSTI)

    Nickolaus, J.R.; Vinther, R.W.; Maguire-Moffitt, N.E.; Hammer, J.A.; Sherfey, L.L.; Warner, R.D. )

    1993-01-01

    As part of the US Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program, Pacific Northwest Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. This listing identifies the version of the code or standard cited in the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and NRC's Bulletins, Information Notices, Circulars, Generic Letters, Policy Statements, Regulatory Guides, and Standard Review Plan (NUREG-08000).

  16. Codes and standards and other guidance cited in regulatory documents

    SciTech Connect (OSTI)

    Nickolaus, J.R.; Vinther, R.W.; Maguire-Moffitt, N.E.; Hammer, J.A.; Sherfey, L.L.; Warner, R.D.

    1993-01-01

    As part of the US Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program, Pacific Northwest Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. This listing identifies the version of the code or standard cited in the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and NRC`s Bulletins, Information Notices, Circulars, Generic Letters, Policy Statements, Regulatory Guides, and Standard Review Plan (NUREG-08000).

  17. Commissioning in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in Federal Buildings Commissioning in Federal Buildings Commissioning in Federal Buildings Commissioning is a quality-assurance process used to verify that a building performs according to the original design and intent, and meets the needs of the owners and occupants. The commissioning process also prepares building staff to operate and maintain the building. Federal agencies are required to make sure building systems and equipment are commissioned in new construction and existing buildings.

  18. Regulatory analysis technical evaluation handbook. Final report

    SciTech Connect (OSTI)

    1997-01-01

    The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC`s Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available.

  19. Public Utility Commission in the year 2000

    SciTech Connect (OSTI)

    Jones, D.N.

    1995-12-31

    This article is about What is and What ought to be as we look to the institution of public utility commission regulation at the turn of the century. To signal my own view at the outset, I find the prospects somewhat worrisome in light of the nature and direction of much of the response to real and imaginary changes in the regulated sectors. I surely do not call for standing in place, but I strongly believe we should leave the place standing. The following items are discernable trends that will shape the PUC at the turn-of-the century: (1) dichotomy of customers into core and noncore groups, (2) unbundling and new service offerings with a menu of prices, (3) relaxed regulation and increased reliance on market solutions instead of command and control, (4) increased use of market-based pricing and incentive ratemaking, (5) large users seeking lowest-cost generation and supply services, (6) shift from old regulatory bargains regarding exclusive territorial franchises and assured recovery of costs and investments, (7) utility diversification, (8) increasing business risk for utilities, amd (9) uncertainty as to continued utility attention to social goals and a changing obligation to serve. For each of these, the author focuses on: (1) changing missions and roles of the PUC, (2) the strategies for achieving them, and (3) the implementation requirements that operationalize the strategies.

  20. Audit Report: IG-0750

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams DOE/IG-0750 December 2006 Department of Energy Washington, DC 20585 December 18, 2006 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY FROM: Inspector General SUBJECT: INFORMATION: Audit Report on "The Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams" BACKGROUND Pursuant to the Federal Power Act, the Federal Energy Regulatory Commission (FERC) regulates certain aspects of non-Federal

  1. Regulatory decision with EPA/NRC/DOE/State Session (Panel)

    SciTech Connect (OSTI)

    O`Donnell, E.

    1995-12-31

    This panel will cover the Nuclear Regulatory Commission`s (NRC) proposed radiation limits in the Branch Technical Position on Low-Level Radioactive Waste Performance Assessment and the Environmental Protection Agency`s (EPA) draft regulation in Part 193. Representatives from NRC and EPA will discuss the inconsistencies in these two regulations. DOE and state representatives will discuss their perspective on how these regulations will affect low-level radioactive waste performance assessments.

  2. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. [National Association of Regulatory Utility Commissioners, Washington, DC (United States); Goldman, C.A. [Lawrence Berkeley Lab., CA (United States); Beldock, J. [USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems; Crandall, G. [MSB Associates, Middleton, WI (United States)

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

  3. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. (National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Goldman, C.A. (Lawrence Berkeley Lab., CA (United States)); Beldock, J. (USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems); Crandall, G. (MSB Associates, Middleton, WI (United States))

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

  4. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  5. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2016-07-12

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  6. Oregon Environmental Quality Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission Jump to: navigation, search Name: Oregon Environmental Quality Commission Address: 811 SW 6th Avenue Place: Portland, Oregon Zip: 97204-1390 Phone Number: 503-229-5301...

  7. LINE Commission Visits Idaho National Laboratory

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how

  8. May 22, 2015 LAB COMMISSION MEETING MINUTES

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its ninth meeting at 9:00 AM on May 22, 2015. Commission Co-Chair Jared Cohon led the meeting. The meeting included discussion with lab directors; technology transfer coordinators; Bay area industrial partners; and site office management. The discussion was followed by an opportunity for public comment.

  9. Beyond Commissioning: The Role of Automation

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2005-02-01

    This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  10. NRC Regulatory Agenda quarterly report, July--September 1993. Volume 12, No. 3

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The NRC Regulator Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  11. Courts and Commissions: Fish or foul

    SciTech Connect (OSTI)

    Radford, B.W.

