National Library of Energy BETA

Sample records for management site specific

  1. Hanford Site environmental management specification

    SciTech Connect

    Grygiel, M.L.

    1998-06-10

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  2. Hanford Site Environmental Management Specification

    SciTech Connect

    DAILY, J.L.

    2001-05-25

    The US Department of Energy, Richland Operations Office (RL) has established a document hierarchy as part of its integrated management system. The Strategic Plan defines the vision, values, missions, strategic goals, high-level outcomes, and the basic strategies in achieving those outcomes. As shown in Figure 1-1, the Site Specification derives requirements from the Strategic Plan and documents the top-level mission technical requirements for the work involved in the RL Hanford Site cleanup and infrastructure activities under the responsibility of the U.S. Department of Energy, Office of Environmental Management (EM). It also provides the basis for all contract technical requirements. Since this is limited to the EM work, neither the Fast Flux Test Facility (FFTF) nor the Pacific Northwest National Laboratory (PNNL) non-EM science activities are included. Figure 1-1 also shows the relationship between this Site Specification and the other Site management and planning documents. Similarly, the documents, orders, and laws referenced in this document represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  3. ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ENERGY ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD (EM SSAB) HANFORD Application No. (Please leave blank) MEMBERSHIP APPLICATION (December 2015)...

  4. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    Washington, D.C. 20585 April 25, 2013 2 Environmental Management Site-Specific Advisory Board - April 25, 2013 Meeting Minutes LIST OF ACRONYMS AB - Advisory Board ANL - Argonne National Laboratory ARP - Accelerator Retrieval Project BNL - Brookhaven National Laboratory BRC - Blue Ribbon Commission CAB - Citizens Advisory Board D&D - Decontamination & Decommissioning DDFO - Deputy Designated Federal Officer DOE - Department of Energy DUF6 - Depleted Uranium Hexafluoride DWPF - Defense

  5. ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    of non-stockpile nuclear materials; excess facilities; future land use and long-term stewardship; risk assessment and management; and clean-up science and technology activities. ...

  6. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    SciTech Connect

    Not Available

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  7. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD CHAIRS' MEETING

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CHAIRS' MEETING for the U.S. DEPARTMENT OF ENERGY PUBLIC MEETING MINUTES Las Vegas Marriott 325 Convention Center Drive Las Vegas, NV 89109 August 31-September 1, 2016 2 Environmental Management Site-Specific Advisory Board Chairs' Meeting - August 31-September 1, 2016 Meeting Minutes LIST OF ACRONYMS ALARA - As Low As Reasonably Achievable CAB - Citizens Advisory Board CBFO - (DOE) Carlsbad Field Office (WIPP) CD - Critical Decision CR - Continuing Resolution D&D - Decontamination &

  8. FTCP Site Specific Information – Office of Environmental Management

    Energy.gov [DOE]

    Site Specific Information including Contact Information, and Annual Workforce Analysis & Staffing Plan Reports.

  9. Environmental Management Site-Specific Advisory Board Chairs Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 20-21, 2016 DoubleTree Hotel, 215 S. Illinois Ave., Oak Ridge, TN Wednesday, April 20 8:00 am Registration 8:30 am Welcome and Opening Remarks  David Borak, EM SSAB Designated Federal Officer  Warren Gooch, Mayor, City of Oak Ridge  Jay Mullis, Deputy Manager for Environmental Management, Oak Ridge  Belinda Price, Chair, Oak Ridge Site Specific Advisory Board 8:50 am Meeting Overview  Eric Roberts, Facilitator 9:00 am EM Program Update  Mark Whitney, Principal Deputy

  10. Environmental Management Site-Specific Advisory Board Chairs...

    Office of Environmental Management (EM)

    and Project Management 12:00 pm Lunch 1:30 pm Site Restoration Update Tania Smith, Acting Associate Deputy Assistant Secretary for Site Restoration 3:00 pm Break 3:15 pm ...

  11. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    SciTech Connect

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  12. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD CHAIRS...

    Office of Environmental Management (EM)

    Dave Borak, EM SSAB Designated Federal Officer Matt McCormick, DOE-RL Manager Kevin Smith, DOE-ORP Manager Jane Hedges, Washington State Department of Ecology Dennis Faulk, U.S. ...

  13. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    SciTech Connect

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The

  14. U.S. Department of Energy Environmental Management Site-Specific

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Site-Specific Advisory Board Policies and Procedures Desk Reference Prepared by The Office of Intergovernmental and Community Activities June 2013 Table of Contents Foreword I. Background and Introduction ................................................................. 2 II. Roles and Responsibilities ........................................................................ 3 A. DOE Headquarters

  15. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    SciTech Connect

    Berger, Matthew T.; Judd, Steven L.

    1999-01-01

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  16. Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards

    Energy.gov [DOE]

    Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific...

  17. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    SciTech Connect

    Not Available

    1993-01-15

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  18. Portsmouth Site Specific Advisory Board

    Energy.gov [DOE]

    The Portsmouth Site Specific Advisory Board (SSAB) provides informed, independent advice and recommendations to DOE regarding environmental restoration, waste management, future land use, risk...

  19. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    SciTech Connect

    Not Available

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  20. Oak Ridge Site Specific

    Office of Environmental Management (EM)

    Site Specific adviSORy BOaRd fy 2014 annual RepORt OctOBeR 2013 - SeptemBeR 2014 ORSSAB FY 2014 ANNUAL REPORT FY 2014 was my first term as chair of the Oak Ridge Site Specific Advisory Board. I thank the members of the board for putting their confidence in me for the year and again for FY 2015. It is an honor and a privilege to represent this important organization. The board's primary mission is to provide independent advice and recommendations to the Department of Energy on its environmental

  1. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    SciTech Connect

    Not Available

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  2. Savannah River Site's Site Specific Plan

    SciTech Connect

    Not Available

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  3. Land Management - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Land Management About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us Land Management Email Email Page | Print Print Page |Text Increase Font Size...

  4. Nevada Site Specific Advisory Board

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    then choose print Page 2 Map of the Nevada National Security Site (NNSS) and the (8) ... through September 2015 (FY 2015) Name Nevada Site Specific Advisory Board 232 Energy ...

  5. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    March 14, 2008 Mr. Steve McCracken Assistant Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. McCracken: Recommendation 165: Recommendation on Conducting Future Verifications of Cleanup At our March 12 meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation. The successes of independent verification of cleanup on the Oak Ridge Reservation, the David Witherspoon Site in Knoxville, and at many other sites

  6. Waste Specification Records - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Specification Records About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a new Hanford Customer Annual Waste Forecast...

  7. Information Exchange management site

    Energy Science and Technology Software Center

    2012-08-01

    Django site used to manage the approved information exchanges (content models) after creation and public comment at https://github.com/usgin-models.

  8. Environmental Restoration and Waste Management Site-Specific Plan for the Oak Ridge Reservation. [Appendix contains accromyms list and maps of waste management facilities

    SciTech Connect

    Not Available

    1991-09-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance at its waste sites and facilities, while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities, planned and completed, undertaken to implement these FYP goals at the DOE Field Office-Oak Ridge (DOE/OR) installations and programs; specifically, for the Oak Ridge Reservation (ORR), Oak Ridge Associated Universities (ORAU), and Hazardous Waste Remedial Action Program (HAZWRAP). Activities described in this SSP address hazardous, radioactive, mixed, and sanitary wastes, along with treatment, storage, and disposal of current production waste and legacy waste from past operation. The SSP is presented in sections emphasizing Corrective Activities (A), Environmental Restoration (ER), Waste Management (WM), Technology Development (TD), and Transportation; and includes descriptions of activities, resources, and milestones by installation or program. 87 tabs.

  9. Waste Specification Records - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Specification Records About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a New Hanford Customer Annual Waste Forecast and Funding Arrangements Waste Stream Approval Waste Shipment Approval Waste Receipt Quality Assurance Program Waste Specification Records Tools Points of Contact Waste Specification Records Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Waste Specification Records (WSRds) are the tool

  10. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Oak Ridge Site Specific Advisory Board Recommendation 233: Recommendations on the Proposed Environmental Management Disposal Facility at the U.S. DOE Oak Ridge Reservation Background Much of the Manhattan Project legacy waste for which the Department of Energy (DOE) Oak Ridge Environmental Management (OREM) program is responsible falls under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 (also known as the Superfund Act), which is a federal law

  11. FTCP Site Specific Information - Oak Ridge Office of Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management | Department of Energy Office of Environmental Management FTCP Site Specific Information - Oak Ridge Office of Environmental Management Annual Workforce Analysis and Staffing Plan Report Calendar Year 2015 Calendar Year 2013 Calendar Year 2012

  12. Site Manager Pantex Site Office

    National Nuclear Security Administration (NNSA)

    workforce. These re- ports serve the purpose of assisting management in workforce planning aligned to our strategic goals. Additionally, the reports help us analyze our...

  13. The Role of the Environmental Management Site Specific Advisory Board under the Federal Advisory Committee Act, With Emphasis on the Northern New Mexico Citizens' Advisory Board - 12482

    SciTech Connect

    Santistevan, Menice B.

    2012-07-01

    The Environmental Management Site Specific Advisory Board (EM SSAB) is comprised of eight Citizens' Advisory Boards, chartered under the Federal Advisory Committee Act (FACA) by the Assistant Secretary for Environmental Management for the U. S. Department of Energy (DOE). The purpose of the EM SSAB is to provide the DOE with recommendations regarding Environmental Management issues from legacy waste produced at major sites across the DOE Complex. The Northern New Mexico Citizens' Advisory Board (NNMCAB) is the site specific advisory board to the DOE on issues of environmental monitoring, remediation, waste management and long-term stewardship at Los Alamos National Laboratory (LANL). The other boards are located at: Hanford, Idaho, Nevada, Paducah, Portsmouth, Oak Ridge and Savannah River. Using broad citizen outreach and input, the SSAB provides an official mechanism for the citizenry at each of these sites to monitor current activities affecting the region and also to have input into the prioritization of future activities. 'The mission of the EM SSAB is to more directly involve stakeholders in EM Planning and decision-making processes for the nuclear weapons complex cleanup. DOE has various means of involving the public in its planning and decision-making processes; the EM SSAB is only one component of EM's public participation program, and is not intended to be an exclusive means of public participation. It is the policy of DOE and EM to conduct it programs in an open and responsive manner, thereby encouraging and providing the opportunity for public participation in its planning and decision-making processes. EM SSAB members are appointed to a two year term and may serve up to three terms. During this time, members are able to hear many presentation from subject matter experts, attend several site tours at their site and across the DOE complex and are able to express their concerns and give input to the prioritization of clean up at each site. It is an

  14. FTCP Site Specific Information - Nuclear Energy Oak Ridge Site Office |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Nuclear Energy Oak Ridge Site Office FTCP Site Specific Information - Nuclear Energy Oak Ridge Site Office Annual Workforce Analysis and Staffing Plan Report Calendar Year 2013 Calendar Year 2012

  15. FTCP Site Specific Information – Pacific Northwest Site Office

    Energy.gov [DOE]

    Site Specific Information including Contact Information, Annual Workforce Analysis & Staffing Plan Reports, and Technical Qualification Program (TQP) Self-Assessment

  16. FTCP Site Specific Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site Specific Information FTCP Site Specific Information Site Specific Information (including staffing analyses, TQP Accreditation Reports and TQP Self-Assessments) EM Sites Carlsbad Field Office EM Consolidated Business Center Oak Ridge Office of EM Office of River Protection Portsmouth Paducah Project Office Richland Operations Office Savannah River Operations Office West Valley EM HQ NNSA Sites Kansas City Field Office Livermore Field Office Los Alamos Field Office Nevada Field Office NNSA

  17. FTCP Site Specific Information – NNSA Headquarters

    Energy.gov [DOE]

    Site Specific Information including Contact Information, Annual Workforce Analysis & Staffing Plan Reports, and Technical Qualification Program (TQP) Self-Assessment.

  18. Oak Ridge Site Specific Advisory Board Meetings

    Energy.gov [DOE]

    Lists links to the Oak Ridge Site Specific Advisory Board Meetings. The links provide meeting documents available for download.

  19. FTCP Site Specific Information- Carlsbad Field Office

    Energy.gov [DOE]

    Site Specific Information including Contact Information, Annual Workforce Analysis & Staffing Plan Reports, and Technical Qualification Program (TQP) Self-Assessment.

  20. Site Specific Single Shell Tank (SST) phase 1 RFI and CMS Work Plan Addendum for Waste Management B-BX-BY

    SciTech Connect

    ROGERS, P.M.

    2000-05-19

    This site-specific work plan addendum for WMA B-BX-BY addresses vadose zone characterization plans for collecting and analyzing sediment samples.

  1. Oak Ridge Site Specific Advisory Board | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Site Specific Advisory Board Oak Ridge Site Specific Advisory Board 2016 ORSSAB members are pictured with representatives from DOE, EPA, and TDEC. 2016 ORSSAB members are pictured with representatives from DOE, EPA, and TDEC. The Oak Ridge Site Specific Advisory Board (ORSSAB) is a federally appointed citizens' panel that provides independent advice and recommendations to the U.S. Department of Energy (DOE)'s Oak Ridge Office of Environmental Management. History The board, formed in

  2. OAKRIDGE SITE SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    Civilian Radioactive Waste Management Washington, D.C. 20585 March 2004 i THE NUCLEAR WASTE POLICY ACT OF 1982 1 An Act to provide for the development of repositories for the disposal of high-level radioactive waste and spent nuclear fuel, to establish a program of research, development, and demonstration regarding the disposal of high-level radioactive waste and spent nuclear fuel, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America

  3. Oak Ridge Site Specific Advisory Board Committees

    Energy.gov [DOE]

    Oak Ridge’s Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its tasks.

  4. Site decommissioning management plan

    SciTech Connect

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

  5. Oak Ridge Site Specific Advisory Board Monthly Meeting Olive Garden

    Office of Environmental Management (EM)

    Olive Garden 7206 Kingston Pike Knoxville, Tennessee 37919 The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks opportunities for input through collaborative

  6. Transition of Sites from Environmental Management Memorandum...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from ...

  7. Paducah Site Management Plan | Department of Energy

    Energy Saver

    Management Plan Paducah Site Management Plan The annual Paducah Gaseous Diffusion Plant Site Management Plan (SMP) outlines DOE's strategic approach for achieving cleanup under the ...

  8. Site Management Guide (Blue Book)

    SciTech Connect

    2014-03-01

    The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Department’s postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOE’s postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site

  9. Site Management Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site Management Guide Site Management Guide Site Management Guide (Blue Book) (Update 18, January 2016) Site Management Guide (Blue Book) (Update 18, January 2016) (1.59 MB) More Documents & Publications 2014 ANNUAL SITE ENVIRONMENTAL REPORT (ASER) 2013 ANNUAL SITE ENVIRONMENTAL REPORT (ASER) 2011 Annual Site Environmental Report (ASER)

  10. Impact Evaluation Plan for the Site-Specific Savings Portfolio

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    the Site-Specific Savings Portfolio SBW Consulting, Inc. iii 4.5. Site-Specific Savings Analysis ......

  11. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    3: Recommendations on Additional Waste Disposal Capacity on the Oak Ridge Reservation At our May 14, 2014, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations on additional waste disposal capacity on the Oak Ridge Reservation. These recommendations are based on the Remedial Investigation/Feasibility Study for CERCLA Oak Ridge Reservation Waste Disposal (DOE/OR/01-2535&D2). The recommendations encourage DOE to continue planning for an additional on-site

  12. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    4 Annual Meeting Oak Ridge Site Specific Advisory Board Saturday, August 16, 2014, 8 a.m. to noon DOE Information Center, 1 Science.gov Way Oak Ridge, Tenn. The Oak Ridge Site Specific Advisory Board (ORSSAB) met for its annual planning meeting beginning at 8 a.m., on Saturday, August 16, 2014, at the Department of Energy (DOE) Information Center, 1 Science.gov Way, Oak Ridge, Tenn. The objectives of the meeting were to: * Develop an increased understanding of and commitment to the goals of the

  13. " Row: Specific Energy-Management Activities...

    Energy Information Administration (EIA) (indexed site)

    of Establishments by Participation in Specific Energy-Management Activities, 2010;" " Level: National Data; " " Row: Specific Energy-Management Activities within NAICS Codes;" " ...

  14. " Row: Specific Energy-Management Activities...

    Energy Information Administration (EIA) (indexed site)

    of Establishments by Participation in Specific Energy-Management Activities, 2006;" " Level: National Data; " " Row: Specific Energy-Management Activities within NAICS Codes;" " ...

  15. Site Manager Y-12 Site Office

    National Nuclear Security Administration (NNSA)

    workforce. These re- ports serve the purpose of assisting management in workforce planning aligned to our strategic goals. Additionally, the reports help us analyze our...

  16. Wetlands management at CERCLA sites

    SciTech Connect

    Harman, C.R.; Romaine, W.M.; D'Alleinne, C.P. )

    1993-01-01

    Wetlands have historically been viewed as dumping grounds for a wide range of waste products. The uncontrolled introduction of hazardous and toxic waste materials into these sensitive ecosystems has prompted the US Environmental Protection Agency (USEPA) to oversee many investigatory and remediation activities in wetlands, as mandated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). USEPA documents, in fact, note that approximately 72% of the CERCLA sites in USEPA Regions 1,2,3 and 4 are associated, to some degree, with wetlands. However, CERCLA activities in these areas are often complicated by the very regulatory measures designed to preserve and protect wetlands from anthropogenic disturbances. The ability of a Potentially Responsible Party (PRP) to effectively respond to issues at a CERCLA site, while still being responsive to both Federal and State wetlands regulations, requires the utmost in both technical and management expertise.

  17. Nevada Site Specific Advisory Board Tackles New Work Plans, Looks...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Specific Advisory Board Tackles New Work Plans, Looks to Future Nevada Site Specific ... groundwater characterization elements during a tour of the Nevada National Security Site. ...

  18. Oak Ridge Site Specific Advisory Board Committees | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Committees Oak Ridge Site Specific Advisory Board Committees Oak Ridge's Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its...

  19. FTCP Site Specific Information – NNSA Service Center

    Energy.gov [DOE]

    Site Specific Information includes Annual Workforce Analysis & Staffing Plan Reports, and TQP Accreditation Report.

  20. FTCP Site Specific Information – Richland Operations Office

    Energy.gov [DOE]

    Site Specific Information including Annual Workforce Analysis and Staffing Plan Reports and TQP Self-Assessments

  1. FTCP Site Specific Information – Portsmouth Paducah Project Office

    Energy.gov [DOE]

    Site Specific Information including Contact Information and Annual Workforce Analysis & Staffing Plan Reports.

  2. DOE - Office of Legacy Management -- LM Sites Map

    Office of Legacy Management (LM)

    Tonawanda North Sites Tuba City Disposal Site Vallecitos Nuclear Center Site Wayne Site Weldon Spring Site Sites Pending Transfer to Legacy Management . Last Updated: 1142016

  3. PIA - Savannah River Site Management and Operating Contractor...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor ...

  4. DOE Site Facility Management Contracts Internet Posting | Department...

    Energy Saver

    DOE Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting PDF icon DOE NNSA Site Facility Management Contracts - November...

  5. DOE Site Facility Management Contracts Internet Posting | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting PDF icon DOE NNSA Site Facility Management Contracts - November 2015.pdf ...

  6. DOE - Office of Legacy Management -- Monticello Mill Site - UT...

    Office of Legacy Management (LM)

    Properties Sites December 2005 Office of Legacy Management Monticello Mill Tailings Site ... Properties Sites December 2006 Office of Legacy Management Monticello Mill Tailings Site ...

  7. Oak Ridge Site Specific Advisory Board 2016 Annual Planning Meeting

    Office of Environmental Management (EM)

    2016 Annual Planning Meeting T r e m o n t L o d g e & R e s o r t 7 7 2 6 E . L a m a r A l e x a n d e r P a r k w a y T o w n s e n d , T e n n e s s e e The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup

  8. DOE Human Resources Management Division - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    About Hanford Cleanup Hanford History Hanford Site Wide Programs DOE Human Resources ... DOE Human Resources Management Division Email Email Page | Print Print Page | Text ...

  9. LM Releases Update of Site Management Guide

    Office of Energy Efficiency and Renewable Energy (EERE)

    A new edition of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Site Management Guide (SMG) was posted to the LM website, February 24, 2015.

  10. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    May 9, 2013 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 215:...

  11. Site Specific Advisory Board Elects Officers for FY 2016 | Department...

    Office of Environmental Management (EM)

    6 Site Specific Advisory Board Elects Officers for FY 2016 September 24, 2015 - 8:56am Addthis The Oak Ridge Site Specific Advisory Board (ORSSAB) elected its FY 2016 officers ...

  12. LTS Project Management - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Key Communication Tools Briefings Fact sheets Website Public documents Frequently Asked ... Laser Interferometer Gravitational Wave Observatory Information Management ...

  13. FTCP Site Specific Information – Los Alamos Field Office

    Energy.gov [DOE]

    Site Specific Information including Contact Information, Annual Workforce Analysis & Staffing Plan Reports, and Technical Qualification Program (TQP) Self-Assessments.

  14. FTCP Site Specific Information – Savannah River Field Office

    Energy.gov [DOE]

    Site Specific Information including Contact Information, Annual Workforce Analysis & Staffing Plan Reports, and Technical Qualification Program (TQP) Self-Assessment.

  15. FTCP Site Specific Information – Chief of Nuclear Safety

    Energy.gov [DOE]

    Site Specific Information including Contact Information, Annual Workforce Analysis & Staffing Plan Reports, and STSM Self-Assessment.

  16. FTCP Site Specific Information – Office of River Protection

    Energy.gov [DOE]

    Site Specific Information including Annual Workforce Analysis and Staffing Plan Reports, and Technical Qualification Program (TQP) Self-Assessment.

  17. FTCP Site Specific Information – Office of Science

    Energy.gov [DOE]

    Site Specific Information includes Annual Workforce Analysis and Staffing Plan Reports, and Technical Qualification Program (TQP) Self-Assessment.

  18. FTCP Site Specific Information – Savannah River Operations Office

    Energy.gov [DOE]

    Site Specific Information including Contact Information, Annual Workforce Analysis & Staffing Plan Reports, and Technical Qualification Program (TQP) Self-Assessment.

  19. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ... * Internet: www.oakridge.doe.govemssab Oak Ridge Site ... and maintenance budget, funding, and personnel ...

  20. Hanford site integrated pest management plan

    SciTech Connect

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  1. Configuration management program plan for Hanford site systems engineering

    SciTech Connect

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  2. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 228: Recommendation on Fiscal Year 2017 DOE Oak Ridge Environmental Management Budget Request At our June 10, ...

  3. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    on Fiscal Year 2016 DOE Oak Ridge Environmental Management Budget Request At our May 14, 2014, ... Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ...

  4. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Whitney: Recommendation 216: Recommendations on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request At our May 8, ...

  5. SITE SPECIFIC ADVISORY BOARD CHAIRS MEETING

    Office of Environmental Management (EM)

    Secretary for Environmental Management 10:00 a.m. Roundtable Discussion * Discussion Leader: James Ajello, Chair 10:15 a.m. Break 10:30 a.m. American Recovery and Reinvestment...

  6. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request Background Each year the U.S. Department of Energy (DOE) Environmental Management (EM) Program develops its budget request for the fiscal year two years beyond the current fiscal year, incorporating budget requests from DOE field offices to develop the EM Program budget request to the president. DOE EM Headquarters typically issues guidelines to the field offices advising them how much

  7. Management of Decommissioning on a Multi-Facility Site (Conference...

    Office of Scientific and Technical Information (OSTI)

    Conference: Management of Decommissioning on a Multi-Facility Site Citation Details In-Document Search Title: Management of Decommissioning on a Multi-Facility Site The management ...

  8. DOE - Office of Legacy Management -- SiteA

    Office of Legacy Management (LM)

    (D&D) Program, the Office of Legacy Management manages the Site APlot M ... The site transferred to the Office of Legacy Management in 2003 and requires routine ...

  9. Hanford Site Waste Management Units Report

    SciTech Connect

    Shearer, Jeffrey P.

    2014-02-19

    The Hanford Site Waste Management Units Report (HSWMUR) has been created to meet the requirements of the Tri-Party Agreement (TPA) Action Plan, Section 3.5, which states: “The Hanford Site Waste Management Units Report shall be generated, in a format agreed upon by the Parties, as a calendar year report and issued annually by the DOE by the end of February of each year, and posted electronically for regulator and public access. This report shall reflect all changes made in waste management unit status during the previous year.” This February 2013 version of the HSWMUR contains a comprehensive inventory of the 3438 sites and 569 subsites in the Waste Information Data System (WIDS). The information for each site contains a description of each unit and the waste it contains, where applicable. The WIDS database provides additional information concerning the sites contained in this report and is maintained with daily changes to these sites.

  10. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    14, 2016, 6:00 p.m. Olive Garden Restaurant 7206 Kingston Pike, Knoxville, Tenn. AGENDA I. Welcome and Announcements (E. Trujillo) ........................................................................ 6:00-6:05 A. Next Meeting: Wednesday, October 12 Presentation Topic: State of the Oak Ridge Environmental Management Program II. Comments from the EPA and TDEC Liaisons (C. Jones, K. Czartoryski)

  11. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Specific Advisory Board Wednesday, March 12, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright)...

  12. Managing Legacy Records for Formerly Utilized Sites Remedial Action Program

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sites | Department of Energy Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008) Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (317.04 KB) More Documents & Publications FUSRAP Overview Recent Developments in DOE FUSRAP Process

  13. New Savannah River Site Deputy Manager Named

    Energy.gov [DOE]

    AIKEN, S.C. – DOE’s Savannah River Operations Office selected Terrel “Terry” J. Spears as the deputy manager of the Savannah River Site (SRS) this month.

  14. DOE - Office of Legacy Management -- Mound Site

    Office of Legacy Management (LM)

    The site long-term monitoring responsibility transferred to the Office of Legacy Management(LM) in 2010 and requires operation and maintenance of a pump and treatment system, ...

  15. Chamber of Commerce Recognizes Portsmouth Site Specific Advisory Board |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Chamber of Commerce Recognizes Portsmouth Site Specific Advisory Board Chamber of Commerce Recognizes Portsmouth Site Specific Advisory Board February 11, 2016 - 12:05pm Addthis The Portsmouth Site Specific Advisory Board was honored at the chamber’s annual dinner in January. Pictured, left to right, are Carlton Cave (Portsmouth SSAB member), Joel Bradburne (Portsmouth SSAB deputy designated federal official), Greg Simonton (Portsmouth SSAB federal coordinator),

  16. Vermont Small Hydropower Assistance Program Site-Specific Determinatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    to library PermittingRegulatory Guidance - Supplemental Material: Vermont Small Hydropower Assistance Program Site-Specific Determinations SummaryPermittingRegulatory...

  17. FTCP Site Specific Information – NNSA Production Office

    Energy.gov [DOE]

    Site Specific Information including Contact Information, Annual Workforce Analysis & Staffing Plan Reports,Technical Qualification Program (TQP) Self-Assessment, and TQP Accreditation Report.

  18. FTCP Site Specific Information - West Valley Demonstration Project...

    Energy Saver

    West Valley Demonstration Project FTCP Site Specific Information - West Valley Demonstration Project Annual Workforce Analysis and Staffing Plan Report Calendar Year 2012

  19. Transuranic Waste Processing Center Oak Ridge Site Specific...

    Office of Environmental Management (EM)

    Transuranic Waste Processing Update Oak Ridge Site Specific Advisory Board May 14, 2014 ...EM 3 Oak Ridge Transuranic (TRU) Waste Inventory * TRU waste is waste ...

  20. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    ... can be accessed at http:energy.govemarticlesem-historical-timeline. ... at SRS for conversion to oxide to provide ... Also, all of the graphics, charts, maps and tables ...

  1. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Equivalents FY - Fiscal Year GAO - Government Accountability Office GDP- Gaseous ... He agreed that the perception of a radiological waste or hazmat truck parked in a public ...

  2. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    Science SNF - Spent Nuclear Fuel SODI - Southern Ohio ... in uranium sold until the price of the market recovers. ... waste (LLWMLLW) disposal forecast at NNSS in FY 2013; ...

  3. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Energy.gov [DOE] (indexed site)

    ... and nuclear and renewable energy research at INL. He noted that DOE and the ... Borak thanked all those who submitted abstracts for papers for the upcoming Waste ...

  4. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    ... Risk Reduction Project; and PBS 11c, Spent Nuclear Fuel down-blend and processing for ... - from receipt through waste emplacement in the panels - but using empty drums. ...

  5. Lawrence Livermore Site Office Manager Joins EM's Senior Leadership...

    Office of Environmental Management (EM)

    Livermore Site Office Manager Joins EM's Senior Leadership Team Lawrence Livermore Site Office Manager Joins EM's Senior Leadership Team November 9, 2011 - 12:00pm Addthis ...

  6. DOE - Office of Legacy Management -- Tatum Salt Dome Test Site...

    Office of Legacy Management (LM)

    Site: Tatum Salt Dome Test Site (MS.01) Long-term care managed by DOE Legacy Management ... Status: Long-term care managed by DOE Legacy Management under the Nevada Offsites ...

