National Library of Energy BETA

Sample records for master em project

  1. Master EM Project Definition Rating Index - Facility Disposition...

    Office of Environmental Management (EM)

    ... both approved and pending changes, as appropriate. The forecast of cost at completion is a reasonable projection based on the status of the project and the experience to-date. ...

  2. Master EM Project Definition Rating Index - Traditional (Conventional...

    Office of Environmental Management (EM)

    ... both approved and pending changes, as appropriate. The forecast of cost at completion is a reasonable projection based on the status of the project and the experience to-date. ...

  3. Master EM Project Definition Rating Index - Environmental Restoration...

    Office of Environmental Management (EM)

    ... both approved and pending changes, as appropriate. The forecast of cost at completion is a reasonable projection based on the status of the project and the experience to-date. ...

  4. EM Current Project Performance

    Energy.gov [DOE]

    In the spirit of promoting transparency with stakeholders and the public, the Office of Environmental Management (EM) posts key project management information on its website. This document provides...

  5. EM Capital Asset Project List

    Energy.gov [DOE]

    Read the EM Capital Asset Project List, which includes the project's name, site, current critical decision and current total project cost.

  6. EM Contractors for Capital Asset Projects

    Energy.gov [DOE]

    Read the EM Contractors for Capital Asset Projects list, which includes the project name, number, site, and contractor.

  7. EM Projects Perspective

    Energy.gov [DOE]

    Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management March 22, 2016

  8. EM International Collaboration and Cooperation Project Information

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM International Collaboration and Cooperation Project Information [Title of project] [Fiscal Year] Revision [#] [Submittal Date] Collaborators International Collaborator Country: [Proper Sovereign Nation Name] Foreign Organization: [Proper Organization Name] Lead Principal Investigator: [Name] [E-mail] [Phone] US Collaborators EM-HQ Mission Unit: [DAS and OD] EM Field/Project Office: [Site/Project Name] EM-HQ Sponsor: [Name] [Title/Position] [E-mail] [Phone] EM-Field POC: [Name]

  9. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    SciTech Connect

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a result of

  10. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  11. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management EM Projects Perspective - Jack Surash, Deputy ...

  12. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition and Project Management, Environmental Management | Department of Energy EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management Presentation Topics EM Funding Evolution of EM Contracts EM Portfolio Project Success Workshop 2015 -Jack Surash_EM Projects Perspective.pdf (2.14 MB)

  13. FY15 EM International Projects Fact Sheets | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FY15 EM International Projects Fact Sheets FY15 EM International Projects Fact Sheets FY15 EM International Projects fact sheets. Summary of the outcomes and accomplishments of the EM International Projects funded in FY15. FY15 EM International Projects Fact Sheets (6.16 MB) More Documents & Publications FY15 EM International Projects Fact Sheets Using Small Business Administration Financing for Energy Efficiency Upgrades Vehicle Technologies Office Merit Review 2015: Medium and Heavy-Duty

  14. LLNL line-item construction projects Master Site Plan

    SciTech Connect

    1996-04-15

    This interim submittal is an updated 1996 overview of the Master Plan based on the 1995 LLNL Site Development Plan, illustrating the future land use considerations, and the locations of proposed facilities as documented through the line item development process and keyed to the summary table. The following components in addition to the line-item proposals remain key elements in the implementation strategy of the Master Plan: personnel migration, revitalization, space reduction, classified core contraction, utility systems, and environmental restoration.

  15. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Management Quality Assurance EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010 EM Quality Assurance Centralized Training Platform Project...

  16. DOE EM Project Experience & Lessons Learned for In Situ Decommissionin...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013) The purpose of ...

  17. Poneman Joins EM Contract and Project Management Workshop | Department...

    Office of Environmental Management (EM)

    Poneman Joins EM Contract and Project Management Workshop Poneman Joins EM Contract and Project Management Workshop June 7, 2013 - 12:00pm Addthis Deputy Secretary Daniel Poneman ...

  18. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  19. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    SciTech Connect

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

  20. ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 PDF icon Rocky Flats Closure Project-Lessons Learned-August 2006.pdf More Documents & Publications...

  1. Decision tool to optimally select pollution prevention projects within a constrained budget. Master`s thesis

    SciTech Connect

    Hudson, C.

    1995-12-01

    Pollution prevention managers need to select the best environmental projects for an installation within a constrained budget but have no standard way of selecting the optimal mix of projects. This thesis proposes a decision tool to aid decision makers in choosing this optimal mix. The model was built using decision analysis theory which provides a framework to aid the decision maker. Criteria sed in the model for selection was determined using a questionnaire sent to base-level pollution prevention managers. The model ses DPL, a software package designed to build, analyze, and conduct sensitivity analysis of decision problems to perform the quantitative analysis. Built in functions of DPL(TM) allow the decision maker to see the optimal decision policy based on the values entered into the model and to run sensitivity analysis to determine which values are the most critical to the outcome of the model. Decision analysis can be used to create a dominance curve that shows all optimal strategies based on the willingness of the decision maker to make tradeoffs between attributes. This model provides analytical data that can be used to justify decisions made by the pollution prevention manager when selecting the optimal mix of pollution prevention projects for implementation.

  2. CVEN 6960 master's project, investigation of a cooling coil in high humidity conditions. Master's thesis

    SciTech Connect

    Sloop, R.E.

    1993-12-10

    The primary purpose of this project is to validate the HVAC*2 Toolkit calculations for a cooling coil in high humidity conditions. A total of 19 experimental runs at different entering air temperature and humidity conditions were performed at the Joint Center for Energy Management HVAC Laboratory that exposed a cooling coil to temperature and humidity conditions that are typically found in the southern United States. The inlet conditions and manufacturer's coil rating data was used as input to the HVAC*2 Toolkit simple cooling coil subroutine (CCSIM). The predicted results from the toolkit were then compared to the experimental results.

  3. Environmental Management (EM) Cleanup Projects

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  4. Support EM LA Airport Landfill Cover Project by providing 40000...

    Office of Environmental Management (EM)

    Support EM LA Airport Landfill Cover Project by providing 40000 tons of soil Support EM LA Airport Landfill Cover Project by providing 40000 tons of soil DE-DT0010454-Task-Order-4 ...

  5. Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy ITR Landfill Assessment Project Lessons Learned Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned By: Craig H. Benson, PhD, PE Where: EM SSAB Teleconference: 1 Briefing provides lessons learned from the DOE EM ITR Landfill Assessment Project. EM SSAB ITR Landfill Assessment Project Lessons Learned Presentation - July 2009 (777.4 KB) More Documents & Publications Disposal Practices at the Nevada Test Site 2008 Operational Issues at the Environmental

  6. EM Employees Engage in Interactive Workshop on Contract, Project...

    Office of Environmental Management (EM)

    Employees Engage in Interactive Workshop on Contract, Project Management Improvements EM Employees Engage in Interactive Workshop on Contract, Project Management Improvements June ...

  7. ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 | Department of Energy

    Energy Saver

    AUG 2006 ROCKY FLATS CLOSURE PROJECT EM, AUG 2006 PDF icon Rocky Flats Closure Project-Lessons Learned-August 2006.pdf More Documents & Publications Rocky Flats Overview...

  8. West Valley Demonstration Project - 2016 EM Success Story | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy - 2016 EM Success Story West Valley Demonstration Project - 2016 EM Success Story Presentation from the 2016 DOE National Cleanup Workshop by Jeff Bradford, President and General Manager, CH2M HILL BWXT West Valley, LLC. West Valley Demonstration Project - 2016 EM Success Story (1.75 MB) More Documents & Publications Probabilistic Modeling and Phase 2 Decision Making at the West Valley Demonstration Project and the Western New York Nuclear Service Center The Path to Success Beyond

  9. Recovery Act Investment Moves EM Past Milestone of 100 Project...

    Office of Environmental Management (EM)

    in place quickly to accomplish the Recovery Act Program goals." Recovery Act Investment Moves EM Past Milestone of 100 Project Completions Below: Recovery Act workers...

  10. Memo Issuance of EM Capital and Major Operating Project Standard...

    Office of Environmental Management (EM)

    and Project Management for the Acquisition of Capital Asset, DOE-STD-1189-2008, Integration of Safety into the Design Process, and EM'S internal business majlagement practices. ...

  11. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel. PDF icon EM Quality ...

  12. EM International Project Submission Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Submission Template EM International Project Submission Template The template below is used for International Project Submission. Project Submission Template (392.48 KB) More Documents & Publications DOE Source Evaluation Board (SEB) Document Templates Interagency Agreement for U.S. Department of Energy Project Facilitator Support Form FEMP Services Interagency Agreement for DOE ESPC Support

  13. EM Focuses on Contract, Project Management Improvements in Three-Day Workshop

    Energy.gov [DOE]

    ORLANDO, Fla. – EM held a three-day workshop in Orlando this month focusing on strategies to improve contract and project management across the EM complex.

  14. Washoe Wisk'e'em Project

    SciTech Connect

    Tara Hess-McGeown

    2012-03-26

    The Washoe Tribe Wiskem Project (Project) was a Congressionally Directed Project identified for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2010. The Project focused on installing up to four small vertical wind turbines at designated locations on Tribal lands to offset energy costs for the Tribe. The Washoe Tribe will use and analyze data collected from the wind turbines to better understand the wind resource.

  15. EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, D.C. – EM officials wrote a chapter of a recently published book, Managing Nuclear Projects – A Comprehensive Management Resource, which covers a range of areas with emphasis on process, requirements and lessons learned. Authors from France, Germany, Argentina, Belgium, Finland, Austria, and the U.S. contributed to the book.

  16. EM's Award-Winning Projects Save More Than $10 Million, Advance...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Award-Winning Projects Save More Than 10 Million, Advance Sustainability at Department of Energy EM's Award-Winning Projects Save More Than 10 Million, Advance Sustainability at ...

  17. Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 4: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs The ORSSAB recommends DOE Quarterly Project Reviews Be Shared with the EM SSABs. Recommendation 174 (324.16 KB) DOE response to recommendation 174 (122.81 KB) More Documents & Publications Recommendation 179: DOE Quarterly Project Reviews Recommendation 173: Recommendation to Support Establishment and Continuation of the Office of

  18. IDC Integrated Master Plan.

    SciTech Connect

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  19. EM's New Project of the Month Focuses on Tribes' Work with Native...

    Office of Environmental Management (EM)

    WASHINGTON, D.C. - EM is highlighting important work by the Confederated Tribes of the Umatilla Indian Reservation in a new Project of the Month on EM's public Web site, ...

  20. Compressed Air System Retrofitting Project Improves Productivity at a Foundry (Cast Masters, Bowling Green, OH)

    SciTech Connect

    2002-06-01

    This case study highlights International Truck and Engine Corporation's optimization project on the compressed air system that serves its foundry, Indianapolis Casting Corporation. Due to the project's implementation, the system's efficiency was greatly improved, allowing the foundry to operate with less compressor capacity, which resulted in reduced energy consumption, significant maintenance savings, and more reliable production.

  1. Directors Advance EM Mission with Help from Rigorous Project Management Program

    Energy.gov [DOE]

    WASHINGTON, D.C. – Nearly 160 EM employees maintain certifications from a project management program that helps them achieve successful outcomes in the Cold War cleanup.

  2. Project PETROL RAM: improving the management of Air Force fuels operations and inventories. Master's thesis

    SciTech Connect

    Frederick, P.R.

    1988-09-01

    The purpose of this research was to provide a handbook on Project PETROL RAM and its ideas for enhancing the base-level fuels operations. This handbook is to serve as an introduction and reference guide to the components, characteristics, and capabilities of the proposed initiative. In preparing this handbook, available information on the structure, operations, and procedures of a typical base Fuels Management Branch was gathered, then condensed and simplified. For added depth and understanding, personal interviews with personnel involved in the design and development of this project were conducted. The research resulted in a handbook that describes, in simplified terminology, the different systems which are being developed under the Project PETROL RAM initiative.

  3. Deep-Angled Drilling Enables EM Chromium Project to Meet Goals | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Deep-Angled Drilling Enables EM Chromium Project to Meet Goals Deep-Angled Drilling Enables EM Chromium Project to Meet Goals August 31, 2016 - 12:25pm Addthis Angled drilling at an injection well at the project site. Angled drilling at an injection well at the project site. LOS ALAMOS, N.M. - EM's Los Alamos Field Office is working to stop a contaminant plume in a regional aquifer from migrating beyond Los Alamos National Laboratory's boundary. The Los Alamos Field Office and its

  4. EM Employees Engage in Interactive Workshop on Contract, Project Management

    Energy Saver

    Services » Program Management » Quality Assurance » EM Commercial Grade Dedication Class Slides EM Commercial Grade Dedication Class Slides PowerPoint presentation used in the EM sponsored commercial grade dedication (CGD) class. This class is designed to provide an understanding of the process for CGD. EM Commercial Grade Dedication Class Slides (1.45 MB) More Documents & Publications NQA-1 Commercial Grade Dedication Critical Characteristics Commercial Grade Dedication Survey and

  5. The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-02-11

    The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

  6. DOE EM Project Experience & Lessons Learned for In Situ Decommissioning (Feb. 2013)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of the "DOE EM Project Experience & Lessons Learned for In Situ Decommissioning" report is to capture the considerable technical experience gained to date for implementation of In...

  7. EM's Award-Winning Projects Save More Than $10 Million, Advance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sustainability at Department of Energy | Department of Energy EM's Award-Winning Projects Save More Than $10 Million, Advance Sustainability at Department of Energy EM's Award-Winning Projects Save More Than $10 Million, Advance Sustainability at Department of Energy March 24, 2015 - 10:00am Addthis The SRS Non-Destructive Radionuclide Assay Team, from left, include Steve Mackmull (now retired), DOE-Savannah River; Todd Shepley, Canberra; and Lee Fox and Steve Mentrup, SRNS. Not pictured:

  8. Support EM LA Airport Landfill Cover Project by providing 40000 tons of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    soil | Department of Energy Support EM LA Airport Landfill Cover Project by providing 40000 tons of soil Support EM LA Airport Landfill Cover Project by providing 40000 tons of soil DE-DT0010454-Task-Order-4 Airport Landfill Construction Activities The purpose of this task order (TO) is to support the EM-LA Field Office in replacing the cover at the Los Alamos County Airport Landfill. The new cover design is an evapotranspiration (ET) cover. Contractor: TSAY Corporation DOE Contracting

  9. Memo Issuance of EM Capital and Major Operating Project Standard Review Plan Edition Two

    Office of Environmental Management (EM)

    MAR 2 4 201011 MEMORANDUM FOR DISTRIBUTION FROM: DR. STEVEN L. KRAHN DEPUTY ASSISTANT SAFETY AND SECU EIVVIROIVMENTAL MANAGEMENT SUBJECT: Issuance of Environmental Management Capital and Major Operating Project Standard Review Plan Edition Two The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission critical projects/facilities. Effective management of these projects requires multiple disciplines to be

  10. Maybell Archived Soil & Groundwater Master Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Maybell Archived Soil & Groundwater Master Reports Maybell Archived Soil & Groundwater Master Reports Maybell Archived Soil & Groundwater Master Reports Maybell - Maybell (38.14 KB) Maybell - UMTRCA Title 1 Disposal Site (44.03 KB) More Documents & Publications Miscellaneous Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Ashtabula Archived Soil & Groundwater Master Reports

  11. Fernald Environmental Management Project Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald ...

  12. Miamisburg Environmental Management Project Archived Soil & Groundwate...

    Office of Environmental Management (EM)

    Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports ...

  13. Recovery Act Investment Moves EM Past Milestone of 100 Project...

    Office of Environmental Management (EM)

    Workers Complete Y-12's Largest Recovery Act Project Ahead of Schedule Recovery Act Changes Hanford Skyline with Explosive Demolitions Recovery Act Funds are Helping Oak Ridge's ...

  14. (SSS)EM Current Project Performance_Sep.xls

    Office of Environmental Management (EM)

    Project Name Current Critical Decision Original Approved Cost Original Completion Date Rebaselines Rebaselined Project Cost Rebaselined Completion Date Site RL-0011.C1 Plutonium Finishing Plant (PFP) Decontamination and Dismantlement - ARRA Base CD-3 $330,200,000 9/30/2011 2 $352,000,000 11/30/2017 Hanford Site RL-0041.C1 Nuclear Facility D&D - River Corridor Closure Project CD-3 $2,251,500,000 9/30/2019 0 Hanford Site 15-D-401 KW Basin Sludge Removal Project CD3 $311,000,000 11/30/2019

  15. Status Report: EM Acquisition and Project Management Review

    Office of Environmental Management (EM)

    Report: Acquisition and Project Management Review August 15, 2006 Submitted ... Management Advisory Board is in the process of ... Terri Lamb, Executive Director of EMAB, forwarded ...

  16. EM Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site

    Energy.gov [DOE]

    IDAHO FALLS, Idaho – EM and its main cleanup contractor at DOE’s Idaho Site recently reached a major project milestone necessary to maintain water quality and continued, safe operations within the site’s spent nuclear fuel storage basin.

  17. 2015-09-25 EM Current Project Performance.xls

    Office of Environmental Management (EM)

    Date Rebaselines Rebaselined Project Cost Rebaselined Completion Date Site 05-D-405 Salt Waste Processing Facility (SWPF) CD-3 900,000,000 11302013 2 2,322,000,000 131...

  18. Clean-coal technology by-products used in a highway embankment stabilization demonstration project. Master's thesis

    SciTech Connect

    Nodjomian, S.M.

    1994-01-01

    Clean-coal technology by-products are used in a highway embankment demonstration project. This research chronicles the procedures used in the process and analyzes the stability of a repaired highway embankment. The reconstructed slope is analyzed using an Intelligent Discussion Support System that was developed from a slope stability program. Water quality studies are performed and an instrumentation plan is suggested. The calculated factors of safety and the observed embankment performance give indications that the field demonstration project was a success. Long-term monitoring will be the best barometer for determining embankment gross movement and the future of FGD by-products as a stabilizing material.

  19. Archived Soil & Groundwater Master Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Archived Soil & Groundwater Master Reports Archived Soil & Groundwater Master Reports Archived Soil & Groundwater Master Reports Amchitka Ashtabula Fernald Environmental Management Project Maybell Miamisburg Environmental Management Project Rocky Flats Environmental Technology Site Shiprock Slick Rock South Valley Spook Tuba City Weldon Spring Miscellaneous

  20. Constructing Predictive Estimates for Worker Exposure to Radioactivity During Decommissioning: Analysis of Completed Decommissioning Projects - Master Thesis

    SciTech Connect

    Dettmers, Dana Lee; Eide, Steven Arvid

    2002-10-01

    An analysis of completed decommissioning projects is used to construct predictive estimates for worker exposure to radioactivity during decommissioning activities. The preferred organizational method for the completed decommissioning project data is to divide the data by type of facility, whether decommissioning was performed on part of the facility or the complete facility, and the level of radiation within the facility prior to decommissioning (low, medium, or high). Additional data analysis shows that there is not a downward trend in worker exposure data over time. Also, the use of a standard estimate for worker exposure to radioactivity may be a best estimate for low complete storage, high partial storage, and medium reactor facilities; a conservative estimate for some low level of facility radiation facilities (reactor complete, research complete, pits/ponds, other), medium partial process facilities, and high complete research facilities; and an underestimate for the remaining facilities. Limited data are available to compare different decommissioning alternatives, so the available data are reported and no conclusions can been drawn. It is recommended that all DOE sites and the NRC use a similar method to document worker hours, worker exposure to radiation (person-rem), and standard industrial accidents, injuries, and deaths for all completed decommissioning activities.

  1. Report: Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    U.S. Department of Energy REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Removal of EM Projects from the GAO High Risk List: Strategies for Improving the Effectiveness of Project and Contract Management in the Office of Environmental Management Submitted by the EMAB Acquisition and Project Management Subcommittee December 5, 2011 Introduction: This report provides a comprehensive summary of the work performed by the Acquisition and Project Management Subcommittee (APMS) of the

  2. Master Renovables | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Master Renovables Jump to: navigation, search Name: Master Renovables Place: Barcelona, Egypt Zip: 8020 Sector: Solar Product: Master Renovables brings solar energy solutions and...

  3. IDC Integrated Master Plan. (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS...

  4. IDC Integrated Master Plan. Clifford, David J.; Harris, James...

    Office of Scientific and Technical Information (OSTI)

    IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS...

  5. EM SSAB ITR Landfill Assessment Project Lessons Learned Presentation - July 2009

    Office of Environmental Management (EM)

    May 7, 2009 EM SSAB Conference Calls - May 7, 2009 Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program, Chairs' Meeting, and Around the Complex updates and Closing Remarks. EM SSAB Conference Call - May 7, 2009 (67.38 KB) More Documents & Publications EM SSAB Conference Calls - July 9, 2009 EM SSAB Conference Calls - January 22, 2009 EM SSAB

  6. 2010-03 "Sufficient Funding of LANL EM Projects and the Consent Order" |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 3 "Sufficient Funding of LANL EM Projects and the Consent Order" 2010-03 "Sufficient Funding of LANL EM Projects and the Consent Order" Additional funding will demonstrate the intent of the Headquarters/DOE to live up to its agreement made in the 2005 Order on Consent. It also should mitigate the need for NMED to fine LANL for not meeting specific deadlines, thus using mission critical funding in ways that will meet the schedule and saving the

  7. Master-slave micromanipulator method

    DOEpatents

    Morimoto, Alan K.; Kozlowski, David M.; Charles, Steven T.; Spalding, James A.

    1999-01-01

    A method based on precision X-Y stages that are stacked. Attached to arms projecting from each X-Y stage are a set of two axis gimbals. Attached to the gimbals is a rod, which provides motion along the axis of the rod and rotation around its axis. A dual-planar apparatus that provides six degrees of freedom of motion precise to within microns of motion. Precision linear stages along with precision linear motors, encoders, and controls provide a robotics system. The motors can be remotized by incorporating a set of bellows on the motors and can be connected through a computer controller that will allow one to be a master and the other one to be a slave. Position information from the master can be used to control the slave. Forces of interaction of the slave with its environment can be reflected back to the motor control of the master to provide a sense of force sensed by the slave. Forces import onto the master by the operator can be fed back into the control of the slave to reduce the forces required to move it.

  8. Master-slave micromanipulator apparatus

    DOEpatents

    Morimoto, Alan K.; Kozlowski, David M.; Charles, Steven T.; Spalding, James A.

    1999-01-01

    An apparatus based on precision X-Y stages that are stacked. Attached to arms projecting from each X-Y stage are a set of two axis gimbals. Attached to the gimbals is a rod, which provides motion along the axis of the rod and rotation around its axis. A dual-planar apparatus that provides six degrees of freedom of motion precise to within microns of motion. Precision linear stages along with precision linear motors, encoders, and controls provide a robotics system. The motors can be positioned in a remote location by incorporating a set of bellows on the motors and can be connected through a computer controller that will allow one to be a master and the other one to be a slave. Position information from the master can be used to control the slave. Forces of interaction of the slave with its environment can be reflected back to the motor control of the master to provide a sense of force sensed by the slave. Forces import onto the master by the operator can be fed back into the control of the slave to reduce the forces required to move it.

  9. Master-slave micromanipulator apparatus

    DOEpatents

    Morimoto, A.K.; Kozlowski, D.M.; Charles, S.T.; Spalding, J.A.