    1993-10-15

    Hydropower is under attack everywhere you look. It started back in the sixties during the battle over Arizona's Glen Canyon Dam. That case purportedly ended in a compromise with the Sierra Club to save the Grand Canyon from hydro development. But once built, the dam played havoc with Colorado River levels, disrupting rafting trips for Grand Canyon tourists. Even Barry Goldwater was later heard to rue the Glen Canyon project. Marc Reisner's 1986 book, Cadillac Desert, galvanized the antihydro faction. A few years later, calls arose for the City of San Francisco to dismantle its O'Shaughnessy Dam across the Hetch Hetchy Valley in the Sierra Nevada, just 15 miles north of famed Yosemite. That move failed. (Maybe San Francisco's oddball reputation had something to do with the result). But now we hear of plans underway to tear down dams on the Elwah River in Washington State's Olympic National Park, to reclaim lost salmon spawning grounds and return the parks to its natural state. This time the dam busters may win. These events are not unconnected. Strung together, they reveal a change in the popular opinion of how rivers, streams, and coastlines contribute to our economic well-being, and how the federal government should manage those economic resources. Federal hydropower control was born to govern our navigable waterways. It grew up as a tool to speed electrification and develop mining and logging. But forces today are seeking to make federal hydropower law more sympathetic to wildlife preservation. They argue that wildlife represents a national economic resource - no less so than timber, minerals, and shipping. This view is winning support from those in high positions, including the Chair of the Federal Energy Regulatory Commission, Elizabeth Moler.

  12. Nuclear Safety Regulatory Framework

    Energy.gov [DOE]

    Presentation that outlines the rules, policies and orders that comprise the Department of Energy Nuclear Safety Regulatory Framework

  13. Reducing Regulatory Burden

    Energy.gov [DOE]

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’

  14. Nuclear Safety Regulatory Framework

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Nuclear Safety Regulatory Framework DOE's Nuclear Safety Enabling Legislation Regulatory Enforcement & Oversight Regulatory Governance Atomic Energy Act 1946 Atomic Energy Act 1954 Energy Reorganization Act 1974 DOE Act 1977 Authority and responsibility to regulate nuclear safety at DOE facilities 10 CFR 830 10 CFR 835 10 CFR 820 Regulatory Implementation Nuclear Safety Radiological Safety Procedural Rules ISMS-QA; Operating Experience; Metrics and Analysis Cross Cutting

  15. Other Regulatory Efforts

    Energy.gov [DOE]

    In addition to regulating international electricity trade, the Office of Electricity Delivery and Energy Reliability participates in other regulatory activities.

  16. Automated Demand Response and Commissioning

    SciTech Connect (OSTI)

    Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

    2005-04-01

    This paper describes the results from the second season of research to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve the electric grid reliability and manage electricity costs. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. We refer to this as Auto-DR. The evaluation of the control and communications must be properly configured and pass through a set of test stages: Readiness, Approval, Price Client/Price Server Communication, Internet Gateway/Internet Relay Communication, Control of Equipment, and DR Shed Effectiveness. New commissioning tests are needed for such systems to improve connecting demand responsive building systems to the electric grid demand response systems.

  17. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  18. PP-54 Ontario Hydro Electric Power Commission | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct, ...

  19. Hawaii State Land Use Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hawaii State Land Use Commission Jump to: navigation, search Name: State Land Use Commission Abbreviation: LUC Place: Honolulu, Hawaii References: State Land Use Commission -...

  20. Energy Audit and Retro-Commissioning Policies for Public and...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Audit and Retro-Commissioning Policies for Public and Commercial Buildings Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Retro-Commissioning...

  1. Arizona Oil and Gas Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission Jump to: navigation, search Logo: Arizona Oil and Gas Commission Name: Arizona Oil and Gas Commission Address: 416 W. Congress Street, Suite 100 Place: Arizona Zip:...

  2. Regulatory and technical reports (abstract index journal): Annual compilation for 1987

    SciTech Connect (OSTI)

    Not Available

    1988-03-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually.

  3. Regulatory and technical reports (abstract index journal). Compilation first quarter, January 1994--March 1994

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually.

  4. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1997, July--September

    SciTech Connect (OSTI)

    Stevenson, L.L.

    1998-01-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. This report contains the third quarter 1997 abstracts.

  5. FERC Pleading Template

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Coordination of Federal Authorizations for Electric Transmission Facilities: Proposed 216(h) Regulations RIN 1901-AB18 COMMENTS OF TRANSMISSION ACCESS POLICY STUDY GROUP On December 13, 2011, the Department of Energy (-Department‖) issued a Notice of Proposed Rulemaking (-NOPR‖) concerning the coordination of Federal authorizations for proposed interstate electric transmission facilities. 1 The Transmission Access Policy Study Group (-TAPS‖) appreciates the opportunity to respond to the

  6. FERC Pleading Template

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... In contrast, by starting the one-year clock based on the status of the environmental review, the Department's proposed approach would seem to lock in the delay associated with ...

  7. FERC Pleading Template

    Energy.gov (indexed) [DOE]

    ... CapX energized the first segment (Monticello to St. Cloud) of the Fargo-St. Cloud 345 kV ... whether they be pooled systems as in Georgia, Indiana, and Minnesota or an LSE transco ...

  8. Codes and standards and other guidance cited in regulatory documents

    SciTech Connect (OSTI)

    Nickolaus, J.R.; Bohlander, K.L.

    1996-08-01

    As part of the U.S. Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program (SRP-UDP), Pacific Northwest National Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. The SRP-UDP has been completed and the SRP-Maintenance Program (SRP-MP) is now maintaining this listing. Besides updating previous information, Revision 3 adds approximately 80 citations. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Enforcement Manual, Generic Letters, Inspection Manual, Policy Statements, Regulatory Guides, Standard Technical Specifications and the Standard Review Plan (NUREG-0800).