  7. Waste management units: Savannah River Site

    SciTech Connect

    Molen, G.

    1991-09-01

    This report indexes every waste management unit of the Savannah River Site. They are indexed by building number and name. The waste units are also tabulated by solid waste units receiving hazardous materials with a known release or no known release to the environment. It also contains information on the sites which has received no hazardous waste, and units which have received source, nuclear, or byproduct material only. (MB)

  8. Configuration management program plan for Hanford site systems engineering

    SciTech Connect

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  9. Mr. Steve Dixon, Chair Oak Ridge Site Site-Specific Advisory...

    Office of Environmental Management (EM)

    0 6 2009 Mr. Steve Dixon, Chair Oak Ridge Site Site-Specific Advisory Boara P.O. Box 2001, MS-7604 Oak Ridge, Tennessee 3783 1 Dear Mr. Dixon: I have received your request for...

  10. Career Map: Site/Plant Manager | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site/Plant Manager Career Map: Site/Plant Manager A female plant manager reads site plans on large sheets of paper next to several electrical components. Site/Plant Manager Position Title Site/Plant Manager Alternate Title(s) n/a Education & Training Level Mid-level, Bachelor's degree preferred, not always required Education & Training Level Description Wind plant managers need at least a high school diploma and years of experience in renewable energy, mechanical, electrical, field

  11. EM Site-Specific Advisory Board (EM SSAB) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB) EM Site-Specific Advisory Board (EM SSAB)

  12. Nevada Test Site Resource Management Plan

    SciTech Connect

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  13. FTCP Site Specific Information - EM Consolidated Business Center...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FTCP Site Specific Information - EM Consolidated Business Center FTCP Agent Organization Name Phone E-Mail EM CBC Timothy J. (TJ) Jackson 513246-0077 tj.jackson@emcbc.doe.gov ...

  14. FTCP Site Specific Information - Kansas City | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Kansas City FTCP Site Specific Information - Kansas City FTCP Agent Organization Name Phone E-Mail Kansas City Mark L. Holecek 816-488-3920 mark.holecek@nnsa.srs.gov

  15. Oak Ridge Site Specific Advisory Board Contacts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-942 Oak Ridge, TN ... Melyssa Noe, Alternate Deputy Designated Federal Officer U.S. DOE-OREM, P.O. Box 2001, ...

  16. Site Specific Advisory Board Elects Officers for FY 2014

    Energy.gov [DOE]

    The Oak Ridge Site Specific Advisory Board (ORSSAB) elected its FY 2014 officers during its September board meeting. Dave Hemelright, Bruce Hicks, and Lisa Hagy will serve as chair, vice chair, and secretary respectively.

  17. FTCP Site Specific Information - Oak Ridge Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FTCP Site Specific Information - Oak Ridge Office FTCP Agent Organization Name Phone E-Mail Oak Ridge Patrick Smith 865574-0960 smithpn@oro.doe.gov Annual Workforce Analysis and ...

  18. Site Specific Coal Conversion | netl.doe.gov

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Site Specific Coal Conversion The Site Specific Coal Conversion Key Technology will include less mature R&D and case-specific engineering and construction and balance of plant R&D to most effectively deploy advanced C&CBTL systems in a certain location, with a certain feed, infrastructure, and environment for fuels production. Essentially, work in this area will be a bridge between a systems or process design for a particular application of coal-biomass to liquids, and a specific

  19. Improving Site-Specific Radiological Performance Assessments - 13431

    SciTech Connect

    Tauxe, John; Black, Paul; Catlett, Kate; Lee, Robert; Perona, Ralph; Stockton, Tom; Sully, Mike

    2013-07-01

    An improved approach is presented for conducting complete and defensible radiological site-specific performance assessments (PAs) to support radioactive waste disposal decisions. The basic tenets of PA were initiated some thirty years ago, focusing on geologic disposals and evaluating compliance with regulations. Some of these regulations were inherently probabilistic (i.e., addressing uncertainty in a quantitative fashion), such as the containment requirements of the U.S. Environmental Protection Agency's (EPA's) 40 CFR 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes, Chap. 191.13 [1]. Methods of analysis were developed to meet those requirements, but at their core early PAs used 'conservative' parameter values and modeling approaches. This limited the utility of such PAs to compliance evaluation, and did little to inform decisions about optimizing disposal, closure and long-term monitoring and maintenance, or, in general, maintaining doses 'as low as reasonably achievable' (ALARA). This basic approach to PA development in the United States was employed essentially unchanged through the end of the 20. century, principally by the U.S. Department of Energy (DOE). Performance assessments developed in support of private radioactive waste disposal operations, regulated by the U.S. Nuclear Regulatory Commission (NRC) and its agreement states, were typically not as sophisticated. Discussion of new approaches to PA is timely, since at the time of this writing, the DOE is in the midst of revising its Order 435.1, Radioactive Waste Management [2], and the NRC is revising 10 CFR 61, Licensing Requirements for Land Disposal of Radioactive Waste [3]. Over the previous decade, theoretical developments and improved computational technology have provided the foundation for integrating decision analysis (DA) concepts and objective-focused thinking, plus a Bayesian approach to

  20. PIA - Savannah River Site Management and Operating Contractor (HRMS) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) (292.43 KB) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA -

  1. Legacy Management FUSRAP Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Falls Vicinity Properties, New York, Site Oak Ridge, Tennessee, Warehouses Site Oxford, Ohio, Site Painesville, Ohio, Site Seymour, Connecticut, Site Springdale, ...

  2. Integrated Waste Management and Consent-Based Siting Booklet | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Integrated Waste Management and Consent-Based Siting Booklet Integrated Waste Management and Consent-Based Siting Booklet This booklet provides an overview of issues involved in the Department's vision of an integrated waste management system and its consent-based approach to siting the facilities needed to manage nuclear waste. It briefly discusses the history of waste management efforts in the United States, key features of a consent-based approach, siting efforts in other

  3. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    2 2 2 , , , 2 2 2 0 0 0 1 1 1 4 4 4 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks

  4. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    1 1 1 , , , 2 2 2 0 0 0 1 1 1 4 4 4 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks

  5. Oak Ridge Site Specific Advisory Board Contacts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contacts Oak Ridge Site Specific Advisory Board Contacts Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-942 Oak Ridge, TN 37831 Phone Numbers (865) 241-4583, (865) 241-4584 (800) 382-6938, option 4 DOE Liaisons Jay Mullis, Deputy Designated Federal Officer U.S. DOE-OREM, P.O Box 2001, EM-90, Oak Ridge, TN 37831 Phone: (865) 241-3706 Fax: (865) 241-6932 Email: Jay.Mullis@orem.doe.gov Dave Adler, Alternate Deputy Designated Federal Officer U.S. DOE-OREM, P.O. Box 2001,

  6. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    Management Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 11142011 - 11182011 ...

  7. Savannah River Site Manager Jack Craig Wins Highest Civil Service...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Savannah River Site Manager Jack Craig Wins Highest Civil Service Award Savannah River Site Manager Jack Craig Wins Highest Civil Service Award December 29, 2015 - 1:00pm Addthis ...

  8. DOE - Office of Legacy Management -- Oak Ridge TN Warehouse Site...

    Office of Legacy Management (LM)

    FACT SHEET This fact sheet provides information about the Oak Ridge, Tennessee, Warehouses Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. ...

  9. DOE - Office of Legacy Management -- Chupadera Mesa NM Site ...

    Office of Legacy Management (LM)

    FACT SHEET This fact sheet provides information about the Chupadera Mesa, New Mexico, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. ...

  10. DOE - Office of Legacy Management -- New York, NY, Site - NY...

    Office of Legacy Management (LM)

    FACT SHEET This fact sheet provides information about the New York, New York, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. Aerial ...

  11. DOE - Office of Legacy Management -- Jersey City NJ Site - NJ...

    Office of Legacy Management (LM)

    FACT SHEET This fact sheet provides information about the Jersey City, New Jersey, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. Jersey ...

  12. DOE - Office of Legacy Management -- Indian Orchard MA Site ...

    Office of Legacy Management (LM)

    FACT SHEET This fact sheet provides information about the Indian Orchard, Massachusetts, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. ...

  13. DOE - Office of Legacy Management -- Hamilton OH Site - OH 27

    Office of Legacy Management (LM)

    This fact sheet provides information about the Hamilton, Ohio, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. Aerial photograph of the ...

  14. DOE - Office of Legacy Management -- Beverly MA Site - MA 04

    Office of Legacy Management (LM)

    This site is managed by the U.S. Department of Energy Office of Legacy Management. MA.04-1 - DOE Memorandum; Voigt to LaGrone; Subject: Designation of Sites for Remedial Action - ...

  15. DOE - Office of Legacy Management -- New Brunswick NJ Site -...

    Office of Legacy Management (LM)

    FACT SHEET This fact sheet provides information about the New Brunswick, New Jersey, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management. Aerial ...

  16. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    SciTech Connect

    Not Available

    1993-01-15

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones.

  17. DOE NNSA Site Facility Management Contracts - June 2016 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy NNSA Site Facility Management Contracts - June 2016 DOE NNSA Site Facility Management Contracts - June 2016 DOE NNSA Site Facility Management Contracts - June 2016.pdf (58.05 KB) More Documents & Publications DOEfacilitymgt_contractsownership_01052011.pdf Chapter 1 - Acquisition Regulations System Class Patent Waiver W(C)2008-001

  18. FTCP Site Specific Information - Idaho Operations Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Idaho Operations Office FTCP Site Specific Information - Idaho Operations Office FTCP Agent Organization Name Phone E-Mail Idaho Mark C. Brown 208-526-7065 brownmc@id.doe.gov Annual Workforce Analysis and Staffing Plan Reports Calendar Year 2014 Calendar Year 2013 Calendar Year 2012 Calendar Year 2011 Calendar Year 2010 TQP Self-Assessment ID TQP and FTCP Self-Assessment, December 2015 ID TQP Self-Assessment, April 2014 ID TQP Self-Assessment, October 2011

  19. FTCP Site Specific Information - Livermore Field Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Livermore Field Office FTCP Site Specific Information - Livermore Field Office FTCP Agent Organization Name Phone E-Mail Livermore Mike Brown Douglas Laniohan 925-423-7936 925-422-2166 Mike.Brown@nnsa.doe.gov Douglas.Laniohan@nnsa.doe.gov Annual Workforce Analysis and Staffing Plan Reports Calendar Year 2015 Calendar Year 2014 Calendar Year 2013 Calendar Year 2012 Calendar Year 2011 Calendar Year 2010 TQP Self-Assessments TQP Self-Assessment, May 2013

  20. FTCP Site Specific Information - Sandia Field Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Sandia Field Office FTCP Site Specific Information - Sandia Field Office FTCP Agent Organization Name Phone E-Mail Sandia James Todd 505-284-6668 jtodd@doeal.gov Annual Workforce Analysis and Staffing Plan Reports Calendar Year 2015 Calendar Year 2014 Calendar Year 2013 Calendar Year 2012 Calendar Year 2011 Calendar Year 2010 TQP Accreditation Reports TQP Reaccreditation Report, November 26 - December 5, 2012 TQP Accreditation Report, June 23 - 27, 2008 TQP Self-Assessment TQP

  1. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    J J J a a a n n n u u u a a a r r r y y y 1 1 1 4 4 4 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts

  2. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    u u u n n n e e e 1 1 1 0 0 0 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge

  3. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    O O O c c c t t t o o o b b b e e e r r r 1 1 1 4 4 4 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts

  4. TPA Project Manager's Lists - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    TPA Project Manager's Lists Tri-Party Agreement The Agreement Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management...

  5. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  6. Methods for generating phosphorylation site-specific immunological reagents

    DOEpatents

    Anderson, Carl W.; Appella, Ettore; Sakaguchi, Kazuyasu

    2001-01-01

    The present invention provides methods for generating phosphorylation site-specific immunological reagents. More specifically, a phosphopeptide mimetic is incorporated into a polypeptide in place of a phosphorylated amino acid. The polypeptide is used as antigen by standard methods to generate either monoclonal or polyclonal antibodies which cross-react with the naturally phosphorylated polypeptide. The phosphopeptide mimetic preferably contains a non-hydrolyzable linkage from the appropriate carbon atom of the amino acid residue to a phosphate group. A preferred linkage is a CF.sub.2 group. Such a linkage is used to generate the phosphoserine mimetic F.sub.2 Pab, which is incorporated into a polypeptide sequence derived from p53 to produce antibodies which recognize a specific phosphorylation state of p53. A CF.sub.2 group linkage is also used to produce the phosphothreonine mimetic F.sub.2 Pmb, and to produce the phosphotyrosine mimetic, F.sub.2 Pmp.

  7. Risk-based technical specifications program: Site interview results

    SciTech Connect

    Andre, G.R.; Baker, A.J. ); Johnson, R.L. )

    1991-08-01

    The Electric Power Research Institute and Pacific Gas and Electric Company are sponsoring a program directed at improving Technical Specifications using risk-based methods. The major objectives of the program are to develop risk-based approaches to improve Technical Specifications and to develop an Interactive Risk Advisor (IRA) prototype. The IRA is envisioned as an interactive system that is available to plant personnel to assist in controlling plant operation. Use of an IRA is viewed as a method to improve plant availability while maintaining or improving plant safety. In support of the program, interviews were conducted at several PWR and BWR plant sites, to elicit opinions and information concerning risk-based approaches to Technical Specifications and IRA requirements. This report presents the results of these interviews, including the functional requirements of an IRA. 2 refs., 6 figs., 2 tabs.

  8. Technitium Management at the Hanford Site

    SciTech Connect

    Robbins, Rebecca A.

    2013-08-15

    Long Abstract. Full Text. The Hanford tank waste contains approx 26,000 Ci of technetium-99 (Tc-99), the majority of which is in the supernate fraction. Tc-99 is a long-lived radionuclide with a half-life of approx 212,000 years and, in its predominant pertechnetate (TcO{sub 4}) form, is highly soluble and very mobile in the vadose zone and ultimately the groundwater. Tc-99 is identified as the major dose contributor (in groundwater) by past Hanford site performance assessments and therefore considered a key radionuclide of concern at Hanford. The United States Department of Energy (DOE) River Protection Project's (RPP) long-term Tc-99 management strategy is to immobilize the Tc-99 in a waste form that will retain the Tc-99 for many thousands of years. To achieve this, the RPP flowsheet will immobilize the majority of the Tc-99 as a vitrified low-activity waste product that will be ultimately disposed on site in the Integrated Disposal Facility. The Tc-99 will be released gradually from the glass at very low rates such that the groundwater concentrations at any point in time would be substantially below regulatory limits.The liquid secondary waste will be immobilized in a low-temperature matrix (cast stone) and the solid secondary waste will be stabilized using grout. Although the Tc-99 that is immobilized in glass will meet the release rate for disposal in IDF, a proportion is driven into the secondary waste stream that will not be vitrified and therefore presents a disposal risk. If a portion of the Tc-99 were to be removed from the Hanford waste inventory and disposed off-site, (e.g., as HLW), it could lessen a major constraint on LAW waste form performance, i.e., the requirement to retain Tc-99 over thousands of years and have a positive impact on the IDF Performance Assessment. There are several technologies available at various stages of technical maturity that can be employed for Tc-99 removal. The choice of technology and the associated efficacy of the

  9. Logistics Services Manager, Nevada Test Site | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Logistics Services Manager, Nevada Test Site Lance Rakow, NTS Logistics Services Mangager Lance Rakow August 2009 U.S. Department of Energy's Management Award Along with colleague Susan Livenick, Lance Rakow was awarded this years Department of Energy's Management Award honoring his outstanding achievements in energy and water management. Lance, the Logistics Services Manager at the Nevada Test Site, oversaw the conversion of nearly all fleet vehicles at NTS to using

  10. Site Specific Analyses of a Spent Nuclear Fuel Transportation Accident

    SciTech Connect

    Biwer, B. M.; Chen, S. Y.

    2003-02-24

    The number of spent nuclear fuel (SNF) shipments is expected to increase significantly during the time period that the United States' inventory of SNF is sent to a final disposal site. Prior work estimated that the highest accident risks of a SNF shipping campaign to the proposed geologic repository at Yucca Mountain were in the corridor states, such as Illinois. The largest potential human health impacts would be expected to occur in areas with high population densities such as urban settings. Thus, our current study examined the human health impacts from the most plausible severe SNF transportation accidents in the Chicago metropolitan area. The RISKIND 2.0 program was used to model site-specific data for an area where the largest impacts might occur. The results have shown that the radiological human health consequences of a severe SNF rail transportation accident on average might be similar to one year of exposure to natural background radiation for those persons living a nd working in the most affected areas downwind of the actual accident location. For maximally exposed individuals, an exposure similar to about two years of exposure to natural background radiation was estimated. In addition to the accident probabilities being very low (approximately 1 chance in 10,000 or less during the entire shipping campaign), the actual human health impacts are expected to be lower if any of the accidents considered did occur, because the results are dependent on the specific location and weather conditions, such as wind speed and direction, that were selected to maximize the results. Also, comparison of the results of longer duration accident scenarios against U.S. Environmental Protection Agency guidelines was made to demonstrate the usefulness of this site-specific analysis for emergency planning purposes.

  11. Oak Ridge Site Specific Advisory Board Annual Meeting

    Office of Environmental Management (EM)

    Numbers in parentheses indicate minutes assigned to topic Oak Ridge Site Specific Advisory Board Annual Meeting Saturday, August 6, 2016 9:00 a.m. - 2:30 p.m. Tremont Lodge & Resort 7726 E. Lamar Alexander Pkwy, Townsend, TN OBJECTIVES 1. Develop an increased understanding of and commitment to the goals of the board 2. Evaluate the effectiveness and achievements of FY 2016 3. Begin development of the FY 2017 work plan AGENDA 9:00-9:05 .......... Welcome (5)*  Opening Remarks - Belinda

  12. Message from the Manager - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Manager, Office of River Protection' Kevin Smith Manager, Office of River Protection We hope that this new redesign will make it easier to access the information about the...

  13. Daniel Hoag Named Y-12 Site Office Deputy Manager | National...

    National Nuclear Security Administration (NNSA)

    Home Field Offices Welcome to the NNSA Production Office NPO News Releases Daniel Hoag Named Y-12 Site Office Deputy Manager Daniel Hoag Named Y-12 Site Office Deputy...

  14. DOE - Office of Legacy Management -- Columbus East OH Site -...

    Office of Legacy Management (LM)

    Documents Related to Columbus East, OH Columbus East Site Aerial Photograph FACT SHEET Office of Legacy Management Columbus East, Ohio, Site OH.26-1 - DOE Memorandum, Wagoner to ...

  15. DOE NNSA Site Facility Management Contracts - MASTER.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NNSA Site Facility Management Contracts November 2015 ... Number Contract Type Business Model FY Competed Award ... Separations Process Research Unit (SPRU) EM URS Energy & ...

  16. DOE - Office of Legacy Management -- Wayne Site - NJ 16

    Office of Legacy Management (LM)

    This site is currently managed by the U.S. Army Corps of Engineers but will eventually transfer to the U.S. Department of Energy Office of Legacy Management. NJ.16-1 - DOE ...

  17. DOE - Office of Legacy Management -- Chicago South IL Site -...

    Office of Legacy Management (LM)

    This site is managed by the U.S. Department of Energy Office of Legacy Management. IL.06-1 - DOE Memorandum; Coffman to LaGrone; Subject: Designation of the University of Chicago ...

  18. Conversion of transuranic waste to low level waste by decontamination: a site specific update

    SciTech Connect

    Allen, R.P.; Hazelton, R.F.

    1985-09-01

    As a followup to an FY-1984 cost/benefit study, a program was conducted in FY-1985 to transfer to the relevant DOE sites the information and technology for the direct conversion of transuranic (TRU) waste to low-level waste (LLW) by decontamination. As part of this work, the economic evaluation of the various TRUW volume reduction and conversion options was updated and expanded to include site-specific factors. The results show, for the assumptions used, that size reduction, size reduction followed by decontamination, or in situ decontamination are cost effective compared with the no-processing option. The technology transfer activities included site presentations and discussions with operations and waste management personnel to identify application opportunities and site-specific considerations and constraints that could affect the implementation of TRU waste conversion principles. These discussions disclosed definite potential for the beneficial application of these principles at most of the sites, but also confirmed the existence of site-specific factors ranging from space limitations to LLW disposal restrictions that could preclude particular applications or diminish expected benefits. 8 refs., 2 figs., 4 tabs.

  19. FTCP Site Specific Information – Office of Environment, Health, Safety & Security

    Energy.gov [DOE]

    Site Specific Information including Contact Information, and Annual Workforce Analysis & Staffing Plan Reports.

  20. Waste management units - Savannah River Site

    SciTech Connect

    Not Available

    1989-10-01

    This report is a compilation of worksheets from the waste management units of Savannah River Plant. Information is presented on the following: Solid Waste Management Units having received hazardous waste or hazardous constituents with a known release to the environment; Solid Waste Management Units having received hazardous waste or hazardous constituents with no known release to the environment; Solid Waste Management Units having received no hazardous waste or hazardous constituents; Waste Management Units having received source; and special nuclear, or byproduct material only.

  1. Project Manager, Nevada Test Site | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Project Manager, Nevada Test Site Susan Livenick, NTS Project Manager Susan Livenick August 2009 U.S. Department of Energy's Management Award On August 12, Susan Livenick, a Project Manager at the Nevada Test Site received the 2009 U.S. Department of Energy's Management Award at a special awards ceremony in Providence, R.I. The awards honor outstanding achievements in energy and water management. Susan oversaw Bldg. B3's abatement and renovation from 2005-2008, making

  2. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  3. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State...

  4. NNSA Statement Regarding Nevada National Security Site Management &

    National Nuclear Security Administration (NNSA)

    Operating Contract | National Nuclear Security Administration | (NNSA) Statement Regarding Nevada National Security Site Management & Operating Contract August 31, 2016 WASHINGTON - On August 26, 2016, the Department of Energy's National Nuclear Security Administration (DOE/NNSA) awarded the contract for the management and operation of the Nevada National Security Site (NNSS) to Nevada Site Science Support and Technologies Corporation (NVS3T). The winning proposal identified NVS3T as a

  5. Software configuration management plan for the Hanford site technical database

    SciTech Connect

    GRAVES, N.J.

    1999-05-10

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system.

  6. Environmental Management Performance Reports - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Impact Statements Environmental Management Performance Reports FY 2016 Reports FY 2015 Reports FY 2014 Reports FY 2013 Reports FY 2012 Reports FY 2011 Reports FY 2010 ...

  7. Legacy Management Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    to managing its responsibilities associated with the environmental legacy of World War II and the Cold War. This legacy includes radioactive and chemical waste, environmental...

  8. Level: National Data; Row: Specific Energy-Management Activities...

    Energy Information Administration (EIA) (indexed site)

    Next MECS will be conducted in 2010 Table 8.4 Number of Establishments by Participation in Specific Energy-Management Activities, 2006; Level: National Data; Row: Specific Energy-M...

  9. Level: National Data; Row: Specific Energy-Management Activities...

    Energy Information Administration (EIA) (indexed site)

    Next MECS will be fielded in 2015 Table 8.4 Number of Establishments by Participation in Specific Energy-Management Activities, 2010; Level: National Data; Row: Specific Energy-Man...

  10. Oak Ridge Site Specific Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831

    Office of Environmental Management (EM)

    October 16, 2012 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 211 : Recommendation on Availability of DOE Environmental Management Documents At our October 10, 2012, meeting the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation regarding the availability and finding of documents online through the DOE Information Center. The board recommends that steps be taken to

  11. DOE - Office of Legacy Management -- Mound Site

    Office of Legacy Management (LM)

    Ohio Mound, Ohio, Site Site Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Annual Institutional Controls Report Community Involvement Plan Long-Term Surveillance and Maintenance Plan Operations and Maintenance Plan Internal Links Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Records External Links Mound Development Corporation (MDC) Ohio Environmental Protection Agency U.S. Environmental Protection

  12. Journey to the Nevada Test Site Radioactive Waste Management Complex

    ScienceCinema

    None

    2016-07-12

    Journey to the Nevada Test Site Radioactive Waste Management Complex begins with a global to regional perspective regarding the location of low-level and mixed low-level waste disposal at the Nevada Test Site. For decades, the Nevada National Security Site (NNSS) has served as a vital disposal resource in the nation-wide cleanup of former nuclear research and testing facilities. State-of-the-art waste management sites at the NNSS offer a safe, permanent disposal option for U.S. Department of Energy/U.S. Department of Defense facilities generating cleanup-related radioactive waste.

  13. Wind Power Opportunities in St. Thomas, USVI: A Site-Specific...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis Utilizes ...

  14. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    plume of spent fuel-related contaminants beneath it. ... one alternative with no action except for the completion of source removal of waste sites at the surface, ...

  15. Savannah River Site Contractor Receives Project Management Institute Award

    Energy.gov [DOE]

    AIKEN, S.C. – The local chapter of the Project Management Institute (PMI) recently honored the Savannah River Site liquid waste contractor with its 2011 Project of the Year award.

  16. DOE - Office of Legacy Management -- Maywood Site - NJ 10

    Office of Legacy Management (LM)

    of Engineers but will eventually transfer to the U.S. Department of Energy Office of Legacy Management. Aerial Photograph of the Maywood, New Jersey, Site NJ.10-1 - DOE Letter;...

  17. SITE SPECIFIC REFERENCE PERSON PARAMETERS AND DERIVED CONCENTRATION STANDARDS FOR THE SAVANNAH RIVER SITE

    SciTech Connect

    Jannik, T.

    2013-03-14

    The purpose of this report is twofold. The first is to develop a set of behavioral parameters for a reference person specific for the Savannah River Site (SRS) such that the parameters can be used to determine dose to members of the public in compliance with Department of Energy (DOE) Order 458.1 “Radiation Protection of the Public and the Environment.” A reference person is a hypothetical, gender and age aggregation of human physical and physiological characteristics arrived at by international consensus for the purpose of standardizing radiation dose calculations. DOE O 458.1 states that compliance with the annual dose limit of 100 mrem (1 mSv) to a member of the public may be demonstrated by calculating the dose to the maximally exposed individual (MEI) or to a representative person. Historically, for dose compliance, SRS has used the MEI concept, which uses adult dose coefficients and adult male usage parameters. Beginning with the 2012 annual site environmental report, SRS will be using the representative person concept for dose compliance. The dose to a representative person will be based on 1) the SRS-specific reference person usage parameters at the 95th percentile of appropriate national or regional data, which are documented in this report, 2) the reference person (gender and age averaged) ingestion and inhalation dose coefficients provided in DOE Derived Concentration Technical Standard (DOE-STD-1196-2011), and 3) the external dose coefficients provided in the DC_PAK3 toolbox. The second purpose of this report is to develop SRS-specific derived concentration standards (DCSs) for all applicable food ingestion pathways, ground shine, and water submersion. The DCS is the concentration of a particular radionuclide in water, in air, or on the ground that results in a member of the public receiving 100 mrem (1 mSv) effective dose following continuous exposure for one year. In DOE-STD-1196-2011, DCSs were developed for the ingestion of water, inhalation of

  18. NNSA Awards Nevada National Security Site Management & Operating Contract

    National Nuclear Security Administration (NNSA)

    to NVS3T | National Nuclear Security Administration | (NNSA) Awards Nevada National Security Site Management & Operating Contract to NVS3T August 26, 2016 Contract Award Provides Best Value to the Government and Workforce Stability for a Decade WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) announced today it has awarded Nevada Site Science Support and Technologies Corporation, LLC (NVS3T) with the management and operating contract for the Nevada National Security

  19. Hanford Site Waste Management Area C Performance Assessment (PA) Current

    Office of Environmental Management (EM)

    Status | Department of Energy Assessment (PA) Current Status Hanford Site Waste Management Area C Performance Assessment (PA) Current Status Marcel Bergeron Washignton River Protection Solutions Alaa Aly INTERA Performance and Risk Assessment Community of Practice Technical Exchange December 11-12, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation - Part 1 Video Presentation - Part 2 Hanford Site Waste Management Area C Performance

  20. Hanford Site Waste Management Area C Performance Assessment | Department of

    Office of Environmental Management (EM)

    Energy Assessment Hanford Site Waste Management Area C Performance Assessment Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015. Hanford Site Waste Management Area C Performance Assessment (3.42 MB) More Documents & Publications DOE Order 435.1 Performance Assessment of WMA C Overview Status Updates on the Performance and Risk Assessment Community of

  1. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Re: 200 West Groundwater Treatment Facility Dear...

  2. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  3. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  4. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland, WA 99352 Jane Hedges, Manager Washington State Department of Ecology 3100 Port of Benton Blvd....

  5. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Protection Agency, Region 10 309 Bradley Blvd. Suite 115 Richland, WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  6. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  7. Oak Ridge Site Specific Advisory Board * P.O...

    Office of Environmental Management (EM)

    TN 37831 Phone: 865-241-4583, 865-241-4584, 1-800-382-6938 * Fax: 865-574-3521 * Internet: www.oakridge.doe.govemssab Many Voices Working for the Community Oak Ridge Site...

