National Library of Energy BETA

Sample records for quadrillion btu pipeline

  1. Expanded standards and codes case limits combined buildings delivered energy to 21 quadrillion Btu by 2035

    Gasoline and Diesel Fuel Update

    Erin Boedecker, Session Moderator April 27, 2011 | Washington, DC Energy Demand. Efficiency, and Consumer Behavior 16 17 18 19 20 21 22 23 24 25 2005 2010 2015 2020 2025 2030 2035 2010 Technology Reference Expanded Standards Expanded Standards + Codes -7.6% ≈ 0 Expanded standards and codes case limits combined buildings delivered energy to 21 quadrillion Btu by 2035 2 Erin Boedecker, EIA Energy Conference, April 27, 2011 delivered energy quadrillion Btu Source: EIA, Annual Energy Outlook 2011

  2. Btu)","per Building

    Energy Information Administration (EIA) (indexed site)

    ,"Number of Buildings (thousand)","Floorspace (million square feet)","Floorspace per Building (thousand square feet)","Total (trillion Btu)","per Building (million Btu)","per...

  3. First BTU | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    that is consumed by the United States.3 References First BTU First BTU Green Energy About First BTU Retrieved from "http:en.openei.orgwindex.php?titleFirstBT...

  4. ,"Total Fuel Oil Consumption (trillion Btu)",,,,,"Fuel Oil Energy...

    Energy Information Administration (EIA) (indexed site)

    A. Fuel Oil Consumption (Btu) and Energy Intensities by End Use for All Buildings, 2003" ,"Total Fuel Oil Consumption (trillion Btu)",,,,,"Fuel Oil Energy Intensity (thousand Btu...

  5. BTU International Inc | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    1862 Product: US-based manufacturer of thermal processing equipment, semiconductor packaging, and surface mount assembly. References: BTU International Inc1 This article is a...

  6. Microfabricated BTU monitoring device for system-wide natural...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Microfabricated BTU monitoring device for system-wide natural gas monitoring. Citation Details In-Document Search Title: Microfabricated BTU monitoring device for ...

  7. ,"Total District Heat Consumption (trillion Btu)",,,,,"District...

    Energy Information Administration (EIA) (indexed site)

    Heat Consumption (trillion Btu)",,,,,"District Heat Energy Intensity (thousand Btusquare foot)" ,"Total ","Space Heating","Water Heating","Cook- ing","Other","Total ","Space...

  8. ,"Total Natural Gas Consumption (trillion Btu)",,,,,"Natural...

    Energy Information Administration (EIA) (indexed site)

    Gas Consumption (trillion Btu)",,,,,"Natural Gas Energy Intensity (thousand Btusquare foot)" ,"Total ","Space Heating","Water Heating","Cook- ing","Other","Total ","Space...

  9. Property:Geothermal/CapacityBtuHr | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    to: navigation, search This is a property of type Number. Pages using the property "GeothermalCapacityBtuHr" Showing 25 pages using this property. (previous 25) (next 25) 4 4 UR...

  10. Property:Geothermal/AnnualGenBtuYr | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    to: navigation, search This is a property of type Number. Pages using the property "GeothermalAnnualGenBtuYr" Showing 25 pages using this property. (previous 25) (next 25) 4 4 UR...

  11. ,"Henry Hub Natural Gas Spot Price (Dollars per Million Btu)...

    Energy Information Administration (EIA) (indexed site)

    12:23:06 PM" "Back to Contents","Data 1: Henry Hub Natural Gas Spot Price (Dollars per Million Btu)" "Sourcekey","RNGWHHD" "Date","Henry Hub Natural Gas Spot Price (Dollars per ...

  12. ,"Henry Hub Natural Gas Spot Price (Dollars per Million Btu)...

    Energy Information Administration (EIA) (indexed site)

    12:23:08 PM" "Back to Contents","Data 1: Henry Hub Natural Gas Spot Price (Dollars per Million Btu)" "Sourcekey","RNGWHHD" "Date","Henry Hub Natural Gas Spot Price (Dollars per ...

  13. ,"Henry Hub Natural Gas Spot Price (Dollars per Million Btu)...

    Energy Information Administration (EIA) (indexed site)

    12:23:12 PM" "Back to Contents","Data 1: Henry Hub Natural Gas Spot Price (Dollars per Million Btu)" "Sourcekey","RNGWHHD" "Date","Henry Hub Natural Gas Spot Price (Dollars per ...

  14. Hydrogen Pipelines

    Energy.gov [DOE]

    Gaseous hydrogen can be transported through pipelines much the way natural gas is today. Approximately 1,700 miles of hydrogen pipelines are currently operating in the United States. Transporting gaseous hydrogen via existing pipelines is a low-cost option for delivering large volumes of hydrogen. The high initial capital costs of new pipeline construction constitute a major barrier to expanding hydrogen pipeline delivery infrastructure. Research today therefore focuses on overcoming technical concerns related to pipeline transmission.

  15. Method for selective detection of explosives in mass spectrometer or ion mobility spectrometer at parts-per-quadrillion level

    SciTech Connect

    Ewing, Robert G.; Atkinson, David A.; Clowers, Brian H.

    2015-09-01

    A method for selective detection of volatile and non-volatile explosives in a mass spectrometer or ion mobility spectrometer at a parts-per-quadrillion level without preconcentration is disclosed. The method comprises the steps of ionizing a carrier gas with an ionization source to form reactant ions or reactant adduct ions comprising nitrate ions (NO.sub.3.sup.-); selectively reacting the reactant ions or reactant adduct ions with at least one volatile or non-volatile explosive analyte at a carrier gas pressure of at least about 100 Ton in a reaction region disposed between the ionization source and an ion detector, the reaction region having a length which provides a residence time (tr) for reactant ions therein of at least about 0.10 seconds, wherein the selective reaction yields product ions comprising reactant ions or reactant adduct ions that are selectively bound to the at least one explosive analyte when present therein; and detecting product ions with the ion detector to determine presence or absence of the at least one explosive analyte.

  16. EIS-0007: Low Btu Coal Gasification Facility and Industrial Park

    Energy.gov [DOE]

    The U.S. Department of Energy (DOE) prepared this draft environmental impact statement that evaluates the potential environmental impacts that may be associated with the construction and operation of a low-Btu coal gasification facility and the attendant industrial park in Georgetown, Scott County, Kentucky. DOE cancelled this project after publication of the draft.

  17. U.S. Total Consumption of Heat Content of Natural Gas (BTU per...

    Gasoline and Diesel Fuel Update

    Consumption of Heat Content of Natural Gas (BTU per Cubic Foot) U.S. Total Consumption of Heat Content of Natural Gas (BTU per Cubic Foot) Decade Year-0 Year-1 Year-2 Year-3 Year-4 ...

  18. Worldwide pipelines and contractors directory

    SciTech Connect

    1999-11-01

    This directory contains information on the following: pipeline contractors; US natural gas pipelines; US crude oil pipelines; US product pipelines; Canadian pipelines and foreign pipelines.

  19. "Economic","per Employee","of Value Added","of Shipments" "Characteristic(a)","(million Btu)","(thousand Btu)","(thousand Btu)"

    Energy Information Administration (EIA) (indexed site)

    2 Relative Standard Errors for Table 6.2;" " Unit: Percents." ,,,"Consumption" " ",,"Consumption","per Dollar" " ","Consumption","per Dollar","of Value" "Economic","per Employee","of Value Added","of Shipments" "Characteristic(a)","(million Btu)","(thousand Btu)","(thousand Btu)" ,"Total United States" "Value

  20. "Economic","per Employee","of Value Added","of Shipments" "Characteristic(a)","(million Btu)","(thousand Btu)","(thousand Btu)"

    Energy Information Administration (EIA) (indexed site)

    2 Relative Standard Errors for Table 6.2;" " Unit: Percents." ,,,"Consumption" ,,"Consumption","per Dollar" ,"Consumption","per Dollar","of Value" "Economic","per Employee","of Value Added","of Shipments" "Characteristic(a)","(million Btu)","(thousand Btu)","(thousand Btu)" ,"Total United States" "Value of Shipments and

  1. A Requirement for Significant Reduction in the Maximum BTU Input Rate of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Decorative Vented Gas Fireplaces Would Impose Substantial Burdens on Manufacturers | Department of Energy A Requirement for Significant Reduction in the Maximum BTU Input Rate of Decorative Vented Gas Fireplaces Would Impose Substantial Burdens on Manufacturers A Requirement for Significant Reduction in the Maximum BTU Input Rate of Decorative Vented Gas Fireplaces Would Impose Substantial Burdens on Manufacturers Comment that a requirement to reduce the BTU input rate of existing decorative

  2. Commercial low-Btu coal-gasification plant

    SciTech Connect

    1981-11-01

    In response to a 1980 Department of Energy solicitation, the General Refractories Company submitted a Proposal for a feasibility study of a low Btu gasification facility for its Florence, KY plant. The proposed facility would substitute low Btu gas from a fixed bed gasifier for natural gas now used in the manufacture of insulation board. The Proposal was prompted by a concern over the rising costs of natural gas, and the anticipation of a severe increase in fuel costs resulting from deregulation. The feasibility study consisted of the following tasks: perform preliminary engineering of a gasification facility; provide a definitive full gas cost estimate based upon the preliminary engineering fuel design; determine the preferred source of coal; determine the potential for the disposition of, and income from, by-products; develop a health and safety program; perform an analysis of the risks involved in constructing and operating such a facility; and prepare a Financial Analysis of General Refractories selected Dravo Engineers and Constructors based upon the qualifications of Dravo in the field of coal conversion, and the fact that Dravo has acquired the rights to the Wellman-Galusha technology. Given the various natural gas forecasts available, there seems to be a reasonable possibility that the five-gasifier LBG prices will break even with natural gas prices somewhere between 1984 and 1989. General Refractories recognizes that there are many uncertainties in developing these natural gas forecasts and, if the present natural gas decontrol plan is not fully implemented, some budgetary risks would occur in undertaking the proposed gasification facility. Because of this, General Refractories has decided to wait for more substantiating evidence that natural gas prices will rise as is now being predicted.

  3. Sectoral combustor for burning low-BTU fuel gas

    DOEpatents

    Vogt, Robert L.

    1980-01-01

    A high-temperature combustor for burning low-BTU coal gas in a gas turbine is disclosed. The combustor includes several separately removable combustion chambers each having an annular sectoral cross section and a double-walled construction permitting separation of stresses due to pressure forces and stresses due to thermal effects. Arrangements are described for air-cooling each combustion chamber using countercurrent convective cooling flow between an outer shell wall and an inner liner wall and using film cooling flow through liner panel grooves and along the inner liner wall surface, and for admitting all coolant flow to the gas path within the inner liner wall. Also described are systems for supplying coal gas, combustion air, and dilution air to the combustion zone, and a liquid fuel nozzle for use during low-load operation. The disclosed combustor is fully air-cooled, requires no transition section to interface with a turbine nozzle, and is operable at firing temperatures of up to 3000.degree. F. or within approximately 300.degree. F. of the adiabatic stoichiometric limit of the coal gas used as fuel.

  4. Pipeline Expansions

    Reports and Publications

    1999-01-01

    This appendix examines the nature and type of proposed pipeline projects announced or approved for construction during the next several years in the United States. It also includes those projects in Canada and Mexico that tie-in with the U.S. markets or projects.

  5. Subtask 3.16 - Low-BTU Field Gas Application to Microturbines

    SciTech Connect

    Darren Schmidt; Benjamin Oster

    2007-06-15

    Low-energy gas at oil production sites presents an environmental challenge to the sites owners. Typically, the gas is managed in flares. Microturbines are an effective alternative to flaring and provide on-site electricity. Microturbines release 10 times fewer NOx emissions than flaring, on a methane fuel basis. The limited acceptable fuel range of microturbines has prevented their application to low-Btu gases. The challenge of this project was to modify a microturbine to operate on gases lower than 350 Btu/scf (the manufacturer's lower limit). The Energy & Environmental Research Center successfully operated a Capstone C30 microturbine firing gases between 100-300 Btu/scf. The microturbine operated at full power firing gases as low as 200 Btu/scf. A power derating was experienced firing gases below 200 Btu/scf. As fuel energy content decreased, NO{sub x} emissions decreased, CO emissions increased, and unburned hydrocarbons remained less than 0.2 ppm. The turbine was self-started on gases as low as 200 Btu/scf. These results are promising for oil production facilities managing low-Btu gases. The modified microturbine provides an emission solution while returning valuable electricity to the oilfield.

  6. Recent regulatory experience of low-Btu coal gasification. Volume III. Supporting case studies

    SciTech Connect

    Ackerman, E.; Hart, D.; Lethi, M.; Park, W.; Rifkin, S.

    1980-02-01

    The MITRE Corporation conducted a five-month study for the Office of Resource Applications in the Department of Energy on the regulatory requirements of low-Btu coal gasification. During this study, MITRE interviewed representatives of five current low-Btu coal gasification projects and regulatory agencies in five states. From these interviews, MITRE has sought the experience of current low-Btu coal gasification users in order to recommend actions to improve the regulatory process. This report is the third of three volumes. It contains the results of interviews conducted for each of the case studies. Volume 1 of the report contains the analysis of the case studies and recommendations to potential industrial users of low-Btu coal gasification. Volume 2 contains recommendations to regulatory agencies.

  7. Hydrogen Pipeline Working Group

    Energy.gov [DOE]

    The Hydrogen Pipeline Working Group of research and industry experts focuses on issues related to the cost, safety, and reliability of hydrogen pipelines. Participants represent organizations...

  8. Low-Btu coal gasification in the United States: company topical. [Brick producers

    SciTech Connect

    Boesch, L.P.; Hylton, B.G.; Bhatt, C.S.

    1983-07-01

    Hazelton and other brick producers have proved the reliability of the commercial size Wellman-Galusha gasifier. For this energy intensive business, gas cost is the major portion of the product cost. Costs required Webster/Hazelton to go back to the old, reliable alternative energy of low Btu gasification when the natural gas supply started to be curtailed and prices escalated. Although anthracite coal prices have skyrocketed from $34/ton (1979) to over $71.50/ton (1981) because of high demand (local as well as export) and rising labor costs, the delivered natural gas cost, which reached $3.90 to 4.20/million Btu in the Hazelton area during 1981, has allowed the producer gas from the gasifier at Webster Brick to remain competitive. The low Btu gas cost (at the escalated coal price) is estimated to be $4/million Btu. In addition to producing gas that is cost competitive with natural gas at the Webster Brick Hazelton plant, Webster has the security of knowing that its gas supply will be constant. Improvements in brick business and projected deregulation of the natural gas price may yield additional, attractive cost benefits to Webster Brick through the use of low Btu gas from these gasifiers. Also, use of hot raw gas (that requires no tar or sulfur removal) keeps the overall process efficiency high. 25 references, 47 figures, 14 tables.

  9. EIA - Natural Gas Pipeline Network - Pipeline Capacity and Utilization

    Annual Energy Outlook

    Pipeline Utilization & Capacity About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Pipeline Capacity & ...

  10. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Working Group Workshop: Code for Hydrogen Pipelines Hydrogen Pipeline Working Group ... Codes and Standards Workshop and the DOE Hydrogen Pipeline Working Group Workshop Agenda

  11. Questions and Issues on Hydrogen Pipelines: Pipeline Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Overground Pipelines: approx 21 km Pipeline Transmission of Hydrogen --- 5 Copyright: 5. Mining areas Pipeline Transmission of Hydrogen --- 6 Copyright: France & Netherlands ...

  12. Components in the Pipeline

    SciTech Connect

    Gorton, Ian; Wynne, Adam S.; Liu, Yan; Yin, Jian

    2011-02-24

    Scientists commonly describe their data processing systems metaphorically as software pipelines. These pipelines input one or more data sources and apply a sequence of processing steps to transform the data and create useful results. While conceptually simple, pipelines often adopt complex topologies and must meet stringent quality of service requirements that place stress on the software infrastructure used to construct the pipeline. In this paper we describe the MeDICi Integration Framework, which is a component-based framework for constructing complex software pipelines. The framework supports composing pipelines from distributed heterogeneous software components and provides mechanisms for controlling qualities of service to meet demanding performance, reliability and communication requirements.

  13. Keystone XL pipeline update

    Energy.gov [DOE]

    Questions have been raised recently about the Keystone XL pipeline project, so we wanted to make some points clear.

  14. Fiber Reinforced Composite Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rawls Savannah River National Laboratory This presentation does not contain proprietary, confidential, or otherwise restricted information Fiber Reinforced Composite Pipelines Hydrogen Transmission and Distribution Workshop February 25, 2014 Fiber Reinforced Piping for H 2 Delivery * Impact: * Composite pipeline technology has the potential to reduce installation costs and improve reliability for hydrogen pipelines. * Fiber Reinforced Piping * The FRP product form consists of an inner

  15. Annual Energy Review 2000

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Includes 0.07 quadrillion Btu coal coke net imports and 0.10 electricity net imports from fossil fuels. Includes, in quadrillion Btu, 0.10 electricity net imports from fossil...

  16. Energy Information Administration/Annual Energy Review

    Gasoline and Diesel Fuel Update

    in quadrillion Btu, 0.04 coal coke net imports and 0.05 electricity net imports from fossil fuels. Includes, in quadrillion Btu, -0.09 hydroelectric pumped storage and -0.15...

  17. Subsea pipeline connection

    SciTech Connect

    Langner, C. G.

    1985-12-17

    A method and apparatus are provided for laying an offshore pipeline or flowline bundle to a deepwater subsea structure. The pipeline or flowline bundle is laid along a prescribed path, preferably U-shape, such that a pullhead at the terminus of the pipeline or flowline bundle falls just short of the subsea structure. A pull-in tool connected to the pipeline or flowline bundle by a short length of pull cable is then landed on and latched to the subsea structure, and the pipeline or flowline bundle is pulled up to the subsea structure by the pull-in tool and pull cable.

  18. "NAICS",,"per Employee","of Value Added","of Shipments" "Code(a)","Economic Characteristic(b)","(million Btu)","(thousand Btu)","(thousand Btu)"

    Energy Information Administration (EIA) (indexed site)

    3 Relative Standard Errors for Table 6.3;" " Unit: Percents." ,,,,"Consumption" ,,,"Consumption","per Dollar" ,,"Consumption","per Dollar","of Value" "NAICS",,"per Employee","of Value Added","of Shipments" "Code(a)","Economic Characteristic(b)","(million Btu)","(thousand Btu)","(thousand Btu)" ,,"Total United States" "

  19. Total Crude by Pipeline

    Energy Information Administration (EIA) (indexed site)

    Product: Total Crude by All Transport Methods Domestic Crude by All Transport Methods Foreign Crude by All Transport Methods Total Crude by Pipeline Domestic Crude by Pipeline Foreign Crude by Pipeline Total Crude by Tanker Domestic Crude by Tanker Foreign Crude by Tanker Total Crude by Barge Domestic Crude by Barge Foreign Crude by Barge Total Crude by Tank Cars (Rail) Domestic Crude by Tank Cars (Rail) Foreign Crude by Tank Cars (Rail) Total Crude by Trucks Domestic Crude by Trucks Foreign

  20. BP and Hydrogen Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    BP and Hydrogen Pipelines DOE Hydrogen Pipeline Working Group Workshop August 30-31, 2005 Gary P. Yoho, P.E. i l i * Green corporate philosophy and senior management commitment * Reduced greenhouse gas emissions nine years ahead of target * Alternatives to oil are a big part of BP' including natural gas, LNG, solar and hydrogen * Hydrogen Bus Project won Australia' prestigious environmental award * UK partnership opened the first hydrogen demonstration refueling station * Two hydrogen pipelines

  1. Questions and Issues on Hydrogen Pipelines: Pipeline Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Pipping of GH2 Pipeline. Background: FG 64 built in 50ies, KP added in 70ies, active mining area over ...

  2. Product Pipeline Reports Tutorial

    Energy Information Administration (EIA) (indexed site)

    Petroleum > Petroleum Survey Forms> Petroleum Survey Forms Tutorial Product Pipeline Reports Tutorial Content on this page requires a newer version of Adobe Flash Player. Get Adobe ...

  3. Low/medium-Btu coal-gasification assessment program for specific sites of two New York utilities

    SciTech Connect

    Not Available

    1980-12-01

    The scope of this study is to investigate the technical and economic aspects of coal gasification to supply low- or medium-Btu gas to the two power plant boilers selected for study. This includes the following major studies (and others described in the text): investigate coals from different regions of the country, select a coal based on its availability, mode of transportation and delivered cost to each power plant site; investigate the effects of burning low- and medium-Btu gas in the selected power plant boilers based on efficiency, rating and cost of modifications and make recommendations for each; and review the technical feasibility of converting the power plant boilers to coal-derived gas. The following two coal gasification processes have been used as the basis for this Study: the Combustion Engineering coal gasification process produces a low-Btu gas at approximately 100 Btu/scf at near atmospheric pressure; and the Texaco coal gasification process produces a medium-Btu gas at 292 Btu/scf at 800 psig. The engineering design and economics of both plants are described. Both plants meet the federal, state, and local environmental requirements for air quality, wastewater, liquid disposal, and ground level disposal of byproduct solids. All of the synthetic gas alternatives result in bus bar cost savings on a yearly basis within a few years of start-up because the cost of gas is assumed to escalate at a lower rate than that of fuel oil, approximately 4 to 5%.

  4. EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Development...

    Energy Information Administration (EIA) (indexed site)

    Pipelinesk > Development & Expansion About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Pipeline ...

  5. EIA - Natural Gas Pipeline Network - Interstate Pipelines Segment

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Interstate Natural Gas Pipeline Segment About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Interstate Natural Gas ...

  6. EIA - Natural Gas Pipeline Network - Intrastate Natural Gas Pipeline...

    Gasoline and Diesel Fuel Update

    Intrastate Natural Gas Pipeline Segment About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Intrastate Natural Gas ...

  7. EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Compressor...

    Gasoline and Diesel Fuel Update

    Compressor Stations Illustration About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates U.S. Natural Gas Pipeline ...

  8. EIA - Natural Gas Pipeline Network - Largest Natural Gas Pipeline...

    Gasoline and Diesel Fuel Update

    Interstate Pipelines Table About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Thirty Largest U.S. Interstate Natural ...

  9. EIA - Natural Gas Pipeline Network - Natural Gas Pipeline Mileage...

    Gasoline and Diesel Fuel Update

    Mileage by State About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Estimated Natural Gas Pipeline Mileage in the ...

  10. Final EIS Keystone Pipeline Project Appendix E Pipeline Restrictive...

    Energy Saver

    Pipeline Project Route Appendix G Public Water Supply Wells Within One Mile of the ... EIS Keystone Pipeline Project Public Water Supplies (PWS Wells and Wellhead ...

  11. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines

    Energy.gov [DOE]

    Code for Hydrogen Piping and Pipelines. B31 Hydrogen Section Committee to develop a new code for H2 piping and pipelines.

  12. Aspen Pipeline | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    navigation, search Name: Aspen Pipeline Place: Houston, Texas Zip: 77057 Product: US firm which acquires, builds and owns pipelines, gathering systems and distribution systems....

  13. Table 2.11 Commercial Buildings Electricity Consumption by End Use, 2003 (Trillion Btu)

    Energy Information Administration (EIA) (indexed site)

    1 Commercial Buildings Electricity Consumption by End Use, 2003 (Trillion Btu) End Use Space Heating Cooling Ventilation Water Heating Lighting Cooking Refrigeration Office Equipment Computers Other 1 Total All Buildings 167 481 436 88 1,340 24 381 69 156 418 3,559 Principal Building Activity Education 15 74 83 11 113 2 16 4 32 21 371 Food Sales 6 12 7 Q 46 2 119 2 2 10 208 Food Service 10 28 24 10 42 13 70 2 2 15 217 Health Care 6 34 42 2 105 1 8 4 10 36 248 Inpatient 3 25 38 2 76 1 4 2 7 21

  14. Table 2.2 Manufacturing Energy Consumption for All Purposes, 2006 (Trillion Btu )

    Energy Information Administration (EIA) (indexed site)

    Manufacturing Energy Consumption for All Purposes, 2006 (Trillion Btu ) NAICS 1 Code Manufacturing Group Coal Coal Coke and Breeze 2 Natural Gas Distillate Fuel Oil LPG 3 and NGL 4 Residual Fuel Oil Net Electricity 5 Other 6 Shipments of Energy Sources 7 Total 8 311 Food 147 1 638 16 3 26 251 105 (s) 1,186 312 Beverage and Tobacco Products 20 0 41 1 1 3 30 11 -0 107 313 Textile Mills 32 0 65 (s) (s) 2 66 12 -0 178 314 Textile Product Mills 3 0 46 (s) 1 Q 20 (s) -0 72 315 Apparel 0 0 7 (s) (s)

  15. Subsea pipeline connection

    SciTech Connect

    Langner, C. G.