    1999-08-31

    An apparatus is disclosed based on precision X-Y stages that are stacked. Attached to arms projecting from each X-Y stage are a set of two axis gimbals. Attached to the gimbals is a rod, which provides motion along the axis of the rod and rotation around its axis. A dual-planar apparatus that provides six degrees of freedom of motion precise to within microns of motion. Precision linear stages along with precision linear motors, encoders, and controls provide a robotics system. The motors can be positioned in a remote location by incorporating a set of bellows on the motors and can be connected through a computer controller that will allow one to be a master and the other one to be a slave. Position information from the master can be used to control the slave. Forces of interaction of the slave with its environment can be reflected back to the motor control of the master to provide a sense of force sensed by the slave. Forces import onto the master by the operator can be fed back into the control of the slave to reduce the forces required to move it. 12 figs.

  10. Shiprock Archived Soil & Groundwater Master Reports | Department...

    Office of Environmental Management (EM)

    Shiprock Archived Soil & Groundwater Master Reports Shiprock Archived Soil & Groundwater Master Reports Shiprock Archived Soil & Groundwater Master Reports Shiprock - Shiprock ...

  11. Acronym master list

    SciTech Connect

    1995-06-01

    This document is a master list of acronyms and other abbreviations that are used by or could be useful to, the personnel at Los Alamos National Laboratory. Many specialized and well-known abbreviations are not included in this list.

  12. Mastering the Metabolic Mix

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Mastering the Metabolic Mix 1663 Los Alamos science and technology magazine Latest Issue:July 2016 past issues All Issues » submit Mastering the Metabolic Mix Through the discovery of natural tricks and the invention of new tactics, scientists are harnessing the power of RNA to manipulate gene expression in bacteria. March 8, 2016 Cliff Unkefer, Karissa Sanbonmatsu, and Scott Hennelly Los Alamos scientists Cliff Unkefer, Karissa Sanbonmatsu, and Scott Hennelly lead a larger team that is

  13. Project Management Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance ...

  14. ELECTRONIC MASTER SLAVE MANIPULATOR

    DOEpatents

    Goertz, R.C.; Thompson, Wm.M.; Olsen, R.A.

    1958-08-01

    A remote control manipulator is described in which the master and slave arms are electrically connected to produce the desired motions. A response signal is provided in the master unit in order that the operator may sense a feel of the object and may not thereby exert such pressures that would ordinarily damage delicate objects. This apparatus will permit the manipulation of objects at a great distance, that may be viewed over a closed TV circuit, thereby permitting a remote operator to carry out operations in an extremely dangerous area with complete safety.

  15. Spook Archived Soil & Groundwater Master Reports | Department...

    Office of Environmental Management (EM)

    Spook Archived Soil & Groundwater Master Reports Spook Archived Soil & Groundwater Master Reports Spook Archived Soil & Groundwater Master Reports Spook - Spook (17.91 KB) More ...

  16. MotorMaster+

    Energy.gov [DOE]

    MotorMaster+ is a free online National Electrical Manufacturers Association (NEMA) Premium® efficiency motor selection and management tool that supports motor and motor systems planning by identifying the most efficient action for a given repair or motor purchase decision. The tool includes a catalog of more than 20,000 low-voltage induction motors, and features motor inventory management tools, maintenance log tracking, efficiency analysis, savings evaluation, energy accounting, and environmental reporting capabilities.

  17. MotorMaster+ Tool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    MotorMaster+ Tool MotorMaster+ Tool This presentation discusses industrial motor systems and introduces the MotorMaster+ Tool Suite. MotorMaster+ Tool Presentation (March 19, 2009) ...

  18. EM Capital and Major Operating Project Standard Review Plan Edition Two

    Office of Energy Efficiency and Renewable Energy (EERE)

    This memorandum introduces the Second Edition of the Capital and Major Operations Projects Standard Review Plan (SRP).

  19. Master's Fellowship Program (MFP): Sandia's Master's Fellowship Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Master's Fellowship Program (MFP): Sandia's Master's Fellowship Program (MFP) is a special, entry-level hiring program, which provides new or recent technical bachelor's degree candidates the opportunity to pursue a fully funded Masters of Science degree. The MFP program supports Sandia's strategic staffing needs to meet our important national security mission. In addition, the program supports achievement of a more diverse technical workforce at Sandia through the Laboratories' Affirmative

  20. One of EM's Last Recovery Act Projects at Oak Ridge Improves...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    arriving at a safer, cleaner campus to conduct their advanced research." The project's main objective was to deactivate a ventilation branch connected to ORNL's central gaseous...

  1. TWRS privatization phase 1 master site plan

    SciTech Connect

    Parazin, R.J.

    1996-09-30

    The DOE-RL is pursuing a new business strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called `privatization` and includes design, permitting, construction, operation and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project consists of several sub-projects which will provide key services needed to support the privatization mission. This master site plan presently describes all pertinent aspects of the site and identifies all planned provisions for site development, utilities and other site services. It is a baseline document which will be revised as privatization proceeds through design, construction and start-up.

  2. FY-2014 EM-EFCOG QA Project Plan_Final.pdf

    Office of Environmental Management (EM)

    3 Excess Elimination Report FY 2013 Excess Elimination Report Signed_FY2013_Excess_Elimination_Rpt.pdf (822.55 KB) More Documents & Publications FY 2014 Excess Elimination Report FINAL UCOR Contract & Fee Determination East Tennessee Technology Park overview

    Metrics and Targets | Department of Energy

    3 Overall Contract and Project Management Improvement Performance Metrics and Targets FY 2013 Overall Contract and Project Management Improvement Performance Metrics and

  3. Report: Removal of EM Projects from the GAO High Risk List

    Office of Environmental Management (EM)

    Report: IG-0449 Report: IG-0449 July 19, 1999 The Office of Defense Programs Robotics and Intelligent Machines Projects Robotics and Intelligent Machines (RIM) are systems composed of machines, sensors, computers, and software capable of executing various tasks with minimal human intervention. They have wide range application for solving many operational challenges including nuclear waste cleanup and weapons manufacturing and dismantlement. RIM accelerates cleanup and reduces the amount of

  4. EM News Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Principal Deputy Assistant Secretary Tracy Mustin and EM Consolidated Business Center Director Jack Craig visited the Moab Project sites in Utah on March 12. March 12, 2013...

  5. EM Leaders Visit Employees at Moab Site

    Energy.gov [DOE]

    EM Principal Deputy Assistant Secretary Tracy Mustin and EM Consolidated Business Center Director Jack Craig visited the Moab Project sites in Utah on March 12.

  6. EM International. Volume 1

    SciTech Connect

    Not Available

    1993-07-01

    It is the intent of EM International to describe the Office of Environmental Restoration and Waste Management`s (EM`s) various roles and responsibilities within the international community. Cooperative agreements and programs, descriptions of projects and technologies, and synopses of visits to international sites are all highlighted in this semiannual journal. Focus on EM programs in this issue is on international collaboration in vitrification projects. Technology highlights covers: in situ sealing for contaminated sites; and remote sensors for toxic pollutants. Section on profiles of countries includes: Arctic contamination by the former Soviet Union, and EM activities with Germany--cooperative arrangements.

  7. Steven T. McMaster

    Energy.gov [DOE]

    Mr. McMaster joined the DOE Office of Technology Transitions in March 2015. Prior to then he had been the director of Technology Deployment at the Idaho National Laboratory (INL) since 2010. At INL...

  8. Master Safeguards and Security Agreements

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1988-02-03

    To establish the Department of Energy policy, requirements, responsibilities, and authorities for the development and implementation of Master Safeguards and Security Agreements (MSSA's). Does not cancel another directive. Canceled by DOE O 5630.13A

  9. Dual arm master controller concept

    SciTech Connect

    Kuban, D.P.; Perkins, G.S.

    1984-01-01

    The Advanced Servomanipulator (ASM) slave was designed with an anthropomorphic stance, gear/torque tube power drives, and modular construction. These features resulted in increased inertia, friction, and backlash relative to tape-driven manipulators. Studies were performed which addressed the human factors design and performance trade-offs associated with the corresponding master controller best suited for the ASM. The results of these studies, as well as the conceptual design of the dual arm master controller, are presented. 6 references, 3 figures.

  10. Chapter 19: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures: September 2011 … December 2014

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures Created as part of subcontract with period of performance September 2011 - December 2014 Jeff Romberger SBW Consulting, Inc. Bellevue, Washington NREL Technical Monitor: Charles Kurnik Subcontract Report NREL/SR-7A40-63167 November 2014 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable

  11. EM-20 ISD Report

    Office of Environmental Management (EM)

    Project Experience & Lessons Learned for In Situ Decommissioning Prepared By U.S. Department of Energy Office of Environmental Management Office of D&D and FE, EM-13 This page is deliberately blank. DOE EM Project Experience for In Situ Decommissioning i Contents Acronyms .................................................................................................................................................... vii 1. Introduction

  12. Implementation plan for HANDI 2000 TWRS master equipment list

    SciTech Connect

    BENNION, S.I.

    1999-03-25

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  13. Microsoft PowerPoint - EM SSAB Chairs Webinar - (2) Huizenga EM Program Update for SSAB Chairs.042513

    Office of Environmental Management (EM)

    Chairs' Webinar www.energy.gov/EM 1 David Huizenga Senior Advisor for the Office of Environmental Management April 25, 2013 Click to edit Master title style Environmental Cleanup-a Key DOE Strategic Goal EM's mission is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. EM supports DOE Strategic Goal #3: Click to edit Master subtitle style www.energy.gov/EM 2 EM supports DOE

  14. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review

    Energy.gov [DOE]

    This EVMS Training Snippet, sponsored by the Office of Project Management (PM) covers how to review an Integrated Master Schedule (IMS) and highlights common areas of non-compliance with ANSI/EIA...

  15. Weldon Spring Site Archived Soil & Groundwater Master Reports...

    Office of Environmental Management (EM)

    Weldon Spring Site Archived Soil & Groundwater Master Reports Weldon Spring Site Archived Soil & Groundwater Master Reports Weldon Spring Site Archived Soil & Groundwater Master ...

  16. Tuba City Archived Soil & Groundwater Master Reports | Department...

    Office of Environmental Management (EM)

    Tuba City Archived Soil & Groundwater Master Reports Tuba City Archived Soil & Groundwater Master Reports Tuba City Archived Soil & Groundwater Master Reports Tuba City - Tuba City ...

  17. Slick Rock Archived Soil & Groundwater Master Reports | Department...

    Office of Environmental Management (EM)

    Slick Rock Archived Soil & Groundwater Master Reports Slick Rock Archived Soil & Groundwater Master Reports Slick Rock Archived Soil & Groundwater Master Reports Slick Rock - Old ...

  18. Project Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM CAPITAL PORTFOLIO EM is tasked with solving the large scale, technically challenging ... to more effectively manage the cost and schedule performance of capital asset projects. ...

  19. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    SciTech Connect

    Not Available

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  20. EM News Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of workers who produced plutonium for the Manhattan Project, World War II, and Cold War. September 4, 2014 EM Acquisition and Project Management Deputy Assistant Secretary...

  1. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  2. Headquarters Facilities Master Security Plan - Chapter 9, Technical...

    Energy Saver

    Headquarters Facilities Master Security Plan - Chapter 9, Technical Surveillance Countermeasures 2016 Headquarters Facilities Master Security Plan - Chapter 9, Technical ...

  3. Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

    SciTech Connect

    Makarov, Yuri V.; Huang, Zhenyu; Etingov, Pavel V.; Ma, Jian; Guttromson, Ross T.; Subbarao, Krishnappa; Chakrabarti, Bhujanga B.

    2010-01-01

    unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

  4. MASTER

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    /)Bcc{-'^y^^ REPORT ON CONTRACT NO. A T ( l l - l ) - 1 0 1 1/ITH THE U . S . ATOMC ENERGY COH'ilSSION ENTnLED "RESEARCH ON THE NATURAL ABUNDANCE OF DEUTERIUl-i AND OTHER ISOTOPES IN NATURItl" by Harold 0. Urey. This contract came to an ehd on September 30, 19$8. The reports that have been submitted from time to time have given a review of the progress from year to year, and, so far as this final report is concerned, nothing new can really be added except to say that a very great deal

  5. Project Definition Rating Index (PDRI)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for...

  6. DOE Recognizes EM Richland Operations Office Employees for Excellence...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... construction with Waste Treatment and Immobilization Project Assistant Manager Bill Hamel, left; EM Acting Assistant Secretary Mark Whitney, second from left; and EM Waste ...

  7. 2012 Annual Planning Summary for EM Energy Technology Engineering...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Energy Technology Engineering Center 2012 Annual Planning Summary for EM Energy Technology Engineering Center The ongoing and projected Environmental Assessments and ...

  8. Headquarters Facilities Master Security Plan | Department of...

    Energy.gov [DOE] (indexed site)

    Welcome to the 2016 version of the Headquarters Facilities Master Security Plan (HQFMSP). ... This plan explains how these requirements are implemented at HQ and gives HQ personnel and ...

  9. IACT-funded Master and Doctoral Theses

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    & Presentations Jobs at IACT Energy Frontier Research Centers at Argonne Strategic Alliances Research Facilities & Tools IACT-funded Master and Doctoral Theses 2013 2013...

  10. MotorMaster+ Fact Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fact Sheet MotorMaster+ Fact Sheet Fact sheet describing how industrial plants can improve their motor system performance using AMO's MotorMaster+ software tool. Fact Sheet (1.24 MB) More Documents & Publications MotorMaster+ Software Tool Brochure MotorMaster+ International Fact Sheet MotorMaster+ User Manual

  11. MotorMaster+ User Manual | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    User Manual MotorMaster+ User Manual This user manual is designed to help users understand the MotorMaster+ software tool. MotorMaster+ User Manual (1.92 MB) More Documents & Publications MotorMaster+ International Fact Sheet Replacing an Oversized and Underloaded Electric Motor MotorMaster+ Software Tool Brochure

  12. SOPP-43, EM-23 Quality Assurance Oversight

    Office of Energy Efficiency and Renewable Energy (EERE)

    Procedure to describe the process that will be utilized by the EM Office of Standards and Quality Assurance to guide its activities related to oversight and audit of the EM Field/site, project, and...

  13. Master equipment list -- Phase 1. Revision 1

    SciTech Connect

    Jech, J.B.

    1995-04-28

    The purpose of this document is to define the system requirements for the Master Equipment List (MEL) Phase 1 project. The intended audience for this document includes Data Automation Engineering (DAE), Configuration Management Improvement and Control Engineering (CMI and CE), Data Administration Council (DAC), and Tank Waste Remedial System (TWRS) personnel. The intent of Phase 1 is to develop a user-friendly system to support the immediate needs of the TWRS labeling program. Phase 1 will provide CMI and CE the ability to administrate, distribute, and maintain key information generated by the labeling program. CMI and CE is assigning new Equipment Identification Numbers (EINs) to selected equipment in Tank Farms per the TWRS Data Standard ``Tank Farm Equipment Identification Number``. The MEL Phase 1 system will be a multi-user system available through the HLAN network. It will provide basic functions such as view, query, and report, edit, data entry, password access control, administration and change control. The scope of Phase 1 data will encompass all Tank Farm Equipment identified by the labeling program. The data will consist of fields from the labeling program`s working database, relational key references and pointers, safety class information, and field verification data.

  14. EM's National TRU Program and WIPP Recovery

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM's National TRU Program and WIPP Recovery Frank Marcinowski, Associate Principal Deputy Assistant Secretary for Regulatory & Policy Affairs for National Cleanup Workshop September 15, 2016 www.energy.gov/EM 2 Today's DOE Panel Participants DOE Field Office Managers: * Todd Shrader, Manager, Carlsbad Field Office, DOE-EM * Doug Hintze, Manager, Los Alamos Field Office, DOE-EM * Jack Zimmerman, Deputy Manager for the Idaho Cleanup Project, Idaho Operations Office, DOE www.energy.gov/EM 3

  15. (SSS)Project Dashboard 2015-12-21 1000.xls

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment 1 EM Bechtel National Inc. 01-D-416 Waste Treatment and ...

  16. Headquarters Facilities Master Security Plan - Chapter 16, Equivalenci...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions June...

  17. Headquarters Facilities Master Security Plan - Chapter 5, Classified...

    Energy Saver

    Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter ...

  18. Headquarters Facilities Master Security Plan - Chapter 2, Limited...

    Energy Saver

    Headquarters Facilities Master Security Plan - Chapter 2, Limited Areas, Vault-Type Rooms and Temporary Limited Areas 2016 Headquarters Facilities Master Security Plan - Chapter 2, ...

  19. Headquarters Facilities Master Security Plan - Chapter 14, Cyber...

    Energy Saver

    Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security 2016 Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security HQ cyber security ...

  20. Headquarters Facilities Master Security Plan - Chapter 12, Special...

    Energy Saver

    Headquarters Facilities Master Security Plan - Chapter 12, Special Access Programs 2016 Headquarters Facilities Master Security Plan - Chapter 12, Special Access Programs This very ...

  1. Headquarters Facilities Master Security Plan - Chapter 15, Outprocessi...

    Energy Saver

    Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing 2016 Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing This chapter describes the ...

  2. Headquarters Facilities Master Security Plan - Chapter 8, Operations...

    Energy Saver

    Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program 2016 Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program This ...

  3. South Valley Archived Soil & Groundwater Master Reports | Department...

    Energy.gov [DOE] (indexed site)

    South Valley Archived Soil & Groundwater Master Reports South Valley - South Valley Plume (16.5 KB) More Documents & Publications Slick Rock Archived Soil & Groundwater Master ...

  4. Headquarters Facilities Master Security Plan - Chapter 5, Classified...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter...

  5. Headquarters Facilities Master Security Plan - Chapter 16, Equivalenci...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6, Equivalencies and Exemptions Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions June 2015 2015 Headquarters Facilities Master Security Plan...

  6. Mastering Campus Energy and Water Management: Tools for Success...

    Office of Environmental Management (EM)

    Mastering Campus Energy and Water Management: Tools for Success Presentations and Materials Mastering Campus Energy and Water Management: Tools for Success Presentations and ...

  7. Mastering Campus Energy and Water Management - Tools for Success...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mastering Campus Energy and Water Management - Tools for Success (Providence, RI) Mastering Campus Energy and Water Management - Tools for Success (Providence, RI) August 8, 2016 ...

  8. Headquarters Facilities Master Security Plan - Chapter 7, Surveys...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7, Surveys and Reviews Headquarters Facilities Master Security Plan - Chapter 7, Surveys and Reviews 2016 Headquarters Facilities Master Security Plan - Chapter 7, Surveys and ...

  9. Second Line of Defense Master Spares Catalog

    SciTech Connect

    Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

    2012-11-20

    This catalog is intended to be a comprehensive listing of repair parts, components, kits, and consumable items used on the equipment deployed at SLD sites worldwide. The catalog covers detection, CAS, network, ancillary equipment, and tools. The catalog is backed by a Master Parts Database which is used to generate the standard report views of the catalog. The master parts database is a relational database containing a record for every part in the master parts catalog along with supporting tables for normalizing fields in the records. The database also includes supporting queries, database maintenance forms, and reports.

  10. 2014 Annual Planning Summary for the EM Consolidated Business Center

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the EM Consolidated Business Center.

  11. Professional Association Honors EM Employee with Technical Excellence Award

    Office of Energy Efficiency and Renewable Energy (EERE)

    An association with expertise in project cost and schedule management honored an EM employee with its Technical Excellence Award.

  12. 2012 Annual Planning Summary for EM Energy Technology Engineering Center

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within EM Energy Technology Engineering Center.

  13. EM Assistant Secretary Monica Regalbuto Views SPRU Demolition Progress |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Assistant Secretary Monica Regalbuto Views SPRU Demolition Progress EM Assistant Secretary Monica Regalbuto Views SPRU Demolition Progress October 31, 2016 - 12:45pm Addthis EM Assistant Secretary Monica Regalbuto, third from left, toured the SPRU demolition project with, left to right, DOE SPRU Project Controls Lori Erbele; DOE SPRU Federal Project Director Steve Feinberg; AECOM Project Manager Jeff Selvey; EM Consolidated Business Center Director Ralph Holland; EM

  14. Projecting

    Energy Information Administration (EIA) (indexed site)

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS infrastructure development Matthew Tanner Office of Petroleum, Gas, & Biofuels Analysis U.S. Energy Information Administration October 25, 2010 This paper is released to encourage discussion and critical comment. The analysis and conclusions ex- pressed here are those of the author and not necessarily those of the U.S. Energy Information Administration. Author: Matthew Tanner, matthew.tanner@eia.gov

  15. Microsoft PowerPoint - Cochran - EM-10 Presentation - EMAB Meeting...

    Office of Environmental Management (EM)

    project management principles for DOE * DOE senior leadership commitment www.em.doe.gov - Continuous improvement of project management - Removing all DOE organizations from the...

  16. EM SSAB Chairs Letters.081408.pdf

    Office of Environmental Management (EM)

    SW Washington, DC 20585 Dear Mr. Rispoli: SUBJECT: Recommendation that Quarterly Project Reviews (QPR) be Shared with the Environmental Management (EM) Site Specific Advisory...

  17. EM National Cleanup Workshop - Path to EM Success in 2016 and Beyond |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy National Cleanup Workshop - Path to EM Success in 2016 and Beyond EM National Cleanup Workshop - Path to EM Success in 2016 and Beyond Presentation from the 2016 DOE National Cleanup Workshop by Sue Cange, Manager, Oak Ridge Office of Environmental Management and Ken Rueter, President and Project Manager, URS|CH2M Oak Ridge. EM National Cleanup Workshop - Path to EM Success in 2016 and Beyond (4.87 MB) More Documents & Publications ETTP Cleanup and

  18. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  19. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  20. MotorMaster+ International Fact Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    International Fact Sheet MotorMaster+ International Fact Sheet This fact sheet describes how industrial plants can improve their motor system performance for a broader range of motors with AMO's MotorMaster+ International software tool. MotorMaster+ International Fact Sheet (984.17 KB) More Documents & Publications MotorMaster+ Software Tool Brochure

  1. MotorMaster+ Software Tool Brochure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Software Tool Brochure MotorMaster+ Software Tool Brochure This brochure provides information on AMO's MotorMaster+ software tool, including how it works, next steps, and how to access it. MotorMaster+ Brochure (2.48 MB) More Documents & Publications MotorMaster+ International Fact Sheet

  2. EM Taps Talent of Minority Serving Institutions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Taps Talent of Minority Serving Institutions EM Taps Talent of Minority Serving Institutions December 23, 2014 - 12:00pm Addthis A student explains an EM-supported applied research project to Mark Gilbertson, EM Deputy Assistant Secretary for Site Restoration, left, at a Historically Black Colleges and Universities workshop held at Savannah River National Laboratory in April 2014. A student explains an EM-supported applied research project to Mark Gilbertson, EM Deputy Assistant Secretary for

  3. EM Works to Involve Local Communities More in Acquisition Processes |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Works to Involve Local Communities More in Acquisition Processes EM Works to Involve Local Communities More in Acquisition Processes September 30, 2016 - 12:55pm Addthis EM Acquisition and Project Management Deputy Assistant Secretary Ralph Holland provides EM's acquisition outlook during the National Cleanup Workshop. EM Acquisition and Project Management Deputy Assistant Secretary Ralph Holland provides EM's acquisition outlook during the National Cleanup Workshop.