  8. INL Site Executable Plan for Energy and Transportation Fuels Management

    SciTech Connect

    Ernest L. Fossum

    2008-11-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  9. Construction management at the SP-100 Ground Engineering System Test Site

    SciTech Connect

    Burchell, G.P.; Wilson, L.R.

    1990-05-01

    The SP-100 Ground Engineering System (GES) Test Site is planned for construction at the US Department of Energy`s Hanford Site in Southeastern Washington. This project provides the Hanford Site contractors with a unique opportunity to showcase a number of design and construction innovations that significantly lower the design and construction costs while providing a facility that will effectively meet all of its design objectives. This paper will explain the organization and management of the SP-100 project, specifically those activities relating to facility design modification and construction management, as performed through the joint efforts of Westinghouse Hanford Company (Westinghouse Hanford) and Kaiser Engineers Hanford (KEH).

  10. Site-Specific Reference Person Parameters and Derived Concentration Standards for the Savannah River Site

    SciTech Connect

    Stone, Daniel K.; Higley, Kathryn A.; Jannik, G. Timothy

    2014-05-01

    The U.S. Department of Energy Order 458.1 states that the compliance with the 1 mSv annual dose constraint to a member of the public may be demonstrated by calculating dose to the maximally exposed individual (MEI) or to a representative person. Historically, the MEI concept was used for dose compliance at the Savannah River Site (SRS) using adult dose coefficients and adult male usage parameters. For future compliance, SRS plans to use the representative person concept for dose estimates to members of the public. The representative person dose will be based on the reference person dose coefficients from the U.S. DOE Derived Concentration Technical Standard and on usage parameters specific to SRS for the reference and typical person. Usage parameters and dose coefficients were determined for inhalation, ingestion and external exposure pathways. The parameters for the representative person were used to calculate and tabulate SRS-specific derived concentration standards (DCSs) for the pathways not included in DOE-STD-1196-2011.

  11. Site-Specific Reference Person Parameters and Derived Concentration Standards for the Savannah River Site

    DOE PAGES [OSTI]

    Stone, Daniel K.; Higley, Kathryn A.; Jannik, G. Timothy

    2014-05-01

    The U.S. Department of Energy Order 458.1 states that the compliance with the 1 mSv annual dose constraint to a member of the public may be demonstrated by calculating dose to the maximally exposed individual (MEI) or to a representative person. Historically, the MEI concept was used for dose compliance at the Savannah River Site (SRS) using adult dose coefficients and adult male usage parameters. For future compliance, SRS plans to use the representative person concept for dose estimates to members of the public. The representative person dose will be based on the reference person dose coefficients from the U.S.more » DOE Derived Concentration Technical Standard and on usage parameters specific to SRS for the reference and typical person. Usage parameters and dose coefficients were determined for inhalation, ingestion and external exposure pathways. The parameters for the representative person were used to calculate and tabulate SRS-specific derived concentration standards (DCSs) for the pathways not included in DOE-STD-1196-2011.« less

  12. EM Site-Specific Advisory Board (EM SSAB) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    risk assessment and management; and clean-up science and technology activities. ... Local site Board membership, which reflects a full diversity of views, cultures, and ...

  13. The design of a Phase I non site-specific Centralized Interim Storage Facility

    SciTech Connect

    Stringer, J.; Kane, D.

    1997-10-28

    The Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) recently completed a Topical Safety Analysis Report (TSAR) for a Phase 1 non site specific Centralized Interim Storage Facility (CISF). The TSAR will be used in licensing the CISF when and if a site is designated. The combined Phase 1 and Phase 2 CISF will provide federal storage capability for 40,000 metric tons of uranium (MTU) Spent Nuclear Fuel (SNF) under the oversight of the DOE. The Phase 1 TSAR was submitted to the NRC on May 1, 1997 and is currently under review having been docketed on June 10, 1997. This paper generally describes the Phase 1 CISF design and its operations as presented in the CISF TSAR.

  14. Oak Ridge Site Specific Advisory Board Meetings | Department...

    Energy.gov [DOE] (indexed site)

    Meeting with Oak Ridge City Manager about the city's perspective on DOE EM work on the Oak Ridge Reservation. March 6, 2015 ORSSAB Meeting - March 2015 Discussion about the FY 2017 ...

  15. Oak Ridge Site Specific Advisory Board Annual Meeting Sue Cange

    Office of Environmental Management (EM)

    ... Topics August 6, 2016 Jeff Crane, FFA Project Manager ... OSWER Debbie Dietrich, OEM David Lloyd, OBLR Matt Hale, ORCR ... ) O NERQy '- W A c..:ft 11 OO:t.REA ...

  16. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 June 5, 2014 David Huizenga Senior Advisor for Environmental Management EM-1Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Doug...

  17. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Re: 200-UP1 Proposed Plan Rev 0 Dear Messrs....

  18. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Policy Act (SEPA) documents 20110-03 June 3, 2011 Page 1 June 3, 2011 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton...

  19. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    University Doug Mercer Richard Stout Public-at-Large Norma Jean Germond Keith Smith Sam ... Board Diversity Page 1 June 7, 2013 Kevin Smith, Manager U.S. Department of Energy, Office ...

  20. Site-specific electronic configurations of Fe 3d states by energy loss by channeled electrons

    SciTech Connect

    Tatsumi, Kazuyoshi; Muto, Shunsuke; Nishida, Ikuo; Rusz, Jan

    2010-05-17

    Site-specific configurations of Fe 3d electrons in a spinel ferrite were investigated by electron energy loss spectroscopy under electron channeling conditions. Site-specific spectra were extracted by applying a multivariate curve resolution (MCR) technique to the data set. An electronic difference in the Fe sites caused by ligand field splitting of trivalent Fe was probed. This demonstrated the promise of site-specific valence and spin state analysis in spintronics applications of spinel ferrites.

  1. Nevada Test Site 2008 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    NSTec Environmental Management

    2009-06-23

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2008 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities.

  2. Nevada National Security Site 2012 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect

    NSTec Environmental Management

    2013-02-11

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2012 results. During 2012, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Groundwater samples were collected at UE5PW-1, UE5PW-2, and UE5PW-3 on March 21, August 7, August 21, and September 11, 2012, and static water levels were measured at each of the three pilot wells on March 19, June 6, August 2, and October 15, 2012. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Final results from samples collected in 2012 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

  3. Nevada National Security Site 2010 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect

    NSTec Environmental Management

    2011-01-01

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2010 results. During 2010, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Samples were collected at UE5PW-1 on March 10 and August 10, 2010; at UE5PW-2 on March 10, August 10, and August 25, 2010; and at UE5PW-3 on March 31, August 10, and August 25, 2010. Static water levels were measured at each of the three pilot wells on March 1, April 26, August 9, and November 9, 2010. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Results from all samples collected in 2010 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

  4. Nevada Test Site 2009 Data Report: Groundwater Monitoring Program, Area 5 Radioactive Waste Management Site

    SciTech Connect

    NSTec Environmental Management

    2010-01-19

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2009 results. During 2009, groundwater at each of the three pilot wells was sampled on March 10, 2009, and August 18, 2009, and water levels at each of the three pilot wells were measured on February 17, May 6, August 17, and November 10, 2009. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Results from all samples collected in 2009 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

  5. Nevada National Security Site 2014 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect

    Hudson, David

    2015-02-19

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site, Nye County, Nevada. Groundwater samples from the aquifer immediately below the Area 5 RWMS have been collected and analyzed and static water levels have been measured in this aquifer since 1993. This report updates these data to include the 2014 results. Analysis results for leachate contaminants collected from the mixed-waste cell at the Area 5 RWMS (Cell 18) are also included. During 2014, groundwater samples were collected and static water levels were measured at three wells surrounding the Area 5 RWMS. Groundwater samples were collected at wells UE5PW-1, UE5PW-2, and UE5PW-3 on March 11 and August 12, 2014, and static water levels were measured at each of these wells on March 10, June 2, August 11, and October 14, 2014. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. General water chemistry (cations and anions) was also measured. Results from samples collected in 2014 are within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. The data from the shallow aquifer indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS, and there were no significant changes in measured groundwater parameters compared to previous years. Leachate from above the primary liner of Cell 18 drains into a sump and is collected in a tank at the ground surface. Cell 18 began receiving waste in January 2011. Samples were collected from the tank when the leachate volume approached the 3,000-gallon tank capacity. Leachate samples have been collected 16 times since January 2011. During 2014, samples were collected on February 25, March 5, May 20, August 12, September 16, November 11, and December 16. Each leachate sample was

  6. V-146: HP Service Manager Bugs Permit Cross-Site Scripting and...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6: HP Service Manager Bugs Permit Cross-Site Scripting and Information Disclosure Attacks V-146: HP Service Manager Bugs Permit Cross-Site Scripting and Information Disclosure...

  7. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    -1 CHAPTER 1 PROPOSED ACTIONS: BACKGROUND, PURPOSE AND NEED Chapter 1 describes the background, purpose and need for the agency action presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS). Section 1.1 provides summary information on the size and distribution of the waste inventory at the Hanford Site (Hanford), the specific objectives of this TC & WM EIS, and the regulatory basis for the proposed

  8. Oak Ridge Site Specific Advisory Board Annual Meeting

    Office of Environmental Management (EM)

    Overall FY 2014 Board Accomplishments 1. Drafted recommendation on additional off-site groundwater migration studies (later approved by board). (EM/S) Suggested by DOE & EPA. 2. Drafted recommendation on additional waste disposal capacity on the ORR (later approved by board). (EM/S) Suggested by DOE, EPA & TDEC. 3. Follow the transition in long-term emphasis from cleanup to stewardship. (EM/S) 4. Held a joint meeting with the EM/Stewardship and Budget & Process Committees to develop

  9. Nevada Site Specific Advisory Board Tackles New Work Plans, Looks to Future

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Site Specific Advisory Board Tackles New Work Plans, Looks to Future Nevada Site Specific Advisory Board Tackles New Work Plans, Looks to Future October 29, 2015 - 12:15pm Addthis NSSAB members get a briefing on groundwater characterization elements during a tour of the Nevada National Security Site. NSSAB members get a briefing on groundwater characterization elements during a tour of the Nevada National Security Site. NSSAB members vote on work plan tasks for fiscal

  10. DOE NNSA Site Facility Management Contracts - MASTER.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NNSA Site Facility Management Contracts June 2016 Contract Title Program Contractor Composition of Contractor Contract Number Contract Type Business Model FY Competed Award Date Current Contract End date Options/Award Term Remaining Ultimate Potential Contract End Date (includes all potential award term and option years) DOE Site Procurement Director DOE Contracting Officer National Renewable Energy Laboratory (NREL) EERE Alliance for Sustainable Energy (ASE) Battelle Memorial Institute,

  11. Laboratory information management system at the Hanford Site

    SciTech Connect

    Leggett, W.; Barth, D.; Ibsen, T.; Newman, B.

    1994-03-01

    In January of 1994 an important new technology was brought on line to help in the monumental waste management and environmental restoration work at the Hanford Site. Cleanup at the Hanford Site depends on analytical chemistry information to identify contaminates, design and monitor cleanup processes, assure worker safety, evaluate progress, and prove completion. The new technology, a laboratory information management system (LIMS) called ``LABCORE,`` provides the latest systems to organize and communicate the analytical tasks: track work and samples; collect and process data, prepare reports, and store data in readily accessible electronic form.

  12. Site-specific variability in BTEX biodegradation under denitrifying conditions

    SciTech Connect

    Kao, C.M.; Borden, R.C.

    1997-03-01

    Laboratory microcosm experiments were conducted to evaluate the feasibility of benzene, toluene, ethylbenzene, m-xylene, and o-xylene (BTEX) biodegradation under denitrifying conditions. Nine different sources of inocula, including contaminated and uncontaminated soil cores from four different sites and activated sludge, were used to establish microcosms. BTEX was not degraded under denitrifying conditions in microcosms inoculated with aquifer material from Rocky Point and Traverse City. However, rapid depletion of glucose under denitrifying conditions was observed in microcosms containing Rocky Point aquifer material. TEX degradation was observed in microcosms containing Rocky Point aquifer material. TEX degradation was observed in microcosms containing aquifer material from Fort Bragg and Sleeping Bear Dunes and sewage sludge. Benzene was recalcitrant in all microcosms tested. The degradation of o-xylene ceased after toluene, ethylbenzene, and m-xylene were depleted in the Fort Bragg and sludge microcosms, but o-xylene continued to degrade in microcosms with contaminated Sleeping Bear Dunes soil. The most probable number (MPN) of denitrifiers in these nine different inocula were measured using a microtiter technique. There was no correlation between the MPN of denitrifiers and the TEX degradation rate under denitrifying conditions. Experimental results indicate that the degradation sequence and TEX degradation rate under denitrifying conditions may differ among sites. Results also indicate that denitrification alone may not be a suitable bioremediation technology for gasoline-contaminated aquifers because of the inability of denitrifiers to degrade benzene.

  13. LLNL Site 200 Risk Management PlanAgust 2008

    SciTech Connect

    Pinkston, D; Johnson, M

    2008-07-30

    been included as an appendix to the RMP Supplemental Information document. LLNL Site 200 is a research and development laboratory with infrastructure necessary to support its operations and personnel. Research and development activities at LLNL are focused on stockpile stewardship; achieving robust and vital scientific, engineering, and manufacturing capability; inertial confinement fusion; laser technology; materials and process science; computational and information sciences; basic sciences; engineering sciences; and biological sciences. Based upon CalARP Program regulations, guidance found in California Accidental Release Prevention Program (CalARP) Administering Guidance, Chapter 1, a review of facility specific documents, accident analyses summarized in this document & detailed in the LLNL Site 200 RMP Supporting Information document, LLNL has determined that each process meeting the CalARP threshold criteria meets the requirements for CalARP Program Level 1. In accordance with CalARP regulations, LLNL considers the natural segmentation of processes at Site 200 to be on a building basis and therefore consideration of inventory should be on a building basis rather than a 'site-wide' basis. Only those materials identified as equal to as or greater than the threshold quantities for the CalARP program on a building (process) level are reflected in this document. As such, materials and quantities reported in this document on a building (process) level will vary from materials and quantities reported in the LLNL Hazardous Materials Business Plan, Acutely Hazardous Material Registration Form on a site-wide level. For each process involving regulated quantities of lithium hydride, worst case accident analysis shows that the toxic endpoint lies within the site boundaries. These analyses document that the nearest public receptor is beyond the distance to a toxic or flammable endpoint. Refer to the LLNL Site 200 RMP Supporting Information document for a more detailed

  14. Letter: Mission, Objectives & Scope of the Site Specific Advisory Board |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Letter: Mission, Objectives & Scope of the Site Specific Advisory Board Letter: Mission, Objectives & Scope of the Site Specific Advisory Board From: Assistant Secretary, Jessie H. Roberson (EM-1) To: SSAB Members (T. Martin, J. Beirer, M. Wilson, P. Claire, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters) This letter reiterates the mission, objectives, and scope of the local Site Specific Advisory Boards (SSABs) associated with nine Department of Energy

  15. Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Analysis | Department of Energy Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis Utilizes a development framework to assist the USVI in identifying and understanding concrete opportunities for wind power development in the territory. Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Analysis (3.78 MB) More Documents & Publications U.S. Virgin Islands

  16. Landfill siting in New York: Case studies confirming the importance of site-specific hydrogeologic investigations

    SciTech Connect

    Cloyd, K.C.; Concannon, P.W. )

    1993-03-01

    Landfill siting is one of the most problematic environmental issues facing society today for a variety of both technical and political reasons. New York State has approached many of these issues by requiring both generalized siting studies and detailed hydrogeologic evaluation of any proposed landfill site. Geographic Information Systems (GIS) have emerged as an appropriate tool for accumulating information for preliminary decision making. Recently, Goodman and others have suggested the use of a terrain suitability map (land use map) as a mechanism for simplifying landfill siting. They propose the use of existing geologic and morphologic information to eliminate large areas of New York from consideration as potential landfill locations. The study concludes that the Appalachian Plateau region (the Southern Tier), and the Erie-Ontario Plain are the most suitable areas for landfill development in the state. An evaluation of the geology at existing landfills and the impacts that relate to the facilities has shown that suitable sites do indeed exist in areas deemed unacceptable by Goodman and others. Conversely, a number of landfills located in suitable terranes have proven to be developed on less than suitable sites. While evaluation of existing information plays an obvious role in preliminary siting studies, it is not a substitute for detailed hydrogeologic investigation. It is local hydrogeological conditions that are most important in determining the suitability of a site for landfill development rather than the regional geologic context of the site.

  17. Stable isotope, site-specific mass tagging for protein identification

    DOEpatents

    Chen, Xian

    2006-10-24

    Proteolytic peptide mass mapping as measured by mass spectrometry provides an important method for the identification of proteins, which are usually identified by matching the measured and calculated m/z values of the proteolytic peptides. A unique identification is, however, heavily dependent upon the mass accuracy and sequence coverage of the fragment ions generated by peptide ionization. The present invention describes a method for increasing the specificity, accuracy and efficiency of the assignments of particular proteolytic peptides and consequent protein identification, by the incorporation of selected amino acid residue(s) enriched with stable isotope(s) into the protein sequence without the need for ultrahigh instrumental accuracy. Selected amino acid(s) are labeled with .sup.13C/.sup.15N/.sup.2H and incorporated into proteins in a sequence-specific manner during cell culturing. Each of these labeled amino acids carries a defined mass change encoded in its monoisotopic distribution pattern. Through their characteristic patterns, the peptides with mass tag(s) can then be readily distinguished from other peptides in mass spectra. The present method of identifying unique proteins can also be extended to protein complexes and will significantly increase data search specificity, efficiency and accuracy for protein identifications.

  18. Final Site-Specific Decommissioning Inspection Report for the University of Washington Research and Test Reactor

    SciTech Connect

    Sarah Roberts

    2006-10-18

    Report of site-specific decommissioning in-process inspection activities at the University of Washington Research and Test Reactor Facility.

  19. Nevada National Security Site 2011 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect

    NSTec Environmental Management

    2012-02-27

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2011 results. During 2011, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Samples were collected at UE5PW-1 on March 8, August 2, August 24, and October 19, 2011; at UE5PW-2 on March 8, August 2, August 23, and October 19, 2011; and at UE5PW-3 on March 8, August 2, August 23, and October 19, 2011. Static water levels were measured at each of the three pilot wells on March 1, June 7, August 1, and October 17, 2011. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Initial total organic carbon and total organic halides results for samples collected in August 2011 were above previous measurements and, in some cases, above the established investigation limits. However, after field sample pumps and tubing were disinfected with Clorox solution, the results returned to normal levels. Final results from samples collected in 2011 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

  20. Software programs that address site-specific inventory characteristics issues.

    SciTech Connect

    Dare, J. H.; Cournoyer, M. E.

    2001-01-01

    The proper characterization of Hazardous, Mixed Low-Level, and Mixed Transuranic waste enhances productivity and safety. Hazardous material criteria that need to be considered include physical and health hazards inherent to the waste stream. Other factors that may influence characterization include: particulate diameter, complexing or chelating agent properties, lead, and mercury content, pressurized containers, and P-listed wastes. To meet these requirements are only a simple matter of generating a database with the proper fields. Manufactures and institutional databases bank huge sources of information, such as, work control documents, substance identification, container types, components of mixtures, physical property data, and regulatory data. In this report, utilization of commercially available software programs to take advantage of these resources in addressing waste characterization issues are presented. The application of user-friendly programs eliminates part of the tediousness associated with the complex requirements of certifying to general waste acceptance criteria with minimal impact on programmatic work. In other words, tapping into manufacturer and institutional database provides a way to take advantage of the combined expertise of these resources in managing a cost effective waste certification program as well as adding a quality assurance element to the program.

  1. Interstate Technology & Regulatory Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance

    Energy.gov [DOE]

    Interstate Technology & Regulatory Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance

  2. Development of site-specific soil cleanup criteria: New Brunswick Laboratory, New Jersey site

    SciTech Connect

    Veluri, V.R.; Moe, H.J.; Robinet, M.J.; Wynveen, R.A.

    1983-03-01

    The potential human exposure which results from the residual soil radioactivity at a decommissioned site is a prime concern during D and D projects. To estimate this exposure, a pathway analysis approach is often used to arrive at the residual soil radioactivity criteria. The development of such a criteria for the decommissioning of the New Brunswick Laboratory, New Jersey site is discussed. Contamination on this site was spotty and located in small soil pockets spread throughout the site area. Less than 1% of the relevant site area was contaminated. The major contaminants encountered at the site were /sup 239/Pu, /sup 241/Am, normal and natural uranium, and natural thorium. During the development of the pathway analysis to determine the site cleanup criteria, corrections for the inhomogeneity of the contamination were made. These correction factors and their effect upon the relevant pathway parameters are presented. Major pathways by which radioactive material may reach an individual are identified and patterns of use are specified (scenario). Each pathway is modeled to estimate the transfer parameters along the given pathway, such as soil to air to man, etc. The transfer parameters are then combined with dose rate conversion factors (ICRP 30 methodology) to obtain soil concentration to dose rate conversion factors (pCi/g/mrem/yr). For an appropriate choice of annual dose equivalent rate, one can then arrive at a value for the residual soil concentration. Pathway modeling, transfer parameters, and dose rate factors for the three major pathways; inhalation, ingestion and external exposure, which are important for the NBL site, are discussed.

  3. END POINTS MANAGEMENT End Points Management The Need for End Point Specifications

    Office of Environmental Management (EM)

    MANAGEMENT End Points Management The Need for End Point Specifications The Need for a Method to Derive End Points Guiding Principles for Specifying End Points Tailored Approach Headquarters, Field Office, and Contractor Roles End Points Approvals Contractor Organization Functions for End Points Implementation Training and Walkdown Guidance for the Facility Engineers The Need for End Point Specifications The policy of the EM is that a formal project management approach be used for the planning,

  4. Oak Ridge Hosts EM Site Specific Advisory Board Spring Chairs Meeting

    Energy.gov [DOE]

    Oak Ridge, Tenn. – More than 60 participants from across the country traveled to Oak Ridge this month to attend the EM Site Specific Advisory Board’s (SSAB) 2016 Spring Chairs Meeting. The event was hosted by the Oak Ridge Site Specific Advisory Board (ORSSAB).

  5. DOE - Office of Legacy Management -- Nevada Test Site - 023

    Office of Legacy Management (LM)

    Nevada Test Site - 023 FUSRAP Considered Sites Site: Nevada Test Site (023) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: ...

  6. DOE - Office of Legacy Management -- West Milton Reactor Site...

    Office of Legacy Management (LM)

    Milton Reactor Site - NY 21 FUSRAP Considered Sites Site: West Milton Reactor Site (NY.21) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site ...

  7. DOE - Office of Legacy Management -- Project Gnome Site - NM...

    Office of Legacy Management (LM)

    Gnome Site - NM 12 FUSRAP Considered Sites Site: Project Gnome Site (NM.12) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: ...

  8. DOE - Office of Legacy Management -- Belfield Mill Site - ND...

    Office of Legacy Management (LM)

    Belfield Mill Site - ND 0-01 FUSRAP Considered Sites Site: Belfield Mill Site (ND.0-01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site...

  9. Composite Analysis for the Area 5 Radioactive Waste Management Site at the Nevada Test Site, Nye County, Nevada

    SciTech Connect

    V. Yucel

    2001-09-01

    This report summarizes the results of a Composite Analysis (CA) for the Area 5 Radioactive Waste Management Site (RWMS). The Area 5 RWMS is a US Department of Energy (DOE)-operated low-level radioactive waste (LLW) management site located in northern Frenchman Flat on the Nevada Test Site (NTS). The Area 5 RWMS has disposed of low-level radioactive waste in shallow unlined pits and trenches since 1960. Transuranic waste (TRU) and high-specific activity waste was disposed in Greater Confinement Disposal (GCD) boreholes from 1983 to 1989. The purpose of this CA is to determine if continuing operation of the Area 5 RWMS poses an acceptable or unacceptable risk to the public considering the total waste inventory and all other interacting sources of radioactive material in the vicinity. Continuing operation of the Area 5 RWMS will be considered acceptable if the total effective dose equivalent (TEDE) is less than 100 mrem in a year. If the TEDE exceeds 30 mrem in a year, a cost-benefit options analysis must be performed to determine if cost-effective management options exist to reduce the dose further. If the TEDE is found to be less than 30 mrem in a year, an analysis may be performed if warranted to determine if doses are as low as reasonably achievable (ALARA).

  10. Mapping site-specific endonuclease binding to DNA by direct imaging with AFM

    SciTech Connect

    Allison, D.P.; Thundat, T.; Doktycz, M.J.; Kerper, P.S.; Warmack, R.J.; Modrich, P.; Isfort, R.J.

    1995-12-31

    Physical mapping of DNA can be accomplished by direct AFM imaging of site specific proteins bound to DNA molecules. Using Gln-111, a mutant of EcoRI endonuclease with a specific affinity for EcoRI sites 1,000 times greater than wild type enzyme but with cleavage rate constants reduced by a factor of 10{sup 4}, the authors demonstrate site-specific mapping by direct AFM imaging. Images are presented showing specific-site binding of Gln-111 to plasmids having either one (pBS{sup +}) or two (pMP{sup 32}) EcoRI sites. Identification of the Gln-111/DNA complex is greatly enhanced by biotinylation of the complex followed by reaction with streptavidin gold prior to imaging. Image enhancement coupled with improvements in the preparation techniques for imaging large DNA molecules, such as lambda DNA (47 kb), has the potential to contribute to direct AFM restriction mapping of cosmid-sized genomic DNAs.

  11. Managing Legacy Records for Formerly Utilized Sites. Remedial Action Program Sites

    SciTech Connect

    Clayton, C.; Gueretta, J.; Tack, J.; Widdop, M.

    2008-07-01

    The Manhattan Engineer District (MED) and U.S. Atomic Energy Commission (AEC) contracted for support work through private and academic parties through the early 1960's. The work often involved radioactive materials. Residual radioactive contamination was left at some of more than 600 potentially contaminated (candidate) sites, and worker health and safety concerns remain from the site operations and subsequent remediation activities. The U.S. Department of Energy (DOE) initiated a program to identify and protect records of MED/AEC activities and of remediation work conducted under the Formerly Utilized Sites Remedial Action Program (FUSRAP) to aid in resolving questions about site conditions, liability, and worker health and safety and to ensure ongoing protectiveness of human health and the environment. This paper discusses DOE activities undertaken to locate records collections, confirm retention schedules and access requirements, and document information about the collections for use by future stewards. In conclusion: DOE-LM recognizes that records and information management is a critical component of effective LTS and M. Records are needed to answer questions about site conditions and demonstrate to the public in the future that the sites are safe. DOE-LM is working to satisfy present needs and anticipate future uses for FUSRAP records, and compile a collection of site and program information from which future stewards can readily locate and retrieve needed information. (authors)

  12. DOE - Office of Legacy Management -- Trinity Test Site - NM 17

    Office of Legacy Management (LM)

    Trinity Test Site - NM 17 FUSRAP Considered Sites Site: TRINITY TEST SITE (NM.17 ) Eliminated from consideration under FUSRAP - U.S. Army controls site Designated Name: Not ...

  13. DOE - Office of Legacy Management -- Grand Junction Sites

    Office of Legacy Management (LM)

    Grand Junction Sites Grand Junction Sites gj_map Grand Junction Disposal Site Grand Junction Processing Site Grand Junction Site Contact Us

  14. Nevada National Security Site 2013 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect

    Hudson, David B

    2014-02-13

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site, Nye County, Nevada. Groundwater samples from the aquifer immediately below the Area 5 RWMS have been collected and analyzed and static water levels have been measured in this aquifer since 1993. This report updates these data to include the 2013 results. Beginning with this report, analysis results for leachate collected from the mixed-waste cell at the Area 5 RWMS (Cell 18) are also included.

  15. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect

    NSTec Environmental Management

    2007-09-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  16. T-693: Symantec Endpoint Protection Manager Input Validation Hole Permits Cross-Site Scripting and Cross-Site Request Forgery Attacks

    Energy.gov [DOE]

    Symantec Endpoint Protection Manager Input Validation Hole Permits Cross-Site Scripting and Cross-Site Request Forgery Attacks .

  17. Site-specific probabilistic seismic hazard analyses for the Idaho National Engineering Laboratory. Volume 1: Final report

    SciTech Connect

    1996-05-01

    This report describes and summarizes a probabilistic evaluation of ground motions for the Idaho National Engineering Laboratory (INEL). The purpose of this evaluation is to provide a basis for updating the seismic design criteria for the INEL. In this study, site-specific seismic hazard curves were developed for seven facility sites as prescribed by DOE Standards 1022-93 and 1023-96. These sites include the: Advanced Test Reactor (ATR); Argonne National Laboratory West (ANL); Idaho Chemical Processing Plant (ICPP or CPP); Power Burst Facility (PBF); Radioactive Waste Management Complex (RWMC); Naval Reactor Facility (NRF); and Test Area North (TAN). The results, probabilistic peak ground accelerations and uniform hazard spectra, contained in this report are not to be used for purposes of seismic design at INEL. A subsequent study will be performed to translate the results of this probabilistic seismic hazard analysis to site-specific seismic design values for the INEL as per the requirements of DOE Standard 1020-94. These site-specific seismic design values will be incorporated into the INEL Architectural and Engineering Standards.