  9. Regulatory Oversight Program, July 1, 1993--March 3, 1997. Volume 2: Appendices

    SciTech Connect (OSTI)

    1997-12-31

    On July, 1993, a Regulatory Oversight (RO) organization was established within the US DOE, Oak Ridge Operations to provide regulatory oversight of the DOE uranium enrichment facilities leased to the United States Enrichment Corporation (USEC). The purpose of the OR program was to ensure continued plant safety, safeguards and security while the plants were transitioned to regulatory oversight by the Nuclear Regulatory Commission (NRC). Volume 2 contains copies of the documents which established the relationship between NRC, DOE, USEC, and DOL (Dept of Labor) required to facilitate regulatory oversight transition.

  10. Commissioning Guidance for ESPCs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Guidance for ESPCs Commissioning Guidance for ESPCs Document provides a description of how commissioning in energy savings performance contract (ESPC) projects can achieve the objective of meeting or exceeding facility performance requirements by optimizing the operation and efficiency of building systems and equipment. Download the Commissioning Guidance for ESPCs. (316.39 KB) More Documents & Publications FEMP Comprehensive ESPC Workshop Presentations Investment-Grade Audit Kickoff Meeting

  11. Regulatory Guide 5.29, Revision 2, "Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants".

    National Nuclear Security Administration (NNSA)

    NUCLEAR REGULATORY COMMISSION June 2013 Revision 2 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH Written suggestions regarding this guide or development of new guides may be submitted through the NRC's public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html. Electronic copies of this regulatory guide, previous versions of this guide, and other recently issued guides are available

  12. EIS-0527: Nationwide Public Safety Broadband Network Programmatic

    Energy Savers

    Statement (FR) | Department of Energy Statement (FR) EIS-0517: FERC Notice of Intent to Prepare an Environmental Impact Statement (FR) Port Arthur Liquefaction Project and Port Arthur Pipeline Project; Jefferson and Orange Counties, Texas, and Cameron Parish, Louisiana The Federal Energy Regulatory Commission (FERC) issued a notice of intent to prepare an EIS that analyzes the potential environmental impacts of a proposal to construct and operate a liquefied natural gas marine terminal along

  13. A National Forum on Demand Response: What Remains to Be Done to Achieve Its

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Potential | Department of Energy A National Forum on Demand Response: What Remains to Be Done to Achieve Its Potential A National Forum on Demand Response: What Remains to Be Done to Achieve Its Potential In July 2011, the Federal Energy Regulatory Commission's (FERC) staff and the Department of Energy (DOE) jointly submitted to Congress a required "Implementation Proposal for the National Action Plan on Demand Response." The Implementation Proposal was for FERC's June 2010

  14. U.S. Energy Information Administration (EIA)

    Gasoline and Diesel Fuel Update

    1, 2012 | Release date: Mar. 22, 2012 | Next release: Mar. 29, 2012 | Previous weeks JUMP TO: In The News | Overview | Prices | Storage In the News: FERC Staff Issues Environmental Impact Statement for Pipeline into New York City. Spectra Energy has received conditional environmental approval from Federal Energy Regulatory Commission (FERC) staff on its proposed New Jersey-New York Expansion project. The project would consist of about 20 miles of pipeline in New Jersey and New York, include new

  15. U.S. Energy Information Administration (EIA)

    Gasoline and Diesel Fuel Update

    9, 2014 | Release date: February 20, 2014 | Next release: February 27, 2014 | Previous weeks JUMP TO: In The News | Overview | Prices/Supply/Demand | Storage In the News: Marcellus natural gas takeaway pipeline projects advance Last week, the Federal Energy Regulatory Commission (FERC) approved three projects to increase natural gas takeaway capacity from the Marcellus Shale formation. On February 11, FERC approved the TEAM 2014 project expansions on Spectra's Texas Eastern Transmission Co.

  16. EA-2036: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Final Environmental Assessment EA-2036: Final Environmental Assessment Sabine Pass Liquefaction Project (design optimization); Cameron Parish, Louisiana In January 2014, the Federal Energy Regulatory Commission (FERC) issued an EA to analyze the potential environmental impacts associated with an application to amend FERC's April 2012 authorization of the Sabine Pass Liquefaction Project in order to optimize its design and operation. In April 2015, Sabine Pass Liquefaction, LLC, and Sabine Pass

  17. EA-2036: Finding of No Significant Impact | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    36: Finding of No Significant Impact EA-2036: Finding of No Significant Impact Sabine Pass Liquefaction Project (design optimization); Cameron Parish, Louisiana In January 2014, the Federal Energy Regulatory Commission (FERC) issued an EA to analyze the potential environmental impacts associated with an application to amend FERC's April 2012 authorization of the Sabine Pass Liquefaction Project in order to optimize its design and operation. In April 2015, Sabine Pass Liquefaction, LLC, and

  18. EA-1971: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana

    Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, announced its intent to prepare an EA to analyze the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass liquefied natural gas terminal in Jefferson County, Texas. In June 2014, FERC announced that due to changes in the project location and scope, it would prepare an EIS. See DOE/EIS-0501.

  19. Hawaii Public Utilities Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Name: Hawaii Public Utility Commission Address: 465 South King Street 103 Place: Honolulu, Hawaii Zip: 96813 Coordinates: 21.3053513, -157.85857 Show Map Loading map......

  20. SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE

    SciTech Connect (OSTI)

    Shishlo, Andrei P; Galambos, John D

    2008-01-01

    The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

  1. Nevada Public Utilities Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Name: Nevada Public Utilities Commission Abbreviation: NPUC Address: Southern Nevada Office, 9075 West Diablo Drive, Suite 250 Place: Las Vegas, Nevada Zip: 89148 Phone Number:...

  2. ASTM PV INSTALLATON COMMISSIONING, OPERATIONS & MAINTENNCE (ICOMP...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ASTM PV INSTALLATON COMMISSIONING, OPERATIONS & MAINTENNCE (ICOMP) STANDARD PRACTICE ... which maps out the intent of the standard including incorporations of existing ...