  4. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  5. EM-PDRI Team Concurrence

    Office of Environmental Management (EM)

    Revision 1, January, 2001, reflects the requirements in DOE Order 413.3 and the Draft Manual for Program and Project Management, October, 2000. As such, the EM*PDRI provides a...

  6. Dual arm master controller for a bilateral servo-manipulator

    DOEpatents

    Kuban, Daniel P.; Perkins, Gerald S.

    1989-01-01

    A master controller for a mechanically dissimilar bilateral slave servo-manipulator is disclosed. The master controller includes a plurality of drive trains comprising a plurality of sheave arrangements and cables for controlling upper and lower degrees of master movement. The cables and sheaves of the master controller are arranged to effect kinematic duplication of the slave servo-manipulator, despite mechanical differences therebetween. A method for kinematically matching a master controller to a slave servo-manipulator is also disclosed.

  7. Microsoft Word - Updated By-Laws for EM QA Corporate Board from...

    Office of Environmental Management (EM)

    2 application of project QA lessons learned throughout the EM complex; and Support continuous improvement of the overall EM mission performance (e.g., capital and major...

  8. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    United States Department of Energy Contract Management by the Department of Energy's ... (EM) acquisitions and of contract and project management reforms that EM is implementing. ...

  9. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects

  10. Latin square three dimensional gage master

    DOEpatents

    Jones, Lynn L.

    1982-01-01

    A gage master for coordinate measuring machines has an nxn array of objects distributed in the Z coordinate utilizing the concept of a Latin square experimental design. Using analysis of variance techniques, the invention may be used to identify sources of error in machine geometry and quantify machine accuracy.

  11. Fernald Environmental Management Project Archived Soil & Groundwater Master

    Office of Environmental Management (EM)

    Federal Register Notice, CBDPP Final Rule Federal Register Notice, CBDPP Final Rule December 8, 1999 Federal Register Notice, Final rule for 10 CFR part 850, CBDPP The Department of Energy (DOE) published a final rule to establish a chronic beryllium disease prevention program (CBDPP) to reduce the number of workers currently exposed to beryllium in the course of their work at DOE facilities managed by DOE or its contractors, minimize the levels of, and potential for, exposure to beryllium, and

  12. GAO Report Reflects Success Story for EM Sites

    Energy.gov [DOE]

    In a report released earlier this year, the U.S. Government Accountability Office (GAO) said it recognized progress on EM projects of $750 million or less and was shifting the focus of EM's high-risk designation more to major contracts and projects greater than $750 million. This progress is evident at several EM sites.

  13. Energy Department to Fund Master's and Doctoral Training in Power...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fund Master's and Doctoral Training in Power Electronics Energy Department to Fund Master's and Doctoral Training in Power Electronics July 30, 2015 - 12:05pm Addthis As part of ...

  14. Oil and Gas Field Code Master List - Energy Information Administration

    Energy Information Administration (EIA) (indexed site)

    Oil and Gas Field Code Master List With Data for 2015 | Release Date: February 24, 2016 | ... Comprehensive listing of U.S. oil and gas field names. Oil and Gas Field Code Master List ...

  15. Microsoft PowerPoint - EM SSAB Chairs Webinar - (2) Huizenga...

    Office of Environmental Management (EM)

    Carlsbad 208M Portsmouth 152M West Valley Demonstration Project 66M Nevada 62M Other 56M Moab 36M SPRU 24M Total Request 5.622B Click to edit Master subtitle style ...

  16. Headquarters Facilities Master Security Plan - Table of Contents |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Facilities Master Security Plan - Table of Contents Headquarters Facilities Master Security Plan - Table of Contents 2016 Headquarters Facilities Master Security Plan - Table of Contents The Table of Contents is an outline of all the chapters and sections of the Headquarters Facilities Master Security Plan (HQFMSP). It directs the reader to the portion of the HQFMSP that will most likely explain the Headquarters (HQ) security procedures he/she is seeking. 2016

  17. Headquarters Facilities Master Security Plan- Chapter 9, Technical Surveillance Countermeasures

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 9, Technical Surveillance Countermeasures Describes the DOE Headquarters Technical Security Countermeasures (TSCM) Program.

  18. EM Historical Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Historical Timeline EM Historical Timeline

  19. ZMK Ems Solar GmbH | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ZMK Ems Solar GmbH Jump to: navigation, search Name: ZMK Ems-Solar GmbH Place: Haren, Germany Zip: 49733 Product: German project developer with 25MW of installed capacity....

  20. 2015-09-25 EM Contractor List.xls

    Office of Environmental Management (EM)

    Project INL Idaho National Laboratory CD0 TBD TBD EM 001021 OR-0041.C2 Outfall 200 Mercury Treatment Facility Oak Ridge Oak Ridge CD0 UCOR URS CH2M Hill Oak Ridge, LLC EM...

  1. Robotics Challenge Aims to Enhance Worker Safety, Improve EM Cleanup -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Other EM Events Set for September Focus on Safety, Technology Development | Department of Energy Robotics Challenge Aims to Enhance Worker Safety, Improve EM Cleanup - Other EM Events Set for September Focus on Safety, Technology Development Robotics Challenge Aims to Enhance Worker Safety, Improve EM Cleanup - Other EM Events Set for September Focus on Safety, Technology Development August 31, 2016 - 12:55pm Addthis Fluor-BWXT Site Project Director Dennis Carr, left, learns how to operate a

  2. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete

  3. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  4. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  5. New hydrocracker complex: The master plan study report. Volume 3. Export trade information

    SciTech Connect

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Kirishi, Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 3 of a three volume report and is divided into the following sections: (5) Marketing Plan; (6) Project Costs and Economics; (7) Project Execution. Appendix C follows.

  6. Uniform Methods Project Related Links | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Related Links Uniform Methods Project Related Links The websites and publications listed below provide supporting information for the Uniform Methods Project and for evaluation, measurement, and verification (EM&V) of energy efficiency programs. Glossaries of EM&V Terms Federal EM&V Resources International Resources Related Standards Glossaries of EM&V Terms The following glossaries provide definitions of technical language and EM&V terms. Appendix A: Glossary of

  7. EMS Description

    Energy.gov [DOE]

    This document describes the joint U.S. Department of Energy (DOE) Office of Legacy Management (LM) and the Legacy Management Support (LMS) Contractor Team Environmental Management System (EMS).

  8. 2011 Annual Planning Summary for Environmental Management (EM)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Environmental Management (EM).

  9. Microsoft Word - MR_Contingency_Protocol_EM_FINAL.docx

    Energy Saver

    41210 1 EM Protocol for Application of Contingency and Management Reserve for the Acquisition of Capital Asset Projects This document provides guidance for the development and...

  10. 2011 Annual Planning Summary for EM Consolidated Business Center (EMCBC)

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the EM Consolidated Business Center (EMCBC) (See Environmental Management APS).

  11. EM international activities. February 1997 highlights

    SciTech Connect

    1997-02-01

    EM International Highlights is a brief summary of on-going international projects within the Department of Energy`s Office of Environmental Management (EM). This document contains sections on: Global Issues, activities in Western Europe, activities in central and Eastern Europe, activities in Russia, activities in Asia and the Pacific Rim, activities in South America, activities in North America, and International Organizations.

  12. Summary - Uranium233 Downblending and Disposition Project

    Office of Environmental Management (EM)

    The projec blended materia or the Nevada cted to coincid ack-end" of the ng observation ... Oak RidgeOR 233 Uranium Do Project September 20 Departmen anium D E-EM Did This em and ...

  13. Mastering Campus Energy and Water Management: Tools for Success

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Presentations and Materials | Department of Energy Mastering Campus Energy and Water Management: Tools for Success Presentations and Materials Mastering Campus Energy and Water Management: Tools for Success Presentations and Materials Presentations and materials covered during the "Mastering Campus Energy and Water Management: Tools for Success" workshop held on August 8, 2016, in Providence, Rhode Island. This interactive workshop featured experts who engaged participants in a

  14. Headquarters Facilities Master Security Plan - Acronyms | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Acronyms Headquarters Facilities Master Security Plan - Acronyms 2016 Headquarters Facilities Master Security Plan - Acronyms The HQFMSP contains many security terms with specialized meanings. In many cases, these specialized terms have been reduced to acronyms in order to save space and improve readability. The acronym list is a handy reference allowing readers to understand the true meaning of unfamiliar security terms. 2016 Headquarters Facilities Master Security Plan - Acronyms

  15. Requirements for being an IREC Certified Instructor and Master Trainer

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    IREC Candidate Handbook v.11 June 2014 11 IREC Certified Instructor and Master Trainer IREC certification as Instructor or Master Trainer indicates a breadth and depth of experience that the individual brings with them wherever they teach. Affiliation with an IREC Accredited Training Provider is not required in order to apply for or maintain certification. To become certified as an Instructor or Master Trainer, a candidate must demonstrate through the application and assessment process that s/he

  16. Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Protection and Control | Department of Energy Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control 2016 Headquarters Facilities Master Security Plan - Chapter 5, Classified Matter Protection and Control This, the largest chapter in the HQFMSP, describes the procedures required to properly protect classified matter from the day it is created to the

  17. Headquarters Facilities Master Security Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    » Headquarters Facilities Master Security Plan Headquarters Facilities Master Security Plan Welcome to the 2016 version of the Headquarters Facilities Master Security Plan (HQFMSP). The purpose of the HQFMSP is to inform employees, contractors, and visitors of the security procedures in place at Department of Energy (DOE) Headquarters (HQ) facilities in the Washington, DC area. The HQFMSP does not establish new security requirements; security requirements are established by various Federal laws

  18. Improve Motor System Performance with MotorMaster+

    SciTech Connect

    2010-08-01

    Fact sheet describes how industrial plants can improve their motor system performance using DOE-AMO's MotorMaster+ software tool.

  19. New hydrocracker complex: The master plan study report, volume 2. Export trade information

    SciTech Connect

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 2 of a three volume report and it is divided into the following sections: (2) Background and Introduction; (3) Project Profile; (4) Safety. Appendixes A and B follow.

  20. (SSS)Project Dashboard.xls

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Date: 10/27/2016 Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment 1 EM Bechtel National Inc. 01-D-416 Waste Treatment and Immobilization Plant (WTP) 5,781,000,000 $ 12,263,000,000 $ R 2 EM Parsons Government Services Inc. 05-D-405 Salt Waste Processing Facility (SWPF) 900,000,000 $ 2,322,000,000 $ G 3 EM CH2M Hill Plateau Remediation Company 15-D-401 KW Basin Sludge Removal Project 311,000,000 $ 311,000,000 $ G 4 EM Savannah River

  1. September 2016 Project Dashboard.xls

    Energy Saver

    Date: 09/26/2016 Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment 1 EM Bechtel National Inc. 01-D-416 Waste Treatment and Immobilization Plant (WTP) 5,781,000,000 $ 12,263,000,000 $ R 2 EM Parsons Government Services Inc. 05-D-405 Salt Waste Processing Facility (SWPF) 900,000,000 $ 2,322,000,000 $ G 3 EM CH2M Hill Plateau Remediation Company 15-D-401 KW Basin Sludge Removal Project 311,000,000 $ 311,000,000 $ G 4 EM Savannah River

  2. Master environmental plan for Fort Devens, Massachusetts

    SciTech Connect

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. . Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  3. Headquarters Facilities Master Security Plan - Chapter 13, Controlled

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Unclassified Information | Department of Energy 3, Controlled Unclassified Information Headquarters Facilities Master Security Plan - Chapter 13, Controlled Unclassified Information 2016 Headquarters Facilities Master Security Plan - Chapter 13, Controlled Unclassified Information CUI consists of information that is not classified, but it is so sensitive that it requires special handling and protection. CUI includes Official Use Only (OUO) and its subcategories of Personally Identifiable

  4. Headquarters Facilities Master Security Plan - Chapter 6, Foreign

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Interaction | Department of Energy 6, Foreign Interaction Headquarters Facilities Master Security Plan - Chapter 6, Foreign Interaction 2016 Headquarters Facilities Master Security Plan - Chapter 6, Foreign Interaction DOE has adopted significant controls over the interaction of its employees and contractors with foreign nationals. When authorized by a treaty or international agreement, some DOE classified information can be shared with foreign government representatives. Unclassified

  5. Benefits of EM&V

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Benefits of EM&V A primary benefit of the Evaluation, Measurement and Verification (EM&V) process is that it specifies which energy efficiency measures and/or programs have met their objectives, which ones are cost effective and what changes could help the programs be more successful. A properly designed EM&V plan will provide the project manager with the ability to adjust the direction of the project as issues develop, thereby proactively enhancing program performance. From a

  6. Coho Salmon Master Plan, Clearwater River Basin.

    SciTech Connect

    Nez Perce Tribe; FishPro

    2004-10-01

    The Nez Perce Tribe has a desire and a goal to reintroduce and restore coho salmon to the Clearwater River Subbasin at levels of abundance and productivity sufficient to support sustainable runs and annual harvest. Consistent with the Clearwater Subbasin Plan (EcoVista 2003), the Nez Perce Tribe envisions developing an annual escapement of 14,000 coho salmon to the Clearwater River Subbasin. In 1994, the Nez Perce Tribe began coho reintroduction by securing eggs through U.S. v. Oregon; by 1998 this agreement provided an annual transfer of 550,000 coho salmon smolts from lower Columbia River hatchery facilities for release in the Clearwater River Subbasin. In 1998, the Northwest Power and Conservation Council authorized the Bonneville Power Administration to fund the development of a Master Plan to guide this reintroduction effort. This Master Plan describes the results of experimental releases of coho salmon in the Clearwater River Subbasin, which have been ongoing since 1995. These data are combined with results of recent coho reintroduction efforts by the Yakama Nation, general coho life history information, and historical information regarding the distribution and life history of Snake River coho salmon. This information is used to assess a number of alternative strategies aimed at restoring coho salmon to historical habitats in the Clearwater River subbasin. These data suggest that there is a high probability that coho salmon can be restored to the Clearwater River subbasin. In addition, the data also suggest that the re-establishment of coho salmon could be substantially aided by: (1) the construction of low-tech acclimation facilities; (2) the establishment of a 'localized' stock of coho salmon; and (3) the construction of hatchery facilities to provide a source of juvenile coho salmon for future supplementation activities. The Nez Perce Tribe recognizes that there are factors which may limit the success of coho reintroduction. As a result of these

  7. EM Contractor Fee

    Office of Environmental Management (EM)

    2016 Site: Portsmouth Paducah Project Office Contract Name: Paducah Deactivation Task Order Contractor: Fluor Federal Services Contract Number: DE-EM0001131-DE-DT0007774 Contract Type: Cost Plus Award Fee and FFP Total Estimated Contract Cost: $422,000,000 Contract Base Period: July 22, 2014 - July 21, 2017 Contract Option Period: N/A Fee Information Minimum Fee $0 Maximum Fee $17,278,589 Performance Period Fee Available Fee Earned FY2015 $6,170,759 $4,257,824 FY2016 $5,553,915 $0 FY2017

  8. Designation of Environmental Management Federal Project Director...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  9. Designation of Environmental Management Federal Project Director...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management Federal Project Director for Separations Process Research Unit by feinberg DesignationofEMFedProjDir-SeparationsProcessResearchUnit-FeinbergEM.pdf -- PDF...

  10. DOE-STD-1104-2014 Master Acronym List | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Master Acronym List DOE-STD-1104-2014 Master Acronym List February 4, 2015 DOE-STD-1104 Master Acronyms List. This document provides a Master Acronyms List of terms used in DOE-STD-1104. DOE-STD-1104-2014 Master Acronym List (38.47 KB) More Documents & Publications DOE-STD-1104-2014 Training Master Acronym List for DOE-STD-3009-2014 Requirements Crosswalk of DOE-STD-1104-2014

  11. Preliminary Master Logic Diagram for ITER operation

    SciTech Connect

    Cadwallader, L.C.; Taylor, N.P.; Poucet, A.E.

    1998-04-01

    This paper describes the work performed to develop a Master Logic Diagram (MLD) for the operations phase of the International Thermonuclear Experimental Reactor (ITER). The MLD is a probabilistic risk assessment tool used to identify the broad set of potential initiating events that could lead to an offsite radioactive or toxic chemical release from the facility under study. The MLD described here is complementary to the failure modes and effects analyses (FMEAs) that have been performed for ITER`s major plant systems in the engineering evaluation of the facility design. While the FMEAs are a bottom-up or component level approach, the MLD is a top-down or facility level approach to identifying the broad spectrum of potential events. Strengths of the MLD are that it analyzes the entire plant, depicts completeness in the accident initiator process, provides an independent method for identification, and can also identify potential system interactions. MLDs have been used successfully as a hazard analysis tool. This paper describes the process used for the ITER MLD to treat the variety of radiological and toxicological source terms present in the ITER design. One subtree of the nineteen page MLD is shown to illustrate the levels of the diagram.

  12. EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS)...

    Energy Saver

    A Integrated Master Schedule (IMS) Initial Baseline Review EVMS Training Snippet: 3.1A Integrated Master Schedule (IMS) Initial Baseline Review This EVMS Training Snippet, ...

  13. 2014 Quality Assurance Improvement Project Plan

    Energy.gov [DOE]

    This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently.

  14. 2015 Quality Assurance Improvement Project Plan

    Energy.gov [DOE]

    This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently.

  15. Participants in Quarterly Public Forum Learn Latest News on Doing Business with EM

    Energy.gov [DOE]

    EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash provides an overview of EM to more than 50 people attending the Business Opportunity Forum this month at DOE headquarters in Washington, D.C.

  16. New hydrocracker complex: The master plan study report. Executive summary. Volume 1. Export trade information

    SciTech Connect

    1995-06-16

    The study, conducted by ABB Lummus Crest, was funded by the U.S. Trade and Development Agency. The purpose of the Master Plan is to aid in the implementation of the new hydrocracker complex at the Kirishi Refinery in Russia. The report contains financial information, including the project costs and the development of a financing plan. Also covered in the study is a marketing plan for both the domestic and export scenarios for products produced by the complex. This is Volume 1 of a three volume report and it contains the Executive Summary.

  17. Headquarters Facilities Master Security Plan - Chapter 1, Physical Security

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy , Physical Security Headquarters Facilities Master Security Plan - Chapter 1, Physical Security 2016 Headquarters Facilities Master Security Plan - Chapter 1, Physical Security This chapter covers the procedures adopted by HQ to implement directives governing the physical protection of U.S security interests. These procedures include control of employee and visitor access to HQ buildings, detection and control of dangerous devices, issuance of security badges to HQ

  18. Headquarters Facilities Master Security Plan - Chapter 10, Security

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Awareness Program | Department of Energy 0, Security Awareness Program Headquarters Facilities Master Security Plan - Chapter 10, Security Awareness Program 2016 Headquarters Facilities Master Security Plan - Chapter 10, Security Awareness Program This chapter covers all the security awareness briefings conducted at HQ. The following security briefings are required for all HQ Federal employees and contractors: an Initial Security Briefing, which is given when a new employee starts work; the

  19. Headquarters Facilities Master Security Plan - Chapter 11, Incidents of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Security Concern | Department of Energy 1, Incidents of Security Concern Headquarters Facilities Master Security Plan - Chapter 11, Incidents of Security Concern 2016 Headquarters Facilities Master Security Plan - Chapter 11, Incidents of Security Concern Whenever a failure to properly protect classified matter is detected, it must be formally reported and investigated. This chapter describes the procedures for doing so. It also covers the process for administering security infractions to

  20. Headquarters Facilities Master Security Plan - Chapter 12, Special Access

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Programs | Department of Energy 2, Special Access Programs Headquarters Facilities Master Security Plan - Chapter 12, Special Access Programs 2016 Headquarters Facilities Master Security Plan - Chapter 12, Special Access Programs This very brief chapter merely identifies who to contact at HQ whenever a question arises about the administration of SAPs. This chapter is maintained by AU-1. It also covers the process for administering security infractions to those responsible for a security

  1. Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 4, Cyber Security Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security 2016 Headquarters Facilities Master Security Plan - Chapter 14, Cyber Security HQ cyber security activities are managed by the Cyber Support Division (IM-622) within the Office of Chief Information Officer (IM-1). This chapter only covers the requirement for each HQ program element to appoint an Information Systems Security Officer (ISSO) to act as the point of contact between the

  2. Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 5, Outprocessing Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing 2016 Headquarters Facilities Master Security Plan - Chapter 15, Outprocessing This chapter describes the security actions that must be taken whenever a HQ Federal employee or contractor terminates their employment or transfers from one HQ program element to another. Such actions include terminating security clearances, changing safe/door combinations, revising access lists, removing

  3. Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Exemptions | Department of Energy 6, Equivalencies and Exemptions Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions 2016 Headquarters Facilities Master Security Plan - Chapter 16, Equivalencies and Exemptions This chapter describes the actions that can be taken by HQ program elements when they cannot meet the security requirements set forth in DOE orders. It provides instructions on how to request an equivalency or exemption to a DOE order and

  4. Headquarters Facilities Master Security Plan - Chapter 17, Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Security Officer Program | Department of Energy 7, Headquarters Security Officer Program Headquarters Facilities Master Security Plan - Chapter 17, Headquarters Security Officer Program 2016 Headquarters Facilities Master Security Plan - Chapter 17, Headquarters Security Officer Program This chapter implements HQ Order 472.1, Headquarters Security Officer Program, which requires that all HQ program elements appoint a Federal employee to the position of HSO and a second Federal employee to

  5. Headquarters Facilities Master Security Plan - Chapter 2, Limited Areas,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Vault-Type Rooms and Temporary Limited Areas | Department of Energy 2, Limited Areas, Vault-Type Rooms and Temporary Limited Areas Headquarters Facilities Master Security Plan - Chapter 2, Limited Areas, Vault-Type Rooms and Temporary Limited Areas 2016 Headquarters Facilities Master Security Plan - Chapter 2, Limited Areas, Vault-Type Rooms and Temporary Limited Areas This chapter covers the establishment, maintenance, and termination of areas within HQ buildings where classified activities

  6. Headquarters Facilities Master Security Plan - Chapter 3, Personnel

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Security | Department of Energy 3, Personnel Security Headquarters Facilities Master Security Plan - Chapter 3, Personnel Security 2016 Headquarters Facilities Master Security Plan - Chapter 3, Personnel Security This chapter addresses the HQ Personnel Security Program. The process to acquire a security clearance is explained. This process must be completed before an employee or contractor can be granted access to classified information. The applicant for a security clearance must provide

  7. Headquarters Facilities Master Security Plan - Chapter 4, FOCI, Facility

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clearances, and Classified Contract Registration | Department of Energy 4, FOCI, Facility Clearances, and Classified Contract Registration Headquarters Facilities Master Security Plan - Chapter 4, FOCI, Facility Clearances, and Classified Contract Registration 2016 Headquarters Facilities Master Security Plan - Chapter 4, FOCI, Facility Clearances, and Classified Contract Registration Before any contract company or its employees is permitted access to U.S. classified information, it must

  8. Headquarters Facilities Master Security Plan - Chapter 7, Surveys and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reviews | Department of Energy 7, Surveys and Reviews Headquarters Facilities Master Security Plan - Chapter 7, Surveys and Reviews 2016 Headquarters Facilities Master Security Plan - Chapter 7, Surveys and Reviews This chapter covers the HQ Security Survey Program, which has two primary functions. First, survey team members assist HQ program elements in establishing, maintaining, and deactivating their LAs, VTRs, and TLAs. Second, the survey team conducts an annual assessment of how well

  9. Headquarters Facilities Master Security Plan - Chapter 8, Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Security Program | Department of Energy 8, Operations Security Program Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program 2016 Headquarters Facilities Master Security Plan - Chapter 8, Operations Security Program This chapter describes the HQ OPSEC Program and the procedures to be followed by HQ program elements for identifying their Critical Information. This chapter also discusses the appointment of OPSEC representatives, activities of the HQ OPSEC

  10. Sandia employee dubbed a master at locking down NNSA's enterprise |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) employee dubbed a master at locking down NNSA's enterprise Wednesday, August 31, 2016 - 10:43am Steve Highland, a Sandia National Laboratories security expert, is the only Certified Master Safe Technician in New Mexico. NNSA's primary missions include keeping dangerous materials out of the wrong hands while protecting and maintaining the nation's nuclear deterrent. It's no surprise, then, that NNSA's labs and sites employ the best experts

  11. Oil and gas field code master list, 1993

    SciTech Connect

    Not Available

    1993-12-16

    This document contains data collected through October 1993 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. Other Federal and State government agencies, as well as industry, use the EIA Oil and Gas Field Code Master List as the standard for field identification. A machine-readable version of the Oil and Gas Field Code Master List is available from the National Technical Information Service.