  18. Wind Power Opportunities in St. Thomas, USVI: A Site-Specific...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DE-AC36-08GO28308 Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis E. Lantz, A. Warren, J.O. Roberts, and V. Gevorgian Prepared under Task No. ...

  19. Mr. Ron Murphree, Chair Oak Ridge Site-Specific Advisory Board

    Office of Environmental Management (EM)

    0 Mr. Ron Murphree, Chair Oak Ridge Site-Specific Advisory Board P.O. Box 2001, MS-7604 Oak Ridge, Tennessee 3783 1 Dear Mr. Murphree: Thank you for your recent letter providing a...

  20. 5 CCR 1002-42 Site Specific Water Quality Standards for Ground...

    OpenEI (Open Energy Information) [EERE & EIA]

    to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: 5 CCR 1002-42 Site Specific Water Quality Standards for Ground WaterLegal Abstract...

  1. Protocol EM-HQ Review Field Self Assessment Site Specific QAP-QIP February 2010

    Energy.gov [DOE]

    This memorandum serves to transmit the Protocol for EM Review/Field Self-Assessment of Site-Specific QAP/QIP.  The subject document is developed as part of continued efforts to ensure technical...

  2. Protocol for EM Review/Field Self-Assessment of Site-Specific QAPs/QIPs

    Energy.gov [DOE]

    The purpose of this document is to present the review protocol and lines of inquiry (LOIs) that are used as basis for EM-HQ technical review and approval of site-specific QAP/QIPs.

  3. Site-Specific Synthesis and In Situ Immobilization of Fluorescent Silver

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Nanoclusters on DNA Nanoscaffolds by Use of the Tollens Reaction Site-Specific Synthesis and In Situ Immobilization of Fluorescent Silver Nanoclusters on DNA Nanoscaffolds by Use of the Tollens Reaction Authors: Pal, S., Varghese, R., Deng, Z., Zhao, Z., Kumar, A., Yan, H., and Liu, Y. Title: Site-Specific Synthesis and In Situ Immobilization of Fluorescent Silver Nanoclusters on DNA Nanoscaffolds by Use of the Tollens Reaction Source: Angewandte Chemie International Edition Year: 2011

  4. DOE - Office of Legacy Management -- Bowman Mill Site - ND 0...

    Office of Legacy Management (LM)

    Bowman Mill Site - ND 0-02 FUSRAP Considered Sites Site: Bowman Mill Site (ND.0-02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition:...

  5. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    61 Subject: 2013 State of the Site Meetings Adopted: September 7, 2012 Page 1 September 7, 2012 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department

  6. DOE - Office of Legacy Management -- WNI Sherwood Site - 039

    Office of Legacy Management (LM)

    Sherwood Site (039) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials...

  7. NNSA Announces Kevin W. Smith as Los Alamos Site Office Manager...

    National Nuclear Security Administration (NNSA)

    Kevin W. Smith as Los Alamos Site Office Manager | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  8. DOE - Office of Legacy Management -- Shoal Test Site - NV 03

    Office of Legacy Management (LM)

    Shoal Test Site - NV 03 FUSRAP Considered Sites Site: SHOAL TEST SITE (NV.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Sand ...

  9. Hetero-site-specific X-ray pump-probe spectroscopy for femtosecond intramolecular dynamics

    DOE PAGES [OSTI]

    Picón, A.; Lehmann, C. S.; Bostedt, C.; Rudenko, A.; Marinelli, A.; Osipov, T.; Rolles, D.; Berrah, N.; Bomme, C.; Bucher, M.; et al

    2016-05-23

    New capabilities at X-ray free-electron laser facilities allow the generation of two-colour femtosecond X-ray pulses, opening the possibility of performing ultrafast studies of X-ray-induced phenomena. Specifically, the experimental realization of hetero-site-specific X-ray-pump/X-ray-probe spectroscopy is of special interest, in which an X-ray pump pulse is absorbed at one site within a molecule and an X-ray probe pulse follows the X-ray-induced dynamics at another site within the same molecule. In this paper, we show experimental evidence of a hetero-site pump-probe signal. By using two-colour 10-fs X-ray pulses, we are able to observe the femtosecond time dependence for the formation of F ionsmore » during the fragmentation of XeF2 molecules following X-ray absorption at the Xe site.« less

  10. CULTURAL RESOURCES MANAGEMENT PLAN FOR THE NEVADA TEST SITE

    National Nuclear Security Administration (NNSA)

    ... . . . . . . . . . . . . . . 38 5.5 Nevada Test Site . . . . . . . . . . . . . . . . . . . ... FIGURES Figure 1.1 Nevada Test Site . . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  11. U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Project Shoal Site Environmental Management End State Vision - January 2005 DOE/NV--955 U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Project Shoal Site Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public

  12. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    SciTech Connect

    Not Available

    1993-01-15

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites.

  13. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    SciTech Connect

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the

  14. Daniel Hoag Named Y-12 Site Office Deputy Manager | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Daniel Hoag Named Y-12 Site Office Deputy Manager March 23, 2011 Daniel hoag named y-12 site office deputy manager. OAK RIDGE, Tenn. -- Daniel K. Hoag has been named Deputy Manager for the National Nuclear Security Administration's Y-12 Site Office (YSO). Microsoft Office document icon NR-03-23

  15. A Short History of Waste Management at the Hanford Site

    SciTech Connect

    Gephart, Roy E.

    2010-03-31

    "The worlds first full-scale nuclear reactors and chemical reprocessing plants built at the Hanford Site in the desert of eastern Washington State produced two-thirds of the plutonium generated in the United States for nuclear weapons. Operating these facilities also created large volumes of radioactive and chemical waste, some of which was released into the environment exposing people who lived downwind and downstream. Hanford now contains the largest accumulation of nuclear waste in the Western Hemisphere. Hanfords last reactor shut down in 1987 followed by closure of the last reprocessing plant in 1990. Today, Hanfords only mission is cleanup. Most onsite radioactive waste and nuclear material lingers inside underground tanks or storage facilities. About half of the chemical waste remains in tanks while the rest persists in the soil, groundwater, and burial grounds. Six million dollars each day, or nearly two billion dollars each year, are spent on waste management and cleanup activities. There is significant uncertainty in how long cleanup will take, how much it will cost, and what risks will remain for future generations. This paper summarizes portions of the waste management history of the Hanford Site published in the book Hanford: A Conversation about Nuclear Waste and Cleanup.(1) "

  16. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  17. DOE - Office of Legacy Management -- Uravan Mill Site - CO 02

    Office of Legacy Management (LM)

    ...S00709; October 2009 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Naturita, Colorado, Disposal Site. ...

  18. DOE - Office of Legacy Management -- Palmerton Ore Buying Site...

    Office of Legacy Management (LM)

    Storage Site, Palmerton, Pennsylvania; January 1994. PA.33-4 - Weston Letter; Levis to Murphie (DOE); Subject: Site Summary Reports for 30 Sites Under Consideration; February 16, ...

  19. DOE - Office of Legacy Management -- New Canaan Site - CT 08

    Office of Legacy Management (LM)

    FUSRAP Considered Sites Site: NEW CANAAN SITE (CT.08) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New Canaan , ...

  20. Closure Strategy Nevada Test Site Area 5 Radioactive Waste Management Site

    SciTech Connect

    NSTec Environmental Management

    2007-03-01

    This paper presents an overview of the strategy for closure of part of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS), which is about 65 miles northwest of Las Vegas, Nevada (Figure 1). The Area 5 RWMS is in the northern part of Frenchman Flat, approximately 14 miles north of Mercury. The Area 5 RWMS encompasses 732 acres subdivided into quadrants, and is bounded by a 1,000-foot (ft)-wide buffer zone. The northwest and southwest quadrants have not been developed. The northeast and southeast quadrants have been used for disposal of unclassified low-level radioactive waste (LLW) and indefinite storage of classified materials. This paper focuses on closure of the 38 waste disposal and classified material storage units within the southeast quadrant of the Area 5 RWMS, called the ''92-Acre Area''. The U.S Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is currently planning to close the 92-Acre Area by 2011. Closure planning for this site must take into account the regulatory requirements for a diversity of waste streams, disposal and storage configurations, disposal history, and site conditions. For ease of discussion, the 92-Acre Area has been subdivided into six closure units defined by waste type, location, and similarity in regulatory requirements. Each of the closure units contains one or more waste disposal units; waste disposal units are also called waste disposal cells. The paper provides a brief background of the Area 5 RWMS, identifies key closure issues for the 92-Acre Area, recommends actions to address the issues, and provides the National Security Technologies, LLC (NSTec), schedule for closure.

  1. Bifunctional chelating agent for the design and development of site specific radiopharmaceuticals and biomolecule conjugation strategy

    DOEpatents

    Katti, Kattesh V.; Prabhu, Kandikere R.; Gali, Hariprasad; Pillarsetty, Nagavara Kishore; Volkert, Wynn A.

    2003-10-21

    There is provided a method of labeling a biomolecule with a transition metal or radiometal in a site specific manner to produce a diagnostic or therapeutic pharmaceutical compound by synthesizing a P.sub.2 N.sub.2 -bifunctional chelating agent intermediate, complexing the intermediate with a radio metal or a transition metal, and covalently linking the resulting metal-complexed bifunctional chelating agent with a biomolecule in a site specific manner. Also provided is a method of synthesizing the --PR.sub.2 containing biomolecules by synthesizing a P.sub.2 N.sub.2 -bifunctional chelating agent intermediate, complexing the intermediate with a radiometal or a transition metal, and covalently linking the resulting radio metal-complexed bifunctional chelating agent with a biomolecule in a site specific manner. There is provided a therapeutic or diagnostic agent comprising a --PR.sub.2 containing biomolecule.

  2. Position specific variation in the rate of evolution intranscription factor binding sites

    SciTech Connect

    Moses, Alan M.; Chiang, Derek Y.; Kellis, Manolis; Lander, EricS.; Eisen, Michael B.

    2003-08-28

    The binding sites of sequence specific transcription factors are an important and relatively well-understood class of functional non-coding DNAs. Although a wide variety of experimental and computational methods have been developed to characterize transcription factor binding sites, they remain difficult to identify. Comparison of non-coding DNA from related species has shown considerable promise in identifying these functional non-coding sequences, even though relatively little is known about their evolution. Here we analyze the genome sequences of the budding yeasts Saccharomyces cerevisiae, S. bayanus, S. paradoxus and S. mikataeto study the evolution of transcription factor binding sites. As expected, we find that both experimentally characterized and computationally predicted binding sites evolve slower than surrounding sequence, consistent with the hypothesis that they are under purifying selection. We also observe position-specific variation in the rate of evolution within binding sites. We find that the position-specific rate of evolution is positively correlated with degeneracy among binding sites within S. cerevisiae. We test theoretical predictions for the rate of evolution at positions where the base frequencies deviate from background due to purifying selection and find reasonable agreement with the observed rates of evolution. Finally, we show how the evolutionary characteristics of real binding motifs can be used to distinguish them from artifacts of computational motif finding algorithms. As has been observed for protein sequences, the rate of evolution in transcription factor binding sites varies with position, suggesting that some regions are under stronger functional constraint than others. This variation likely reflects the varying importance of different positions in the formation of the protein-DNA complex. The characterization of the pattern of evolution in known binding sites will likely contribute to the effective use of comparative

  3. DOE - Office of Legacy Management -- Nevada Test Site - 023

    Office of Legacy Management (LM)

    Nevada Test Site - 023 FUSRAP Considered Sites Site: Nevada Test Site (023) More information at http:energy.govem and http:www.nv.energy.gov Designated Name: Not Designated ...

  4. Nevada Test Site 2007 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect

    NSTec Environmental Management

    2008-01-01

    This report is a compilation of the groundwater sampling results from three monitoring wells located near the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS), Nye County, Nevada, for calendar year 2007. The NTS is an approximately 3,561 square kilometer (1,375 square mile) restricted-access federal installation located approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada (Figure 1). Pilot wells UE5PW-1, UE5PW-2, and UE5PW-3 are used to monitor the groundwater at the Area 5 RWMS (Figure 2). In addition to groundwater monitoring results, this report includes information regarding site hydrogeology, well construction, sample collection, and meteorological data measured at the Area 5 RWMS. The disposal of low-level radioactive waste and mixed low-level radioactive waste at the Area 5 RWMS is regulated by U.S. Department of Energy (DOE) Order 435.1, 'Radioactive Waste Management'. The disposal of mixed low-level radioactive waste is also regulated by the state of Nevada under the Resource Conservation and Recovery Act (RCRA) regulation Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities' (CFR, 1999). The format of this report was requested by the Nevada Division of Environmental Protection (NDEP) in a letter dated August 12, 1997. The appearance and arrangement of this document have been modified slightly since that date to provide additional information and to facilitate the readability of the document. The objective of this report is to satisfy any Area 5 RWMS reporting agreements between DOE and NDEP.

  5. A decision methodology for the evaluation of mixed low-level radioactive waste management options for DOE sites

    SciTech Connect

    Bassi, J.; Abashian, M.S.; Chakraborti, S.; Devarakonda, M.; Djordjevic, S.M.

    1993-03-01

    Currently, many DOE sites are developing site-specific solutions to manage their mixed low-level wastes. These site-specific MLLW programs often result in duplication of efforts between the different sites, and consequently, inefficient use of DOE system resources. A nationally integrated program for MLLW eliminates unnecessary duplication of effort, but requires a comprehensive analysis of waste management options to ensure that all site issues are addressed. A methodology for comprehensive analysis of the complete DOE MLLW system is being developed by DOE-HQ to establish an integrated and standardized solution for managing MLLW. To be effective, the comprehensive systems analysis must consider all aspects of MLLW management from cradle-to-grave (i.e. from MLLW generation to disposal). The results of the analysis will include recommendations for alternative management options for the complete DOE MLLW system based on various components such as effectiveness, cost, health and safety risks, and the probability of regulatory acceptance for an option. Because of the diverse nature of these various components and the associated difficulties in comparing between them, a decision methodology is being developed that will integrate the above components into a single evaluation scheme for performing relative comparisons between different MLLW management options. The remainder of this paper provides an overview of the roles and responsibilities of the various participants of the DOE MLLW Program, and discusses in detail the components involved in the development of the decision methodology for a comprehensive systems analysis.

  6. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report. Volume 3, Appendix F, Final design, specifications, and drawings

    SciTech Connect

    Not Available

    1992-02-01

    This volume contains Appendix F, bid schedule and specifications for remedial action on three sites: Old Rifle processing site; New Rifle processing site and Estes Gulch disposal site.

  7. Dry Deposition Velocity Estimation for the Savannah River Site: Part 2 -- Parametric and Site-Specific Analysis

    SciTech Connect

    Napier, Bruce A.; Rishel, Jeremy P.; Cook, Kary M.

    2013-09-12

    Values for the dry deposition velocity of airborne particles were estimated with the GENII Version 2.10.1 computer code for the Savannah River site using assumptions about surface roughness parameters and particle size and density. Use of the GENII code is recommended by the U.S. Department of Energy for this purpose. Meteorological conditions evaluated include atmospheric stability classes D, E, and F and wind speeds of 0.5, 1.0, 1.5, and 2.0 m/s. Local surface roughness values ranging from 0.03 to 2 meters were evaluated. Particles with mass mean diameters of 1, 5, and 10 microns and densities of 1, 3, 4, and 5 g/cm3 were evaluated. Site specific meteorology was used to predict deposition velocity for Savannah River conditions for a range of distances from 670 to 11,500 meters.

  8. An Approach to Industrial Stormwater Benchmarks: Establishing and Using Site-Specific Threshold Criteria at Lawrence Livermore National Laboratory

    SciTech Connect

    Campbell, C G; Mathews, S

    2006-09-07

    Current regulatory schemes use generic or industrial sector specific benchmarks to evaluate the quality of industrial stormwater discharges. While benchmarks can be a useful tool for facility stormwater managers in evaluating the quality stormwater runoff, benchmarks typically do not take into account site-specific conditions, such as: soil chemistry, atmospheric deposition, seasonal changes in water source, and upstream land use. Failing to account for these factors may lead to unnecessary costs to trace a source of natural variation, or potentially missing a significant local water quality problem. Site-specific water quality thresholds, established upon the statistical evaluation of historic data take into account these factors, are a better tool for the direct evaluation of runoff quality, and a more cost-effective trigger to investigate anomalous results. Lawrence Livermore National Laboratory (LLNL), a federal facility, established stormwater monitoring programs to comply with the requirements of the industrial stormwater permit and Department of Energy orders, which require the evaluation of the impact of effluent discharges on the environment. LLNL recognized the need to create a tool to evaluate and manage stormwater quality that would allow analysts to identify trends in stormwater quality and recognize anomalous results so that trace-back and corrective actions could be initiated. LLNL created the site-specific water quality threshold tool to better understand the nature of the stormwater influent and effluent, to establish a technical basis for determining when facility operations might be impacting the quality of stormwater discharges, and to provide ''action levels'' to initiate follow-up to analytical results. The threshold criteria were based on a statistical analysis of the historic stormwater monitoring data and a review of relevant water quality objectives.

  9. DOE - Office of Legacy Management -- Gunnison Mill Site - CO...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Gunnison, Colorado, ...

  10. DOE - Office of Legacy Management -- Ambrosia Lake Mill Site...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Ambrosia Lake Mill ...

  11. DOE - Office of Legacy Management -- Shiprock Mill Site - NM...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Shiprock Disposal, ...

  12. DOE - Office of Legacy Management -- Monument Valley Mill Site...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Monument Valley, ...

  13. DOE - Office of Legacy Management -- Naturita Mill Site - CO...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ... Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ...

  14. DOE - Office of Legacy Management -- Tuba City Mill Site - AZ...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ... Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ...

  15. DOE - Office of Legacy Management -- Lowman Mill Site - ID 01

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Lowman, Idaho, ...

  16. DOE - Office of Legacy Management -- Green River Mill Site -...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ... Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ...

  17. DOE - Office of Legacy Management -- Slick Rock Mill Site - CO...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ... Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ...

  18. DOE - Office of Legacy Management -- Maybell Mill Site - CO 0...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Maybell, Colorado, ...

  19. DOE - Office of Legacy Management -- Durango Mill Site - CO 0...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Durango, Colorado, ...

  20. DOE - Office of Legacy Management -- Riverton Mill Site - WY...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ... Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ...

  1. DOE - Office of Legacy Management -- Mexican Hat Mill Site -...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Mexican Hat, Utah, ...

  2. DOE - Office of Legacy Management -- Edgemont Mill Site - SD...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management ... custody and managed by the Office of Legacy Management Also see Edgemont, South ...

  3. DOE - Office of Legacy Management -- Falls City Mill Site - TX...

    Office of Legacy Management (LM)

    Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ... Licensed to DOE for long-term custody and managed by the Office of Legacy Management. ...

  4. DOE - Office of Legacy Management -- SiteA

    Office of Legacy Management (LM)

    Illinois Site A/Plot M Decommissioned Reactor Site Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2016 Inspection and Annual Site Status Report for the Site A/Plot M, Cook County, Illinois Decontamination and Decommissioning Program Site Annual Monitoring Report Environmental Monitoring Program at Site A and Plot M, Palos Forest Preserve, Cook County, Illinois Long-Term Surveillance and Maintenance Plan for Site A/Plot M, Illinois,Decommissioned

  5. Waste Management at the Nevada Test Site Year 2002: Current Status

    SciTech Connect

    Becker, Bruce, D.; Gertz, Carl, P.; Clayton, Wendy, A.; Carilli, Jhon, T.; Crowe, Bruce M.

    2003-02-24

    The performance attributes of the U. S. Department of Energy's National Nuclear Security Administration Nevada Site Office Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other LLW disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified material, and high-specific activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations.

  6. Nevada Test Site 2000 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    Yvonne Townsend

    2001-06-01

    Environmental monitoring data, subsidence monitoring data, and meteorology monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS) (refer to Figure 1). These monitoring data include radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota data. Although some of these media (radiation exposure, air, and groundwater) are reported in detail in other Bechtel Nevada reports (Annual Site Environmental Report [ASER], the National Emissions Standard for Hazardous Air Pollutants [NESHAP] report, and the Annual Groundwater Monitoring Report), they are also summarized in this report to provide an overall evaluation of RWMS performance and environmental compliance. Direct radiation monitoring data indicate that exposure at and around the RWMSs is not above background levels. Air monitoring data indicate that tritium concentrations are slightly above background levels, whereas radon concentrations are not above background levels. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS has not been affected by the facility. Meteorology data indicate that 2000 was an average rainfall year: rainfall totaled 167 mm (6.6 in) at the Area 3 RWMS (annual average is 156 mm [6.5 in]) and 123 mm (4.8 in) at the Area 5 RWMS (annual average is 127 mm [5.0 in]). Vadose zone monitoring data indicate that 2000 rainfall infiltrated less than one meter (3 ft) before being returned to the atmosphere by evaporation. Soil-gas tritium monitoring data indicate slow subsurface migration, and tritium concentrations in biota were lower than in previous years. All 2000 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing well at isolating buried waste.

  7. Nevada Test Site 2001 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    Y. E. Townsend

    2002-06-01

    Environmental monitoring data, subsidence monitoring data, and meteorology monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS) (refer to Figure 1). These monitoring data include radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota data. Although some of these media (radiation exposure, air, and groundwater) are reported in detail in other Bechtel Nevada (BN) reports (Annual Site Environmental Report [ASER], the National Emissions Standard for Hazardous Air Pollutants [NESHAP] report, and the Annual Groundwater Monitoring Report), they are also summarized in this report to provide an overall evaluation of RWMS performance and environmental compliance. Direct radiation monitoring data indicate that exposure at and around the RWMSs is not above background levels. Air monitoring data indicate that tritium concentrations are slightly above background levels. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS has not been affected by the facility. Meteorology data indicate that 2001 was an average rainfall year: rainfall totaled 150 mm (5.9 in) at the Area 3 RWMS and 120 mm (4.7 in) at the Area 5 RWMS. Vadose zone monitoring data indicate that 2001 rainfall infiltrated less than one meter (3 ft) before being returned to the atmosphere by evaporation. Soil-gas tritium monitoring data indicate slow subsurface migration, and tritium concentrations in biota were lower than in previous years. All 2001 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility performance assessments.

  8. DOE - Office of Legacy Management -- South Valley Superfund Site...

    Office of Legacy Management (LM)

    Not considered for FUSRAP - in another program Site Operations: AEC operations occurred in the 1950s. Other chemical distribution and military operations also occurred at the site. ...

  9. DOE - Office of Legacy Management -- Project Gas Buggy Site ...

    Office of Legacy Management (LM)

    1993. Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico, December 1993. Project Gasbuggy Site Restoration Final Report, July 1983. Surface ...

  10. DOE - Office of Legacy Management -- WNI Split Rock Site - 043

    Office of Legacy Management (LM)

    Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Western Nuclear, Inc. (WNI) Split Rock site is a Uranium Mill ...

  11. Fernald Environmental Management Project 1995 site environmental report

    SciTech Connect

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  12. Maintenance at DOE Legacy Management Sites Weldon Spring Site LTS&M Plan U.S. Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Developing and Implementing Institutional Controls for Long-Term Surveillance and Maintenance at DOE Legacy Management Sites Weldon Spring Site LTS&M Plan U.S. Department of Energy Doc. No. S00790-1.0 December 2008 Page 2-22 Figure 2-4. MNA Groundwater Monitoring Locations January 2015 DOE/LM-1414 Guidance for Developing and Implementing Institutional Controls for Long-Term Surveillance and Maintenance at DOE Legacy Management Sites January 2015 The most recent and official controlled hard

  13. DOE-ORP Contract Management Plans - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Plan (Rev. 7 September 19, 2014) (PDF) Tank Operations Contract Management Plan TOC Contract Management Plan (October 27, 2008) (PDF) TOC CMP Attachment A Section B...

  14. V-026: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Let Local Users Bypass Security Restrictions | Department of Energy 26: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions V-026: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions November 16, 2012 - 6:00am Addthis PROBLEM: RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions. PLATFORM: RSA

  15. Hydrogeologic characterization of an arid zone Radioactive Waste Management Site

    SciTech Connect

    Ginanni, J.M.; O`Neill, L.J. [USDOE Nevada Operations Office, Las Vegas, NV (United States); Hammermeister, D.P.; Blout, D.O.; Dozier, B.L.; Sully, M.J.; Johnejack, K.R.; Emer, D.F. [Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (United States); Tyler, S.W. [Nevada Univ., Reno, NV (United States). Desert Research Inst.

    1994-06-01

    An in-depth subsurface site characterization and monitoring program for the soil water migration pathway has been planned, implemented, and completed to satisfy data requirements for a waiver from groundwater monitoring, for an exemption from liner leachate collections systems, and for different regulatory driven performance assessments. A traditional scientific approach has been taken to focus characterization and monitoring efforts. This involved developing a conceptual model of the hydrogeologic system and defining and testing hypotheses about this model. Specific hypotheses tested included: that the system was hydrologically heterogenous and anisotropic, and that recharge was very low or negligible. Mineralogical, physical, and hydrologic data collected to test hypotheses has shown the hydrologic system to be remarkably homogenous and isotropic rather than heterogenous and anisotropic. Both hydrodynamic and environmental tracer approaches for estimating recharge have led to the conclusion that recharge from the Area 5 RWMS is not occurring in the upper region of the vadose zone, and that recharge at depth is extremely small or negligible. This demonstration of ``no migration of hazardous constituents to the water table satisfies a key requirement for both the groundwater monitoring waiver and the exemption from liner leachate collection systems. Data obtained from testing hypotheses concerning the soil water migration pathway have been used to refine the conceptual model of the hydrogeologic system of the site. These data suggest that the soil gas and atmospheric air pathways may be more important for transporting contaminants to the accessible environment than the soil water pathway. New hypotheses have been developed about these pathways, and characterization and monitoring activities designed to collect data to test these hypotheses.

  16. Computational design of a red fluorophore ligase for site-specific protein labeling in living cells

    DOE PAGES [OSTI]

    Liu, Daniel S.; Nivon, Lucas G.; Richter, Florian; Goldman, Peter J.; Deerinck, Thomas J.; Yao, Jennifer Z.; Richardson, Douglas; Phipps, William S.; Ye, Anne Z.; Ellisman, Mark H.; et al

    2014-10-13

    In this study, chemical fluorophores offer tremendous size and photophysical advantages over fluorescent proteins but are much more challenging to target to specific cellular proteins. Here, we used Rosetta-based computation to design a fluorophore ligase that accepts the red dye resorufin, starting from Escherichia coli lipoic acid ligase. X-ray crystallography showed that the design closely matched the experimental structure. Resorufin ligase catalyzed the site-specific and covalent attachment of resorufin to various cellular proteins genetically fused to a 13-aa recognition peptide in multiple mammalian cell lines and in primary cultured neurons. We used resorufin ligase to perform superresolution imaging of themore » intermediate filament protein vimentin by stimulated emission depletion and electron microscopies. This work illustrates the power of Rosetta for major redesign of enzyme specificity and introduces a tool for minimally invasive, highly specific imaging of cellular proteins by both conventional and superresolution microscopies.« less

  17. Computational design of a red fluorophore ligase for site-specific protein labeling in living cells

    SciTech Connect

    Liu, Daniel S.; Nivon, Lucas G.; Richter, Florian; Goldman, Peter J.; Deerinck, Thomas J.; Yao, Jennifer Z.; Richardson, Douglas; Phipps, William S.; Ye, Anne Z.; Ellisman, Mark H.; Drennan, Catherine L.; Baker, David; Ting, Alice Y.

    2014-10-13

    In this study, chemical fluorophores offer tremendous size and photophysical advantages over fluorescent proteins but are much more challenging to target to specific cellular proteins. Here, we used Rosetta-based computation to design a fluorophore ligase that accepts the red dye resorufin, starting from Escherichia coli lipoic acid ligase. X-ray crystallography showed that the design closely matched the experimental structure. Resorufin ligase catalyzed the site-specific and covalent attachment of resorufin to various cellular proteins genetically fused to a 13-aa recognition peptide in multiple mammalian cell lines and in primary cultured neurons. We used resorufin ligase to perform superresolution imaging of the intermediate filament protein vimentin by stimulated emission depletion and electron microscopies. This work illustrates the power of Rosetta for major redesign of enzyme specificity and introduces a tool for minimally invasive, highly specific imaging of cellular proteins by both conventional and superresolution microscopies.