  3. Sandia Contributes to International Electrotechnical Commission...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... Commission (IEC) Committee on Wind Turbine Availability to develop three specifications for IEC-61400-26-the standard that addresses wind turbine and wind-plant availability. ...

  4. Illinois Commerce Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commerce Commission Place: Springfield, Illinois Zip: 62701 Product: Regulator of public utilities and transportation in Illinois. Coordinates: 42.640925, -88.413644...

  5. Michigan Public Service Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    of the Michigan Public Service Commission is to grow Michigan's economy and enhance the quality of life of its communities by assuring safe and reliable energy,...

  6. New Mexico Preservation Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission Jump to: navigation, search Name: New Mexico Preservation Division Abbreviation: HPD Address: Bataan Memorial Building, 407 Galisteo Street, Suite 236 Place: Santa Fe,...

  7. Telephone. Federal Communications Commission. Marlene H. Dortch...

    Energy.gov (indexed) [DOE]

    Commission amends 47 CFR parts 20 and 54 as follows: PART 20-COMMERCIAL MOBILE RADIO SERVICES 1. The authority citation for part 20 continues to read as follows:...

  8. United States Atomic Energy Commission formed

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Energy Commission failed to come to grips with the growing nuclear weapons problem, the United States worked to establish its own formal organization. The transition from...

  9. Texas Railroad Commission - Pollution Discharge Regulations ...

    Open Energy Information (Open El) [EERE & EIA]

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Texas Railroad Commission - Pollution Discharge Regulations Citation...

  10. Colorado Public Utilities Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    CBONDORA1251633139779 Retrieved from "http:en.openei.orgwindex.php?titleColoradoPublicUtilitiesCommission&oldid886925" Feedback Contact needs updating Image needs...

  11. Harrods commissions new CHP station

    SciTech Connect (OSTI)

    Mullins, P.

    1994-04-01

    Three new combined heat and power (CHP) sets have recently been commissioned at Harrods, the world-famous department store in the heart of London's fashionable Knightsbridge district. The sets provide all the electricity needed by the store for lighting, heating and air-conditioning and are powered by Ruston 6RK270 turbocharged, charge-air-cooled diesel engines each producing 1392 kW at 750 r/min. These high power-to-weight ratio units were chosen in view of severe engine room space limitations. Low-grade waste heat is extracted from the engine jacket water to preheat water for three new boilers supplying some 1600 kg/h of steam for process heat to the store. The engines drive Brush BJS HW 10 100/8 alternators and are fully automatic in operation through a Regulateurs Europa control system. Some 600 sensors feed data into a Satchwell Building Management System (BMS). In the event of a breakdown, the engine control system can be switched to manual. 5 figs.

  12. A.12d1 Management letter when auditing financial statements of a nonpublic entity (excluding FDICIA engagements)-suggested format (Rev. 9/10)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 Financial Statement Audit OAI-FS-16-04 January 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Attachment 1 December 11, 2015 Federal Energy Regulatory Commission, and The Department of Energy, Office of Inspector General Ladies and Gentlemen: In planning and performing our audit of the financial statements of the Federal Energy Regulatory Commission (the Commission or FERC), as of and for the years ended September 30, 2015 and 2014, in accordance

  13. Natural gas storage - end user interaction. Task 2. Topical report

    SciTech Connect (OSTI)

    1996-01-01

    New opportunities have been created for underground gas storage as a result of recent regulatory developments in the energy industry. The Federal Energy Regulatory Commission (FERC) Order 636 directly changed the economics of gas storage nationwide. This paper discusses the storage of natural gas, storage facilities, and factors affecting the current, and future situation for natural gas storage.

  14. Regulatory Review of Early Site Permit Applications

    SciTech Connect (OSTI)

    Scott, Michael L.

    2004-07-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  15. Automated Commissioning for Lower-Cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2007-01-31

    This book chapter takes a brief look at the benefits of building commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems.

  16. Environmental regulatory update table

    SciTech Connect (OSTI)

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  17. FPCC Regulatory Barriers Submittal

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Performance Contracting Coalition (FPCC) appreciates the opportunity to comment on reducing regulatory burdens on the Federal government, specifically as they pertain to federal energy...

  18. Papers on the nuclear regulatory dilemma

    SciTech Connect (OSTI)

    Barkenbus, J.N.; Freeman, S.D.; Weinberg, A.M.

    1985-10-01

    The four papers contained in this report are titled: (1) From Prescriptive to Performance-Based Regulation of Nuclear Power; (2) Nuclear Regulatory Reform: A Technology-Forcing Approach; (3) Improving the Regulation of Nuclear Power; and (4) Science and Its Limits: The Regulators' Dilemma. These four papers investigate issues relating to the long-term regulation of nuclear energy. They were prepared as part of the Institute for Energy Analysis' project on Nuclear Regulation funded by a grant from the Mellon Foundation and a smaller grant by the MacArthur Foundation. Originally this work was to be supplemented by contributions from the Nuclear Regulatory Commission and from the Department of Energy. These contributions were not forthcoming, and as a result the scope of our investigations was more restricted than we had originally planned.

  19. Rules implementing Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978: a regulatory history

    SciTech Connect (OSTI)

    Danziger, R.N.; Caples, P.W.; Huning, J.R.