  12. Briefing: DOE EM Landfill Workshop & Path Forward | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Landfill Workshop & Path Forward Briefing: DOE EM Landfill Workshop & Path Forward By: Office of Groundwater and Soil Remediation Where: SSAB Teleconference 2 Subject: DOE EM Landfill Workshop & Path Forward DOE EM Landfill Workshop and Path Forward - July 2009 (316.86 KB) More Documents & Publications Briefing: Summary and Recommendations of EM Landfill Workshop Briefing: DOE EM ITR Landfill Assessment Project Lessons Learned Environmental Management Waste Management Facility

  13. The EM Story Brochure

    Energy.gov [DOE]

    In 2012, the EM story brochure was released to the public that provided a high-level summary and communicated EM's history, cleanup, and challenges.

  14. EM-421

    Office of Legacy Management (LM)

    NY-W] ' qc-,p,,4 ,P -pIj i; ,./&+e~--- ,jJs AIJG 0 2 130 EM-421 Addition of Sites to FUSRAP Lester K. Price, Director Technical Services,Division Oak Ridge Operations Office Attached is a memorandum approving transfer of responsibility for the Niagara Falls Storage Site (NFSS) in New York and the New Brunswick Laboratory (NBL) Site in New Jersey to FUSRAP. Please incorporate these sites in the FUSRAP rebaselining effort now underway. As we previously discussed, funding for NBL will provide

  15. Miscellaneous Archived Soil & Groundwater Master Reports | Department...

    Office of Environmental Management (EM)

    KB) Durango (40.82 KB) Falls City (42.13 KB) Gasbuggy (33.09 KB) Gnome-Coach (35.73 KB) Grand Junction Project Office (38.89 KB) Grand Junction (35.92 KB) Green River (38.54 KB) ...

  16. (SSS)Project Dashboard 2015-10-28.xls

    Office of Environmental Management (EM)

    2,251,500,000 R 10 EM Savannah River Nuclear Solutions, LLC SR-0030.D.C1 D-Area Ash Project 185,000,000 185,000,000 R 11 EM URS Energy & Construction, Inc....

  17. EM Site-Specific Advisory Board (EM SSAB) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB)

  18. Assessment of the Integrated Facility Disposition Project at Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    National Laboratory & Y-12 for Transfer of Facilities & Materials to EM | Department of Energy the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program

  19. Method of fabricating a 3-dimensional tool master

    DOEpatents

    Bonivert, William D. (Pleasanton, CA); Hachman, John T. (Stockton, CA)

    2002-01-01

    The invention is a method for the fabrication of an imprint tool master. The process begins with a metallic substrate. A layer of photoresist is placed onto the metallic substrate and a image pattern mask is then aligned to the mask. The mask pattern has opaque portions that block exposure light and "open" or transparent portions which transmit exposure light. The photoresist layer is then exposed to light transmitted through the "open" portions of the first image pattern mask and the mask is then removed. A second layer of photoresist then can be placed onto the first photoresist layer and a second image pattern mask may be placed on the second layer of photoresist. The second layer of photoresist is exposed to light, as before, and the second mask removed. The photoresist layers are developed simultaneously to produce a multi-level master mandrel upon which a conductive film is formed. A tool master can now be formed onto the conductive film. An imprint tool is then produced from the tool master. In one embodiment, nickel is electroplated onto the tool master to produce a three-dimensional imprint tool.

  20. Oak Ridge's EM Program Realizes Successful 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge's EM Program Realizes Successful 2010 Oak Ridge's EM Program Realizes Successful 2010 February 7, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Cleanup at the Oak Ridge Reservation took a major leap forward in 2010, as the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) completed numerous projects that reduced risks, decreased the site's footprint, and paved the way for new development for DOE missions. Major accomplishments were completed across the Oak Ridge

  1. Oil and Gas Field Code Master List 1990

    SciTech Connect

    Not Available

    1991-01-04

    This is the ninth annual edition of the Energy Information Administration's (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1990 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. There are 54,963 field records in this year's Oil and Gas Field Code Master List (FCML). This amounts to 467 more than in last year's report. As it is maintained by EIA, the Master List includes: Field records for each state and county in which a field resides; field records for each offshore area block in the Gulf of Mexico in which a field resides;field records for each alias field name; fields crossing state boundaries that may be assigned different names by the respective state naming authorities.

  2. DOE Recertifies EM Contractors in Star Program Recognizing Excellence in Safety

    Energy.gov [DOE]

    EM congratulated two of its contractors at the Savannah River Operations and Portsmouth/Paducah Project offices for their recent Voluntary Protection Program (VPP) Star recertifications.

  3. EM Launches Comprehensive Flickr Collection

    Energy.gov [DOE]

    WASHINGTON, D.C. – EM recently established an EM Flickr Collection, which organizes over 1,100 photos from around the EM complex.

  4. Oil and gas field code master list 1994

    SciTech Connect

    Not Available

    1995-01-01

    This is the thirteenth annual edition of the Energy Information Administration`s (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1994 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the United States. The master field name spellings and codes are to be used by respondents when filing the following Department of Energy (DOE) forms: Form EIA-23, {open_quotes}Annual Survey of Domestic Oil and Gas Reserves,{close_quotes} filed by oil and gas well operators (field codes are required from larger operators only); Forms FERC 8 and EIA-191, {open_quotes}Underground Gas Storage Report,{close_quotes} filed by natural gas producers and distributors who operate underground natural gas storage facilities. Other Federal and State government agencies, as well as industry, use the EIA Oil and Gas Field Code Master List as the standard for field identification. A machine-readable version of the Oil and Gas Field Code Master List is available from the National Technical Information Service, 5285 Port Royal Road, Springfield, Virginia 22161, (703) 487-4650. In order for the Master List to be useful, it must be accurate and remain current. To accomplish this, EIA constantly reviews and revises this list. The EIA welcomes all comments, corrections, and additions to the Master List. All such information should be given to the EIA Field Code Coordinator at (214) 953-1858. EIA gratefully acknowledges the assistance provides by numerous State organizations and trade associations in verifying the existence of fields and their official nomenclature.

  5. DOE NNSA Site Facility Management Contracts - MASTER.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NNSA Site Facility Management Contracts November 2015 ... Number Contract Type Business Model FY Competed Award ... Separations Process Research Unit (SPRU) EM URS Energy & ...

  6. Analysis of soil vapor extraction expenses to estimate bioventing expenses. Master`s thesis

    SciTech Connect

    Lokan, S.M.

    1995-11-01

    An in-depth analysis of the expenses incurred with five soil venting petroleum remediation projects was accomplished. The data was obtained from receipts provided by a major United States petroleum refiner and distributor. Cost categories were designed that incorporated all costs and provided a method to analyze the data. The five cost categories used were: permits, equipment, management, utilities, and analysis. Further analysis showed trends and described the behavior of the costs related to remediation events. The relative percentile for each cost category was found to be consistent among the projects. Many costs were also found to be very linear through out the life of the project from discovery to final cleanup. These linear costs for each cost category were also found to have similar slopes when comparing different projects.

  7. EM Leaders Earn National Defense Degrees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Leaders Earn National Defense Degrees EM Leaders Earn National Defense Degrees August 31, 2015 - 12:00pm Addthis Stephen Casey of the PortsmouthPaducah Project Office receives his ...

  8. EM SSAB CHAIRS Bi-Monthly Conference Call

    Office of Environmental Management (EM)

    ... One third of the FY 2013 LLWMLLW is forecast to come from Portsmouth's Gaseous Diffusion Plant D&D project. EM is expected to complete its Waste Incidental to Reprocessing (WIR) ...

  9. 2012 Quality Assurance Improvement Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Quality Assurance Improvement Project Plan 2012 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to the EM Quality Assurance (QA) Corporate Board. The Board serves a vital and critical role in ensuring that the EM mission is completed safely, correctly, and efficiently. 2012 Quality Assurance Improvement

  10. McMaster University`s artificial computing system

    SciTech Connect

    Dawes, A.; Bentley, M.

    1996-12-31

    This will be McMaster University`s first entry into the AAAI Mobile Robotics competition. As such, this year will serve as a testing ground for future developments. It is the goal of the designers to experiment with new techniques and approaches based on their engineering background.

  11. Latin-square three-dimensional gage master

    DOEpatents

    Jones, L.

    1981-05-12

    A gage master for coordinate measuring machines has an nxn array of objects distributed in the Z coordinate utilizing the concept of a Latin square experimental design. Using analysis of variance techniques, the invention may be used to identify sources of error in machine geometry and quantify machine accuracy.

  12. Paducah Site Interns Learn About EM Opportunities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Interns Learn About EM Opportunities Paducah Site Interns Learn About EM Opportunities August 28, 2014 - 12:00pm Addthis LATA Kentucky groundwater cleanup site superintendent Donnie Bell, far right, describes the project to (from left) Steve Christmas of LATA Kentucky and interns Weston Loyd, Matthew Jehnke, and Wesley Morgan. LATA Kentucky groundwater cleanup site superintendent Donnie Bell, far right, describes the project to (from left) Steve Christmas of LATA Kentucky and interns Weston

  13. West Valley Demolition Marks Important Accomplishment for EM | Department

    Energy Saver

    of Energy Demolition Marks Important Accomplishment for EM West Valley Demolition Marks Important Accomplishment for EM June 13, 2013 - 12:00pm Addthis Workers demolish the West Valley Demonstration Project's largest and most complex ancillary facility. Workers demolish the West Valley Demonstration Project's largest and most complex ancillary facility. Demolition work is shown in February 2013. Demolition work is shown in February 2013. Demolition continues in April 2013 with removal of

  14. Developing a master plan for hospital solid waste management: A case study

    SciTech Connect

    Karamouz, Mohammad Zahraie, Banafsheh Kerachian, Reza Jaafarzadeh, Nemat Mahjouri, Najmeh

    2007-07-01

    Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management.

  15. DUF6 Project Doubles Production in 2013 | Department of Energy

    Energy Saver

    EM's Portsmouth Paducah Project Office (PPPO) and contractor Babcock & Wilcox Conversion Services LLC (BWCS) began operations in 2011 to convert the nation's 800,000-metric-ton ...

  16. Deactivation Project Begins at Paducah Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Begins at Paducah Gaseous Diffusion Plant Deactivation Project Begins at Paducah Gaseous Diffusion Plant October 21, 2014 - 5:00pm Addthis EM Paducah site lead Jennifer Woodard ...

  17. EM-PDRI Manual

    Office of Environmental Management (EM)

    Table 2-3. Maximum Score For Each Rating Area . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . 51 Appendix B EM*PDRI Self Assessment Forms ...

  18. EM Contractor Fee

    Office of Environmental Management (EM)

    Department of Energy Citizens Advisory Board Celebrates 20th Anniversary, Meets in Idaho EM Citizens Advisory Board Celebrates 20th Anniversary, Meets in Idaho September 30, 2014 - 12:00pm Addthis EM SSAB Chairs, Vice Chairs, and staff attend the September 2014 Chairs' meeting in Idaho Falls. EM SSAB Chairs, Vice Chairs, and staff attend the September 2014 Chairs' meeting in Idaho Falls. IDAHO FALLS, Idaho - The Environmental Management Site-Specific Advisory Board (EM SSAB) held its Chairs

  19. EM/Stewardship Committee

    Energy.gov [DOE]

    The Oak Ridge Site Specific Advisory Board's EM/Stewardship Committee meeting is open to the public.

  20. EM Current Project Performance.xls

    Office of Environmental Management (EM)

    0 Hanford Site VL-SPRU-0040.C1 Nuclear Facility D&D - Separations Process Research Unit CD-3 78,600,000 9302012 Pending 78,600,000 9302012 Knolls Atomic Power Laboratory...

  1. Report: EM Acquisition and Project Management

    Office of Environmental Management (EM)

    ... Mr. Surash recommended EMAB invite Mr. Scott Van Camp to a Board meeting for an update on ... Surash indicated that Brooks Bill procedures (PL 92-585: 86 STAT.1278) are not being used ...

  2. A Platinum Anniversary for U.S. Atomic Heritage - EM's Historic Manhattan

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Sites Gain International Media Attention | Department of Energy A Platinum Anniversary for U.S. Atomic Heritage - EM's Historic Manhattan Project Sites Gain International Media Attention A Platinum Anniversary for U.S. Atomic Heritage - EM's Historic Manhattan Project Sites Gain International Media Attention September 1, 2012 - 12:00pm Addthis WASHINGTON, D.C. - Traditionally, a platinum anniversary marks 70-years. The Manhattan project legacy reached that special milestone this

  3. Quantum Markovian master equation for scattering from surfaces

    SciTech Connect

    Li, Haifeng; Shao, Jiushu; Azuri, Asaf; Pollak, Eli Alicki, Robert

    2014-01-07

    We propose a semi-phenomenological Markovian Master equation for describing the quantum dynamics of atom-surface scattering. It embodies the Lindblad-like structure and can describe both damping and pumping of energy between the system and the bath. It preserves positivity and correctly accounts for the vanishing of the interaction of the particle with the surface when the particle is distant from the surface. As a numerical test, we apply it to a model of an Ar atom scattered from a LiF surface, allowing for interaction only in the vertical direction. At low temperatures, we find that the quantum mechanical average energy loss is smaller than the classical energy loss. The numerical results obtained from the space dependent friction master equation are compared with numerical simulations for a discretized bath, using the multi-configurational time dependent Hartree methodology. The agreement between the two simulations is quantitative.

  4. Microsoft PowerPoint - Master Presentation - Consolidated (10...

    Office of Environmental Management (EM)

    DOERW-0333P & NQA-1 Christian Palay (EM-43) 8:55-9:10 am Status of Efforts on Resource Recommendations Ray Wood (Trinity Eng.) 9:10-9:25 am Centralized NQA-1 Lead Auditor ...

  5. EM SSAB Recommendations & Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Communication & Engagement EM SSAB EM SSAB Recommendations & Letters EM SSAB Recommendations & Letters September 30, 2014 EM SSAB Recommendations and Letters - 2014-05...

  6. 2016 Mastering the Subsurface Through Technology Innovation and

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    MEISPP Flyer 2016 MEISPP Flyer 2016 MEISPP Flyer.pdf (872.78 KB) More Documents & Publications 2016 Student Employment Brochure Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting | netl.doe.gov

    Carbon Storage and Oil and Natural Gas Technologies Review Meeting Proceedings of the 2016 Mastering the Subsurface Through Technology Innovation and Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting August 16-18, 2016 Meeting

  7. Mastering Campus Energy and Water Management - Tools for Success

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mastering Campus Energy and Water Management - Tools for Success Kim Fowler Pacific Northwest National Laboratory August 8, 2016 Elena Meehan Jesse Maestas CSRA, Inc. Verus Resource Management, Inc. 2 Adminstrative Notes * Logistics: - No tables, which means there will be times we will be asking for your help in re-arranging the room for different activities - Lunch is on your own * To be eligible for continuing education units (CEUs) for this workshop, you must - Sign in and sign out - Complete

  8. Draft SPD Supplemental EIS Master Reference List | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Draft SPD Supplemental EIS Master Reference List References for Chapters 1 - 5 References for Appendix A References for Appendix B References for Appendix C References for Appendix D References for Appendix E References for Appendix F References for Appendix G References for Appendix H References for Appendix I References for Appendix J References for Summary Learn More SPD SEIS References for Appendix E SPD SEIS References for Appendix F SPD SEIS References

  9. Oil and Gas field code master list 1995

    SciTech Connect

    1995-12-01

    This is the fourteenth annual edition of the Energy Information Administration`s (EIA) Oil and Gas Field Code Master List. It reflects data collected through October 1995 and provides standardized field name spellings and codes for all identified oil and/or gas fields in the US. The Field Code Index, a listing of all field names and the States in which they occur, ordered by field code, has been removed from this year`s publications to reduce printing and postage costs. Complete copies (including the Field Code Index) will be available on the EIA CD-ROM and the EIA World-Wide Web Site. Future editions of the complete Master List will be available on CD-ROM and other electronic media. There are 57,400 field records in this year`s Oil and Gas Field Code Master List. As it is maintained by EIA, the Master List includes the following: field records for each State and county in which a field resides; field records for each offshore area block in the Gulf of Mexico in which a field resides; field records for each alias field name (see definition of alias below); and fields crossing State boundaries that may be assigned different names by the respective State naming authorities. Taking into consideration the double-counting of fields under such circumstances, EIA identifies 46,312 distinct fields in the US as of October 1995. This count includes fields that no longer produce oil or gas, and 383 fields used in whole or in part for oil or gas Storage. 11 figs., 6 tabs.

  10. Replication of surface features from a master model to an amorphous metallic article

    DOEpatents

    Johnson, William L.; Bakke, Eric; Peker, Atakan

    1999-01-01

    The surface features of an article are replicated by preparing a master model having a preselected surface feature thereon which is to be replicated, and replicating the preselected surface feature of the master model. The replication is accomplished by providing a piece of a bulk-solidifying amorphous metallic alloy, contacting the piece of the bulk-solidifying amorphous metallic alloy to the surface of the master model at an elevated replication temperature to transfer a negative copy of the preselected surface feature of the master model to the piece, and separating the piece having the negative copy of the preselected surface feature from the master model.

  11. EM-LA Blog | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Blog EM-LA Blog October 31, 2016 The cleanup site was carefully surveyed using state of the art landscape survey instruments prior to soil removal. In Pictures: Soil Cleanup at Upper Los Alamos Canyon The U.S. Department of Energy Environmental Management Los Alamos Field Office (EM-LA) and Los Alamos National Laboratory (LANL) have completed a project to remove contaminated soil from four legacy waste sites along the south-facing slopes of Los Alamos Canyon adjacent to the Los Alamos Townsite.

  12. Northeast Oregon Hatchery Spring Chinook Master Plan, Technical Report 2000.

    SciTech Connect

    Ashe, Becky L.; Concannon, Kathleen; Johnson, David B.

    2000-04-01

    Spring chinook salmon populations in the Imnaha and Grande Ronde rivers are listed as threatened under the Endangered Species Act (ESA) and are at high risk of extirpation. The Nez Perce Tribe, the Confederated Tribes of the Umatilla Indian Reservation, and Oregon Department of Fish and Wildlife, are co-managers of conservation/restoration programs for Imnaha and Grande Ronde spring chinook salmon that use hatchery supplementation and conventional and captive broodstock techniques. The immediate goal of these programs is to prevent extirpation and provide the potential for restoration once factors limiting production are addressed. These programs redirect production occurring under the Lower Snake River Compensation Plan (LSRCP) from mitigation to conservation and restoration. Both the Imnaha and Grande Ronde conservation/restoration programs are described in ESA Section 10 permit applications and the co-managers refer to the fish production from these programs as the Currently Permitted Program (CPP). Recently, co-managers have determined that it is impossible to produce the CPP at Lookingglass Hatchery, the LSRCP facility intended for production, and that without additional facilities, production must be cut from these conservation programs. Development of new facilities for these programs through the Columbia Basin Fish and Wildlife Program is considered a new production initiative by the Northwest Power Planning Council (NPPC) and requires a master plan. The master plan provides the NPPC, program proponents and others with the information they need to make sound decisions about whether the proposed facilities to restore salmon populations should move forward to design. This master plan describes alternatives considered to meet the facility needs of the CPP so the conservation program can be fully implemented. Co-managers considered three alternatives: modify Lookingglass Hatchery; use existing facilities elsewhere in the Basin; and use new facilities in

  13. DOE Completes Five Recovery Act Projects

    Energy.gov [DOE]

    DOE's EM program recently completed five projects at the Oak Ridge site funded through the Recovery Act. The projects included the expansion of two landfills at the Oak Ridge Reservation (ORR) and pre-demolition and demolition projects at ETTP and Y-12.

  14. Project Manager Ned Sauthoff Talks About US ITER

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Management Project Management Workers safely demolished a 175-foot-high exhaust stack at the Hanford Site in southeastern Washington State, a project supported by $420,000 in Recovery Act funds. Workers safely demolished a 175-foot-high exhaust stack at the Hanford Site in southeastern Washington State, a project supported by $420,000 in Recovery Act funds. EM CAPITAL PORTFOLIO EM is tasked with solving the large scale, technically challenging risks and hazardous conditions posed by the

  15. 2010 Quality Assurance Improvement Project Plan

    Energy.gov [DOE]

    This Project Plan is jointly developed by  the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to...

  16. Report: EM Communications

    Office of Environmental Management (EM)

    ... Stevens is currently the Acting Director of the Office of Public Affairs, taking the place of Anne Womack Kolton. Mr. Stevens offered the following observations. Within EM, the ...

  17. EM News Flashes

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    +0000 1478496 at http:energy.gov Experts Explore Opportunities to Advance Use of Robotics in EM Cleanup http:energy.govemarticlesexperts-explore-opportunities-advance-use...

  18. EM-40 Document Hierarchy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM-5 Corporate Services Candice Trummell, APDAS EM-3 Field Operations Stacy Charboneau, APDAS Savannah River National Laboratory Policy Office EM-3.1 Safety, Security, and Quality Assurance Jim Hutton, DAS Greg Sosson, ADAS 3.11 Field Operations Oversight/CNS Greg Sosson, ADAS 3.111 Safety Management (Greg Sosson, Acting) 3.112 Operational Safety (Terrance Tracey) 3.113 Standards and Quality Assurance (Robert Murray) 3.114 Safeguards, Security, and Emergency Preparedness (Jimmy McMillian) EM-3.3

  19. EM Utility Contracts

    Office of Environmental Management (EM)

    22012 EM UTILITY CONTRACT Site State Supplier Executed Contract Type DOE Contract East Tennessee Technology Park TN Tennessee Valley Authority 4272007 Energy supply contract ...

  20. EM Recovery Act Performance

    Energy.gov [DOE]

    The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently achieved 74 percent footprint reduction, exceeding the originally established goal of 40...