    1985-09-17

    A method and apparatus are provided for connecting an offshore pipeline or flowline bundle to a deepwater subsea structure and then laying away from said structure. The pipeline or flowline bundle is deployed vertically from a pipelay vessel to make a hinged connection with the subsea structure. The connection operation is facilitated by a flowline connection tool attached to the pipeline or flowline bundle and designed to be inserted into a funnel located either centrally or to one side of the subsea structure. The connection procedure consists of landing and securing the flowline connection tool onto the subsea structure, then hinging over and connecting the pipeline or flowline bundle to the subsea structure as the pipeline or flowline bundle is laid on the seafloor beginning at the subsea structure.

  16. Fuel injection staged sectoral combustor for burning low-BTU fuel gas

    DOEpatents

    Vogt, Robert L.

    1985-02-12

    A high-temperature combustor for burning low-BTU coal gas in a gas turbine is described. The combustor comprises a plurality of individual combustor chambers. Each combustor chamber has a main burning zone and a pilot burning zone. A pipe for the low-BTU coal gas is connected to the upstream end of the pilot burning zone: this pipe surrounds a liquid fuel source and is in turn surrounded by an air supply pipe: swirling means are provided between the liquid fuel source and the coal gas pipe and between the gas pipe and the air pipe. Additional preheated air is provided by counter-current coolant air in passages formed by a double wall arrangement of the walls of the main burning zone communicating with passages of a double wall arrangement of the pilot burning zone: this preheated air is turned at the upstream end of the pilot burning zone through swirlers to mix with the original gas and air input (and the liquid fuel input when used) to provide more efficient combustion. One or more fuel injection stages (second stages) are provided for direct input of coal gas into the main burning zone. The countercurrent air coolant passages are connected to swirlers surrounding the input from each second stage to provide additional oxidant.

  17. Fuel injection staged sectoral combustor for burning low-BTU fuel gas

    DOEpatents

    Vogt, Robert L.

    1981-01-01

    A high-temperature combustor for burning low-BTU coal gas in a gas turbine is described. The combustor comprises a plurality of individual combustor chambers. Each combustor chamber has a main burning zone and a pilot burning zone. A pipe for the low-BTU coal gas is connected to the upstream end of the pilot burning zone; this pipe surrounds a liquid fuel source and is in turn surrounded by an air supply pipe; swirling means are provided between the liquid fuel source and the coal gas pipe and between the gas pipe and the air pipe. Additional preheated air is provided by counter-current coolant air in passages formed by a double wall arrangement of the walls of the main burning zone communicating with passages of a double wall arrangement of the pilot burning zone; this preheated air is turned at the upstream end of the pilot burning zone through swirlers to mix with the original gas and air input (and the liquid fuel input when used) to provide more efficient combustion. One or more fuel injection stages (second stages) are provided for direct input of coal gas into the main burning zone. The countercurrent air coolant passages are connected to swirlers surrounding the input from each second stage to provide additional oxidant.

  18. GAS PIPELINE PIGABILITY

    SciTech Connect

    Ted Clark; Bruce Nestleroth

    2004-04-01

    In-line inspection equipment is commonly used to examine a large portion of the long distance transmission pipeline system that transports natural gas from well gathering points to local distribution companies. A piece of equipment that is inserted into a pipeline and driven by product flow is called a ''pig''. Using this term as a base, a set of terms has evolved. Pigs that are equipped with sensors and data recording devices are called ''intelligent pigs''. Pipelines that cannot be inspected using intelligent pigs are deemed ''unpigable''. But many factors affect the passage of a pig through a pipeline, or the ''pigability''. The pigability pipeline extend well beyond the basic need for a long round hole with a means to enter and exit. An accurate assessment of pigability includes consideration of pipeline length, attributes, pressure, flow rate, deformation, cleanliness, and other factors as well as the availability of inspection technology. All factors must be considered when assessing the appropriateness of ILI to assess specific pipeline threats.

  19. EIA - Natural Gas Pipeline Network - Largest Natural Gas Pipeline Systems

    Energy Information Administration (EIA) (indexed site)

    Interstate Pipelines Table About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Thirty Largest U.S. Interstate Natural Gas Pipeline Systems, 2008 (Ranked by system capacity) Pipeline Name Market Regions Served Primary Supply Regions States in Which Pipeline Operates Transported in 2007 (million dekatherm)1 System Capacity (MMcf/d) 2 System Mileage Columbia Gas Transmission Co. Northeast Southwest, Appalachia DE, PA, MD, KY, NC, NJ, NY,

  20. INTERNAL REPAIR OF PIPELINES

    SciTech Connect

    Robin Gordon; Bill Bruce; Nancy Porter; Mike Sullivan; Chris Neary

    2003-05-01

    The two broad categories of deposited weld metal repair and fiber-reinforced composite repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repairs and for fiber-reinforced composite repair. To date, all of the experimental work pertaining to the evaluation of potential repair methods has focused on fiber-reinforced composite repairs. Hydrostatic testing was also conducted on four pipeline sections with simulated corrosion damage: two with composite liners and two without.

  1. Composites Technology for Hydrogen Pipelines

    Energy.gov [DOE]

    Investigate application of composite, fiber-reinforced polymer pipeline technology for hydrogen transmission and distribution

  2. Rnnotator Assembly Pipeline

    SciTech Connect

    Martin, Jeff

    2010-06-03

    Jeff Martin of the DOE Joint Genome Institute discusses a de novo transcriptome assembly pipeline from short RNA-Seq reads on June 3, 2010 at the "Sequencing, Finishing, Analysis in the Future" meeting in Santa Fe, NM

  3. Investigation of Fuel Quality Impact on the Combustion and Exhaust Emissions of a Turbo-Charged SI Engine Operated on Low BTU Gases

    Energy.gov [DOE]

    Research results validate an engine simulation model and provide guidelines for the improved control of combustion stability of SI engines operated on low-BTU gaseous fuels.

  4. Combined compressed air storage-low BTU coal gasification power plant

    DOEpatents

    Kartsounes, George T.; Sather, Norman F.

    1979-01-01

    An electrical generating power plant includes a Compressed Air Energy Storage System (CAES) fueled with low BTU coal gas generated in a continuously operating high pressure coal gasifier system. This system is used in coordination with a continuously operating main power generating plant to store excess power generated during off-peak hours from the power generating plant, and to return the stored energy as peak power to the power generating plant when needed. The excess coal gas which is produced by the coal gasifier during off-peak hours is stored in a coal gas reservoir. During peak hours the stored coal gas is combined with the output of the coal gasifier to fuel the gas turbines and ultimately supply electrical power to the base power plant.

  5. Table 3.1 Fossil Fuel Production Prices, 1949-2011 (Dollars per Million Btu)

    Energy Information Administration (EIA) (indexed site)

    Fossil Fuel Production Prices, 1949-2011 (Dollars per Million Btu) Year Coal 1 Natural Gas 2 Crude Oil 3 Fossil Fuel Composite 4 Nominal 5 Real 6 Nominal 5 Real 6 Nominal 5 Real 6 Nominal 5 Real 6 Percent Change 7 1949 0.21 1.45 0.05 0.37 0.44 3.02 0.26 1.81 – – 1950 .21 1.41 .06 .43 .43 2.95 [R] .26 1.74 -3.6 1951 .21 1.35 .06 .40 .44 2.78 .26 1.65 -5.4 1952 .21 1.31 [R] .07 .45 .44 2.73 .26 1.63 -1.0 1953 .21 1.29 .08 .50 .46 2.86 .27 1.69 3.3 1954 .19 1.18 .09 .55 .48 2.94 .28 1.70 .7 1955

  6. DOE Hydrogen Pipeline Working Group Workshop

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pipeline Working Group Workshop August 31, 2005 Augusta, Georgia Hydrogen Pipeline Experience Presented By: LeRoy H. Remp Lead Project Manager Pipeline Projects ppt00 3 Hydrogen ...

  7. EIA - Natural Gas Pipeline Network - Generalized Natural Gas Pipeline

    Energy Information Administration (EIA) (indexed site)

    Capacity Design Schematic Generalized Design Schematic About U.S. Natural Gas Pipelines- Transporting Natural Gas based on data through 2007/2008 with selected updates Generalized Natural Gas Pipeline Capacity Design Schematic Generalized Natural Gas Pipeline Capcity Design Schematic

  8. Composites Technology for Hydrogen Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Composites Technology for Hydrogen Pipelines Barton Smith, Barbara Frame, Larry Anovitz and Cliff Eberle Oak Ridge National Laboratory Pipeline Working Group Meeting Pipeline Working Group Meeting Aiken, South Carolina Aiken, South Carolina September 25-26, 2007 September 25-26, 2007 Managed by UT-Battelle for the Department of Energy 2 Managed by UT Battelle for the Department of Energy Presentation name - _ Composites Technology for Hydrogen Pipelines Fiber-reinforced polymer pipe Project

  9. New Materials for Hydrogen Pipelines

    Energy.gov [DOE]

    Barriers to Hydrogen Delivery: Existing steel pipelines are subject to hydrogen embrittlement and are inadequate for widespread H2 distribution.

  10. Hydrogen Pipeline Working Group Workshop: Code for Hydrogen Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Code for Hydrogen Pipelines Hydrogen Pipeline Working Group Workshop Augusta, Georgia August 31, 2005 Louis Hayden, PE Chair ASME B31.12 3 Presentation Outline * Approval for new code development * Charge from BPTCS to B31 Standards Committee for Hydrogen Piping/Pipeline code development * B31.12 Status & Structure * Hydrogen Pipeline issues * Research Needs * Where Do We Go From Here? 4 Code for Hydrogen Piping and Pipelines * B31 Hydrogen Section Committee to develop a new code for H 2

  11. UQ Pipeline Lorenz Portlet

    SciTech Connect

    2012-08-31

    This is web client software that can help initiate UQ Pipeline jobs on LLNL's LC compute systems and visually shows the status of such jobs in a browser window. The web client interacts with LC's interactive compute nodes using (LLNL) Lorenz REST API to initiate action and obtain status data in JSON format.

  12. Annual pipeline directory and equipment guide

    SciTech Connect

    Not Available

    1994-11-01

    This issue reviews international pipeline and gas utility operations, design, and maintenance. It includes the identification of companies, their addresses, telephone numbers, company officers, and types of involvement with oil and gas pipeline issues. Specific categories addressed include companies involved in pipeline valves; engineering and construction services; pipe coating applicators; crude oil pipelines; natural gas pipelines; slurry pipelines; gas distribution utilities; and, pipeline manufacturers and suppliers.

  13. Commercial demonstration of atmospheric medium BTU fuel gas production from biomass without oxygen the Burlington, Vermont Project

    SciTech Connect

    Rohrer, J.W.

    1995-12-31

    The first U.S. demonstration of a gas turbine operating on fuel gas produced by the thermal gasification of biomass occurred at Battelle Columbus Labs (BCL) during 1994 using their high throughput indirect medium Btu gasification Process Research Unit (PRU). Zurn/NEPCO was retained to build a commercial scale gas plant utilizing this technology. This plant will have a throughput rating of 8 to 12 dry tons per hour. During a subsequent phase of the Burlington project, this fuel gas will be utilized in a commercial scale gas turbine. It is felt that this process holds unique promise for economically converting a wide variety of biomass feedstocks efficiently into both a medium Btu (500 Btu/scf) gas turbine and IC engine quality fuel gas that can be burned in engines without modification, derating or efficiency loss. Others are currently demonstrating sub-commercial scale thermal biomass gasification processes for turbine gas, utilizing both atmospheric and pressurized air and oxygen-blown fluid bed processes. While some of these approaches hold merit for coal, there is significant question as to whether they will prove economically viable in biomass facilities which are typically scale limited by fuel availability and transportation logistics below 60 MW. Atmospheric air-blown technologies suffer from large sensible heat loss, high gas volume and cleaning cost, huge gas compressor power consumption and engine deratings. Pressurized units and/or oxygen-blown gas plants are extremely expensive for plant scales below 250 MW. The FERCO/BCL process shows great promise for overcoming the above limitations by utilizing an extremely high throughout circulation fluid bed (CFB) gasifier, in which biomass is fully devolitalized with hot sand from a CFB char combustor. The fuel gas can be cooled and cleaned by a conventional scrubbing system. Fuel gas compressor power consumption is reduced 3 to 4 fold verses low Btu biomass gas.

  14. Instrumented Pipeline Initiative

    SciTech Connect

    Thomas Piro; Michael Ream

    2010-07-31

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  15. Trans ecuadorian pipeline; Mountainous pipeline restoration a logistical masterpiece

    SciTech Connect

    Hamilton, L. )

    1988-06-01

    The Trans Ecuadorian Pipeline pumped approximately 300,000 b/d of crude from fields in eastern Ecuador to an export terminal and refinery at Esmeraldas on the Pacific coast. The devastation resulting from an earthquake cut off the main portion of export income as well as domestic fuel supplies and propane gas. Approximately 25 km of the pipeline was destroyed. This article details how the pipeline was reconstructed, including both the construction of a temporary line and of permanent facilities.

  16. Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen

    Energy.gov [DOE]

    Pipping of GH2 Pipeline. Background: FG 64 built in 50ies, KP added in 70ies, active mining area over total length

  17. New Materials for Hydrogen Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY New Materials for Hydrogen Pipelines New Materials for Hydrogen Pipelines Barton Smith, Barbara Frame, Cliff Eberle, Larry Anovitz, James Blencoe and Tim Armstrong Oak Ridge National Laboratory Jimmy Mays University of Tennessee, Knoxville Hydrogen Pipeline Working Group Meeting August 30-31, 2005 Augusta, Georgia 2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Overview Overview - - Barriers and Technical Targets Barriers and

  18. INTERNAL REPAIR OF PIPELINES

    SciTech Connect

    Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

    2005-07-20

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without

  19. Liquefaction and Pipeline Costs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Liquefaction and Pipeline Costs Bruce Kelly Nexant, Inc. Hydrogen Delivery Analysis Meeting May 8-9, 2007 Columbia, Maryland 2 Hydrogen Liquefaction Basic process Compress Cool to temperature with positive Joule- Thompson coefficient Throttle to form liquid Water cooling Nitrogen refrigerator precooler Ortho-para conversion reactors J-T valve L H 2 H 2 gas Compressor(s) 3 Hydrogen Liquefaction - Continued Electric energy requirements Isentropic demand is 3.9 kWh/kg y = 17.844x -0.1548 6 8 10 12

  20. Monthly energy review, December 1985. 1985 Annual data and summaries

    SciTech Connect

    Not Available

    1986-03-26

    US energy production during 1985 was 64.7 quadrillion British thermal units (Btu), 1.4% below the record level attained in 1984. US consumption of energy totaled 73.8 quadrillion Btu, about the same as in 1984 but well below the 78.9 quadrillion Btu consumed during the peak year of 1979. Net imports of energy fell from 9.0 quadrillion Btu in 1984 to 7.8 quadrillion Btu in 1985, a 12.8% decline that brought net imports to the second lowest level since the 1973-1974 oil embargo. Net imports remained significantly below the all-time high of 18.0 quadrillion Btu reached in 1977.

  1. EIA - Natural Gas Pipeline System - Midwest Region

    Energy Information Administration (EIA) (indexed site)

    Midwest Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Pipelines in the Midwest Region ...

  2. EIA - Natural Gas Pipeline System - Central Region

    Annual Energy Outlook

    Central Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Pipelines in the Central Region ...

  3. EIA - Natural Gas Pipeline System - Southwest Region

    Energy Information Administration (EIA) (indexed site)

    Southwest Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Pipelines in the Southwest Region ...

  4. EIA - Natural Gas Pipeline System - Southeast Region

    Annual Energy Outlook

    Southeast Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Pipelines in the Southeast Region ...

  5. Pipeline Safety Research, Development and Technology

    Energy Saver

    Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Safety Research, Development and Technology Natural Gas Infrastructure R&D and Methane Emissions ...

  6. EIA - Natural Gas Pipeline System - Northeast Region

    Energy Information Administration (EIA) (indexed site)

    Northeast Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Pipelines in the Northeast Region ...

  7. EIA - Natural Gas Pipeline System - Western Region

    Energy Information Administration (EIA) (indexed site)

    Western Region About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Pipelines in the Western Region ...

  8. Machinist Pipeline/Apprentice Program Program Description

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Machinist PipelineApprentice Program Program Description The Machinist Pipeline Program was created by the Prototype Fabrication Division to fill a critical need for skilled ...

  9. Computer Science and Information Technology Student Pipeline

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Science and Information Technology Student Pipeline Program Description Los Alamos ... and underrepresented minorities in our candidate pool and in the workforce pipeline. ...

  10. New Materials for Hydrogen Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    New Materials for Hydrogen Pipelines Bart Smith, Jimmy Mays, Barbara Frame, Mike Simonson, Cliff Eberle, Jim Blencoe, and Tim Armstrong Hydrogen Pipeline R&D Project Review Meeting January 5-6, 2005 Oak Ridge National Laboratory 2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Coming Soon..

  11. Heavy oil transportation by pipeline

    SciTech Connect

    Gerez, J.M.; Pick, A.R.

    1996-12-31

    Worldwide there are a number of pipelines used to transport heavy crude oils. The operations are facilitated in a variety of ways. For example, the Alyeska pipeline is an insulated pipeline transporting warm oil over 800 miles. This 48-inch line experiences limited heat loss due to the insulation, volume of oil contained, and heat gain due to friction and pumping. Some European trunk lines periodically handle heavy and waxy crudes. This is achieved by proper sizing of batches, following waxy crudes with non-waxy crudes, and increased use of scrapers. In a former Soviet republic, the transportation of heavy crude oil by pipeline has been facilitated by blending with a lighter Siberian crude. The paper describes the pipeline transport of heavy crudes by Interprovincial Pipe Line Inc. The paper describes enhancing heavy oil transportation by emulsion formation, droplet suspension, dilution, drag reducing agents, and heating.

  12. Table 2.9 Commercial Buildings Consumption by Energy Source, Selected Years, 1979-2003 (Trillion Btu)

    Energy Information Administration (EIA) (indexed site)

    9 Commercial Buildings Consumption by Energy Source, Selected Years, 1979-2003 (Trillion Btu) Energy Source and Year Square Footage Category Principal Building Activity Census Region 1 All Buildings 1,001 to 10,000 10,001 to 100,000 Over 100,000 Education Food Sales Food Service Health Care Lodging Mercantile and Service Office All Other Northeast Midwest South West Major Sources 2 1979 1,255 2,202 1,508 511 [3] 336 469 278 894 861 1,616 1,217 1,826 1,395 526 4,965 1983 1,242 1,935 1,646 480 [3]

  13. Low-Btu coal-gasification-process design report for Combustion Engineering/Gulf States Utilities coal-gasification demonstration plant. [Natural gas or No. 2 fuel oil to natural gas or No. 2 fuel oil or low Btu gas

    SciTech Connect

    Andrus, H E; Rebula, E; Thibeault, P R; Koucky, R W

    1982-06-01

    This report describes a coal gasification demonstration plant that was designed to retrofit an existing steam boiler. The design uses Combustion Engineering's air blown, atmospheric pressure, entrained flow coal gasification process to produce low-Btu gas and steam for Gulf States Utilities Nelson No. 3 boiler which is rated at a nominal 150 MW of electrical power. Following the retrofit, the boiler, originally designed to fire natural gas or No. 2 oil, will be able to achieve full load power output on natural gas, No. 2 oil, or low-Btu gas. The gasifier and the boiler are integrated, in that the steam generated in the gasifier is combined with steam from the boiler to produce full load. The original contract called for a complete process and mechanical design of the gasification plant. However, the contract was curtailed after the process design was completed, but before the mechanical design was started. Based on the well defined process, but limited mechanical design, a preliminary cost estimate for the installation was completed.

  14. Presentation Title

    Energy Information Administration (EIA) (indexed site)

    International Energy Outlook 2016 For Center for Strategic and International Studies May 11, 2016 | Washington, DC By Adam Sieminski, Administrator Key findings in the IEO2016 Reference case * World energy consumption increases from 549 quadrillion Btu in 2012 to 629 quadrillion Btu in 2020 and then to 815 quadrillion Btu in 2040, a 48% increase (1.4%/year). Non-OECD Asia (including China and India) account for more than half of the increase. * The industrial sector continues to account for the

  15. Presentation Title

    Gasoline and Diesel Fuel Update

    Center for Strategic and International Studies May 11, 2016 | Washington, DC By Adam Sieminski, Administrator Key findings in the IEO2016 Reference case * World energy consumption increases from 549 quadrillion Btu in 2012 to 629 quadrillion Btu in 2020 and then to 815 quadrillion Btu in 2040, a 48% increase (1.4%/year). Non-OECD Asia (including China and India) account for more than half of the increase. * The industrial sector continues to account for the largest share of delivered energy

  16. Presentation Title

    Gasoline and Diesel Fuel Update

    Schlumberger June 23, 2016 | Cambridge, MA By Adam Sieminski, Administrator Key findings in the IEO2016 Reference case * World energy consumption increases from 549 quadrillion Btu in 2012 to 629 quadrillion Btu in 2020 and then to 815 quadrillion Btu in 2040, a 48% increase (1.4%/year). Non-OECD Asia (including China and India) account for more than half of the increase. * The industrial sector continues to account for the largest share of delivered energy consumption; the world industrial

  17. Presentation Title

    Gasoline and Diesel Fuel Update

    Dentons 2016 Energy Outlook August 2, 2016 | Washington, DC By Adam Sieminski, Administrator Key findings in the IEO2016 Reference case * World energy consumption increases from 549 quadrillion Btu in 2012 to 629 quadrillion Btu in 2020 and then to 815 quadrillion Btu in 2040, a 48% increase (1.4%/year). Non-OECD Asia (including China and India) account for more than half of the increase. * The industrial sector continues to account for the largest share of delivered energy consumption; the

  18. Presentation Title

    Gasoline and Diesel Fuel Update

    Temple University, Fox School of Business September 12, 2016 | Philadelphia, PA By Adam Sieminski, Administrator International Energy Outlook: key findings in the 2016 Reference case * World energy consumption increases from 549 quadrillion Btu in 2012 to 629 quadrillion Btu in 2020 and then to 815 quadrillion Btu in 2040, a 48% increase (1.4%/year). Non-OECD Asia (including China and India) account for more than half of the increase. * The industrial sector continues to account for the largest

  19. IESP Exascale Challenge: Co-Design of Architectures and Algorithms

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    U.S. Energy Information Administration | International Energy Outlook 2016 Chapter 1 World energy demand and economic outlook Overview The International Energy Outlook 2016 (IEO2016) Reference case projects significant growth in worldwide energy demand over the 28-year period from 2012 to 2040. Total world consumption of marketed energy expands from 549 quadrillion British thermal units (Btu) in 2012 to 629 quadrillion Btu in 2020 and to 815 quadrillion Btu in 2040-a 48% increase from 2012 to

  20. "NAICS",,"per Employee","of Value Added","of Shipments" "Code(a)","Economic Characteristic(b)","(million Btu)","(thousand Btu)","(thousand Btu)"

    Energy Information Administration (EIA) (indexed site)

    4 Relative Standard Errors for Table 6.4;" " Unit: Percents." " "," ",,,"Consumption" " "," ",,"Consumption","per Dollar" " "," ","Consumption","per Dollar","of Value" "NAICS",,"per Employee","of Value Added","of Shipments" "Code(a)","Economic Characteristic(b)","(million Btu)","(thousand

  1. INTERNAL REPAIR OF PIPELINES

    SciTech Connect

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-12-31

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without

  2. INTERNAL REPAIR OF PIPELINES

    SciTech Connect

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

    2004-04-12

    The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to

  3. INTERNAL REPAIR OF PIPELINES

    SciTech Connect

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-08-17

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners

  4. Armenia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ,"inlineLabel":"","visitedicon":"" Country Profile Name Armenia Population Unavailable GDP Unavailable Energy Consumption 0.22 Quadrillion Btu 2-letter ISO code AM 3-letter ISO...

  5. Annual Energy Review 2009 - Released August 2010

    Annual Energy Outlook

    less than 0.1 quadrillion Btu of coal coke net exports. 4 Conventional hydroelectric power, geothermal, solarPV, wind, and biomass. 5 Includes industrial...

  6. Annual Energy Review, 1996

    Annual Energy Outlook

    condensate. b Natural gas plant liquids. c Biofuels, conventional hydroelectric power, geothermal energy, solar energy, and wind energy. d Includes -0.03 quadrillion Btu for...

  7. Annual Energy Review 1997

    Annual Energy Outlook

    condensate. b Natural gas plant liquids. c Biofuels, conventional hydroelectric power, geothermal energy, solar energy, and wind energy. d Includes -0.04 quadrillion Btu...