  18. Management Changes at the Y-12 Site Office Announced | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Management Changes at the Y-12 Site Office Announced January 02, 2008 Microsoft Office document icon NR-1-08

  19. James A. Turi selected Site Manager for Jefferson Lab | Jefferson Lab

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    James A. Turi selected Site Manager for Jefferson Lab James A. Turi James A. Turi, Jefferson Lab Site Manager James A. Turi selected Site Manager for Jefferson Lab April 16, 2003 NEWS MEDIA CONTACTS: Frank Juan, (865) 576-0885 Linda Ware, (757) 269-7689 The U.S. Department of Energy (DOE) has recently selected James A. Turi as the new Site Manager for the Thomas Jefferson National Accelerator Facility in Newport News, Virginia. In his new position, Turi will be responsible for DOE programs and

  20. A guide to writing procurement specifications for new and existing CHAWS sites

    SciTech Connect

    Martins, S.A.; Fry, C.

    1991-09-01

    Turn-key Chemical Hazard Warning Systems (CHAWS) have been designed by the Lawrence Livermore National Laboratory (LLNL) and installed at a number of US Army sites. This document is intended to be used as a guide by those charged with writing procurement specification for both new and existing CHAWS sites. It discusses issues of system design and the functional requirements for both hardware and software. Suggestions are made for those interested in updating the computer platform and/or operating system used in older CHAWS designs. The topics of new-site installation and training are only briefly discussed. The reader is referred to the CHAWS User's Guides listed in the bibliography for user information. 5 refs., 1 tab.

  1. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - Volumes 1-3

    SciTech Connect

    Gerber, E.W.

    1996-09-30

    The Hanford Site Integrated Stabilization Management Plan (SISMP) was developed in support of the US Department of Energy's (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Volume 3 of the SISMP identifies the 35 Plutonium Environmental, Safety, and Health Vulnerabilities. The vulnerabilities range from institutional problems to specific hardware problems. Many of the identified vulnerabilities will be corrected through the stabilization and packaging activities required by the DNFSB Recommendation 94-1 Implementation Plan, the remainder will be corrected as a part of the plutonium handling facilities transition (deactivation) to the Environmental Restoration Program.

  2. 2008 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

    SciTech Connect

    NSTec Environmental Management

    2009-01-13

    This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS) including calendar year 2008 results. Each of the three Pilot Wells was sampled on March 11, 2008, and September 10, 2008. These wells were sampled for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also monitored. Results from all samples collected in 2008 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. Other information in the report includes an updated Cumulative Chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

  3. Stormwater runoff water quality evaluation and management program for hazardous chemical sites: Development issues

    SciTech Connect

    Lee, G.F.; Jones-Lee, A.

    1998-12-31

    The deficiencies in the typical stormwater runoff water quality monitoring from hazardous chemical sites and an alternative approach (Evaluation Monitoring) for monitoring that shifts the monitoring program from periodic sampling and analysis of stormwater runoff for a suite of chemical parameters to examining the receiving waters to determine what, if any, water quality use impairments are occurring due to the runoff-associated constituents is presented in this paper. Rather than measuring potentially toxic constituents such as heavy metals in runoff, the monitoring program determines whether there is aquatic life toxicity in the receiving waters associated with the stormwater runoff. If toxicity is found, its cause is determined and the source of the constituents causing the toxicity is identified through forensic analysis. Based on this information, site-specific, technically valid stormwater runoff management programs can be developed that will control real water quality impacts caused by stormwater runoff-associated constituents.

  4. Oak Ridge Site Specific Advisory Board Monthly Meeting DOE Information Center

    Office of Environmental Management (EM)

    October 2. November (draft) 3. Work plan schedule of meetings BOARD MINUTES/RECOMMENDATIONS & MOTIONS 1. September 14, 2016, unapproved meeting minutes 2. Recommendations on the proposed EM Disposal Facility REPORTS & MEMOS 1. EM Project Update 2. Travel Opportunities for FY 2017 3. Trip Reports AGENDA Oak Ridge Site Specific Advisory Board Wednesday, October 12, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price)

  5. Oak Ridge Site Specific Advisory Board Monthly Meeting DOE Information Center

    Office of Environmental Management (EM)

    November 2. December (draft) 3. Work plan schedule of meetings BOARD MINUTES/RECOMMENDATIONS & MOTIONS 1. October 12, 2016, unapproved meeting minutes REPORTS & MEMOS 1. EM Project Update 2. Travel Opportunities for FY 2017 3. Waste Definitions Table AGENDA Oak Ridge Site Specific Advisory Board Wednesday, November 9, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. 37831 AGENDA I. Welcome and Announcements (B. Price)

  6. EM Site Manager Reflects on Field Office's Formative Year, Looks to

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Future | Department of Energy EM Site Manager Reflects on Field Office's Formative Year, Looks to Future EM Site Manager Reflects on Field Office's Formative Year, Looks to Future April 27, 2016 - 12:40pm Addthis EM Los Alamos Field Office Manager Douglas E. Hintze EM Los Alamos Field Office Manager Douglas E. Hintze LOS ALAMOS, N.M. - EM Los Alamos Field Office Manager Douglas E. Hintze recently spoke with EM Update about the launch of EM's newest site office and its challenges and

  7. DOE - Office of Legacy Management -- Hecla Durita Site - 012

    Office of Legacy Management (LM)

    and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The majority of milling conducted at this site was for private sale. ...

  8. DOE - Office of Legacy Management -- Exxon Ray Point Site - 032

    Office of Legacy Management (LM)

    owned and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The milling conducted at this site was for private sale. ...

  9. DOE - Office of Legacy Management -- Sohio Lbar Site - 022

    Office of Legacy Management (LM)

    owned and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The milling conducted at this site was for private sale. ...

  10. DOE - Office of Legacy Management -- WNI Sherwood Site - 039

    Office of Legacy Management (LM)

    owned and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The majority milling conducted at this site was for private sale. ...

  11. DOE - Office of Legacy Management -- Middlesex North NJ Site...

    Office of Legacy Management (LM)

    North NJ Site - NJ 05 FUSRAP Considered Sites Middlesex North, NJ Alternate Name(s): Middlesex Landfill Middlesex Municipal Landfill NJ.05-2 NJ.05-4 Location: Mountain Avenue to ...

  12. DOE - Office of Legacy Management -- Central Nevada Test Site...

    Office of Legacy Management (LM)

    Also see Central Nevada Test Area (CNTA), Nevada, Site Documents Related to Central Nevada ... to replace the existing report under Key Documents and add to the All Site Documents list. ...

  13. DOE - Office of Legacy Management -- Pathfinder Lucky Mc Site...

    Office of Legacy Management (LM)

    The Pathfinder Lucky Mc site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in the Gas Hills Uranium Mining District west of Casper, Wyoming. UMTRA Title ...

  14. Low-level radioactive waste management at the Nevada Test Site -- Current status

    SciTech Connect

    Becker, B.D.; Crowe, B.M.; Gertz, C.P.; Clayton, W.A.

    1999-04-01

    The performance objectives of the Department of Energy`s Low-Level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the US. Situated at the southern end of the Great Basin, 800 feet above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity wastes, classified materials, and high-specific-activity special case wastes. Twenty miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMS`s since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations.

  15. Waste Management at the Nevada Test Site Fiscal Year 2001 Current Status

    SciTech Connect

    B. D. Becker; W. A. Clayton; B. M. Crowe

    2002-05-01

    The performance objectives of the U. S. Department of Energy's National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified radioactive material, and high-specific-activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1 968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations.

  16. DOE - Office of Legacy Management -- Exxon Ray Point Site - 032

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... sale. After the owner completes U S. Nuclear Regulatory Commission license termination ...

  17. DOE - Office of Legacy Management -- Conoco Conquista Site -...

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U. S. Nuclear Regulatory Commission license termination the ...

  18. DOE - Office of Legacy Management -- Dawn Ford Site - 038

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U. S. Nuclear Regulatory Commission license termination the ...

  19. DOE - Office of Legacy Management -- Chevron Panna Maria Site...

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U. S. Nuclear Regulatory Commission license termination the ...

  20. DOE - Office of Legacy Management -- Sohio Lbar Site - 022

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U. S. Nuclear Regulatory Commission license termination, the ...

  1. DOE - Office of Legacy Management -- EFB White Mesa Site - 033

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U. S. Nuclear Regulatory Commission license termination the ...

  2. Site-Specific Analyses for Demonstrating Compliance with 10 CFR 61 Performance Objectives - 12179

    SciTech Connect

    Grossman, C.J.; Esh, D.W.; Yadav, P.; Carrera, A.G.

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its regulations at 10 CFR Part 61 to require low-level radioactive waste disposal facilities to conduct site-specific analyses to demonstrate compliance with the performance objectives in Subpart C. The amendments would require licensees to conduct site-specific analyses for protection of the public and inadvertent intruders as well as analyses for long-lived waste. The amendments would ensure protection of public health and safety, while providing flexibility to demonstrate compliance with the performance objectives, for current and potential future waste streams. NRC staff intends to submit proposed rule language and associated regulatory basis to the Commission for its approval in early 2012. The NRC staff also intends to develop associated guidance to accompany any proposed amendments. The guidance is intended to supplement existing low-level radioactive waste guidance on issues pertinent to conducting site-specific analyses to demonstrate compliance with the performance objectives. The guidance will facilitate implementation of the proposed amendments by licensees and assist competent regulatory authorities in reviewing the site-specific analyses. Specifically, the guidance provides staff recommendations on general considerations for the site-specific analyses, modeling issues for assessments to demonstrate compliance with the performance objectives including the performance assessment, intruder assessment, stability assessment, and analyses for long-lived waste. This paper describes the technical basis for changes to the rule language and the proposed guidance associated with implementation of the rule language. The NRC staff, per Commission direction, intends to propose amendments to 10 CFR Part 61 to require licensees to conduct site-specific analyses to demonstrate compliance with performance objectives for the protection of public health and the environment. The amendments would require a

  3. Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans

    Energy.gov [DOE]

    Review protocol and lines of inquiry that are used as basis for technical review and approval of site-specific quality assurance programs.

  4. Protocol EM-HQ Review Field Self Assessment Site Specific QAP-QIP February 2010

    Office of Environmental Management (EM)

    2008 | Department of Energy Protecting Intelligent Distributed Power Grids Against Cyber Attacks - May 2008 Protecting Intelligent Distributed Power Grids Against Cyber Attacks - May 2008 Development of a novel distributed and hierarchical security layer specific to intelligent grid design will help protect intelligent distributed power grids from cyber attacks. Intelligent power grids are interdependent energy management systems-encompassing generation, distribution, IT networks, and

  5. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Worker Safety and Communication Restrictions November 5, 2015 2016O-01 Page 1 November 5, 2015 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Re: Worker Safety and Communication Restrictions Dear Mr. Smith, Since the inception of the Hanford Advisory Board (Board), one of the Board's primary values is the protection of worker health and safety at the Hanford Site. The Board continues to be concerned about the consequences of

  6. Characterization Report for the 92-Acre Area of the Area 5 Radioactive Waste Management Site, Nevada Test Site, Nevada

    SciTech Connect

    Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2006-06-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office manages two low-level Radioactive Waste Management Sites at the Nevada Test Site. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. This report summarizes characterization and monitoring work pertinent to the 92-Acre Area in the southeast part of the Area 5 Radioactive Waste Management Sites. The decades of characterization and assessment work at the Area 5 RWMS indicate that the access controls, waste operation practices, site design, final cover design, site setting, and arid natural environment contribute to a containment system that meets regulatory requirements and performance objectives for the short- and long-term protection of the environment and public. The available characterization and Performance Assessment information is adequate to support design of the final cover and development of closure plans. No further characterization is warranted to demonstrate regulatory compliance. U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is proceeding with the development of closure plans for the six closure units of the 92-Acre Area.

  7. AUTHORIZING THE DOT SPECIFICATION 6M PACKAGING FOR CONTINUED USE AT THE SAVANNAH RIVER SITE

    SciTech Connect

    Watkins, R.; Loftin, B.; Hoang, D.

    2010-03-04

    The U.S. Department of Transportation (DOT) Specification 6M packaging was in extensive use for more than 40 years for in-commerce shipments of Type B quantities of fissile and radioactive material (RAM) across the USA, among the Department of Energy (DOE) laboratories, and between facilities in the DOE production complex. In January 2004, the DOT Research and Special Programs Administration (RSPA) Agency issued a final rule in the Federal Register to ammend requirements in the Hazardous Materials Regulations (HMR) pertaining to the transportation of radioactive materials. The final rule became effective on October 1, 2004. One of those changes discontinued the use of the DOT specification 6M, along with other DOT specification packagings, on October 1, 2008. A main driver for the change was due to the fact that 6M specification packagings were not supported by a Safety Analysis Report for Packagings (SARP) that was compliant with Title 10 of the Code of Federal Regulations (CFR) Part 71 (10 CFR 71). The regulatory rules for the discontinued use have been edited in Title 49 of the CFR Parts 100-185, 2004 edition and thereafter. Prior to October 1, 2008, the use of the 6M within the boundaries of the Savannah River Site (SRS), called an onsite transfer, was governed by an onsite transportation document that referenced 49 CFR Parts 100-185. SRS had to develop an Onsite Safety Assessment (OSA) which was independent of 49 CFR in order to justify the continued use of the DOT Specification 6M for the transfer of radioactive material (RAM) at the SRS after October 1, 2008. This paper will discuss the methodology for and difficulties associated with authorizing the DOT Specification 6M Packaging for continued use at the Savannah River Site.

  8. Geology Report: Area 3 Radioactive Waste Management Site DOE/Nevada Test Site, Nye County, Nevada

    SciTech Connect

    NSTec Environmental Management

    2006-07-01

    Surficial geologic studies near the Area 3 Radioactive Waste Management Site (RWMS) were conducted as part of a site characterization program. Studies included evaluation of the potential for future volcanism and Area 3 fault activity that could impact waste disposal operations at the Area 3 RWMS. Future volcanic activity could lead to disruption of the Area 3 RWMS. Local and regional studies of volcanic risk indicate that major changes in regional volcanic activity within the next 1,000 years are not likely. Mapped basalts of Paiute Ridge, Nye Canyon, and nearby Scarp Canyon are Miocene in age. There is a lack of evidence for post-Miocene volcanism in the subsurface of Yucca Flat, and the hazard of basaltic volcanism at the Area 3 RWMS, within the 1,000-year regulatory period, is very low and not a forseeable future event. Studies included a literature review and data analysis to evaluate unclassified published and unpublished information regarding the Area 3 and East Branch Area 3 faults mapped in Area 3 and southern Area 7. Two trenches were excavated along the Area 3 fault to search for evidence of near-surface movement prior to nuclear testing. Allostratigraphic units and fractures were mapped in Trenches ST02 and ST03. The Area 3 fault is a plane of weakness that has undergone strain resulting from stress imposed by natural events and underground nuclear testing. No major vertical displacement on the Area 3 fault since the Early Holocene, and probably since the Middle Pleistocene, can be demonstrated. The lack of major displacement within this time frame and minimal vertical extent of minor fractures suggest that waste disposal operations at the Area 3 RWMS will not be impacted substantially by the Area 3 fault, within the regulatory compliance period. A geomorphic surface map of Yucca Flat utilizes the recent geomorphology and soil characterization work done in adjacent northern Frenchman Flat. The approach taken was to adopt the map unit boundaries (line

  9. Nevada Test Site 2005 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    David B. Hudson, Cathy A. Wills

    2006-08-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2005 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (U.S. Department of Energy, 2005; Grossman, 2005; Bechtel Nevada, 2006). Direct radiation monitoring data indicate that exposure levels around the RWMSs are at or below background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. There is no detectable man-made radioactivity by gamma spectroscopy, and concentrations of americium and plutonium are only slightly above detection limits at the Area 3 RWMS. Measurements at the Area 5 RWMS show that radon flux from waste covers is no higher than natural radon flux from undisturbed soil in Area 5. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. Precipitation during 2005 totaled 219.1 millimeters (mm) (8.63 inches [in.]) at the Area 3 RWMS and 201.4 mm (7.93 in.) at the Area 5 RWMS. Soil-gas tritium monitoring continues to show slow subsurface migration consistent with previous results. Moisture from precipitation at Area 5 has percolated to the bottom of the bare-soil weighing lysimeter, but this same moisture has been removed from the vegetated weighing lysimeter by evapotranspiration. Vadose zone data from the operational waste pit covers show that precipitation from the fall of 2004 and the spring of 2005 infiltrated past the deepest sensors at 188 centimeters (6.2 feet) and remains in the pit cover

  10. Nevada Test Site, 2006 Waste Management Monitoring Report, Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    David B. Hudson

    2007-06-30

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2006 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (U.S. Department of Energy, 2006; Warren and Grossman, 2007; National Security Technologies, LLC, 2007). Direct radiation monitoring data indicate that exposure levels around the RWMSs are at or below background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. There is no detectable man-made radioactivity by gamma spectroscopy, and concentrations of americium and plutonium are only slightly above detection limits at the Area 3 RWMS. Measurements at the Area 5 RWMS show that radon flux from waste covers is no higher than natural radon flux from undisturbed soil in Area 5. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. Precipitation during 2006 totaled 98.6 millimeters (mm) (3.9 inches [in.]) at the Area 3 RWMS and 80.7 mm (3.2 in.) at the Area 5 RWMS. Soil-gas tritium monitoring continues to show slow subsurface migration consistent with previous results. Moisture from precipitation at Area 5 remains at the bottom of the bare-soil weighing lysimeter, but this same moisture has been removed from the vegetated weighing lysimeter by evapotranspiration. Vadose zone data from the operational waste pit covers show that evaporation continues to slowly remove soil moisture that came from the heavy precipitation in the fall of 2004 and the spring of

  11. Selection of area and specific site for drilling a horizontal well in Calhoun County, West Virginia

    SciTech Connect

    Reeves, T.K.; Overbey, W.K. Jr.; Salamy, S.P.; Locke, C.D.

    1992-03-01

    This report discusses the data collection and analysis procedures used to establish criteria for geologic and engineering studies conducted by BDM to select a general area for more detailed study and a specific site for the drilling of a cooperative well with an industry partner, the Consolidated Natural Gas Development Company (CNGD). The results of detailed geologic studies are presented for two areas in Calhoun County, West Virginia, and one area along the Logan-Boone County line in West Virginia. The effects of Appalachian Basin tectonics and the Rome Trough Rift system were identified on seismic lines made available by (CNGD). These helped to identify and define the trapping mechanisms which had been effective in each area. Engineering analyses of past production histories provided data to support selection of target areas and then to select a specific site that met the project requirements for production, reservoir pressure, and risk. A final site was selected in Lee District at the southwestern margin of the Sand Ridge gas field based on the combination of a geologic trapping mechanism and reservoir pressures which were projected as 580 psi with a stress ratio of 0.53.

  12. DOE - Office of Legacy Management -- Maryland Disposal Site ...

    Office of Legacy Management (LM)

    under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Baltimore - Vicinity , Maryland MD.05-1 Evaluation Year: 1989 MD.05-1 Site Operations:...

  13. DOE - Office of Legacy Management -- St Louis Airport Site Vicinity...

    Office of Legacy Management (LM)

    from uranium processing operations, primarily from the former Mallinckrodt Chemical Company Plants in St. Louis, at a location currently referred to as the St. Louis Downtown Site. ...

  14. DOE - Office of Legacy Management -- Hecla Durita Site - 012

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U.S. Nuclear Regulatory Commission license termination, the ...

  15. DOE - Office of Legacy Management -- ANC Gas Hills Site - 040

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U.S. Nuclear Regulatory Commission license termination, the ...

  16. DOE - Office of Legacy Management -- Pathfinder Lucky Mc Site...

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U.S. Nuclear Regulatory Commission license termination, the ...

  17. DOE - Office of Legacy Management -- Kennecott Sweetwater Site...

    Office of Legacy Management (LM)

    Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials ... After the owner completes U.S. Nuclear Regulatory Commission license termination, the ...

  18. Cryptographic Trust Management Requirements Specification: Version 1.1

    SciTech Connect

    Edgar, Thomas W.

    2009-09-30

    The Cryptographic Trust Management (CTM) Project is being developed for Department of Energy, OE-10 by the Pacific Northwest National Laboratory (PNNL). It is a component project of the NSTB Control Systems Security R&D Program.

  19. Nevada Test 1999 Waste Management Monitoring Report, Area 3 and Area 5 radioactive waste management sites

    SciTech Connect

    Yvonne Townsend

    2000-05-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). These monitoring data include radiation exposure, air, groundwater, meteorology, vadose zone, and biota data. Although some of these media (radiation exposure, air, and groundwater) are reported in detail in other Bechtel Nevada reports (Annual Site Environmental Report [ASER], the National Emissions Standard for Hazardous Air Pollutants [NESHAP] report, and the Annual Groundwater Monitoring Report), they are also summarized in this report to provide an overall evaluation of RWMS performance and environmental compliance. Direct radiation monitoring data indicate that exposure at and around the RWMSs is not above background levels. Air monitoring data indicate that tritium concentrations are slightly above background levels, whereas radon concentrations are not above background levels. Groundwater monitoring data indicate that the groundwater in the alluvial aquifer beneath the Area 5 RWMS has not been affected by the facility. Meteorology data indicate that 1999 was a dry year: rainfall totaled 3.9 inches at the Area 3 RWMS (61 percent of average) and 3.8 inches at the Area 5 RWMS (75 percent of average). Vadose zone monitoring data indicate that 1999 rainfall infiltrated less than one foot before being returned to the atmosphere by evaporation. Soil-gas tritium data indicate very slow migration, and tritium concentrations in biota were insignificant. All 1999 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing as expected at isolating buried waste.

  20. Savannah River Site Manager Jack Craig Wins Highest Civil Service Award |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Manager Jack Craig Wins Highest Civil Service Award Savannah River Site Manager Jack Craig Wins Highest Civil Service Award December 29, 2015 - 1:00pm Addthis DOE Savannah River Operations Office Manager Jack Craig DOE Savannah River Operations Office Manager Jack Craig WASHINGTON, D.C. - DOE Savannah River Operations Office Manager Jack Craig recently received the nation's highest civil service recognition, the Presidential Rank of Distinguished Executive award. The

  1. Management of the Area 5 Radioactive Waste Management Site using Decision-based, Probabilistic Performance Assessment Modeling

    SciTech Connect

    Carilli, J.; Crowe, B.; Black, P.; Tauxe, J.; Stockton, T.; Catlett, K.; Yucel, V.

    2003-02-27

    Low-level radioactive waste from cleanup activities at the Nevada Test Site and from multiple sites across the U.S. Department of Energy (DOE) complex is disposed at two active Radioactive Waste Management Sites (RWMS) on the Nevada Test Site. These facilities, which are managed by the DOE National Nuclear Security Administration Nevada Site Office, were recently designated as one of two regional disposal centers and yearly volumes of disposed waste now exceed 50,000 m3 (> 2 million ft3). To safely and cost-effectively manage the disposal facilities, the Waste Management Division of Environmental Management has implemented decision-based management practices using flexible and problem-oriented probabilistic performance assessment modeling. Deterministic performance assessments and composite analyses were completed originally for the Area 5 and Area 3 RWMSs located in, respectively, Frenchman Flat and Yucca Flat on the Nevada Test Site. These documents provide the technical bases for issuance of disposal authorization statements for continuing operation of the disposal facilities. Both facilities are now in a maintenance phase that requires testing of conceptual models, reduction of uncertainty, and site monitoring all leading to eventual closure of the facilities and transition to long-term stewardship.

  2. Determining site-specific drum loading criteria for storing combustible {sup 238}Pu waste

    SciTech Connect

    Marshall, R.S.; Callis, E.L.; Cappis, J.H.; Espinoza, J.M.; Foltyn, E.M.; Reich, B.T.; Smith, M.C.

    1994-02-01

    Waste containing hydrogenous-combustible material contaminated with {sup 238}Pu can generate hydrogen gas at appreciable rates through alpha radiolysis. To ensure safe transportation of WIPP drums, the limit for {sup 238}Pu-combustible waste published in the WIPP TRUPACT-11 CONTENT (TRUCON) CODES is 21 milliwafts per 55 gallon drum. This corresponds to about 45 milligrams of {sup 238}PuO{sub 2} used for satellite heat source-electrical generators. The Los Alamos waste storage site adopted a {sup 238}Pu waste storage criteria based on these TRCUCON codes. However, reviews of the content in drums of combustible waste generated during heat source assembly at Los Alamos showed the amount of {sup 238}Pu is typically much greater than 45 milligrams. It is not feasible to appreciably reduce Los Alamos {sup 238}Pu waste drum loadings without significantly increasing waste volumes or introducing unsafe practices. To address this concern, a series of studies were implemented to evaluate the applicability of the TRUCON limits for storage of this specific waste. Addressed in these evaluations were determination of the hydrogen generation rate, hydrogen diffusion rates through confinement layers and vent filters, and packaging requirements specific to Los Alamos generated {sup 238}Pu contaminated combustible waste. These studies also showed that the multiple-layer packaging practices in use at Los Alamos could be relaxed without significantly increasing the risk of contamination. Based on a model developed to predict H{sub 2} concentrations in packages and drum headspace, the site specific effective hydrogen generation rate, and hydrogen-diffusion values, and revising the waste packaging practices, we were able to raise the safe loading limit for {sup 238}Pu waste drums for on site storage to the gram levels typical of currently generated {sup 238}Pu waste.

  3. Site-specific analysis of radiological and physical parameters for cobbly soils at the Gunnison, Colorado, processing site

    SciTech Connect

    Not Available

    1993-10-01

    The remedial action at the Gunnison, Colorado, processing site is being performed under the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 [Public Law (PL) 95-6041]. Under UMTRCA, the US Environmental Protection Agency (EPA) is charged with the responsibility of developing appropriate and applicable standards for the cleanup of radiologically contaminated land and buildings at 24 designated sites, including the Gunnison, Colorado, inactive processing site. The remedial action at the processing site will be conducted to remove the tailings and contaminated materials to meet the EPA bulk soil cleanup standards for surface and subsurface soils. The site areas disturbed by remedial action excavation will be either contoured or backfilled with radiologically uncontaminated soil and contoured to restore the site. The final contours will produce a final surface grade that will create positive drainage from the site.

  4. Low-level radioactive waste (LLW) management at the Nevada Test Site (NTS)

    SciTech Connect

    Becker, B.D.; Gertz, C.P.; Clayton, W.A.; Crowe, B.M.

    1998-12-31

    In 1978, the Department of Energy, Nevada Operations Office (DOE/NV), established a managed LLW disposal project at the Nevada Test Site (NTS). Two, sites which were already accepting limited amounts of on-site generated waste for disposal and off-site generated Transuranic Waste for interim storage, were selected to house the disposal facilities. In those early days, these sites, located about 15 miles apart, afforded the DOE/NV the opportunity to use at least two technologies to manage its waste cost effectively. The Area 5 Radioactive Waste Management Site (RWMS) uses engineered shallow-land burial cells to dispose packaged waste while the Area 3 RWMS uses subsidence craters formed from underground testing of nuclear weapons for the disposal of packaged and unpackaged bulk waste. The paper describes the technical attributes of both Area 5 and Area 3 facilities, the acceptance process, the disposal processes, and present and future capacities of both sites.

  5. DOE - Office of Legacy Management -- Conoco Conquista Site -...

    Office of Legacy Management (LM)

    After the owner completes U. S. Nuclear Regulatory Commission license termination the Department of Energy's Office of Legacy Management will be responsible for providing ...

  6. DOE - Office of Legacy Management -- Chevron Panna Maria Site...

    Office of Legacy Management (LM)

    After the owner completes U. S. Nuclear Regulatory Commission license termination the Department of Energy's Office of Legacy Management will be responsible for providing ...

  7. DOE - Office of Legacy Management -- Dawn Ford Site - 038

    Office of Legacy Management (LM)

    After the owner completes U. S. Nuclear Regulatory Commission license termination the Department of Energy's Office of Legacy Management will be responsible for providing ...

  8. DOE - Office of Legacy Management -- Cotter Canon City Site ...

    Office of Legacy Management (LM)

    After the owner completes U. S. Nuclear Regulatory Commission license termination, the Department of Energy's Office of Legacy Management will be responsible for providing ...

  9. DOE - Office of Legacy Management -- ANC Gas Hills Site - 040

    Office of Legacy Management (LM)

    After the owner completes U.S. Nuclear Regulatory Commission license termination, the Department of Energy's Office of Legacy Management will be responsible for providing ...

  10. DOE - Office of Legacy Management -- EFB White Mesa Site - 033

    Office of Legacy Management (LM)

    After the owner completes U. S. Nuclear Regulatory Commission license termination the Department of Energy's Office of Legacy Management will be responsible for providing ...

  11. DOE - Office of Legacy Management -- Niagara Falls Storage Site...

    Office of Legacy Management (LM)

    of Engineers but will eventually transfer to the U.S. Department of Energy Office of Legacy Management. Assessment of Historical Knolls Atomic Power Laboratory Waste Storage...

  12. Evolution of I-SceI Homing Endonucleases with Increased DNA Recognition Site Specificity

    SciTech Connect

    Joshi, Rakesh; Ho, Kwok Ki; Tenney, Kristen; Chen, Jui-Hui; Golden, Barbara L.; Gimble, Frederick S.