  1. EM SSAB CHAIRS

    Office of Environmental Management (EM)

    ... opportunities are in the prime contractor's work scope ... Idaho National Laboratory EM CAB - Willie Preacher The INL CAB is ... In July, the members traveled to Sandia, where they ...

  2. West Valley Demonstration Project Unique Remote Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Approved for Public Release; Further Dissemination Unlimited West Valley Demonstration Project 2016 EM Success Story Jeff Bradford, President and General Manager CH2M HILL BWXT West Valley, LLC. September 14, 2016 www.energy.gov/EM 2 2016 Goals * Excellent Safety Performance * Complete the High-Level Waste Relocation and Storage Project * Complete the offsite shipment and disposal of the vitrification components (Melter, CFMT and MHFT) * Complete demolition preparations in the Extraction Cells

  3. EM Active Sites (large) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Active Sites (large) EM Active Sites (large) Center Map View All Maps Addthis

  4. Sinc function representation and three-loop master diagrams

    SciTech Connect

    Easther, Richard; Guralnik, Gerald; Hahn, Stephen

    2001-04-15

    We test the Sinc function representation, a novel method for numerically evaluating Feynman diagrams, by using it to evaluate the three-loop master diagrams. Analytical results have been obtained for all these diagrams, and we find excellent agreement between our calculations and the exact values. The Sinc function representation converges rapidly, and it is straightforward to obtain accuracies of 1 part in 10{sup 6} for these diagrams and with longer runs we found results better than 1 part in 10{sup 12}. Finally, this paper extends the Sinc function representation to diagrams containing massless propagators.

  5. Informational meeting on new environmental health and safety master's

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    degree program CSU environmental health and safety degree program Informational meeting on new environmental health and safety master's degree program WHEN: Mar 05, 2015 12:00 PM - 1:00 PM WHERE: Mesa Public Library Los Alamos, NM CONTACT: Terri Moore (505) 664-0947 CATEGORY: Community INTERNAL: Calendar Login Event Description The two-year degree program is offered by Colorado State University and is open to anyone who has a bachelor of science or bachelor of arts degree and has completed

  6. EM Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Monica Regalbuto. EM and National Science Foundation Partner for Nuclearized Robotics WASHINGTON, D.C. - EM recently signed a memorandum of understanding with the National...

  7. EM Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    search for a mock radiological source in a training exercise. EM Conducts Third Annual Spanish Language Training with Record Participation SAN DIEGO - EM conducted a training...

  8. Modeling the uptake and transpiration of TCE using phreatophytic trees. Master`s Thesis

    SciTech Connect

    Wise, D.P.

    1997-12-01

    Phytoremediation is a recent addition to the numerous methods used today to remediate ground water contaminants. It is proving more effective and efficient compared to existing remediation techniques. The use of phreatophytes, or water seeking trees, has great potential for phytoremediation. These trees are fast growing, long lived, grow their roots down to the ground water table, transpire large amounts of water, and are proven to actively remove contaminants from the soil horizon. The purpose of this research is to develop quantitative concepts for understanding the dynamics of TCE uptake and transpiration by phreatophytic trees over a short rotation woody crop time frame. This will he done by constructing a system dynamics model of this process and running it over a wide range of conditions. This research will offer managers a tool to simulate long-term uptake and transpiration of TCE at potential sites. The results of this study indicate that TCE is actively removed from the soil horizon by phreatophytic trees and a significant proportion of this TCE is then transpired. Changes in soil horizon parameters, xylem flow rates, and variables in the uptake equation greatly influence TCE uptake rates as well as transpiration. Also, parameters used in equations representing flows in and out of the leaf greatly influence transpiration. Better understanding of these processes is essential for managers to accurately predict the amount of TCE removed and transpired during potential phytoremediation projects.

  9. Evaluation of the Mesoscale Eta Model over the western United States. Master`s thesis

    SciTech Connect

    Swanson, R.T.

    1995-09-10

    The skill of the Mesoscale Eta Model is evaluated over a 6-month period from October 1, 1994 to March 31, 1995 over the western United States. This model will continue to undergo changes until and after its projected operational release in July 1995. Many diagnostics and error statistics are created to evaluate its performance as forecasts are received and archived at the University of Utah. These statistics are available on the Internet allowing researchers and operational forecasters access to them in near real-time. The Mesoscale Eta Model forecast initialized at 1200 UTC, 9 November 1994 is used as a case study to introduce many of the diagnostics developed to evaluate the model. A systematic evaluation of the average and root-mean-squared error over months and seasons reveals little significant bias in upper tropospheric fields such as 300 mb wind or 500 mb geopotential height. Moderate average errors are evident in lower tropospheric temperature. Accumulated precipitation over months and seasons indicates the model`s spinup of precipitation during the first 12 hours of the forecast cycle.

  10. Final report of Project 617, the Energy Saver

    SciTech Connect

    1996-12-31

    The Project work was begun in January of 1995 and was completed in May of 1996. The authors performed a broad value engineering study to examine all parts and functions to lower costs, improve functioning and safety. The results of the Phase 1 work was a total redesign of the original Energy Saver resulting in two components instead of three, a weight of four pounds versus the original fourteen pounds and a reduction from 21 pieces to 10 pieces. The manufactured cost dropped from $350 to $175. Based on these improvements the Value Improvement Project has been successful. The second generation unit was named the BROIL-MASTER and has been registered under the Provisional Application (Patent) Program. The authors performed a technical analysis to determine the potential energy savings of applications identified and collect data on host product gas consumption, payback period, and other cost/saving relationships. The industrial search for energy project applications for the authors design was not successful. Seven Broil-Master demonstration projects have been successfully completed. The Broil-Master has received certification from the American Gas Association and UL approval is due by the end of July. The Restaurant Equipment Test Center of Pacific Gas and Electric is interested in testing the Broil-Master sometime in 1996. The Broil-Master was shown at an International Restaurant Equipment Show in September, 1995 and the National Restaurant Show in May, 1996. The authors now have under way four tests with chains and several other tests pending.

  11. Coupled simulation of the reactor core using CUPID/MASTER

    SciTech Connect

    Lee, J. R.; Cho, H. K.; Yoon, H. Y.; Jeong, J. J.

    2012-07-01

    The CUPID is a component-scale thermal hydraulics code which is aimed for the analysis of transient two-phase flows in nuclear reactor components such as the reactor vessel, steam generator, containment. This code adopts a three-dimensional, transient, two-phase and three-field model, and includes physical models and correlations of the interfacial mass, momentum, and energy transfer for the closure. In the present paper, a multi-physics simulation was performed by coupling CUPID with a three dimensional neutron kinetics code, MASTER. MASTER is merged into CUPID as a dynamic link library (DLL). The APR1400 reactor core during a control rod drop/ejection accident was simulated as an example by adopting a porous media approach to employ a fuel assembly. The following sections present the numerical modeling for the reactor core, coupling of the kinetics code, and the simulation results. And also, a preliminary study for multi-scale simulation between CUPID and system-scaled thermal hydraulics code, MARS will be introduced as well. (authors)

  12. Thermodynamics of the polaron master equation at finite bias

    SciTech Connect

    Krause, Thilo Brandes, Tobias; Schaller, Gernot; Esposito, Massimiliano

    2015-04-07

    We study coherent transport through a double quantum dot. Its two electronic leads induce electronic matter and energy transport and a phonon reservoir contributes further energy exchanges. By treating the system-lead couplings perturbatively, whereas the coupling to vibrations is treated non-perturbatively in a polaron-transformed frame, we derive a thermodynamic consistent low-dimensional master equation. When the number of phonon modes is finite, a Markovian description is only possible when these couple symmetrically to both quantum dots. For a continuum of phonon modes however, also asymmetric couplings can be described with a Markovian master equation. We compute the electronic current and dephasing rate. The electronic current enables transport spectroscopy of the phonon frequency and displays signatures of Franck-Condon blockade. For infinite external bias but finite tunneling bandwidths, we find oscillations in the current as a function of the internal bias due to the electron-phonon coupling. Furthermore, we derive the full fluctuation theorem and show its identity to the entropy production in the system.

  13. EM Prepares to Demolish Most Hazardous Hanford Site Facility | Department

    Office of Environmental Management (EM)

    Plans | Department of Energy Marks Progress on Facilities, Outlines Safe Startup and Commissioning Plans EM Marks Progress on Facilities, Outlines Safe Startup and Commissioning Plans June 15, 2016 - 12:45pm Addthis Panelists at the event for the House Nuclear Cleanup Caucus included, left to right, Parsons Senior Vice President and Salt Waste Processing Facility Project Manager Frank Sheppard, EM Principal Deputy Assistant Secretary Mark Whitney, and Bechtel National Inc. Waste Treatment

  14. Microsoft PowerPoint - Johnson - How EM Does Business (FINAL)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    How EM Does Business Thomas Johnson, Jr. Associate Deputy Assistant Secretary for Acquisition and Project Management Environmental Management Site-Specific Advisory Board Chairs Meeting September 17, 2014 www.energy.gov/EM 2 Procurement Policy Implementation * Ensure contracts align with taxpayer interests and structure contracts so contractors bear responsibility * Hold contractors accountable for overruns due to negligence * Share savings due to better-than-promised performance * Improve

  15. EM's Richland Operations Office Marks Milestone in Preparing its

    Office of Environmental Management (EM)

    Energy Award for Role as Strong Small Businesses Advocate EM Wins Award for Role as Strong Small Businesses Advocate June 28, 2012 - 12:00pm Addthis DOE Office of Economic Impact and Diversity Director Dot Harris, left, presents the Sub-to-Prime Small Business Champion of the Year Award to EM Small Business Advocate Kay Rash, center, and EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash during DOE’s Fiscal Year 2011 DOE Secretarial Small Business Awards

  16. Master plate production for the tile calorimeter extended barrel modules.

    SciTech Connect

    Guarino, V.J.; Hill, N.; Petereit, E.; Price, L.E.; Proudfoot, J.; Wood, K.

    1999-03-10

    Approximately 41,000 master plates (Fig. 1) are required for the Extended Barrel Hadronic Calorimeter for the ATLAS experiment at the LHC. Early in the R&D program associated with the detector, it was recognized that the fabrication of these steel laminations was a significant issue, both in terms of the cost to produce these high precision formed plates, as well as the length of time required to produce all plates for the calorimeter. Two approaches were given serious consideration: laser cutting and die stamping. The Argonne group was a strong supporter of the latter approach and in late 1995 initiated an R&D program to demonstrate the feasibility and cost effectiveness of die stamping these plates by constructing a die and stamping approximately 2000 plates for use in construction of three full size prototype modules. This was extremely successful and die stamping was selected by the group for production of these plates. When the prototype die was constructed it was matched to the calorimeter envelope at that time. This subsequently changed. However with some minor adjustments in the design envelope and a small compromise in terms of instrumented volume, it became possible to use this same die for the production of all master plates for the Tile Calorimeter. Following an extensive series of discussions and an evaluation of the performance of the stamping presses available to our collaborators in Europe, it was decided to ship the US die to CERN for use in stamping master plates for the barrel section of the calorimeter. This was done under the supervision of CERN and JINR, Dubna, and carried out at the TATRA truck plant at Koprivinice, Czech Republic. It was a great success. Approximately 41,000 plates were stamped and fully met specification. Moreover, the production time was significantly reduced by avoiding the need of constructing and then qualifying a second die for use in Europe. This also precluded small geometrical differences between the barrel and

  17. Summary - Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN

    Office of Environmental Management (EM)

    & ORNL, Oak Ridge, TN EM Project: Integrated Facility Disposition Project (IFDP) ETR Report Date: August 2008 ETR-15 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN Why DOE-EM Did This Review Approximately two million pounds of mercury are unaccounted for at Y-12 and mercury contamination has been detected in both soils and groundwater. The IFDP will

  18. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    SciTech Connect

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  19. Report on Acquisition and Project Management Continuous Improvement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy on Acquisition and Project Management Continuous Improvement Report on Acquisition and Project Management Continuous Improvement EM senior management has committed to extensive management reforms and has completed several robust improvements in contract and project management. Additional improvement initiatives are continuing and this document outlines the consolidated plan of these initiatives in a top-down framework of EM vision, goals, strategies, performance metrics,

  20. About Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and ...

  1. Report: EM Communications

    Office of Environmental Management (EM)

    EMAB and specifically asked for the Board's input with regard to tools (e.g., plain language) and strategies that will allow EM to be proactive in its communications, and...

  2. EM Contractor Fee Payments

    Energy.gov [DOE]

    In the interest of furthering transparency in its government operations, the Department of Energy’s Office of Environmental Management (EM) herein is releasing information relating to fee payments...

  3. EM Headquarters Completes Reorganization

    Energy.gov [DOE]

    WASHINGTON, D.C. – EM headquarters is moving forward with a new organizational structure intended to further improve EM’s ability to effectively and efficiently conduct cleanup activities across the DOE complex.

  4. EM International Cooperative Program

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    June 16-20, 2014 Iraq Technical Assistance Meeting on Rad Waste Cleanup R. Elmetti, EM -2.1 Iraq Washington, D.C. To discuss the possibility of creating linkages to facilitate ...

  5. EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site

    Energy.gov [DOE]

    RICHLAND, Wash. – In this issue of the EM Update newsletter, EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site. This year marked the 10th anniversary of the River Corridor Closure Contract, the nation’s largest environmental cleanup closure project, managed by Washington Closure Hanford. The work has involved projects to clean up existing contamination and waste sites near the river, preventing contamination from reaching it, and cocooning or demolishing hundreds of structures no longer in use, including former reactors along the river that helped create materials for the U.S. nuclear weapons program.

  6. EM SSAB Funding Background

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Funding Background The Environmental Management Site Specific Advisory Board (EM SSAB), comprises 200+ individuals from eight regional Advisory Boards from Georgia, Idaho, Kentucky, Nevada, New Mexico, Ohio, Oregon, South Carolina, Tennessee and Washington. These Advisory Boards cumulatively represent a stakeholder population of millions of people affected by waste generator sites, transportation routes, and waste disposal areas. EM SSAB members commit their time and resources as volunteers to

  7. EM Update Presentation by David Huizenga

    Office of Environmental Management (EM)

    EM Program Update EM Site-Specific Advisory Board Chairs' Meeting October 2, 2012 David Huizenga Senior Advisor for Environmental Management www.em.doe.gov safety performance ...

  8. EM Utility Contracts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Utility Contracts EM Utility Contracts Table providing summary information of EM awards for utility services. PDF icon EM Utility Contracts More Documents & Publications Land and ...

  9. EM Telemetry Tool for Deep Well Drilling Applications

    SciTech Connect

    Jeffrey M. Gabelmann

    2005-11-15

    This final report discusses the successful development and testing of a deep operational electromagnetic (EM) telemetry system, produced under a cooperative agreement with the United States Department of Energy's National Energy Technology Laboratory. This new electromagnetic telemetry system provides a wireless communication link between sensors deployed deep within oil and gas wells and data acquisition equipment located on the earth's surface. EM based wireless telemetry is a highly appropriate technology for oil and gas exploration in that it avoids the need for thousands of feet of wired connections. In order to achieve the project performance objectives, significant improvements over existing EM telemetry systems were made. These improvements included the development of new technologies that have improved the reliability of the communications link while extending operational depth. A key element of the new design is the incorporation of a data-fusion methodology which enhances the communication receiver's ability to extract very weak signals from large amounts of ambient environmental noise. This innovative data-fusion receiver based system adapts advanced technologies, not normally associated with low-frequency communications, and makes them work within the harsh drilling environments associated with the energy exploration market. Every element of a traditional EM telemetry system design, from power efficiency to reliability, has been addressed. The data fusion based EM telemetry system developed during this project is anticipated to provide an EM tool capability that will impact both onshore and offshore oil and gas exploration operations, for conventional and underbalanced drilling applications.

  10. Summary - Plutonium Preparation Project at the Savannah River Site

    Office of Environmental Management (EM)

    Site EM Project: PuPP ETR Report Date: October 2008 ETR-17 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Plutonium Preparation Project at the Savannah River Site Why DOE-EM Did This Review The purpose of the Plutonium Preparation Project (PuPP) is to prepare for disposition of plutonium materials; for examination, re-stabilization, and disassembly of the Fast Flux Test Facility (FFTF) unirradiated fuel; and for repackaging of Pu

  11. EM Develops Database for Efficient Solutions to Nuclear Cleanup Challenges Across Complex

    Energy.gov [DOE]

    WASHINGTON, D.C. – Many deactivation and decommissioning (D&D) projects across the EM complex require robotic and remote handling systems to protect workers during nuclear cleanup operations.

  12. EM Employees at West Valley Help Beat Goal for Food Banks

    Energy.gov [DOE]

    WEST VALLEY, N.Y. – EM employees and their contractor counterparts at the West Valley Demonstration Project (WVDP) have supported their local food banks for several years, and this year was no exception.

  13. WIPP Project Records Management Handbook

    SciTech Connect

    Not Available

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, Records Disposition'' ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project.

  14. EM Tribal Programs in Indian Country | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in Indian Country EM Tribal Programs in

  15. Projects | MIT-Harvard Center for Excitonics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Projects Exciton - a quasiparticle excitation consisting of a bound electron and hole that mediates the absorption and emission of light, especially in disordered and low-dimensional materials. figure1-website-fission We seek to supersede traditional electronics with devices that use excitons to mediate the flow of energy. Mastering the properties of excitons offers the ability to guide energy at the nanoscale, and transform it with a flexibility that is impossible in conventional systems. For

  16. Oil and gas field code master list 1997

    SciTech Connect

    1998-02-01

    The Oil and Gas Field Code Master List 1997 is the sixteenth annual listing of all identified oil and gas fields in the US. It is updated with field information collected through October 1997. The purpose of this publication is to provide unique, standardized codes for identification of domestic fields. Use of these field codes fosters consistency of field identification by government and industry. As a result of their widespread adoption they have in effect become a national standard. The use of field names and codes listed in this publication is required on survey forms and other reports regarding field-specific data collected by EIA. There are 58,366 field records in this year`s FCML, 437 more than last year. The FCML includes: field records for each State and county in which a field resides; field records for each offshore area block in the Gulf of Mexico in which a field resides; field records for each alias field name (definition of alias is listed); fields crossing State boundaries that may be assigned different names by the respective State naming authorities. This report also contains an Invalid Field Record List of 4 records that have been removed from the FCML since last year`s report. These records were found to be either technically incorrect or to represent field names which were never recognized by State naming authorities.

  17. EM International Program Action Table

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Design and Operations N. Buschman, EM-22 Germany Albuquerque & Carlsbad, NM Continue ... and Research (BMBF) G. DeLeon, EM-22 Germany Cologne, Germany Follow-up meeting from ...

  18. EM Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    29, 2015 'One EM Team' Concept Among Team's Recommendations to Improve Work Culture WASHINGTON, D.C. - EM headquarters employees enjoy their work, put in extra effort to get a job...

  19. West Valley Demonstration Project Unique Remote Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Path to Success Beyond Phase 1 Facility Disposition Bryan Bower U.S. Department of Energy West Valley Demonstration Project September 14, 2016 www.energy.gov/EM 2 Approved for Public Release; Further Dissemination Unlimited Where we are . . . www.energy.gov/EM 3 Approved for Public Release; Further Dissemination Unlimited and where we are going. 4 Decision Making Process Phase 2 Decommissioning (Decisions made by 2020) Phase 2 Decisions Decisions for disposition of remaining facilities : 

  20. EM/Stewardship Committee meeting

    Energy.gov [DOE]

    The Oak Ridge Site Specific Advisory Board's EM/Stewardship Committee meeting is open to the public.

  1. EM SSAB Charter 2016.pdf

    Energy Saver

    Funding Payment Summary by Site EM Recovery Act Funding Payment Summary by Site Summary table of EM Recovery Act Spending Plan which shows dollar amounts obligated to contracts, payments to date and unpaid balances by site. EM Recovery Act Funding Payment Summary by Site - 03/10/14 (14.87 KB) More Documents & Publications American Recovery and Reinvestment Act Payments Surge Past $4 Billion American Recovery and Reinvestment Act Payments Surge Past $5 Billion EM Recovery Act Lessons Learned

  2. EM Highlights Advisory Board Contributions

    Energy.gov [DOE]

    Advisory board contributions to the EM program were the subject of a session at the Waste Management Conference.

  3. EM-40 Document Hierarchy

    Energy Saver

    Year in Review at Savannah River Site EM's Year in Review at Savannah River Site December 23, 2014 - 12:00pm Addthis This photo shows the dissolution of fuel from the Sodium Reactor Experiment Campaign in H-Canyon. This photo shows the dissolution of fuel from the Sodium Reactor Experiment Campaign in H-Canyon. AIKEN, S.C. - The EM program at the Savannah River Site (SRS) achieved many accomplishments in 2014: Dissolved fuel in the Sodium Reactor Experiment Campaign in H-Canyon; the fuel in this

  4. The IPHI Project

    SciTech Connect

    Ferdinand, Robin; Beauvais, Pierre-Yves

    2005-06-08

    High Power Proton Accelerators (HPPAs) are studied for several projects based on high-flux neutron sources driven by proton or deuteron beams. Since the front end is considered as the most critical part of such accelerators, the two French national research agencies CEA and CNRS decided to collaborate in 1997 to study and build a High-Intensity Proton Injector (IPHI). The main objective of this project is to master the complex technologies used and the concepts of manufacturing and controlling the HPPAs. Recently, a collaboration agreement was signed with CERN and led to some evolutions in the design and in the schedule. The IPHI design current was maintained at 100 mA in Continuous Wave mode. This choice should allow to produce a high reliability beam at reduced intensity (typically 30 mA) tending to fulfill the Accelerator Driven System requirements. The output energy of the Radio Frequency Quadrupole (RFQ), was reduced from 5 to 3 MeV, allowing then the adjunction and the test, in pulsed operation of a chopper line developed by CERN for the Superconducting Proton Linac (SPL). In a final step, the IPHI RFQ and the chopper line should become parts of the SPL injector. In this paper, the IPHI project and the recent evolutions are reported together with the construction and operation schedule.

  5. EM Makes Progress on GAO High-Risk List

    Energy.gov [DOE]

    WASHINGTON, D.C. – The U.S. Government Accountability Office (GAO) has removed EM capital asset projects of $750 million or less from its high-risk list because of the nuclear cleanup program’s progress in completing that work.

  6. EM Lab Addresses Waste Challenge, Improves Worker Safety

    Energy.gov [DOE]

    AIKEN, S.C. – EM is funding research at the Savannah River National Laboratory to develop a material to safely contain the radioactive waste generated by a planned multi-year decontamination project at the Savannah River Site (SRS) while the waste is being shipped for disposal.