  8. Tips: Heating and Cooling | Department of Energy

    Energy Saver

    Year and Fuel Type (Quadrillion Btu and Percent of Total). ... and cooling Natural gas and oil heating Programmable ... Rebates & Tax Credits Federal tax credits are available for ...

  9. Word Pro - Untitled1

    Energy Information Administration (EIA) (indexed site)

    in the United States, Selected Years, 1635-1945 (Quadrillion Btu) Year Fossil Fuels Renewable Energy Electricity Net Imports Total Coal Natural Gas Petroleum Total...

  10. Slovenia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Slovenia Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code SI 3-letter ISO code SVN Numeric ISO code...

  11. Peru: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Peru Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code PE 3-letter ISO code PER Numeric ISO code...

  12. Guadeloupe: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Guadeloupe Population Unavailable GDP Unavailable Energy Consumption 0.03 Quadrillion Btu 2-letter ISO code GP 3-letter ISO code GLP Numeric ISO...

  13. Marshall Islands: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Marshall Islands Population 56,429 GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code MH 3-letter ISO code MHL Numeric ISO code...

  14. Australia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Australia Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code AU 3-letter ISO code AUS Numeric ISO code...

  15. San Marino: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name San Marino Population 32,576 GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code SM 3-letter ISO code SMR Numeric ISO code...

  16. Anguilla: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Anguilla Population 13,452 GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code AI 3-letter ISO code AIA Numeric ISO code...

  17. Gambia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Gambia Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code GM 3-letter ISO code GMB Numeric ISO code...

  18. Antigua and Barbuda: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Antigua and Barbuda Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code AG 3-letter ISO code ATG Numeric ISO code...

  19. Thailand: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Thailand Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code TH 3-letter ISO code THA Numeric ISO code...

  20. Sierra Leone: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Sierra Leone Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code SL 3-letter ISO code SLE Numeric ISO code...

  1. Djibouti: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Djibouti Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code DJ 3-letter ISO code DJI Numeric ISO code...

  2. Saint Barthlemy: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Saint Barthlemy Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code BL 3-letter ISO code BLM Numeric ISO code...

  3. Taiwan: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Taiwan Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code TW 3-letter ISO code TWN Numeric ISO code...

  4. Georgia (country): Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Georgia Population Unavailable GDP Unavailable Energy Consumption 0.17 Quadrillion Btu 2-letter ISO code GE 3-letter ISO code GEO Numeric ISO...

  5. France: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name France Population Unavailable GDP Unavailable Energy Consumption 11.29 Quadrillion Btu 2-letter ISO code FR 3-letter ISO code FRA Numeric ISO...

  6. Croatia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Croatia Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code HR 3-letter ISO code HRV Numeric ISO code...

  7. Palau: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Palau Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code PW 3-letter ISO code PLW Numeric ISO code...

  8. Uganda: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Uganda Population Unavailable GDP Unavailable Energy Consumption 0.04 Quadrillion Btu 2-letter ISO code UG 3-letter ISO code UGA Numeric ISO...

  9. Tuvalu: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Tuvalu Population 10,837 GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code TV 3-letter ISO code TUV Numeric ISO code...

  10. Ireland: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Ireland Population Unavailable GDP Unavailable Energy Consumption 0.69 Quadrillion Btu 2-letter ISO code IE 3-letter ISO code IRL Numeric ISO...

  11. Cayman Islands: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Cayman Islands Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code KY 3-letter ISO code CYM Numeric ISO code...

  12. Myanmar: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Myanmar Population Unavailable GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code MM 3-letter ISO code MMR Numeric ISO code...

  13. Appendix A: Reference case

    Annual Energy Outlook

    Reference case Energy Information Administration Annual Energy Outlook 2014 Table A17. Renewable energy consumption by sector and source (quadrillion Btu) Sector and source...

  14. Annual Energy Outlook 2015 - Appendix A

    Annual Energy Outlook

    Reference case Table A2. Energy consumption by sector and source (quadrillion Btu per year, unless otherwise noted) Energy Information Administration Annual Energy Outlook 2015 ...

  15. Appendix A: Reference case

    Annual Energy Outlook

    4 Reference case Table A2. Energy consumption by sector and source (quadrillion Btu per year, unless otherwise noted) Energy Information Administration Annual Energy Outlook 2014...

  16. css_2014_energy_revised_20150326

    Annual Energy Outlook

    supplemental gaseous fuels. 3 Includes less than -0.1 quadrillion Btu of coal coke net imports. 4 Conventional hydroelectric power, geothermal, solarphotovoltaic, wind, and ...

  17. Word Pro - Untitled1

    Annual Energy Outlook

    . Energy Consumption by Sector THIS PAGE INTENTIONALLY LEFT BLANK Figure 2.0 Primary Energy Consumption by Source and Sector, 2011 (Quadrillion Btu) U.S. Energy Information ...

  18. Advanced, Energy-Efficient Hybrid Membrane System for Industrial...

    Energy Saver

    StateChallenges Heavy industrial water utilization footprint Freshwater ... 5.2 quadrillion BTU* (2010) consumed for water services in U.S. industrial sector ...

  19. Word Pro - S1

    Annual Energy Outlook

    Primary Energy Overview (Quadrillion Btu) Overview, 1949-2015 Overview, Monthly Overview, April 2016 Net Imports, January-April Web Page: http:www.eia.govtotalenergydata...

  20. Natural gas pipeline technology overview.

    SciTech Connect

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by transmission companies

  1. 1997 annual pipeline directory and equipment guide

    SciTech Connect

    1997-09-01

    This annual guide is divided into the following sections: Equivalent valve tables; Complete 1997 line pipe tables; Engineering and construction services; Crude oil pipeline companies; Slurry companies; Natural gas companies; Gas distribution pipeline companies; Municipal gas systems; Canadian pipeline companies; International pipeline companies; and Company index. The tables list component materials, manufacturers, and service companies.

  2. About U.S. Natural Gas Pipelines

    Reports and Publications

    2007-01-01

    This information product provides the interested reader with a broad and non-technical overview of how the U.S. natural gas pipeline network operates, along with some insights into the many individual pipeline systems that make up the network. While the focus of the presentation is the transportation of natural gas over the interstate and intrastate pipeline systems, information on subjects related to pipeline development, such as system design and pipeline expansion, are also included.

  3. Fatigue analysis for submarine pipelines

    SciTech Connect

    Celant, M.; Re, G.; Venzi, S.

    1982-01-01

    The techniques used in fatigue life forecasts for a submarine pipeline, which have been worked out during the design of the Transmediterranean Pipeline, are presented. The stress level imposed by supports configuration, pipeline weight and weight-pressure-temperature of the internal fluid, is increased further by cyclic loads of sensible extent, resulting from hydroelastic phenomena of interaction between spanning pipe and seabottom current; the synchronization between the characteristic frequencies of vortex-shedding and the natural frequencies of the spans provokes cyclic loading which affect negatively the fatigue life of the pipeline. The results of this research have affected the design choices from the operations of route selection; in particular, they were aiming at the determination of the intervention works on the sea bottom before pipelaying, and the possible installation of overweights or pipe supports in order to avoid free spans of unacceptable length, and at the determination of the interval between periodic inspection.

  4. Pipelines programming paradigms: Prefab plumbing

    SciTech Connect

    Boeheim, C.

    1991-08-01

    Mastery of CMS Pipelines is a process of learning increasingly sophisticated tools and techniques that can be applied to your problem. This paper presents a compilation of techniques that can be used as a reference for solving similar problems

  5. New Materials for Hydrogen Pipelines

    Energy.gov [DOE]

    Presentation by 08-Smith to DOE Hydrogen Pipeline R&D Project Review Meeting held January 5-6, 2005 at Oak Ridge National Laboratory in Oak Ridge, Tennessee.

  6. The Geysers pipeline project

    SciTech Connect

    Dellinger, M.; Allen, E.

    1997-01-01

    A unique public/private partnership of local, state, federal and corporate stakeholders are constructing the world`s first wastewater-to-electricity system at The Geysers. A rare example of a genuinely {open_quotes}sustainable{close_quotes} energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of the The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities` effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project`s unique sponsorship, function and environmental impacts, its implementation has required: (1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; (2) acquisition of 25 local, state, and federal permits; (3) negotiation of six federal and state financial assistance agreements; (4) negotiation of six participant agreements on construction, operation and financing of the project, and (5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project`s success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally.

  7. Hydrogen permeability and Integrity of hydrogen transfer pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Presentation by 03-Babu for the DOE Hydrogen Pipeline R&D Project Review Meeting held ... Delivery Pipelines Proceedings of the 2005 Hydrogen Pipeline Working Group Workshop

  8. Industrial co-generation through use of a medium BTU gas from biomass produced in a high throughput reactor

    SciTech Connect

    Feldmann, H.F.; Ball, D.A.; Paisley, M.A.

    1983-01-01

    A high-throughput gasification system has been developed for the steam gasification of woody biomass to produce a fuel gas with a heating value of 475 to 500 Btu/SCF without using oxygen. Recent developments have focused on the use of bark and sawdust as feedstocks in addition to wood chips and the testing of a new reactor concept, the so-called controlled turbulent zone (CTZ) reactor to increase gas production per unit of wood fed. Operating data from the original gasification system and the CTZ system are used to examine the preliminary economics of biomass gasification/gas turbine cogeneration systems. In addition, a ''generic'' pressurized oxygen-blown gasification system is evaluated. The economics of these gasification systems are compared with a conventional wood boiler/steam turbine cogeneration system.

  9. COMPCOAL{trademark}: A profitable process for production of a stable high-Btu fuel from Powder River Basin coal

    SciTech Connect

    Smith, V.E.; Merriam, N.W.

    1994-10-01

    Western Research Institute (WRI) is developing a process to produce a stable, clean-burning, premium fuel from Powder River Basin (PRB) coal and other low-rank coals. This process is designed to overcome the problems of spontaneous combustion, dust formation, and readsorption of moisture that are experienced with PRB coal and with processed PRB coal. This process, called COMPCOAL{trademark}, results in high-Btu product that is intended for burning in boilers designed for midwestern coals or for blending with other coals. In the COMPCOAL process, sized coal is dried to zero moisture content and additional oxygen is removed from the coal by partial decarboxylation as the coal is contacted by a stream of hot fluidizing gas in the dryer. The hot, dried coal particles flow into the pyrolyzer where they are contacted by a very small flow of air. The oxygen in the air reacts with active sites on the surface of the coal particles causing the temperature of the coal to be raised to about 700{degrees}F (371{degrees}C) and oxidizing the most reactive sites on the particles. This ``instant aging`` contributes to the stability of the product while only reducing the heating value of the product by about 50 Btu/lb. Less than 1 scf of air per pound of dried coal is used to avoid removing any of the condensible liquid or vapors from the coal particles. The pyrolyzed coal particles are mixed with fines from the dryer cyclone and dust filter and the resulting mixture at about 600{degrees}F (316{degrees}C) is fed into a briquettor. Briquettes are cooled to about 250{degrees}F (121{degrees}C) by contact with a mist of water in a gas-tight mixing conveyor. The cooled briquettes are transferred to a storage bin where they are accumulated for shipment.

  10. Mapco's NGL Rocky Mountain pipeline

    SciTech Connect

    Isaacs, S.F.

    1980-01-01

    The Rocky Mountain natural gas liquids (NGL) pipeline was born as a result of major producible gas finds in the Rocky Mountain area after gas deregulation. Gas discoveries in the overthurst area indicated considerable volumes of NGL would be available for transportation out of the area within the next 5 to 7 years. Mapco studied the need for a pipeline to the overthrust, but the volumes were not substantial at the time because there was little market and, consequently, little production for ethane. Since that time crude-based products for ethylene manufacture have become less competitive as a feed product on the world plastics market, and ethane demand has increased substantially. This change in the market has caused a major modification in the plans of the NGL producers and, consequently, the ethane content of the NGL stream for the overthrust area is expected to be 30% by volume at startup and is anticipated to be at 45% by 1985. These ethane volumes enhance the feasibility of the pipeline. The 1196-mile Rocky Mountain pipeline will be installed from the existing facility in W. Texas, near Seminole, to Rock Springs, Wyoming. A gathering system will connect the trunk line station to various plant locations. The pipeline development program calls for a capacity of 65,000 bpd by the end of 1981.

  11. Method and system for pipeline communication

    SciTech Connect

    Richardson; John G.

    2008-01-29

    A pipeline communication system and method includes a pipeline having a surface extending along at least a portion of the length of the pipeline. A conductive bus is formed to and extends along a portion of the surface of the pipeline. The conductive bus includes a first conductive trace and a second conductive trace with the first and second conductive traces being adapted to conformally couple with a pipeline at the surface extending along at least a portion of the length of the pipeline. A transmitter for sending information along the conductive bus on the pipeline is coupled thereto and a receiver for receiving the information from the conductive bus on the pipeline is also couple to the conductive bus.

  12. 2007 Hydrogen Pipeline Working Group Workshop

    Energy.gov [DOE]

    The Department of Energy (DOE) Hydrogen Pipeline Working Group met Sept. 25–26, 2007, to review the progress and results of DOE-sponsored pipeline research and development (R&D) projects. More...

  13. Hydrogen Pipeline Discussion | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Discussion Hydrogen Pipeline Discussion ASTM T.G. G1.06.08 Goals and Workshop, May 17, 2005. Formed on November 11, 2004. Identify major laboratory facilities and capabilities. hpwgw_discission_zawierucha.pdf (189.73 KB) More Documents & Publications Assessing Steel Pipeline and Weld Susceptibility to Hydrogen Embrittlement Webinar Assessing Steel Pipeline and Weld Susceptibility to Hydrogen Embrittlement Webinar Hydrogen permeability and Integrity of hydrogen transfer pipelines

  14. California Natural Gas Pipelines: A Brief Guide

    SciTech Connect

    Neuscamman, Stephanie; Price, Don; Pezzola, Genny; Glascoe, Lee

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  15. OMAE 1993: Proceedings. Volume 5: Pipeline technology

    SciTech Connect

    Yoon, M.; Murray, A.; Thygesen, J.

    1993-01-01

    This volume of conference proceedings is volume five of a five volume series dealing with offshore and arctic pipeline, marine riser, platforms, and ship design and engineering. This volume is a result of increased use of pipeline transportation for oil, gas, and liquid products and the resultant need for lower design and operating costs. Papers in this conference cover topics on environmental considerations, pipeline automation, computer simulation techniques, materials testing, corrosion protection, permafrost problems, pipeline integrity, geotechnical concerns, and offshore engineering problems.

  16. Industry Research for Pipeline Systems Panel

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Research Council International, Inc. DOE Natural Gas Infrastructure R&D and Methane Emissions Mitigation Workshop -Industry Research for Pipeline Systems Panel Mike Whelan Director, Research Operations November 12, 2014 2 www.prci.org Pipeline Research Council Int'l. Overview  Founded in 1952 - Current Membership  39 Pipelines, over 350,000 miles of transmission pipe * Natural Gas and Hazardous Liquids Pipelines * 27 members are North American based - Remainder: Europe, Brazil, China,

  17. Kinder Morgan Central Florida Pipeline Ethanol Project

    Alternative Fuels and Advanced Vehicles Data Center

    KINDER MORGAN CENTRAL FLORIDA PIPELINE ETHANOL PROJECT  In December 2008, Kinder Morgan began transporting commercial batches of denatured ethanol along with gasoline shipments in its 16-inch Central Florida Pipeline (CFPL) from Tampa to Orlando, making CFPL the first transmarket gasoline pipeline in the United States to do so. The 16-inch pipeline previously only transported regular and premium gasoline.  Kinder Morgan invested approximately $10 million to modify the line for ethanol

  18. Seismic assessment of buried pipelines

    SciTech Connect

    Al-Chaar, G.; Brady, P.; Fernandez, G.

    1995-12-31

    A structure and its lifelines are closely linked because the disruption of lifeline systems will obstruct emergency service functions that are vitally needed after an earthquake. As an example of the criticality of these systems, the Association of Bay Area Government (ABAG) recorded thousands of leaks in pipelines that resulted in more than twenty million gallons of hazardous materials being released in several recorded earthquakes. The cost of cleaning the spills from these materials was very high. This information supports the development of seismic protection of lifeline systems. The US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL) has, among its missions, the responsibility to develop seismic vulnerability assessment procedures for military installations. Within this mission, a preliminary research program to assess the seismic vulnerability of buried pipeline systems on military installations was initiated. Phase 1 of this research project resulted in two major studies. In the first, evaluating current procedures to seismically design or evaluate existing lifeline systems, the authors found several significant aspects that deserve special consideration and need to be addressed in future research. The second was focused on identifying parameters related to buried pipeline system vulnerability and developing a generalized analytical method to relate these parameters to the seismic vulnerability assessment of existing pipeline systems.

  19. Low NO{sub x} turbine power generation utilizing low Btu GOB gas. Final report, June--August 1995

    SciTech Connect

    Ortiz, I.; Anthony, R.V.; Gabrielson, J.; Glickert, R.

    1995-08-01

    Methane, a potent greenhouse gas, is second only to carbon dioxide as a contributor to potential global warming. Methane liberated by coal mines represents one of the most promising under exploited areas for profitably reducing these methane emissions. Furthermore, there is a need for apparatus and processes that reduce the nitrogen oxide (NO{sub x}) emissions from gas turbines in power generation. Consequently, this project aims to demonstrate a technology which utilizes low grade fuel (CMM) in a combustion air stream to reduce NO{sub x} emissions in the operation of a gas turbine. This technology is superior to other existing technologies because it can directly use the varying methane content gases from various streams of the mining operation. The simplicity of the process makes it useful for both new gas turbines and retrofitting existing gas turbines. This report evaluates the feasibility of using gob gas from the 11,000 acre abandoned Gateway Mine near Waynesburg, Pennsylvania as a fuel source for power generation applying low NO{sub x} gas turbine technology at a site which is currently capable of producing low grade GOB gas ({approx_equal} 600 BTU) from abandoned GOB areas.

  20. Philadelphia gas works medium-Btu coal gasification project: capital and operating cost estimate, financial/legal analysis, project implementation

    SciTech Connect

    Not Available

    1981-12-01

    This volume of the final report is a compilation of the estimated capital and operating costs for the project. Using the definitive design as a basis, capital and operating costs were developed by obtaining quotations for equipment delivered to the site. Tables 1.1 and 1.2 provide a summary of the capital and operating costs estimated for the PGW Coal Gasification Project. In the course of its Phase I Feasibility Study of a medium-Btu coal-gas facility, Philadelphia Gas Works (PGW) identified the financing mechanism as having great impact on gas cost. Consequently, PGW formed a Financial/Legal Task Force composed of legal, financial, and project analysis specialists to study various ownership/management options. In seeking an acceptable ownership, management, and financing arrangement, certain ownership forms were initially identified and classified. Several public ownership, private ownership, and third party ownership options for the coal-gas plant are presented. The ownership and financing forms classified as base alternatives involved tax-exempt and taxable financing arrangements and are discussed in Section 3. Project implementation would be initiated by effectively planning the methodology by which commercial operation will be realized. Areas covered in this report are sale of gas to customers, arrangements for feedstock supply and by-product disposal, a schedule of major events leading to commercialization, and a plan for managing the implementation.

  1. Low/medium Btu coal gasification assessment of central plant for the city of Philadelphia, Pennsylvania. Final report

    SciTech Connect

    Not Available

    1981-02-01

    The objective of this study is to assess the technical and economic feasibility of producing, distributing, selling, and using fuel gas for industrial applications in Philadelphia. The primary driving force for the assessment is the fact that oil users are encountering rapidly escalating fuel costs, and are uncertain about the future availability of low sulfur fuel oil. The situation is also complicated by legislation aimed at reducing oil consumption and by difficulties in assuring a long term supply of natural gas. Early in the gasifier selection study it was decided that the level of risk associated with the gasification process sould be minimal. It was therefore determined that the process should be selected from those commercially proven. The following processes were considered: Lurgi, KT, Winkler, and Wellman-Galusha. From past experience and a knowledge of the characteristics of each gasifier, a list of advantages and disadvantages of each process was formulated. It was concluded that a medium Btu KT gas can be manufactured and distributed at a lower average price than the conservatively projected average price of No. 6 oil, provided that the plant is operated as a base load producer of gas. The methodology used is described, assumptions are detailed and recommendations are made. (LTN)

  2. World pipeline construction plans show increase into next century

    SciTech Connect

    Koen, A.D.; True, W.R.

    1995-02-06

    Plans for worldwide pipeline construction into the next century increased in the past year, especially for developing regions of Latin America and Asia-Pacific. Many of the projects involve large capacity, international gas pipeline systems. By contrast, pipeline construction in Canada, The US, and Europe will decline. Those trends and others are revealed in the latest Oil and Gas Journal pipeline construction data, derived from a survey of world pipeline operators, industry sources, and published information. More than 61,000 miles of crude oil, product, and natural gas pipeline are to be built in 1995 and beyond. The paper discusses Europe's markets, North Sea pipelines, expansion of German pipeline, pipelines in the UK, European and African gas, the trans-Mediterranean gas pipeline, Caspian Sea pipeline, Middle East pipelines, Asia-Pacific activity, South American gas lines, pipelines in Colombia, TransCanada line, Gulf of Mexico pipelines, other Gulf activities, and other US activity.

  3. Hydrogen Embrittlement in Pipeline Steels

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Applied Chemicals & Materials Division Material Measurement Laboratory HYDROGEN EMBRITTLEMENT IN PIPELINE STEELS AJ Slifka, ES Drexler, RL Amaro, DS Lauria, JR Fekete Applied Chemicals & Materials Division Material Measurement Laboratory Cheaper vs Safe?: Does it have to be choice * Steel is sold by the ton * X80 costs about the same as a X42/ton * Use less X80, therefore save money by using higher strength material, thinner wall * BUT hydrogen piping code encourages use of X52, because

  4. Workforce Pipeline | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    In the News 2-week U46 stop showcases STEM possibilities Chicago Tribune STEM Gets Marvelous for a Local Student Naperville Community Television Neuqua teen scientist wins trip to 'Doctor Strange' premiere Chicago Tribune/Naperville Sun Workforce Pipeline Argonne seeks to attract, hire and retain a diverse set of talent in order to meet the laboratory's mission of excellence in science, engineering and technology. In order for Argonne to continue to carry out world-class science, the lab needs

  5. System and process for the abatement of casting pollution, reclaiming resin bonded sand, and/or recovering a low BTU fuel from castings

    DOEpatents

    Scheffer, Karl D.

    1984-07-03

    Air is caused to flow through the resin bonded mold to aid combustion of the resin binder to form a low BTU gas fuel. Casting heat is recovered for use in a waste heat boiler or other heat abstraction equipment. Foundry air pollution is reduced, the burned portion of the molding sand is recovered for immediate reuse and savings in fuel and other energy is achieved.

  6. System and process for the abatement of casting pollution, reclaiming resin bonded sand, and/or recovering a low Btu fuel from castings

    DOEpatents

    Scheffer, K.D.

    1984-07-03

    Air is caused to flow through the resin bonded mold to aid combustion of the resin binder to form a low Btu gas fuel. Casting heat is recovered for use in a waste heat boiler or other heat abstraction equipment. Foundry air pollutis reduced, the burned portion of the molding sand is recovered for immediate reuse and savings in fuel and other energy is achieved. 5 figs.

  7. Capsule injection system for a hydraulic capsule pipelining system

    DOEpatents

    Liu, Henry

    1982-01-01

    An injection system for injecting capsules into a hydraulic capsule pipelining system, the pipelining system comprising a pipeline adapted for flow of a carrier liquid therethrough, and capsules adapted to be transported through the pipeline by the carrier liquid flowing through the pipeline. The injection system comprises a reservoir of carrier liquid, the pipeline extending within the reservoir and extending downstream out of the reservoir, and a magazine in the reservoir for holding capsules in a series, one above another, for injection into the pipeline in the reservoir. The magazine has a lower end in communication with the pipeline in the reservoir for delivery of capsules from the magazine into the pipeline.

  8. US pipelines report mixed results for 1993

    SciTech Connect

    True, W.R.

    1994-11-21

    US natural gas pipelines started 1994 in generally better conditions than a year earlier. These companies' operational and financial results for 1993 indicate modest but continuing improvement. Petroleum liquids pipelines, on the other hand, suffered reduced revenues and incomes last: increased deliveries and trunkline movement of liquid petroleum products failed fully to offset fewer barrels of crude oil moving through the companies' pipeline systems. Revenues, incomes, mileage operated, and other data are tracked in Oil and Gas Journal's exclusive Economics Report. Additionally, this report contains extensive data on actual costs of pipeline construction compared with what companies expected to spend at the time of projects' approvals. The paper also discusses the continuing shift of natural gas pipelines as merchants to role of transporter; what was spent; the US interstate network; pipeline mileage; deliveries; the top 10 companies; construction activities; cost trends; and cost components.

  9. Buried pipelines in large fault movements

    SciTech Connect

    Wang, L.J.; Wang, L.R.L.