    1980-09-15

    An analysis is made of the rules implementing Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). The act provides that utilities must purchase power from qualifying producers of electricity at nondiscriminatory rates, and it exempts private generators from virtually all state and Federal utility regulations. Most of the analysis presented is taken from the perspective of photovoltaics (PV) and solar thermal electric point-focusing distributed receivers (pfdr). It is felt, however, that the analysis is applicable both to cogeneration and other emerging technologies. Chapters presented are: The FERC Response to Oral Comments on the Proposed Rules Implementing Sections 201 and 210 of PURPA; Additional Changes Made or Not Made That Were Addressed in Other Than Oral Testimony; View on the Proposed Rules Implementing Sections 201 and 210 of PURPA; Response to Comments on the Proposed 201 and 210 Rules; and Summary Analysis of the Environmental Assessment of the Rules. Pertinent reference material is provided in the Appendices, including the text of the rules. (MCW)

  20. Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2011-08-16

    This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  1. Instrumented home energy rating and commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  2. Railroad Commission of Texas | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    was established in 1891 under a constitutional and legislative mandate to prevent discrimination in railroad charges and establish reasonable tariffs. It is the oldest regulatory...

  3. Slide 1

    Gasoline and Diesel Fuel Update

    Energy Regulatory Commission * Market Oversight @ FERC.gov Short-Term Energy Prices What Drivers Matter Most? Chris Ellsworth Division of Energy Market Oversight April 6, 2010 EIA 2010 Energy Conference Federal Energy Regulatory Commission * Market Oversight @ FERC.gov Henry Hub Natural Gas Daily Spot Prices 2008, 2009 and 2003-2007 Range 2085 Source: Derived from Platts data. $0 $2 $4 $6 $8 $10 $12 $14 $16 $18 $20 J a n F e b M a r A p r M a y J u n J u l A u g S e p O c t N o v D e c 2003 -

  4. Commission. The Nuclear Materials Management and Safeguards System (NMMSS) 2014 Annual Users

    National Nuclear Security Administration (NNSA)

    April 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. The Nuclear Materials Management and Safeguards System (NMMSS) 2014 Annual Users Training Meeting will be held May 12-15, 2014, in Denver, Colorado. NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and commercial nuclear facilities. The data serve a critical

  5. Investigating Potential Strategies for Automating Commissioning Activities

    SciTech Connect (OSTI)

    Brambley, Michael R.; Briggs, Robert S.; Katipamula, Srinivas; Dasher, Carolyn; Luskay, Larry; Irvine, Linda

    2002-05-31

    This paper provides summary results from a project on automated and continuous commissioning currently underway for the Air-Conditioning & Refrigeration Technology Institute (ARTI). The project focuses on developing methods for automating parts of the commissioning of heating, ventilating and air-conditioning (HVAC) equipment in newly-built, as well as existing, commercial buildings. This paper provides a summary of work completed to date, which has focused on selecting building systems; operation problems; and parts of the commissioning process where automation is likely to provide the greatest benefits. It also includes an overview of the approach planned for development and demonstration of methods for automating the selected areas.

  6. Blue Ribbon Commission on America's Nuclear Future

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Blue Ribbon Commission on America's Nuclear Future Draft Report to the Secretary of Energy July 29, 2011 Draft Report of the Blue Ribbon Commission ii July 2011 PREAMBLE The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new plan. It is co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other

  7. Regulatory guidance for lightning protection in nuclear power plants

    SciTech Connect (OSTI)

    Kisner, R. A.; Wilgen, J. B.; Ewing, P. D.; Korsah, K.; Antonescu, C. E.

    2006-07-01

    Oak Ridge National Laboratory (ORNL) was engaged by the U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) to develop the technical basis for regulatory guidance to address design and implementation practices for lightning protection systems in nuclear power plants (NPPs). Lightning protection is becoming increasingly important with the advent of digital and low-voltage analog systems in NPPs. These systems have the potential to be more vulnerable than older analog systems to the resulting power surges and electromagnetic interference (EMI) when lightning strikes facilities or power lines. This paper discusses the technical basis for guidance to licensees and applicants covered in Regulatory Guide (RG) 1.204, Guidelines for Lightning Protection of Nuclear Power Plants, issued August 2005. RG 1.204 describes guidance for practices that are acceptable to the NRC staff for protecting nuclear power structures and systems from direct lightning strikes and the resulting secondary effects. (authors)

  8. Developing consensus in response to regulatory change: a survival strategy

    SciTech Connect (OSTI)

    McAllister, J.E.

    1985-11-01

    For several years now, the nuclear industry has implemented basic regulatory guides and pursued evolving incremental changes by de facto execution of US Nuclear Regulatory Commission codes or in anticipation of them. The purpose of this paper is to describe a consensus-building process recently employed by industry representatives to respond to changes to 10CFR55, Operator's Licenses and Conforming Amendment. This process resulted from the necessity for industry stakeholders to evaluate the impact of pending regulatory change. It also highlighted the need for more dialogue in the industry and the potential of expanding links with academic representatives. In addition, the paper reports participants; documentation of unnecessary regulatory constraint and vagueness of new terminology and requirements.

  9. Regulatory Guidance for Lightning Protection in Nuclear Power Plants

    SciTech Connect (OSTI)

    Kisner, Roger A; Wilgen, John B; Ewing, Paul D; Korsah, Kofi; Antonescu, Christina E

    2006-01-01

    Abstract - Oak Ridge National Laboratory (ORNL) was engaged by the U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) to develop the technical basis for regulatory guidance to address design and implementation practices for lightning protection systems in nuclear power plants (NPPs). Lightning protection is becoming increasingly important with the advent of digital and low-voltage analog systems in NPPs. These systems have the potential to be more vulnerable than older analog systems to the resulting power surges and electromagnetic interference (EMI) when lightning strikes facilities or power lines. This paper discusses the technical basis for guidance to licensees and applicants covered in Regulatory Guide (RG) 1.204, Guidelines for Lightning Protection of Nuclear Power Plants, issued August 2005. RG 1.204 describes guidance for practices that are acceptable to the NRC staff for protecting nuclear power structures and systems from direct lightning strikes and the resulting secondary effects.