  7. Environmental Management Completed Projects 2005-Present | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Completed Projects 2005-Present Environmental Management Completed Projects 2005-Present This document provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project's performance related to cost, schedule, and scope. Environmental Management Completed Projects 2005-Present (389.48 KB) More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental

  8. About the Uniform Methods Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Initiatives & Projects » Uniform Methods Project » About the Uniform Methods Project About the Uniform Methods Project The Uniform Methods Project is developing measurement and verification protocols for determining energy savings for commonly implemented program measures. This work is being done through collaboration with energy efficiency program administrators, stakeholders, and EM&V consultants-including the firms that perform roughly 70% of the energy efficiency evaluations in

  9. Best-In-Class Project Management Initiative Corporate Implementation Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Best-In-Class Project Management Initiative Corporate Implementation Plan Best-In-Class Project Management Initiative Corporate Implementation Plan To continue Project Management and Contract Management Improvements, DOE EM has developed a vision for building a "Best-in-Class" Project Management and Contract Management organization. Click here to read the Corporate Initiative Plan. Best-in-Class Project Management Initiative Corporate Implementation Plan

  10. Project Management Career Development Program

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management Career Development Program Certified Federal Project Directors * Program Secretarial Office Name Certification Level Certified FPD Since EA LOW,JAMES O Level I 10/14/2009 EE BUMBACA,PRISCILLA B Level I 01/25/2011 EE COLLETTE,GREGORY D Level II 04/28/2006 EE DINS,RANDALL S Level II 02/13/2009 EE GRAHAM,MATT E Level III 04/28/2006 EE SWEENEY,ROBIN L Level I 11/21/2008 EM ABDUL,WAHED NMN Level III 12/08/2006 EM ADAMS,KAREN M Level I 07/31/2009 EM ADAMS,VINCENT NMN Level III 12/08/2006

  11. Smarter finance for cleaner energy: open up master limited partnerships (MLPs) and real estate investment trusts (REITs) to renewable energy investment

    SciTech Connect

    Mormann, Feliz; Reicher, Dan

    2012-11-15

    Master Limited Partnerships (MLPs) and Real Estate Investment Trusts (REITs)—both well-established investment structures—should be opened up to renewable energy investment. MLPs and, more recently, REITs have a proven track record for promoting oil, gas, and other traditional energy sources. When extended to renewable energy projects these tools will help promote growth, move renewables closer to subsidy independence, and vastly broaden the base of investors in America’s energy economy. The extension of MLPs and REITs to renewables enjoys significant support from the investment and clean energy communities. In addition, MLPs for renewables also enjoy bipartisan political backing in Congress.

  12. Master Acronym List for DOE-STD-3009-2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE-STD-1104-2014 Master Acronym List DOE-STD-3009-2014 Training Modules (Changes to DOE-STD-3009 and Expectations for Effective Implementation) DOE-STD-3009-2014 Frequently Asked ...

  13. MHK ISDB/Instruments/ChannelMaster H-ADCP | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ChannelMaster H-ADCP < MHK ISDB Jump to: navigation, search MHK Instrumentation & Sensor Database Menu Home Search Add Instrument Add Sensor Add Company Community FAQ Help Under...

  14. Diffusion approximations to the chemical master equation only have a consistent stochastic thermodynamics at chemical equilibrium

    SciTech Connect

    Horowitz, Jordan M.

    2015-07-28

    The stochastic thermodynamics of a dilute, well-stirred mixture of chemically reacting species is built on the stochastic trajectories of reaction events obtained from the chemical master equation. However, when the molecular populations are large, the discrete chemical master equation can be approximated with a continuous diffusion process, like the chemical Langevin equation or low noise approximation. In this paper, we investigate to what extent these diffusion approximations inherit the stochastic thermodynamics of the chemical master equation. We find that a stochastic-thermodynamic description is only valid at a detailed-balanced, equilibrium steady state. Away from equilibrium, where there is no consistent stochastic thermodynamics, we show that one can still use the diffusive solutions to approximate the underlying thermodynamics of the chemical master equation.

  15. Improve Motor System Efficiency for a Broad Range of Motors with MotorMaster+ International

    SciTech Connect

    2005-05-01

    Available at no charge, MotorMaster+ International is designed to support motor systems improvement planning at industrial facilities by identifying the most cost-effective choice when deciding to repair or replace older motor models.

  16. Improving the Department's Management of Projects

    Energy.gov [DOE]

    DOE is managing some of the largest, most complex, and technically challenging projects in the public or private sector. Many are one-of-a-kind projects that involve the risks and challenges of nuclear operations. The Department made significant progress over the past five years in improving overall project management, and in 2013 the GAO narrowed its High-Risk List focus at the Department to NNSA and EM projects valued at more than $750 million. Based on this progress, this secretarial memorandum makes improving project management a continuing priority.

  17. Eight Y-12 employees awarded master's in engineering management | Y-12

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    National Security Complex Eight Y-12 employees ... Eight Y-12 employees awarded master's in engineering management Posted: March 28, 2014 - 3:22pm Eight employees at Y-12 recently earned a master's in industrial engineering with a concentration in engineering management at the University of Tennessee-Knoxville. Students pursuing this degree complete the 16-course, four-semester program as an ensemble, attending all-day Friday classes not held on the university campus. "This particular

  18. _Dear Reader_Cover Sheet_Master Table of Contents

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    & EASTERN CLEAN LINE TRANSMISSION PROJECT E N V I R O N M E N T A L I M P A C T S T A T E M E N T U.S. DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability Washington, DC December 2014 Volume I of V Dear Reader: Enclosed for your review and comment is the U.S. Department of Energy's (DOE's) Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Line Project (Draft EIS). Included with the Draft EIS is a Reference CD, which includes key

  19. Overview of the US Department of Energy Master Safeguards and Security Agreement program

    SciTech Connect

    Billings, M.P.; Duncan, M.R.; Craig, J.R.

    1988-06-01

    The Master Safeguards and Security Agreement establishes a contract between the US Department of Energy-Headquarters and a US Department of Energy regional Operations Office regarding protection strategies, protection system performance, and acceptability of risks for US Department of Energy Safeguards and Security interests at a facility or site. An approved Master Safeguards and Security Agreement defines the protection system performance baseline for evaluations, inspections, and audits, and can introduce exceptions to US Department of Energy orders. Responsibilities and authorities for development and approval of a Master Safeguards and Security Agreement are outlined in US Department of Energy Order 5630.13, ''Master Safeguards and Security Agreement'' and US Department of Energy Order 5630.xx, ''Safeguards and Security Planning Program'' (draft). To date, 14 Master Safeguards and Security Agreements have been approved by the US Department of Energy-Headquarters and about 34 are in preparation or review. A total of approximately 50 are anticipated before completion of the program. The Master Safeguards and Security agreement program has been positively received by both the US Department of Energy-Headquarters and the US Department of Energy Operations Offices, because it provides visibility as to the effectiveness of Safeguards and Security protection systems and affords a sensible foundation for security planning based on risk. 6 refs., 3 figs., 6 tabs.

  20. Memorandum: Participation of the EM SSAB, Stakeholders, and Regulators...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Participation of the EM SSAB, Stakeholders, and Regulators in EM Budget Requests Memorandum: Participation of the EM SSAB, Stakeholders, and Regulators in EM Budget Requests From: ...

  1. EM-LA Press Releases | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Press Releases EM-LA Press Releases October 6, 2016 Los Alamos Townsite Cleanup Complete at TA-01 LOS ALAMOS, N.M. - The U.S. Department of Energy Environmental Management Los Alamos Field Office (EM-LA) and Los Alamos National Laboratory (LANL) have completed a project to remove contaminated soil from four legacy waste sites along the south-facing slopes of Los Alamos Canyon adjacent to the Los Alamos Townsite. September 21, 2016 DOE Releases Final Request for Proposal for Los Alamos Legacy

  2. Statistical Analyses for Probabilistic Assessments of the Reactor Pressure Vessel Structural Integrity: Building a Master Curve on an Extract of the 'Euro' Fracture Toughness Dataset, Controlling Statistical Uncertainty for Both Mono-Temperature and multi-temperature tests

    SciTech Connect

    Josse, Florent; Lefebvre, Yannick; Todeschini, Patrick; Turato, Silvia; Meister, Eric

    2006-07-01

    Assessing the structural integrity of a nuclear Reactor Pressure Vessel (RPV) subjected to pressurized-thermal-shock (PTS) transients is extremely important to safety. In addition to conventional deterministic calculations to confirm RPV integrity, Electricite de France (EDF) carries out probabilistic analyses. Probabilistic analyses are interesting because some key variables, albeit conventionally taken at conservative values, can be modeled more accurately through statistical variability. One variable which significantly affects RPV structural integrity assessment is cleavage fracture initiation toughness. The reference fracture toughness method currently in use at EDF is the RCCM and ASME Code lower-bound K{sub IC} based on the indexing parameter RT{sub NDT}. However, in order to quantify the toughness scatter for probabilistic analyses, the master curve method is being analyzed at present. Furthermore, the master curve method is a direct means of evaluating fracture toughness based on K{sub JC} data. In the framework of the master curve investigation undertaken by EDF, this article deals with the following two statistical items: building a master curve from an extract of a fracture toughness dataset (from the European project 'Unified Reference Fracture Toughness Design curves for RPV Steels') and controlling statistical uncertainty for both mono-temperature and multi-temperature tests. Concerning the first point, master curve temperature dependence is empirical in nature. To determine the 'original' master curve, Wallin postulated that a unified description of fracture toughness temperature dependence for ferritic steels is possible, and used a large number of data corresponding to nuclear-grade pressure vessel steels and welds. Our working hypothesis is that some ferritic steels may behave in slightly different ways. Therefore we focused exclusively on the basic french reactor vessel metal of types A508 Class 3 and A 533 grade B Class 1, taking the sampling

  3. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  4. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  5. Project Accounts

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:50

  6. Project Financing

    Office of Environmental Management (EM)

    evaluate a Federal Energy Efficiency Project across three broad risk categories: - Contract Risk - Project Risk - Participant Risk * Ultimately, pricing and terms are set by ...

  7. Project Gnome

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961 ...

  8. ECT* EM Probes Programme

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Electromagnetic Probes of Hot and Dense Matter ECT* Programme, Trento, June 3-11, 2005 Organizers: Peter Braun-Munzinger, Charles Gale and Ralf Rapp (coordinator) Scope of the Meeting: Due to their penetrating character, electromagnetic (e.m.) observables (photons and lepton pairs) are unique and powerful probes of the high-energy density matter created in high-energy collisions of heavy nuclei. On the one hand, photons and dileptons of invariant masses and/or transverse momenta above about 1

  9. EM Quality Assurance Program (EM-QA-001 Revision 1)

    Energy.gov [DOE]

    The purpose of this document is to describe the U.S. Department of Energy (DOE), Office of Environmental Management (EM) Quality Assurance Program (QAP).

  10. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    SciTech Connect

    Sanford, P.C.; Moe, M.A.; Hombach, W.G.; Urdangaray, R.

    2013-07-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

  11. Contact EM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    About Us » Contact EM Contact EM For information about the Office of Environmental Management and its programs; for assistance in information on this website; or for general information purposes: By E-Mail: EM.WebContentManager@em.doe.gov By Mail: U.S. Department of Energy ATTENTION: Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 By Phone: 202-586-5000 (Main DOE Switchboard) 202-586-7709 (Office of Environmental Management) National DOE Phone Directory For

  12. Engineers Society Awards EM Employee

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, D.C. – An EM employee has been honored for bringing a greater international perspective to work to maintain standards for nuclear quality assurance.

  13. Report: EM Human Capital Initiatives

    Office of Environmental Management (EM)

    HUMAN CAPITAL September 25, 2008 Submitted by the EMAB Human Capital Subcommittee Background: The enhancement of the Office of Environmental Management's (EM) human capital has ...

  14. EM News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of River Protection (ORP), named a winning team earlier this year. December 29, 2015 EM employees Carol Ward, right, and Marlenia Murray, center, serve hot dogs and...

  15. EM Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of River Protection (ORP), named a winning team earlier this year. December 29, 2015 EM employees Carol Ward, right, and Marlenia Murray, center, serve hot dogs and...

  16. EM Highlights | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FY 2012 Budget Request Highlights (927.14 KB) More Documents & Publications EM SSAB Conference Calls - December 15, 2004 FY 2013 Budget Justification FY 2014 Budget Justification

  17. Project Controls

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  18. Collaborative Computational Project for Electron cryo-Microscopy

    SciTech Connect

    Wood, Chris; Burnley, Tom [Science and Technology Facilities Council, Research Complex at Harwell, Didcot OX11 0FA (United Kingdom); Patwardhan, Ardan [European Molecular Biology Laboratory, Wellcome Trust Genome Campus, Hinxton, Cambridge CB10 1SD (United Kingdom); Scheres, Sjors [MRC Laboratory of Molecular Biology, Francis Crick Avenue, Cambridge Biomedical Campus, Cambridge CB2 0QH (United Kingdom); Topf, Maya [University of London, Malet Street, London WC1E 7HX (United Kingdom); Roseman, Alan [University of Manchester, Oxford Road, Manchester M13 9PT (United Kingdom); Winn, Martyn, E-mail: martyn.winn@stfc.ac.uk [Science and Technology Facilities Council, Daresbury Laboratory, Warrington WA4 4AD (United Kingdom); Science and Technology Facilities Council, Research Complex at Harwell, Didcot OX11 0FA (United Kingdom)

    2015-01-01

    The Collaborative Computational Project for Electron cryo-Microscopy (CCP-EM) is a new initiative for the structural biology community, following the success of CCP4 for macromolecular crystallography. Progress in supporting the users and developers of cryoEM software is reported. The Collaborative Computational Project for Electron cryo-Microscopy (CCP-EM) has recently been established. The aims of the project are threefold: to build a coherent cryoEM community which will provide support for individual scientists and will act as a focal point for liaising with other communities, to support practising scientists in their use of cryoEM software and finally to support software developers in producing and disseminating robust and user-friendly programs. The project is closely modelled on CCP4 for macromolecular crystallography, and areas of common interest such as model fitting, underlying software libraries and tools for building program packages are being exploited. Nevertheless, cryoEM includes a number of techniques covering a large range of resolutions and a distinct project is required. In this article, progress so far is reported and future plans are discussed.

  19. Recommendation 179: DOE Quarterly Project Reviews | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: DOE Quarterly Project Reviews Recommendation 179: DOE Quarterly Project Reviews ORSSAB Recommendation to DOE on Providing Information in the DOE Quarterly Project Reviews. Recommendation 179 (107.34 KB) DOE response to recommendation 179 (293.68 KB) More Documents & Publications Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 164: Recommendation on Engineering and Technology Development on the Oak Ridge Reservation Recommendation 163:

  20. Moab Project Receives Award for Purchasing Environmentally Friendly

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Products | Department of Energy Moab Project Receives Award for Purchasing Environmentally Friendly Products Moab Project Receives Award for Purchasing Environmentally Friendly Products February 26, 2014 - 12:00pm Addthis MOAB, Utah - EM's Moab Uranium Mill Tailings Remedial Action Project in Utah was one of three GreenBuy Award recipients for fiscal year 2013. DOE's Office of Sustainability Support awarded the Moab Project the highest level - the Gold Award - for achieving nine goals in

  1. DOE Office of Environmental Management Project and Contract Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Improvement Timeline | Department of Energy Acquisition » DOE Office of Environmental Management Project and Contract Management Improvement Timeline DOE Office of Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. View some highlights of EM's improvement actions here. DOE Office of Environmental Management Contract and Project Management

  2. EM Headquarters Office Ensures Safeguards, Security, Emergency...

    Energy Saver

    Its role assisting, assessing, and advocating for EM field sites is similar to the functions of the rest of EM headquarters. But the office differs with its focus on ensuring EM's ...

  3. EM News Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    July 20, 2015 Douglas E. Hintze was named the manager of the new EM Los Alamos Field Office. EM Names Los Alamos Field Office Manager LOS ALAMOS, N.M. - EM announced today the...

  4. Advisory Board Makes Valuable Contributions to EM

    Energy.gov [DOE]

    WASHINGTON, D.C. – The eight local boards of the EM Site-Specific Advisory Board (EM SSAB) provided 56 recommendations collectively in 2011, according to a recent assessment of board input into the EM program.

  5. Project Information

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-RIC REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory FE0027167 High Yield and Economical

  6. EM's Paducah Site Completes Building Removals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM's Paducah Site Completes Building Removals EM's Paducah Site Completes Building Removals Addthis

  7. EM SSAB Recommendations & Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    December 23, 2015 EM SSAB Recommendations and Letters - 2015-01 Included recommendations, letters, and other related materials. September 30, 2014 EM SSAB Recommendations and ...

  8. EM Contractor Fee

    Office of Environmental Management (EM)

    Portsmouth Environmental Technical Services II Contractor: Restoration Services Inc Contract Number: DE-EM0002639 Contract Type: Cost Plus Award Fee Total Estimated Contract Cost: $51,615,957 Contract Base Period: October 1, 2013 - September 30, 2016 Contract Option Period: Option 1: 10/1/16 - 9/30/18 Fee Information Minimum Fee $0 Maximum Fee $1,179,075 Performance Period Fee Available Fee Earned FY2014 $389,929 $358,735 FY2015 $392,092 $360,725 FY2016 $397,054 FY2017 (Option) $0 FY2018

  9. EM Issues Summary

    Office of Environmental Management (EM)

    of Energy Issues Amended Decision to Expand Use of Nuclear Facility EM Issues Amended Decision to Expand Use of Nuclear Facility April 1, 2013 - 12:00pm Addthis H-Canyon at Savannah River Site. The building is called a canyon because of its long rectangular shape and two continuous trenches that contains process vessels. H-Canyon at Savannah River Site. The building is called a canyon because of its long rectangular shape and two continuous trenches that contains process vessels. AIKEN, S.C.

  10. DE-EM0003383

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5EM001741 See Block 16C 0008 12 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth

  11. DE-EM0003383

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    EM000757 See Block 16C 0011 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  12. DE-EM0003383

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    EM001381 See Block 16C 0013 6 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  13. EM Mercury Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technology Plan to Address the EM Mercury Challenge FEBRUARY 2016 Table of Contents SUMMARY 1 1. BACKGROUND 2 1.1 OAK RIDGE RESERVATION'S MERCURY CHALLENGE 2 1.2 SAVANNAH RIVER SITE'S MERCURY CHALLENGE 3 2. APPROACH 4 3. OREM'S 2014 TECHNOLOGY DEVELOPMENT PLAN 5 4. RESEARCH AND TECHNOLOGY DEVELOPMENT AREAS FOR OAK RIDGE 6 4.1 MERCURY DETECTION AND MEASUREMENT 6 4.2 Y-12 SITE CLEANUP 7 4.3 EAST FORK POPLAR CREEK REMEDIATION 9 4.4 MODELING 10 5. RESEARCH AND TECHNOLOGY DEVELOPMENT AREAS FOR THE

  14. Mastering the art of plutonium pit production to ensure national security

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Mastering the art of plutonium pit production Mastering the art of plutonium pit production to ensure national security For 19 years, the U.S. was the only nuclear superpower unable to build a pit and put it in a stockpile. That ended in 2007. April 24, 2012 Recapturing the capability of making plutonium pits "Pit manufacturing is an art," Putnam asserts. By learning from experienced subject-matter experts at Rocky Flats, LANL, and Lawrence Livermore National Laboratory, the Plutonium

  15. Microsoft PowerPoint - Master Presentation - Consolidated (10-27-14) [Compatibility Mode]

    Office of Environmental Management (EM)

    5 th Quality Assurance Corporate Board U.S. Dept. of Energy - Office of Environmental Management Nevada Federal Building - Room: Auditorium October 27, 2014 Time (local) Topic Presenter General Overview and Introductory Remarks 8:00-8:10 am Introductions, Roll Call, and Status from Last Meeting Larry Perkins (EM-43) 8:10-8:25 am Opening Remarks and General Status of EM Quality Assurance Program Jim Hutton (EM-40) Bob Murray (EM-43) 8:25 - 8:40 am Current Efforts from CNS Debbie Sparkman (CNS)

  16. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    SciTech Connect

    Cercy, M; Ronald Fayfich, R; Steven P Schneider, S

    2008-12-12

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  17. Technical Risk Rating of DOE Environmental Projects - 9153

    SciTech Connect

    Cercy, Michael; Fayfich, Ronald; Schneider, Steven

    2009-02-11

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  18. Breakout Session EM 1

    Office of Environmental Management (EM)

    Nuclear Fuel (SNF) Transfer between SRS and INL Scotty DeClue, PE, PMP Federal Project Director This information is not approved for release to the public or a foreign national; further distribution is prohibited without written approval from the DOE-SR Technical Information Officer 2/22/2008 2 2006 DOE approved the Enriched Uranium Disposition Project Plan which included the H-Canyon facility at SRS to process Al-based SNF 2007 DOE approved the Enriched Uranium Disposition Project Baseline A

  19. Workers Access Cell in First Human Entry in 20 Years at EM's West Valley

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site | Department of Energy Access Cell in First Human Entry in 20 Years at EM's West Valley Site Workers Access Cell in First Human Entry in 20 Years at EM's West Valley Site June 30, 2016 - 12:50pm Addthis WEST VALLEY, N.Y. - It has been 20 years since a human has been allowed in the Vitrification Cell at EM's West Valley Demonstration Project (WVDP), where past operations involved solidifying liquid high-level radioactive waste. WVDP workers are cleaning up the cell in the Vitrification

  20. Line Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  1. EM SSAB CHAIRS

    Office of Environmental Management (EM)

    ... was shipped, which is 12% of the initial forecast for disposal at the NNSS in FY 2012. ... activity D&D debris. OR U233 - A revised project strategy is being implemented with U233 ...

  2. EM-1 Related Memorandum

    Office of Environmental Management (EM)

    for that project phase should have justification for the reduced score at the Energy ... Expected Score CD-0 Mission Need Justification 400 CD-1CD-2 ConceptualPreliminary ...

  3. Masters Study in Advanced Energy and Fuels Management

    SciTech Connect

    Mondal, Kanchan

    2014-12-08

    There are currently three key drivers for the US energy sector a) increasing energy demand and b) environmental stewardship in energy production for sustainability and c) general public and governmental desire for domestic resources. These drivers are also true for energy nation globally. As a result, this sector is rapidly diversifying to alternate sources that would supplement or replace fossil fuels. These changes have created a need for a highly trained workforce with a the understanding of both conventional and emerging energy resources and technology to lead and facilitate the reinvention of the US energy production, rational deployment of alternate energy technologies based on scientific and business criteria while invigorating the overall economy. In addition, the current trends focus on the the need of Science, Technology, Engineering and Math (STEM) graduate education to move beyond academia and be more responsive to the workforce needs of businesses and the industry. The SIUC PSM in Advanced Energy and Fuels Management (AEFM) program was developed in response to the industries stated need for employees who combine technical competencies and workforce skills similar to all PSM degree programs. The SIUC AEFM program was designed to provide the STEM graduates with advanced technical training in energy resources and technology while simultaneously equipping them with the business management skills required by professional employers in the energy sector. Technical training include core skills in energy resources, technology and management for both conventional and emerging energy technologies. Business skills training include financial, personnel and project management. A capstone internship is also built into the program to train students such that they are acclimatized to the real world scenarios in research laboratories, in energy companies and in government agencies. The current curriculum in the SIUC AEFM will help fill the need for training both recent

  4. Moab UMTRA Project/LM Technical Exchange | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Moab UMTRA Project/LM Technical Exchange Moab UMTRA Project/LM Technical Exchange July 18, 2016 - 12:20pm Addthis What does this project do? Goal 2. Preserve, protect, and share records and information 01. EM-LM Tech Exchange.png Technical exchange meeting attendees (from left) Don Metzler, EM; Ken Karp, LM contractor; Mark Kautsky, LM; and Scott Den Baars, LM contractor; mingle with past and present co-workers during the meet and greet. The first U.S. Department of Energy (DOE) Office of

  5. Project Benefits

    Energy.gov [DOE]

    Benefits of the Guidelines for Home Energy Professionals project including reducing energy upgrade costs for consumers, employers, and program administrators.