    2013-09-18

    Elucidating how homing endonucleases undergo changes in recognition site specificity will facilitate efforts to engineer proteins for gene therapy applications. I-SceI is a monomeric homing endonuclease that recognizes and cleaves within an 18-bp target. It tolerates limited degeneracy in its target sequence, including substitution of a C:G{sub +4} base pair for the wild-type A:T{sub +4} base pair. Libraries encoding randomized amino acids at I-SceI residue positions that contact or are proximal to A:T{sub +4} were used in conjunction with a bacterial one-hybrid system to select I-SceI derivatives that bind to recognition sites containing either the A:T{sub +4} or the C:G{sub +4} base pairs. As expected, isolates encoding wild-type residues at the randomized positions were selected using either target sequence. All I-SceI proteins isolated using the C:G{sub +4} recognition site included small side-chain substitutions at G100 and either contained (K86R/G100T, K86R/G100S and K86R/G100C) or lacked (G100A, G100T) a K86R substitution. Interestingly, the binding affinities of the selected variants for the wild-type A:T{sub +4} target are 4- to 11-fold lower than that of wild-type I-SceI, whereas those for the C:G{sub +4} target are similar. The increased specificity of the mutant proteins is also evident in binding experiments in vivo. These differences in binding affinities account for the observed -36-fold difference in target preference between the K86R/G100T and wild-type proteins in DNA cleavage assays. An X-ray crystal structure of the K86R/G100T mutant protein bound to a DNA duplex containing the C:G{sub +4} substitution suggests how sequence specificity of a homing enzyme can increase. This biochemical and structural analysis defines one pathway by which site specificity is augmented for a homing endonuclease.

  13. Site specific incorporation of heavy atom-containing unnatural amino acids into proteins for structure determination

    DOEpatents

    Xie, Jianming; Wang, Lei; Wu, Ning; Schultz, Peter G.

    2008-07-15

    Translation systems and other compositions including orthogonal aminoacyl tRNA-synthetases that preferentially charge an orthogonal tRNA with an iodinated or brominated amino acid are provided. Nucleic acids encoding such synthetases are also described, as are methods and kits for producing proteins including heavy atom-containing amino acids, e.g., brominated or iodinated amino acids. Methods of determining the structure of a protein, e.g., a protein into which a heavy atom has been site-specifically incorporated through use of an orthogonal tRNA/aminoacyl tRNA-synthetase pair, are also described.

  14. Nevada National Security Site 2011 Waste Management Monitoring Report, Area 3 and Area 5 Radioactive Waste Management Site

    SciTech Connect

    NSTec Environmental Management

    2012-07-31

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2011 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. During the last 2 weeks of March 2011, gamma spectroscopy results for air particles showed measurable activities of iodine-131 (131I), cesium-134 (134Cs), and cesium-137 (137Cs). These results are attributed to the release of fission products from the damaged Fukushima Daiichi power plant in Japan. The remaining gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below minimum detectable concentrations. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. The 86.3 millimeters (mm) (3.40 inches [in.]) of precipitation at the Area 3 RWMS during 2011 is 44% below the average of 154.1 mm (6.07 in.), and the 64.8 mm

  15. Nevada National Security Site 2013 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site

    SciTech Connect

    Hudson, D. B.

    2014-08-19

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2013 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2013; 2014a; 2014b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are close to detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 105.8 millimeters (mm) (4.17 inches [in.]) of precipitation at the Area 3 RWMS during 2013 is 30% below the average of 150.3 mm (5.92 in.), and the 117.5 mm (4.63 in.) of precipitation at the Area 5 RWMS during 2013 is 5% below the average of 123.6 mm (4.86 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents

  16. Nevada National Security Site 2012 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site

    SciTech Connect

    Hudson, David B.

    2013-09-10

    Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2012 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2012; 2013a; 2013b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 133.9 millimeters (mm) (5.27 inches [in.]) of precipitation at the Area 3 RWMS during 2012 is 12% below the average of 153.0 mm (6.02 in.), and the 137.6 mm (5.42 in.) of precipitation at the Area 5 RWMS during 2012 is 11% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents

  17. Nevada Test Site 2007 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    NSTec Environmental Management

    2008-06-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2007 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2007a; 2008; Warren and Grossman, 2008). Direct radiation monitoring data indicate exposure levels at the RWMSs are at background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. A single gamma spectroscopy measurement for cesium was slightly above the minimum detectable concentration, and concentrations of americium and plutonium are only slightly above detection limits at the Area 3 RWMS. The measured levels of radionuclides in air particulates are below derived concentration guides for these radionuclides. Radon flux from waste covers is well below regulatory limits. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 136.8 millimeters (mm) (5.39 inches [in.]) of precipitation at the Area 3 RWMS during 2007 is 13 percent below the average of 158.1 mm (6.22 in.), and the 123.8 mm (4.87 in.) of precipitation at the Area 5 RWMS during 2007 is 6 percent below the average of 130.7 mm (5.15 in.). Soil-gas tritium monitoring at borehole GCD-05U continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward movement percolation of precipitation more effectively

  18. Nevada Test Site 2009 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    NSTec Radioactive Waste

    2010-06-23

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2009 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NTS. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. All gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below the minimum detectable concentrations, and concentrations of americium and plutonium are only slightly above detection limits. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. Radon flux from waste covers is well below regulatory limits. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 87.6 millimeters (mm) (3.45 inches [in.]) of precipitation at the Area 3 RWMS during 2009 is 43 percent below the average of 152.4 mm (6.00 in.), and the 62.7 mm (2.47 in.) of precipitation at the Area 5 RWMS during 2009 is 49 percent below the average of 122.5 mm (4.82 in.). Soil-gas tritium monitoring at borehole GCD-05 continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation

  19. Nevada National Security Site 2010 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    NSTec Environmental Management

    2011-06-01

    Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2010 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2010a; 2010b; 2011). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. All gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below the minimum detectable concentrations, and concentrations of americium and plutonium are only slightly above detection limits. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 246.9 millimeters (mm) (9.72 inches [in.]) of precipitation at the Area 3 RWMS during 2010 is 56 percent above the average of 158.7 mm (6.25 in.), and the 190.4 mm (7.50 in.) of precipitation at the Area 5 RWMS during 2010 is 50 percent above the average of 126.7 mm (4.99 in.). Soil-gas tritium monitoring at borehole GCD-05 continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than

  20. Performance Assessment Transport Modeling of Uranium at the Area 5 Radioactive Waste Management Site at the Nevada National Security Site

    SciTech Connect

    NSTec Radioactive Waste

    2010-10-12

    Following is a brief summary of the assumptions that are pertinent to the radioactive isotope transport in the GoldSim Performance Assessment model of the Area 5 Radioactive Waste Management Site, with special emphasis on the water-phase reactive transport of uranium, which includes depleted uranium products.

  1. DOE - Office of Legacy Management -- Kennecott Sweetwater Site...

    Office of Legacy Management (LM)

    Mill Tailings Radiation Control Act was passed in 1978. The majority of the milling conducted at these sites was for private sale, but a portion was sold to the U.S. Government. ...

  2. DOE - Office of Legacy Management -- WNI Split Rock Site - 043

    Office of Legacy Management (LM)

    the Uranium Mill Tailings Control Act was passed in 1978. The majority of the milling conducted at these sites was for private sale, but a portion was sold to the U.S. Government. ...

  3. DOE - Office of Legacy Management -- Reactor Site - Fort Belvoir...

    Office of Legacy Management (LM)

    VA.0-02-1 - DOE Letter; Fiore to Schafer; Referral of DOD or Former DOD Sites for Consideration Under Appropriate DOD Programs; May 29, 1987. Enclosure 2; Department of the Defense ...

  4. DOE - Office of Legacy Management -- St Louis Airport Site Vicinity...

    Office of Legacy Management (LM)

    Louis. The properties are associated with the St. Louis Airport Site. The Manhattan Engineer District (MED), a predecessor agency of the U.S. Department of Energy (DOE), acquired ...

  5. DOE - Office of Legacy Management -- Latty Avenue Site - MO 04

    Office of Legacy Management (LM)

    Former Cotter Site, Latty Avenue Properties Contemporary Metals Corp. Continental Mining and Milling MO.04-1 MO.04-2 MO.04-5 MO.04-6 MO.06-8 MO.06-11 Location: 9200 Latty ...

  6. DOE - Office of Legacy Management -- St Louis Downtown Site ...

    Office of Legacy Management (LM)

    MO.02-1 - DOE Memorandum; Coffman to LaGrone; Authorization for Remedial Action at the Seaway Industrial Park and Ashland Oil Co. (I) Sites at Tonawanda, NY and Mallinckrodt ...

  7. CULTURAL RESOURCES MANAGEMENT PLAN FOR THE NEVADA TEST SITE

    National Nuclear Security Administration (NNSA)

    ... The Nevada Test Site (NTS) is a U.S. Department of Energy ... They consist of non- renewable remains of human activity, ... Implied in this process, outlined by federal law and ...

  8. Site specific seismic hazard analysis at the DOE Kansas City Plant

    SciTech Connect

    Lynch, D.T.; Drury, M.A.; Meis, R.C.; Bieniawski, A.; Savy, J.B.; Llopis, J.L.; Constantino, C.; Hashimoto, P.S.; Campbell, K.W.

    1995-10-01

    A site specific seismic hazard analysis is being conducted for the Kansas City Plant to support an on-going structural evaluation of existing buildings. This project is part of the overall review of facilities being conducted by DOE. The seismic hazard was probabilistically defined at the theoretical rock outcrop by Lawrence Livermore National Laboratory. The USArmy Engineer Waterways Experiment Station conducted a subsurface site investigation to characterize in situ S-wave velocities and other subsurface physical properties related to the geology in the vicinity of the Main Manufacturing Building (MMB) at the Bannister Federal Complex. The test program consisted of crosshole S-wave, seismic cone penetrometer testing,and laboratory soil analyses. The information acquired from this investigation was used in a site response analysis by City College of New York to determine the earthquake motion at grade. Ground response spectra appropriate for design and evaluation of Performance Category 1 and 2 structures, systems, and components were recommended. Effects of seismic loadings on the buildings will be used to aid in designing any structural modifications.

  9. Hanford Integrated Planning Process: 1993 Hanford Site-specific science and technology plan

    SciTech Connect

    Not Available

    1993-12-01

    This document is the FY 1993 report on Hanford Site-specific science and technology (S&T) needs for cleanup of the Site as developed via the Hanford Integrated Planning Process (HIPP). It identifies cleanup problems that lack demonstrated technology solutions and technologies that require additional development. Recommendations are provided regarding allocation of funding to address Hanford`s highest-priority technology improvement needs, technology development needs, and scientific research needs, all compiled from a Sitewide perspective. In the past, the S&T agenda for Hanford Site cleanup was sometimes driven by scientists and technologists, with minimal input from the ``problem owners`` (i.e., Westinghouse Hanford Company [WHC] staff who are responsible for cleanup activities). At other times, the problem-owners made decisions to proceed with cleanup without adequate scientific and technological inputs. Under both of these scenarios, there was no significant stakeholder involvement in the decision-making process. One of the key objectives of HIPP is to develop an understanding of the integrated S&T requirements to support the cleanup mission, (a) as defined by the needs of the problem owners, the values of the stakeholders, and the technology development expertise that exists at Hanford and elsewhere. This requires a periodic, systematic assessment of these needs and values to appropriately define a comprehensive technology development program and a complementary scientific research program. Basic to our success is a methodology that is defensible from a technical perspective and acceptable to the stakeholders.

  10. DOE - Office of Legacy Management -- Berkeley CA Site - CA 03

    Office of Legacy Management (LM)

    Berkeley CA Site - CA 03 FUSRAP Considered Sites Berkeley, CA Alternate Name(s): University of California Gilman Hall, University of California CA.03-1 Location: Gilman Hall, University of California, Berkeley, California CA.03-1 Historical Operations: Performed research and development on the synthesis and production of plutonium, resulting in uranium, plutonium, cesium and americium contamination. CA.03-3 CA.03-5 Eligibility Determination: Eligible CA.03-1 CA.03-2 Radiological Survey(s):

  11. EM Site Manager Talks Leadership Philosophy, Career Advice with Students

    Energy.gov [DOE]

    EM Richland Operations Office Manager Stacy Charboneau joined other community leaders on a guest panel to discuss leadership, role models, and motivation at Washington State University Tri-Cities in Richland, Wash. this month.

  12. 2002 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

    SciTech Connect

    Y. E. Townsend

    2003-06-01

    Environmental, subsidence, and meteorological monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS)(refer to Figure 1). These monitoring data include radiation exposure, air, groundwater,meteorology, vadose zone, subsidence, and biota data. Although some of these media (radiation exposure, air, and groundwater) are reported in detail in other Bechtel Nevada (BN) reports (Annual Site Environmental Report [ASER], the National Emissions Standard for Hazardous Air Pollutants [NESHAP] report, and the Annual Groundwater Monitoring Report), they are also summarized in this report to provide an overall evaluation of RWMS performance and environmental compliance. Direct radiation monitoring data indicate that exposure at and around the RWMSs is not above background levels. Air monitoring data indicate that tritium concentrations are slightly above background levels. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS has not been affected by the facility. Meteorological data indicate that 2002 was a dry year: rainfall totaled 26 mm (1.0 in) at the Area 3 RWMS and 38 mm (1.5 in) at the Area 5 RWMS. Vadose zone monitoring data indicate that 2002 rainfall infiltrated less than 30 cm (1 ft) before being returned to the atmosphere by evaporation. Soil-gas tritium monitoring data indicate slow subsurface migration, and tritium concentrations in biota were lower than in previous years. Special investigations conducted in 2002 included: a comparison between waste cover water contents measured by neutron probe and coring; and a comparison of four methods for measuring radon concentrations in air. All 2002 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility Performance Assessments (PAs).

  13. DOE - Office of Legacy Management -- Seymour CT Site - CT 02

    Office of Legacy Management (LM)

    Seymour CT Site - CT 02 FUSRAP Considered Sites Seymour, CT Alternate Name(s): Bridgeport Brass Company Seymour Specialty Wire Reactive Metals, Inc. National Distillers and Chemical Co. Havens Plant CT.02-2 CT.02-3 CT.02-6 Location: 15 Franklin Street, Seymour, Connecticut CT.02-4 Historical Operations: Procured, processed and stored uranium oxides, salts, and metals for AEC and processed the products by cold-forming or extruding natural uranium metal. CT.02-3 CT.02-9 Eligibility Determination:

  14. DOE - Office of Legacy Management -- Fairfield OH Site - OH 23

    Office of Legacy Management (LM)

    Fairfield OH Site - OH 23 FUSRAP Considered Sites Fairfield, OH Alternate Name(s): Associate Aircraft Tool & Manufacturing, Inc. Associated Aircraft Tool and Manufacturing Company Force Control Industries Former Dixie Machinery OH.23-1 OH.23-2 Location: 3660 Dixie Highway, Fairfield, Ohio OH.23-2 Historical Operations: Produced natural uranium hollow slugs, resulting in uranium metal contamination. OH.23-4 OH.23-5 Eligibility Determination: Eligible OH.23-1 OH.23-2 Radiological Survey(s):

  15. DOE - Office of Legacy Management -- Oxford OH Site - OH 22

    Office of Legacy Management (LM)

    Oxford OH Site - OH 22 FUSRAP Considered Sites Oxford, OH Alternate Name(s): Alba Craft Shop Alba Craft Laboratory Albaugh dba Alba Craft Shop OH.22-3 OH.22-4 Location: 10-14 West Rose Avenue, Oxford, Ohio OH.22-7 Historical Operations: Performed metal fabrication under subcontract with AEC prime contract to National Lead Company of Ohio on uranium metal. Includes VPs. OH.22-5 OH.22-6 OH.22-8 Eligibility Determination: Eligible OH.22-1 OH.22-2 Radiological Survey(s): Assessment Survey,

  16. Environmental Management at the Nevada Test Site Year 2001 Current Status

    SciTech Connect

    Becker, B. D.; Gertz, C. P.; Clayton, W. A.; Carilli, J. T.; DiSanza, E. F.; Wycoff, R. C.; Crowe, B. M.

    2002-02-26

    The performance objectives of the U. S. Department of Energy's National Nuclear Security Administration Nevada Operations Office Low-level Radioactive Waste (LLW) disposal facilities located at the Nevada Test Site transcend those of any other radioactive waste disposal site in the United States. Situated at the southern end of the Great Basin, 244 meters (800 feet) above the water table, the Area 5 Radioactive Waste Management Site (RWMS) has utilized a combination of engineered shallow land disposal cells and deep augured shafts to dispose a variety of waste streams. These include high volume low-activity waste, classified material, and high-specific-activity special case waste. Fifteen miles north of Area 5 is the Area 3 RWMS. Here bulk LLW disposal takes place in subsidence craters formed from underground testing of nuclear weapons. Earliest records indicate that documented LLW disposal activities have occurred at the Area 5 and Area 3 RWMSs since 1961 and 1968, respectively. However, these activities have only been managed under a formal program since 1978. This paper describes the technical attributes of the facilities, present and future capacities and capabilities, and provides a description of the process from waste approval to final disposition. The paper also summarizes the current status of the waste disposal operations. Additionally, the Nevada Operations Office Environmental Restoration Division is responsible for identifying the nature and extent of contamination; determining its potential risk to the public and the environment; and performing the necessary corrective actions in compliance with guidelines and requirements. This paper summarizes just a few of the successes of the Nevada Operations Office projects.

  17. Project Schedules and Milestones Draft July 2014 Site Management Plan Page 1

    Office of Legacy Management (LM)

    Draft July 2014 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FY 2015-FY 2017) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the Site Management Plan (SMP) establishes the overall plan for remedial actions at the Monticello Mill Tailings Site (MMTS) and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the Monticello Vicinity Properties site (MVP), which was deleted from the

  18. Project Schedules and Milestones Final August 2013 Site Management Plan Page 1

    Office of Legacy Management (LM)

    Final August 2013 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FY 2014-FY 2016) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the Site Management Plan (SMP) establishes the overall plan for remedial actions at the Monticello Mill Tailings Site (MMTS) and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the Monticello Vicinity Properties site (MVP), which was deleted from the

  19. Overview of Science and Technology Improvements at Office of Legacy Management Sites

    SciTech Connect

    Morrison, S.; Bartlett, T.; Boylan, J.; Carpenter, C.; Miller, D.; Kothari, V.

    2007-07-01

    The U.S. Department of Energy Office of Legacy Management (LM) supports science and technology (S and T) initiatives to more effectively manage LM sites, help protect human health and the environment, and reduce long-term costs of site maintenance and remediation by ensuring that sound engineering and scientific principles are used. Through the use of telemetry, LM's SOARS (System Operation and Analysis of Remote Sites) project provides project scientists and engineers with timely information needed to evaluate, maintain, and optimize remediation systems, while limiting the amount of required travel. This paper presents three recent S and T activities focused on enhancing remediation of ground water at LM sites. (authors)

  20. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  1. Site-specific study on stabilization of acid-generating mine tailings using coal fly ash

    SciTech Connect

    Shang, J.Q.; Wang, H.L.; Kovac, V.; Fyfe, J.

    2006-03-15

    A site-specific study on stabilizing acid-generating mine tailings from Sudbury Mine using a coal fly ash from Nanticoke Generating Station is presented in this paper. The objective of the study is to evaluate the feasibility of codisposal of the fly ash and mine tailings to reduce environmental impacts of Sudbury tailings disposal sites. The study includes three phases, i.e., characterization of the mine tailings, and coal fly ash, oxidation tests on the mine tailings and kinetic column permeation tests. The results of the experiments indicate that when permeated with acid mine drainage, the hydraulic conductivity of Nanticoke coal fly ash decreased more than three orders of magnitude (from 1 x 10{sup -6} to 1 x 10{sup -9} cm/s), mainly due to chemical reactions between the ash solids and acid mine drainage. Furthermore, the hydraulic gradient required for acid mine drainage to break through the coal fly ash is increased up to ten times (from 17 to 150) as compared with that for water. The results also show that the leachate from coal fly ash neutralizes the acidic pore fluid of mine tailings. The concentrations of trace elements in effluents from all kinetic column permeation tests indicated that coplacement of coal fly ash with mine tailings has the benefit of immobilizing trace elements, especially heavy metals. All regulated element concentrations from effluent during testing are well below the leachate quality criteria set by the local regulatory authority.

  2. Site-specific earthquake response analysis for Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report

    SciTech Connect

    Sykora, D.W.; Davis, J.J.

    1993-08-01

    The Paducah Gaseous Diffusion Plant (PGDP), owned by the US Department of Energy (DOE) and operated under contract by Martin Marietta Energy systems, Inc., is located southwest of Paducah, Kentucky. An aerial photograph and an oblique sketch of the plant are shown in Figures 1 and 2, respectively. The fenced portion of the plant consists of 748 acres. This plant was constructed in the 1950`s and is one of only two gaseous diffusion plants in operation in the United States; the other is located near Portsmouth, Ohio. The facilities at PGDP are currently being evaluated for safety in response to natural seismic hazards. Design and evaluation guidelines to evaluate the effects of earthquakes and other natural hazards on DOE facilities follow probabilistic hazard models that have been outlined by Kennedy et al. (1990). Criteria also established by Kennedy et al. (1990) classify diffusion plants as ``moderate hazard`` facilities. The US Army Engineer Waterways Experiment Station (WES) was tasked to calculate the site response using site-specific design earthquake records developed by others and the results of previous geotechnical investigations. In all, six earthquake records at three hazard levels and four individual and one average soil columns were used.

  3. Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis

    SciTech Connect

    Lantz, E.; Warren, A.; Roberts, J. O.; Gevorgian, V.

    2012-09-01

    This NREL technical report utilizes a development framework originated by NREL and known by the acronym SROPTTC to assist the U.S. Virgin Islands in identifying and understanding concrete opportunities for wind power development in the territory. The report covers each of the seven components of the SROPTTC framework: Site, Resource, Off-take, Permitting, Technology, Team, and Capital as they apply to wind power in the USVI and specifically to a site in Bovoni, St. Thomas. The report concludes that Bovoni peninsula is a strong candidate for utility-scale wind generation in the territory. It represents a reasonable compromise in terms of wind resource, distance from residences, and developable terrain. Hurricane risk and variable terrain on the peninsula and on potential equipment transport routes add technical and logistical challenges but do not appear to represent insurmountable barriers. In addition, integration of wind power into the St. Thomas power system will present operational challenges, but based on experience in other islanded power systems, there are reasonable solutions for addressing these challenges.

  4. WMA-C - Waste Management Area C Closure Process - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Documents > WMA-C - Waste Management Area C Closure Process Documents DOE - RL ContractsProcurements DOE-ORP ContractsProcurements CERCLA Five-Year Review Hanford Site Safety...

  5. U-204: HP Network Node Manager i Input Validation Hole Permits Cross-Site Scripting Attacks

    Energy.gov [DOE]

    Potential security vulnerabilities have been identified with HP Network Node Manager I (NNMi) for HP-UX, Linux, Solaris, and Windows. The vulnerabilities could be remotely exploited resulting in cross site scripting (XSS).

  6. U-229: HP Network Node Manager i Input Validation Flaw Permits Cross-Site Scripting Attacks

    Energy.gov [DOE]

    Potential security vulnerabilities have been identified with HP Network Node Manager i (NNMi) for HP-UX, Linux, Solaris, and Windows. The vulnerabilities could be remotely exploited resulting in cross site scripting (XSS).

  7. Inspection of Environment, Safety, and Health Management at the Hanford Site, March 2002

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) management at the Department of Energy (DOE) Hanford Site in January-February 2002.

  8. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE/EIS-0391 Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington Summary U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS)

  9. A Probabilistic Approach to Site-Specific, Hazard-Consistent Vertical-to-Horizontal Spectral Ratio Model

    Energy.gov [DOE]

    A Probabilistic Approach to Site-Specific, Hazard-Consistent Vertical-to-Horizontal Spectral Ratio Model Rizzo Associates Presented at U.S. DOE Natural Phenomena Hazards Meeting October 21, 2014

  10. EIS-0109: Long-Term Management of the Existing Radioactive Wastes and Residues at the Niagara Falls Storage Site

    Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of several alternatives for management and control of the radioactive wastes and residues at the Niagara Falls Storage Site, including a no action alternative, an alternative to manage wastes on site, and two off-site management alternatives.

  11. Acquisition Information Management system telecommunication site survey results

    SciTech Connect

    Hake, K.A.; Key, B.G.

    1993-09-01

    The Army acquisition community currently uses a dedicated, point-to-point secure computer network for the Army Material Plan Modernization (AMPMOD). It must transition to the DOD supplied Defense Secure Network 1 (DSNET1). This is one of the first networks of this size to begin the transition. The type and amount of computing resources available at individual sites may or may not meet the new network requirements. This task surveys these existing telecommunications resources available in the Army acquisition community. It documents existing communication equipment, computer hardware, associated software, and recommends appropriate changes.

  12. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    R-1 APPENDIX R CUMULATIVE IMPACTS: ASSESSMENT METHODOLOGY This appendix describes the cumulative impacts methodology for the U.S. Department of Energy's Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. The appendix is organized into sections on (1) regulations and guidance, (2) previous studies, (3) history of land use at the Hanford Site and in surrounding regions, (4) future land use at the Hanford Site, (5) future land use in

  13. Site specific health and safety plan, 233-S decontamination and decommissioning

    SciTech Connect

    J. E. Fasso

    1997-12-31

    The deactivated 233-S Plutonium Concentration Facility, located in the 200 Area at the Hanford Site, is the subject of this Health and Safety Plan.The 233-S Facility operated from January 1952 until July 1967 at which time the building entered the U.S. Department of Energy`s Surplus Facility Management Program as a retired facility. The facility has since undergone severe degradation due to exposure to extreme weather conditions. Additionally, the weather caused existing cracks in concrete structures of the building to lengthen, thereby increasing the potential for failed confinement of the radioactive material in the building. Differential settlement has also occurred causing portions of the facility to separate from the main building structure, increasing the potential for release of radioactive material to the environment. An expedited response is proposed to remove this threat and ensure protection of human health and the environment. On this premise it is intended that the 233-S Facility removal action be performed as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Time-Critical Project being conducted under the Pilot Hanford Environmental Restoration (ER) Initiative

  14. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  15. SU-F-BRD-07: Empirical Derivation of Site-Specific Margin Formulas

    SciTech Connect

    Conroy, L; Smith, W; Quirk, S

    2014-06-15

    systematic error. Site-specific margin formulas may be better suited to patient populations than theoretically derived, ideal geometry general margin formulas.

  16. Waste management units - Savannah River Site. Volume 1, Waste management unit worksheets

    SciTech Connect

    Not Available

    1989-10-01

    This report is a compilation of worksheets from the waste management units of Savannah River Plant. Information is presented on the following: Solid Waste Management Units having received hazardous waste or hazardous constituents with a known release to the environment; Solid Waste Management Units having received hazardous waste or hazardous constituents with no known release to the environment; Solid Waste Management Units having received no hazardous waste or hazardous constituents; Waste Management Units having received source; and special nuclear, or byproduct material only.

  17. Alternative Evaluation Study: Methods to Mitigate/Accommodate Subsidence for the Radioactive Waste Management Sites at the Nevada Test Site, Nye County Nevada, with Special Focus on Disposal Cell U-3ax/bl

    SciTech Connect

    Barker, L.

    1997-09-01

    An Alternative Evaluation Study is a type of systematic approach to problem identification and solution. An Alternative Evaluation Study was convened August 12-15, 1997, for the purpose of making recommendations concerning closure of Disposal Cell U-3ax/bl and other disposal cells and mitigation/accommodation of waste subsidence at the Radioactive Waste Management Sites at the Nevada Test Site. This report includes results of the Alternative Evaluation Study and specific recommendations.

  18. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2-1 TC & WM EIS Proposed Actions (1) Retrieve, treat, and dispose of waste in single-shell tank (SST) and double-shell tank (DST) farms and close the SST system. (2) Decommission the Fast Flux Test Facility, manage the resulting waste, and manage the disposition of the Hanford Site's (Hanford's) inventory of bulk sodium. (3) Manage waste from tank closure and other Hanford activities, as well as limited volumes received from U.S. Department of Energy sites. CHAPTER 2 PROPOSED ACTIONS AND

  19. Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary

    SciTech Connect

    REEP, I.E.

    1999-05-12

    The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

  20. Savannah River Site Waste Management Program Plan, FY 1993. Revision 1

    SciTech Connect

    Not Available

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes.

  1. Technical specification for the Sandia Management Restructure Study Team (MRST) Prototype Information System

    SciTech Connect

    Wyatt, T.R.; Hall, R.C.; Davis, L.T.; Klamerus, E.J.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Sandia Management Restructure Study Team (MRST) Prototype Information System, which resides on a Sun SPARC II workstation employing the INGRES RDBMS. The INGRES/Windows 4GL application editor was used to define the components of the two user applications which comprise the system. These specifications together with the MRST information model and corresponding database definition constitute the MRST Prototype Information System technical specification and implementation description presented herein. The MRST Prototype Information System represents a completed software product which has been presented to the Management Restructure Study Team to support the management restructing processes at Sandia National Laboratories.