    1995-12-31

    Responses of buried pipelines in large fault movements are examined based upon a non-linear cantilever beam analogy. This analogy assumes that the pipeline in a large deflection zone behaves like a cantilever beam under a transverse-concentrated shear at the inflection point with a uniformly distributed soil pressure along the entire span. The tangent modulus approach is adopted to analyze the coupled axial force-bending moment interaction on pipeline deformations in the inelastic range. The buckling load of compressive pipeline is computed by the modified Newmark`s numerical integration scheme. Parametric studies of both tensile and compressive pipeline responses to various fault movements, pipeline/fault crossing angles, soil/pipe friction angles, buried depths, pipe diameters and thickness are investigated. It is shown by the comparisons that previous findings were unconservative.

  10. EIA - Natural Gas Pipeline Network - U.S. Natural Gas Pipeline...

    Gasoline and Diesel Fuel Update

    Network Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates U.S. Natural Gas Pipeline Network, 2009 U.S. Natural ...

  11. EIA - Natural Gas Pipeline Network - Transportation Process ...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Process and Flow About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Transportation Process and Flow Overview | ...

  12. EIA - Natural Gas Pipeline Network - Regulatory Authorities

    Gasoline and Diesel Fuel Update

    Regulatory Authorities About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates U.S. Natural Gas Regulatory Authorities ...

  13. EIA - Natural Gas Pipeline Network - Network Configuration &...

    Energy Information Administration (EIA) (indexed site)

    Network Configuration & System Design About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Network Configuration and ...

  14. "Changing Natural Gas Pipeline Throughputs in Canada"

    Annual Energy Outlook

    Changing Natural Gas Pipeline Throughputs in Canada" Presented at 2015 EIA Energy Conference June 15, 2015 Margaret Skwara, National Energy Board Abha Bhargava, National Energy ...

  15. Acoustic system for communication in pipelines

    DOEpatents

    Martin, II, Louis Peter; Cooper, John F.

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  16. GLAST (FERMI) Data-Processing Pipeline

    SciTech Connect

    Flath, Daniel L.; Johnson, Tony S.; Turri, Massimiliano; Heidenreich, Karen A.; /SLAC

    2011-08-12

    The Data Processing Pipeline ('Pipeline') has been developed for the Gamma-Ray Large Area Space Telescope (GLAST) which launched June 11, 2008. It generically processes graphs of dependent tasks, maintaining a full record of its state, history and data products. The Pipeline is used to automatically process the data down-linked from the satellite and to deliver science products to the GLAST collaboration and the Science Support Center and has been in continuous use since launch with great success. The pipeline handles up to 2000 concurrent jobs and in reconstructing science data produces approximately 750GB of data products using 1/2 CPU-year of processing time per day.

  17. Clean Development Mechanism Pipeline | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Clean Development Mechanism Pipeline AgencyCompany Organization: UNEP-Risoe Centre, United Nations Environment Programme Sector: Energy, Land Topics: Finance, Implementation,...

  18. Pipeline and Gas Journal`s 1998 annual pipeline directory and equipment guide

    SciTech Connect

    1998-09-01

    The tables provide information on line pipe sizes, walls, grades, and manufacturing processes. Data are presented by manufacturer within each country. Also tabulated are engineering and construction service companies, crude oil pipeline companies, products pipeline companies, natural gas pipeline companies, gas distribution companies, and municipal gas systems in the US. There is also a Canadian and an international directory.

  19. EIA - Natural Gas Pipeline Network - Natural Gas Imports/Exports...

    Gasoline and Diesel Fuel Update

    Pipelines About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas ImportExport Pipelines As of the close of ...

  20. Pipeline transportation and underground storage are vital and...

    Energy Information Administration (EIA) (indexed site)

    Additions to Capacity on the U.S. Natural Gas Pipeline Network: 2005 This report examines the amount of new natural gas pipeline capacity added to the U.S. natural gas pipeline ...

  1. FERC approves Northwest pipeline expansion

    SciTech Connect

    Not Available

    1992-06-15

    Northwest Pipeline Co., Salt Lake City, Utah, received a final permit from the Federal Energy Regulatory Commission for a $373.4 million main gas line expansion. This paper reports that it plans to begin construction of the 443 MMcfd expansion in mid-July after obtaining further federal, state, and local permits. The expanded system is to be fully operational by second quarter 1993. When the expansion is complete, total Northwest system mileage will be 3,936 miles and system capacity about 2.49 bcfd.

  2. Addressing the workforce pipeline challenge

    SciTech Connect

    Leonard Bond; Kevin Kostelnik; Richard Holman

    2006-11-01

    A secure and affordable energy supply is essential for achieving U.S. national security, in continuing U.S. prosperity and in laying the foundations to enable future economic growth. To meet this goal the next generation energy workforce in the U.S., in particular those needed to support instrumentation, controls and advanced operations and maintenance, is a critical element. The workforce is aging and a new workforce pipeline, to support both current generation and new build has yet to be established. The paper reviews the challenges and some actions being taken to address this need.

  3. EIA - Natural Gas Pipeline Network - Regional Overview and Links

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Overview and Links About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Regional Overviews and Links to Pipeline ...

  4. Assessment of the Adequacy of Natural Gas Pipeline Capacity in...

    Energy Saver

    Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States - November 2013 Assessment of the Adequacy of Natural Gas Pipeline Capacity in the ...

  5. EIA - Natural Gas Pipeline Network - States Dependent on Interstate...

    Energy Information Administration (EIA) (indexed site)

    States Dependent on Interstate Pipelines About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates States in grey which are ...

  6. EIA - Natural Gas Pipeline Network - Natural Gas Import/Export...

    Gasoline and Diesel Fuel Update

    Pipelines > ImportExport Location List About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Currently, there are 58 ...

  7. Natural Gas Compressor Stations on the Interstate Pipeline Network...

    Annual Energy Outlook

    Compressor Stations on the Interstate Pipeline Network: Developments Since 1996 This special report looks at the use of natural gas pipeline compressor stations on the interstate ...

  8. Evalutation of Natural Gas Pipeline Materials and Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed Gas Service Evalutation of Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed ...

  9. Evaluation of Natural Gas Pipeline Materials for Hydrogen Science...

    Office of Environmental Management (EM)

    Evaluation of Natural Gas Pipeline Materials for Hydrogen Science Evaluation of Natural Gas Pipeline Materials for Hydrogen Science Presentation by 04-Adams to DOE Hydrogen ...

  10. EIS-0501: Golden Pass LNG Export and Pipeline Project, Texas...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana EIS-0501: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana Summary The Federal Energy Regulatory ...

  11. December 4, 2007: NETL's Robotic Pipeline Inspection Tool

    Energy.gov [DOE]

    December 4, 2007The Department's National Energy Technology Laboratory announces the development of a new robotic pipeline inspection tool that could revolutionize the pipeline inspection process....

  12. Hydrogen Permeability and Integrity of Hydrogen Delivery Pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and its impact on hydrogen embrittlement of pipeline steels under high gaseous pressures relevant to hydrogen gas transmission pipeline hpwgwpermeabilityintegrityfeng.pdf (1.41 ...

  13. Utah Natural Gas Pipeline and Distribution Use (Million Cubic...

    Gasoline and Diesel Fuel Update

    (Million Cubic Feet) Utah Natural Gas Pipeline and Distribution Use (Million Cubic Feet) ... 10312016 Referring Pages: Natural Gas Pipeline & Distribution Use Utah Natural Gas ...

  14. Pipeline and Memory Interface Synthesis of FPGA Accelerators...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Pipeline and Memory Interface Synthesis of FPGA Accelerators Event Sponsor: Argonne ... The first topic discusses the pipeline synthesis approach to automatic generation of ...

  15. Assessing Steel Pipeline and Weld Susceptibility to Hydrogen...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Assessing Steel Pipeline and Weld Susceptibility to Hydrogen Embrittlement U.S. Department ... Office eere.energy.gov Assessing Steel Pipeline and Weld Susceptibility to Hydrogen ...

  16. Virginia Natural Gas Pipeline and Distribution Use Price (Dollars...

    Energy Information Administration (EIA) (indexed site)

    Price (Dollars per Thousand Cubic Feet) Virginia Natural Gas Pipeline and Distribution Use ... Referring Pages: Price for Natural Gas Pipeline and Distribution Use Virginia Natural ...

  17. Vermont Natural Gas Pipeline and Distribution Use (Million Cubic...

    Gasoline and Diesel Fuel Update

    Vermont Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Decade Year-0 ... 10312016 Referring Pages: Natural Gas Pipeline & Distribution Use Vermont Natural Gas ...

  18. Wyoming Natural Gas Pipeline and Distribution Use Price (Dollars...

    Gasoline and Diesel Fuel Update

    Price (Dollars per Thousand Cubic Feet) Wyoming Natural Gas Pipeline and Distribution Use ... Referring Pages: Price for Natural Gas Pipeline and Distribution Use Wyoming Natural Gas ...

  19. Wisconsin Natural Gas Pipeline and Distribution Use Price (Dollars...

    Annual Energy Outlook

    Price (Dollars per Thousand Cubic Feet) Wisconsin Natural Gas Pipeline and Distribution ... Referring Pages: Price for Natural Gas Pipeline and Distribution Use Wisconsin Natural ...

  20. Vermont Natural Gas Pipeline and Distribution Use Price (Dollars...

    Annual Energy Outlook

    Price (Dollars per Thousand Cubic Feet) Vermont Natural Gas Pipeline and Distribution Use ... Referring Pages: Price for Natural Gas Pipeline and Distribution Use Vermont Natural Gas ...

  1. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Presentation by 09-Sofronis to DOE Hydrogen Pipeline R&D Project Review Meeting held ... More Documents & Publications Hydrogen Embrittlement of Pipeline Steels: Causes and ...

  2. Washington Natural Gas Pipeline and Distribution Use Price (Dollars...

    Energy Information Administration (EIA) (indexed site)

    Price (Dollars per Thousand Cubic Feet) Washington Natural Gas Pipeline and Distribution ... Referring Pages: Price for Natural Gas Pipeline and Distribution Use Washington Natural ...

  3. Washington Natural Gas Pipeline and Distribution Use (Million...

    Gasoline and Diesel Fuel Update

    Washington Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Decade Year-0 ... 10312016 Referring Pages: Natural Gas Pipeline & Distribution Use Washington Natural ...

  4. Universities Provide Pipeline of Talent, Ideas, and Innovation...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Universities Provide Pipeline of Talent, Ideas, and Innovation Universities Provide Pipeline of Talent, Ideas, and Innovation February 17, 2016 - 11:07am Addthis Hyliion from ...

  5. Wisconsin Natural Gas Pipeline and Distribution Use (Million...

    Annual Energy Outlook

    Wisconsin Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Decade Year-0 ... 10312016 Referring Pages: Natural Gas Pipeline & Distribution Use Wisconsin Natural Gas ...

  6. West Virginia Natural Gas Pipeline and Distribution Use (Million...

    Energy Information Administration (EIA) (indexed site)

    West Virginia Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Decade Year-0 ... 10312016 Referring Pages: Natural Gas Pipeline & Distribution Use West Virginia Natural ...

  7. Wyoming Natural Gas Pipeline and Distribution Use (Million Cubic...

    Energy Information Administration (EIA) (indexed site)

    Wyoming Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Decade Year-0 ... 10312016 Referring Pages: Natural Gas Pipeline & Distribution Use Wyoming Natural Gas ...

  8. Report to Congress: Dedicated Ethanol Pipeline Feasability Study...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Report to Congress: Dedicated Ethanol Pipeline Feasability Study - Energy Independence and Security Act of 2007 Section 243 Report to Congress: Dedicated Ethanol Pipeline ...

  9. Utah Natural Gas Pipeline and Distribution Use Price (Dollars...

    Gasoline and Diesel Fuel Update

    Price (Dollars per Thousand Cubic Feet) Utah Natural Gas Pipeline and Distribution Use ... Referring Pages: Price for Natural Gas Pipeline and Distribution Use Utah Natural Gas ...

  10. EIS-0517: Port Arthur Liquefaction Project and Port Arthur Pipeline...

    Energy Saver

    Port Arthur Pipeline Project; Jefferson and Orange Counties, Texas, and Cameron Parish, Louisiana EIS-0517: Port Arthur Liquefaction Project and Port Arthur Pipeline Project; ...

  11. Virginia Natural Gas Pipeline and Distribution Use (Million Cubic...

    Gasoline and Diesel Fuel Update

    Virginia Natural Gas Pipeline and Distribution Use (Million Cubic Feet) Decade Year-0 ... 10312016 Referring Pages: Natural Gas Pipeline & Distribution Use Virginia Natural Gas ...

  12. West Virginia Natural Gas Pipeline and Distribution Use Price...

    Annual Energy Outlook

    Price (Dollars per Thousand Cubic Feet) West Virginia Natural Gas Pipeline and ... Referring Pages: Price for Natural Gas Pipeline and Distribution Use West Virginia ...

  13. Assessing Steel Pipeline and Weld Susceptibility to Hydrogen...

    Energy.gov [DOE] (indexed site)

    Office webinar "Assessing Steel Pipeline and Weld Susceptibility to Hydrogen Embrittlement" held on January 12, 2016. Assessing Steel Pipeline and Weld Susceptibility to ...

  14. Advanced Manufacturing pipeline brings NSC and Minority Serving...

    National Nuclear Security Administration (NNSA)

    Advanced Manufacturing pipeline brings NSC and Minority Serving Institutions together Thursday, August 27, 2015 - 4:41pm In an ongoing effort to build a sustainable STEM pipeline ...

  15. ,"Total Crude Oil and Petroleum Products Net Receipts by Pipeline...

    Energy Information Administration (EIA) (indexed site)

    Net Receipts by Pipeline, Tanker, Barge and Rail between PAD Districts" ,"Click worksheet ... and Petroleum Products Net Receipts by Pipeline, Tanker, Barge and Rail between PAD ...

  16. Transportation and storage infrastructure-the networks of pipelines...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... quantities inside the pipeline, providing real-time safety assurances. Transportation and Storage Figure 1. U.S. natural gas pipelines. Crude Oil Properties Relevant to ...

  17. Sweetgrass, MT Liquefied Natural Gas Pipeline Exports to Canada...

    Energy Information Administration (EIA) (indexed site)

    Liquefied Natural Gas Pipeline Exports to Canada (Million Cubic Feet) Sweetgrass, MT Liquefied Natural Gas Pipeline Exports to Canada (Million Cubic Feet) Year Jan Feb Mar Apr May ...

  18. Penitas, TX Natural Gas Pipeline Imports From Mexico (Dollars...

    Energy Information Administration (EIA) (indexed site)

    Penitas, TX Natural Gas Pipeline Imports From Mexico (Dollars per Thousand Cubic Feet) Penitas, TX Natural Gas Pipeline Imports From Mexico (Dollars per Thousand Cubic Feet) Decade ...

  19. Alamo, TX Natural Gas Pipeline Imports From Mexico (Dollars per...

    Energy Information Administration (EIA) (indexed site)

    Alamo, TX Natural Gas Pipeline Imports From Mexico (Dollars per Thousand Cubic Feet) Alamo, TX Natural Gas Pipeline Imports From Mexico (Dollars per Thousand Cubic Feet) Decade ...

  20. Crosby, ND Natural Gas Pipeline Imports From Canada

    Energy Information Administration (EIA) (indexed site)

    2013 2014 2015 View History Pipeline Volumes 0 29 85 2013-2015 Pipeline Prices -- 4.16 1.68 2013

  1. The Sloan Digital Sky Survey Monitor Telescope Pipeline (Journal...

    Office of Scientific and Technical Information (OSTI)

    The Sloan Digital Sky Survey Monitor Telescope Pipeline Citation Details In-Document Search Title: The Sloan Digital Sky Survey Monitor Telescope Pipeline You are accessing a...

  2. Hydrogen Delivery Technologies and Systems- Pipeline Transmission of Hydrogen

    Energy.gov [DOE]

    Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen. Design and operations standards and materials for hydrogen and natural gas pipelines.

  3. Rio Grande pipeline introduces LPG to Mexico

    SciTech Connect

    1997-06-01

    Rio Grande Pipeline, a joint venture between Mid-America Pipeline Co., Amoco Pipeline Co. and Navajo Pipeline Co., has broken new ground in the energy industry as the first LPG pipeline to cross the US-Mexico border. Plans for the project were announced in November 1995 and first deliveries started three months ago on March 21, 1997. The 8-inch, 265-mile pipeline originates near Odessa, TX, where it receives an 85-15 propane-butane mix via a connection to Mid-America Pipeline. From Odessa, product moves west through the Texas desert and crosses the Rio Grande River about 15 miles south of El Paso near Clint, TX and extends 20 miles into Mexico. Capacity of the line is 24,000 bpd and it has been averaging about 22,000 bpd since line-fill. All in all, it sounded like a reasonably feasible, routine project. But perceptions can be deceiving, or at least misleading. In other words, the project can be summarized as follows: one river, two cultures and a world of difference. The official border crossing for pipeline construction took place on Dec. 2, 1996, with a directional drill under the Rio Grande River, but in actuality, the joint venture partners were continually bridging differences in language, laws, customs and norms with Pemex and contracted workers from Mexico.

  4. Algeria LPG pipeline is build by Bechtel

    SciTech Connect

    Horner, C.

    1984-08-01

    The construction of the 313 mile long, 24 in. LPG pipeline from Hassi R'Mel to Arzew, Algeria is described. The pipeline was designed to deliver 6 million tons of LPG annually using one pumping station. Eventually an additional pumping station will be added to raise the system capacity to 9 million tons annually.

  5. Natural Gas Pipeline and System Expansions

    Reports and Publications

    1997-01-01

    This special report examines recent expansions to the North American natural gas pipeline network and the nature and type of proposed pipeline projects announced or approved for construction during the next several years in the United States. It includes those projects in Canada and Mexico that tie in with U.S. markets or projects.

  6. Changes in the Pipeline Transportation Market

    Reports and Publications

    1999-01-01

    This analysis assesses the amount of capacity that may be turned back to pipeline companies, based on shippers' actions over the past several years and the profile of contracts in place as of July 1, 1998. It also examines changes in the characteristics of contracts between shippers and pipeline companies.

  7. Failure modes for pipelines in landslide areas

    SciTech Connect

    Bruschi, R.; Spinazze, M.; Tomassini, D.; Cuscuna, S.; Venzi, S.

    1995-12-31

    In recent years a number of incidences of pipelines affected by slow soil movements have been reported in the relevant literature. Further related issues such as soil-pipe interaction have been studied both theoretically and through experimental surveys, along with the environmental conditions which are responsible for hazard to the pipeline integrity. A suitable design criteria under these circumstances has been discussed by several authors, in particular in relation to a limit state approach and hence a strain based criteria. The scope of this paper is to describe the failure mechanisms which may affect the pipeline in the presence of slow soil movements impacting on the pipeline, both in the longitudinal and transverse direction. Particular attention is paid to environmental, geometric and structural parameters which steer the process towards one or other failure mechanism. Criteria for deciding upon remedial measures required to guarantee the structural integrity of the pipeline, both in the short and in the long term, are discussed.

  8. Magnetic pipeline for coal and oil

    SciTech Connect

    Knolle, E.

    1998-07-01

    A 1994 analysis of the recorded costs of the Alaska oil pipeline, in a paper entitled Maglev Crude Oil Pipeline, (NASA CP-3247 pp. 671--684) concluded that, had the Knolle Magnetrans pipeline technology been available and used, some $10 million per day in transportation costs could have been saved over the 20 years of the Alaska oil pipeline's existence. This over 800 mile long pipeline requires about 500 horsepower per mile in pumping power, which together with the cost of the pipeline's capital investment consumes about one-third of the energy value of the pumped oil. This does not include the cost of getting the oil out of the ground. The reason maglev technology performs superior to conventional pipelines is because by magnetically levitating the oil into contact-free suspense, there is no drag-causing adhesion. In addition, by using permanent magnets in repulsion, suspension is achieved without using energy. Also, the pumped oil's adhesion to the inside of pipes limits its speed. In the case of the Alaska pipeline the speed is limited to about 7 miles per hour, which, with its 48-inch pipe diameter and 1200 psi pressure, pumps about 2 million barrels per day. The maglev system, as developed by Knolle Magnetrans, would transport oil in magnetically suspended sealed containers and, thus free of adhesion, at speeds 10 to 20 times faster. Furthermore, the diameter of the levitated containers can be made smaller with the same capacity, which makes the construction of the maglev system light and inexpensive. There are similar advantages when using maglev technology to transport coal. Also, a maglev system has advantages over railroads in mountainous regions where coal is primarily mined. A maglev pipeline can travel, all-year and all weather, in a straight line to the end-user, whereas railroads have difficult circuitous routes. In contrast, a maglev pipeline can climb over steep hills without much difficulty.

  9. U.S. interstate pipelines ran more efficiently in 1994

    SciTech Connect

    True, W.R.

    1995-11-27

    Regulated US interstate pipelines began 1995 under the momentum of impressive efficiency improvements in 1994. Annual reports filed with the US Federal Energy Regulatory Commission (FERC) show that both natural-gas and petroleum liquids pipeline companies increased their net incomes last year despite declining operating revenues. This article discusses trends in the pipeline industry and gives data on the following: pipeline revenues, incomes--1994; current pipeline costs; pipeline costs--estimated vs. actual; current compressor construction costs; compressor costs--estimated vs. actual; US interstate mileage; investment in liquids pipelines; 10-years of land construction costs; top 10 interstate liquids pipelines; top 10 interstate gas pipelines; liquids pipeline companies; and gas pipeline companies.

  10. Table 8.4c Consumption for Electricity Generation by Energy Source: Commercial and Industrial Sectors, 1989-2011 (Subset of Table 8.4a; Billion Btu)

    Energy Information Administration (EIA) (indexed site)

    c Consumption for Electricity Generation by Energy Source: Commercial and Industrial Sectors, 1989-2011 (Subset of Table 8.4a; Billion Btu) Year Fossil Fuels Nuclear Electric Power Renewable Energy Other 9 Electricity Net Imports Total Coal 1 Petroleum 2 Natural Gas 3 Other Gases 4 Total Conventional Hydroelectric Power 5 Biomass Geo- thermal Solar/PV 5,8 Wind 5 Total Wood 6 Waste 7 Commercial Sector 10<//td> 1989 9,135 6,901 18,424 1,143 35,603 [–] 685 1,781 9,112 [–] – – 11,578 – –

  11. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    SciTech Connect

    Agnew, Kieran

    2013-07-01

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes; - Hot tapping - a method

  12. EIS-0433: Keystone XL Pipeline

    Energy.gov [DOE]

    The proposed Keystone XL project consists of a 1,700-mile crude oil pipeline and related facilities that would primarily be used to transport Western Canadian Sedimentary Basin crude oil from an oil supply hub in Alberta, Canada to delivery points in Oklahoma and Texas. This EIS, prepared by the Department of State, evaluates the environmental impacts of the proposed Keystone XL project. DOE’s Western Area Power Administration, a cooperating agency, has jurisdiction over certain proposed transmission facilities (construction and operation of a short 230-kv transmission line and construction of a new substation). The State Department published a notice in the Federal Register on February 3, 2012, regarding the denial of the Keystone XL presidential permit (77 FR 5614).

  13. Rapid Threat Organism Recognition Pipeline

    Energy Science and Technology Software Center

    2013-05-07

    The RAPTOR computational pipeline identifies microbial nucleic acid sequences present in sequence data from clinical samples. It takes as input raw short-read genomic sequence data (in particular, the type generated by the Illumina sequencing platforms) and outputs taxonomic evaluation of detected microbes in various human-readable formats. This software was designed to assist in the diagnosis or characterization of infectious disease, by detecting pathogen sequences in nucleic acid sequence data from clinical samples. It has alsomore » been applied in the detection of algal pathogens, when algal biofuel ponds became unproductive. RAPTOR first trims and filters genomic sequence reads based on quality and related considerations, then performs a quick alignment to the human (or other host) genome to filter out host sequences, then performs a deeper search against microbial genomes. Alignment to a protein sequence database is optional. Alignment results are summarized and placed in a taxonomic framework using the Lowest Common Ancestor algorithm.« less

  14. Rapid Threat Organism Recognition Pipeline

    SciTech Connect

    Williams, Kelly P.; Solberg, Owen D.; Schoeniger, Joseph S.

    2013-05-07

    The RAPTOR computational pipeline identifies microbial nucleic acid sequences present in sequence data from clinical samples. It takes as input raw short-read genomic sequence data (in particular, the type generated by the Illumina sequencing platforms) and outputs taxonomic evaluation of detected microbes in various human-readable formats. This software was designed to assist in the diagnosis or characterization of infectious disease, by detecting pathogen sequences in nucleic acid sequence data from clinical samples. It has also been applied in the detection of algal pathogens, when algal biofuel ponds became unproductive. RAPTOR first trims and filters genomic sequence reads based on quality and related considerations, then performs a quick alignment to the human (or other host) genome to filter out host sequences, then performs a deeper search against microbial genomes. Alignment to a protein sequence database is optional. Alignment results are summarized and placed in a taxonomic framework using the Lowest Common Ancestor algorithm.