  6. Hydropower Projects

    Energy.gov [DOE]

    This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

  7. Economics of chlorofluorocarbon (CFC) machine replacement. Master's thesis

    SciTech Connect

    Rudderow, G.D.

    1994-09-01

    Continued use of chlorofluorocarbon (CFC) refrigerants may have a severe financial as well as operational impact on the users of air-conditioning and other refrigeration equipment as price increases continue and production is phased out. With production of CFC's coming to a halt on 31 December 1995, the two major refrigerants that have been used in commercial and industrial cooling applications will no longer be available. The phase out of production is a result of national and international agreement that these, as well as other CFC's, are a primary cause of the depletion of the stratospheric ozone layer. To help the user reduce this impact, an economic model based on the time value of money and utilizing replacement analysis was developed. The model is designed to require the user to supply information on his own equipment and on the projected costs of non-CFC replacement equipment. After running the model, the point in time when the existing equipment should be replaced is indicated. By way of example, the model is applied to a centrifugal chiller application. The results of this approach indicate that the increase in CFC costs is only a small factor in the cost of chiller operation. Rather than make a replacement to avoid the high price of refrigerant, the controlling factor is the overall cost of power consumption required to provide the cooling effect.

  8. On One Master Integral for Three-loop On-shell HQET Propagator Diagrams with Mass

    SciTech Connect

    Grozin, A.G.; Huber, T.; Maitre, D.; /SLAC

    2007-06-26

    An exact expression for the master integral I{sub 2} [1] arising in three-loop on-shell HQET propagator diagrams with mass is derived and its analytical expansion in the dimensional regularization parameter {var_epsilon} is given.

  9. EM Quality Assurance Program (EM-QA-001 Revision 0)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Previous revision of the Environmental Management Quality Assurance Program. The program is the EM management system to ensure we "do work correctly." This document has been superseded by Revision...

  10. Modeling study for the implementation of in situ cometabolic bioremediation of trichloroethylene-contaminated groundwater. Master`s Thesis

    SciTech Connect

    Christ, J.A.

    1997-12-01

    The limitations of conventional groundwater remediation technologies have led to the development of innovative technologies which may achieve national hazardous waste site remediation goals. Before an innovative technology can be implemented in the field, remedial project managers, regulators and other stakeholders require adequate modeling tools to help assess the applicability of the technology at a particular site. This modeling study investigates how an innovative technology, in situ cometabolic bioremediation, might be implemented to remediate a TCE-contaminated site, under different site conditions. A steady-state model is developed which couples an analytical expression to simulate the effect of flow between multiple pumping and injection wells, with an expression to calculate TCE removal as groundwater circulates through in situ bioreactors established around the injection wells. Varying site conditions and well configurations are investigated to determine their effect on the overall treatment efficiency of a system. A dual screen well design is found to be an effective method for contaminant capture and treatment given typical values of anisotropy. Investigation of a multiple row implementation concept proves it to be an effective configuration for site cleanup. The model is integrated into interactive software which serves as a technology screening tool.

  11. EM News Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    News Flashes EM News Flashes RSS September 28, 2016 EM Releases Supporting Materials from 2016 National Cleanup Workshop WASHINGTON, D.C. - EM is making available support materials from the 2016 National Cleanup Workshop. The materials include speaker presentations, photos from the workshop and an attendee list. September 28, 2016 EM's Next Business Opportunity Forum is Oct. 13 During ETEBA Conference in Knoxville, Tenn. KNOXVILLE, Tenn. - EM's next quarterly public forum to discuss upcoming

  12. HQ EMS Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EMS Policy HQ EMS Policy Office of Administration Environmental Management System (EMS) Policy for Managing Department of Energy HQ Facilities This policy statement sets forth the commitments and basic structure of the Department of Energy (DOE) Headquarters Facility Environmental Management System (EMS). The scope of this EMS includes facility operations and support activities for the DOE Forrestal facility in Washington, DC and the Germantown facility in Germantown, Maryland. The DOE

  13. DOE/EM-51

    Office of Environmental Management (EM)

    | Department of Energy DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension Northern Pass Transmission Line Project, New Hampshire EPA announces that DOE has extended the public comment period for the Draft Environmental Impact Statement for the Northern Pass Transmission Line Project (DOE/EIS-0463) to April 4, 2016. Comments submitted to DOE concerning the Northern Pass Draft EIS prior to this

  14. Minutes: EM SSAB Chairs Budget Conference Call | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Minutes: EM SSAB Chairs Budget Conference Call Minutes: EM SSAB Chairs Budget Conference Call Attendees: EM SSAB CHAIRS Subject: Briefing & Timeline for Stakeholder Involvement in the EM Budget Process Date: October 5, 2010 EM SSAB Conference Call - October 5, 2010 (203.14 KB) More Documents & Publications EM SSAB Conference Calls - October 5, 2010 Memorandum: Guidance for Participation of the EM SSAB, Stakeholders, Regulators, and Tribal Governments in EM FY 2013 Budget Request EM SSAB

  15. EM Newsletters | Department of Energy

    Energy.gov [DOE] (indexed site)

    tubes for recycling at the SRS Recycling Center. From Silver to Lead, SRS Turns Trash to Treasure AIKEN, S.C. - EM's contractor for the nuclear cleanup at the Savannah...

  16. EM News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    tries his hand using a manipulator. Experts Explore Opportunities to Advance Use of Robotics in EM Cleanup AIKEN, S.C. - Forty-four U.S. and international robotics experts...

  17. EM Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Away Process Gas Equipment Moves Portsmouth D&D Forward Crane operator Brian Lambert of Fluor-BWXT Portsmouth, EM decontamination and decommissioning (D&D) contractor, lowers the...

  18. FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    SciTech Connect

    Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

    2001-10-31

    This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders ("surveillance monitoring"); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.

  19. FY 2016 EM Budget Rollout Presentation | Department of Energy

    Energy.gov [DOE] (indexed site)

    Rollout Presentation (1.54 MB) More Documents & Publications FY 2017 EM Budget Rollout Presentation FY 2015 EM Budget Rollout Presentation FY 2014 EM Budget Rollout Presentation

  20. EM International Strategic Plan 2015-2020 | Department of Energy

    Energy Saver

    Strategic Plan 2015-2020 EM International Strategic Plan 2015-2020 The 2015 - 2020 EM International Strategic Plan outlines the EM International Program's strategic approaches to ...

  1. EM International Program Action Table - June 2014 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Action Table - June 2014 EM International Program Action Table - June 2014 EM International Program Action Table - June 2014 PDF icon EM International Program Action Table - June ...

  2. Update on EM Transportation Program Activities | Department of...

    Office of Environmental Management (EM)

    EM Transportation Program Activities Update on EM Transportation Program Activities Motor Carrier Evaluation Program, DOE Directives, Upcoming Shipping Activities Update on EM ...

  3. Microsoft Word - Welcome David Huizenga from EM SSAB - FINAL...

    Office of Environmental Management (EM)

    (EM SSAB) welcome you to your new position as Acting Assistant Secretary for EM. We look forward to continuing the positive, collaborative working relationship that the EM SSAB...

  4. EM SSAB Recommendations and Letters - 2014-02 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 EM SSAB Recommendations and Letters - 2014-02 Documents Available for Download ... Paths EM SSAB Recommendations and Letters - 2014-01 EM SSAB Recommendations and ...

  5. EM SSAB Recommendations and Letters - 2013-01 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 EM SSAB Recommendations and Letters - 2013-01 Documents Available for Download ... options EM SSAB Recommendations and Letters - 2014-02 EM SSAB Recommendations and ...

  6. EM SSAB Recommendations and Letters - August 2011 Letter | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    August 2011 Letter EM SSAB Recommendations and Letters - August 2011 Letter Documents ... More Documents & Publications EM SSAB Recommendations and Letters - 2011-01 EM SSAB ...

  7. EM SSAB Recommendations and Letters - 2014-01 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 EM SSAB Recommendations and Letters - 2014-01 Documents Available for Download ... for Cleanup EM SSAB Recommendations and Letters - 2010-02 EM SSAB Recommendations and ...

  8. EM SSAB Recommendations and Letters - 2010-01 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 EM SSAB Recommendations and Letters - 2010-01 Documents Available for Download ... Language EM SSAB Recommendations and Letters - 2010-02 EM SSAB Recommendations and ...

  9. EM SSAB Recommendations and Letters - May 2009 Letter | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    May 2009 Letter EM SSAB Recommendations and Letters - May 2009 Letter Documents Available ... More Documents & Publications EM SSAB Recommendations and Letters - 2010-02 EM SSAB ...

  10. EM SSAB Recommendations and Letters - 2010-02 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 EM SSAB Recommendations and Letters - 2010-02 Documents Available for Download ... Recommendation 194: 2012 Budget Baseline EM SSAB Recommendations and Letters - 2011-01 EM ...

  11. Technology Development Advances EM Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Development Advances EM Cleanup Technology Development Advances EM Cleanup The unique nature of many of EM's remaining facilities will require a strong and responsive engineering ...

  12. Archived EM SSAB Correspondence & Briefings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Communication & Engagement EM SSAB Archived EM SSAB Correspondence & Briefings Archived EM SSAB Correspondence & Briefings 2006 June 21, 2006 Letter: Congratulating Oak Ridge ...

  13. EM International Program Presentation for Waste Management 2015...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Associate Principal Deputy Assistant Secretary Monica Regalbuto gave a presentation on EM's International Program at the Waste Management Conference in March 2015 in Phoenix. EM ...

  14. Project Tour

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Tour Project Tour See NMSSUP from the ground NMSSUP Phase II Construction Project Tour Transportation Transportation to the tour will be provided from Hilton Santa Fe Buffalo Thunder to Los Alamos National Laboratory, Technical Area 55. After the tour, transportation will be provided back to Hilton Santa Fe Buffalo Thunder. What to wear Wear comfortable pants and leather shoes (flat, comfortable, closed-toe; no tennis shoes or high heels). Schedule There will be a one-hour, no-host lunch

  15. PROJECT INFORMATION

    Office of Scientific and Technical Information (OSTI)

    PROJECT INFORMATION DOE award number: DE EE0000621 Name of recipient: San Francisco Public Utilities Commission Project title: San Francisco Biofuel Program Name of project: Brown Grease to Biodiesel Demonstration Director/principal investigator: Domenec Jolis Consortium/teaming members: Environmental Protection Agency (EPA) California Energy Commission (CEC) URS Corporation EXECUTIVE SUMMARY Municipal wastewater treatment facilities have typically been limited to the role of accepting

  16. Progress Moves West Valley Closer to Finishing Canister Relocation Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Moves West Valley Closer to Finishing Canister Relocation Project Progress Moves West Valley Closer to Finishing Canister Relocation Project October 17, 2016 - 12:10pm Addthis Workers place a vertical storage cask liner on a construction pad. Workers place a vertical storage cask liner on a construction pad. WEST VALLEY, N.Y. - EM's West Valley Demonstration Project (WVDP) is about 70 percent complete toward relocating all high-level waste canisters from a building to

  17. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    SciTech Connect

    Not Available

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable.

  18. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    structure whose behavior is fundamentally nonlinear. Thus, the students assigned to this project will develop control techniques that will allow an electrodynamic shake table to...

  19. Custom Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  20. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  1. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  2. Project Complete

    Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  3. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San ...

  4. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  5. DOE - NNSA/NFO -- EM Underground Test Area (UGTA) Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Groundwater Open Houses NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Click to subscribe to NNSS News Groundwater Open House Open house photo Thank you Amargosa ...

  6. DOE - NNSA/NFO -- EM Underground Test Area (UGTA) Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Groundwater NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Click to subscribe to NNSS News Groundwater Characterization Environmental Restoration photo Click here to ...

  7. EM SSAB ITR Landfill Assessment Project Lessons Learned Presentation...

    Office of Environmental Management (EM)

    hydrology, regulatory interactions. * David P. Ray, PE - US Army Corps of Engineers, Omaha, NB: waste containment systems, civil engineering, geotechnical engineering. * John ...

  8. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... the Lead Auditor-under instruction (may not be the same as ... a college level curriculum addressing the basic knowledge of quality assurance principles, methods of ...

  9. ISMS/EMS Lessons Learned Disposition Projects at SRS | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications EIS-0283-S2: Final Supplemental Environmental Impact Statement EIS-0283-SA-02: Supplement Analysis EIS-0283-S2: Draft Supplemental Environmental ...

  10. FINAL - EM International Program 2015 Project Fact Sheets (2).pdf

    Energy Saver

  11. EM Completes Project to Maintain Water Quality of Spent Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... This was an outstanding accomplishment." Addthis Related Articles Workers demolish the CPP 601-602 Spent Nuclear Fuel Reprocessing Complex at the Idaho Site. A Decade of Cleanup ...

  12. New Developments in the Technology Readiness Assessment Process in US DOE-EM - 13247

    SciTech Connect

    Krahn, Steven; Sutter, Herbert; Johnson, Hoyt

    2013-07-01

    A Technology Readiness Assessment (TRA) is a systematic, metric-based process and accompanying report that evaluates the maturity of the technologies used in systems; it is designed to measure technology maturity using the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration (NASA) in the 1980's. More recently, DoD has adopted and provided systematic guidance for performing TRAs and determining TRLs. In 2007 the GAO recommended that the DOE adopt the NASA/DoD methodology for evaluating technology maturity. Earlier, in 2006-2007, DOE-EM had conducted pilot TRAs on a number of projects at Hanford and Savannah River. In March 2008, DOE-EM issued a process guide, which established TRAs as an integral part of DOE-EM's Project Management Critical Decision Process. Since the development of its detailed TRA guidance in 2008, DOE-EM has continued to accumulate experience in the conduct of TRAs and the process for evaluating technology maturity. DOE has developed guidance on TRAs applicable department-wide. DOE-EM's experience with the TRA process, the evaluations that led to recently developed proposed revisions to the DOE-EM TRA/TMP Guide; the content of the proposed changes that incorporate the above lessons learned and insights are described. (authors)

  13. Awarded projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    projects Awarded projects 2016 Allocation Awards This page lists the allocation awards for NERSC for the 2016 allocation year (Jan 12, 2016 through Jan 09, 2017). Read More » Previous Year Awards Last edited: 2016-04-29 11:35:1

  14. Idaho’s Advanced Mixed Waste Treatment Project Details 2013 Accomplishments

    Energy.gov [DOE]

    IDAHO FALLS, Idaho – EM and its contractor, Idaho Treatment Group (ITG), safely and compliantly met all of their production and shipping targets in the Advanced Mixed Waste Treatment Project (AMWTP) at the Idaho site in 2013.

  15. Unconventional Groundwater System Proves Effective in Reducing Contamination at West Valley Demonstration Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    WEST VALLEY, N.Y. – A unique groundwater treatment system has significantly reduced the presence of a contaminant at EM's West Valley Demonstration Project (WVDP), according to a report issued this month.

  16. Facility Software Quality Assurance (SQA) for Captal Project Critical Decisions RM

    Energy.gov [DOE]

    The purpose of this Software Quality Assurance for Capital Project Critical Decision Review Module (SQA RM) is to identify, integrate, and clarify, in one EM document, the SQA performance...

  17. EM Contractor List.xls

    Office of Environmental Management (EM)

    Vrain Facility Improvements Project Idaho National Laboratory CD3A Sandia Corporation Lockheed Martin 001035 ID-0030B.C4 Accelerated Retrieval Project IX Idaho National Laboratory ...

  18. Improved master equation approach to quantum transport: From Born to self-consistent Born approximation

    SciTech Connect

    Jin, Jinshuang; Li, Jun; Liu, Yu; Li, Xin-Qi; Yan, YiJing

    2014-06-28

    Beyond the second-order Born approximation, we propose an improved master equation approach to quantum transport under self-consistent Born approximation. The basic idea is to replace the free Green's function in the tunneling self-energy diagram by an effective reduced propagator under the Born approximation. This simple modification has remarkable consequences. It not only recovers the exact results for quantum transport through noninteracting systems under arbitrary voltages, but also predicts the challenging nonequilibrium Kondo effect. Compared to the nonequilibrium Green's function technique that formulates the calculation of specific correlation functions, the master equation approach contains richer dynamical information to allow more efficient studies for such as the shot noise and full counting statistics.

  19. Improving EM&V for Energy Efficiency Programs (Fact Sheet)

    SciTech Connect

    Not Available

    2012-07-01

    This fact sheet describes the objectives of the U.S. Department of Energy Uniform Methods Project to bring consistency to energy savings calculations in U.S. energy efficiency programs. The U.S. Department of Energy (DOE) is developing a framework and a set of protocols for determining gross energy savings from energy efficiency measures and programs. The protocols represent a refinement of the body of knowledge supporting energy efficiency evaluation, measurement, and verification (EM&V) activities. They have been written by technical experts within the field and reviewed by industry experts. Current EM&V practice allows for multiple methods for calculating energy savings. These methods were developed to meet the needs of energy efficiency program administrators and regulators. Although they served their original objectives well, they have resulted in inconsistent and incomparable savings results - even for identical measures. The goal of the Uniform Methods Project is to strengthen the credibility of energy savings determinations by improving EM&V, increasing the consistency and transparency of how energy savings are determined.

  20. FY 2014 EM Budget Rollout Presentation | Department of Energy

    Energy.gov [DOE] (indexed site)

    View the FY 2014 EM Budget Request to Congress EM FY14 Budget Rollout Presentation (2.6 MB) More Documents & Publications FY 2015 EM Budget Rollout Presentation FY 2016 EM Budget ...

  1. Project of the Month

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management (EM) legacy cleanup activities at the site.

    Sat, 01 Sep 2012 16:00:00 +0000 577819 at http:energy.gov EM Plan Accelerates Uranium-233...

  2. Legacy Cleanup Completion Project

    Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Christine Gelles, Associate Deputy Assistant Secretary, Waste Management EM HQ.

  3. Joint Environmental Management System (EMS) Declaration of Conformance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of ...

  4. Memorandum: Guidance for Participation of the EM SSAB, Stakeholders, Regulators, and Tribal Governments in EM FY 2013 Budget Request

    Energy.gov [DOE]

    From: Dae Y. Chung, Principle Deputy Assistant Secretary for EM (EM-2) Subject: Guidance for Participation of the EM SSAB, Stakeholders, Regulators, and Tribal Governments in EM FY 2013 Budget Request

  5. Improve Motor System Efficiency with MotorMaster+, Software Tools for Industry, Industrial Technologies Program (ITP) (Fact Sheet)

    SciTech Connect

    Not Available

    2008-12-01

    This fact sheet describes how the Industrial Technologies Program MotorMaster+ software tool aids industrial plants with finding energy-efficient motor replacement options and managing motor systems.

  6. EM Contractor Fee

    Office of Environmental Management (EM)

    Portsmouth/Paducah Project Office Contract Name: Portsmouth D&D Contract Contractor: Fluor-BWXT Portsmouth LLC Contract Number: DE-AC30-10CC40017 Contract Type: Cost-Plus-Award-Fee Total Estimated Contract Cost: $2,505,496,484 Contract Base Period: March 29, 2011 - March 28, 2016 Contract Option Period: Option 1: 3/29/16 -9/30/18 Option 1a: 10/1/18 - 3/28/21 Fee Information Minimum Fee $0 Maximum Fee $184,024,974 Performance Period Fee Available Fee Earned FY2011 $6,190,992 $5,779,687 FY2012

  7. Project 1027697

    Office of Scientific and Technical Information (OSTI)

    William Apel and Frank Roberto at) the Biotechnology Department at the INEEL. Each part of this project is funded under a different contract with the Science Division of the US ...

  8. RENOTER Project

    Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  9. EGS Projects

    Energy.gov [DOE]

    EGS projects span research, development, and demonstration. Unlike traditional hydrothermal systems, EGS capture heat from areas that traditional geothermal energy cannot—where fluid and/or...

  10. EM to Hold Procurement Workshop Sept. 16

    Energy.gov [DOE]

    WASHINGTON, D.C. – EM is scheduled to hold a procurement workshop Sept. 16 at DOE headquarters in Washington, D.C. to help solicit industry feedback as EM prepares for upcoming acquisitions.

  11. EM Quality Assurance Assessment Schedule FY 2010

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... R. Tom, EM-23 M. Giltatson, EM-50 A. Holland, CBFO G. Girard, ORP P. Carier, ORP C. ... Idaho Operations Office (ID) Ralph E. Holland, Acting Director, Consolidated Business ...

  12. EM's Budget Outlook by Terry Tyborowski

    Office of Environmental Management (EM)

    Assistant Secretary for Program Planning and Budget April 18, 2012 www.em.doe.gov safety performance cleanup closure E M Environmental Management 2 EM's Budget Outlook: FY 2013, FY ...

  13. EM Corporate Performance Measures- Complex Wide

    Energy.gov [DOE]

    The corporate (i.e., relating to the entire DOE-EM complex) measures are tracked in the context of the total measure (life-cycle) necessary to complete cleanup of each site, as well as the EM...

  14. EM Energy Solutions Ltd | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    EM Energy Solutions Ltd Jump to: navigation, search Name: EM Energy Solutions Ltd Place: London, United Kingdom Zip: NW3 5QY Product: Consultant specialising in the development and...

  15. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Projects » Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate

  16. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Projects Joint Los Alamos National Laboratory/UCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email "Since 2003, LANL has funded numerous collaborative

  17. Master Document

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    If the actual generation exceeds the Exhibit A amount, the Customer will receive a credit. If the actual generation is less than the Exhibit A amount, the Customer will...

  18. EM Hosts Contract Performance and Management Workshop

    Energy.gov [DOE]

    WASHINGTON, D.C. – EM hosted the Environmental Management Contract Performance and Management Workshop at DOE headquarters Wednesday.

  19. EMS Awards and Certifications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EMS Awards and Certifications EMS Awards and Certifications 2012 Not Just Your Average EMS Award 2012 Not Just Your Average EMS Award Read more 2012 Quality in Construction Award 2012 Quality in Construction Award Read more 2011 Federal Electronics Challenge Bronze Award 2011 Federal Electronics Challenge Bronze Award Read more 2010 Management Award 2010 Management Award Read more 2009 EStar Award 2009 EStar Award Read more AWARDS 2016 Keeping It Clean Award: Faced with the need to treat

  20. EM Waste and Materials Disposition & Transportation | Department...

    Office of Environmental Management (EM)

    Waste and Materials Disposition & Transportation EM Waste and Materials Disposition & Transportation DOE's Radioactive Waste Management Priorities: Continue to manage waste ...

  1. EM Recovery Act Lessons Learned (Olinger)

    Energy.gov [DOE]

    Presentation slides from EM ARRA Best Practices and Lessons Learned WorkshopWaste Management SymposiumPhoenix, AZMarch 1, 2012.

  2. EM Recovery Act Lessons Learned (Sites)

    Energy.gov [DOE]

    Presentation slides from EM ARRA Best Practices and Lessons Learned WorkshopWaste Management SymposiumPhoenix, AZMarch 1, 2012.

  3. EM QA Working Group September 2011 Notes

    Energy.gov [DOE]

    Meeting minutes and notes from the EM QA Working Group video conference meeting held in September 2011.