  10. NGNP Project Regulatory Gap Analysis for Modular HTGRs

    SciTech Connect (OSTI)

    Wayne Moe

    2011-09-01

    The Next Generation Nuclear Plant (NGNP) Project Regulatory Gap Analysis (RGA) for High Temperature Gas-Cooled Reactors (HTGR) was conducted to evaluate existing regulatory requirements and guidance against the design characteristics specific to a generic modular HTGR. This final report presents results and identifies regulatory gaps concerning current Nuclear Regulatory Commission (NRC) licensing requirements that apply to the modular HTGR design concept. This report contains appendices that highlight important HTGR licensing issues that were found during the RGA study. The information contained in this report will be used to further efforts in reconciling HTGR-related gaps in the NRC licensing structure, which has to date largely focused on light water reactor technology.

  11. National Labs Commission Phase I Meeting Schedule

    Energy.gov [DOE]

    The Commission meets monthly to gather information that will inform its study. Public meetings allow for public participation.  Individuals who would like to attend must RSVP to Karen Gibson,...

  12. The Atomic Energy Commission By Alice Buck

    Energy.gov (indexed) [DOE]

    Atomic Energy Commission By Alice Buck July 1983 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 ...

  13. Phenylpropanoid related regulatory protein-regulatory region associations

    DOE Patents [OSTI]

    Apuya, Nestor; Bobzin, Steven Craig; Park, Joon-Hyun; Doukhanina, Elena

    2012-01-03

    Materials and methods for identifying lignin regulatory region-regulatory protein associations are disclosed. Materials and methods for modulating lignin accumulation are also disclosed.

  14. NWTC Engineer Wins Prestigious International Electrotechnical Commission

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award | Wind | NREL NWTC Engineer Wins Prestigious International Electrotechnical Commission Award April 5, 2016 Jeroen van Dam is proving that a single person can have a global impact. A principal engineer at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory, van Dam recently received the International Electrotechnical Commission (IEC) 1906 award. This honor is bestowed on technical experts whose exceptional involvement in IEC activities has brought

  15. SWPF System Turnover from Construction to Commissioning

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PARSONS SALT WASTE PROCESSING FACILITY PROJECT PROCEDURE Procedure Number: PP-CM-8103 Procedure Title: SWPF System Turnover from Construction to Commissioning Revision: 2 (Complete Rewrite - No Revision Bars Used) Change: N/A Document Owner: Skip Singer Effective Date: 05/23/2014 Document Approver: _ _ _ _ S _ki_ ._.._p_S _i_ n_._.g'- er _ _ _ _ 1.0 PURPOSE/SCOPE COMMISSIONING AND TESTING MANAGER This Salt Waste Processing Facility (SWPF) Project Procedure (PP) establishes requirements and

  16. Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Request for information on reducing regulatory burden Reducing Regulatory Burden (177.64 KB) More Documents & Publications Reducing Regulatory Burden Reducing Regulatory Burden

  17. Regulatory cross-cutting topics for fuel cycle facilities.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Brown, Jason; Goldmann, Andrew Scott; Louie, David

    2013-10-01

    This report overviews crosscutting regulatory topics for nuclear fuel cycle facilities for use in the Fuel Cycle Research & Development Nuclear Fuel Cycle Evaluation and Screening study. In particular, the regulatory infrastructure and analysis capability is assessed for the following topical areas: Fire Regulations (i.e., how applicable are current Nuclear Regulatory Commission (NRC) and/or International Atomic Energy Agency (IAEA) fire regulations to advance fuel cycle facilities) Consequence Assessment (i.e., how applicable are current radionuclide transportation tools to support risk-informed regulations and Level 2 and/or 3 PRA) While not addressed in detail, the following regulatory topic is also discussed: Integrated Security, Safeguard and Safety Requirement (i.e., how applicable are current Nuclear Regulatory Commission (NRC) regulations to future fuel cycle facilities which will likely be required to balance the sometimes conflicting Material Accountability, Security, and Safety requirements.)

  18. A proposed Regulatory Guide basis for spent fuel decay heat

    SciTech Connect (OSTI)

    Hermann, O.W.; Parks, C.V.; Renier, J.P.

    1991-01-01

    A proposed revision to Regulatory Guide 3.54, Spent Fuel Heat Generation in an Independent Spent Fuel Storage Installation'' has been developed for the US Nuclear Regulatory Commission. The proposed revision includes a data base of decay heat rates calculated as a function of burnup, specific power, cooling time, initial fuel {sup 235}U enrichment and assembly type (i.e., PWR or BWR). Validation of the calculational method was done by comparison with existing measured decay heat rates. Procedures for proper use of the data base, adjustment formulae accounting for effects due to differences in operating history and initial enrichment, and a defensible safety factor were derived. 15 refs., 6 tabs.

  19. Nuclear regulatory legislation, 104th Congress, Volume 1, No. 4

    SciTech Connect (OSTI)

    1997-12-01

    This document is the first of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Atomic Energy Act, Energy Reorganization Act, Low-Level Radioactive Waste Policy Amendments Act, and Nuclear Waste Policy Act. Other information included in this volume pertains to NRC user fees, NRC authorizations, the Inspector General Act, and the Administrative Procedure Act.

  20. Analysis of PURPA and solar energy

    SciTech Connect (OSTI)

    Rice, M.