  15. Middleware for Astronomical Data Analysis Pipelines

    SciTech Connect

    Abdulla, G; Liu, D; Garlick, J; Miller, M; Nikolaev, S; Cook, K; Brase, J

    2005-01-26

    In this paper the authors describe the approach to research, develop, and evaluate prototype middleware tools and architectures. The developed tools can be used by scientists to compose astronomical data analysis pipelines easily. They use the SuperMacho data pipelines as example applications to test the framework. they describe their experience from scheduling and running these analysis pipelines on massive parallel processing machines. they use MCR a Linux cluster machine with 1152 nodes and Luster parallel file system as the hardware test-bed to test and enhance the scalability of the tools.

  16. Pipeline transportation of heavy crude oil

    SciTech Connect

    Kessick, M.A.; St. Denis, C.E.

    1982-08-10

    Heavy crude oils are transported by pipeline from deposit location to a remote upgrading location by emulsifying the crude oil using deaerated sodium hydroxide solution, conveying the oilin-water emulsion through the pipeline, and recovery of the oil from the oil-in-water emulsion by inverting the emulsion and dewatering the resulting water-in-oil emulsion. The emulsion inversion may be effected using slaked lime, resulting in recovery of a substantial proportion of the sodium hydroxide used in the initial emulsification. The sodium hydroxide solution may be recycled by a separate pipeline for reuse or treated for discharge.

  17. Design method addresses subsea pipeline thermal stresses

    SciTech Connect

    Suman, J.C.; Karpathy, S.A. )

    1993-08-30

    Managing thermal stresses in subsea pipelines carrying heated petroleum requires extensive thermal-stress analysis to predict trouble spots and to ensure a design flexible enough to anticipate stresses and expansions. Explored here are various methods for resolving predicaments posed by thermal loads and resulting deformations by keeping the stresses and deformations in the pipeline system within allowable limits. The problems posed by thermal stresses are not unique; the solutions proposed here are. These methods are based on recent work performed for a major Asian subsea pipeline project currently under construction.

  18. Otay Mesa, CA Natural Gas Imports by Pipeline from Mexico

    Energy Information Administration (EIA) (indexed site)

    0 1,717 0 0 0 0 2007-2015 Pipeline Prices -- 3.55 -- --

  19. Method and apparatus for constructing buried pipeline systems

    SciTech Connect

    Heuer, C.E.; Hsu, H.; Jahns, H.O.

    1982-11-09

    A method and apparatus for mitigating or eliminating the frost heave of refrigerated pipelines buried in frost-susceptible soil are provided. A blanket of heat absorbent material is placed over the pipeline on the surface of the soil to increase the flow of heat into the region surrounding the pipeline. This technique may be used in combination with other frost heave mitigation techniques, such as insulating the pipeline and supporting the pipeline with a heave resistant bedding material.

  20. Proceedings of the 2005 Hydrogen Pipeline Working Group Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Proceedings of the 2005 Hydrogen Pipeline Working Group Workshop Proceedings of the 2005 Hydrogen Pipeline Working Group Workshop The U.S. Department of Energy's Hydrogen Pipeline Working Group Workshop included more than 45 researchers and industry experts. The workshop provided an overview of hydrogen pipeline projects. hpwgw_proceed05.pdf (1.24 MB) More Documents & Publications Hydrogen Pipeline Discussion Hydrogen Transmission and Distribution Workshop Materials

  1. Florida products pipeline set to double capacity

    SciTech Connect

    True, W.R.

    1995-11-13

    Directional drilling has begun this fall for a $68.5 million, approximately 110,000 b/d expansion of Central Florida Pipeline Co.`s refined products line from Tampa to Orlando. The drilling started in August and is scheduled to conclude this month, crossing under seven water bodies in Hillsborough, Polk, and Osceola counties. The current 6 and 10-in. system provides more than 90% of the petroleum products used in Central Florida, according to Central Florida Pipeline. Its additional capacity will meet the growing region`s demand for gasoline, diesel, and jet fuel. The new pipeline, along with the existing 10-in. system, will increase total annual capacity from 30 million bbl (82,192 b/d) to approximately 70 million bbl (191,781 b/d). The older 6-in. line will be shutdown when the new line is operating fully. The steps of pipeline installation are described.

  2. Overview of interstate hydrogen pipeline systems.

    SciTech Connect

    Gillette, J .L.; Kolpa, R. L

    2008-02-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  3. Field weldability of high strength pipeline steels

    SciTech Connect

    Noble, D.N.; Pargeter, R.J.

    1988-01-01

    This project has studied the small-scale SMA weldability of two X80 grade pipeline steels and conducted mechanical and fracture toughness tests on full-size SMA and GMA welds in both pipes.

  4. Pump packages for Colombian crude oil pipeline

    SciTech Connect

    1994-05-01

    The Caterpillar Large Engine Center recently packaged ten engine-driven centrifugal pump packages for British Petroleum Exploration`s crude oil pipeline in South America. The ten sets, which use Ingersoll-Dresser centrifugal pumps, are designed to increase significantly the output of BP`s Central LLanos pipeline located in a remote region near Bogota, Colombia. BP anticipates that the addition of the new pump packages will increase daily volume from the current 100000 barrels to approximately 210000 barrels when the upgrade of the pipeline is completed in September. The ten sets are installed at three separate pumping stations. The stations are designed to operate continuously while unmanned, with only periodic maintenance required. The pump packages are powered by Caterpillar 3612 engines rated 3040 kW at 1000 r/min. The 12-cylinder engines are turbocharged and charge-air cooled and use the pipeline oil as both fuel and a cooling medium for the fuel injectors.

  5. 2005 Hydrogen Pipeline Working Group Workshop

    Energy.gov [DOE]

    DOE held a Hydrogen Pipeline Working Group Workshop August 30-31, 2005 in Augusta, Ga. The workshop provided the opportunity for researchers to hear from industry experts about their field...

  6. Liquefaction and Pipeline Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Liquefaction and Pipeline Costs Liquefaction and Pipeline Costs Presentation by Bruce Kelly of Nexant at the Joint Meeting on Hydrogen Delivery Modeling and Analysis, May 8-9, 2007 deliv_analysis_kelly_lh2.pdf (66.99 KB) More Documents & Publications Forecourt and Gas Infrastructure Optimization Joint Meeting on Hydrogen Delivery Modeling and Analysis Meeting Agenda H2A Delivery Components Model and Analysis

  7. Seadrift/UCAR pipelines achieve ISO registration

    SciTech Connect

    Arrieta, J.R.; Byrom, J.A.; Gasko, H.M. )

    1992-10-01

    Proper meter station design using gas orifice meters must include consideration of a number of factors to obtain the best accuracy available. This paper reports that Union Carbide's Seadrift/UCAR Pipelines has become the world's first cross-country pipelines to comply with the International Standards Organization's quality criteria for transportation and distribution of ethylene. Carbide's organization in North America and Europe, with 22 of the corporation's businesses having the internationally accepted quality system accredited by a third-party registrar.

  8. Materials Solutions for Hydrogen Delivery in Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY Materials Solutions for Hydrogen Delivery in Pipelines Dr. Subodh K. Das SECAT Inc. This presentation does not contain any proprietary or confidential information 2 OAK RIDGE NATIONAL LABORATORY U.S. DEPARTMENT OF ENERGY Overview * Project start date: 05/2005 * Project end date: 09/2008 * Percent complete: 14% Barriers addressed High capital cost and Hydrogen Embrittlement of Pipelines Technical Targets (2015): - Capital cost ($0.8

  9. Are shorted pipeline casings a problem

    SciTech Connect

    Gibson, W.F. )

    1994-11-01

    The pipeline industry has many road and railroad crossings with casings which have been in service for more than 50 years without exhibiting any major problems, regardless of whether the casing is shorted to or isolated from the carrier pipe. The use of smart pigging and continual visual inspection when retrieving a cased pipeline segment have shown that whether shorted or isolated, casings have no significant bearing on the presence or absence of corrosion on the carrier pipe.

  10. World pipeline work set for rapid growth

    SciTech Connect

    Not Available

    1992-08-01

    This paper reports on international pipeline construction which has entered a fast-growth period, accelerated by the new political and economic realities around the world and increasing demand for natural gas, crude oil and refined petroleum products. Many projects are under way or in planning for completion in the mid- to late 1990s in Europe, South America, Asia and the Middle East. Pipeline And Gas Journal's projection calls for construction or other work on 30,700 miles of new natural gas, crude oil and refined products pipelines in the 1992-93 period outside Canada and the U.S. These projects will cost an estimated $30 billion-plus. Natural gas pipelines will comprise most of the mileage, accounting for almost 23,000 miles at an estimated cost of $26.3 billion. Products pipelines, planned or under construction, will add another 5,800 miles at a cost of $2.8 billion. Crude oil pipelines, at a minimum, will total 1,900 new miles at a cost of slightly under $1 billion.

  11. Bayou pipeline crossing requires helical pilings

    SciTech Connect

    Not Available

    1992-01-01

    This paper discusses a routine inspection by Transcontinental Gas Pipe Line Corp. which revealed the approximately 100 ft of its 30-in gas pipeline in St. Landry Parish, La., had become suspended. The situation occurred in the West Atchafalaya Floodway after periods of heavy rain produced strong currents that scoured the soil from around and below the pipeline. To protect the pipeline from possible damage from overstressing, Transco awarded a lump-sum contract to Energy Structures Inc., Houston, to design and install pipeline supports. The pipeline supports engineered by ESI used helical-screw pilings instead of conventional driven pilings. The helical piles were manufactured by A.B. Chance Co., Centralia, Mo. Typically, helical pilings consist of steel pipe ranging from 3.5- to 8-in. diameter pipe with one or more helixes welded onto the pipe. Selection of the proper piling cross-section was based on design loads and soil conditions at the project locations. length was determined by the amount of pipeline suspension and on-site soil conditions.

  12. The 14th Pipeline and Gas Journal 500 report. [Statistical dimensions of leading US pipeline companies

    SciTech Connect

    Congram, G.E.

    1994-09-01

    This article presents compiled data on oil and gas pipeline systems in the US and includes specific information on mileage, volume of transported fluids, and cost information. It lists the rankings based on miles of pipeline, units of gas sold, number of customers, units of petroleum sold, and utility by production sales. Information is also presented in alphabetical format.

  13. Monthly energy review: September 1996

    SciTech Connect

    1996-09-01

    Energy production during June 1996 totaled 5.6 quadrillion Btu, a 0.5% decrease from the level of production during June 1995. Energy consumption during June 1996 totaled 7.1 quadrillion Btu, 2.7% above the level of consumption during June 1995. Net imports of energy during June 1996 totaled 1.6 quadrillion Btu, 4.5% above the level of net imports 1 year earlier. Statistics are presented on the following topics: energy consumption, petroleum, natural gas, oil and gas resource development, coal, electricity, nuclear energy, energy prices, and international energy. 37 figs., 59 tabs.

  14. International Energy Outlook 2016-Coal - Energy Information Administration

    Gasoline and Diesel Fuel Update

    4. Coal print version Overview In the IEO2016 Reference case, coal remains the second-largest energy source worldwide-behind petroleum and other liquids-until 2030. From 2030 through 2040, it is the third-largest energy source, behind both liquid fuels and natural gas. World coal consumption increases from 2012 to 2040 at an average rate of 0.6%/year, from 153 quadrillion Btu in 2012 to 169 quadrillion Btu in 2020 and to 180 quadrillion Btu in 2040. The Reference case estimates do not include

  15. Table 8.4b Consumption for Electricity Generation by Energy Source: Electric Power Sector, 1949-2011 (Subset of Table 8.4a; Billion Btu)

    Energy Information Administration (EIA) (indexed site)

    b Consumption for Electricity Generation by Energy Source: Electric Power Sector, 1949-2011 (Subset of Table 8.4a; Billion Btu) Year Fossil Fuels Nuclear Electric Power 5 Renewable Energy Other 9 Electricity Net Imports 10 Total Coal 1 Petroleum 2 Natural Gas 3 Other Gases 4 Total Conventional Hydroelectric Power 5 Biomass Geo- thermal 5 Solar/PV 5,8 Wind 5 Total Wood 6 Waste 7 1949 1,995,055 414,632 569,375 NA 2,979,062 0 1,349,185 5,803 NA NA NA NA 1,354,988 NA 5,420 4,339,470 1950 2,199,111

  16. Effect of simulated medium-Btu coal gasifier atmospheres on the biaxial stress rupture behavior of four candidate coal gasifier alloys

    SciTech Connect

    Horton, R.M.; Smolik, G.R.

    1982-01-01

    Tests were conducted to determine whether the biaxial stress rupture behavior of four alloys was adversely affected by exposure to four simulated medium-Btu coal gasifier atmospheres. The results of exposures up to approximately 500 h at temperatures between 649 and 982/sup 0/C are presented. Exposure to these atmospheres at temperatures below 900/sup 0/C did not significantly reduce the rupture properties from those measured in air. Only at 982/sup 0/C were the rupture strength and life in the simulated coal gasifier atmospheres lower than those measured in air at atmospheric pressure. Possible reasons for this reduction in strength/life are discussed. The results of detailed examination of specimen ruptures are also presented.

  17. INNOVATIVE ELECTROMAGNETIC SENSORS FOR PIPELINE CRAWLERS

    SciTech Connect

    J. Bruce Nestleroth

    2004-11-05

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they encounter. Recent development efforts include a new generation of powered inspection platforms that crawl slowly inside a pipeline and are able to maneuver past the physical barriers that can limit inspection. At Battelle, innovative electromagnetic sensors are being designed and tested for these new pipeline crawlers. The various sensor types can be used to assess a wide range of pipeline anomalies including corrosion, mechanical damage, and cracks. The Applied Energy Systems Group at Battelle is concluding the first year of work on a projected three-year development effort. In this first year, two innovative electromagnetic inspection technologies were designed and tested. Both were based on moving high-strength permanent magnets to generate inspection energy. One system involved translating permanent magnets towards the pipe. A pulse of electric current would be induced in the pipe to oppose the magnetization according to Lenz's Law. The decay of this pulse would indicate the presence of defects in the pipe wall. This inspection method is similar to pulsed eddy current inspection methods, with the fundamental difference being the manner in which the current is generated. Details of this development effort were reported in the first semiannual report on this project. This second semiannual report focuses on the development of a second inspection methodology, based on rotating permanent magnets. During this period, a rotating permanent magnet exciter was designed and built. The exciter unit produces strong eddy currents in the pipe wall. The tests have shown that at distances of a pipe diameter or more, the currents flow circumferentially, and that these circumferential

  18. Commercial low-Btu coal-gasification plant. Feasibility study: General Refractories Company, Florence, Kentucky. Volume I. Project summary. [Wellman-Galusha

    SciTech Connect

    1981-11-01

    In response to a 1980 Department of Energy solicitation, the General Refractories Company submitted a Proposal for a feasibility study of a low Btu gasification facility for its Florence, KY plant. The proposed facility would substitute low Btu gas from a fixed bed gasifier for natural gas now used in the manufacture of insulation board. The Proposal from General Refractories was prompted by a concern over the rising costs of natural gas, and the anticipation of a severe increase in fuel costs resulting from deregulation. The proposed feasibility study is defined. The intent is to provide General Refractories with the basis upon which to determine the feasibility of incorporating such a facility in Florence. To perform the work, a Grant for which was awarded by the DOE, General Refractories selected Dravo Engineers and Contractors based upon their qualifications in the field of coal conversion, and the fact that Dravo has acquired the rights to the Wellman-Galusha technology. The LBG prices for the five-gasifier case are encouraging. Given the various natural gas forecasts available, there seems to be a reasonable possibility that the five-gasifier LBG prices will break even with natural gas prices somewhere between 1984 and 1989. General Refractories recognizes that there are many uncertainties in developing these natural gas forecasts, and if the present natural gas decontrol plan is not fully implemented some financial risks occur in undertaking the proposed gasification facility. Because of this, General Refractories has decided to wait for more substantiating evidence that natural gas prices will rise as is now being predicted.

  19. JGI Plant Genomics Gene Annotation Pipeline

    SciTech Connect

    Shu, Shengqiang; Rokhsar, Dan; Goodstein, David; Hayes, David; Mitros, Therese

    2014-07-14

    Plant genomes vary in size and are highly complex with a high amount of repeats, genome duplication and tandem duplication. Gene encodes a wealth of information useful in studying organism and it is critical to have high quality and stable gene annotation. Thanks to advancement of sequencing technology, many plant species genomes have been sequenced and transcriptomes are also sequenced. To use these vastly large amounts of sequence data to make gene annotation or re-annotation in a timely fashion, an automatic pipeline is needed. JGI plant genomics gene annotation pipeline, called integrated gene call (IGC), is our effort toward this aim with aid of a RNA-seq transcriptome assembly pipeline. It utilizes several gene predictors based on homolog peptides and transcript ORFs. See Methods for detail. Here we present genome annotation of JGI flagship green plants produced by this pipeline plus Arabidopsis and rice except for chlamy which is done by a third party. The genome annotations of these species and others are used in our gene family build pipeline and accessible via JGI Phytozome portal whose URL and front page snapshot are shown below.

  20. Caspian pipeline combine awards construction contract

    SciTech Connect

    Not Available

    1992-11-02

    This paper reports that the Caspian Pipeline Consortium (CPC) has let contract to Overseas Bechtel Inc. for a 500 mile crude oil export pipeline in Russia. Bechtel will provide engineering, procurement, financing, and construction services and serve as project manager for the 42 inc. line that will extend west from Grozny, near the Caspian Sea, to Novorossiisk, on the Black Sea. Estimated cost is more than $850 million. At Grozny, the new line will tie into 800 miles of existing pipeline that runs along the north shore of the Caspian Sea from supergiant Tengiz field in Kazakhstan. Together, the two segments will form a 1,300 mile system capable of shipping crude oil from the Tengiz region and from Baku, Azerbaijan, to a new terminal and port facilities at Novorossiisk for shipment to world markets, ultimately reaching open oceans via the Mediterranean Sea.

  1. Subsea pipeline isolation systems: Reliability and costs

    SciTech Connect

    Masheder, R.R.

    1996-08-01

    Since the Piper Alpha disaster, more than 80 subsea isolation systems (SSIS) have been installed in subsea gas and oil pipelines in the U.K. continental shelf at an estimated cost in the region of {Brit_pounds}500 million. The reliability and costs of these installations have now been assessed between Dec. 1992 and Oct. 1993. This assessment was based upon comprehensive reliability and cost databases which were established so that the studies could be based upon factual information in order to obtain a current status as required by the sponsoring group. The study consultants report findings have now been consolidated into a report by the UKOOA Pipeline Valve Work Group. Probabilities of failure for different types of valves and systems have been assessed and expenditures broken down and compared. The results of the studies and the conclusions drawn by UKOOA Pipeline Valve Group and the HSE Offshore Safety Division are presented in this paper.

  2. Energy Department Moves Forward on Alaska Natural Gas Pipeline...

    Office of Environmental Management (EM)

    Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program May 26, 2005 - 1:03pm ...

  3. EIA - Natural Gas Pipeline Network - Combined Natural Gas Transportati...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Combined Natural Gas Transportation Maps About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates U.S. Natural Gas Pipeline ...

  4. Blending Hydrogen into Natural Gas Pipeline Networks: A Review...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues The United States has 11 ...

  5. EIA - Natural Gas Pipeline Network - Natural Gas Import/Export...

    Gasoline and Diesel Fuel Update

    Export Pipelines > ImportExport Locations Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates U.S. Natural Gas ...

  6. Evaluation of Natural Gas Pipeline Materials for Hydrogen Science

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Thad M. Adams Materials Technology Section Savannah River National Laboratory DOE Hydrogen Pipeline R&D Project Review Meeting January 5-6, 2005 Evaluation of Natural Gas Pipeline ...

  7. U.S. pipelines continue gains into 1996

    SciTech Connect

    True, W.R.

    1996-11-25

    US interstate natural gas, crude oil, and petroleum product pipelines turned in health performances for 1995, continuing impressive efficiency improvements that were evident in 1994. Revenues and incomes earned from operations along with volumes moved are among data annually submitted to FERC and tracked by Oil and Gas Journal year to year in this exclusive report. This year`s report expands coverage of plans for new construction and completed-cost figures by including Canadian activity for the same 12-month period: July 1, 1995, to June 30, 1996. The paper includes data on the following: pipeline revenues, incomes--1995; North American pipeline costs, estimated; US pipeline costs, estimated vs. actual; North American compressor-construction costs; US compressor costs, estimated vs. actual; Canadian pipeline construction costs, actual; US interstate mileage; investment in liquids pipelines; 10 years of land construction costs; to 10 interstate liquids lines; top 10 interstate gas lines; liquids pipeline companies; and gas pipeline companies.

  8. Weather, construction inflation could squeeze North American pipelines

    SciTech Connect

    True, W.R.

    1998-08-31

    Major North American interstate and interprovincial pipeline companies appear headed for a squeeze near-term: 1997 earnings from operations were down for the second straight year even as the companies expected new construction to begin this year or later to cost more. The effects of warmer-than-normal weather during 1997 in North America made a showing in annual reports filed by US regulated interstate oil and gas pipeline companies with the US Federal Energy Regulatory Commission (FERC). This paper contains data on the following: pipeline revenues, incomes--1997; North American pipeline costs; North American pipeline costs (estimated vs. actual); North American compressor construction costs; US compressor costs (estimated vs. actual); US interstate mileage; investment in liquids pipelines; 10 years of land construction costs; top 10 interstate liquids lines; top 10 interstate gas lines; liquids pipeline companies; and gas pipeline companies.

  9. Marine pipeline dynamic response to waves from directional wave spectra

    SciTech Connect

    Lambrakos, K.F.

    1982-07-01

    A methodology has been developed to calculate the dynamic probabilistic movement and resulting stresses for marine pipelines subjected to storm waves. A directional wave spectrum is used with a Fourier series expansion to simulate short-crested waves and calculate their loads on the pipeline. The pipeline displacements resulting from these loads are solutions to the time-dependent beam-column equation which also includes the soil resistance as external loading. The statistics of the displacements for individual waves are combined with the wave statistics for a given period of time, e.g. pipeline lifetime, to generate probabilistic estimates for net pipeline movement. On the basis of displacements for specified probability levels the pipeline configuration is obtained from which pipeline stresses can be estimated using structural considerations, e.g. pipeline stiffness, end restraints, etc.

  10. Alamo, TX Natural Gas Pipeline Exports to Mexico (Million Cubic...

    Gasoline and Diesel Fuel Update

    data. Release Date: 09302015 Next Release Date: 10302015 Referring Pages: U.S. Natural Gas Pipeline Exports by Point of Exit Alamo, TX Natural Gas Imports by Pipeline from...

  11. Crosby, ND Liquefied Natural Gas Pipeline Exports to Canada ...

    Annual Energy Outlook

    Pipeline Exports to Canada (Million Cubic Feet) Crosby, ND Liquefied Natural Gas Pipeline Exports to Canada (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov ...

  12. Webinar January 12: Assessing Steel Pipeline and Weld Susceptibility...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hydrogen pipelines in the United States are built in compliance with the ASME B31.12 Code for Hydrogen Piping and Pipelines. The Code is based on decades of research and in-field ...

  13. Rio Grande, TX Natural Gas Pipeline Exports to Mexico (Million...

    Energy Information Administration (EIA) (indexed site)

    Grande, TX Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Rio Grande, TX ... 05312016 Referring Pages: U.S. Natural Gas Pipeline Exports by Point of Exit Rio Grande

  14. Sasabe, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic...

    Energy Information Administration (EIA) (indexed site)

    Sasabe, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Sasabe, AZ Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug ...

  15. Hydrogen Permeability and Integrity of Hydrogen Delivery Pipelines

    Energy.gov [DOE]

    Project Objectives: To gain basic understanding of hydrogen permeation behavior and its impact on hydrogen embrittlement of pipeline steels under high gaseous pressures relevant to hydrogen gas transmission pipeline

  16. Havre, MT Natural Gas Imports by Pipeline from Canada

    Energy Information Administration (EIA) (indexed site)

    1998 1999 2000 2001 2002 2003 View History Pipeline Volumes NA NA 1,309 NA NA 0 1998-2003 Pipeline Prices NA NA 3.66 NA NA -- 1998-2003

  17. International Falls, MN Natural Gas Imports by Pipeline from Canada

    Energy Information Administration (EIA) (indexed site)

    2001 2002 2003 2004 2005 2006 View History Pipeline Volumes 617 602 0 0 22 0 1996-2006 Pipeline Prices 4.85 3.01 -- -- 11.20 -- 1996-2006

  18. Roma, TX Natural Gas Pipeline Exports to Mexico (Million Cubic...

    Energy Information Administration (EIA) (indexed site)

    Roma, TX Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Roma, TX Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep ...