  4. EM Waste and Materials Disposition & Transportation

    Office of Environmental Management (EM)

    On Closure Success 1 EM Waste and Materials Disposition & Transportation National ... Management DOE's Radioactive Waste Management Priorities * Continue to manage ...

  5. FY 2017 EM Budget Rollout Presentation

    Office of Energy Efficiency and Renewable Energy (EERE)

    FY 2017 EM Budget Rollout Presentation Office of Environmental Management Monica Regalbuto, Assistant Secretary for Environmental Management February 9, 2016

  6. Oak Ridge completes field work on Recovery Act-projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Ridge completes field work on Recovery Act-projects Oak Ridge completes field work on Recovery Act-projects May 8, 2014 - 12:00pm Addthis The U.S. Department of Energy's Oak Ridge Office of Environmental Management (EM) has finished field work on the last Recovery Act-funded environmental cleanup project. Since 2009, EM has used the $751 million in Recovery Act funds to accomplish 27 projects, many of which included multiple subcomponents and extensive scopes. "This is a landmark

  7. Integration of Full Tensor Gravity and ZTEM Passive Low Frequency EM Instruments for Simultaneous Data Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Full Tensor Gravity and ZTEM Passive Low Frequency EM Instruments for Simultaneous Data Acquisition Scott Wieberg Bell Geospace, Inc. Track Name Project Officer: Ava Coy: Total Project Funding: $1.8M: April 25, 2013 This presentation does not contain any proprietary confidential, or otherwise restricted information. 2 | US DOE Geothermal Office eere.energy.gov Relevance/Impact of Research *Objectives - Combine Air-FTG ® and ZTEM(tm) onto One Platform for Simultaneous Acquisition - Test

  8. Two Peer Review Processes Help EM Achieve Cost, Schedule Targets in Environmental Cleanup Mission

    Energy.gov [DOE]

    WASHINGTON, D.C. – EM revamped and expanded peer reviews for its contracts and projects in the past year with a goal of improving performance and delivering results in the world’s largest nuclear cleanup on time and within cost.

  9. Chinese Delegation Meets with EM Officials in its First Visit to Savannah River Site

    Energy.gov [DOE]

    AIKEN, S.C. – A delegation from two nuclear-related entities in China visited the Savannah River Site (SRS) for the first time last month, and its members agreed with EM officials to discuss potential areas of collaboration in waste treatment and disposal and to establish collaborative technology projects.

  10. Oak Ridge EM Program Upgrades Environmental Database for Public’s Ease of Use

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – Oak Ridge is working to remediate contaminated areas in one of the EM program’s most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War.

  11. Duffy Served as EM's First Assistant Secretary

    Energy.gov [DOE]

    Editor’s note: In an occasional EM Update series, we feature interviews with former EM Assistant Secretaries to reflect on their achievements and challenges in the world’s largest nuclear cleanup and to discuss endeavors in life after EM.

  12. EM Communicators Meet to Plan Public Outreach

    Energy.gov [DOE]

    EM held a communicators forum in Washington, D.C. last week in coordination with the National Cleanup Workshop. Public affairs representatives from across the DOE complex gathered to share their best strategies for public communications and transparent outreach on EM cleanup accomplishments. EM Principal Deputy Assistant Secretary Mark Whitney engaged with the communicators in the forum.

  13. DOE Project Scorecards

    Energy.gov [DOE]

    DOE Project Scorecards DOE project scorecards summarize capital asset project performance compared to the current approved baseline. 

  14. DOE Project Scorecards

    Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  15. Project Execution Plan

    SciTech Connect

    DOE /NV

    1999-03-22

    Created in 1989 to address over 50 years of environmental liabilities arising out of nuclear weapons production and testing in the United States since World War II, the U.S. Department of Energy's (DOE's) Environmental Management (EM) Programs decade-long effort to reduce the costs of those environmental liabilities, collectively known as DOE's ''environmental mortgage,'' includes past as well as future cleanup costs associated with environmental contamination, hazardous and radioactive materials and wastes, contaminated buildings and facilities, and their associated risks. Tasked with the bulk of these cleanup efforts, the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's), Nevada Environmental Restoration Project (NV ERP) is attempting to complete applicable corrective actions at inactive contaminated sites and facilities managed by DOE/NV, while at the same time protecting human health and the environment. Regulated under the Federal Facility Agreement and Consent Order, the objectives of the NV ERP are to identify the nature and extent of the contamination, determine its potential risk to the public and the environment, and to perform the necessary corrective actions in compliance with this and other state and federal regulations, guidelines, and requirements. Associated with this vast effort are approximately 2,000 sites both on and off of the Nevada Test Site (NTS) that were used primarily for nuclear testing and are addressed in the NV ERP. This includes sites that were underground areas where tests were actually conducted, contaminated surface soils resulting from aboveground testing activities, and sites that supported other related testing hardware paraphenalia and/or NTS real estate properties (e.g., underground storage tanks, leachfields, landfills, contaminated waste areas, injection wells, muckpiles, and ponds). To assist in this effort, a NV ERP Team was assembled which is composed of organizations from both the public and private

  16. Surface phenomena during the early stages of sintering in steels modified with Fe–Mn–Si–C master alloys

    SciTech Connect

    Oro, Raquel; Campos, Mónica; Hryha, Eduard; Torralba, José Manuel

    2013-12-15

    The characteristics of the metallic powder surface play a critical role in the development of strong bonds between particles during sintering, especially when introducing elements with a high affinity for oxygen. In this study, Mn and Si have been combined in a Fe–Mn–Si–C master alloy powder in order to reduce their chemical activity and prevent oxidation during the heating stage of the sintering process. However, when this master alloy powder is mixed with an iron base powder, differences in chemical activity between both components can lead to an oxygen transfer from the iron base powder to the surface of the master alloy particles. The present research is focused on studying the evolution of the master alloy particle surface during the early stages of sintering. Surface characterization by X-ray Photoelectron Spectroscopy (XPS) shows that the master alloy powder surface is mostly covered by a thin easily reducible iron oxide layer (∼ 1 nm). Mn–Si particulate oxides are found as inclusions in specific areas of the surface. Evolution of oxides during sintering was studied on green compacts containing iron powder, graphite and Fe–Mn–Si–C master alloy powder that were heat treated in vacuum (10{sup −6} mbar) at different temperatures (from 400, 600, 800 to 1000 °C) and analyzed by means of XPS. Vacuum sintering provides the necessary conditions to remove manganese and silicon oxides from the powder surface in the range of temperatures between 600 °C and 1000 °C. When sintering in vacuum, since the gaseous products from reduction processes are continuously eliminated, oxidation of master alloy particles due to oxygen transfer through the atmosphere is minimized. - Highlights: • Mn and Si were introduced in sintered steels using a master alloy powder. • Surface of the master alloy is mainly covered by an easily reducible iron oxide. • Temperature ranges for oxidation/reduction are identified. • Vacuum conditions avoid oxygen transfer to

  17. EM Launches Facebook Page | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Launches Facebook Page EM Launches Facebook Page May 31, 2016 - 4:30pm Addthis EM Launches Facebook Page WASHINGTON, D.C. - EM has created its own Facebook page. Please like our page to keep up to date with EM's progress across the complex, as well as to learn more about the history of our sites, the work that we do, and our workforce. Keep an eye out for #TeardownTuesday, #WildlifeWednesday and #FlashbackFriday! EM is also on social media via our YouTube playlist and our Flickr account. Addthis

  18. SOPP-43, EM-23 Quality Assurance Oversight

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    POLICY: The Office of Environmental Management (EM) Quality Assurance program requirements and expectations are documented in the EM Quality Assurance Program (QAP), EM-QA-001, dated October 2008. The QAP is the EM management system to ensure that all EM organizations "do work correctly." The QAP meets the requirements of DOE O 414.1C, Quality Assurance, and 10 CFR 830 Subpart A "Quality Assurance Requirements." The QAP demonstrates how QA and the Integrated Safety

  19. Cloudnet Project

    SciTech Connect

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  20. Cloudnet Project

    DOE Data Explorer

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  1. Water Integration Project Science Strategies White Paper

    SciTech Connect

    Alan K. Yonk

    2003-09-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

  2. Neutron cross-section libraries in the AMPX master interface format for thermal and fast reactors

    SciTech Connect

    Bjerke, M.A.; Webster, C.C.

    1981-12-01

    Neutron cross-section libraries in the AMPX master interface format have been created for three reactor types. Included are an 84-group library for use with light-water reactors, a 27-group library for use with heavy-water CANDU reactors and a 126-group library for use with liquid metal fast breeder reactors. In general, ENDF/B data were used in the creation of these libraries, and the nuclides included in each library should be sufficient for most neutronic analyses of reactors of that type. Each library has been used successfully in fuel depletion calculations.

  3. Dissipation in a rotating frame: Master equation, effective temperature, and Lamb shift

    SciTech Connect

    Verso, Alvise; Ankerhold, Joachim

    2010-02-15

    Motivated by recent realizations of microwave-driven nonlinear resonators in superconducting circuits, the impact of environmental degrees of freedom is analyzed as seen from a rotating frame. A system plus reservoir model is applied to consistently derive in the weak coupling limit the master equation for the reduced density in the moving frame and near the first bifurcation threshold. The concept of an effective temperature is introduced to analyze to what extent a detailed balance relation exists. Explicit expressions are also found for the Lamb-shift. Results for ohmic baths are in agreement with experimental findings, while for structured environments population inversion is predicted that may qualitatively explain recent observations.

  4. Coeur d'Alene Tribe Fish, Water and Wildlife Program : Coeur d'Alene Tribe Trout Production Facility Master Plan.

    SciTech Connect

    Peters, Ronald L.; Woodward-Lilengreen, Kelly L.; Vitale, Angelo J.

    1999-09-01

    The Northwest Power Planning Council (Council) receives and reviews proposals to mitigate for fish and wildlife losses and refers approved measures to Bonneville Power Administration (BPA) for funding. The Northwest Power Act (Act) calls on the Council to include measures in its Columbia River Basin Fish and Wildlife Program (Program) to address system-wide fish and wildlife losses. The Act further states that the Council may include in its Program measures that provide off-site mitigation--mitigation physically removed from the hydro project(s) that caused the need to mitigate. The Program includes a goal ''to recover and preserve the health of native resident fish injured by the hydropower system, where feasible, and, where appropriate, to use resident fish to mitigate for anadromous fish losses in the system.'' Among those recommended measures are off-site mitigation for losses of anadromous fisheries including the measure under analysis in this Coeur d'Alene Tribe Trout Production Facility Master Plan, proposed by the Coeur d'Alene Tribe. To meet the need for off-site mitigation for anadromous fish losses in the Columbia River Basin in a manner consistent with the objectives of the Council's Fish and Wildlife Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operations and maintenance of a trout production facility on the Coeur d'Alene Indian Reservation. Measures for establishing a Coeur d'Alene fish production facility have been a part of the Council's Program since 1987. The Coeur d'Alene Tribe Trout Production Facility is intended to rear and release westslope cutthroat trout into rivers and streams with the express purpose of increasing the numbers of fish spawning, incubating and rearing in the natural environment. It will use the modern technology that hatcheries offer to overcome the mortality resulting from habitat degradation in lakes, rivers, and streams after eggs are laid in the gravel. Supplementation of

  5. Integrated monitoring plan for the Hanford groundwater monitoring project

    SciTech Connect

    Hartman, M.J.; Dresel, P.E.; McDonald, J.P.; Mercer, R.B.; Newcomer, D.R.; Thornton, E.C.

    1998-09-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy (DOE) manages these activities through the Hanford Groundwater Monitoring Project (groundwater project), which is the responsibility of Pacific Northwest National Laboratory. The groundwater project does not include all of the monitoring to assess performance of groundwater remediation or all monitoring associated with active facilities. This document is the first integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; other, established monitoring plans by reference; and a master well/constituent/frequency matrix for the entire Hanford Site.

  6. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  7. Reservoir characterization and process monitoring with EM methods. 1994 Annual report

    SciTech Connect

    Wilt, M.

    1995-05-01

    During the past five years at Lawrence Livermore National Laboratory (LLNL) the authors have applied the EM induction method to the problem of petroleum reservoir characterization and enhanced oil recovery (EOR) monitoring. The goal is to develop practical tools for determining the electrical resistivity distribution between boreholes at a useful scale for reservoir characterization. During FY94 the authors conducted their largest field test to date. They applied crosshole and surface-to-borehole EM techniques to reservoir characterization at the Los Hills No. 3 oil field making three sets of measurements during the initial phase of the steam drive.From these data they were able to determine the resistivity and configuration of the oil sands, between the observation wells, and provide an image of the subsurface resistivity changes due to the steam drive. They also conducted a waterflood experiment at the Richmond Field Station facility using the borehole-to-surface EM technique. For this test they injected a small quantity of saltwater, and applied the Em technique to monitor the progress of the injected plume. Data collection for this experiment is complete but the results are yet to be interpreted. Finally, a project to understand EM propagation through steel casing was initiated in 1994. The goals of the experiment are to determine the limits and applications for crosswell EM surveys through steel well casing.

  8. Recommendation 226: Recommendation to EM on Communication Tools |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 6: Recommendation to EM on Communication Tools Recommendation 226: Recommendation to EM on Communication Tools The EM SSAB Chairs note examples that illustrate positive benefits from EM remediation efforts and believe DOE EM should develop ways to make those successes known to the public. Recommendation 226: Recommendation to EM on Communication Tools (159.69 KB) Responseto226.pdf (129.22 KB) More Documents & Publications EM SSAB Recommendations and Letters - 2014-04

  9. Project Narrative

    SciTech Connect

    Driscoll, Mary C.

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  10. Moab Project Hosts International Meeting on Uranium Mining and Remediation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Hosts International Meeting on Uranium Mining and Remediation Moab Project Hosts International Meeting on Uranium Mining and Remediation October 17, 2016 - 12:30pm Addthis The visitors pose for a group photo on the disposal cell cover at the Crescent Junction site. The visitors pose for a group photo on the disposal cell cover at the Crescent Junction site. EM Federal Project Director Donald Metzler (orange vest) discusses mill tailings removal and conditioning

  11. The US DOE-EM International Program - 13004

    SciTech Connect

    Elmetti, Rosa R.; Han, Ana M.; Williams, Alice C.

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eight international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into FY 2013 and beyond. (authors)

  12. Department of Energy Completes Five Recovery Act Projects- Moves Closer to Completing Recovery Act Funded Work at Oak Ridge Site

    Energy.gov [DOE]

    OAK RIDGE, Tenn. - The U.S. Department of Energy’s (DOE) Environmental Management (EM) program recently completed five projects at the Oak Ridge site funded through the American Recovery and Reinvestment Act.

  13. Alleghanian development of the Goat Rock fault zone, southernmost Appalachians: Temporal compatibility with the master decollement

    SciTech Connect

    Steltenpohl, M.G. (Auburn Univ., AL (United States)); Goldberg, S.A. (Univ. of North Carolina, Chapel Hill (United States)); Hanley, T.B. (Columbus College, GA (United States)); Kunk, M.J. (Geological Survey, Reston, VA (United States))

    1992-09-01

    The Goat Rock and associated Bartletts Ferry fault zones, which mark the eastern margin of the Pine Mountain Grenville basement massif, are controversial due to the suggestion that they are rare exposed segments of the late Paleozoic southern Appalachian master decollement. The controversy in part stems from reported middle Paleozoic (Acadian) radiometric dates postulated as the time of movement along these fault zones. Ultramylonite samples from the type area at Goat Rock Dam yield a 287 [plus minus] 15 Ma Rb-Sr isochron interpreted as the time of Sr isotopic rehomgenization during mylonitization. This date is corroborated by Late Pennsylvanian-Early Permian [sup 40]Ar/[sup 39]Ar mineral ages on hornblende (297-288 Ma) and muscovite (285-278 Ma) from neomineralized and dynamically recrystallized rocks within and straddling the fault zone. These Late Pennsylvanian-Early Permian dates indicate the time of right-slip movement (Alleghenian) along the Goat Rock fault zone, which is compatible with the timing suggested by COCORP for thrusting along the southern Appalachian master decollement.

  14. Unified Einstein-Virasoro Master Equation in the General Non-Linear Sigma Model

    SciTech Connect

    Boer, J. de; Halpern, M.B.

    1996-06-05

    The Virasoro master equation (VME) describes the general affine-Virasoro construction $T=L^abJ_aJ_b+iD^a \\dif J_a$ in the operator algebra of the WZW model, where $L^ab$ is the inverse inertia tensor and $D^a $ is the improvement vector. In this paper, we generalize this construction to find the general (one-loop) Virasoro construction in the operator algebra of the general non-linear sigma model. The result is a unified Einstein-Virasoro master equation which couples the spacetime spin-two field $L^ab$ to the background fields of the sigma model. For a particular solution $L_G^ab$, the unified system reduces to the canonical stress tensors and conventional Einstein equations of the sigma model, and the system reduces to the general affine-Virasoro construction and the VME when the sigma model is taken to be the WZW action. More generally, the unified system describes a space of conformal field theories which is presumably much larger than the sum of the general affine-Virasoro construction and the sigma model with its canonical stress tensors. We also discuss a number of algebraic and geometrical properties of the system, including its relation to an unsolved problem in the theory of $G$-structures on manifolds with torsion.

  15. MHK Projects/Manchac Point Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  16. MHK Projects/Claiborne Island Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  17. MHK Projects/Point Pleasant Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  18. MHK Projects/College Point Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    bel":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St James, LA Project StateProvince Louisiana Project Country United States Project Resource...

  19. EM Contractor's Role in Energy-Conservation Challenge Pays Off for Idaho

    Office of Environmental Management (EM)

    Site | Department of Energy Contractor's Role in Energy-Conservation Challenge Pays Off for Idaho Site EM Contractor's Role in Energy-Conservation Challenge Pays Off for Idaho Site October 29, 2015 - 12:20pm Addthis IDAHO FALLS, Idaho - A challenge issued three years ago by a facility director to his staff at the Idaho Site has resulted in the implementation of several energy-conservation projects and huge cost savings to taxpayers. CH2M-WG Idaho (CWI), EM's main cleanup contractor at the

  20. Hydropower Projects

    SciTech Connect

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  1. EM's Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee EM's Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee July 28, 2016 - 12:45pm Addthis UCOR’s K-27 Building demolition project, pictured here, is ahead of schedule with actual costs projected to be less than planned, according to OREM’s correspondence regarding the contractor’s fee determination. UCOR's K-27 Building demolition project, pictured here, is ahead of schedule with

  2. PROJECT SUMMARY

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PROJECT SUMMARY 1 TITLE Advancing Synchrophasor Applications and Training through Academic-Industry Collaborations 2 PRINCIPLE INVESTIGATORS University of Wyoming: Dongliang Duan (PI), John Pierre, Suresh Muknahallipatna (co-PIs) Colorado State University: Liuqing Yang, Louis L. Scharf (co-PIs) Montana Tech of the University of Montana: Daniel Trudnowski, Matthew Donnelly (co-PIs) 3 CONTACT INFORMATION Dongliang Duan Dept. 3295, 1000 E. University Ave. Laramie, WY 82070 Tel: (307)766-6541; Fax:

  3. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    FFA Quarterly Report: April 1-June 30, 2009 July 2009 Doc. No. S05572 Page 1 Monticello National Priorities List Sites Federal Facilities Agreement (FFA) Quarterly Report: April 1-June 30, 2009 This report summarizes project status and activities implemented April through June 2009, and provides a schedule of near-term activities for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) sites. This report also includes disposal cell and Pond 4 leachate collection

  4. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    09 January 2010 Doc. No. S06172 Page 1 1.3 Peripheral Properties (Private and City-Owned) * No land use or supplemental standards compliance issues were observed or reported by LTSM on-site staff. Monticello National Priorities List Sites Federal Facilities Agreement (FFA) Quarterly Report: October 1-December 31, 2009 This report summarizes project status and activities implemented October through December 2009, and provides a schedule of near-term activities for the Monticello Mill Tailings

  5. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    1 July 2011 Doc. No. S07978 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: April 1-June 30, 2011 This report summarizes project status and activities implemented April through June 2011 and provides a schedule for near-term activities at the Monticello Vicinity Properties (MVP) site and the Monticello Mill Tailings Site (MMTS) located in and near Monticello, Utah. The MMTS and MVP were placed on the U.S. Environmental Protection Agency

  6. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    31, 2011 April 2011 Doc. No. S07666 Page 1 Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: January 1-March 31, 2011 This report summarizes project status and activities implemented January through March 2011 and provides a schedule for near-term activities at the Monticello Vicinity Properties (MVP) site and the Monticello Mill Tailings Site (MMTS) located in and near Monticello, Utah. The MMTS and MVP were placed on the U.S. Environmental

  7. Hallmark Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hallmark Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message

  8. Office of Environmental Management (EM) Organization Chart | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart (200.68 KB) More Documents & Publications Chairs Meeting - August 2016 EM SSAB Conference Calls - August 11, 2015 EM SSAB Conference Calls - December 15, 2014

  9. River Protection Project information systems assessment

    SciTech Connect

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  10. Hanford Site performance summary -- EM funded programs, July 1995

    SciTech Connect

    Schultz, E.A.

    1995-07-01

    Performance data for July 1995 reflects a 4% unfavorable schedule variance and is an improvement over June 1995. The majority of the behind schedule condition is attributed to EM-30, (Office of Waste Management). The majority of the EM-30 schedule variance is associated with the Tank Waste Remediation System (TWRS) Program. The TWRS schedule variance is attributed to the delay in obtaining key decision 0 (KD-0) for Project W-314, ``Tank Farm Restoration and Safe Operations`` and the Multi-Function Waste Tank Facility (MWTF) workscope still being a part of the baseline. Baseline Change Requests (BCRs) are in process rebaselining Project W-314 and deleting the MWTF from the TWRS baseline. Once the BCR`s are approved and implemented, the overall schedule variance will be reduced to $15.0 million. Seventy-seven enforceable agreement milestones were scheduled FYTD. Seventy-one (92%) of the seventy-seven were completed on or ahead of schedule, two were completed late and four are delinquent. Performance data reflects a continued significant favorable cost variance of $124.3 million (10%). The cost variance is attributed to process improvements/efficiencies, elimination of low-value work, workforce reductions and is expected to continue for the remainder of this fiscal year. A portion of the cost variance is attributed to a delay in billings which should self-correct by fiscal year-end.

  11. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    SciTech Connect

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt

  12. EM News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the implementation of several energy-conservation projects and huge cost savings to taxpayers. October 29, 2015 NSSAB members get a briefing on groundwater characterization...

  13. EM Newsletters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Dave Olson, WRPS president and project manager; Jennie Weber, ESD's eastern regional director; and Nick Erickson, the local veterans' employment representative. State Honors...

  14. EM SSAB Conference Calls- May 11, 2006

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  15. EM SSAB Conference Calls- June 8, 2005

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  16. EM SSAB Conference Calls- January 22, 2009

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  17. EM SSAB Conference Calls- May 10, 2007

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  18. EM SSAB Conference Calls- January 11, 2007

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  19. EM SSAB Conference Calls- November 20, 2008

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...

  20. EM SSAB Conference Calls- July 13, 2006

    Energy.gov [DOE]

    Minutes and highlights of the Environmental Management (EM) Site Specific Advisory Board's (SSAB) Bi-Monthly conference call including Participants, DOE-HQ Representatives, Opening Remarks, Program...