    1980-03-01

    The Public Utility Regulatory Policies Act of 1978 (PURPA) is designed to promote energy conservation, the efficient use of utility resources, and equitable rates. PURPA specifically directs the Federal Energy Regulatory Commission (FERC) to encourage small power production from renewable resources (and also cogeneration of electric energy as well as heat) by setting standards under which facilities qualify for interconnection, and guidelines for sales between utilities and independent facilities. The way FERC carries out this mandate may critically affect the development of solar alternatives to electric power production from fossil and nuclear resources. This report comments on proposed FERC regulations and suggests ways to encourage small power production within the PURPA mandate. In addition, some internal strains within PURPA are analyzed that seem to limit the effectiveness with which FERC can encourage independent facilities, and possible modifications to PURPA are suggested. 255 references.

  1. MARCH 24, 2015 LAB COMMISSION MEETING MINUTES | Department of...

    Energy.gov (indexed) [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its seventh meeting at 10:30 AM on March 24, 2015. Commission Co-Chair TJ...

  2. FEBRUARY 24, 2015 LAB COMMISSION MEETING MINUTES | Department...

    Energy.gov (indexed) [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its sixth meeting at 9:00 AM on February 24, 2015. Commission Co-Chair...

  3. .Energy Project Regulatory Considerations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Regulatory Considerations John Clancy Godfrey & Kahn, S.C. jclancy@gklaw.com Telephone: (414) 287-9256 August 31, 2016 Tribal Energy and Economic Development Webinar 1 Regulatory Issues and Opportunities * A number of federal laws and regulations apply to energy development activities on tribal lands * Federal laws, regulations, and Executive Orders apply to energy development activities * State laws and regulations largely do not apply to energy development on tribal lands *

  4. Guernsey Renewable Energy Commission GREC | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Renewable Energy Commission GREC Jump to: navigation, search Name: Guernsey Renewable Energy Commission (GREC) Place: St. Martin, Guernsey, Channel Islands, United Kingdom Zip: GY1...

  5. Memorandum on the Interim Report of the Commission to Review...

    Office of Environmental Management (EM)

    the Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories Memorandum on the Interim Report of the Commission to Review the Effectiveness...

  6. Public Utility Commission of Texas | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Public Utility Commission of Texas Name: Public Utility Commission of Texas Address: 1701 N. Congress Avenue Place: Austin, Texas Zip: 78701 Year Founded: 1975 Website:...

  7. New Mexico Public Regulation Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Public Regulation Commission Name: New Mexico Public Regulation Commission Address: 33 Plaza La Prensa Place: Santa Fe, New Mexico Zip: 87507 Website: www.nmprc.state.nm.us...

  8. Retro-Commissioning Increases Data Center Efficiency at Low Cost...

    Energy Savers

    Retro-Commissioning Increases Data Center Efficiency at Low Cost Retro-Commissioning Increases Data Center Efficiency at Low Cost Fact sheet discusses a success story detailing a ...

  9. ENERGY STAR Guide to Retro-Commissioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in Federal Energy Savings Performance Contracts Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Retro-Commissioning Sensor Suitcase Fact Sheet

  10. COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST ...

  11. Arkansas Oil and Gas Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Oil and Gas Commission Jump to: navigation, search Name: Arkansas Oil and Gas Commission Address: 301 Natural Resources Dr. Ste 102 Place: Arkansas Zip: 72205 Website:...

  12. Commission to Review the Effectiveness of the National Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule Commission to Review the Effectiveness of the National Energy Laboratories, ...

  13. File:07FDBPlantCommissioning.pdf | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    FDBPlantCommissioning.pdf Jump to: navigation, search File File history File usage Metadata File:07FDBPlantCommissioning.pdf Size of this preview: 463 599 pixels. Other...

  14. File:07CAAPlantCommissioningProcessApplicationForCertification...

    Open Energy Information (Open El) [EERE & EIA]

    7CAAPlantCommissioningProcessApplicationForCertification.pdf Jump to: navigation, search File File history File usage Metadata File:07CAAPlantCommissioningProcessApplicationForCert...

  15. File:07ORDExpeditedPlantCommissioningProcess.pdf | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    ORDExpeditedPlantCommissioningProcess.pdf Jump to: navigation, search File File history File usage Metadata File:07ORDExpeditedPlantCommissioningProcess.pdf Size of this preview:...

  16. OSTIblog Articles in the Commission on Science and Technology...

    Office of Scientific and Technical Information (OSTI)

    Commission on Science and Technology for Development Topic WorldWideScience Opens ... of the United Nations' Commission on Science and Technology for Development (CSTD). ...

  17. San Francisco Bay Conservation and Development Commission | Open...

    Open Energy Information (Open El) [EERE & EIA]

    Conservation and Development Commission Jump to: navigation, search Logo: San Francisco Bay Conservation and Development Commission Name: San Francisco Bay Conservation and...

  18. Ex parte communication of the California Energy Commission- Docket...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No. ...

  19. California Energy Commission ¬ネメ Energy Efficiency and...

    Office of Environmental Management (EM)

    California Energy Commission - Energy Efficiency and Conservation Block Grant Program ... Commission - Energy Efficiency and Conservation Block Grant Program Funds Provided by ...

  20. Chapter 9: Commissioning the Building | Department of Energy

    Energy Savers

    Chapter 9 of the LANL Sustainable Design Guide contains information on commissioning process overview and commissioning activities and documentation for the project. sustainablegu...

  1. Retro-Commissioning for State and Local Governments

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how state and local governments can lead by example by retro-commissioning their own buildings and adopting retro-commissioning policies for the private sector.

  2. Arizona Const. Art.15 - The Corporation Commission | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Arizona Const. Art.15 - The Corporation CommissionLegal Abstract This article sets forth the Constitutional provisions governing the Arizona Corporations Commission. Published...