  19. Cathodic protection of a remote river pipeline

    SciTech Connect

    Martin, B.A. )

    1994-03-01

    The 261-km long 500-mm diam Kutubu pipeline, which runs through dense jungle swamps in Papua, New Guinea, was built for Chevron Niugini to transport oil from the remote Kutubu oil production facility in the Southern Highlands to an offshore loading facility. The pipeline was laid with a section in the bed of a wide, fast-flowing river. This section was subject to substantial telluric effects and current density variations from changing water resistivities. The cathodic protection system's effectiveness was monitored by coupon off'' potentials and required an innovative approach.

  20. Self lubrication of bitumen froth in pipelines

    SciTech Connect

    Joseph, D.D.

    1997-12-31

    In this paper I will review the main properties of water lubricated pipelines and explain some new features which have emerged from studies of self-lubrication of Syncrudes` bitumen froth. When heavy oils are lubricated with water, the water and oil are continuously injected into a pipeline and the water is stable when in a lubricating sheath around the oil core. In the case of bitumen froth obtained from the Alberta tar sands, the water is dispersed in the bitumen and it is liberated at the wall under shear; water injection is not necessary because the froth is self-lubricating.

  1. EIA - Natural Gas Pipeline Network - Regional Overview and Links

    Energy Information Administration (EIA) (indexed site)

    Overview and Links About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Regional Overviews and Links to Pipeline Companies Through a series of interconnecting interstate and intrastate pipelines the transportation of natural gas from one location to another within the United States has become a relatively seamless operation. While intrastate pipeline systems often transports natural gas from production areas directly to consumers in

  2. Deliverability on the Interstate Natural Gas Pipeline System

    Reports and Publications

    1998-01-01

    Examines the capability of the national pipeline grid to transport natural gas to various U.S. markets.

  3. Innovative Electromagnetic Sensors for Pipeline Crawlers

    SciTech Connect

    J. Bruce Nestleroth

    2006-05-04

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they encounter. Recent development efforts include a new generation of powered inspection platforms that crawl slowly inside a pipeline and are able to maneuver past the physical barriers that can limit inspection. At Battelle, innovative electromagnetic sensors are being designed and tested for these new pipeline crawlers. The various sensor types can be used to assess a wide range of pipeline anomalies including corrosion, mechanical damage, and cracks. Battelle is in the final year on a projected three-year development effort. In the first year, two innovative electromagnetic inspection technologies were designed and tested. Both were based on moving high-strength permanent magnets to generate inspection energy. One system involved translating permanent magnets towards the pipe. A pulse of electric current would be induced in the pipe to oppose the magnetization according to Lenz's Law. The decay of this pulse would indicate the presence of defects in the pipe wall. This inspection method is similar to pulsed eddy current inspection methods, with the fundamental difference being the manner in which the current is generated. Details of this development effort were reported in the first semiannual report on this project. The second inspection methodology is based on rotating permanent magnets. The rotating exciter unit produces strong eddy currents in the pipe wall. At distances of a pipe diameter or more from the rotating exciter, the currents flow circumferentially. These circumferential currents are deflected by pipeline defects such as corrosion and axially aligned cracks. Simple sensors are used to detect the change in current densities in the pipe wall. The second semiannual

  4. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Barriers: Hydrogen embrittlement of pipelines and remediation (mixing with water vapor?) hpwgw_embrittlementsteels_sofronis.pdf (675.35 KB) More Documents & Publications Webinar: I2CNER: An International Collaboration to Enable a Carbon-Neutral Energy Economy Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation Hydrogen permeability and Integrity of hydrogen transfer pipelines

  5. Sensor and transmitter system for communication in pipelines

    SciTech Connect

    Cooper, John F.; Burnham, Alan K.

    2013-01-29

    A system for sensing and communicating in a pipeline that contains a fluid. An acoustic signal containing information about a property of the fluid is produced in the pipeline. The signal is transmitted through the pipeline. The signal is received with the information and used by a control.

  6. Expansion of the U.S. Natural Gas Pipeline Network

    Reports and Publications

    2009-01-01

    Additions in 2008 and Projects through 2011. This report examines new natural gas pipeline capacity added to the U.S. natural gas pipeline system during 2008. In addition, it discusses and analyzes proposed natural gas pipeline projects that may be developed between 2009 and 2011, and the market factors supporting these initiatives.

  7. North West Shelf pipeline. Part 2 (conclusion). Laying Australia's North West Shelf pipeline

    SciTech Connect

    Seymour, E.V.; Craze, D.J.; Ruinen, W.

    1984-05-14

    Details of the construction of Australia's North West Shelf gas pipeline cover the pipelaying operation, trunkline-to-riser tie-in, posttrenching, backfilling, slugcatcher construction, connection with the shore terminal, and hydrostatic testing.

  8. Cathodic protection of pipelines in discontinuous permafrost

    SciTech Connect

    Mitchell, C.J.; Wright, M.D.; Waslen, D.W.

    1997-10-01

    There are many unknowns and challenges in providing cathodic protection (CP) for a pipeline located in discontinuous permafrost areas. Preliminary pipe-to-soil data indicates that CP coverage was achieved in these regions without needing local anodes. Work is required to verify whether this conclusion can be extended over the course of an annual freeze-thaw cycle.

  9. New system pinpoints leaks in ethylene pipeline

    SciTech Connect

    Hamande, A.; Condacse, V.; Modisette, J.

    1995-04-01

    A model-based leak detection, PLDS, developed by Modisette Associates, Inc., Houston has been operating on the Solvay et Cie ethylene pipeline since 1989. The 6-in. pipeline extends from Antwerp to Jemeppe sur Sambre, a distance of 73.5 miles and is buried at a depth of 3 ft. with no insulation. Except for outlets to flares, located every 6 miles for test purposes, there are no injections or deliveries along the pipeline. Also, there are block valves, which are normally open, at each flare location. This paper reviews the design and testing procedures used to determine the system performance. These tests showed that the leak system was fully operational and no false alarms were caused by abrupt changes in inlet/outlet flows of the pipeline. It was confirmed that leaks larger than 2 tonnes/hr. (40 bbl/hr) are quickly detected and accurately located. Also, maximum leak detection sensitivity is 1 tonne/hr. (20 bbl/hr) with a detection time of one hour. Significant operational, configuration, and programming issues also were found during the testing program. Data showed that temperature simulations needed re-examining for improvement since accurate temperature measurements are important. This is especially true for ethylene since its density depends largely on temperature. Another finding showed the averaging period of 4 hrs. was too long and a 1 to 2 hr. interval was better.

  10. Computer Science and Information Technology Student Pipeline

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Science and Information Technology Student Pipeline Program Description Los Alamos National Laboratory's High Performance Computing and Information Technology Divisions recruit and hire promising undergraduate and graduate students in the areas of Computer Science, Information Technology, Management Information Systems, Computer Security, Software Engineering, Computer Engineering, and Electrical Engineering. Students are provided a mentor and challenging projects to demonstrate their

  11. Appendix A. Reference case projections

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    by region and end-use sector, High Oil Price case, 2010-40 (quadrillion Btu) Region History Projections Average annual percent change, 2010-40 2010 2020 2025 2030 2035 2040 OECD...

  12. Afghanistan: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    nlineLabel":"","visitedicon":"" Country Profile Name Afghanistan Population 15,500,000 GDP 21,747,000,000 Energy Consumption 0.02 Quadrillion Btu 2-letter ISO code AF 3-letter...

  13. Energy Department Intends to Issue Funding Opportunity Announcement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    primary feedstocks could offer energy savings on the order of 1.6 quadrillion BTU (quads) annually across four classes of waste materials - metals, fibers, polymers, and e-waste. ...

  14. Word Pro - S3

    Energy Information Administration (EIA) (indexed site)

    Asphalt Aviation Distillate Jet Kerosene Liquefied Lubricants Motor Petroleum Residual Other 0.0 0.6 1.2 1.8 Quadrillion Btu a Includes renewable diesel fuel (including biodiesel) ...

  15. MU Eneg

    Annual Energy Outlook

    is included, but an estimated 3.0 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  16. Ordering Information

    Annual Energy Outlook

    is included, but an estimated 3.4 quadrillion Btu of renewable Note 8; and Table A8. Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  17. AA

    Annual Energy Outlook

    is included, but an estimated 3.0 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  18. DOE/EI-003595/10

    Gasoline and Diesel Fuel Update

    is included, but an estimated 3.0 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  19. Ordering Information

    Annual Energy Outlook

    is included, but an estimated 3.4 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  20. 1) E/ L I

    Annual Energy Outlook

    is included, but an estimated 3.0 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  1. DOE/EIA-0035(94/01) Ener Revie

    Gasoline and Diesel Fuel Update

    is included, but an estimated 3.4 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  2. DOE/ELIA-0035(95/105), Monthly

    Gasoline and Diesel Fuel Update

    is included, but an estimated 3.0 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  3. II IIE

    Annual Energy Outlook

    is included, but an estimated 3.0 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  4. II Now Available State Energy Data Report 1992

    Gasoline and Diesel Fuel Update

    is included, but an estimated 3.4 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  5. I.

    Annual Energy Outlook

    is included, but an estimated 3.0 quadrillion Btu of renewable Note 8; and Table A8. * Geothermal Energy and Other: Section 2, energy used by other sectors is not included....

  6. Solomon Islands: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Solomon Islands Population 523,000 GDP 840,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code SB 3-letter ISO code SLB Numeric ISO...

  7. Kenya: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Kenya Population 38,610,097 GDP Unavailable Energy Consumption 0.21 Quadrillion Btu 2-letter ISO code KE 3-letter ISO code KEN Numeric ISO...

  8. Madagascar: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Madagascar Population 12,238,914 GDP 10,025,000,000 Energy Consumption 0.05 Quadrillion Btu 2-letter ISO code MG 3-letter ISO code MDG Numeric ISO...

  9. Mauritius: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    "","visitedicon":"" Country Profile Name Mauritius Population 1,236,817 GDP 14 Energy Consumption 0.06 Quadrillion Btu 2-letter ISO code MU 3-letter ISO code MUS Numeric ISO...

  10. Senegal: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Senegal Population 13,508,715 GDP 13,864,000,000 Energy Consumption 0.09 Quadrillion Btu 2-letter ISO code SN 3-letter ISO code SEN Numeric ISO...

  11. Greenland: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Greenland Population 56,968 GDP Unavailable Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code GL 3-letter ISO code GRL Numeric ISO...

  12. Maldives: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Maldives Population 393,500 GDP 1,944,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code MV 3-letter ISO code MDV Numeric ISO...

  13. United States: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    page. Country Profile Name United States Population 320,206,000 GDP Unavailable Energy Consumption 99.53 Quadrillion Btu 2-letter ISO code US 3-letter ISO code USA Numeric ISO...

  14. Tanzania: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    "","visitedicon":"" Country Profile Name Tanzania Population 44,928,923 GDP 37 Energy Consumption 0.12 Quadrillion Btu 2-letter ISO code TZ 3-letter ISO code TZA Numeric ISO...

  15. Syria: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Syria Population 17,951,639 GDP Unavailable Energy Consumption 0.84 Quadrillion Btu 2-letter ISO code SY 3-letter ISO code SYR Numeric ISO...

  16. Saint Lucia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Saint Lucia Population 173,765 GDP 1,239,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code LC 3-letter ISO code LCA Numeric ISO...

  17. Yemen: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Yemen Population 19,685,000 GDP 36,700,000,000 Energy Consumption 0.31 Quadrillion Btu 2-letter ISO code YE 3-letter ISO code YEM Numeric ISO...

  18. Seychelles: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Seychelles Population 84,000 GDP 2,760,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code SC 3-letter ISO code SYC Numeric ISO...

  19. South Korea: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name South Korea Population 51,302,044 GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code KR 3-letter ISO code KOR Numeric ISO code...

  20. Guyana: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Guyana Population 747,884 GDP 2,788,000,000 Energy Consumption 0.02 Quadrillion Btu 2-letter ISO code GY 3-letter ISO code GUY Numeric ISO...

  1. Albania: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Albania Population 2,821,977 GDP 14,000,000,000 Energy Consumption 0.11 Quadrillion Btu 2-letter ISO code AL 3-letter ISO code ALB Numeric ISO...

  2. Romania: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Romania Population 20,121,641 GDP 191,581,000,000 Energy Consumption 1.68 Quadrillion Btu 2-letter ISO code RO 3-letter ISO code ROU Numeric ISO...

  3. Morocco: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Morocco Population 33,250,000 GDP 114,700,000,000 Energy Consumption 0.56 Quadrillion Btu 2-letter ISO code MA 3-letter ISO code MAR Numeric ISO...

  4. Dominica: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Dominica Population 72,301 GDP 497,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code DM 3-letter ISO code DMA Numeric ISO...

  5. Tonga: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Tonga Population 103,036 GDP 439,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code TO 3-letter ISO code TON Numeric ISO...

  6. Antigua and Barbuda: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Antigua and Barbuda Population 81,799 GDP 1,176,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code AG 3-letter ISO code ATG Numeric ISO...

  7. Cape Verde: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Cape Verde Population 512,096 GDP 2,071,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code CV 3-letter ISO code CPV Numeric ISO...

  8. Burundi: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Burundi Population 8,053,574 GDP 3,037,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code BI 3-letter ISO code BDI Numeric ISO...

  9. Somalia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Somalia Population 10,428,043 GDP Unavailable Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code SO 3-letter ISO code SOM Numeric ISO...

  10. Ethiopia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Ethiopia Population 73,750,932 GDP 51,000,000,000 Energy Consumption 0.12 Quadrillion Btu 2-letter ISO code ET 3-letter ISO code ETH Numeric ISO...

  11. Montserrat: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Montserrat Population 4,900 GDP Unavailable Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code MS 3-letter ISO code MSR Numeric ISO...

  12. Faroe Islands: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Faroe Islands Population 48,351 GDP 2,450,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code FO 3-letter ISO code FRO Numeric ISO...

  13. I.N

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    heating or water heating. Fuel 011, LPG, and Kerosene. Expenditures of 11 Fuel Oil. Consumption of 1.0 quadrillion Btu of fuel billion for fuel oil, LPG, and kerosene...

  14. Nepal: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Nepal Population 26,494,504 GDP Unavailable Energy Consumption 0.08 Quadrillion Btu 2-letter ISO code NP 3-letter ISO code NPL Numeric ISO...

  15. Panama: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Panama Population 3,608,431 GDP 49,142,000,000 Energy Consumption 0.24 Quadrillion Btu 2-letter ISO code PA 3-letter ISO code PAN Numeric ISO...

  16. Iran: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Iran Population 77,176,930 GDP 402,700,000,000 Energy Consumption 8.12 Quadrillion Btu 2-letter ISO code IR 3-letter ISO code IRN Numeric ISO...

  17. Nauru: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    "","visitedicon":"" Country Profile Name Nauru Population 9,275 GDP Unavailable Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code NR 3-letter ISO code NRU Numeric ISO...

  18. Guinea: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Guinea Population 10,628,972 GDP 5,212,000,000 Energy Consumption 0.02 Quadrillion Btu 2-letter ISO code GN 3-letter ISO code GIN Numeric ISO...

  19. Tunisia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Tunisia Population 10,982,754 GDP 45,611,000,000 Energy Consumption 0.35 Quadrillion Btu 2-letter ISO code TN 3-letter ISO code TUN Numeric ISO...

  20. Lithuania: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Lithuania Population 3,043,429 GDP 51,002,000,000 Energy Consumption 0.39 Quadrillion Btu 2-letter ISO code LT 3-letter ISO code LTU Numeric ISO...

  1. Northern Mariana Islands: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Northern Mariana Islands Population 53,833 GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code MP 3-letter ISO code MNP Numeric ISO code...

  2. Cambodia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Cambodia Population 13,388,910 GDP 17,250,000,000 Energy Consumption 0.07 Quadrillion Btu 2-letter ISO code KH 3-letter ISO code KHM Numeric ISO...

  3. Kosovo: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Kosovo Population 1,733,842 GDP 7,813,000,000 Energy Consumption Quadrillion Btu 2-letter ISO code XK 3-letter ISO code XKX Numeric ISO code N...

  4. Togo: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Togo Population 5,337,000 GDP 3,685,000,000 Energy Consumption 0.04 Quadrillion Btu 2-letter ISO code TG 3-letter ISO code TGO Numeric ISO...

  5. Guinea-Bissau: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Guinea-Bissau Population 1,345,479 GDP 870,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code GW 3-letter ISO code GNB Numeric ISO...

  6. Uruguay: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Uruguay Population 3,286,314 GDP 58,283,000,000 Energy Consumption 0.17 Quadrillion Btu 2-letter ISO code UY 3-letter ISO code URY Numeric ISO...

  7. Turks and Caicos Islands: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Turks and Caicos Islands Population 31,458 GDP Unavailable Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code TC 3-letter ISO code TCA Numeric ISO...

  8. Rwanda: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Rwanda Population 10,515,973 GDP 7,431,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code RW 3-letter ISO code RWA Numeric ISO...

  9. Grenada: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Grenada Population 109,590 GDP 790,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code GD 3-letter ISO code GRD Numeric ISO...

  10. Burkina Faso: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Burkina Faso Population 14,017,262 GDP 13,000,000,000 Energy Consumption 0.02 Quadrillion Btu 2-letter ISO code BF 3-letter ISO code BFA Numeric ISO...

  11. Iraq: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Iraq Population 36,004,552 GDP 164,600,000,000 Energy Consumption 1.36 Quadrillion Btu 2-letter ISO code IQ 3-letter ISO code IRQ Numeric ISO...

  12. Benin: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Benin Population 9,983,884 GDP 7,429,000,000 Energy Consumption 0.05 Quadrillion Btu 2-letter ISO code BJ 3-letter ISO code BEN Numeric ISO...

  13. Portugal: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Portugal Population 10,562,178 GDP Unavailable Energy Consumption 1.06 Quadrillion Btu 2-letter ISO code PT 3-letter ISO code PRT Numeric ISO...

  14. Oman: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Oman Population 2,773,479 GDP 78,788,000,000 Energy Consumption 0.71 Quadrillion Btu 2-letter ISO code OM 3-letter ISO code OMN Numeric ISO...

  15. Angola: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Angola Population 18,498,000 GDP 129,785,000,000 Energy Consumption 0.20 Quadrillion Btu 2-letter ISO code AO 3-letter ISO code AGO Numeric ISO...

  16. Lebanon: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Lebanon Population 4,965,914 GDP 44,967,000,000 Energy Consumption 0.20 Quadrillion Btu 2-letter ISO code LB 3-letter ISO code LBN Numeric ISO...

  17. Belize: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Belize Population 324,528 GDP 1,554,000,000 Energy Consumption 0.02 Quadrillion Btu 2-letter ISO code BZ 3-letter ISO code BLZ Numeric ISO...

  18. Republic of Macedonia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Republic of Macedonia Population 2,022,547 GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code MK 3-letter ISO code MKD Numeric ISO code...

  19. Slovakia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Slovakia Population 5,397,036 GDP Unavailable Energy Consumption 0.80 Quadrillion Btu 2-letter ISO code SK 3-letter ISO code SVK Numeric ISO...

  20. Bhutan: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Bhutan Population Unavailable GDP 1,488,000,000 Energy Consumption 0.05 Quadrillion Btu 2-letter ISO code BT 3-letter ISO code BTN Numeric ISO...

  1. Comoros: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Comoros Population 798,000 GDP 655,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code KM 3-letter ISO code COM Numeric ISO...

  2. Finland: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Finland Population 5,180,000 GDP 276,275,000,000 Energy Consumption 1.29 Quadrillion Btu 2-letter ISO code FI 3-letter ISO code FIN Numeric ISO...

  3. Latvia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Latvia Population 2,070,371 GDP 34,118,000,000 Energy Consumption 0.16 Quadrillion Btu 2-letter ISO code LV 3-letter ISO code LVA Numeric ISO...

  4. Cuba: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Cuba Population 11,210,064 GDP 78,694,000,000 Energy Consumption 0.42 Quadrillion Btu 2-letter ISO code CU 3-letter ISO code CUB Numeric ISO...

  5. Barbados: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Barbados Population 277,821 GDP 4,490,000,000 Energy Consumption 0.02 Quadrillion Btu 2-letter ISO code BB 3-letter ISO code BRB Numeric ISO...

  6. Cyprus: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Cyprus Population 838,897 GDP 23,006,000,000 Energy Consumption 0.13 Quadrillion Btu 2-letter ISO code CY 3-letter ISO code CYP Numeric ISO...

  7. Kiribati: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Kiribati Population 103,500 GDP 167,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code KI 3-letter ISO code KIR Numeric ISO...

  8. Saint Helena: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Saint Helena Population 4,255 GDP Unavailable Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code SH 3-letter ISO code SHN Numeric ISO...

  9. Brunei: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Brunei Population 415,717 GDP 17,092,000,000 Energy Consumption 0.19 Quadrillion Btu 2-letter ISO code BN 3-letter ISO code BRN Numeric ISO...

  10. Kuwait: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Kuwait Population 2,213,403 GDP 173,438,000,000 Energy Consumption 1.19 Quadrillion Btu 2-letter ISO code KW 3-letter ISO code KWT Numeric ISO...

  11. Malaysia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Malaysia Population 28,334,135 GDP Unavailable Energy Consumption 2.45 Quadrillion Btu 2-letter ISO code MY 3-letter ISO code MYS Numeric ISO...

  12. New Zealand: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name New Zealand Population 4,242,048 GDP Unavailable Energy Consumption Quadrillion Btu 2-letter ISO code NZ 3-letter ISO code NZL Numeric ISO code...

  13. Zimbabwe: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    "","visitedicon":"" Country Profile Name Zimbabwe Population 13,061,239 GDP 11 Energy Consumption 0.16 Quadrillion Btu 2-letter ISO code ZW 3-letter ISO code ZWE Numeric ISO...

  14. Togo: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Togo Population 7,154,237 GDP 3,685,000,000 Energy Consumption 0.04 Quadrillion Btu 2-letter ISO code TG 3-letter ISO code TGO Numeric ISO...

  15. Estonia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Estonia Population 1,294,486 GDP 27,410,000,000 Energy Consumption 0.24 Quadrillion Btu 2-letter ISO code EE 3-letter ISO code EST Numeric ISO...

  16. Suriname: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Suriname Population 492,829 GDP 5,273,000,000 Energy Consumption 0.04 Quadrillion Btu 2-letter ISO code SR 3-letter ISO code SUR Numeric ISO...

  17. Bulgaria: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Bulgaria Population 7,364,570 GDP 57,596,000,000 Energy Consumption 0.83 Quadrillion Btu 2-letter ISO code BG 3-letter ISO code BGR Numeric ISO...

  18. Switzerland: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Switzerland Population 7,954,700 GDP 679,028,000,000 Energy Consumption 1.32 Quadrillion Btu 2-letter ISO code CH 3-letter ISO code CHE Numeric ISO...

  19. Jordan: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Jordan Population 5,611,202 GDP 33,516,000,000 Energy Consumption 0.31 Quadrillion Btu 2-letter ISO code JO 3-letter ISO code JOR Numeric ISO...

  20. Costa Rica: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Costa Rica Population 4,586,353 GDP 52,968,000,000 Energy Consumption 0.20 Quadrillion Btu 2-letter ISO code CR 3-letter ISO code CRI Numeric ISO...

  1. Guatemala: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Guatemala Population 15,806,675 GDP 49,880,000,000 Energy Consumption 0.21 Quadrillion Btu 2-letter ISO code GT 3-letter ISO code GTM Numeric ISO...

  2. Liechtenstein: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Liechtenstein Population 37,132 GDP 5,155,000,000 Energy Consumption Quadrillion Btu 2-letter ISO code LI 3-letter ISO code LIE Numeric ISO code...

  3. Gabon: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Gabon Population 1,475,000 GDP 20,664,000,000 Energy Consumption 0.05 Quadrillion Btu 2-letter ISO code GA 3-letter ISO code GAB Numeric ISO...

  4. Niger: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Niger Population 17,138,707 GDP 6,022,000,000 Energy Consumption 0.02 Quadrillion Btu 2-letter ISO code NE 3-letter ISO code NER Numeric ISO...

  5. Singapore: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ","visitedicon":"" Country Profile Name Singapore Population 5,469,700 GDP 298 Energy Consumption 2.38 Quadrillion Btu 2-letter ISO code SG 3-letter ISO code SGP Numeric ISO...

  6. Cameroon: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Cameroon Population 17,463,836 GDP 30,000,000,000 Energy Consumption 0.10 Quadrillion Btu 2-letter ISO code CM 3-letter ISO code CMR Numeric ISO...