  2. Characterization ReportOperational Closure Covers for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect

    Bechtel Nevada Geotechnical Sciences

    2005-06-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS) for the U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Area 3 RWMS is located in south-central Yucca Flat and the Area 5 RWMS is located about 15 miles south, in north-central Frenchman Flat. Though located in two separate topographically closed basins, they are similar in climate and hydrogeologic setting. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste, while the Area 3 RWMS uses subsidence craters formed from underground testing of nuclear weapons for the disposal of packaged and unpackaged bulk waste. Over the next several decades, most waste disposal units at both the Area 3 and Area 5 RWMSs are anticipated to be closed. Closure of the Area 3 and Area 5 RWMSs will proceed through three phases: operational closure, final closure, and institutional control. Many waste disposal units at the Area 5RWMS are operationally closed and final closure has been placed on one unit at the Area 3 RWMS (U-3ax/bl). Because of the similarities between the two sites (e.g., type of wastes, environmental factors, operational closure cover designs, etc.), many characterization studies and data collected at the Area 3 RWMS are relevant and applicable to the Area 5 RWMS. For this reason, data and closure strategies from the Area 3 RWMS are referred to as applicable. This document is an interim Characterization Report – Operational Closure Covers, for the Area 5 RWMS. The report briefly describes the Area 5 RWMS and the physical environment where it is located, identifies the regulatory requirements, reviews the approach and schedule for closing, summarizes the monitoring programs, summarizes characterization studies and results, and then presents conclusions and recommendations.

  3. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    SciTech Connect

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.

  4. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    ... with representatives of the governor of Nevada regarding the disposition of the Consolidated Edison Uranium Solidification Project uranium-233 at the Nevada National Security Site. ...

  5. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    ... various State and local officials and the public on transportation and disposal of Consolidated Edison Uranium Solidification Project material at Nevada National Security Site. ...

  6. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    ... Adler - Mr. Adler reported on the status resuming shipments of uranium-233 from Oak Ridge National Laboratory to the Nevada National Security Site for disposal. Shipments have been ...

  7. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    Ecology Corp. SEP - supplemental environmental project STP - site treatment plan SW - surface water SWSA - solid waste storage area Tc - technetium TC - time critical TDEC -...

  8. LED Site Lighting in the Commercial Building Sector: Opportunities, Challenges, and the CBEA Performance Specification

    Energy.gov [DOE]

    This March 26, 2009 webcast presented information about the Commercial Building Energy Alliances' (CBEA) efforts to explore the viability of LED site lighting in commercial parking lots. LED...

  9. US Department of Energy interim mixed waste inventory report: Waste streams, treatment capacities and technologies: Volume 4, Site specific---Ohio through South Carolina

    SciTech Connect

    Not Available

    1993-04-01

    The Department of Energy (DOE) has prepared this report to provide an inventory of its mixed wastes and treatment capacities and technologies in response to Section 105(a) of the Federal Facility Compliance Act (FFCAct) of 1992 (Pub. L. No. 102-386). As required by the FFCAct-1992, this report provides site-specific information on DOE`s mixed waste streams and a general review of available and planned treatment facilities for mixed wastes at the following five Ohio facilities: Battelle Columbus Laboratories; Fernald Environmental Management Project; Mound Plant; Portsmouth Gaseous Diffusion Plant; and RMI, Titanium Company.

  10. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    L-1 APPENDIX L GROUNDWATER FLOW FIELD DEVELOPMENT This appendix describes the development of the regional-scale groundwater flow field used for the groundwater modeling that supports assessment of the groundwater quality impacts discussed in the Draft and Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS), Chapters 5 and 6 and Appendices O and V. Included are an overview of groundwater flow at the site; the purpose

  11. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    P-1 APPENDIX P ECOLOGICAL RESOURCES AND RISK ANALYSIS This appendix presents the ecological resources (see Section P.1) at the Hanford Site and lists the plants and animals evaluated in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Potential impacts of both airborne releases during operations and groundwater discharges under the various alternatives are evaluated in this appendix. The purpose of the risk analysis is to compare

  12. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    APPENDIX S WASTE INVENTORIES FOR CUMULATIVE IMPACT ANALYSES Integral to development of the inventory data set for the cumulative impact analyses presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington was identification of those waste sites potentially contributing to cumulative impacts on groundwater. Their identification involved two semi-independent, convergent processes: a Waste Information Data System screen and a

  13. EIS-0063: Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington

    Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the existing tank design and consider additional specific design and safety feature alternatives for the thirteen tanks being constructed for storage of defense high-level radioactive liquid waste at the Hanford Site in Richland, Washington. This statement supplements ERDA-1538, "Final Environmental Statement on Waste Management Operation."

  14. Protocol EM-HQ Review Field Self Assessment Site Specific QAP...

    Office of Environmental Management (EM)

    The referenced attachment can be found at on the Environmental Management website via the Standard Review Plan (Quality Assurance Section) at the following link: http:...

  15. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 Subject: TCWM EIS Adopted: June 8, 2012 Page 1 June 8, 2012 David Huizenga Senior Advisor for Environmental Management EM-1/Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection

  16. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 Subject:100 N Proposed Plan, Draft A Adopted: March 7, 2014 Page 1 March 7, 2014 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-76) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland WA 99352 Jane Hedges, Manager Washington State Department of Ecology 3100 Port of

  17. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 Subject: Path Forward on Tank Waste Adopted: March 7, 2014 Page 1 March 7, 2014 David Huizenga Senior Advisor for Environmental Management EM-1/Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-76) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S.

  18. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 Subject: 2014 Lifecycle Scope, Schedule & Cost Report Adopted: June 5, 2014 Page 1 June 5, 2014 Doug Shoop, Acting Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-75) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd., Suite 115 Richland, WA 99352 Jane Hedges, Manager Washington State Department of

  19. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    HAB Consensus Advice # 283 Subject: Central Plateau Inner Area Guidelines Adopted: April 9, 2015 Page 1 April 9, 2015 Stacy Charboneau, Manager U.S. Department of Energy, Richland Operations Office P.O. Box 550 (A7-75) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 825 Jadwin Ave., Suite 210 Richland, WA 99352 Jane Hedges, Manager

  20. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    HAB Consensus Advice # 284 Subject: FY2016 & FY2017 Budget Priorities Adopted: June 11, 2015 Page 1 June 11, 2015 Stacy Charboneau, Manager U.S. Department of Energy, Richland Operations Office P.O. Box 550 (A7-75) Richland, WA 99352 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 825 Jadwin Ave., Suite 210 (A1-43) Richland, WA 99352 Jane Hedges, Manager

  1. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    ... the primary low-level waste disposal location is at the EM Waste Management Facility ... Is there a cutoff or criteria? Mr. Adler - ... Board DHrsg Checklist Recommendations ...

  2. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    nuclear materials, excess facilities, future land use and long-term stewardship, risk assessment and management, and cleanup science and technology activities. The Board...

  3. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    E-1 APPENDIX E DESCRIPTIONS OF FACILITIES, OPERATIONS, AND TECHNOLOGIES Appendix E provides additional information about the technologies, processes, and facilities for the three key activities of this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington: tank closure, Fast Flux Test Facility decommissioning, and waste management. Section E.1 includes this information for tank closure; Section E.2, for Fast Flux Test Facility

  4. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    for the Hanford Site, Richland, Washington 5-394 5.2 FFTF DECOMMISSIONING ALTERNATIVES This section describes the potential long-term environmental and human health impacts associated with implementation of alternatives considered to decommission FFTF and auxiliary facilities at Hanford; to manage waste from the decommissioning process, including waste designated as remote-handled special components (RH-SCs); and to manage the disposition of the Hanford inventory of radioactively contaminated

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 ▪ Public Comments and DOE Responses 3-1053 Campaign A March 16, 2010 As a resident of the Pacifc Northwest, I oppose the "preferred alternative" to ship nuclear waste from other Department of Energy sites to Hanford, as outlined in the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (DOE/EIS--0391). I vehemently oppose the plan to add more radioactive waste to the Hanford site. Shipping this waste along Northwest

  6. Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1

    SciTech Connect

    1995-09-01

    In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

  7. Hanford Site Tank Waste Remediation System. Waste management 1993 symposium papers and viewgraphs

    SciTech Connect

    Not Available

    1993-05-01

    The US Department of Energy`s (DOE) Hanford Site in southeastern Washington State has the most diverse and largest amount of highly radioactive waste of any site in the US. High-level radioactive waste has been stored in large underground tanks since 1944. A Tank Waste Remediation System Program has been established within the DOE to safely manage and immobilize these wastes in anticipation of permanent disposal in a geologic repository. The Hanford Site Tank Waste Remediation System Waste Management 1993 Symposium Papers and Viewgraphs covered the following topics: Hanford Site Tank Waste Remediation System Overview; Tank Waste Retrieval Issues and Options for their Resolution; Tank Waste Pretreatment - Issues, Alternatives and Strategies for Resolution; Low-Level Waste Disposal - Grout Issue and Alternative Waste Form Technology; A Strategy for Resolving High-Priority Hanford Site Radioactive Waste Storage Tank Safety Issues; Tank Waste Chemistry - A New Understanding of Waste Aging; Recent Results from Characterization of Ferrocyanide Wastes at the Hanford Site; Resolving the Safety Issue for Radioactive Waste Tanks with High Organic Content; Technology to Support Hanford Site Tank Waste Remediation System Objectives.

  8. Lessons Learned for Construction and Waste Water Management at Radioactive Waste Closure Site

    SciTech Connect

    Anderson, K.D.

    2008-07-01

    Environmental remediation of three different radioactive waste closure sites each required exhaustive characterization and evaluation of sampling and analytical information in resolving regulatory and technical issues that impact cleanup activities. One of the many regulatory and technical issues shared by all three and impacting the cleanup activities is the compliant management and discharge of waste waters generated and resulting from the remediation activities. Multiple options were available for each closure site in resolving waste water management challenges depending upon the base regulatory framework defined for the cleanup or closure of the site. These options are typically regulated by the federal Clean Water Act (CWA), with exemptions available under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Superfund Amendments and Reauthorization Act of 1986 (SARA) or Memorandum of Understanding (MOU) between regulatory agencies. In general, all parties must demonstrate equivalent compliance when concerns related to the protection of the general public and the environment. As such, all options for management of waste water resulting from closure activities must demonstrate compliance to or equivalent actions under the CWA. The CWA provides for the National Pollution Discharge Elimination System (NPDES) that is typically maintained by individual states through permitting process to generators, public utilities, and more recently, construction sites. Of the three sites, different compliance strategies were employed for each. The approach for the Columbus Closure Project (CCP) was to initiate full scale compliance to the Ohio EPA General Construction Permit No. OHC000002. The CCP provided Notice of Intent (NOI) to the Ohio EPA to discharge under the general permit according to the regulator approved Storm Water Pollution Prevention Plan. For the second site, the Li Tungsten Superfund Site in Glen Cove, New York, the option

  9. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    ... The facility reps have a list of things to watch for, for instance things that might be ... 1-800-382-6938 * Fax: 865-241-6932 * Internet: www.energy.govorssab Oak Ridge Site ...

  10. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    ... when you excavate knowing the age of the plant and the things that have been built there. ... 1-800-382-6938 * Fax: 865-241-6932 * Internet: www.energy.govorssab Oak Ridge Site ...

  11. DOE-SPR-EIS-0075-SA-03 SUPPLEMENT ANALYSIS OF SITE-SPECIFIC AND

    Energy.gov [DOE] (indexed site)

    ... A review of the basic changes of the socioeconomic conditions in the locations of the SPR sites in Louisiana and Texas was performed using the 2010 Decennial Census data. ...

  12. Natural resource management activities at the Savannah River Site. Environmental Assessment

    SciTech Connect

    Not Available

    1993-07-01

    This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

  13. Result Summary for the Area 5 Radioactive Waste Management Site Performance Assessment Model Version 4.113

    SciTech Connect

    Shott, G. J.

    2012-04-15

    Preliminary results for Version 4.113 of the Nevada National Security Site Area 5 Radioactive Waste Management Site performance assessment model are summarized. Version 4.113 includes the Fiscal Year 2011 inventory estimate.

  14. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 Subject: 100-K Proposed Plan (Draft A) Adopted: February 10, 2012 Page 1 February 10, 2012 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 309 Bradley Blvd,, Suite 115 Richland WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton Blvd. Richland, WA 99354 Re: 100-K Proposed Plan (Draft A) Dear Messrs. McCormick, Faulk

  15. U-238: HP Service Manager Input Validation Flaw Permits Cross-Site Scripting Attacks

    Energy.gov [DOE]

    Cross-site scripting (XSS) vulnerability in HP Service Manager Web Tier 7.11, 9.21, and 9.30, and HP Service Center Web Tier 6.28, allows remote attackers to inject arbitrary web script or HTML via unspecified vectors.

  16. Stewardship of the Hanford Site Now and Into the Future

    Office of Environmental Management (EM)

    of the Hanford Site Now and Into the Future Bob Suyama Vice-Chair Hanford Advisory Board Stewardship Roundtable Environmental Management Site-Specific Advisory Board Chairs Meeting...

  17. RCRA Assessment Plan for Single-Shell Tank Waste Management Area A-AX at the Hanford Site

    SciTech Connect

    Narbutovskih, Susan M.; Chou, Charissa J.

    2006-03-03

    This document describes a groundwater assessment plan for the single-shell tank systems in Waste Management Area A-AX at the Hanford Site.

  18. Site-Specific Scaling Relations for Hydrocarbon Adsorption on Hexagonal Transition Metal Surfaces

    SciTech Connect

    Montemore, Matthew M.; Medlin, James W.

    2013-10-03

    Screening a large number of surfaces for their catalytic performance remains a challenge, leading to the need for simple models to predict adsorption properties. To facilitate rapid prediction of hydrocarbon adsorption energies, scaling relations that allow for calculation of the adsorption energy of any intermediate attached to any symmetric site on any hexagonal metal surface through a carbon atom were developed. For input, these relations require only simple electronic properties of the surface and of the gas-phase reactant molecules. Determining adsorption energies consists of up to four steps: (i) calculating the adsorption energy of methyl in the top site using density functional theory or by simple relations based on the electronic structure of the surface; (ii) using modified versions of classical scaling relations to scale between methyl in the top site and C₁ species with more metal-surface bonds (i.e., C, CH, CH₂) in sites that complete adsorbate tetravalency; (iii) using gas-phase bond energies to predict adsorption energies of longer hydrocarbons (i.e., CR, CR₂, CR₃); and (iv) expressing energetic changes upon translation of hydrocarbons to various sites in terms of the number of agostic interactions and the change in the number of carbon-metal bonds. Combining all of these relations allows accurate scaling over a wide range of adsorbates and surfaces, resulting in efficient screening of catalytic surfaces and a clear elucidation of adsorption trends. The relations are used to explain trends in methane reforming, hydrocarbon chain growth, and propane dehydrogenation.

  19. Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

    SciTech Connect

    2012-03-01

    This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

  20. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 Subject: Employee Concerns Program Adopted: June 8, 2012 Page 1 June 8, 2012 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Re: Employee Concerns Program Dear Messrs. Samuelson and McCormick, Background: The Employee Concerns Programs (ECP) at Hanford are an integral part of the safety culture. It is imperative

  1. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 Subject: Safety Culture at the Waste Treatment & Immobilization Plant Adopted: June 8, 2012 Page 1 June 8, 2012 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 David Huizenga, Senior Advisor for Environmental Management EM-1/Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Re: Safety Culture at the Waste treatment and Immobilization Plant Dear Messrs. Samuelson and Huizenga,

  2. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 Subject: Preservation of Historical Properties & Artifacts Page 1 September 7, 2012 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Re: Preservation of Historical Properties and Artifacts Dear Messrs Samuelson and McCormick, The Hanford Advisory Board (HAB or Board) congratulates the U.S. Department of Energy

  3. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    PW 1/3/6 Adopted: February 4, 2016 2016O-04 Page 1 February 4, 2016 Stacy Charboneau, Manager U.S. Department of Energy, Richland Operations Office P.O. Box 550 (A7-75) Richland, WA 99352 Dennis Faulk, Manager U.S. Environmental Protection Agency, Region 10 825 Jadwin Ave., Suite 210 (A1-43) Richland, WA 99352 Re: PW 1/3/6 Operable Units Dear Ms. Charboneau and Mr. Faulk, Recognizing that the Tri-Party Agreement (TPA) agencies are in the process of negotiating the remediation of 200-CW-5,

  4. Derivation of site-specific relationships between hydraulic parameters and p-wave velocities based on hydraulic and seismic tomography

    SciTech Connect

    Brauchler, R.; Doetsch, J.; Dietrich, P.; Sauter, M.

    2012-01-10

    In this study, hydraulic and seismic tomographic measurements were used to derive a site-specific relationship between the geophysical parameter p-wave velocity and the hydraulic parameters, diffusivity and specific storage. Our field study includes diffusivity tomograms derived from hydraulic travel time tomography, specific storage tomograms, derived from hydraulic attenuation tomography, and p-wave velocity tomograms, derived from seismic tomography. The tomographic inversion was performed in all three cases with the SIRT (Simultaneous Iterative Reconstruction Technique) algorithm, using a ray tracing technique with curved trajectories. The experimental set-up was designed such that the p-wave velocity tomogram overlaps the hydraulic tomograms by half. The experiments were performed at a wellcharacterized sand and gravel aquifer, located in the Leine River valley near Gttingen, Germany. Access to the shallow subsurface was provided by direct-push technology. The high spatial resolution of hydraulic and seismic tomography was exploited to derive representative site-specific relationships between the hydraulic and geophysical parameters, based on the area where geophysical and hydraulic tests were performed. The transformation of the p-wave velocities into hydraulic properties was undertaken using a k-means cluster analysis. Results demonstrate that the combination of hydraulic and geophysical tomographic data is a promising approach to improve hydrogeophysical site characterization.

  5. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    SciTech Connect

    Not Available

    1994-06-01

    This site management plan for the Oak Ridge Reservation (ORR) describes the overall approach for addressing environmental contamination problems at the ORR Superfund site located in eastern Tennessee. The ORR consists of three major US Department of Energy (DOE) installations constructed in the early to mid 1940s as research, development, and process facilities in support of the Manhattan Project. In addition to the three installations -- Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site (formerly the Oak Ridge Gaseous Diffusion Plant) -- the ORR Superfund Site also includes areas outside the installations, land used by the Oak Ridge Associated Universities and waterways that have been contaminated by releases from the DOE installations. To date, {approximately} 400 areas (Appendix A) requiring evaluation have been identified. Cleanup of the ORR is expected to take two to three decades and cost several billion dollars. This site management plan provides a blueprint to guide this complex effort to ensure that the investigation and cleanup activities are carried out in an efficient and cost-effective manner.

  6. Integrated Weed Control for Land Stewardship at Legacy Management's Rocky Flats Site in Colorado - 13086

    SciTech Connect

    Nelson, Jody K.

    2013-07-01

    Land stewardship is one of nine sustainability programs in the U.S. Department of Energy's Environmental Management System. Land stewardship includes maintaining and improving ecosystem health. At the Rocky Flats Site near Westminster, Colorado, land stewardship is an integral component of the Office of Legacy Management's post-closure monitoring and management at the site. Nearly 263 hectares (650 acres) were disturbed and re-vegetated during site cleanup and closure operations. Proactive management of revegetation areas is critical to the successful reestablishment of native grasslands, wetlands, and riparian communities. The undisturbed native plant communities that occur at the site also require active management to maintain the high-quality wetlands and other habitats that are home to numerous species of birds and other wildlife such as elk and deer, rare plant communities, and the federally listed threatened Preble's meadow jumping mouse. Over the past several decades, an increase of Noxious weeds has impacted much of Colorado's Front Range. As a result, weed control is a key component of the land stewardship program at Rocky Flats. Thirty-three species of state-listed Noxious weeds are known to occur in the Central and Peripheral Operable Units at Rocky Flats, along with another five species that are considered invasive at the site. Early detection and rapid response to control new invasive species is crucial to the program. An integrated weed control/vegetation management approach is key to maintaining healthy, sustainable plant communities that are able to resist Noxious weed invasions. Weed mapping, field surveys, and field-staff training sessions (to learn how to identify new potential problem species) are conducted to help detect and prevent new weed problems. The integrated approach at Rocky Flats includes administrative and cultural techniques (prevention), mechanical controls, biological controls, and chemical controls. Several species of biocontrol

  7. Rooting Characteristics of Vegetation Near Areas 3 and 5 Radioactive Waste Management Sites at the Nevada Test Site--Part 1

    SciTech Connect

    D. J. Hansen

    2003-09-30

    The U.S. Department of Energy emplaced high-specific-activity low-level radioactive wastes and limited quantities of classified transuranic wastes in Greater Confinement Disposal (GCD) boreholes from 1984 to 1989. The boreholes are located at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada Test Site (NTS) in southern Nevada. The boreholes were backfilled with native alluvium soil. The surface of these boreholes and trenches is expected to be colonized by native vegetation in the future. Considering the long-term performance of the disposal facilities, bioturbation (the disruption of buried wastes by biota) is considered a primary release mechanism for radionuclides disposed in GCD boreholes as well as trenches at both Areas 3 and 5 RWMSs. This report provides information about rooting characteristics of vegetation near Areas 3 and 5 RWMSs. Data from this report are being used to resolve uncertainties involving parameterization of performance assessment models used to characterize the biotic mixing of soils and radionuclide transport processes by biota. The objectives of this study were to: (1) survey the prior ecological literature on the NTS and identify pertinent information about the vegetation, (2) conduct limited field studies to describe the current vegetation in the vicinity of Areas 3 and 5 RWMSs so as to correlate findings with more extensive vegetation data collected at Yucca Mountain and the NTS, ( 3 ) review prior performance assessment documents and evaluate model assumptions based on current ecological information, and (4) identify data deficiencies and make recommendations for correcting such deficiencies.

  8. Project Schedules and Milestones September 2008 Site Management Plan Page 5…1

    Office of Legacy Management (LM)

    September 2009 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FYs 2010-2012) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the SMP establishes the overall plan for remedial actions at the MMTS and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the MVP Site, which was deleted from the NPL on February 28, 2000. The SMP was first prepared in 1995 and was revised annually from 1998

  9. Project Schedules and Milestones September 2008 Site Management Plan Page 5…1

    Office of Legacy Management (LM)

    December 2010 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FYs 2011-2013) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the SMP establishes the overall plan for remedial actions at the MMTS and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the MVP Site, which was deleted from the NPL on February 28, 2000. The SMP was first prepared in 1995 and was revised annually from 1998

  10. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 Subject: Ind. Evaluation of Procedures & Industrial Hygiene Equipment Used to Monitor Tank Vapors Adopted: February 8, 2013 Page 1 February 8, 2013 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Re: Independent Evaluation of Procedures and Industrial Hygiene Equipment Used to Monitor Tank Vapors and Flammable Gas Dear Mr. Smith, Background In December 2012, health physics technicians discovered that industrial hygiene (IH)

  11. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    HAB Letter 2016O-02 Adopted: February 4, 2016 Page 1 February 4, 2016 Jane Hedges, Manager Washington State Department of Ecology 3100 Port of Benton Blvd. Richland, WA 99354 Re: Appreciation Dear Jane, On behalf of the Hanford Advisory Board, I wish to sincerely recognize and thank you for your professionalism and leadership in helping the Board to meet its obligations over the past years. The Board has been so very fortunate to have your expertise and enthusiasm stimulating our shared

  12. Framework for managing wastes from oil and gas exploration and production (E&P) sites.

    SciTech Connect

    Veil, J. A.; Puder, M. G.; Environmental Science Division

    2007-09-15

    Oil and gas companies operate in many countries around the world. Their exploration and production (E&P) operations generate many kinds of waste that must be carefully and appropriately managed. Some of these wastes are inherently part of the E&P process; examples are drilling wastes and produced water. Other wastes are generic industrial wastes that are not unique to E&P activities, such as painting wastes and scrap metal. Still other wastes are associated with the presence of workers at the site; these include trash, food waste, and laundry wash water. In some host countries, mature environmental regulatory programs are in place that provide for various waste management options on the basis of the characteristics of the wastes and the environmental settings of the sites. In other countries, the waste management requirements and authorized options are stringent, even though the infrastructure to meet the requirements may not be available yet. In some cases, regulations and/or waste management infrastructure do not exist at all. Companies operating in these countries can be confronted with limited and expensive waste management options.

  13. Development of Site-Specific Soil Design Basis Earthquake (DBE) Parameters for the Integrated Waste Treatment Unit (IWTU)

    SciTech Connect

    Payne, Suzette

    2008-08-01

    Horizontal and vertical PC 3 (2,500 yr) Soil Design Basis Earthquake (DBE) 5% damped spectra, corresponding time histories, and strain-compatible soil properties were developed for the Integrated Waste Treatment Unit (IWTU). The IWTU is located at the Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Laboratory (INL). Mean and 84th percentile horizontal DBE spectra derived from site-specific site response analyses were evaluated for the IWTU. The horizontal and vertical PC 3 (2,500 yr) Soil DBE 5% damped spectra at the 84th percentile were selected for Soil Structure Interaction (SSI) analyses at IWTU. The site response analyses were performed consistent with applicable Department of Energy (DOE) Standards, recommended guidance of the Nuclear Regulatory Commission (NRC), American Society of Civil Engineers (ASCE) Standards, and recommendations of the Blue Ribbon Panel (BRP) and Defense Nuclear Facilities Safety Board (DNFSB).

  14. Familial site-specific Ovarian cancer is linked to BRCA1 on 17q12-21

    SciTech Connect

    Steichen-Gersdorf, E.; Gallion, H.H.; Ponder, M.A.; Pye, C.; Mazoyer, S.; Smith, S.A.; Ponder, B.A.J.; Ford, D.; Easton, D.F.; Girodet, C.

    1994-11-01

    In a study of nine families with {open_quotes}site-specific{close_quotes} ovarian cancer (criterion: three or more cases of epithelial ovarian cancer and no cases of breast cancer diagnosed at age <50 years) we have obtained evidence of linkage to the breast-ovarian cancer susceptibility gene, BRCA1 on 17q12-21. If the risk of cancer in these families is assumed to be restricted to the ovary, the best estimate of the proportion of families linked to BRCA1 is .78 (95% confidence interval .32-1.0). If predisposition to both breast and ovarian cancer is assumed, the proportion linked is 1.0 (95% confidence interval .46-1.0). The linkage of familial site-specific ovarian cancer to BRCA1 indicates the possibility of predictive testing in such families; however, this is only appropriate in families where the evidence for linkage to BRCA1 is conclusive. 17 refs., 3 figs., 1 tab.

  15. Multi-site-specific 16S rRNA Methyltransferase RsmF from Thermus thermophilus

    SciTech Connect

    Demirci, H.; Larsen, L; Hansen, T; Rasmussen, A; Cadambi, A; Gregory, S; Kirpekar, F; Jogl, G

    2010-01-01

    Cells devote a significant effort toward the production of multiple modified nucleotides in rRNAs, which fine tune the ribosome function. Here, we report that two methyltransferases, RsmB and RsmF, are responsible for all four 5-methylcytidine (m{sup 5}C) modifications in 16S rRNA of Thermus thermophilus. Like Escherichia coli RsmB, T. thermophilus RsmB produces m{sup 5}C967. In contrast to E. coli RsmF, which introduces a single m{sup 5}C1407 modification, T. thermophilus RsmF modifies three positions, generating m{sup 5}C1400 and m{sup 5}C1404 in addition to m{sup 5}C1407. These three residues are clustered near the decoding site of the ribosome, but are situated in distinct structural contexts, suggesting a requirement for flexibility in the RsmF active site that is absent from the E. coli enzyme. Two of these residues, C1400 and C1404, are sufficiently buried in the mature ribosome structure so as to require extensive unfolding of the rRNA to be accessible to RsmF. In vitro, T. thermophilus RsmF methylates C1400, C1404, and C1407 in a 30S subunit substrate, but only C1400 and C1404 when naked 16S rRNA is the substrate. The multispecificity of T. thermophilus RsmF is potentially explained by three crystal structures of the enzyme in a complex with cofactor S-adenosyl-methionine at up to 1.3 {angstrom} resolution. In addition to confirming the overall structural similarity to E. coli RsmF, these structures also reveal that key segments in the active site are likely to be dynamic in solution, thereby expanding substrate recognition by T. thermophilus RsmF.

  16. 300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan

    SciTech Connect

    Freshley, Mark D.