  3. Public Service Commission of Wisconsin | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Commission of Wisconsin Jump to: navigation, search Name: Public Service Commission of Wisconsin Address: 610 North Whitney Way Place: Madison, Wisconsin Zip: 53707-7854 Phone...

  4. Kansas Corporation Commission Energy Division | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    Commission Energy Division Jump to: navigation, search Name: Kansas Corporation Commission Energy Division Address: 1500 SW Arrowhead Road Place: Topeka, KS Zip: 66604-4074 Phone...

  5. Retro-Commissioning Sensor Suitcase Fact Sheet | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Retro-Commissioning Sensor Suitcase Fact Sheet Retro-Commissioning Sensor Suitcase Fact Sheet Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory ...

  6. Philippines-Support for the National Climate Commission | Open...

    Open Energy Information (Open El) [EERE & EIA]

    Philippines-Support for the National Climate Commission Jump to: navigation, search Name GIZ-Philippines-Support for the National Climate Commission AgencyCompany Organization...

  7. Philippines-Support for the National Climate Commission | Open...

    Open Energy Information (Open El) [EERE & EIA]

    Philippines-Support for the National Climate Commission (Redirected from GIZ-Philippines-Support for the National Climate Commission) Jump to: navigation, search Name...

  8. Oklahoma Corporate Commission Oil and Gas | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Corporate Commission Oil and Gas Jump to: navigation, search Name: Oklahoma Corporate Commission Oil and Gas Place: Oklahoma Zip: 73152-2000 Website: www.occeweb.comogoghome.htm...

  9. Wyoming Oil and Gas Conservation Commission | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Oil and Gas Conservation Commission Jump to: navigation, search Name: Wyoming Oil and Gas Conservation Commission Address: 2211 King Blvd Place: Wyoming Zip: 82602 Website:...

  10. Fact Sheet: DOE/National Association of Regulatory Utility Commissioners

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fact Sheet: DOE/National Association of Regulatory Utility Commissioners Natural Gas Infrastructure Modernization Partnership Summary: Building on many years of productive collaboration, the U.S. Department of Energy will work with NARUC to encourage investments in infrastructure modernization to enhance pipeline safety, efficiency and deliverability. State Public Utility Commissions serve a leading role in ensuring continued investments are made to secure safe, reliable, affordable and robust

  11. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  12. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  13. Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Burden Reducing Regulatory Burden Request for information on reducing regulatory burden Reducing Regulatory Burden (289.74 KB) More Documents & Publications Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 SEVENTH RFI COMMENTS ON REDUCING REGULATORY BURDEN

  14. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 18

    SciTech Connect (OSTI)

    1995-07-23

    This document (NUREG-0325) is the current US NRC organization chart, listing all NRC offices and regions and their components down through the branch level as of July 23, 1995. Functional statements of each position are given, as is the name of the individual holding the position.

  15. The United States Nuclear Regulatory Commission and the United States Department Of Energy Public Meeting

    Office of Environmental Management (EM)

    Department of Energy The U.S. and China - Advancing Clean Energy Research Through Cooperation The U.S. and China - Advancing Clean Energy Research Through Cooperation September 3, 2010 - 9:45am Addthis David Sandalow David Sandalow Former Under Secretary of Energy (Acting) and Assistant Secretary for Policy & International Affairs What does this project do? Advances in clean vehicles. Advances in clean coal, including carbon capture and storage. What two countries lead the world in

  16. Transportation Security Rulemaking Activities at the U.S. Nuclear Regulatory Commission

    Office of Environmental Management (EM)

    Technology Validation » Transportation Projects Transportation Projects Because highway vehicles account for a large share of petroleum use, carbon dioxide (a primary greenhouse gas) emissions, and air pollution, advances in fuel cell power systems for transportation could substantially improve our energy security and air quality. However, few fuel-cell-powered vehicles are in use today; even fewer are available commercially. A number of fuel cell vehicle demonstrations are currently underway

  17. Rationales for regulatory activity

    SciTech Connect (OSTI)

    Perhac, R.M.

    1997-02-01

    The author provides an outline which touches on the types of concerns about risk evaluation which are addressed in the process of establishing regulatory guides. Broadly he says regulatory activity serves three broad constituents: (1) Paternalism (private risk); (2) Promotion of social welfare (public risks); (3) Protection of individual rights (public risks). He then discusses some of the major issues encountered in reaching a decision on what is an acceptable level of risk within each of these areas, and how one establishes such a level.

  18. Letter from the Department of Energy to the District of Columbia Public

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Service Commission with respect to the Emergency Petition and Complaint | Department of Energy with respect to the Emergency Petition and Complaint Letter from the Department of Energy to the District of Columbia Public Service Commission with respect to the Emergency Petition and Complaint Docket No. EO-05-01: We have received the Petition and Complaint that you filed with the Department of Energy (DOE) and the Federal Energy Regulatory Commission (FERC) on August 24, 2005, on behalf of the

  19. Potential Benefits of Commissioning California Homes

    SciTech Connect (OSTI)

    Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

    2002-01-01

    Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California

  20. Checkout, Testing, and Commissioning Plan RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Checkout, Testing, and Commissioning Plan RM Checkout, Testing, and Commissioning Plan RM The CP RM Module is a tool that assists DOE federal project review teams in evaluating the sufficiency of the Commissioning Plan and its implementation. The CP RM can be used by the DOE federal project teams both to evaluate the adequacy of the Commissioning Plan documentation/programs and the execution of programs by the contractor. Commissioning Plan RM (2.88 MB) More Documents & Publications