  7. Honduras: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Honduras Population 7,529,403 GDP 19,567,000,000 Energy Consumption 0.13 Quadrillion Btu 2-letter ISO code HN 3-letter ISO code HND Numeric ISO...

  8. Federated States of Micronesia: Energy Resources | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Profile Name Federated States of Micronesia Population 106,104 GDP 277,000,000 Energy Consumption Quadrillion Btu 2-letter ISO code FM 3-letter ISO code FSM Numeric ISO code...

  9. Pakistan: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Pakistan Population 196,174,380 GDP Unavailable Energy Consumption 2.48 Quadrillion Btu 2-letter ISO code PK 3-letter ISO code PAK Numeric ISO...

  10. Moldova: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Moldova Population Unavailable GDP 8,738,000,000 Energy Consumption 0.14 Quadrillion Btu 2-letter ISO code MD 3-letter ISO code MDA Numeric ISO...

  11. Jamaica: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Jamaica Population 2,889,187 GDP 15,569,000,000 Energy Consumption 0.17 Quadrillion Btu 2-letter ISO code JM 3-letter ISO code JAM Numeric ISO...

  12. Hungary: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Hungary Population 9,937,628 GDP 145,153,000,000 Energy Consumption 1.11 Quadrillion Btu 2-letter ISO code HU 3-letter ISO code HUN Numeric ISO...

  13. Paraguay: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Paraguay Population 6,800,284 GDP 30,558,000,000 Energy Consumption 0.44 Quadrillion Btu 2-letter ISO code PY 3-letter ISO code PRY Numeric ISO...

  14. Algeria: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Algeria Population 37,900,000 GDP 227,802,000,000 Energy Consumption 1.71 Quadrillion Btu 2-letter ISO code DZ 3-letter ISO code DZA Numeric ISO...

  15. Bangladesh: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Bangladesh Population 156,594,962 GDP Unavailable Energy Consumption 0.87 Quadrillion Btu 2-letter ISO code BD 3-letter ISO code BGD Numeric ISO...

  16. Nigeria: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Nigeria Population 140,431,790 GDP 594,257,000,000 Energy Consumption 1.09 Quadrillion Btu 2-letter ISO code NG 3-letter ISO code NGA Numeric ISO...

  17. Chad: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Chad Population 6,279,921 GDP 15,986,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code TD 3-letter ISO code TCD Numeric ISO...

  18. Eritrea: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Eritrea Population 6,380,803 GDP 3,881,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code ER 3-letter ISO code ERI Numeric ISO...

  19. Bolivia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Bolivia Population 10,556,102 GDP 29,802 Energy Consumption 0.25 Quadrillion Btu 2-letter ISO code BO 3-letter ISO code BOL Numeric ISO...

  20. Andorra: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Andorra Population 85,458 GDP 4,510,000,000 Energy Consumption Quadrillion Btu 2-letter ISO code AD 3-letter ISO code AND Numeric ISO code...

  1. Liberia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Liberia Population 3,476,608 GDP 1,735,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code LR 3-letter ISO code LBR Numeric ISO...

  2. Bahamas: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name The Bahamas Population 254,685 GDP 8,043,000,000 Energy Consumption Quadrillion Btu 2-letter ISO code BS 3-letter ISO code BHS Numeric ISO code...

  3. Ivory Coast: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Ivory Coast Population 15,366,672 GDP 32,000,000,000 Energy Consumption Quadrillion Btu 2-letter ISO code CI 3-letter ISO code CIV Numeric ISO code...

  4. Mauritania: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Mauritania Population 3,537,368 GDP 4,547,000,000 Energy Consumption 0.04 Quadrillion Btu 2-letter ISO code MR 3-letter ISO code MRT Numeric ISO...

  5. Dominican Republic: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Dominican Republic Population 9,378,818 GDP 62,484,000,000 Energy Consumption 0.30 Quadrillion Btu 2-letter ISO code DO 3-letter ISO code DOM Numeric ISO...

  6. Bahrain: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Bahrain Population 1,234,571 GDP Unavailable Energy Consumption 0.55 Quadrillion Btu 2-letter ISO code BH 3-letter ISO code BHR Numeric ISO...

  7. Laos: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    bel":"","visitedicon":"" Country Profile Name Laos Population 4,574,848 GDP 11 Energy Consumption 0.04 Quadrillion Btu 2-letter ISO code LA 3-letter ISO code LAO Numeric ISO...

  8. Qatar: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Qatar Population 1,699,435 GDP 213,784,000,000 Energy Consumption 1.00 Quadrillion Btu 2-letter ISO code QA 3-letter ISO code QAT Numeric ISO...

  9. Lesotho: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Lesotho Population 2,031,348 GDP 2,616,000,000 Energy Consumption 0.01 Quadrillion Btu 2-letter ISO code LS 3-letter ISO code LSO Numeric ISO...

  10. Sweden: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Sweden Population 9,658,301 GDP Unavailable Energy Consumption 2.22 Quadrillion Btu 2-letter ISO code SE 3-letter ISO code SWE Numeric ISO...

  11. Vanuatu: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Vanuatu Population 243,304 GDP 743,000,000 Energy Consumption 0.00 Quadrillion Btu 2-letter ISO code VU 3-letter ISO code VUT Numeric ISO...

  12. Annual Energy Outlook 2015 - Appendix A

    Annual Energy Outlook

    Table A1. Total energy supply, disposition, and price summary (quadrillion Btu per year, ... 21.7 22.2 22.5 22.5 22.6 0.5% Nuclear uranium 2 ......

  13. Fact #792: August 12, 2013 Energy Consumption by Sector and Energy Source, 1982 and 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    In the last 30 years, overall energy consumption has grown by about 22 quadrillion Btu. The share of energy consumption by the transportation sector has seen modest growth in that time – from about...

  14. Fact #792: August 12, 2013 Energy Consumption by Sector and Energy...

    Energy.gov [DOE] (indexed site)

    In the last 30 years, overall energy consumption has grown by about 22 quadrillion Btu. The share of energy consumption by the transportation sector has seen modest growth in that ...

  15. Residential | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    used 19.6 quadrillion Btu of delivered energy, or 21 percent of total U.S. energy consumption. The residential sector accounted for 57 percent of that energy use and the...

  16. Commercial | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    used 19.6 quadrillion Btu of delivered energy, or 21 percent of total U.S. energy consumption. The residential sector accounted for 57 percent of that energy use and the...

  17. Transportation | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Data From AEO2011 report . Market Trends From 2009 to 2035, transportation sector energy consumption grows at an average annual rate of 0.6 percent (from 27.2 quadrillion Btu...

  18. Annual Energy Review 2008 - Released June 2009

    Gasoline and Diesel Fuel Update

    0.1 quadrillion Btu of coal coke net imports. 4 Conventional hydroelectric power, geothermal, solarPV, wind, and biomass. 5 Includes industrial combined-heat-and-power (CHP)...

  19. Tips: Heating and Cooling | Department of Energy

    Energy.gov [DOE] (indexed site)

    us use natural gas. | Source: Buildings Energy Data Book 2011, 2.1.1 Residential Primary Energy Consumption, by Year and Fuel Type (Quadrillion Btu and Percent of Total)....

  20. Israel: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Energy Consumption 0.86 Quadrillion Btu 2-letter ISO code IL 3-letter ISO code ISR Numeric ISO code 376 UN Region1 Western Asia OpenEI Resources Energy Maps 0 Tools 2...

  1. AEO2011:Total Energy Supply, Disposition, and Price Summary ...

    OpenEI (Open Energy Information) [EERE & EIA]

    case. The dataset uses quadrillion Btu and the U.S. Dollar. The data is broken down into production, imports, exports, consumption and price. Data and Resources AEO2011:Total...

  2. U.S. Energy Information Administration (EIA) - Pub

    Gasoline and Diesel Fuel Update

    Delivered energy consumption by sector Transportation Energy consumption in the transportation sector declines in the AEO2015 Reference case from 27.0 quadrillion Btu (13.8 million ...

  3. U.S. Energy Information Administration (EIA) - Pub

    Annual Energy Outlook

    Increasing energy efficiency reduces the energy intensity of many residential end uses between 2013 and 2040. Total energy consumption for space heating is 4.2 quadrillion Btu in ...

  4. Cape Verde: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    0.00 Quadrillion Btu 2-letter ISO code CV 3-letter ISO code CPV Numeric ISO code 132 UN Region1 Western Africa OpenEI Resources Energy Maps 0 Tools 0 Programs 4 view...

  5. U.S. Energy Information Administration | Renewable Energy...

    Gasoline and Diesel Fuel Update

    7 Table 4.17 Geothermal energy consumption by direct use of energy and from heat pumps, 1990 - 2009 (quadrillion Btu) Year Direct Use Heat Pum ps Total 1990 0.0048 0.0054 0.0102 ...

  6. Buildings Energy Data Book

    1 FY 2007 Federal Primary Energy Consumption (Quadrillion Btu) Buildings and Facilities 0.88 Vehicles/Equipment 0.69 (mostly jet fuel and diesel) Total Federal Government Consumption 1.57

  7. Azerbaijan: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Azerbaijan Population 9,494,600 GDP 73,537,000,000 Energy Consumption 0.68 Quadrillion Btu 2-letter ISO code AZ 3-letter ISO code AZE Numeric ISO...

  8. Mongolia: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Mongolia Population 3,000,000 GDP 11,516,000,000 Energy Consumption 0.09 Quadrillion Btu 2-letter ISO code MN 3-letter ISO code MNG Numeric ISO...

  9. Sierra Leone: Energy Resources | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Country Profile Name Sierra Leone Population 6,190,280 GDP 3,777,000,000 Energy Consumption 0.02 Quadrillion Btu 2-letter ISO code SL 3-letter ISO code SLE Numeric ISO...

  10. Analysis of gas chilling alternatives for Arctic pipelines

    SciTech Connect

    Dvoiris, A.; McMillan, D.K.; Taksa, B.

    1994-12-31

    The operation of buried natural gas pipelines in Arctic regions requires installation of gas chilling facilities at compressor stations. These facilities are required in order to cool compressed pipeline gases to temperatures below that of permanently frozen surrounding soil. If these pipeline gas temperatures are too high, the frozen ground around the pipelines will eventually thaw. This is undesirable for many reasons amongst which are ground settlement and possible catastrophic failure of the pipeline. This paper presents the results of a study which compared several alternative methods of gas chilling for possible application at one of the compressor stations on the proposed new Yamal-Center gas pipeline system in the Russian Arctic. This technical and economic study was performed by Gulf Interstate Engineering (GIE) for GAZPROM, the gas company in Russia that will own and operate this new pipeline system. Geotechnical, climatical and other information provided by GAZPROM, coupled with information developed by GIE, formed the basis for this study.

  11. Transuranic Waste Processing Center Exceeds Contract Year Goals |

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Chapter 8 Transportation sector energy consumption Overview In the International Energy Outlook 2016 (IEO2016) Reference case, transportation sector delivered energy consumption increases at an annual average rate of 1.4%, from 104 quadrillion British thermal units (Btu) in 2012 to 155 quadrillion Btu in 2040. Transportation energy demand growth occurs almost entirely in regions outside of the Organization for Economic Cooperation and Development (non-OECD), with transportation demand roughly

  12. International Energy Outlook 2016-Transportation sector energy consumption

    Gasoline and Diesel Fuel Update

    - Energy Information Administration 8. Transportation sector energy consumption print version Overview In the International Energy Outlook 2016 (IEO2016) Reference case, transportation sector delivered energy consumption increases at an annual average rate of 1.4%, from 104 quadrillion British thermal units (Btu) in 2012 to 155 quadrillion Btu in 2040. Transportation energy demand growth occurs almost entirely in regions outside of the Organization for Economic Cooperation and Development

  13. Word Pro - S2.lwp

    Energy Information Administration (EIA) (indexed site)

    Primary Energy Consumption by Source and Sector, 2012 (Quadrillion Btu) 1 Does not include biofuels that have been blended with petroleum-biofuels are included in "Renewable Energy." 2 Excludes supplemental gaseous fuels. 3 Includes less than 0.1 quadrillion Btu of coal coke net imports. 4 Conventional hydroelectric power, geothermal, solar/photovoltaic, wind, and biomass. 5 Includes industrial combined-heat-and-power (CHP) and industrial electricity-only plants. 6 Includes commercial

  14. Word Pro - Untitled1

    Energy Information Administration (EIA) (indexed site)

    F1. Primary Energy Consumption and Delivered Total Energy, 2010 (Quadrillion Btu) U.S. Energy Information Administration / Annual Energy Review 2011 347 Primary Energy Consumption by Source 1 Delivered Total Energy by Sector 8 1 Includes electricity net imports, not shown separately. 2 Does not include biofuels that have been blended with petroleum-biofuels are included in "Renewable Energy." 3 Excludes supplemental gaseous fuels. 4 Includes less than 0.1 quadrillion Btu of coal coke

  15. Coal slurry pipelines: Blach Mesa and future projects

    SciTech Connect

    Brolick, H.J.

    1998-12-31

    Most people in the mining industry have some familiarity with pipelining of minerals in slurry form, however, many may not realize the extent that mineral slurry pipeline transport is used throughout the world. The author is referring to the shipment of the minerals in the raw or concentrate form, not tailings pipelines which are also commonplace in the minerals industry. There are over forty mineral pipelines around the world. The list covers a wide range of minerals, including copper ore concentrate, iron ore concentrate, limestone, phosphate concentrate, kaolin, Gilsonite and gold ore, with only eleven of the mineral pipelines located in the USA. It should be noted that one of the earliest slurry pipelines was a 108 mile coal slurry pipeline in Ohio, which started up in 1957. The pipeline only operated until 1963 when a railroad company literally bought out the transportation contract. This really was the beginning of the unit train concept. Each mineral has specific physical and chemical characteristics to be considered when evaluating transport by pipeline. The processing required at the pipeline origin, as well as at the pipeline termination, are also important factors in determining slurry pipeline feasibility. Transport distance, annual volume, and continuity of shipments are other important factors. One of the most difficult minerals to transport as a slurry is coal because the specific gravity is closer to water than most other minerals. Thus, the fine balance of creating enough fine particles to serve as a carrier for the coarser material, while at the same time having a material that can be economically dewatered is very sensitive and technical designs will vary with types of coal. Additionally, since coal is purchased for its thermal value, excess surface moisture can lower the value of the coal to the customer. One of the most successful slurry pipeline operations, and the only current operating long-distance coal slurry pipeline is the Black Mesa

  16. Buried gas pipelines under vehicular crossings

    SciTech Connect

    Oey, H.S.; Greggerson, V.L.; Womack, D.P.

    1984-03-01

    This paper describes and evaluates the various methods used in the analysis and design of buried pipelines under vehicular crossings extracted from a vast number of literature. It was found that a unified treatment of the subject is currently not available and additional work is required. The study shows that there are sufficient data and technical information that can be integrated to produce sound design. Theoretical as well as empirical formulas are scrutinized and incorporated in their appropriate places. Design examples are presented, complete with the detail calculations. Where applicable nomographs and graphs are adapted as design aids. A brief review of the current safety codes pertaining to natural gas pipeline design is also presented.

  17. Structural monitoring helps assess deformations in Arctic pipelines

    SciTech Connect

    Nyman, K.J.; Lara, P.F.

    1986-11-10

    Advanced structural monitoring systems can play an important role in the evaluation of arctic pipeline distortions along the alignment. These systems can influence pipeline design requirements, reduce capital costs, and improve operating reliability. Differential soil movements resulting from terrain instabilities are the main features which threaten a pipeline's structural integrity and affect the design of buried pipeline systems in the Arctic. Economic, aesthetic, and safety concerns make conventional buried construction an optimum design choice for an arctic crude-oil or gas-pipeline transportation system. However, variable frozen and thawed soil conditions underlying the pipeline along a discontinuous permafrost corridor pose a challenge to the design and operation of such systems. Crude-oil pipelines which must operate at elevated temperatures can be installed in unfrozen soils or in permafrost soils where initially frozen segments will exhibit limited settlement under the thawed conditions imposed by pipeline construction and operation. Ice-rich portions of the frozen alignment may have an unacceptable settlement potential for a warm buried pipeline. In contrast, natural-gas pipelines can be operated cold to increase throughput capability and to prevent the problems associated with thawing permafrost.

  18. Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

    SciTech Connect

    Mattiozzi, Pierpaolo; Strom, Alexander

    2008-07-08

    Twin oil (20 and 24 inch) and gas (20 and 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE) - the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures.

  19. Pipelining heavy crude oil requires special pumps

    SciTech Connect

    Brennan, J.R.

    1995-10-01

    This paper reviews the use of rotary screw pumps installed at Guatemala`s Xan oil field to help pipeline heavy crudes to their processing facilities. It reviews the special design characteristics and specifications for each of the three pumps. It provides information on the capacities and the materials used in making the pumps. It provides information on cooling systems and on the engines used to power the pumps.

  20. EIA - Natural Gas Pipeline Network - Regional Definitions

    Energy Information Administration (EIA) (indexed site)

    Definitions Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Regional Definitions The regions defined in the above map are based upon the 10 Federal Regions of the U.S. Bureau of Labor Statistics. The State groupings are as follows: Northeast Region - Federal Region 1: Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont. Federal Region 2: New Jersey, and New York. Federal Region 3:Delaware, District of

  1. Materials Solutions for Hydrogen Delivery in Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solutions for Hydrogen Delivery in Pipelines Dr. Subodh K. Das Secat, Inc. September 26, 2007 This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Team SECAT (KY) Project Manager Oregon Steel Mills (OR) Steel Pipe Producer Columbia Gas of Kentucky (KY) NG transporter Schott North America (PA) Glass coatings supplier Chemical Composite Coatings (GA) Composites coatings Advanced Technology Corp. (TN) ABI technology provider ASME (NY) Codes

  2. Natural Gas Pipeline Network: Changing and Growing

    Reports and Publications

    1996-01-01

    This chapter focuses upon the capabilities of the national natural gas pipeline network, examining how it has expanded during this decade and how it may expand further over the coming years. It also looks at some of the costs of this expansion, including the environmental costs which may be extensive. Changes in the network as a result of recent regional market shifts are also discussed.

  3. CFPL installs products pipeline with directional drilling

    SciTech Connect

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland {number_sign}70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line.

  4. Drag reduction in coal log pipelines

    SciTech Connect

    Marrero, T.R.; Liu, H.

    1996-12-31

    It is well-known that solutions of dissolved long-chain macromolecules produce lower friction or drag losses than with the solvent alone. In coal log pipeline (CLP), water is the conveying medium. Synthetic polymers such as poly(ethylene oxide) have been dissolved in water and tested for their extent of drag reduction as a function of concentration and other variables. Lab-scale experimental results for CLP indicate substantial drag reduction at low concentration levels of polymer. But, the macromolecules exhibit degradation under mechanical shear stresses. The large molecules break into smaller units. This degradation effect causes a loss of drag reduction. However, high levels of drag reduction can be maintained as follows: (1) by injecting polymer into the CLP at several locations along the pipeline, (2) by injecting polymer of different particle sizes, (3) by using more robust types of polymers, or (4) by using polymer-fiber mixtures. This report presents the value of drag-reducing agents in terms of pumping power net cost savings. In addition, this report outlines the environmental impact of drag reduction polymers, and end-of-pipeline water treatment processes. For an operating CLP, hundreds of miles in length, the use of poly(ethylene oxide) as a drag reducing agent provides significant pumping power cost savings at a minimal materials cost.

  5. BTU LLC | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Small start-up with breakthrough technology seeking funding to prove commercial feasibility Coordinates: 45.425788, -122.765754 Show Map Loading map......

  6. Hydrogen pipeline compressors annual progress report.

    SciTech Connect

    Fenske, G. R.; Erck, R. A.

    2011-07-15

    The objectives are: (1) develop advanced materials and coatings for hydrogen pipeline compressors; (2) achieve greater reliability, greater efficiency, and lower capital in vestment and maintenance costs in hydrogen pipeline compressors; and (3) research existing and novel hydrogen compression technologies that can improve reliability, eliminate contamination, and reduce cost. Compressors are critical components used in the production and delivery of hydrogen. Current reciprocating compressors used for pipeline delivery of hydrogen are costly, are subject to excessive wear, have poor reliability, and often require the use of lubricants that can contaminate the hydrogen (used in fuel cells). Duplicate compressors may be required to assure availability. The primary objective of this project is to identify, and develop as required, advanced materials and coatings that can achieve the friction, wear, and reliability requirements for dynamically loaded components (seal and bearings) in high-temperature, high-pressure hydrogen environments prototypical of pipeline and forecourt compressor systems. The DOE Strategic Directions for Hydrogen Delivery Workshop identified critical needs in the development of advanced hydrogen compressors - notably, the need to minimize moving parts and to address wear through new designs (centrifugal, linear, guided rotor, and electrochemical) and improved compressor materials. The DOE is supporting several compressor design studies on hydrogen pipeline compression specifically addressing oil-free designs that demonstrate compression in the 0-500 psig to 800-1200 psig range with significant improvements in efficiency, contamination, and reliability/durability. One of the designs by Mohawk Innovative Technologies Inc. (MiTi{reg_sign}) involves using oil-free foil bearings and seals in a centrifual compressor, and MiTi{reg_sign} identified the development of bearings, seals, and oil-free tribological coatings as crucial to the successful

  7. U.S., Canada pipeline work shows gain in 1994

    SciTech Connect

    Watts, J.

    1994-01-01

    Pipeline construction activity in the US and Canada is expected to be down slightly during 1994 from 1993 mileage, even though natural gas pipeline work remains steady on both sides of the border. Pipeline and Gas Journal and Pipeline and Utilities Construction estimate that a total of 3.638 miles of new gas, crude oil and refined products pipeline will be installed during 1994 in the US, down from a total of 4.278 miles built in 1993. Canadian 1994 work remains essentially unchanged in 1994, with 1,094 new miles compared to 1,091 miles in 1993. This paper reviews the proposed construction by region and company. It includes information on mileage, type pipeline, and estimated completion date.

  8. Virtual Pipeline System Testbed to Optimize the U.S. Natural Gas Transmission Pipeline System

    SciTech Connect

    Kirby S. Chapman; Prakash Krishniswami; Virg Wallentine; Mohammed Abbaspour; Revathi Ranganathan; Ravi Addanki; Jeet Sengupta; Liubo Chen

    2005-06-01

    The goal of this project is to develop a Virtual Pipeline System Testbed (VPST) for natural gas transmission. This study uses a fully implicit finite difference method to analyze transient, nonisothermal compressible gas flow through a gas pipeline system. The inertia term of the momentum equation is included in the analysis. The testbed simulate compressor stations, the pipe that connects these compressor stations, the supply sources, and the end-user demand markets. The compressor station is described by identifying the make, model, and number of engines, gas turbines, and compressors. System operators and engineers can analyze the impact of system changes on the dynamic deliverability of gas and on the environment.

  9. Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Guarantee Program | Department of Energy Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program Energy Department Moves Forward on Alaska Natural Gas Pipeline Loan Guarantee Program May 26, 2005 - 1:03pm Addthis WASHINGTON, DC - The Department of Energy tomorrow, Friday, May 27, will publish a Notice of Inquiry in the Federal Register seeking public comment on an $18 billion loan guarantee program to encourage the construction of a pipeline that will bring Alaskan natural gas to

  10. World`s developing regions provide spark for pipeline construction

    SciTech Connect

    Koen, A.D.; True, W.R.

    1996-02-05

    This paper reviews the proposed construction of oil and gas pipelines which are underway or proposed to be started in 1996. It breaks down the projects by region of the world, type of product to be carried, and diameter of pipeline. It also provides mileage for each category of pipeline. Major projects in each region are more thoroughly discussed giving details on construction expenditures, construction problems, and political issues.

  11. New construction era reflected in East Texas LPG pipeline

    SciTech Connect

    Mittler, T.J. )

    1990-04-02

    Installation of 240 miles of 6, 10, and 12-in. LPG pipelines from Mont Belvieu to Tyler, Tex., has provided greater feedstock-supply flexibility to a petrochemical plant in Longview, Tex. The project, which took place over 18 months, included tie-ins with metering at four Mont Belvieu suppliers. The new 10 and 12-in. pipelines now transport propane while the new and existing parts of a 6-in. pipeline transport propylene.

  12. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Embrittlement of Pipeline Steels: Causes and Remediation P. Sofronis, I. M. Robertson, D. D. Johnson University of Illinois at Urbana-Champaign Hydrogen Pipeline Working Group Workshop Augusta, GA, August 30, 2005 Funding and Duration * Timeline - Project start date: 7/20/05 - Project end date: 7/19/09 - Percent complete: 0.1% * Budget: Total project funding: 300k/yr * DOE share: 75% * Contractor share: 25% * Barriers - Hydrogen embrittlement of pipelines and remediation (mixing with water

  13. EIA - Natural Gas Pipeline Network - Natural Gas Transportation...

    Gasoline and Diesel Fuel Update

    Corridors > Major U.S. Natural Gas Transportation Corridors Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates ...