    2008-12-31

    Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

  17. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 Subject: Greater than Class C Waste Adopted: June 3, 2011 Page 1 June 3, 2011 Inés Triay Assistant Secretary for Environmental Management EM-1/Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Arnold Edelman Greater-Than-Class C Low-Level Radioactive Waste EIS Office of Technical and Regulatory Support (EM-43) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0119 Re: Draft Greater Than Class C Waste Environmental Impact

  18. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    69 Subject: Hanford Long-Term Stewardship Adopted: June 7, 2013 Page 1 June 7, 2013 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Re: Hanford Long-Term Stewardship Dear Mr. McCormick, Background The purpose of this advice is to present Hanford Advisory Board (HAB or Board) recommendations to the U.S. Department of Energy - Richland Operations Office (DOE- RL) for consideration concerning the current 100-F Area and other planned

  19. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Theresa Labriola Steve Hudson Floyd Hodges Susan Leckband Gerald Pollet State of Oregon Ken Niles Mecal Seppalainen Liaison Representatives Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942-1926 HAB Consensus Advice # 280 Subject: 100-F/IU Area Proposed Plan Adopted: September 5, 2014 Page 1 September 5, 2014 Doug Shoop, Acting Manager U.S. Department of Energy, Richland Operations P.O. Box 550

  20. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 Subject: Submittal to National Remedy Review Board February 23, 2012 Page 1 February 23, 2012 Ms. Amy Legare, NRRB Chair U.S. Environmental Protection Agency National Remedy Review Board 1200 Pennsylvania Avenue, NW MC5204P Washington, DC 20460 Re: Submittal to National Remedy Review Board Dear Ms. Legare, The Hanford Advisory Board is a U.S. Department of Energy Environmental Management Federal Advisory Committee Act board which has offered advice for the past 17 years to the Tri-Party

  1. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Fax: (509) 942-1926 Hanford Advisory Board Subject: Appreciation June 5, 2014 2014O-04 Page 1 June 5, 2014 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-75) Richland, WA 99352 Re: Appreciation Dear Matt, The Hanford Advisory Board (Board) sincerely wishes to thank you for your leadership over the past four years. Clearly we have benefitted from your commitment to a more open and transparent engagement with the Board. In particular, the Board appreciates

  2. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    SciTech Connect

    Gerber, E.W.

    1995-10-01

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE`s Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP is being further developed to include complex-wide requirements for research and development and a long-range facility requirements section. The planned additions to the baseline IPP are being developed based on a systems engineering approach that integrates facilities and capabilities at the various DOE sites and focuses on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 and to provide a basis for formulating planned additions to the IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the baseline DNFSB Recommendation 94-1 IPP. The SISMPs will be periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations.

  3. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    APPENDIX B CONTRACTOR AND SUBCONTRACTOR NATIONAL ENVIRONMENTAL POLICY ACT DISCLOSURE STATEMENTS NATIONAL ENVIRONMENTAL POLICY ACT DISCLOSURE STATEMENT FOR PREPARATION OF THE TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON The Council of Environmental Quality regulations at Title 40 of the Code of Federal Regulatiolls (CFR), Section 1506.5(c), which have been adopted by the U.S. Department of Energy (10 CFR 1021), require contractors and

  4. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    D-1 APPENDIX D WASTE INVENTORIES This appendix provides additional information about the inventories that drive the proposed alternatives described in Chapter 2 of this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS). Information provided in this appendix forms the basis for determining the short- and long-term environmental impacts under each alternative, which are described in Chapters 4 and 5, respectively, of this

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    APPENDIX F DIRECT AND INDIRECT IMPACTS: ASSESSMENT METHODOLOGY This appendix briefly describes the methods used to assess the potential direct and indirect effects of the alternatives in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. Included in this appendix are discussions of general impact assessment methodologies for land resources, infrastructure, noise and vibration, air quality, geology and soils, water resources,

  6. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    APPENDIX I WORKFORCE ESTIMATES This appendix presents the estimated number of workers required to perform construction, operations, deactivation, closure, and decommissioning tasks under each of the alternatives presented in this Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington. I.1 INTRODUCTION Full-time-equivalent (FTE) estimates were based on information provided in data reports prepared to support this environmental impact statement

  7. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    X-1 APPENDIX X SUPPLEMENT ANALYSIS OF THE DRAFT TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON Consistent with U.S. Department of Energy (DOE) Regulations (10 CFR 1021.314(c)(3)), "DOE shall make the determination and the related Supplement Analysis available to the public for information. Copies of the determination and Supplement Analysis shall be provided upon written request. DOE shall make copies available for inspection in

  8. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Volume 3, Book 1 Section 1: Overview Section 2: Topics of Interest Section 3: Individual Commentors U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County,

  9. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reader's Guide U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) (DOE/EIS-0391) Location: Benton County, Washington Contacts: For copies of this Final TC & WM EIS, call toll-free

  10. EIS-0220: Interim Management of Nuclear Materials at the Savannah River Site

    Office of Energy Efficiency and Renewable Energy (EERE)

    This environmental impact statement assesses the potential environmental impacts of actions necessary to manage nuclear materials at the Savannah River Site (SRS) in Aiken, South Carolina, until decisions on their ultimate disposition are made and implemented. The Department of Energy has decided to initiate actions which will stabilize certain of the SRS materials that represent environment, safety and health vulnerabilities in their current storage condition or which may represent a vulnerability within the next 10 years.

  11. Addendum 1 Composite Analysis for the Area 5 Radioactive Waste Management Site at the Nevada Test Site, Nye County, Nevada

    SciTech Connect

    Vefa Yucel

    2001-11-01

    A disposal authorization statement (DAS) was issued by the U.S. Department of Energy/Headquarters (DOE/HQ) on December 5, 2000, authorizing the DOE's National Nuclear Security Administration Nevada Operations Office to continue the operation of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site for the disposal of low-level waste and mixed low-level waste. Prior to the issuance of the DAS, the Low-Level Waste Disposal Facility Federal Review Group (LFRG) had conducted reviews of the performance assessment (PA) and the composite analysis (CA) for the Area 5 RWMS, in accordance with the requirements of the DOE Radioactive Waste Management Order DOE O 435.1. A brief history of the reviews is as follows. (The reviews were conducted by independent review teams chartered by the LFRG; the review findings and recommendations were issued in review team reports to the LFRG.) The LFRG accepted the initial PA, with conditions, on August 30, 1996. Revision 2.1 to the PA was issued in January 1998, implementing the conditions of acceptance of the 1996 PA. The LFRG reviewed Revision 2.1 as part of the Area 5 RWMS CA review during 2000, and found it acceptable. The CA and the Supplemental Information provided in response to issues identified during the initial review of the CA were accepted by the LFRG. The Supplemental Information (including the responses to four key issues) is included in the Review Team Report to the LFRG, which recommends that it be incorporated into the CA and issued to all known holders of the CA. The Area 5 RWMS DAS requires that the Supplemental Information generated during the DOE/HQ review of the CA be incorporated into the CA within one year of the date of issuance of the DAS. This report, the first addendum to the Area 5 CA, is prepared to fulfill that requirement. The Supplemental Information includes the following: Issues Identified in the Review Team Report; Crosswalk Presentation; and Maintaining Doses As Low As Reasonably

  12. Assessment of national systems for obtaining local acceptance of waste management siting and routing activities

    SciTech Connect

    Paige, H.W.; Lipman, D.S.; Owens, J.E.

    1980-07-01

    There is a rich mixture of formal and informal approaches being used in our sister nuclear democracies in their attempts to deal with the difficulties of obtaining local acceptance for siting of waste management facilities and activities. Some of these are meeting with a degree of success not yet achieved in the US. Although this survey documents and assesses many of these approaches, time did not permit addressing in any detail their relevance to common problems in the US. It would appear the US could benefit from a periodic review of the successes and failures of these efforts, including analysis of their applicability to the US system. Of those countries (Germany, Sweden, Switzerland, Japan, Belgium, and the US) who are working to a time table for the preparation of a high-level waste (HLW) repository, Germany is the only country to have gained local siting acceptance for theirs. With this (the most difficult of siting problems) behind them they appear to be in the best overall condition relative to waste management progress and plans. This has been achieved without a particularly favorable political structure, made up for by determination on the part of the political leadership. Of the remaining three countries studied (France, UK and Canada) France, with its AVM production facility, is clearly the world leader in the HLW immobilization aspect of waste management. France, Belgium and the UK appear to have the least favorable political structures and environments for arriving at waste management decisions. US, Switzerland and Canada appear to have the least favorable political structures and environments for arriving at waste management decisions.

  13. Long-Term Stewardship: Institutional Controls on Department of Energy Sites. Development and Management of Institutional Controls at U.S. Department of Energy Office of Legacy Management Sites

    SciTech Connect

    Schiesswohl, S.; Bahrke, C.; Deyo, Y.; Uhlmeyer, T.

    2007-07-01

    The U.S. Department of Energy (DOE) has managed the Long Term Stewardship and Maintenance activities at DOE sites since 1988. DOE's Office of Legacy Management (LM) was established in December 2003, and its specific mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody for legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. LM uses DOE Policy 454.1: Use of Institutional Controls (ICs) and Associated Guidance. Many major Federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs as part of efforts to appropriately limit access to, or uses of, land, facilities and other real and personal property assets; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. ICs generally fall into one of four categories identified by EPA guidance, and DOE is successfully using a 'defense in depth' strategy which uses multiple mechanisms to provide 'layering' for additional durability and protectiveness: - Proprietary controls - such as easements and covenants. - Governmental controls - implemented and enforced by state or local governments. - Enforcement and permit tools with IC components - such as CERCLA agreements or RCRA permits. - Informational devices - such as state registries or public advisories. An additional practice that supports ICs at LM sites entails the use of engineered controls, such as fences, gates, access controls, etc. to ensure public access to applicable areas is limited. An engineered control that is not an IC is the disposal cell itself with its design criteria that protects the contaminated interior, controls the penetration of precipitation, and the

  14. Capacitated location of collection sites in an urban waste management system

    SciTech Connect

    Ghiani, Gianpaolo; Lagana, Demetrio; Manni, Emanuele; Triki, Chefi

    2012-07-15

    Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the location of waste collection sites. In this paper, we propose an integer programming model that helps decision makers in choosing the sites where to locate the unsorted waste collection bins in a residential town, as well as the capacities of the bins to be located at each collection site. This model helps in assessing tactical decisions through constraints that force each collection area to be capacitated enough to fit the expected waste to be directed to that area, while taking into account Quality of Service constraints from the citizens' point of view. Moreover, we propose an effective constructive heuristic approach whose aim is to provide a good solution quality in an extremely reduced computational time. Computational results on data related to the city of Nardo, in the south of Italy, show that both exact and heuristic approaches provide consistently better solutions than that currently implemented, resulting in a lower number of activated collection sites, and a lower number of bins to be used.

  15. Geographic Information System Tools for Management of US DOE Sites - 13489

    SciTech Connect

    Carpenter, Cliff; Pilz, Elaine; Pawel, Steve

    2013-07-01

    The DOE Office of Legacy Management (LM) uses a variety of GIS tools to support long-term surveillance and maintenance (LTS and M) activities at DOE closure sites. These geo-spatial applications provide access to data both for external public viewing and for internal analysis and decision making. LM uses a custom geo-spatial application called geo-spatial Environmental Mapping System (GEMS) that draws validated information from a database of 4.6 million analytical results and 232,000 water level measurements for 58 LTS and M sites. These data were collected from transferred sites over a period of 40 years. The database is used to capture and store historical environmental information such as analytical chemistry data, groundwater depths and elevations, well logs, well construction data, geo-referenced boundaries, site physical features, and sampling locations from LTS and M sites. Stakeholders, regulators, and project personnel can use this Web-based application and data to display information in several forms, such as a tabular report, a graph, and a geo-spatial display, or the data can be labeled or highlighted in a map view. Institutional controls, with their LTS and M requirements and documentation, have recently been incorporated into a prototype GEMS Web page for the Weldon Spring, Missouri, Site. LM uses multiple internal GIS viewers to help ensure the future protection of human health and the environment. For example, at the Rocky Flats, Colorado, Site, LM uses a GIS application to display real property interests on authoritative maps. Another project is used to facilitate discussions at stakeholder meetings for the Rocky Flats site's Original Landfill. The Uranium Leasing Program uses multiple interactive maps that assist in ongoing monitoring and the oversight of lease-holders' activities. (authors)

  16. Digital lock-in detection of site-specific magnetism in magnetic materials

    DOEpatents

    Haskel, Daniel; Lang, Jonathan C.; Srajer, George

    2008-07-22

    The polarization and diffraction characteristics of x-rays incident upon a magnetic material are manipulated to provide a desired magnetic sensitivity in the material. The contrast in diffracted intensity of opposite helicities of circularly polarized x-rays is measured to permit separation of magnetic signals by element type and by atomic environment. This allows for the direct probing of magnetic signals from elements of the same species in nonequivalent atomic environments to better understand the behavior and characteristics of permanent magnetic materials. By using known crystallographic information together with manipulation of the polarization of x-rays having energies tuned near element-specific electronic excitations and by detecting and comparing the incident and diffracted photons at the same frequency, more accurate magnetic measurements can be made over shorter observation periods.

  17. Establishing Specifications for Low Enriched Uranium Fuel Operations Conducted Outside the High Flux Isotope Reactor Site

    SciTech Connect

    Pinkston, Daniel; Primm, Trent; Renfro, David G; Sease, John D

    2010-10-01

    The National Nuclear Security Administration (NNSA) has funded staff at Oak Ridge National Laboratory (ORNL) to study the conversion of the High Flux Isotope Reactor (HFIR) from the current, high enriched uranium fuel to low enriched uranium fuel. The LEU fuel form is a metal alloy that has never been used in HFIR or any HFIR-like reactor. This report provides documentation of a process for the creation of a fuel specification that will meet all applicable regulations and guidelines to which UT-Battelle, LLC (UTB) the operating contractor for ORNL - must adhere. This process will allow UTB to purchase LEU fuel for HFIR and be assured of the quality of the fuel being procured.

  18. Human factors in environmental management: New directions from the Hanford Site

    SciTech Connect

    Wise, J.A.; Savage, S.F.

    1992-10-01

    Environmental management is the general term given to modern attempts to seek technological solutions to certain constrained environmental problems. it involves developing and applying new technologies that respond to changes in environmental policy. It does not eliminate the need for environmental ethics'' in society. Nor does it substitute for the fundamental changes in political and social structures that are needed for dealing with large-scale environmental issues. The scope of these issues can be illustrated by looking at the Hanford Site. Since 1943, the 560-square-mile Hanford Site in southeastern Washington state has been the production source of much of the nuclear weapons-grade radioactive materials for the United States. The legacy of 50 years of producing fissile materials has been an environmental cleanup problem of impressive proportions. In 1989, with the Cold War winding down, Secretary of Energy James Watkins established a new vision for Hanford as the flagship for waste management research.'' As plans and preparations for cleanup work proceed at the Hanford Site and around the world, the need for well-orchestrated environmental management methodologies has become increasingly apparent. In 1990, a Human Factors Engineering Group was established in the Technology Planning and Analysis Center at PNL to provide appropriate support for the Laboratory's research efforts. At an ever-increasing rate, these research efforts require integrating human performance into complex environmental technology systems. The endeavor of responding to the Laboratory's research needs has provided innovative opportunities for the application of the concept of Human Factors. Discussed are some of the major applications of Human Factors to environmental management.

  19. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan - VOLUMES 1-3

    SciTech Connect

    Gerber, E.W.

    1996-09-23

    The US Department of Energy (DOE) has developed an Integrated Program Plan (IPP) to address concerns identified in Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The IPP describes the actions that DOE plans to implement at its various sites to convert excess fissile materials to forms or conditions suitable for safe interim storage. The baseline IPP was issued as DOE's DNFSB Recommendation 94-1 Implementation Plan (IP), which was transmitted to the DNFSB on February 28, 1995. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. These additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs supported formulation of the initial versions of the Integrated Facilities Plan and the Research and Development Plan. The SISMPs are periodically updated to reflect improved integration between DOE sites as identified during the IPP systems engineering evaluations. This document constitutes the Hanford SISMP. This document includes the planned work scope, costs and schedules for activities at the Hanford site to implement the DNFSB Recommendation 94-1 IPP.

  20. Low-level radioactive waste management: transitioning to off-site disposal at Los Alamos National Laboratory

    SciTech Connect

    Dorries, Alison M

    2010-11-09

    Facing the closure of nearly all on-site management and disposal capability for low-level radioactive waste (LLW), Los Alamos National Laboratory (LANL) is making ready to ship the majority of LLW off-site. In order to ship off-site, waste must meet the Treatment, Storage, and Disposal Facility's (TSDF) Waste Acceptance Criteria (WAC). In preparation, LANL's waste management organization must ensure LANL waste generators characterize and package waste compliantly and waste characterization documentation is complete and accurate. Key challenges that must be addressed to successfully make the shift to off-site disposal of LLW include improving the detail, accuracy, and quality of process knowledge (PK) and acceptable knowledge (AK) documentation, training waste generators and waste management staff on the higher standard of data quality and expectations, improved WAC compliance for off-site facilities, and enhanced quality assurance throughout the process. Certification of LANL generators will allow direct off-site shipping of LLW from their facilities.

  1. U.S. Department of Energy Environmental Management Site-Specific

    Energy.gov [DOE] (indexed site)

    the Assistant General Counsel for General Law...... 4 4. Office of the ... Office of the Assistant General Counsel for General Law The Manual requires that the ...

  2. ENVIRONMENT AL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD U.S. Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A full-time or permanent part-time DOE employee, appointed in accordance with agency procedures, will serve as the Designated Federal Officer (DFO or designee). The DFO (or ...

  3. ENVIRONMENT AL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD U.S. Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Board is being renewed in accordance with the provisions of the Federal Advisory Committee Act (F ACA), as amended, 5 U.S.C., App. 2. 3. Objectives and Scope of Activities. The ...

  4. Memorandum: Revised Guidance for the Office of Environmental Management Site Specific Advisory Boards

    Energy.gov [DOE]

    From: Assistant Secretary, Jessie H. Roberson (EM-1) To: SSAB Members (J. Bierer, T. Martin, M. Wilson, P. Claire, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters)

  5. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    -1 Region of Influence A site-specific geographic area in which the principal direct and indirect effects of the proposed actions are likely to occur. Cumulative Impact Impact on the environment that results from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions, regardless of what agency or person undertakes such other actions (40 CFR 1508.7). Reasonably foreseeable actions are ongoing and will continue into the future, are funded

  6. Technical specification for the Product Evaluation Management Information System (PREMIS) Version 1. 1. 2

    SciTech Connect

    Eaton, D.S.; Hall, R.C.; Orman, J.L.; Klamerus, J.

    1990-06-01

    This document contains the technical specifications and implementation details for the Product Evaluation Management Information System (PREMIS) Version 1.1.2. This document does not include the requirements analysis or design information and is not intended as a user's guide. The INGRES Applications-by-Forms (ABF) software development tool was used to specify and define the modules and screens which comprise the PREMIS application. Several external procedures are called by the ABF procedures; these have been written in VAX/VMS DCL (Digital Command Language) and SQL (Standard Query Language). These specifications together with the PREMIS information model and corresponding database definition constitute the PREMIS Version 1.1.2 technical specification and implementation description presented herein.

  7. Special Analysis of the Area 3 Radioactive Waste Management Site at the Nevada National Security Site, Nye County, Nevada

    SciTech Connect

    National Security Technologies, LLC, Environmental Management

    2012-09-30

    This report describes the methods and results of a special analysis (SA) of the Area 3 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The purpose of the SA is to determine if the approved performance assessment (PA) and composite analysis (CA) (Shott et al., 2001) remain valid. The Area 3 RWMS PA and CA were prepared as a single document and received conditional approval on October 6, 1999. A conditional Disposal Authorization Statement (DAS) for the Area 3 RWMS was issued on October 20, 1999. Since preparation of the approved PA and CA, new information and additional environmental monitoring data have been used to update the PA and CA. At the same time, continual advancements in computer processors and software have allowed improvement to the PA and CA models. Annual reviews of the PA and CA required by U.S. Department of Energy (DOE) Order DOE O 435.1 have documented multiple changes occurring since preparation of the PA and CA. Potentially important changes include: Development of a new and improved baseline PA and CA model implemented in the probabilistic GoldSim simulation platform. A significant increase in the waste inventory disposed at the site. Revision and updating of model parameters based on additional years of site monitoring data and new research and development results. Although changes have occurred, many important PA/CA issues remain unchanged, including the site conceptual model, important features, events, and processes, and the points of compliance. The SA is performed to document the current status of the PA/CA model and to quantitatively assess the impact of cumulative changes on the PA and CA results. The results of the SA are used to assess the validity of the approved PA/CA and make a determination if revision of the PA or CA is necessary. The SA was performed using the Area 3 RWMS, version 2.102, GoldSim model, the current baseline PA/CA model. Comparison of the maximum SA results with the PA

  8. U.S. DEPARTMENT OF ENERGY\tRulison Site\tENVIRONMENTAL MANAGEMENT...

    Office of Legacy Management (LM)

    ... Nevada Operations Office. 1977. Project Rulison Well Plugging and Site ... Teat Site Area, GASBUGGY Test Site Area, GNOME Test Site Area, EPA-402-R-02-007. ...

  9. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    SciTech Connect

    Not Available

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  10. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 OVERVIEW OF THE PUBLIC COMMENT PROCESS 1-1 SECTION 1 OVERVIEW OF THE PUBLIC COMMENT PROCESS This section of this Comment-Response Document (CRD) describes the public comment process for the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM EIS) and the procedures used to respond to public comments. Section 1.1 summarizes the organization of this CRD. Section 1.2 discusses the public comment process and the means

  11. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 1

    SciTech Connect

    McCormack, R.L.

    1995-08-01

    This document describes the plans of the Hanford Site for the safe interim storage of fissile materials. Currently, spent nuclear fuels reside in storage basins that have leaked in the past and are projected to leak in the future. Other problems in the basins include; sludge from decomposition, degraded cladding of fuel elements, and construction defects which make the basins seismically unsafe. This management plan describes the time and cost that it will take to implement a safe interim storage plan for the fissile materials.

  12. RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area C at the Hanford Site

    SciTech Connect

    Horton, Duane G.; Narbutovskih, Susan M.

    2001-01-01

    This document describes the groundwater monitoring plan for Waste Management Area C located in the 200 East Area of the DOE Hanford Site. This plan is required under Resource Conservation and Recovery Act of 1976 (RCRA).

  13. EIS-0245: Management of Spent Fuel from the K Basins at the Hanford Site- Supplement Analysis, Richland, Washington

    Energy.gov [DOE]

    The identification of, and subsequent changes to the Preferred Alternative for the Management of Spent Nuclear Fuel from the K Basins at the Hanford Site in Richland, Washington, are analyzed in...

  14. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    SciTech Connect

    S. E. Rawlinson

    2001-09-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  15. RCRA Assessment Plan for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    SciTech Connect

    Chou, C.J.; Johnson, V.G.

    1999-10-06

    A groundwater quality assessment plan was prepared for waste management area S-SX at the Hanford Site. Groundwater monitoring is conducted at this facility in accordance with Title 40, Code of Federal Regulation (CFR) Part 265, Subpart F [and by reference of Washington Administrative Code (WAC) 173-303-400(3)]. The facility was placed in assessment groundwater monitoring program status after elevated waste constituents and indicator parameter measurements (i.e., chromium, technetium-99 and specific conductance) in downgradient monitoring wells were observed and confirmed. A first determination, as allowed under 40 CFR 265.93(d), provides the owner/operator of a facility an opportunity to demonstrate that the regulated unit is not the source of groundwater contamination. Based on results of the first determination it was concluded that multiple source locations in the waste management area could account for observed spatial and temporal groundwater contamination patterns. Consequently, a continued investigation is required. This plan, developed using the data quality objectives process, is intended to comply with the continued investigation requirement. Accordingly, the primary purpose of the present plan is to determine the rate and extent of dangerous waste (hexavalent chromium and nitrate) and radioactive constituents (e.g., technetium-99) in groundwater and to determine their concentrations in groundwater beneath waste management area S-SX. Comments and concerns expressed by the Washington State Department of Ecology on the initial waste management area S-SX assessment report were addressed in the descriptive narrative of this plan as well as in the planned activities. Comment disposition is documented in a separate addendum to this plan.

  16. Consolidated Online Data Management Strategy in Support of Environmental Remediation Activities at the Dupont Chambers Works Formerly Utilized Sites Remedial Action Program (Fusrap) Site

    SciTech Connect

    Nelson, K.A.; Desai, N.B.; Samus, J.E.; Bock, G.O.

    2007-07-01

    The U.S. Army Corps of Engineers (USACE) has developed and implemented an innovative online data management application in support of site characterization and remediation activities at the DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) Site. The password-protected, web-based application was implemented to centralize project data, facilitate project communications, and provide a large and diverse group of project team members with access to the data and analytical tools they need to efficiently and effectively manage the ongoing characterization and remediation efforts. Centralizing resources using the online application and web-based strategy streamlines data access and communications, allowing the team to effectively keep the project on track while reducing the costs associated with data requests, data duplication, document review and retrieval, software requirements, and lapses in communication or data transfer. (authors)

  17. DNFSB recommendation 94-1 Hanford site integrated stabilization management plan

    SciTech Connect

    McCormack, R.L.

    1997-05-07

    In May 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued DNFSB Recommendation 94-1 (Conway 1994), which identified concerns related to US Department of Energy (DOE) management of legacy fissile materials remaining from past defense production activities. The DNFSB expressed concern about the existing storage conditions for these materials and the slow pace at which the conditions were being remediated. The DNFSB also expressed its belief that additional delays in stabilizing these fissile materials would be accompanied by further deterioration of safety and unnecessary increased risks to workers and the public. In February 1995, DOE issued the DNFSB Recommendation 94-1 Implementation Plan (O`Leary 1995) to address the concerns identified in DNFSB Recommendation 94-1. The Implementation Plan (IP) identifies several DOE commitments to achieve safe interim storage for the legacy fissile materials, and constitutes DOE`s baseline DNFSB Recommendation 94-1 Integrated Program Plan (IPP). The IPP describes the actions DOE plans to implement within the DOE complex to convert its excess fissile materials to forms or conditions suitable for safe interim storage. The IPP was subsequently supplemented with an Integrated Facilities Plan and a Research and Development Plan, which further develop complex-wide research and development and long-range facility requirements and plans. The additions to the baseline IPP were developed based on a systems engineering approach that integrated facilities and capabilities at the various DOE sites and focused on attaining safe interim storage with minimum safety risks and environmental impacts. Each affected DOE site has developed a Site Integrated Stabilization Management Plan (SISMP) to identify individual site plans to implement the DNFSB Recommendation 94-1 IPP. The SISMPs were developed based on the objectives, requirements, and commitments identified in the DNFSB Recommendation 94-1 IP. The SISMPs also supported

  18. INL Site FY 2010 Executable Plan for Energy and Transportation Fuels Management with the FY 2009 Annual Report

    SciTech Connect

    Ernest L. Fossum

    2009-12-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  19. An Evaluation of the Effectiveness of Local Site-Specific Advisory Boards for US Department of Energy Environmental Restoration Programs

    SciTech Connect

    Bradbury, J.A.; Branch, K.M.

    1999-03-12

    In the early 1990s, the US Department of Energy (DOE) undertook a major new effort to involve community stakeholders in decisions that would affect them and their communities and interests. An important component of this effort was the establishment of local Site-Specific Advisory Boards (SSABs) at 12 DOE environmental remediation sites. These boards were a formal representation of a change in the way DOE conducts its missions, adding consideration of community concerns and values to the Department's decision-making processes. DOE's purpose in creating the SSAB Initiative was to obtain broadly based, independent, consensus advice and recommendations on issues that have the potential to affect communities surrounding DOE sites, so that it could formulate policies that could be implemented with community consent. Because the boards represented a significant commitment by DOE to change its relationships with community stakeholders, the Department has conducted several assessments of the boards. In 1996 and 1997 a survey was administered to board members and others involved in the work of the boards (DOE/EM 0311, 1996; DOE/EM, 1997). As part of the first survey, DOE and the boards established a set of performance criteria. The surveys provided data that revealed wide variations in board performance and significant change over time. To gain a better understanding of the factors affecting board performance, DOE initiated a more in-depth, qualitative study of nine of the boards across the complex. This study focused on identifying and analyzing the factors affecting board performance and presenting that information in a format that helped the boards and DOE gain insight into their strengths and weaknesses and learn from one another. This report presents the results of this in-depth study. It begins with an overview report that identifies and discusses the six factors that were found to affect board performance. The overview report provides the framework and rationale for

  20. RCRA Assessment Plan for Single-Shell Tank Waste Management Area B-BX-BY at the Hanford Site

    SciTech Connect

    Narbutovskih, Susan M.

    2006-09-29

    This document was prepared as a groundwater quality assessment plan revision for the single-shell tank systems in Waste Management Area B-BX-BY at the Hanford Site. Groundwater monitoring is conducted at this facility in accordance with 40 CFR Part 265, Subpart F. In FY 1996, the groundwater monitoring program was changed from detection-level indicator evaluation to a groundwater quality assessment program when elevated specific conductance in downgradient monitoring well 299 E33-32 was confirmed by verification sampling. During the course of the ensuing investigation, elevated technetium-99 and nitrate were observed above the drinking water standard at well 299-E33-41, a well located between 241-B and 241-BX Tank Farms. Earlier observations of the groundwater contamination and tank farm leak occurrences combined with a qualitative analysis of possible solutions, led to the conclusion that waste from the waste management area had entered the groundwater and were observed in this well. Based on 40 CFR 265.93 [d] paragraph (7), the owner-operator must continue to make the minimum required determinations of contaminant level and rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.