  14. EIA - Natural Gas Pipeline Network - Major Natural Gas Transportation...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Major Natural Gas Transportation Corridors About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Major Natural Gas ...

  15. Panel 2, Hydrogen Delivery in the Natural Gas Pipeline Network

    Energy.gov [DOE] (indexed site)

    in the Natural Gas Pipeline Network DOE'S HYDROGEN ENERGY STORAGE FOR GRID AND TRANSPORTATION SERVICES WORKSHOP Sacramento, CA May 14, 2014 Brian Weeks Gas Technology Institute 2 2 ...

  16. EIA - Natural Gas Pipeline Network - Underground Natural Gas...

    Energy Information Administration (EIA) (indexed site)

    Storage About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Underground Natural Gas Storage Overview | Regional ...

  17. EIA - Natural Gas Pipeline Network - Natural Gas Transmission...

    Gasoline and Diesel Fuel Update

    Transmission Path Diagram About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Transmission Path Natural ...

  18. EIA - Natural Gas Pipeline Network - Regional/State Underground...

    Gasoline and Diesel Fuel Update

    RegionalState Underground Natural Gas Storage Table About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Regional ...

  19. EIA - Natural Gas Pipeline Network - Region To Region System...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Interregional Capacity About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Interregional Natural Gas Transmission ...

  20. Evalutation of Natural Gas Pipeline Materials and Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Natural Gas Pipeline Materials and Infrastructure for HydrogenMixed Gas Service Thad Adams, George Rawls, Poh-Sang Lam and Robert Sindelar Savannah River National Laboratory ...

  1. Enter the Post-Doc: The Untapped Sourcing Pipeline

    SciTech Connect

    Boscow, Ryan B.

    2011-07-30

    This article addresses the potential formulation and utilization of an industry-based Post-Doc program in order to create workforce candidate pipelines with targeted universities.

  2. Structural Genomics of Minimal Organisms: Pipeline and Results...

    Office of Scientific and Technical Information (OSTI)

    The former has fewer than 500 genes and the latter has fewer than 700 genes. A semiautomated structural genomics pipeline was set up from target selection, cloning, expression, ...

  3. Renewable Energy Pipeline Development Terms of Reference | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Development Terms of Reference Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Pipeline Development Terms of Reference AgencyCompany Organization:...

  4. EnSys Energy Report on Keystone XL Pipeline

    Energy.gov [DOE]

    As part of ongoing analysis, the Department of Energy's Office of Policy and International Affairs commissioned a report on the proposed Keystone XL pipeline project.

  5. Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Webinar: I2CNER: An International Collaboration to Enable a Carbon-Neutral Energy Economy Hydrogen Embrittlement of Pipeline Steels: Causes and Remediation Hydrogen permeability ...

  6. Gas supplies of interstate natural gas pipeline companies, 1991

    SciTech Connect

    Not Available

    1992-12-11

    This publication provides information on the total reserves, production, and deliverability capabilities of the 64 interstate pipeline companies required to file the Federal Energy Regulatory Commission (FERC) Form 15, ``Interstate Pipeline`s Annual Report of Gas Supply.`` Data reported on this form are not considered to be confidential. This publication is the 29th in a series of annual reports on the total gas supplies of interstate pipeline companies since the inception of individual company reports to the Federal Power Commission (FPC) in 1964 for report year 1963.

  7. Refiners react to changes in the pipeline infrastructure

    SciTech Connect

    Giles, K.A.

    1997-06-01

    Petroleum pipelines have long been a critical component in the distribution of crude and refined products in the U.S. Pipelines are typically the most cost efficient mode of transportation for reasonably consistent flow rates. For obvious reasons, inland refineries and consumers are much more dependent on petroleum pipelines to provide supplies of crude and refined products than refineries and consumers located on the coasts. Significant changes in U.S. distribution patterns for crude and refined products are reshaping the pipeline infrastructure and presenting challenges and opportunities for domestic refiners. These changes are discussed.

  8. EIA - Analysis of Natural Gas Imports/Exports & Pipelines

    Annual Energy Outlook

    trends, offshore production shut-ins caused by infrastructure problems and hurricanes, imports and exports of pipeline and liquefied natural gas, and the above-average...

  9. Sweetgrass, MT Natural Gas Imports by Pipeline from Canada

    Energy Information Administration (EIA) (indexed site)

    932 781 716 1,160 0 0 1998-2015 Pipeline Prices 3.98 3.77 2.41 3.67 -- -- 1998

  10. EIA - Natural Gas Pipeline Network - Aquifer Storage Reservoir...

    Energy Information Administration (EIA) (indexed site)

    Aquifer Storage Reservoir Configuration About U.S. Natural Gas Pipelines - Transporting ... Aquifer Underground Natural Gas Storage Reservoir Configuration Aquifer Underground ...

  11. EIA - Natural Gas Pipeline Network - Depleted Reservoir Storage...

    Gasoline and Diesel Fuel Update

    Depleted Reservoir Storage Configuration About U.S. Natural Gas Pipelines - Transporting ... Depleted Production Reservoir Underground Natural Gas Storage Well Configuration Depleted ...

  12. EIS-0517: Port Arthur Liquefaction Project and Port Arthur Pipeline...

    Energy.gov [DOE] (indexed site)

    natural gas marine terminal along the Sabine-Neches ship channel (Jefferson County, Texas), about 35 miles of new pipeline, and associated facilities. DOE, Office of Fossil...

  13. Pipeline and Distribution Use of Natural Gas (Summary)

    Gasoline and Diesel Fuel Update

    Pipeline and Distribution Use Price Citygate Price Residential Price Commercial Price Industrial Price Vehicle Fuel Price Electric Power Price Proved Reserves as of 1231 Reserves ...

  14. Evaluation of Trenchless Technologies for Installation of Pipelines...

    Office of Scientific and Technical Information (OSTI)

    for Installation of Pipelines in Radioactive Environments - 10249 Citation Details In-Document Search Title: Evaluation of Trenchless Technologies for Installation of ...

  15. Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks

    SciTech Connect

    Dooley, James J.; Dahowski, Robert T.; Davidson, Casie L.

    2008-02-29

    There is growing interest regarding the potential size of a future U.S. dedicated CO2 pipeline infrastructure if carbon dioxide capture and storage (CCS) technologies are commercially deployed on a large scale. In trying to understand the potential scale of a future national CO2 pipeline network, comparisons are often made to the existing pipeline networks used to deliver natural gas and liquid hydrocarbons to markets within the U.S. This paper assesses the potential scale of the CO2 pipeline system needed under two hypothetical climate policies and compares this to the extant U.S. pipeline infrastructures used to deliver CO2 for enhanced oil recovery (EOR), and to move natural gas and liquid hydrocarbons from areas of production and importation to markets. The data presented here suggest that the need to increase the size of the existing dedicated CO2 pipeline system should not be seen as a significant obstacle for the commercial deployment of CCS technologies.

  16. Pipeline bottoming cycle study. Final report

    SciTech Connect

    Not Available

    1980-06-01

    The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle working fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.

  17. Materials Solutions for Hydrogen Delivery in Pipelines

    SciTech Connect

    Ningileri, Shridas T.; Boggess, Todd A; Stalheim, Douglas

    2013-01-02

    The main objective of the study is as follows: Identify steel compositions/microstructures suitable for construction of new pipeline infrastructure and evaluate the potential use of the existing steel pipeline infrastructure in high pressure gaseous hydrogen applications. The microstructures of four pipeline steels were characterized and tensile testing was conducted in gaseous hydrogen and helium at pressures of 5.5 MPa (800 psi), 11 MPa (1600 psi) and 20.7 MPa (3000 psi). Based on reduction of area, two of the four steels that performed the best across the pressure range were selected for evaluation of fracture and fatigue performance in gaseous hydrogen at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi). The basic format for this phase of the study is as follows: Microstructural characterization of volume fraction of phases in each alloy; Tensile testing of all four alloys in He and H{sub 2} at 5.5 MPa (800 psi), 11 MPa (1600 psi), and 20.7 MPa (3000 psi). RA performance was used to choose the two best performers for further mechanical property evaluation; Fracture testing (ASTM E1820) of two best tensile test performers in H{sub 2} at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi); Fatigue testing (ASTM E647) of two best tensile test performers in H2 at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi) with frequency =1.0 Hz and R-ratio=0.5 and 0.1.

  18. Natural Gas Processing Plants in the United States: 2010 Update / National

    Gasoline and Diesel Fuel Update

    Overview Btu Content National Overview Btu Content The natural gas received and transported by the major intrastate and interstate mainline transmission systems must be within a specific energy (Btu) content range. Generally, the acceptable Btu content is 1,035 Btu per cubic foot, with an acceptable deviation of +/-50 Btu. However, when natural gas is extracted, its Btu content can be very different from acceptable pipeline specifications. The Btu content of natural gas extracted varies

  19. Cathodic protection of pipelines in discontinuous permafrost

    SciTech Connect

    Mitchell, C.J.; Wright, M.D.; Waslen, D.W.

    1997-08-01

    This paper discusses the challenges in providing cathodic protection for a pipeline located in an area with discontinuous permafrost. Specific challenges included: unknown time for the permafrost to melt out, unpredictable current distribution characteristics and wet, inaccessible terrain. Based on preliminary pipe-to-soil data, it appears that cathodic protection coverage was achieved in discontinuous permafrost regions without the need of local anodes. Future work is required to verify whether this conclusion can be extended over the course of an annual freeze-thaw cycle.

  20. EIS-0410: Keystone Oil Pipeline Project

    Energy.gov [DOE]

    This environmental impact statement (EIS) analyzes the environmental impacts of the TransCanada Keystone Oil Pipeline Project. The U.S. Department of State (DOS) was the lead agency. The U.S. Department of Energy's (DOE's) Western Power Administration (Western) participated as a cooperating agency in the preparation of this EIS in order to address Western's proposed response to interconnection requests from Minnkota Power Cooperative, Central Power Electric Cooperative, and East River Electric Power Cooperative requiring modification of three existing Western substation facilities and construction of one new tap facility. DOE adopted the DOS Final EIS as DOE/EIS-0410 on January 21, 2009.

  1. Praxair extending hydrogen pipeline in Southeast Texas

    SciTech Connect

    Not Available

    1992-08-24

    This paper reports that Praxair Inc., an independent corporation created by the spinoff of Union Carbide Corp.'s Linde division, is extending its high purity hydrogen pipeline system from Channelview, Tex., to Port Arthur, Tex. The 70 mile, 10 in. extension begins at a new pressure swing adsorption (PSA) purification unit next to Lyondell Petrochemical Co.'s Channelview plant. The PSA unit will upgrade hydrogen offgas from Lyondell's methanol plant to 99.99% purity hydrogen. The new line, advancing at a rate of about 1 mile/day, will reach its first customer, Star Enterprise's 250,000 b/d Port Arthur refinery, in September.

  2. EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project...

    Office of Environmental Management (EM)

    LNG Project and Rio Bravo Pipeline Project; Kleberg, Kenedy, Willacy, and Cameron Counties, Texas EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project; Kleberg, Kenedy, ...

  3. Pipeline and Pressure Vessel R&D under the Hydrogen Regional...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pipeline and Pressure Vessel R&D under the Hydrogen Regional Infrastructure Program In Pennsylvania Pipeline and Pressure Vessel R&D under the Hydrogen Regional Infrastructure ...

  4. UNEP-Risoe CDM/JI Pipeline Analysis and Database | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Risoe CDMJI Pipeline Analysis and Database (Redirected from UNEP Risoe CDMJI Pipeline Analysis and Database) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNEP Risoe...

  5. UNEP-Risoe CDM/JI Pipeline Analysis and Database | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    UNEP-Risoe CDMJI Pipeline Analysis and Database Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNEP Risoe CDMJI Pipeline Analysis and Database AgencyCompany...

  6. Alamo, TX Natural Gas Imports by Pipeline from Mexico

    Energy Information Administration (EIA) (indexed site)

    Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 2009 2010 2011 2012 2013 2014 View History Pipeline Volumes 13,279 4,685 0 0 0 0 1998-2014 Pipeline Prices 4.10 4.30 -- -- -- -- 1998-2014

  7. North Troy, VT Natural Gas Imports by Pipeline from Canada

    Energy Information Administration (EIA) (indexed site)

    Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 1997 1998 1999 2000 2001 2002 View History Pipeline Volumes 11,207 11,319 2,250 NA NA NA 1996-2002 Pipeline Prices 2.96 2.75 2.27 NA NA NA 1996-2002

  8. EIA - Natural Gas Pipeline Network - Expansion Process Flow Diagram

    Energy Information Administration (EIA) (indexed site)

    Development & Expansion > Development and Expansion Process Figure About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Development and Expansion Process For Natural Gas Pipeline Projects Figure showing the expansion process

  9. Structural Materials Challenges in the Deployment of Hydrogen Pipelines

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Structural Materials Challenges in the Deployment of Hydrogen Pipelines Brian Somerday Hydrogen and Metallurgy Science Department Sandia National Laboratories, Livermore, CA Hydrogen Transmission and Distribution Workshop National Renewable Energy Laboratory, Golden, Colorado Feb. 25-26, 2014 Two principal materials-related challenges for steel hydrogen pipelines: reliability and cost * Prominent reliability issue is potential for hydrogen embrittlement - No hydrogen embrittlement-related

  10. El Paso, TX Natural Gas Imports by Pipeline from Mexico

    Energy Information Administration (EIA) (indexed site)

    Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 1998 1999 2000 2001 2002 View History Pipeline Volumes 996 NA NA NA NA 1998-2002 Pipeline Prices 2.09 1998-1998

  11. Hidalgo, TX Natural Gas Imports by Pipeline from Mexico

    Energy Information Administration (EIA) (indexed site)

    Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Data Series Area 2009 2010 2011 2012 2013 2014 View History Pipeline Volumes 284 62 0 0 0 0 1996-2014 Pipeline Prices 4.40 4.21 -- -- -- -- 1996-2014

  12. Ultrasonic corrosion inspection of crude oil pipeline

    SciTech Connect

    Kondo, Munetaka; Kobayashi Motoi; Kurashima, Mineo

    1999-07-01

    An ultrasonic in-line inspection tool has successfully inspected a crude oil pipeline, which is 48-inches in diameter and 1,287 kms in length. This is one of the biggest crude oil pipeline systems in the world. The longest distance of a single inspection run is 1,055 km. The survey runs have been carried out total eight times from 1989 to 1998. The ultrasonic instruments were upgraded and the new ultrasonic tool was built in 1995. The new ultrasonic tool has 512 ultrasonic transducers and the firing interval of each transducer is 1.6 ms (625 Hz). The specified criterion for the grading of the data collected by the ultrasonic tool is single transducer grading. This criterion requires that corrosion will be reported when a single transducer detects a metal loss. The data observation software for personal computers is supplied to show inspection results and measured data collected by the ultrasonic tool. This paper describes the ultrasonic corrosion inspection technology of the ultrasonic tool applied for this project.

  13. Leak detection on an ethylene pipeline

    SciTech Connect

    Hamande, A.; Condacse, V.; Modisette, J.

    1995-12-31

    A model-based leak detection system has been in operation on the Solvay et Cie ethylene pipeline from Antwerp to Jemeppe on Sambre since 1989. The leak detection system, which is the commercial product PLDS of Modisette Associations, Inc., was originally installed by the supplier. Since 1991, all system maintenance and configuration changes have been done by Solvay et Cie personnel. Many leak tests have been performed, and adjustments have been made in the configuration and the automatic tuning parameters. The leak detection system is currently able to detect leaks of 2 tonnes/hour in 11 minutes with accurate location. Larger leaks are detected in about 2 minutes. Leaks between 0.5 and 1 tonne per hour are detected after several hours. (The nominal mass flow in the pipeline is 15 tonnes/hour, with large fluctuations.) Leaks smaller than 0.5 tonnes per hour are not detected, with the alarm thresholds set at levels to avoid false alarms. The major inaccuracies of the leak detection system appear to be associated with the ethylene temperatures.

  14. Improved internal seals for pipeline centrifugal compressors

    SciTech Connect

    Shapiro, W.; Lee, C.

    1988-05-31

    Internal labyrinth seals are used extensively in pipeline compressors as impeller inlet seals, interstage seals, and balance piston seals (for beam-type machines). The purposes of this program were to determine the effects on compressor performance of internal seal leakage, consider variations in labyrinth configurations to improve performance, and determine the feasibility of other types of seals that might provide improved performance. In addition, rotordynamic studies of an overhung machine were conducted to establish whether unbalance response was sufficient to cause seal contact and consequent wear. The program involved consultation with both users and manufacturers of pipeline compressors to obtain information regarding the nature of problems, description of the machinery and seal configurations, operating conditions, contemporary design procedures, and advanced seal developments. The results indicated that internal leakage can significantly reduce compressor efficiency; in some machines as much as 3 to 6%, depending on seal clearance. Optimized step seal geometries will provide improved performance, especially for seals that have worn from rubbing contact. A principal problem is seal wear that results from compressor surge. During normal operation, impeller motions are constrained within seal clearances, but when surge occurs severe rubbing can take place. Abradable seals do not address the surge wear problem, except that wear may take longer since abradable seals start out with tighter clearances. A variety of advanced concepts were considered. The most promising are resilient labyrinths that can elastically respond to impeller movements created by compressor surge without excessive damage or wear. 10 refs., 74 figs., 24 tabs.

  15. Gulf of Mexico pipelines heading into deeper waters

    SciTech Connect

    True, W.R.

    1987-06-08

    Pipeline construction for Gulf of Mexico federal waters is following drilling and production operations into deeper waters, according to U.S. Department of Interior (DOI) Minerals Management Service (MMS) records. Review of MMS 5-year data for three water depth categories (0-300 ft, 300-600 ft, and deeper than 600 ft) reveals this trend in Gulf of Mexico pipeline construction. Comparisons are shown between pipeline construction applications that were approved by the MMS during this period and projects that have been reported to the MMS as completed. This article is the first of annual updates of MMS gulf pipeline data. Future installments will track construction patterns in water depths, diameter classifications, and mileage. These figures will also be evaluated in terms of pipeline-construction cost data.

  16. Use of look-ahead modeling in pipeline operations

    SciTech Connect

    Wray, B.; O`Leary, C.

    1995-12-31

    Amoco Canada Petroleum Company, Ltd. operates the Cochin pipeline system. Cochin pumps batched liquid ethane, propane, ethylene, butane, and NGL. Operating and scheduling this pipeline is very complex. There are safety considerations, especially for ethylene, which cannot be allowed to drop below vapor pressure. Amoco Canada needs to know where batches are in the line, what pressure profiles will look like into the future, and when batches arrive at various locations along the line. In addition to traditional instrumentation and SCADA, Amoco Canada uses modeling software to help monitor and operate the Cochin pipeline. Two important components of the modeling system are the Estimated Time of Arrival (ETA) and Predictive Model (PM) modules. These modules perform look ahead modeling to assist in operating the Cochin pipeline. The modeling software was first installed for the Cochin system in February of 1994, and was commissioned on August 1, 1994. This paper will discuss how the look ahead modules are used for the Cochin pipeline.

  17. Pipeline in-service relocation engineering manual. Final report

    SciTech Connect

    Rosenfeld, M.J.

    1994-12-31

    When pipeline relocation is necessary, it is a common practice for pipeline operators to move the line while it contains gas or liquid product under pressure in order to avoid taking the line out of service. Reasons for this practice include lowering to accommodate a new crossing, raising for repair or recoating, or moving to avoid encroachment. Such operations increase the longitudinal stresses in the relocated section of pipeline. Usually, this has not caused significant problems. However, at least four pipeline failures have been associated with the movement of pipelines over the years. On October 22, 1991, the DOT Office of Pipeline Safety issued an `Alert Notice` to US pipeline operators urging them to conduct analyses prior to moving a pipeline, regardless of whether the line is in service during the operation or not; to determine the extent to which a pipeline may be safely moved, considering the material toughness as a factor; and specific procedures for the operation. The notice resulted from recommendations by the National Transportation Safety Board following their investigation of the North Blenheim failure. This document in intended to be a reasonably comprehensive manual for engineering a safe relocation of an operating pipeline in service. The major elements of the desired guidelines were perceived to already exist in various industry guidelines, standards, proceedings, and research reports. Those sources were compiled, compared and distilled into recommendations for designing a safe line relocation. This manual supplements existing guidelines such as API RP-1117 rather than superseding them; indeed, the user of this document would benefit by referring to them as well. Observance of recommendations made herein should satisfy the nominal requirements and concerns of regulators. However, this document could not possibly address every conceivable situation which might arise in line relocation, nor is it a substitute for independent engineering judgement.

  18. Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks

    SciTech Connect

    Dooley, James J.; Dahowski, Robert T.; Davidson, Casie L.

    2009-04-20

    There is growing interest regarding the potential size of a future U.S. dedicated carbon dioxide (CO2) pipeline infrastructure if carbon dioxide capture and storage (CCS) technologies are commercially deployed on a large scale within the United States. This paper assesses the potential scale of the CO2 pipeline system needed under two hypothetical climate policies (so called WRE450 and WRE550 stabilization scenarios) and compares this to the extant U.S. pipeline infrastructures used to deliver CO2 for enhanced oil recovery (EOR), and to move natural gas and liquid hydrocarbons from areas of production and importation to markets. The analysis reveals that between 11,000 and 23,000 additional miles of dedicated CO2 pipeline might be needed in the U.S. before 2050 across these two cases. While that is a significant increase over the 3,900 miles that comprise the existing national CO2 pipeline infrastructure, it is critically important to realize that the demand for additional CO2 pipeline capacity will unfold relatively slowly and in a geographically dispersed manner as new dedicated CCS-enabled power plants and industrial facilities are brought online. During the period 2010-2030, the growth in the CO2 pipeline system is on the order of a few hundred to less than a thousand miles per year. In comparison during the period 1950-2000, the U.S. natural gas pipeline distribution system grew at rates that far exceed these projections in growth in a future dedicated CO2 pipeline system. This analysis indicates that the need to increase the size of the existing dedicated CO2 pipeline system should not be seen as a major obstacle for the commercial deployment of CCS technologies in the U.S. Nevertheless, there will undoubtedly be some associated regulatory and siting issues to work through but these issues should not be unmanageable based on the size of infrastructure requirements alone.

  19. Trends in energy use in commercial buildings -- Sixteen years of EIA's commercial buildings energy consumption survey

    SciTech Connect

    Davis, J.; Swenson, A.

    1998-07-01

    The Commercial Buildings Energy Consumption Survey (CBECS) collects basic statistical information on energy consumption and energy-related characteristics of commercial buildings in the US. The first CBECS was conducted in 1979 and the most recent was completed in 1995. Over that period, the number of commercial bindings and total amount of floorspace increased, total consumption remained flat, and total energy intensity declined. By 1995, there were 4.6 million commercial buildings and 58.8 billion square feet of floorspace. The buildings consumed a total of 5.3 quadrillion Btu (site energy), with a total intensity of 90.5 thousand Btu per square foot per year. Electricity consumption exceeded natural gas consumption (2.6 quadrillion and 1.9 quadrillion Btu, respectively). In 1995, the two major users of energy were space heating (1.7 quadrillion Btu) and lighting (1.2 quadrillion Btu). Over the period 1979 to 1995, natural gas intensity declined from 71.4 thousand to 51.0 thousand Btu per square foot per year. Electricity intensity did not show a similar decline (44.2 thousand Btu per square foot in 1979 and 45.7 thousand Btu per square foot in 1995). Two types of commercial buildings, office buildings and mercantile and service buildings, were the largest consumers of energy in 1995 (2.0 quadrillion Btu, 38% of total consumption). Three building types, health care, food service, and food sales, had significantly higher energy intensities. Buildings constructed since 1970 accounted for half of total consumption and a majority (59%) of total electricity consumption.

  20. Techniques for preventing accidental damage to pipelines

    SciTech Connect

    Lothon, A.; Akel, S.

    1996-12-31

    Following a survey of all of the techniques capable of preventing third-party damage to its gas transmission pipelines, Gaz de France has selected two of them, Electromagnetic Detection and Positioning by Satellite. The first technique is based on detection of the magnetic field existing around transmission pipes excited by a driving current. A receiver is mounted on the excavation equipment to detect the magnetic field, thereby preventing any risk of hitting the pipe. The second technique consists in locating excavators by satellite. Each excavator needs to be equipped with a GPS beacon to know its position. Using the map of the transmission network stored in data-base form, i.e., digitized, the system calculates the position of the excavator relative to the pipes buried in its vicinity so as to avoid any accidental contact. The main features, advantages and drawbacks of the two techniques are presented in this paper.